Вы находитесь на странице: 1из 3

N O T E S

FOR GENERAL NOTES, LEGEND AND STANDARD


F
DETAILS REFER TO DRAWING NO. 00-74-D03

FUTURE CONNECTION
WITH END CAP

STORE-1

"P" TRAP
SHALLOW BEDROOM 1 DN
ACCESS
CHAMBER
KITCHEN

BEDROOM 2
N.
MI
UPVC,2%

STORE-2
EXPOSED
0m m

FTG
BATH 2
DISCHARGE STACK EXPOSED DISCHARGE STACK
1
A.1

DIA. 110 MM DIA. 110 MM


FAMILY HALL
DI

DIA. 110 MM
VENT PIPE
END CAP
W. C. LOBBY
BATH 1

1 FTG

00-74-D03

GENERAL REVISION
MAR. 2012 STANDARD DETAILS OMITTED AND F

INCLUDED IN DRAWING NO. 00-74-D03


PORCH
DISCHARGE STACK RELOCATED AND
MAY,2009 E
BEDIT OMITED

MAJLIS DRAWING REDRAFTED FROM A1 SIZE


FEB. 2005 D
TO FIT A3.

700 (MIN.) WASHING MACHINE LOCATED BACK TO ITS


JULY ’04 C
ORIGINAL LOCATION

JULY ’04 WASHING MACHINE LOCATION CHANGED B


UP
N.

GROUND FLOOR KITCHEN & TOILET-


MI

FEB. ’98 A
FLOOR GULLY CHANGED TO ’P’ TRAP.
N.
MI

UPVC,2%

PAVEMENT ISSUED FOR CONSTRUCTION


,2%
UPVC

ISSUED FOR TENDER


0m m
0m m

APP’D/DATE REVISIONS
A.1
1
A.1

DI
DI

FOR ALIGNMENT SEE


SEWER LAYOUT PLAN

KINGDOM OF BAHRAIN
MINISTRY OF HOUSING
P.O. BOX 5802,MANAMA,KINGDOM OF BAHRAIN ,TEL:+973 17 533000, FAX: +973 17 533836

BOUNDARY WALL

LIMIT OF CONTRACT 350

HOUSING PROJECTS PLANNING &


DESIGN DIRECTORATE

PROJECT NAME

PUBLIC DRAINAGE
PUBLIC DRAINAGE
INSPECTION CHAMBER
HOUSE TYPE - D5
INSPECTION CHAMBER
SERVING ONE HOUSE
SERVING TWO HOUSES DRAWING TITLE
˙ ˙ƪ

DRAINAGE LAYOUT

DESIGNED ˙ƪªª HEAD, ENGINEERING DESIGN˘ ˙Æ˚ªª ˙Æˇ


QAZI HEAD, DWELLING REHABILITATION

CHECKED ˙ƪ˙ FAREED


FARZANARADHI
AMIRI

1
2 FIRST FLOOR PLAN WALA CHIEF,DESIGN ˘ ˙Æ˚ªª
GROUND FLOOR PLAN DRAWN/CAD ˙Æ˙ª
SCALE 1 : 100 AHMAD
74-D01 SCALE
1 : 100 74-D01 ADEL BIN RAJAB

SHEET SIZE SCALE


ª˙ ˙ƪ
DATE
˙Æ˚˙˛
A 1
1 : 100 DEC. 1996

DRAWING NUMBER REVISION


ª ˙ƪ

D5-74-D01 F
N O T E S

FOR GENERAL NOTES, LEGEND AND STANDARD


L
DETAILS REFER TO DRAWING NO. 00-74-P03

15MM. PE PIPE
TO GROUND
WATER TANK

200MM. THICK
CONCRETE PLINTH

2
P 00-74-P03
PUMP
1 HP

POLYETHYLENE
WATER TANK
1000 LITER

GARDEN TAP

9 7
COMPOUND WALL

25MM. PE PIPE
TO WATER TANK
ON ROOF

KITCHEN
NE
LI
15m m .PE SUPPLY

GENERAL REVISION
MAR. 2012 STANDARD DETAILS OMITTED AND INCLUDED L
ON DRAWIN ON DRAWING NO. 00-74-P03

GENERAL REVISION AND


JAN. 2012 K
SECTION A-A ADDED

MAY, 2010 GROUND WATER TANK RELOCATED J

PIPE DUCT
ENCLOSURE MAY, 2009 BEDIT OMITED H

8
C
JULY, 2008 PEX PIPES CHANGED INTO PPR PIPES G

JUNE, 2007 GROUND WATER TANK & PUMP ADDED


F
2 2 AND PLUMBING REVISED ACCORDINGLY

PLUMBING REVISED TO SUIT PPR & PEX


TOILET FEB. 2007 PIPES & WATER HEATERS INCLUDED IN E
5 BATH-1 CONTRACT,
4
4 FEB. 2005 DRAWING REDRAFTED FROM A1 SIZE
6 D
TO FIT A3 .
6
PIPE DUCT
ENCLOSURE
AUG.2003 NOTE 12 ADDED RE: EXPANSION PIPES C

6 MAY 1998 STOP VALVE ADDED B


3 4

BATH-1 BATH TUB SHIFTED AND ONE WATER


MAR. 1998 A
WATER HEATER OMITTED IN FIRST FLOOR

1 MAJLIS 2
ISSUED FOR CONSTRUCTION
00-74-P03

ISSUED FOR TENDER

APP’D/DATE REVISIONS

KINGDOM OF BAHRAIN
MINISTRY OF HOUSING
P.O. BOX 5802,MANAMA,KINGDOM OF BAHRAIN ,TEL:+973 17 533000, FAX: +973 17 533836

WATER METER &


HOUSE STOP COCK
HOUSING PROJECTS PLANNING &
FROM W.D.D
DESIGN DIRECTORATE

PROJECT NAME

HOUSE TYPE-D5
1
2 FIRST FLOOR PLAN
GROUND FLOOR PLAN DRAWING TITLE
˙ ˙ƪ
1 : 100 74-P01 SCALE: 1:100
74-P01 SCALE

HOT/COLD WATER SUPPLY

DESIGNED ˙ƪªª HEAD, ENGINEERING DESIGN˘ ˙Æ˚ªª ˙Æˇ


HEAD, DWELLING REHABILITATION
QAZI

CHECKED ˙ƪ˙ FARZANA


FAREED RADHI
AMIRI

WALA
CHIEF,DESIGN ˘ ˙Æ˚ªª
DRAWN/CAD ˙Æ˙ª
AHMAD
ADEL BIN RAJAB

SHEET SIZE SCALE


ª˙ ˙ƪ
DATE
˙Æ˚˙˛
1:100 A 1 DEC.’96

DRAWING NUMBER REVISION


ª ˙ƪ

L
D5-74-P-01
N O T E S

FOR GENERAL NOTES, LEGEND AND STANDARD


F
DETAILS REFER TO DRAWING NO. 00-74-P03

POLYETHYLENE TANK ON ROOF


CAPACITY 1500 LITRE AT STAIR CASE

25mm BALL VALVE CLEAN OUT PIPE

(22mm )

25mm GATE VALVE

50mm
STAIRCASE ROOF
GATE VALVE

50MM. DIA
25MM. PE
PPR

WATER HEATER
WITH GRP COVER

CAPACITY 80
LITER (EACH)

1500L WATER TANK


ON 1400X2200mm
CONCRETE PLINTH

ROOF W1

3NO. WATER 32MM. DIA PPR WATER HEATER RELOCATED

MAR, 2012 STANDARD NOTES AND LEGENDS INCLUDED F


HEATERS WITH 32mm. PPR HOT WATER LINE
ON DRAWING NO. 00-74-P03

GRP COVER
COPPER PIPE REVISED TO PPR AND E
JAN. 2011
F 2
WATER TANK SPEC. REVISED

5
W1 4
6 JULY, 2009 GRP COVER ADDED D

32mm. PPR 6
ONE WATER HEATER OMITED AND
MAY, 2009 C
ROOF PIPES RELOCATED

32 BATH 1
m
m PR JULY, 2008 PEX PIPES CHANGED INTO PPR PIPES B
.P .P
1ST FL.
PR mm
25 GROUND
2 GROUND WATER TANK & PUMP ADDED
BATH 2 JUNE, 2007 A
3 WATER TANK AND PLUMBING REVISED ACCORDINGLY

25mm. PPR 32
m
m
7 .P ISSUED FOR CONSTRUCTION
PR

9
25mm. PPR ISSUED FOR TENDER

25mm. PPR
KITCHEN LIFT PUMP APP’D/DATE REVISIONS

8 REF. SECT. B-B


25
m
m
.P 25MM. PE PIPE
PR TO WATER TANK
GRD FL. m
m ON ROOF
2 TOILET
25 WALL MOUNTED WATER METER
4
25MM. DIA PPR 6 HOUSE (SEE NOTE 11)
HOT WATER LINE
STOPCOCK
KINGDOM OF BAHRAIN
MINISTRY OF HOUSING
15MM. PE PIPE P.O. BOX 5802,MANAMA,KINGDOM OF BAHRAIN ,TEL:+973 17 533000, FAX: +973 17 533836

TO GROUND
25mm. PPR
WATER TANK

FROM WDD MAIN

HOUSING PROJECTS PLANNING &


DESIGN DIRECTORATE

PROJECT NAME

HOUSE TYPE-D5
DRAWING TITLE
˙ ˙ƪ
1 ROOF PLAN
74-P02 SCALE 1:100
ROOF WATER SUPPLY LAYOUT
AND ISOMETRIC VIEW

DESIGNED ˙ƪªª HEAD, ENGINEERING DESIGN˘ ˙Æ˚ªª ˙Æˇ


QAZI

CHECKED ˙ƪ˙ FARZANA AMIRI

2 ISOMETRIC VIEW WALA


CHIEF,DESIGN ˘ ˙Æ˚ªª
DRAWN/CAD ˙Æ˙ª
74-P02 N.T.S AHMAD
ADEL BIN RAJAB

SHEET SIZE SCALE


ª˙ ˙ƪ
DATE
˙Æ˚˙˛
A 1 1 : 100 FEB. 2007

DRAWING NUMBER REVISION


ª ˙ƪ

D5 - 74 - P02 F