Вы находитесь на странице: 1из 8

LIST OF TESTS TO BE CONDUCTED ON VARIOUS EQUIPMENTS

SL. NO EQUIPMENT

1 CIRCUIT BREAKER-SWITCHYARD

2 ISOLATOR-SWITCHYARD

3 EARTH SWITCH-ISOLATOR

4 CURRENT TRANSFORMER-SWITCHYARD

5 EMVT-SWITCHYARD

6 CVT-SWITCHYARD

7 LIGHTNING ARRESTER-SWITCHYARD

8 EARTHING

9 POWER TRANSFORMER
9 POWER TRANSFORMER

10 INVERTER TRANSFORMER

11 AUXILARY TRANSFORMER

12 HT SWITCHBOARD/SWITCHGEAR
13 CONTROL & RELAY PANEL

14 OLTC & RTCC PANEL

15 AC HT CABLE

16 AC LT CABLE

17 ICOG PANEL (HT)

18 INVERTER

19 AC / DC DISTRIBUTION BOARD

20 BATTERY

21 CHARGER

22 SCADA SYSTEM

23 PLC SYSTEM
24 SCB

Note : Above mentioned tests are the minimum tests which are to be conducted at site. However, any other tests which may
needed to perform at site as per ACME engineer’s discretion/ site requirements/KPTCL requirement is also to be performed
vendor without any cost and time implication.
O BE CONDUCTED ON VARIOUS EQUIPMENTS

TESTS TO BE PERFORMED

CB TIMING TEST

CONTACT RESISTANCE MEASUREMENT

TRIP & CLOSE COIL RESISTANCE MEASUREMENT

INSULATION RESISTANCE MEASURMENT

CONTACT RESISTANCE MEASUREMENT

CONTACT RESISTANCE MEASUREMENT

MECHANICAL & EECTRICAL INTERLOCK CHECKS

POLARITY TEST

INSULATION RESISTANCE MEASURMENT

RATIO TEST

WINDING RESISTANCE MEASUREMENT

KNEE POINT VOLTAGE TEST

POLARITY TEST

RATIO TEST

INSULATION RESISTANCE MEASURMENT

WINDING RESISTANCE MEASUREMENT

POLARITY TEST

RATIO TEST

INSULATION RESISTANCE MEASURMENT

INSULATION RESISTANCE MEASURMENT

LA COUNTER CHECK

EARTH RESISTANCE MEASUREMENT

INSULATION RESISTANCE MEASURMENT

MAGNETIC BALANCE TEST

MAGENTIZING CURRENT TEST

VECTOR GROUP TEST

TAN DELTA TEST


VOLTAGE RATIO TEST

WINDING RESISTANCE MEASUREMENT

BDV TEST FOR OIL

FUNCTIONAL CHECKS FOR COOLER CONTROL CABINET

FUNCTIONAL CHECKS FOR MECHANICAL PROTECTION

INSULATION RESISTANCE MEASURMENT

MAGNETIC BALANCE TEST

MAGENTIZING CURRENT TEST

VECTOR GROUP TEST

VOLTAGE RATIO TEST

WINDING RESISTANCE MEASUREMENT

BDV TEST FOR OIL

FUNCTIONAL CHECKS FOR MECHANICAL PROTECTION

INSULATION RESISTANCE MEASURMENT

MAGNETIC BALANCE TEST

MAGENTIZING CURRENT TEST

VECTOR GROUP TEST

VOLTAGE RATIO TEST

WINDING RESISTANCE MEASUREMENT

BDV TEST FORO OIL

FUNCTIONAL CHECKS FOR MECHANICAL PROTECTION

CT TEST (POLARITY/RATIO/WR/IR)

PT TEST(IR/POLARITY/RATIO/WR)

CB TEST (TIMING/CRM/COIL RESISTANCE/SPRING CHRGE MOTOR)

ENERGY METER TEST(SEC INJ)

RELAY TEST(SEC INJ)

BUS BAR HIPOT

SCHEME CHECK

OPERATIONAL CHECK
SCHEME WIRING

COMPONENT HEALTHINESS

RELAY TEST

OPERATIONAL CHECKS

ENERGY METER TEST

FUNCTIONAL CHECKS

INSULATION RESISTANCE MEASURMENT

HIPOT TEST

IR

CT TEST (POLARITY/RATIO/WR/IR)

PT TEST(IR/POLARITY/RATIO/WR)

ENERGY METER TEST(SEC INJ)

RELAY TEST(SEC INJ)

BUS BAR HIPOT

LA TEST (IR)

SCHEME CHECK

OPERATIONAL CHECKS

IR OF BUS BAR

INVERTER TEST

INSULATION RESISTANCE MEASURMENT

SCHEME CHECK

OPERATIONAL INTERLOCK CHECK

COMPONENT HEALTHINESS CHECK

AS PER VENDOR RECOMMENDATION

HEALTHINESS OF COMPONENT

WIRING CHECK

OPERATIONAL CHECK
CABLE TIGHTNESS CHECK

VOC MEASUREMENT

ests which are to be conducted at site. However, any other tests which may be
s discretion/ site requirements/KPTCL requirement is also to be performed by