CONSTRUCTION OF PROPOSED PRIMARY LEARNING RESOURCE CENTER

AT CATHEDRAL BOYS SCHOOL COLOMBO 13.


Client :
Consultant :

QUALITY ASSUARANCE & QUALITY CONTROLLING DOCUMENT


Check list no: Date:
CONCRETE CHECK LIST

Structure : Schedule commencement :

Date : Element :

Signature Remark & Signature


No Item Description
(contractor) (consultant)
Pump car Adequate Yes/No
1 Conveyance system Crane & Bucket Adequate Yes/No
Truck mixture Adequate Yes/No
2 Stand by Arrangements Adequate Yes No
Surface Preparation at joints(if
3 OK Yes No
any)
Arrangements for pockets, Locations OK Yes/No
Pre concreting

4 Dimentions OK Yes/No
Drops & levels
Formwork Adequate Yes/No
Positions OK Yes/No
5 Embedment Details
Dimentions OK Yes/No
6 Cover arrangement for concrete Adequate Yes No
7 Cleanliness of surface area OK Yes No
8 Safety measures OK Yes No
Arrangement to access for
9 inspection area - Ladder Adequate Yes No
Arrangement to provide tent for
10 OK Yes No
concrete area
11 Arrangement for illumination OK Yes No
Slump OK Yes/No
1 Concrete Tests Cube casting Adequate Yes/No
2 Sequence of concreting OK Yes No
Pouring time

Arrangement for formwork


3 movements Adequate Yes No
4 Vibration Adequate Yes No
5 Leveling of Top surface OK Yes No
Arrangement for leakage of
6 Water/Grout Adequate Yes No
1 Arrangement for curing Adequate Yes No
2 Support for formwork Adequate Yes No
Post concrete

3 Finished Level of Concrete OK Yes No


Keep vertical alignment of
4 OK Yes No
column
Keep supports & F/W for
5 OK Yes No
required period
Comment note 1 :

Comment note 2 :

Comment note 3 :

……………………………. ………………………………
Engineer - Contractor Engineer - Consultant