The document provides calibration readings for an ultrasonic cable height meter before equipment moves. It lists check points to ensure the meter is accurately measuring heights of 15 meters and 50 feet. Signatures are required from both the EHS and operations departments to verify the calibration checks were completed successfully three times prior to route surveys.
The document provides calibration readings for an ultrasonic cable height meter before equipment moves. It lists check points to ensure the meter is accurately measuring heights of 15 meters and 50 feet. Signatures are required from both the EHS and operations departments to verify the calibration checks were completed successfully three times prior to route surveys.
The document provides calibration readings for an ultrasonic cable height meter before equipment moves. It lists check points to ensure the meter is accurately measuring heights of 15 meters and 50 feet. Signatures are required from both the EHS and operations departments to verify the calibration checks were completed successfully three times prior to route surveys.
Suparule - Cable Height Meter Calibration Readings
Rig Move: DATE: Location: Nimr Equip: Ultrasonic Date of Testing By: Tested By: Make/Model/Rating: Megger CHM 600 E Checklist Height Measured - 15 m / 50 ft Checks to be done at Before every Move Sr. No CHECK POINT CONDITION REMARKS Note 1 Reading 1 =
2 Reading 2 =
3 Reading 3 =
Signature of EHS Department & Date Signature of Operations Department
& Date Note: Other important Safety Measures 1. Checks to be done # 3 times before all Route Survey 2. Calibration Reading and Observations to be Noted