Daily Progress Report HSE

DATE 17/9/18

SL NO PROCESS EQUIPMENTS USED

1 installation of water tank ,condensded water tank Back hoe


1 excavation work-mannul & mechanical
2 shifitng of spoils , concrete works
Trucks /Transit mixer
3 hard barrication works & sign board fixing
4 shiftng of materials ,& survey works
2 MANPOWER OBSERVATIONS
subcontractor OIL PIPES
THANASING CHAUHAN It is observe that some of
labour -2 survior-1 helpers HSE PERSON the materials are stack near
2 0 to excavation this may
1 leads to cavin
operator -2 engineer-1 supervisor
1
total - 9 no
3 MEIL Employees CONTROL MEASURES
Remove all the from the
Civil HR Person HSE edge of excavtion
engineers-1 -1 PERSONS
1 2
DRIVER-1
ADMIN-1 DYM-1
2 PERSONEL PROTECTIVE EQUIPMENTS ISSUED NA
3 PERMIT RAISED -SPARK,CONFINED SPACE,VECHICLE ENTRY PERMIT

TODAY INDUCTION TBT MANNUL EXCAVTION


STATUS 0 CONDUCTED YES TOPIC
Prepared By
jithin shankar hse manager