NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.

: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

SPAN OF GIRDERS = 2.75 Metres C/C Spacing Of Girders = 0 Metres


WIDTH OF BRIDGE= 0 Metres Overhang Portion = 0 Metres
LENGTH OF DIAPHRAGM = 0 Metres C/C Spacing Of Diaph. = 0.00 Metres

NO. OF GIRDERS= 0

NO. OF DIAPHRAGMS= 0

COMPUTATION OF SECTION PROPERTIES

PROPERTIES OF MAIN GIRDER

CALCULATION OF EFFECTIVE FLANGE WIDTH

(i) be=Span/4.0
be= 688 mm

( ii ) be=12hf + bw or 1/2 Width of top flange

be= 140 mm

( iii ) be= C/C Spacing of Girder


be= 0 mm

Therefore Effective Flange Width = 0 mm


Reduced Effective Flange Width = 0 mm

INPUT DATA B1 St
Span 50m D2 INPUT
D3
B1 = 140 mm
D4 TOTAL DEPTH OF GIRDER
B2 = 140 mm ###
B4
B3 = 140 mm D SLAB
B3
B4 = 0 mm ###
D TOP FLANGE
St = 0 mm D1 ###
D1 = 140 mm D TOP TRIANGLE
D2 = 0 mm ###
D3 = 0 mm D TOP RECTANGLE
D4 = 0 mm ###
D5 = 0 mm D5 D TOP TRIANGLE
D6 = 0 mm ###
D6
###
B2 D BOTTOM TRIANGLE
###
D BOTTOM FLANGE
CONCRETE STRENGTH FOR SLAB = 24 Mpa = 3 Ksi
CONCRETE FOR GIRDER = 23 Mpa = 3.0 Ksi
CONCRETE FOR COMPOSITE SEC. = 24 Mpa = 3.0 Ksi

file:///conversion/tmp/scratch/398028472.xls
OUTPUT COMPOSITE SECTION ONLY GIRDER
AREA (Ax) = 19600 mm2 = 19600 mm2
AREA (Reduced) = 19600 mm2 = 19600 mm2
y' LOCATON OF N.A FROM BOTTOM = 70 mm = 70 mm
M.O.I (Ix) (Iz) = 32013333.3 mm4 = 32013333.33333 mm4
M.O.I (Iy) = 32013333.3 mm4 = 32013333.33333 mm4
SHEAR AREA (Ay) (Web) = 19600 mm2 = 19600 mm2
SHEAR AREA (Az) (Flang) = 0 mm2 =
SECTION MODULUS (BOTTOM) Zb = 0.0005 m3 = 0.0005 m3
SECTION MODULUS (TOP) Zt = 0.0005 m3 = 0.0005 m3

TORSIONAL CONSTANT 'C' FOR MAIN GIRDER


PART B T C B/T 3.2E­05
SLAB 0.00 0 0 #DIV/0!
TOP FLANGE #DIV/0! 0 #DIV/0! #DIV/0!
WEB 140 140 128053333 1.00
BOTTOM FLANGE #DIV/0! 0 #DIV/0! #DIV/0!
TOTAL #DIV/0! mm4

file:///conversion/tmp/scratch/398028472.xls
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

CALCULATION OF LOSSES

Span = 2.75 (m)

fc' = 3000 (psi)


fci' = 3000 (psi)

Es = 28000000 (psi)
193192561.795 (KN/m2)
Eci = 3320560.94659 (psi)
22891947.1658 Kn/m2
Girder Self Wt. Momemt Mo = 0.00 (T-m)
D.L.Moments(slab+diaph) Mdp= 0.00 (T-m)
D.L.Moments(w.surface+footpath+barrier) Mdc= 0.00 (T-m) From Model
Total Dead Load Moments Md = 0.00 (T-m)
Live Load Moments with Impact Ml = 0.61 (T-m) From Model

Effective Prestress Req'd= #DIV/0! (Tons)

Concrete Beam Section Data:

Sectional Area Ac = 0.0196 (m2)


Moment Of Inertia Ic = 0.0000 (m4)
Sectional Modulus Bottom Zb 0.0005 (m3)
Sectional Modulus Top Zt = 0.0005 (m3)

Composite Beam Section Data:

Sectional Area Ac = 0.0196 (m2)


Sectional Modulus Bottom Zbc 0.0005 (m3)
Sectional Modulus Top Ztc= 0.0005 (m3)
Moment Of Inertia Icc = 0.0000 (m4)

Prestress Cable Data: MID SECTION END SECTION

Breaking Load Fpu = 2.46 (Tons) Strong Hold Table


Jacking Force = 0.75*Fpu = 1.845 (Tons)

Wobble Coofficent, K = 0.0033 (per meter) ACI Code: for Grouted Tendons in metal
Curvature Coofficient, μ = 0.25 sheathing Wire Strand
Anchorege Set "∆ L"= 0.005 (m)
Relative Humidity RH = 50 %

Page 3 of 16
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

Eccentricity e = 0.000 (m) Tendon Vertical distance from bottom at mid Span
of Tendons for girder section only 1 2 3
Approx. Losses = 20 % 90 90 90
50 50 50 0
App no. of Strands = #DIV/0! 4 5 6 7

No.of Strands provided = 72 Tendon Vertical distance from bottom at end


1 2 3
No.of tendons = 6 15/0.5" 90 90 90
50 50 50 0
FRICTRION LOSSES 4 5 6 7

Pj = Px * ( 1 + K*L + μ*α ) stressing from 2 ends

Cable Length Dip Ap α K*L+μ*α Pj Px ∆P


by ACI
(m) (m) (m2) (rad) <=0.3 (Tons) (Tons) (Tons)

C1 2.75 0.000 #N/A 0.000 0.005 #N/A #N/A #N/A


C2 2.75 0.000 #N/A 0.000  0.005 #N/A #N/A #N/A
C3 2.75 0.000 #N/A 0.000  0.005 #N/A #N/A #N/A
C4 2.75 0.000 #N/A 0.000  0.005 #N/A #N/A #N/A
C5 2.75 0.000 #N/A 0.000  0.005 #N/A #N/A #N/A
C6 2.75 0.000 #N/A 0.000  0.005 #N/A #N/A #N/A
C7 2.75 0.000 #N/A 0.000  0.005 #N/A #N/A #N/A

Sum = #N/A #N/A #N/A #N/A

Av. Force at mid span after Friction Loss= #N/A (Tons)


= #N/A (KN)

Stress Loss due to Friction FR= #N/A (KN/m2)

Loss Of Prestress Force at midspan= #N/A (Tons) = #N/A %


#N/A (KN)

ELASTIC SHORTENING

ES=0.5 * Es/Eci * fcir #N/A 0.25


Note:- The value of cell "H" should
fcir = -Pi/Ac * ( 1 + e^2 / r^2 ) + Mo * e / Ic be the value of cell "G" untill
it becomes equal
= #N/A (KN/m2)

Stress Loss due to Elastic Shortening ES= #N/A (KN/m2)

Loss Of Prestress Force = #N/A (Tons) = #N/A %


#N/A (KN)

ANCHORAGE SLIP

Page 4 of 16
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

Length affected by Anchorage Slip W = SQRT(∆ L * Es * Ap / ∆P )

∆ P = (Pj - Px) / x

= #N/A (T/m)
#N/A (KN/m)

Length W = #N/A (m) from end

#N/A

Loss of Prestress Force = #N/A (Tons) = #N/A %


#N/A (KN)

CREEP OF CONCRETE

CRc = 12 * fcir - 7 * fcds

fcds = Md * e / Ic

= 0.00 (KN/m2)

Stress Loss due to Creep of Concrete CRc = #N/A (KN/m2)

Loss of Prestress Force= #N/A (Tons) = #N/A %


#N/A (KN)

SHRINKAGE OF CONCRETE

SH = 0.8 * ( 17000 - 150 * RH ) (psi)

Stress Loss due to Shrinkage of Concrete SH= 7600.00 (psi)


= 52437.98 (KN/m2)

Loss of Prestress Force= #N/A (Tons) = #N/A %


#N/A (KN)

Page 5 of 16
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

RELAXATION OF PRESTRESSING STEEL

Normal Relaxation Steel


For Normal Relaxation Steel Low Relaxation Steel

CRs = 20000 - 0.3 * FR - 0.4 * ES - 0.2 * (SH+CRc) (psi)

Stress Loss due to Steel Relaxation CRs = #N/A (psi)


#N/A (KN/m2)

Loss of Prestress Force = #N/A (Tons) = #N/A %


#N/A (KN)

TOTAL LOSSES

Total Immidiate Losses=Friction+Anchorage Set+Elastic Shortening

= #N/A (Tons) = #N/A %


#N/A (KN)

Total Time Dependant Losses=Creep+Shrinkage+Relaxation

= #N/A (Tons) = #N/A %


#N/A (KN)

Total Losses=Total immidiate+Total Time Dependant

= #N/A (Tons) = #N/A %


#N/A (KN)

Page 6 of 16
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009
STRESSES AT EXTREME FIBRES

Stage 1: At Yard

Pi = #N/A (KN) : minus sign indicates Tension

Ft = Pi/Ac - Pi*e/Zt + Mo/Zt = #N/A (KN/m2) #N/A psi

Fb = Pi/Ac + Pi*e/Zb - Mo/Zb = #N/A (KN/m2) #N/A psi

allowable tension = -1133.7 (KN/m2) -164.43 psi


allowable compression = 11384.5 (KN/m2) 1651.19 psi
Stage 2: Intermediate Condition

Pe = #N/A (KN)

Ft = Pe/Ac - Pe*e/Zt + (Mo + Mdp)/Zt = #N/A (KN/m2) #N/A psi

Fb = Pe/Ac + Pe*e/Zb - (Mo + Mdp)/Zb = #N/A (KN/m2) #N/A psi

Stage 3: At Service Loads

Pe = #N/A (KN)

Ft = Pe/Ac - Pe*e/Zt + (Mo + Mdp)/Zt + (Mdc+Ml)/Ztc = #N/A (KN/m2) #N/A psi

Fb = Pe/Ac + Pe*e/Zb - (Mo + Mdp)/Zb - (Mdc + Ml)/Zbc = #N/A (KN/m2) #N/A psi
: minus sign indicates Tension

allowable compression = 8279.6 (KN/m2) 1200.86 psi


allowable tension = -2267.5 (KN/m )2
-328.87 psi

Page 7 of 16
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

CALCULATIONS OF FLEXURAL STRENGTH

M D.L = Moment due to all dead loads including selfweight = 0.00 Ton-m
of girder
M L.L = Moment at mid span due to live load = 0.61 Ton-m Live + Impact

Mu = 1.3(M deadload + 1.67M liveload) = 1.32 Ton-m

b = top flange width of Composite Section = 0.000 m = 0.00 inches


b' = web width of a Girder Section = 0.140 m = 5.51 inches
h = Total height of Girder Section = 0.365 m = 14.37 inches
t = Thickness of compression flange i.e deck slab = 0.000 m = 0.00 inches

As* = Area of prestressing steel = #N/A inches2 = #N/A m2


As = Area of non prestressing tension steel = 1.83 inches2

d* = Prestressing steel centroid from bottom at mid point = 0.070 m = 2.76 inches
d = Effective depth from top to prestressing steel centroid = 11.61 inches at mid section

fs' = ultimate tensile strength of prestressing steel = 250.00 Ksi


fsy = yield strength of non prestressing steel = 60.00 Ksi
fc' slab = concrete strength of deck slab at 28 days = 3.48 Ksi
fc' girder = concrete strength of girder at 28 days = 3.00 Ksi

fc' composite = concrete strength of composite section = 5.00 Ksi

γ* = factor for type of prestressing steel = 0.40 for normal relaxation steel
β1 = factor for concrete strength = 0.80
Ø = capacity reduction factor = 0.90 for post-tensioned cast in place concrete

p* = prestressing steel ratio = As*/(bd) = #N/A

fsu* = stress in prestressing steel at ultimate loads = #N/A Ksi


= fs'{1-γ*/β1(p*fs'/fc'composite)}

Asf = steel area for flange overhang portion = 0.85fc'slab(b-b')t/fsu* = #N/A inches2
Non prestressed tension reinforcement included (included / not included)
Asr = steel area for web = As*+(Asfsy/fsu*)-Asf = #N/A inches2
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

Check:
Reinforcement Index = Asr fsu*/(b'd fcgirder) = #N/A
0.36 β1 = = 0.29 #N/A

When Reinf. Index > 0.36β1


Eq.1: ØMn = Ø((0.36β1-0.08β12)fc'b'd2+0.85fc'(b-b')t(d-0.5t)) = 475.4 K-in = 5.5 Ton­m

Depth of N.A. = (Asr fsu*)/0.85fc'composite b' = #N/A inches = #N/A m


#N/A

When depth of N.A. > thickness of flange i.e. it lies in web


Eq.2: ØMn = Ø(Asrfsu*d(1-0.6(Asr fsu*/(b'df'c)) #N/A K-in = #N/A Ton­m
+0.85fc'(b-b')t(d-0.5t))

When depth of N.A. < thickness of flange i.e. it lies in flange


Eq.3: ØMn = Ø(As*fsu*d(1-0.6(ρ* fsu*/f'c)) #N/A K-in = #N/A Ton­m

Therefore Moment Capacity of Section = ØMn = #N/A K-in = #N/A Ton­m


#N/A Mu #N/A
Moment to be resisted by non prestressed reinforcement = #N/A K-in = #N/A Ton­m
#N/A
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

CALCULATIONS FOR SHEAR

V L.L = For live load at critcal section from face = 52.00 Ton From Model
Vgirder+Vslab = For Dead load at critcal section from face = 106.00 Ton From Model
Vslab = For slab load at critcal section from face = 0.00 Ton
Vsdl = For superimposed dead loads = 20.00 Ton From Model
at critcal section from face
ML.L = For live load at critcal section from face = 160.00 Ton - m From Model
Mgirder = For girder load at critcal section from face = 0.01 Ton - m
Mslab = For slab load at critcal section from face = 0.00 Ton - m
Msdl = For superimposed dead loads = 60.00 Ton - m From Model
at critcal section from face
b' = Thickness of web of the girder = 0.140 m = 5.51 inches
d = 0.8 h = 0.292 m = 11.50 inches

fc' = Concrete strength of girder = 3,000 Psi


fsy = Steel strength = 60,000 Psi
Md = ( girder + slab) = 0.01 Ton - m
V dead load = V girder + V slab = 106.00 Ton
Vu = 1.3(V dead load + 1.67xV live load) = 276.69 Ton = 609.83 Kips

Vi =1.3(V dead load + V sdl + 1.67x VL.L) - (V dead load + Vsdl) = 150.69 Ton = 332.13 Kips
= 332125.17 lbs

Total height of composite section = 0.365 m = 14.37 inch


x = distance from end to the critical section = 0.365 m
y = centroid of tendons from bottom at critical section = #N/A m

d = distance of centroid of girder section from bottom = 0.070 m


e = d-y = #N/A m
pe = #N/A kN = #N/A tons
fpe = pe / Ac + pe * e / Zb = #N/A Ton /m2 = #N/A k/ft2
= #N/A lbs/in2

fd = stress due to unfactored dead loads = Md / Zb = 131225.74 Ton /m2 = 26866.94 k /ft2
= 186594.91 lbs/in2

Mcr = I / Yb ( 6 ( fc' )1/2 + fpe - fd ) = #N/A Ton-m = #N/A kip- feet

Mmax = 1.3 (Md + Msdl + 1.67 M L.L) - (Md + Msdl) = 365.36 Ton - m = 2642.07 kip- feet
= 3.170E+07 lb - in

Vci = 0.6(fc')1/2 b'd + Vd + Vi (Mcr/Mmax) = #N/A Tons = #N/A kips

Check: 1.7(fc')1/2b'd = 2.68 Tons #N/A


NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

fpc = Pe/Ac = #N/A Ton /m2 = #N/A k /ft2

Vp = Vertical component of effective prestress force = #N/A Ton = #N/A kips


=
Vcw = (3.5(fc')1/2 + 0.3 fpc)b'd + Vp = #N/A Tons = #N/A kips

Shear Strength provided by concrete = lesser of Vci & Vcw = #N/A Tons = #N/A kips
Ø Vc = #N/A Tons = #N/A kips

Vu = 276.69 Tons = 609.83 kips


VS = Vu - Ø Vc = #N/A Tons = #N/A kips

VS Should not be taken greater than 8(fc')1/2b'd


8(fc')1/2b'd = 12.60 Tons = 27.76 kips
VS #N/A 8(fc')1/2b'd #N/A

Area of shear reinforcement provided/leg = 0.20 in2


No. of shear reinforcement legs provided = 2 Nos.
s = Avfyd/Vs (USING #4 FOUR LEGGED STIRRUPS) = #N/A in = #N/A mm

When VS exceeds 4(fc')1/2b'd


4(fc')1/2b'd 6.30 Tons = 13.88 kips

CRITERIA FOR MAXIMUM SPACING


i ) Spacing should not be greater than = #N/A inches
ii ) Spacing should not be greater than 0.75h = #N/A inches
iii ) Spacing = Av fsy/50b' ( if Av = 0.4 in) = 85.34 inches

s required (Min. of Three & s calculated) = #N/A inches c/c = #N/A mm

CHECK FOR HORIZONTAL SHEAR


bv = width of girder section at top = 0.14 m = 5.51 inch
d = 0.8h (h is total depth of girder puls slab) = 0.29 m = 11.50 inch
Vnh = 80 bv d = 2.30 Tons = 5.07 kips

Ø Vnh = 1.95 Tons = 4.31 kips


Vu = 276.69 Tons = 609.83 kips

Vu>fVnh stirrups of pre cast girder must be extend into the deck slab
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

CALCULATIONS FOR END BLOCK REINFORCEMENT

Jacking Force in Cable = Pj = #N/A Tons


Effective Force after Losses = Pe = #N/A Tons

fc' of girder = 2110.01 Ton /m2 = 3000 lbs/in2


fci' i.e conc. Strength at jacking = 2110.01 Ton /m 2
= 3000 lbs/in2
fy = 42200.21 Ton /m 2
= 60000 lbs/in2
Height of girder = 0.14 m

Try Size of Anchorage Plate (Square) = 300 mm


Dia of Sheathing (hole) = #N/A mm
Size of symmeterical concrete block
around anchorage plate = 360 mm

Anchorage Plate Area = A1 = #N/A m2


Concrete block Area = A2 = 0.1296 m2

Check at Service Loads:

After Losses Bearing Stress = Pe / A1 = #N/A Ton /m2 = #N/A lbs/in2


Allowable Anchorage Bearing Stress = 2110.0 Ton /m 2
= 3000.0 lbs/in2
#N/A

Check at Ultimate Loads:

At Jacking Bearing Stress = 1.15 Pj / A1 = #N/A Ton /m2 = #N/A lbs/in2

Allowable Bearing Stress at Jacking =


i) 0.8 fci' ( A2 / A1 - 0.2 )1/2 = #N/A Ton /m2 = #N/A lbs/in2
ii) 1.5 Ø 0.85 fci' ( A2 / A1 ) 1/2
= #N/A Ton /m 2
= #N/A lbs/in2

Minimum of the two #N/A Ton /m2 = #N/A lbs/in2


but should be less than 1.25 fci' = 2637.5 Ton /m 2
= 3750.0 lbs/in2
#N/A
#N/A

After Losses Bearing Stress = 1.15 Pe / A1 = #N/A Ton /m2 = #N/A lbs/in2

Allowable Bearing Stress after Losses =


0.6 fc' ( A2 / A1 )1/2 = #N/A Ton /m2 = #N/A lbs/in2
but should be less than fc' = 2110.0 Ton /m 2
= 3000.0 lbs/in2
#N/A
#N/A

Ref. Stronghold Brocheure


1/2 of symmeterical concrete block = Yo = 180 mm
1/2 of steel anchor plate = Ypo = 150 mm
Ypo / Yo = 0.833
Bursting Force/Jacking Force = Fbst / Pk = #N/A From Table II Stronghold Brochure
Area of Steel = As = Fbst / ( 0.9 fy ) = #N/A m2 = #N/A in2
Horizontal and Vertical over a Length of 2Yo = 360 mm from face behind each anchor

Height of Plate/Height of Girder = hb / h = 2.1429 < 0.2 Use other formula


T = 0.3 Pj ( 1- hb / h ) = #N/A Tons
Area of Steel = As = T / ( 0.32 fy ) = #N/A m2 = #N/A in2
Vertical Stirrups only over a Length of h = 140 mm from face
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD. Job No.: 2778
Project: ERRA By: MM
Subject: Prestressed Girder 50 m span Chk.: BF
Date: APRIL. 2009

SUMMARY OF PRESTRESSING RESULTS

TABLE - 1 JACKING FORCE = #N/A


DATA FOR GIRDER Extension
Tendon
at each
no. END 0.00 0.05L 0.1L 0.15L 0.2L 0.25L 0.3L 0.35L 0.4L 0.45L 0.5L end
Z #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
1 #N/A
Y 0 0 0 0 0 0 0 0 0 0 0
Z #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
### #N/A
Y 0 0.000 19 39.0 58 78 97 117 136 156 175
Z #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
### #N/A
Y 0 0.000 -19 -39.0 -58 -78 -97 -117 -136 -156 -175
Z 0 0 0 0 0 0 0 0 0 0 0
0 #N/A
Y 0 0 0 0 0 0 35 70 105 140 175
Z 0 0 0 0 0 0 0 0 0 0 0
0 #N/A
Y 0 0 0 0 0 0 -88 -88 -88 -131 -175
Z 0 0 0 0 0 0 0 0 0 0 0
0 #N/A
Y 0 0 0 0 0 0 0 0 0 0 0
0

No. of Strands per Tendon = 15/0.5"

TABLE - 2
ANCHORAGE RECESS DATA
TENDON NO. ANGLE X (mm)
1 0°00'00'' 0
2 0°00'00'' 0
3 0°00'00'' 0
4 0°00'00'' 0
5 0°00'00'' 0
6 0°00'00'' 0
sequence of stressing

112.5
51
DEFLECTION CALCULATIONS

Span of Girder = 2.75 m


Dead loads
Self Weight = 0.4614624 kN / m
Weight of Slab + Diaphragm = 0 kN / m
Weight of w.surface + footpath + barrier = 0 kN / m
Total Imposed Dead Load = 0 kN / m
Total Dead Load = 0.4614624 kN / m
Live Loads
Live Load = 6.3302876 kN / m
Live Load with Impact = 6.3302876 kN / m
Deflections
Deflection due to Self Weight = 5 * Wo * L^4 / 384 / Ec / Ic
= 0.468913 mm
Deflection(Camber) due to Initial Prestress = 5 * Pe * e * L^2 / 48 / Ec / Ic
#N/A mm
Net Deflection(Camber) at Transfer = #N/A mm
Deflection due to Super Imposed Dead Load = 5 * Wd * L^4 / 384 / Ec / Icc
= 0 mm
Total Dead Load deflection = 0.468913 mm
Deflection due to Final Effective Prestress = 5 * Pe * e * L^2 / 48 / Ec / Icc
#N/A mm
Net Deflection without Live Load = #N/A mm
Total Live Load Deflection = 5 * Wl * L^4 / 384 / Ec / Icc
= 6.4324936 mm
Final Deflection at Service Load Stage ( without LL) #N/A mm
Final Deflection at Service Load Stage ( with LL) #N/A mm
Allowable Service Live load Deflection = L / 800
including Impact
= 3.4375 <
NS

384 / Ec / Ic
Downward
2 / 48 / Ec / Ic
Upward
Upward
384 / Ec / Icc
Downward
Downward
2 / 48 / Ec / Icc
Upward
Downward
384 / Ec / Icc
Downward
Downward
Downward

6.43 Not ok