Вы находитесь на странице: 1из 1

M/S SHRIRANG P.

PANDE
ENGINEERS & CONTRACTORS
Flat No. G -1, Kalpana Apartment,
Ph. No. 9822561645 Plot No. 39 -40, Atreylayout,
0712-6459608 Pratapnagar, Nagpur – 440022

Ref. : Date :

(Based on IS 8009 (Part I) – 1976)


Settlement Criteria
NAME OF WORK : GEOTECHNICAL INVESTIGATION FOR VARIOUS BRIDGES
FOR PROJECT NH 353 C SAKOLI TO BHANDARA IN
STATE OF MAHARASHTRA.

LOCATION : BH. NO.1


SPT ‘N’ value observed = 100
Depth of footing (D) = 1.5 mt.
Corrected N for dialatancy =15+1/2(100 -15)(From clause no 3.6.2 of IS 2131- 1981)
= 57.5
Width of footing (B) = 3.0
Settlement for 1 kg/cm 2 load from fig. 9 of IS 8009 Part I
Assumed Water table below foundation level d=0 B=2.5 =d/B =0.0/2.5=0
(Adopted water table correction W ’ = 0.5)
= 0.0045 m
= 4.5 mm
= 9 mm (After applying W’)
Permissible settlement = 50 mm. (As per IS 1904 -1986 clause 16.3.4 Table 1)
Therefore allowable Bearing Pressure = Permissible Settlement / Settlement
as per Fig 9
= 50/9
= 5.55 kg/cm 2 = 55.5 T/m 2

_____________________________________________________________________________
Geotechnical Services
*Soil Investigations *Pile Load Tests *Plate Load Tests
* Epoxy and Polyurethane Grouting