Академический Документы
Профессиональный Документы
Культура Документы
Technical Specification
for
Type TL-ATS
for
H:\gil_work\crarnes & systems\spreaders\STS TwinLift\\חומר טכני למכרז2017 \רכש ספרדר כפולTL-ATS-STS tender version 01072017.docx
Table of Contents
1. General
2. Main operational and technical demands
3. Design criteria
3.1. General
3.2. Classification
3.3. Structure and mechanical system
3.4. Materials
3.5. Corrosion protection
3.6. Hydraulic system
3.7. Electrical system
3.8. Spreader – Head-block (crane) connections
3.9. Maintenance consideration
4. Design review and appraisal
5. Shop work
5.1. General
5.2. Structure
5.3. Cleaning and painting
6. Quality assurance and quality control (QA &QC)
7. Technical documentation
8. Training of maintenance personnel
9. Final tests and acceptance
10. Warranty
11. Auxiliary equipment
12. Timetable
1. General
The Long Twin Lift Automatic Telescopic Spreader (TL-ATS) is intended for use on Ship
To Shore Container Cranes (STS-SPP) in single and twin lift operation. The TL-ATS
shall be suitable for handling 20’, 2X20’, 40’, ISO standard containers.
Long Twin refers to spreader's ability, once lifting two 20' containers, to separate them
from each other.
The contractor shall furnish all appliances and/or accessories that are necessary for the
proper performance of the spreader, whether detailed or not in the drawings, called for in
the specifications, or shown on the data sheet.
Extend / retract automatic system to adjust its length to handle 20’and 40’, plus
spacing adjustment for 45’ and 2x20’ ISO containers in 40’ or 45’ positions (“long twin”
feature).
Automatic twist locks operation for use with ISO standard containers.
Automatic twist locks operation for twin lift operation. (Twin lift unit).
Retractable corner guides.
The locking and unlocking functions of the twist locks shall be controlled from the
operator cabin and integrated with the crane control. In addition, the twist locks
assembly shall be provided with mechanical safety devices:
To prevent the closing of the twist locks unless the spreader is well seated in the
container pockets.
To prevent the opening of the twist locks if a container is hanging in midair and slack
rope signal does not persist.
Rotation of the twist locks shall take maximum two (2) seconds.
A solution should be provided for the easy and quick release of the twist locks in case of
electrical / hydraulic failure or when the spreader is stuck in the container pockets.
The twin lift unit shall be designed for handling of two 20’ containers with a height
difference of 6”.
2.6. Indications
Indication signals shall be provided and installed on the spreader, displaying the status
of twist locks.
Twist locks closed - Green lamp.
Twist locks open - Red lamp.
Spreader seated - Blue lamp.
Spreader in twin lift mode - White lamp.
The signal lamps shall be LED type and shall be fixed to the spreader through a
suspended bracket designed to withstand vibration and acting as shock absorbers. Final
location of signal lights will be determined during DR phase. Up to two signal light sets
shall be installed on the spreader.
The control of the corner guides shall be from the operator’s cabin. The operator shall be
able to control all of them simultaneously and each one of the guides separately. The
flippers shall retract automatically whenever the twist locks are locked onto a container.
Time for up/down movements, of all four corner guides, shall be maximum 7 secs.
The Corner guides shall always be kept under pressure to overcome shock loads.
On-board PLC.
Manual pump (can be detachable).
Shock absorbers for the twist-locks.
Twin 20’ detection signaling element to prevent lifting of 2X20’ containers with 40’
spreader position.
Height detection system – to slow down operation before landing on a container
Reserve power in the telescoping and twist lock functions for operation together with
an automatic telescopic Over-Height Frame such as TOF by Sort & Store, Germany.
Auxiliary equipment as described in clause 11 of this spesification
3. Design Criteria
3.1. General
Unless otherwise mentioned the design, construction and equipment shall conform to
the following regulations, standards and codes:
AWS - American Welding Society.
ASTM - American Society for Testing Materials.
EN - European Norm.
FEM - Federation European de la Manutantion.
IEC - International Electrotechnical Committee.
ISO - International Standards Organization.
SSPC - Steel Structure Painting Counsel.
VDE - Verband Deutscher Elektrotechniker.
ILO - International Labor Organization.
In case of any difference between standard/code demands and this specification, the
contents of the specification will prevail
All bolted connections shall be maintenance free and positively secured to susceptibility
against vibrations.
3.2. Classification
The classification of the spreader calculated to the SWL of 40/55 ton, shall be in
accordance with the FEM rules 1.001 3rd edition revised 1/10/1998:
The spreader corners shall protrude at least 100 millimeter below the spreader structure,
to enable handling of distorted containers.
The bottom of the spreader shall be specially reinforced and protected against
operational damages.
Ladders shall be provided at the spreader sides for climbing up to the human cage,
which is located on the crane head block and for maintenance.
Power chain (steel type preferred) may be used for the telescoping motion and for
protection of moving parts.
3.4. Materials
All materials and equipment shall be new, of the highest grade, free from defects and
shall conform to the applicable specifications and requirements of this specification.
Steel grades will be selected according to FEM paragraph 3.1.
Load bearing structure - Only killed steel will be used for the load bearing structure.
Steels will be purchased from manufacturers listed in the “approved manufacturers list”
of a classification company. The steels will be delivered with certificate 3.2 as in EN
10204.
A classification company will act as the purchaser's authorized representative (to be
approved by HPC). All relevant costs will not be borne by the HPC.
Other uses - These steels will be delivered with certificate 3.1.
The system shall be design with a pressure service factor of minimum 2. The designed
operation pressure shall not exceed 150 bar. All parts shall be heavy duty type. Cylinders’
rods shall be chrome plated.
Filters shall be provided. Filter elements shall be disposable type. A mechanical clog
indicator shall be provided.
The terminal box shall be of stainless steel grade A4 (316) or PVC, with IP55 degree of
protection. The box shall be positioned at the side of the spreader so that it is easily
accessible when the spreader is connected to the crane. The box will not protrude
outside of the spreader frame lines.
The box will have a hinged door open upwards with an automatic lock /unlock device
(top hinges). The door shall have a locking handle or a latch.
Wiring diagram in laminated form shall be attached on the inside of the door.
Solenoid valves voltage shall be 230V/24V. Push button shall be provided on the
solenoids to enable local manual operation. The electrical connection of the solenoid
valves shall be by plug-in connectors with indication lights.
Electrical cables shall comply with VDE 0250 standard, with maximum allowed
operating temperature of 900C, oil and acid resistance. Minimum cross section area
shall be 2.5/mm2. Cross section 1.5/mm 2 may be used where it is practical (low current,
voltage drop limitation, physical dimension of equipment and components).
The electrical components, cables and wires shall have marking as commonly practiced
in electrical system. Method to be approved by HPC.
5. Shop work
5.1. General
All structural, mechanical, hydraulic and electrical work shall be performed by, or directly
supervised, by qualified and skilled personnel.
5.2. Structure
Metal cutting, weld preparation, welders' certification, welding procedures and welding
quality assurance shall meet the requirements of the relevant ISO standards, or the
requirements of AWS D1.1 and AWS D14.4.
Intermitted welds and overhead welding shall not be used.
Plates thicker than 30 mm shall be ultrasonically tested for lamination and discontinuity.
Structural parts shall be jig welded and jig drilled to assure accurate fit-up.
5.3. Cleaning and painting.
The paint system is a re-coatable epoxy paint system based on Ameron B.V. paints.
Alternative paints and / or paint system may be suggested by the supplier, subjects to
HPC approval.
Paints manufacturer instructions should be strictly followed.
The cleaning and paintwork shall be executed in the shop, prior to the installation and
assembling of the components on the spreader.
Surface preparation and cleaning
All welds spatter, slags etc. shall be thoroughly removed and sharp edges rounded off.
The spreader structure shall be dry-shot or grit blasted to cleanliness grade Sa 2½
according to ISO 8501 and roughness grade Medium S according to ISO 8503.
Dust, oil, grease and dirt shall be cleaned with viscous emulsion cleaner Ameron 57,
washed with high-pressure tap water and dried completely prior to the application of the
first coat.
Painting system
Strip coat
Corners, plates’ edges and all welds, shall receive one strip-coat of Zinc rich epoxy
paint Amercoat 68, by brush (satin). DFT = 50.
Strip coat to cover 2-3 cm. on each side of the edge. Repair coat shall be applied to 5-6
cm. on all sides of the welded areas.
Quality plan
The supplier shall issue the Quality Plan in a comprehensive programmed
file. The file will include all the information and data referring to the QA and
QC, for material and components purchasing, manufacturing, assembly,
inspection, commissioning and testing, including activities, procedures,
instructions, etc.
The file shall be reviewed and approved by the HPC prior to start of
fabrication.
Painting inspection
The supplier shall keep painting inspection report. The inspection report
shall include the testing according to ISO 12944-7 – “Execution and
supervision of paint work”.
Inspection of the paintwork shall be executed in the shop, prior to the
installation and assembling of the components on the spreader.
7. Technical documentation.
7.1. General
All documentation and correspondence shall be in English.
The technical documents shall be bounded in a durable loose-leaf binder. Additionally,
all documentation will be submitted on magnetic media (CD).
The documentation mentioned below shall be comprehensive to include all the relevant
information that may be required in case of maintenance, break down or a failure in the
structure / mechanical / electrical part.
Thus, HPC personnel will be able to refer to the documentation, to obtain spare parts
data or any technical information required for the repair, maintenance or to order of the
required parts from the OEM without being compelled to dismantle the component.
The documents may be used also for training of maintenance personnel.
be kept in the HPC stores. The list shall be prepared on the basis of the complete list of
parts and on delivery time, quantity installed, etc. Prices and delivery time shall be noted
in the list. The list shall include complete units as well as a breakdown to single items
and components.
Reference to each component and its parts breakdown as applicable shall appear in the
maintenance manual.
Lubrication
This chapter will include (minimum requirements):
Lubrication chart showing all points to be lubricated, type of lubricant/oil to be
used for each point and recommended frequency for re-lubrication / oiling.
Lubricants list with equivalent Israeli lubricants. Only lubricants approved by the HPC
will be used.
Maintenance personnel instructions and training will be given to electric and mechanic
technicians groups. Each training session shall last two – three days. offer should
include at least 5 training sessions for each profession (electric / mechanic) – total of
min. 10 sessions.
10. Warranty
11. Auxiliary equipment to be supplied with the spreader (as long it is not exists)
Installation of the a/m control panels is to include all necessary equipment (cabling,
switches, compartments, connectors etc…) in order to allow switching between the
existing control unit (Stinis) to the new supplied one.
Panel is to include, inter-alia, the same controller as on the supplied spreader and
should control all spreaders' operations exactly as the spreader controller (open / close
twist-locks, 20' / 40' operation, twin lift operation, oil pump etc…) controller is also to
supply status of all sensors and switches of the spreader.
12. Timetable
Timetable for the complete supply shall be submitted with the proposal.
At least the following phases shall be detailed:
Engineering and design review (one month to consider for HPC's review / reply).
Purchasing and supply of materials and components.
Manufacturing & Assembly.
Testing in the manufacturer shop.
Transportation.
Installation of all 8 "duplicate controllers" assuming availability of cranes is one per
day.
Commissioning.
Testing in Haifa port.
Training.
Operational test