AUTO ENGINEERING SDN BHD P299-ELE-03

Date: 04.04.2013
HOSPITAL BARU PEREMPUAN DAN KANAK-KANAK,
KG. KIULAP Page 1 of 4
(FASA 1 )

M & E CONTRACTOR

AUTO ENGINEERING SDN BHD


No. 865 6 1/2 Mile, Jalan Kota-Batu BD2117

Bandar Seri Begawan, Negara Brunei Darussalam

Tel: 2786689 / 90 Fax: 2786278 Email: autoeng@brunet.bn

METHOD STATEMENT

FOR

LAYING OF LV CABLES
AUTO ENGINEERING SDN BHD P299
Date: 04.04.2013

HOSPITAL BARU PEREMPUAN & KANAK-KANAK ,


Page 2 of 4
KG KIULAP (FASA 1 )

METHOD STATEMENT FOR LAYING OF LV CABLES

TABLE OF CONTENTS

1) Purpose

2) Scope of Works

3) Storage

4) Pre-installation

5) Installation

6) Reference Documents

7) Checklist
AUTO ENGINEERING SDN BHD P299
Date: 04.04.2013

HOSPITAL BARU PEREMPUAN & KANAK-KANAK ,


Page 3 of 4
KG KIULAP (FASA 1 )

1) LAYING OF LV CABLES

After finishing fixing cable tray, we will start pulling the armoured cables from
trasnformer to MSB and from MSB room to all concerned Electrical rooms one
by one, with more care to avoid any damage for cable, after that it will be tied
strongly with cable tie / cable belts and will be terminated to MDB, SMDB and
DB with proper gland and earth tags etc.

* Approved cables are only used for installation

* No joints in the tray unless the length is more than 200meter

* Proper cable jack, rollers etc to be used for cable laying

CABLE TERMINATION AND GLANDING

* Ensure that all termination and glanding are made by appropriate and
qualified personnel.

* Cut all cable end immediately prior to jointing or terminating. Seal cables left
unconnected for more than 24 hours to prevent the ingress of moisture

* Stripe cable to bring out the cores and expose conductors, for minimum
length required for connection. Ensure that stands are not damaged when
stripping cable cores. Twist strands together. Do not reduce the strand. Secure
all strands at terminations.

* Use compressions type lugs for bolted terminal connections


AUTO ENGINEERING SDN BHD P299
Date: 04.04.2013

HOSPITAL BARU PEREMPUAN & KANAK-KANAK ,


Page 4 of 4
KG KIULAP (FASA 1 )

* Do not bunch more than three cores at clamping terminal or bolted


connections

* Mark cable identification each end of the cable.

* The constractor shall be responsible for testing all cables before fully
marking off ends and connecting up.

* Where cable sheaths are used as earth conduiting conductor, gland shall have
the necessary content surface or strap to provide a low resistance path under
fault condition.

* All cables connection shall be made with approved cable lugs. Compression
type together with usage of a proper tools.

* Earthing tag shall be fitted with each gland on assembly, prior to the lugs
being attached.

* Ensure to order cable glands in kit form complete with earth tag shroud,
lock nut etc.