Академический Документы
Профессиональный Документы
Культура Документы
03
1. Design Codes
2. Material
3. Loadings:
Load on Roof
ɣ =540 Kg/m³
w = 0.111 KN /m
Ceiling Load
Panel 1
DL 6 (weight of 19mm Ceiling cover)
ɣ =540 Kg/m³
W(SH)= (540Kg/m³)(9.8)(0.019)= 0.1KN/m²
W= w6 + w7 +w8
W = 0.592 KN/M²
Load Combination
* Use CHS Ø323.9 x 12.75 mm for the column (refer to STAAD output)
360