Вы находитесь на странице: 1из 3

Mainline Integration Schedule as of 20 April 2018

Day/Ni Total April 2018


ght Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Cable Splicing (JP-19/JP-20) Day 1
150kV-North Line Cable Termination @CSW & RSS Day 9

Hi-Pot Test @RSS (Main Trans - GIS) Day 1


Day &
HDD & HDPE (JP4-5/JP14-15) 12
Night
Day &
Joint Pit (JP4/5/6/7/14/15) 19
Night

150kV-South Line Day & JP9-10 JP1-2


Cable Pulling (JP9-10/10-11/11-12/1-2) 10 JP10-11
Night
JP11-12
Day & JP10
Cable Splicing (JP-10/11) 6
Night JP11
Day &
PDS/SBS Cabling 20kV Cabling 4 BLM-SSM
Night
PAT/SAT Day 6
Final Confirmation/Provision for Power
Day 2
Receiving
LBB – TSS1 20kV Power Receiving (Temporary) AM 1

Energization of Downstream PM 1

Power Feeding to Depot OCS Day 1

SSM - TSS3 PAT/SAT Day 7

DKA - TSS4 PAT/SAT Day 15

LBB ER PAT/SAT Day 3

FTM ER PAT/SAT Day 4

CPR ER PAT/SAT Day 3

HJN ER PAT/SAT Day 3

BLA ER PAT/SAT Day 10

BLM ER PAT/SAT Day 13


Final Confirmation / Provision for
Day 1
Power Receiving
SSM ER 20kV Power Receiving (Temporary) AM 1

Energization of Downstream PM 1
Mainline Integration Schedule as of 20 April 2018
Day/Ni Total April 2018
ght Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Final Confirmation/Provision for Power
Day 1
Receiving
SNY ER 20kV Power Receiving AM 1

Energization of Downstream PM 1
Final Confirmation/Provision for Power
Day 1
Receiving
IST ER 20kV Power Receiving AM 1

CP107 Energization of Downstream PM 1


Final Confirmation/Provision for Power
Day 1
Receiving
BNH ER 20kV Power Receiving AM 1

Energization of Downstream PM 1
Final Confirmation/Provision for Power
Day 1
Receiving
STB ER 20kV Power Receiving AM 1

Energization of Downstream PM 1
Final Confirmation/Provision for Power
Day 1
Receiving
DKA ER 20kV Power Receiving AM 1

Energization of Downstream PM 1

PAT/SAT Day 7
Final Confirmation/Provision for Power
Day 1
BHI ER Receiving
20kV Power Receiving AM 1

Energization of Downstream PM 1

RSS PAT/SAT Day 25


Day &
Elevated 30
Night
Track work
Day &
Underground 30
Night
Day &
Elevated (Grounding/Feeder Cable) 30
Night
OCS Wiring
Day &
Underground 30 BHI-STB
Night
HJN-BLA
Mainline Integration Schedule as of 20 April 2018
Day/Ni Total April 2018
ght Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
DAL-LBB
SIG/TEL Cabling Metalic Cable Day 8 SNY-SSM

BHI-STB

BHI

Day & DKA


BHI/DKA/STB/BNH Station 15
Night STB
SIG Construction
BNH

Day &
HJN/BLA/BLM/SSM/SNY/IST Station 1 HJN
Night
BNH Day 1

STB Day 9
TEL PAT
DKA Day 9

BHI Day 9

Noise Barrier H Beam Installation Day 7 LP & FP

Cable Trough Installation Day 14 FP Area DP Area (Waiting MOC)


CP101&
Ponding Water Rectification Day 25 DP Area
CP102
Parapet Surface Finishing Day 25 DP, LP, FP & CP Area

Earthing Day 25 DP & LP Area

Noise Barrier H Beam Installation Day 1 AP

Cable Trough Installation Day 28 AP Area AP Area

CP103 Up Stand Wall Day 25 AP Area

Drainage Inside Viaduct Day 25 MP Area MP Area MP Area AP Area AP


Parapet Surface Finishing Day 7 AP Area

CP104 Senayan Station Individual Test Day 13


Legend: : Actual Progress

Вам также может понравиться