Академический Документы
Профессиональный Документы
Культура Документы
PAGE (Página) 1 OF 7
DATE (FECHA): 9/16/2015 JOB (OT): 685-1
EQUIPMENT: FILTRO DE GAS DRAWINGS: T-041-0685-01-01 REV: 0
(EQUIPO) (PLANOS) REV:
R= REVIEW (REVISIÓN)
PREPARED BY: DATE: APPROVED BY: DATE:
H.P.=HOLD POINT (PUNTO DE ESPERA)
(PREPARADO POR:) (FECHA) (APROBADO POR:) (FECHA)
W= WITNESS POINT (PUNTO DE ATESTIGUAMIIENTO)
EXAMINATION, INSPECTION AND TEST PLAN
(PLAN DE EXAMINACIONES , INSPECCIONES Y PRUEBAS)
PAGE (Página) 2 OF 7
DATE (FECHA): 9/16/2015 JOB (OT): 685-1
WELDING CONTROL
1 WPS AND PQR REVIEW ASME secc IX R
WELDERS/W.OPERATORS
2 ASME secc IX R
QUALIFICATION REVIEW
3 FITUP MAIN JOINTS (SEE PAGE 4) DRAWINGS HP
4 FITUP NOZZLES (SEE PAGE 5) DRAWINGS HP
R= REVIEW (REVISIÓN)
PREPARED BY: DATE: APPROVED BY: DATE:
H.P.=HOLD POINT (PUNTO DE ESPERA)
(PREPARADO POR:) (FECHA) (APROBADO POR:) (FECHA)
W= WITNESS POINT (PUNTO DE ATESTIGUAMIIENTO)
EXAMINATION, INSPECTION AND TEST PLAN
(PLAN DE EXAMINACIONES , INSPECCIONES Y PRUEBAS)
PAGE (Página) 3 OF 7
DATE (FECHA): 9/16/2015 JOB (OT): 685-1
FINAL INSPECTION
1 INTERNAL INSPECTION ASME secc. VIII R2.6-F29 HP
2 EXTERNAL INSPECTION ASME secc. VIII R2.6-F29 HP
TEST
1 HYDROSTATIC TEST 65 PSI R2.6-I08 R2.6-F39 HP
CERTIFICATION
1 NCR CLOSED QUALITY MANUAL R2.6-F11 R
2 "US BUILT DIMENSION" DRAWINGS R
3 DOSSIER QUALITY MANUAL R
R= REVIEW (REVISIÓN)
PREPARED BY: DATE: APPROVED BY: DATE:
H.P.=HOLD POINT (PUNTO DE ESPERA)
(PREPARADO POR:) (FECHA) (APROBADO POR:) (FECHA)
W= WITNESS POINT (PUNTO DE ATESTIGUAMIIENTO)
EXAMINATION, INSPECTION AND TEST PLAN
(PLAN DE EXAMINACIONES , INSPECCIONES Y PRUEBAS)
PAGE (P
DATE (FECHA): 9/16/2015 JOB (OT
JOINT
I.P. QC
I.P. QC
I.P. AI
I.P. AI
Examination Inspection Inspection Examination Inspection Inspection Examination
Results Results Results Results Results Results Results
C1
cuerpo a H H
cabeza
C2 tapa H H
a cuerpo
R= REVIEW (REVISIÓN)
PREPARED BY: DATE: APPROVED BY: DATE:
H.P.=HOLD POINT (PUNTO DE ESPERA)
(PREPARADO POR:) (FECHA) (APROBADO POR:) (FECHA)
W= WITNESS POINT (PUNTO DE ATESTIGUA
PAGE (Página) 4 OF 7
JOB (OT): 685-1
T-041-0685-01-01 REV: 0
REV:
EDICION 2013
RT
✘ RT FULL
SPOT
I.P. QC Inspect. Inspect. Report
I.P. AI
Results Results No.
H
R= REVIEW (REVISIÓN)
PAGE (Página) 5 OF 7
DATE (FECHA): 9/16/2015 JOB (OT): 685-1
EQUIPMENT: FILTRO DE GAS DRAWINGS: T-041-0685-01-01 REV: 0
(EQUIPO) (PLANOS) REV:
I.P. QC
I.P. QC
I.P. AI
I.P. AI
I.P. AI
Inspection Inspection Examination Inspection Inspection
Results Results Results Results Results Results
Results Results Results No.
A HP HP
B HP HP
C HP
D HP
E HP
R= REVIEW (REVISIÓN)
PREPARED BY: DATE: APPROVED BY: DATE:
H.P.=HOLD POINT (PUNTO DE ESPERA)
(PREPARADO POR:) (FECHA) (APROBADO POR:) (FECHA)
W= WITNESS POINT (PUNTO DE ATESTIGUAMIIENTO)
EXAMINATION, INSPECTION AND TEST PLAN
(PLAN DE EXAMINACIONES , INSPECCIONES Y PRUEBAS)
0
R= REVIEW (REVISIÓN)
0
R= REVIEW (REVISIÓN)