BOQ Summary Page 1 of 1

BOQ SUMMARY

Project Name: MALAKAPUR MNC

Element :  Beam

No. Material Unit Quantity Rate र Cost र


1 Concrete M35 (cum) 27.86 7500.00 208929
Sub Total 27.86 2,08,928

2 Rebar T8 (Fe500) (kg) 327.46 60.00 19648


3 Rebar T10 (Fe500) (kg) 211.59 60.00 12695
4 Rebar T12 (Fe500) (kg) 1339.87 60.00 80392
5 Rebar T16 (Fe500) (kg) 1367.46 60.00 82048
6 Rebar T20 (Fe500) (kg) 514.21 60.00 30853
7 Rebar T25 (Fe500) (kg) 620.36 60.00 37222
8 Rebar T32 (Fe500) (kg) 1073.22 60.00 64393
Sub Total 5454.17 3,27,250

9 Shuttering (sq.M) 169.08 600.00 101448


Sub Total 1,01,448

Grand Total 6,37,627

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 195.79 kg/cum
2 Concrete % M35 = 100.00 % 
3 Shuttering  = 6.07 sqm/cum