WEIGHT AS WEIGHT AS WEIGHT AS Remarks

PER DWA UNIT WT AS UNIT WT AS


A6 Mounting Structures : station
PER PER
PBOM(kgs) PBOM(MT)

Current transformer. 220 kV & NCT's. (0.1500MT per Structure + 5% for 02/0.315 110.100 0.2202
i No/MT ITI
B&N)

Current transformer. 66 kV & NCT's. (0.19 MT per Structure + 5% for ITI-02/NGEF- 05/0.9975 177.462 0.88731
ii No/MT
B&N) 03

High Pedestal Insulator for 31.5MVA Transformers (0.22MT per structure 09/2.079 196.082 1.7674
iii No/MT ITI
+ 5% for B&N).

Cable Terminating structure with provision to mount LA's for 09/2.079


iv Transformer: No/MT ITI
66kV side-0.22 MT per structure

Fabricated structures of 5mtr height, on top of 220kV and 66kV GIS Hall 12/2.079
v with provision for stringing cross bus with drake ACSR (each structure No/MT ITI
weight is 0.14MT + 5% for B&N).

02/10.794
66kV Cable Terminating tower 5.14MT + 5% for B&N per tower and it
vi No/MT ITI
includes all tower accessories complete with earthing systems.

11 kV Cable terminating structure to capacitor bank (0.069 MT per 06/0.4347


vii No/MT ITI
Structure + 5% for B&N)

02/1.05 475.990 0.971


WITH E/S
Viii 66 kV Isolators. (0.50MT per Structure + 5% for B&N) No/MT NGEF
495.028 W/O
E/S

ix Lightening arrestors. 66 kV . (0.14MT per Structure + 5% for B&N) No/MT NGEF 03/0.441 NA NA

x Pedestal insulators. 66 kV . (0.15MT per Structure + 5% for B&N) No/MT NGEF 03/0.4725
Pedestal insulators for Cable termination 66 kV. (0.1500MT per Structure 03/0.4725 213.708 0.641 66 KV CTS
xi No/MT NGEF
+ 5% for B&N) CUM LA

Total Weight of Mounting Structures. MT 26.30

220 KV CTT TOWER MT 32.00

TEMPLATES AND MISCILLENOUS Structure for Templates and stubs for 2.00
MT
220 KV&66 KV CTT TOWER