1.0 Geotechnical investigation for the proposed viaduct at chainage 22+935 was
conducted for the proposed 4 lane new bridge. Number of bore holes was
determined as per TOR, clause no. 4.11.4.4, point no.-1 and depth was
this bridge location five nos. of bore hole of was drilled upto a maximum depth of
15.00m from the existing ground level. The location of borehole is shown in the
borehole location plan in Fig. The details of boreholes with the termination depth,
Bed level and water level are shown in the following table.
conducted on the samples (DS) collected from the boreholes. The field
investigation data and the laboratory tests conducted on the soil samples indicate
Standard Penetration Test N value. The subsoil formation as revealed from the
formation at this location consist of very dense grayish highly weathered rock up
Safe bearing capacity of 5.0m dia circular foundation have been computed from
3.5m to 8.00m depth and shown in the following table, detail calculations are
3.5 23.00
5.0 29.50
1.0 5.0
6.0 39.80
8.0 45.50
However, type, size and depth of the foundation depends upon the design
Bridge expert using the test results to fulfill the specific requirement.
Chemical analysis of soil and water was done and results are shown in Table
1987 and that for water as per IS: 3025-1964. All these results are within
permissible limits and need no special measure during design and construction