PROJECT :
CONSULTANT : CONTRACTOR:
DRAWING REF. : SERVICE FIRE FIGHTING DATE
SI DESCRIPTION QTY UNIT MATERIAL MATERIAL MHR MHR RATE LABOUR REMARKS
UNIT COST COST UNIT TOTAL COST
FIRE FIGHTING SYSTEM
1 Combined Fire Pump set - (E+D+J) Set
2 Fire Hydrant Nos
2 Inlet breeching unit Nos
3 Inlet box SS Nos
4 Hose reel and LV cabinet Nos
5 Automatic Hose reel 1"x100' Nos
6 2 1\2" Fire hose,Nozzel l& Pin Rack Nos
7 Landing valve c/w Built in PRV Nos
8 5 KG Dry powder fire extinguish Nos
9 5Kg CO2 fire extinguisher Nos
Page 1 TH-F-36.2
FIRE FIGHTING - ESTIMATION SHEET
PROJECT :
CONSULTANT : CONTRACTOR:
DRAWING REF. : SERVICE FIRE FIGHTING DATE
SI DESCRIPTION QTY UNIT MATERIAL MATERIAL MHR MHR RATE LABOUR REMARKS
UNIT COST COST UNIT TOTAL COST
9 40 mm Dia Pipe Mtrs
10 32 mm Dia Pipe Mtrs
11 25 mm Dia Pipe Mtrs
14 Fittings 1 Lot
Galvanised Iron Pipes -SEAMLESS -
1 200 mm Dia Pipe Mtrs
2 150 mm Dia Pipe Mtrs
3 125 mm Dia Pipe Mtrs
4 100 mm Dia Pipe Mtrs
5 80 mm Dia Pipe Mtrs
6 65 mm Dia Pipe Mtrs
7 50 mm Dia Pipe Mtrs
8 40 mm Dia Pipe Mtrs
9 32 mm Dia Pipe Mtrs
10 25 mm Dia Pipe Mtrs
11 20 mm Dia Pipe Mtrs
12 Fittings 1 Lot
13 Brackets & Supports 1 Lot
Total GI pipes 0
VALVES
1 6" ZCV Nos
2 4" ZCV Nos
3 3" ZCV Nos
4 21/2" ZCV Nos
5 6" Flow Switch Nos
6 4" Flow Switch Nos
7 3" Flow Switch Nos
8 21/2" Flow Switch Nos
9 1" Test & drain Valve Nos
10 4" Flow Detector Nos
11 Alarm Gong Nos
12 6" OS&Y Gate Valve Nos
13 4" OS&Y Gate Valve Nos
14 6" Gate Valve Nos
15 4" Gate Valve Nos
16 21/2" Gate Valve Nos
17 1" Gate Valve Nos
18 6" PRV Nos
19 4" PRV Nos
20 1" PRV Nos
21 6" N.R.V Nos
22 4" N.R.V Nos
23 Air Release Valve Nos
Page 2 TH-F-36.2
FIRE FIGHTING - ESTIMATION SHEET
PROJECT :
CONSULTANT : CONTRACTOR:
DRAWING REF. : SERVICE FIRE FIGHTING DATE
SI DESCRIPTION QTY UNIT MATERIAL MATERIAL MHR MHR RATE LABOUR REMARKS
UNIT COST COST UNIT TOTAL COST
3 Builders work 1 Lot
4 Seismic control 1 Lot
Total valves
ACCESSORIES
1 BS exhaust pipes & Pump Valves 0 Lot
Total accessories
MATERIAL+LABOUR
OFFICE EXPENSES
SUMMARY
MATERIAL COST
LABOUR
OFFICE COST
TOTAL COST
ESTIMATOR : MANAGER :
DATE : DATE :
Page 3 TH-F-36.2