Вы находитесь на странице: 1из 3

FIRE FIGHTING - ESTIMATION SHEET

PROJECT :
CONSULTANT : CONTRACTOR:
DRAWING REF. : SERVICE FIRE FIGHTING DATE
SI DESCRIPTION QTY UNIT MATERIAL MATERIAL MHR MHR RATE LABOUR REMARKS
UNIT COST COST UNIT TOTAL COST
FIRE FIGHTING SYSTEM
1 Combined Fire Pump set - (E+D+J) Set
2 Fire Hydrant Nos
2 Inlet breeching unit Nos
3 Inlet box SS Nos
4 Hose reel and LV cabinet Nos
5 Automatic Hose reel 1"x100' Nos
6 2 1\2" Fire hose,Nozzel l& Pin Rack Nos
7 Landing valve c/w Built in PRV Nos
8 5 KG Dry powder fire extinguish Nos
9 5Kg CO2 fire extinguisher Nos

10 5 KG Automatic Dry Powder Fire Extinguisher Nos


11 6Ltr Water fire extinguisher Nos
12 Fire Blanket Nos
13 Deluge / Foam water system Lot
13 FM 200 System Lot
Total fire fighting
GI PIPES
Galvanised Iron Pipes -ERW
1 250 mm Dia Pipe Mtrs
2 200 mm Dia Pipe Mtrs
3 150 mm Dia Pipe Mtrs
4 125 mm Dia Pipe Mtrs
5 100 mm Dia Pipe Mtrs
6 80 mm Dia Pipe Mtrs
7 65 mm Dia Pipe Mtrs
8 50 mm Dia Pipe Mtrs
9 40 mm Dia Pipe Mtrs
10 32 mm Dia Pipe Mtrs
11 25 mm Dia Pipe Mtrs
14 Fittings 1 Lot
Galvanised Iron Pipes -SEAMLESS Locally Galvanized
1 250 mm Dia Pipe Mtrs
2 200 mm Dia Pipe Mtrs
3 150 mm Dia Pipe Mtrs
4 125 mm Dia Pipe Mtrs
5 100 mm Dia Pipe Mtrs
6 80 mm Dia Pipe Mtrs
7 65 mm Dia Pipe Mtrs
8 50 mm Dia Pipe Mtrs
9 40 mm Dia Pipe Mtrs
10 32 mm Dia Pipe Mtrs
11 25 mm Dia Pipe Mtrs
14 Fittings 1 Lot
Galvanised Iron Pipes -SEAMLESS - Locally Galvanized
2 200 mm Dia Pipe Mtrs
3 150 mm Dia Pipe Mtrs
4 125 mm Dia Pipe Mtrs
5 100 mm Dia Pipe Mtrs
6 80 mm Dia Pipe Mtrs
7 65 mm Dia Pipe Mtrs
8 50 mm Dia Pipe Mtrs

Page 1 TH-F-36.2
FIRE FIGHTING - ESTIMATION SHEET
PROJECT :
CONSULTANT : CONTRACTOR:
DRAWING REF. : SERVICE FIRE FIGHTING DATE
SI DESCRIPTION QTY UNIT MATERIAL MATERIAL MHR MHR RATE LABOUR REMARKS
UNIT COST COST UNIT TOTAL COST
9 40 mm Dia Pipe Mtrs
10 32 mm Dia Pipe Mtrs
11 25 mm Dia Pipe Mtrs
14 Fittings 1 Lot
Galvanised Iron Pipes -SEAMLESS -
1 200 mm Dia Pipe Mtrs
2 150 mm Dia Pipe Mtrs
3 125 mm Dia Pipe Mtrs
4 100 mm Dia Pipe Mtrs
5 80 mm Dia Pipe Mtrs
6 65 mm Dia Pipe Mtrs
7 50 mm Dia Pipe Mtrs
8 40 mm Dia Pipe Mtrs
9 32 mm Dia Pipe Mtrs
10 25 mm Dia Pipe Mtrs
11 20 mm Dia Pipe Mtrs
12 Fittings 1 Lot
13 Brackets & Supports 1 Lot
Total GI pipes 0

VALVES
1 6" ZCV Nos
2 4" ZCV Nos
3 3" ZCV Nos
4 21/2" ZCV Nos
5 6" Flow Switch Nos
6 4" Flow Switch Nos
7 3" Flow Switch Nos
8 21/2" Flow Switch Nos
9 1" Test & drain Valve Nos
10 4" Flow Detector Nos
11 Alarm Gong Nos
12 6" OS&Y Gate Valve Nos
13 4" OS&Y Gate Valve Nos
14 6" Gate Valve Nos
15 4" Gate Valve Nos
16 21/2" Gate Valve Nos
17 1" Gate Valve Nos
18 6" PRV Nos
19 4" PRV Nos
20 1" PRV Nos
21 6" N.R.V Nos
22 4" N.R.V Nos
23 Air Release Valve Nos

24 Sprinkler Head Upright Type 1/2" , 79 Deg. C Nos

25 Sprinkler Head Side Wall Type 1/2" , 79 Deg. C Nos

26 Sprinkler Head Side Wall Type 1/2" , 68 Deg. C Nos

27 Sprinkler Head Concealed 1/2", 68 Deg. C Nos


28 Testing & Commissioing 1 Lot
29 Fire Stopping 1 Lot

Page 2 TH-F-36.2
FIRE FIGHTING - ESTIMATION SHEET
PROJECT :
CONSULTANT : CONTRACTOR:
DRAWING REF. : SERVICE FIRE FIGHTING DATE
SI DESCRIPTION QTY UNIT MATERIAL MATERIAL MHR MHR RATE LABOUR REMARKS
UNIT COST COST UNIT TOTAL COST
3 Builders work 1 Lot
4 Seismic control 1 Lot
Total valves
ACCESSORIES
1 BS exhaust pipes & Pump Valves 0 Lot
Total accessories

MATERIAL+LABOUR

OFFICE EXPENSES

Total office expenses

SUMMARY

MATERIAL COST

LABOUR

OFFICE COST

TOTAL COST

ESTIMATOR : MANAGER :
DATE : DATE :

Page 3 TH-F-36.2

Вам также может понравиться