PRELIMINARY OPERATING RESULTS FROM THE BATTELLE / FERCO GASIFICATION

DEMONSTRATION PLANT IN BURLINGTON, VERMONT, U.S.A.

M.A. Paisleya, M.C. Farrisa, J.W. Blacka, J.M. Irvingb, R.P.Overendc


a B C
FERCO Burlington Electric Department National Renewable Energy Laboratory
3500 Parkway Lane, Suite 440 585 Pine Street 1617 Cole Blvd.
Norcross, GA 30052 Burlington, VT 05401 Golden, CO 80401

ABSTRACT: The Burlington Vermont gasifier is the first commercial scale demonstration of the Battelle
/ FERCO indirectly heated biomass gasification process. The plant is coupled to the McNeil station of the
Burlington Electric Department and is being used to evaluate and demonstrate the gasification technology
both as a producer of fuel gas in the first operational phase and in a combined cycle with a gas turbine power
generation system in subsequent operations. This paper discusses recent operating results at the Burlington
site and compares them with the results obtained in the Battelle pilot plant gasifier. FERCO the owner of the
gasification technology has recently reorganized and been refinanced and plans to develop projects
worldwide.

1. INTRODUCTION

Current biomass electricity systems are almost all based on


boilers fired with wood or agricultural residues. As a result
these systems are limited to approximately 25 percent
overall conversion efficiency to electric power. Much higher
efficiencies are being achieved in natural gas combined cycle
units where efficiencies approaching 60 percent are possible.

Transforming solid fuels such as coal or biomass into gas so


that these higher efficiencies in combined cycle systems can
be achieved is a goal of the United States Department of
Energy (DOE) and the European Union.

The FERCO biomass gasification process was developed to Figure 1: The FERCO Biomass Gasification Process
convert biomass into such a gaseous. Unlike other biomass
gasification processes, the FERCO process is not based on • Provides a non-diluted product gas stream suitable
starved air combustion, but rather rapidly heats raw biomass for synthesis applications. Potential applications
in an air free environment to minimize tar formation and include the production of Fisher Tropsch liquids,
create a solid residue char that is used as a heat source for alcohols, and hydrogen
the biomass heating. Significantly less emissions are
produced in the process because of the relative ease of • Reduces greenhouse gas emissions over an order
treating the high energy density, medium heating value of magnitude compared with current fossil fuel
gaseous product. based technologies and over 50% compared to
direct combustion of biomass.
2. PROCESS BACKGROUND
The flexibility of the process makes possible the production
2.1 The FERCO Biomass Gasification Process of mixtures of the above products as co-products as part of a
The FERCO gasification technology underwent initial “biorefinery” providing increased flexibility depending on
developments at Battelle’s Columbus Laboratories as a part the specific needs of end users.
of the DOE’s Biomass Power Program. The technology is
specifically designed to take advantage of the unique The process, shown schematically in figure 1, uses two
properties of biomass, such as high reactivity, low ash, low circulating fluidized bed reactors as the primary process
sulfur, and high volatile matter. vessels. The process, unlike most conventional gasification
processes, uses indirect heating of the biomass to generate a
The process: medium heating value (11-14 MJ/Nm3) gas rather than a low
• Produces a fuel gas that it can be used oxygen partial combustion of the biomass.
interchangeably with natural gas or distillate oil
. In the process sand is used as a heat transfer medium to
• Provides efficiency gains of 60% over rapidly heat the incoming biomass and convey char from the
conventional biomass power plants and with gasification reactor into the process combustor. The FERCO
advanced power systems such as fuel cells process takes advantage of the inherently high reactivity of
improvements of over 160% biomass feedstocks. In the process extremely high
throughputs (in excess of 14,600 kg/hr-m2) have been
achieved. processing results in cost competitive products from
renewable biomass resources.
2.2 The Vermont Development Program
The successful operation in the Battelle pilot plant led to the As the program has progressed, the facility has demonstrated
decision to scale up the process to commercial scale. itself to have application beyond the direct development of
Burlington Electric Department’s McNeil station was the FERCO technology and will be used as a Development
selected as the site for this demonstration plant. The plant and Applications Testing Platform (DATP) for other
is designed for 182 dry tonnes per day of biomass feed. The supporting technologies such as gas cleanup, gas
program has been conducted in three phases, design, compressing, biomass feeding and handling, and drying.
construction and initial operation firing the product gas in
the McNeil boiler, and the third phase adding additional gas Each of these supporting technologies are being evaluated as
cleanup, gas compression, and a gas turbine power a part of the current program, but are anticipated to be
generation system. expanded to encompass additional technologies after the
initial operating data has been generated.
2.3 Development Partners
The partners in the development of the process at the 2.5 Design of the McNeil Gasifier
McNeil site are Future Energy Resources (FERCO), Plant design was initiated in 1994. Construction began in
Burlington Electric, Battelle, the US DOE, and the National 1996 and was completed late in 1997. The first wood was
Renewable Energy Laboratory (NREL). Battelle engineers fed to the unit in December of 1997. A photograph of the
invented the process and conducted the initial developments facility is shown in Figure 2. The gasifier structure is 34 m
under contract to the US DOE in the early 1980's. In 1992, in height and has a rather compact footprint of 10.5 x 14.5
FERCO purchased the rights to the technology from Battelle m. An additional scrubber building of 10.5 x 10.5 m
and is now the owner of the worldwide rights. In 1999, completes the facility. The compact size of the FERCO
FERCO was reorganized and refinanced, bringing in gasifier increases its utility for industrial applications and
additional shareholders including the Turner foundation. helps to lower overall capital cost of the process.
FERCO is developing renewable energy projects based on
the gasification technology worldwide. These projects will
build on the operations at Burlington.

BED has a long history with biomass based power


generation. The McNeil station, at 50 MW is one of the
world’s largest wood fired power stations. BED hopes to
improve its generating efficiency by implementing a
gasification combined cycle system. The US DOE and
NREL provide valuable technical support to the program
along with program management.

2.4 Program Goals and Objectives


The development program at McNeil has as its primary
objective the demonstration, at commercial scale, of the
FERCO gasification process. The scale selected is sufficient Figure 2. The McNeil Gasifier
ly large so that commercial scale process equipment could be
utilized to eliminate so called “pilot plant compromises” in
the design. Startup testing of the process began in earnest in 1998 and
continued into 1999. The first operation of the plant in full
The program has a number of established technical goals. steam gasification occurred in August of 1999.
These are:
3. Operating Results in Vermont
• Develop a reliable technology
• Develop detailed commercial design information 3.1 An Extended Startup Period
• Demonstrate power production systems Startup operations in the plant have extended beyond the
• Demonstrate synthesis applications original schedule for the plant leading to an impression that
• Establish the Burlington site as a developmental there has been some “problem” with the technology. On the
platform contrary, no problems with the process have been
encountered, but rather “non-related” situations have
These technical goals parallel the Department of Energy’s combined to extend the startup period. These situations
goals for bioenergy. The progress made by the Vermont have included:
Gasification project establishes its role as a key element for
future development of biomass derived products. Thermal
gasification of biomass provides flexibility for the production • The McNeil station is a dispatched plant and does
of a complete slate of products as described above in a not operate 7 days a week. McNeil must operate
virtual “biomass refinery”. The favorable size and for the gasifier to operate. This results in a
processing methods characteristic of thermochemical gasifier operating schedule of approximately 3
days a week. Comparison of Burlington Data to PRU
100
• Although core process systems have performed as
expected, a number of support systems have 80

Carbon Conversion, %
required significant modifications. These include
60
materials handling, solids separation, and product
gas scrubbing. 40

• Multiple changes in design engineering staff were 20

made due to organizational changes with the EPC


0
contractor. 1000 1200 1400 1600 1800 2000
Gasifier Temperature, F
• Poor performance of the process cyclone
separators and impacts of the increased solids Figure 3. Comparison of Conversions in PRU and
loading on the scrubber. Burlington Gasifiers

Despite these difficulties, operations at the plant have Figure 3 illustrates the gas production rates expressed as a
continued and positive operating results have been obtained. fraction of the incoming wood carbon found in the product
As is the case with all development scale projects, some gas. The McNeil gasifier data fall well within the data set
equipment modifications continue at the Burlington site, but previously generated in the Battelle pilot plant even though
the operational availability has now increased to the point initial operating temperatures are below the design operating
where detailed process evaluations are underway. point of about 800C (1450 to 1500F).

3.2 Program Accomplishments Other key accomplishments include:


As operations have progressed, a number of significant
accomplishments have been achieved.. Primary among these • Product gas has been generated by the process and
accomplishments is the demonstration of the production of supplied to the McNeil station demonstrating the
a product gas with essentially the same composition and use of the gas as a co-firing fuel, and the
production rates as the projections made based on pilot scale generation of power from biomass gasification.
data generated at Battelle. • Demonstration that char can be transferred
between the process vessels and therefore provide
The following table illustrates the composition of the product the driving force for the process.
gas generated in the Battelle PRU compared to the gas • Wood feed system reliability has been increased
currently being generated in the McNeil gasifier. providing feed rates in excess of “design rates” to
the process
Table 1. Comparision of McNeil Gasifier Gas • Startup operations have been improved reducing
Composition to Battelle Pilot Data startup periods from 12 to 24 hours down to 4 to 6
hours
Pilot Data McNeil Data
• Improvements in the scrubber system have been
H2 17.5 18.0 made to aid in the handling of tars generated in the
process.
CO 50.0 47.0 • Understanding of process response allowing
improvements to the process control system to be
CO2 9.4 14.3 made
• Improvements in wood handling operations have
CH4 15.5 14.9 been made to provide consistent biomass
properties to the plant.
C2H4 6.0 4.7 • Diagnostic tests on the sand circulation system
have been performed that have guided the design
C2H6 1.1 1.1
of circulation system improvements.
HHV • Process design improvements have been identified
that will improve efficiency of the process and
MJ/Nm3 18.5 16.8 reduce capital cost.

Btu/scf 499 455 As additional operating experience has been gained in the
facility, operating periods have been extended and system
As can be seen, the compositions are essentially the same operability has increased. A series of equipment
differing only in the carbon dioxide content of the gas. This modifications has recently been completed that will further
difference was due to a small air flow that remained in one improve system operability and allow further process data to
of the sand circulation loops during the test resulting in be generated. The current program schedule developed by
combustion of a small portion of the product gas. FERCO, reflects this improved operation and has as one of
the milestones, continuous, around-the-clock operation in the
McNeil gasifier in early July, 2000.
• No environmental problems exist with the
4. Future Plans technology.
• No extensive preparation of the biomass
4.1 Parametric Testing feedstocks is necessary for the process.
A detailed parametric testing program has been established • FERCO refinancing and reorganization has added
that will provide operating data on a range of process significant momentum to implementation of
parameters including steam rates, wood moisture, and turnup commercial projects utilizing the technology..
and turndown ratios. These operations will provide an • FERCO is in active discussions regarding a
accurate picture of the process operation and provide number of projects worldwide as both technology
additional inputs to subsequent process design activities. As provider and equity participant.
discussed above, as an intermediate step in the testing
program, FERCO has established a corporate goal of
achieving 24 hours of sustained operating in full gasification REFERENCES
at design conditions by early July.
[1] Paisley, M.A., Slack, W., Farris, G., and Irving, J..
4.2 Equipment Modifications “Commercial Development of the Battelle/FERCO
Modifications have been identified that will significantly Biomass Gasification Process – Initial Operation
improve the operation of the sand circulation system. The of the McNeil Gasifier”, Proceedings of the Third
modifications will result allow for increased sand Biomass Conference of the Americas, 1997,
circulation rates and improved performance of the process Pergamon-Elsevier Science: Oxford, U.K.; pp 579-
cyclones. 588.

Additional improvements are planned to the process [2] Paisley, M.A. and Overend, R.P., “Biomass
scrubber system. Minor modifications to the gasifier and Gasification for Power Generation”, 1994, EPRI
combustor vessels are planned to improve gas distribution in 13th Conference on Gasification Power Plants.
the reactors.
[3] Paisley, M.A., Farris, M.C., Black, J.W., Irving,
4.3 Further Investigations J.M., and Overend, R.P., “Commercial
Later in 2000 and through 2001, FERCO will be evaluating Development of the Battelle/FERCO Biomass
gas conditioning. These studies will initially focus on a Gasification Process: Startup and Initial Operating
proprietary gas cleanup system developed by FERCO and Experience,” 4th Biomass Conference of the
Battelle but will also include other commercial and Americas, 1999, Pergamon-Elsevier Science:
developing gas cleanup systems as well. These studies will Oxford, U.K.; pp 1061-1066
also demonstrate the ability of the Burlington gasifier to
provide smaller quantities of representative product gas for [4] Farris, M., Paisley, M.A., Irving, J., and Overend,
evaluation of other technologies at the site including R.P., “The Battelle/FERCO Biomass Gasification
chemical synthesis, advanced power systems, or hydrogen Process: Design, Engineering, Construction, and
generation. Startup Phase”, 1998, Seminar on Power
Production from Biomass III, Espo Finland.
Detailed evaluation of biomass drying options are planned as
a part of the McNeil efforts. Drying has been identified as
an areas that can have significant impact on the overall
capital requirements of biomass gasification systems.

FERCO’s development plans also include the design and


implementation of advanced power generation at the site.
Development partners will be added to the program team to
provide the necessary expertise in gas compression, and
power generation. These activities will move the program
into its third phase, installation and operation of a gas
turbine power generation system.

5. Conclusions

Operation at the McNeil site has validated the expected


performance of the FERCO gasification process and has
shown that:

• A medium heating value product gas can be


produced from biomass without the use of pure
oxygen.
• High biomass throughputs can be achieved in
compact reactors