FACILITIES IMPROVEM ENT

Facilities Layout Improvement at Rodilla’s Yema Cake

A Project Study

Presented to the Faculty of the

College of Engineering and Technical Department

Manuel S. Enverga University Foundation

In partial fulfillment of the

Requirements for the Degree of

Bachelor of Science in Industrial Engineering

by

Aaron Justine E. Abuel

Armando F. Anading III

Yvonne R. Casas

Sharmaine V. Comintan

Joy E. Panaligan

May 2017
FACILITIES IMPROVEM ENT 2

Approval Sheet

In partial fulfillment of the requirements for the degree of Bachelor of Science in

Industrial Engineering program. This project entitled “Facilities Layout Improvement at

Rodilla’sYema Cake”, prepared and submitted by Aaron Justine E. Abuel, Armando F. Anading

III, Yvonne R. Casas, Sharmaine V. Comintan, and Joy E. Panaligan, is here by recommended

for oral examination.

Engr. James Louie R. Meneses, CIE, AAIE


Adviser

Approval in partial fulfillment of the requirements for the Degree of Bachelor of Science

in Industrial Engineering by Oral Examination panel, November 2016 with the rating of

_________________.

Dr. Guillermo M. Rago Jr. Ed. D CE


Chairman

Engr. Gervin S. Espinosa Engr. Luzviminda Sinapilo


Member Member

Accepted in partial fulfillment of the requirements for the Degree of Bachelor of Science

in Industrial Engineering.

May 2017 Guillermo M. Rago Jr. Ed. D CE


Dean, College of Engineering
FACILITIES IMPROVEM ENT 3

Acknowledgement

The researchers would like to acknowledge the supports and efforts of the following

people:

Firstly, we would like to express our sincere gratitude to our adviser, Engr. James Louie

R. Meneses, Engr. Gervin S. Espinosa and Engr. Agnes Aviles for the continuous support of our

study and related research, for their patience, motivation, and immense knowledge. Their

guidance helped us in all the time of research and writing of this thesis.

Beside our advisers, we would like to thank thehead thesis committee: Dr. Guillermo M.

Rago Jr., for his insightful comments and encouragement to widen our research from various

perspectives.

My sincere thanks also go to Mr. and Mrs. Vincent and Juliet Rodilla, who gave access to

their production facilities. Without their precious support it would not be possible to conduct this

research.

We thank our fellow classmates in for the stimulating discussions, for the sleepless nights

we were working together before deadlines, and for all the fun we have had in the last four years.

To our parents for all the support for our financial needs to finish this study also for

encouragement they have given them.

And lastly, to our Almighty God, the great source of the researcher’s self-confidence,

energy and strength every day.


FACILITIES IMPROVEM ENT 4

Dedication

As one of the authors, I would like to extend my sincerest thank with deepest gratitude

and acknowledgement to the following:

Above all, to Almighty God for His presence, love, wisdom and guidance, to God be thy

glory.

To my family; my sisters, Janine and Jessah; to my brother and niece, Jeff and Jacob,

most especially to my parents who never stopped supporting me in whatever I do and who

inspired me the most finish this study.These two persons gave me the tools and values necessary

to be where I am standing today. My parents support me on every step I make, and decision I

take; but is necessary to understand that they let me take my decisions alone in order for me to

learn from my personal mistake and as my father says to “learn and grow from each seatback”.

My thanks and gratitude to them will never end for all the opportunities that they have offered

and gave me, for all the teachings that they have taught me and for every advise that come out of

their mouth. I am so grateful with them for trusting me that I would do a good job in the

university, and letting me come to achieve a higher education.

To PIIE MSEUF-SC, my classmates and friends, and especially to my thesis mates who

spent time and effort for this study.

To everyone I love, thank you for inspiring me and bringing out the best in me. .

Joy E. Panaligan 
FACILITIES IMPROVEM ENT 5

I would like to dedicate this work to those people who supported me through my ups and

downs. First is to God for giving me life, strength, wisdom, and guidance that they given us . To

my Family for supporting me financially, emotionally, and mentally, and encourage me to study

well .To my professors for their endless support and guidance throughout my college life. To my

Friends who are always there to help me and especially my teammates who supported me

throughout the process. For giving their time effort, and skills, I will always appreciate all they

have done to make this research possible. Thank you!!!

Sharmaine V. Comintan

I would like to dedicate our project study, to my parents Casius P .Casas and Nida R.

Casas, for your love and support. To my sisters, Mary Grace and Gynica Justine thank you for

giving me strength and inspire me to reach and chase my dreams;

To my group mates, Anading, Abuel, Sharmaine, and to our leader Joy, thanks for the

fun, grumpy days, and everything that we had gone through. “Team Relax /Attitude, will always

be ngarag when the deadline is tomorrow’’.

To my friends, especially IE Gagz , my classmates , my batch mates and PIIE, thanks for

sharing knowledge that we could use in our study.

And lastly, to Papa Jesus thank you for giving us the strength, knowledge patience and

everything we have without your guidance the lord this would have never become possible.

~yvonne
FACILITIES IMPROVEM ENT 6

As a symbol of gratitude I dedicate this project study to God Almighty. His presence has

continuously inspired me and given me strength.

I dedicate this project to my parents. Also to my friends who have shared with me all the

hardship and delight of being BSIE student. To my adviser, I acknowledge his contribution,

Engr. James Louie R. Meneses who share his knowledge in doing this project. And lastly I

dedicate this to myself, the fruit of my labor has finally paid off.

Aaron Justine E. Abuel

This is perhaps the easiest and hardest chapter in our project study to write. It will be

simple to name all the people that helped to get this done, but it will tough to thank them enough.

This piece of work is heartily dedicated to my parents and guardians, who taught me that even

the largest task can be accomplished if it is done one stage at a time, and for always reminding

me to value my vision.

I also dedicate this Project Study to my friends “IE GAGZ” , “JEG” and “Team Chaka” for

encouraging me even they bullying me and to the one who is special to me who waking me up

early when I need to do some papers in our study and to Hatchi to conquering my stress and

relieving my tiredness`

And to IE Professors who imparted their knowledge and become part of my college life.

Armando Anading
FACILITIES IMPROVEM ENT 7

Table of Contents

Title Page………………………………..………………………………..……………………….1

Approval Letter………………………………..………………………………..…………………2

Acknowledgement………………………………..………………………………..……………...3

Dedication………………………………..………………………………..………………………4

Table of Contents………………………………..………………………………..……………….7

List of Tables………………………………..………………………………..…………………...9

List of Figures………………………………..………………………………..…………………10

Abstract………………………………..………………………………..………………………..11

Unit I – Introduction……..………………………………..………………………………..……12

Background of the Study………………………………..……………………………….13

Objectives of the Study………………………………..…………………………………14

Conceptual Framework…………………………………………………………………..15

Scope and Limitations……………………………………………………………………16

Significance of the Study………………………………………………………………...16

Definition of Terms………………………………..………………………………..……17

Acronyms……………………………………………………………………….………..18

Unit II - Review Of Related Literature and Studies.………………………...…………………..19

Unit III - Methods and Procedure….……………………………………...……………………..32

Research Design………………………………………………………………………….32
FACILITIES IMPROVEM ENT 8

Research Environment……………………………………...……………………………33

Procedures………………………………………………………………………………..34

Design Concepts………………………………………………………………………....37

Unit IV – Results and Discussion……….……………..……………...………………………..41

Data Gathering………………………………………………...…………………………41

Data Analysis………………………………………………………………………….…53

Design of Improved Facility Layout…………………………………………..…………54

Development……………………………………………………………………………..62

Evaluation…………………………………………………………………………….….64

Unit V - Conclusions and Recommendations…………………..…………………………...…72

Conclusions………………………………………………………………………………72

Recommendations………………………………………………………………………..73

References………………………………………………………………………………..74

Appendices…………………………………………………………………………….....77

A. Project Study Gantt Chart……………………………….……………..……..77

B. Result of Interviews & Observations……………………………………......78

C. Survey Result………………….…………………………..………………….83

D. Cost Benefit Analysis……………………………..….………………………86

Transmittal letter…………………………………………...…………………….89

Curriculum Vitae…………………………………….…………………………………..90
FACILITIES IMPROVEM ENT 9

List of Tables

Table No. Title Page No.

1 Modified Likert scale………………………………………………………...…..38

2 Present time study for small cakes…………………………………………..…...48

3 Present time study for big cakes……………………………...………………….49

4 Summation of the present time study for small and big cakes………...………...50

5 Present time study data ………………………………………………….………51

6 Whys Analysis – Causes of the problem in Rodilla’s Yema Cake………………54

7 Validation of Root Cause Using Why’s Analysis………………………………..55

8 Validation of Root Cause Using Ishikawa Diagram……….…………………….56

9 Proposed time study for small cakes……………………….…………………….60

10 Proposed time study for big cakes……………………….………………………61

11 Comparison of Total Time between the Present and Proposed Layout of Small

Yema Cakes…………………………...……………………………………...….66

12 Comparison of Total Time between the Present and Proposed Layout of Big

Yema Cakes……………………………...………………………………………67

13 Survey Result……………………………….……………………………………70

14 Result of the survey based on Likert Scale………………………………………71

15 Cost benefit analysis…………………………………………….……………….72


FACILITIES IMPROVEM ENT 10

List of Figures

FIgure No. Title Page No.

1 Conceptual Framework Paradigm ..….…………………………………………..16

2 Present flow process chart ……..………………………….……………...……..43

3 Present flow diagram ……………………………...…………………...………..44

4 Present relationship diagram ………………………..……..…………………….45

5 Present facility layout ……………………...…………………..………………..46

6 Present flow process chart for small cakes …………………………..…….……52

7 Present flow process chart for big cakes ……………………………………..….53

8 Ishikawa Diagram………………………………………………………………..55

9 Activity relationship chart………………………………………………………..57

10 Space relationship diagram………………………………………………………58

11 Block diagram……………………………………………………………...…….59

12 Proposed flow process chart for small cakes…………………………………….62

13 Proposed flow process chart for big cakes……………………………………….63

14 Proposed flow diagram…………………………………………………………..64

15 Proposed facility layout………………………………………………...………..65

16 Graphical representation of the compared present and proposed time study……68

17 Graphical representation of the compared present and proposed time study……69


FACILITIES IMPROVEM ENT 11

Abstract

Abuel, Aaron Justine E., Anading, Armando F. III, Casas, Yvonne R., Comintan,
Sharmaine V., Panaligan, Joy E., “Facilities Layout Improvement At Rodilla’s Yema Cake”,
Unpublished Project Study for the Degree of Bachelor of Science in Industrial Engineering,
Manuel S. Enverga University Foundation, November, 2016.
Facility planning and design is an important component of all business overall operations,

both in terms of maximizing the effectiveness of the production process and meeting the needs of

employees. Rodilla’s Yema Cake is one of the most popular and well known delicacies not just

here in Quezon but also in other places in Central Luzon. For the past years, it had encountered

error in production of yema cakes because of the substandard arrangement of the assembly lines

in the working area that causes the long transportation of the operation. Through the observations

in the workplace and interview with the owner and employees, the researchers conclude to

improve the design of facility layout of their production area using time and motion study.

In designing the layout, various factors were assessed by the researchers in creating the

proposed facility layout. Process layout was selected as type of layout because it aims to improve

efficiency in Rodilla’s production area. Another factor that they consider is the availability of the

facilities, workers, and space in the production area. As the proposed layout was evaluated, the

flow processing time of production of the existing layout which is 51.32 minutes was decreased to

46.10 minutes for the production of small yema cakes, while the flow processing time of

production of the existing layout which is 50.40 minutes was decreased to 45.58 minutes for the

production of big yema cakes. Rodilla’s Yema Cake saves 5.2 minutes in the whole processing of

small yema cakes and 4.23 minutes in the whole processing of big yema cakes. Thus, this result

has a great effect on the annual savings of the Rodilla’s Yema Cake.
FACILITIES IMPROVEM ENT 13

Unit I

Introduction

Today, Rodilla‟s Yema Cake is one of the most popular and well known delicacies not

just here in Quezon but also in other places in Central Luzon. And because of this there are so

many Rodilla‟s outlets and resellers that are scattered around the area, and therefore we cannot

stop wondering how these delicious and mouth-watering cakes are being produced. As an

Industrial Engineering students and researchers, we know that the production process is needed

to have a lower cost with a great effectiveness and much higher productivity. To achieve this

productivity there has to be a good and effective facility layout.

Facility planning and design is an important component of all business overall operations,

both in terms of maximizing the effectiveness of the production process and meeting the needs of

employees. The basic objective of the layout is to ensure a smooth flow of work, material, and

information through system. The basic meaning of facility is the space in which a business's

activities take place. The layout and design of that space impact greatly how the work is done, and

the flow of work, materials, and information through the system. Layout affects the cost of material

handling and the movement of time, and hence affects the overall productivity and efficiency in the

plant. The key to a good facility layout and design is the integration of the needs of people

(personnel and customers), materials (raw, finishes, and in process), and machinery in such a way

that they create a single, well-functioning system. Poor facility layout leads fatigue to the workers,

much spending in one machine to another that can result in increasing the material handling costs.
FACILITIES IMPROVEM ENT 14

Background of the Study

Today, people are fond of discovering different variety of food that are unusual but are

very palatable. Filipinos are popularly known as food lovers and this is probably the reason why

many delectable Pinoy delicacies had risen. Filipino culture is noticeably seen from the inviting

appetizers and aperitifs, flavorful main dishes and toothsome sweets to their refreshing drinks in

festivities and celebrations. These dishes served on the table of every Filipino family reflect to

their nation‟s history as many had visited and colonized the country.

Quezon, a historic province in south of Manila, is popular for its food and spiritual

destinations. It's also famed for its numerous pasalubongs. Pasalubong giving has been a

beautiful tradition and a well-known trait of Filipinos. No wonder there are pasalubong stores all

over the archipelago. From various kalamay (Rice cakes) to a variety of delicacies like broas,

lady fingers (camachile), pastillas, yema cakes, and boat tarts, there's never a shortage of

selections for someone with the sweet tooth.

One of the most famous pasalubong in Quezon that can be found specifically in Tayabas

is the Rodilla‟s Yema Cake. The Rodilla‟s Yema Cake is fast catching up as an irresistible,

mouth-watering dessert among food lovers. It is a creamy and delicious custard cake originates

in southern part of Luzon. This dessert is made from 2 layer chiffon cake coated with yema

frosting. The custard is almost similar to brazo de mercedez and dulce de leche that consists of

egg yolks, condensed milk, evaporated milk and vanilla extract.

The researchers interviewed the manager/head of the operations and some of the workers

at the production area of Rodilla‟s Yema Cake; they informed us that one of the major problems

they encounter during their production is the unstandardized time in the process of making yema
FACILITIES IMPROVEM ENT 15

cake and the FLP (Facility Layout Problem). We were able to observe the present facility area

and the present production area wherein they do the process of baking, mixing, cooling, slicing,

icing, cheesing, packing and loading of the finished products; and we discover that the causes of

the problem are the imbalance line, slow transportation and long processing time because of a

poor facility layout of the workplace.

Facility layout considers available space, final product, safety of users and facility and

convenience of operations. An effective facility layout ensures that there is a smooth and steady

flow of production material, equipment and manpower at minimum cost. Facility layout looks at

physical allocation of space for economic activity in the production area. Therefore, the main

objective of the facility layout planning is to design effective work flow as to make equipment

and workers more productive.

In response to the mentioned problem above, the researchers chose to make an improved

facility planning and design at Rodilla‟s Yema Cake production area. This project study proposes

to use Systematic Layout Planning (SLP) as the infrastructure for layout optimization and

entitled the study “Facilities Layout Improvement at Rodilla‟s YemaCake”. This study will

tackle on how the researcher came up with the design and effective facility layout that will help

eliminate the problems and improve the productivity inside the Rodilla‟s Yema Cake Factory.

Objectives of the Study

The main objective of the study is to design and develop an improved facility layout at

Rodilla‟s Yema Cake production area; thus this study aims to achieve the following specific

objectives:
FACILITIES IMPROVEM ENT 16

1. To design an improved facility layout at Rodilla‟s Yema Cake.

2. To develop the improved facilities layout at Rodilla‟s Yema Cake.

3. To evaluate the improved facilities layout in terms of effectiveness, efficiency and cost.

Conceptual Framework

The project can be better understood through the guiding concepts as stated in (Input,

Process, and Output) model. The paradigm in Figure 1 shows the structure on how to conduct

and construct the proposed design.

Necessary processing time data would be gathered in this study. The current layout and

unnecessary movements would be carefully studied and considered inputs. The Input includes,

present work flow layout. The process comprises data gathering, time and motion study, design

of process layout, and process layout development. And the output: facilities layout improvement

at Rodilla‟s Yema Cake.

Existing facility layout


INPUT Present production process
Current production system

Data gathering and analysis


PROCESS Design of improved facilities layout
Development of the improved facilities layout
Evaluation

Facilities layout improvement at Rodilla‟s


OUTPUT Yema Cake

Figure 1. Conceptual Framework Paradigm


FACILITIES IMPROVEM ENT 17

Scope and Limitations

This research only focuses in designing much better facility layout that would

improve the facility layout in the production area of yema cake at Rodilla‟s. It is only

concentrated in the existing layout of the workplace, the arrangements of machines, other

facilities and workers assigned, the sequence of operations, number of facilities and workers, takt

time, and the shifting operations of every worker, on which we would be used. All other stuffs

that are not related to the study would not be included. This project study only focuses on the

simulation of the proposed facility layout.

This research would tackle all different types of facility layout with their advantages

and disadvantages, especially the machine layout which it would be as the proposed facility

layout. The time and motion study, worker-machine process, line balancing and right-hand- left-

hand rule would also be discuss in this research to show the effectiveness of the proposed layout.

Significance of the Study

The proposed process facility layout provides significant contribution on Rodilla‟s Yema

Cake like a fully maximize lines improve the overall productivity of the team. The importance of

this after the implementation would be beneficial to the following:

Company and Management. Implementation of the proposed facility layout that would

improve the process flow cycle, the time in baking, the time in baking, the arrangement of

workers and machines, and the elimination of bottleneck in the operation. To attain of higher

productivity efficiency and competitiveness of the company.


FACILITIES IMPROVEM ENT 18

Employees. They will have a comfortable working environment, much safer, and much

easier work. The proposed layout would make their work easier and lessen their fatigue, but in

the other hand they will have greater satisfaction and higher productivity.

Customers. They would be more satisfied that Rodilla‟s Yema Cake will meet their

expected taste and quality and ordered on time because of the improvement of proposed facility

layout.

Students. This research can be used as guide and reference for those students who will be

undertaking similar activities. It would capture their interest for further research and studies.

Researcher. They will have much benefit in this study in terms of verification and

application of the theories and concept with regards to their profession. They were able to apply

tools and techniques of an Industrial Engineer in the overall industry.

Definition of Terms

The following are words define operationally to easily help the readers to comprehend in

the study;

Facility Layout is thearrangement of equipment and machines at the production area of

Rodilla‟s Yema Cake.

Material Handling is a manual process of producing yema cakes by the workers at

Rodilla‟s Yema Cake to control the moving of materials.

Processing Time is the duration of time in each process of producing yema cake.
FACILITIES IMPROVEM ENT 19

Process Improvement is the changes being made in the production area of Rodilla‟s

Yema Cake for the betterment of their process.

Production is the process of making Yema Cake.

Productivity is the rate of producing Yema Cake.

Acronyms

FLP- Facilities layout problem

JIT – Just in time

LB – Line balancing

PSI – Preference selection index

SLP- Systematic layout planning


FACILITIES IMPROVEM ENT 20

Unit II

Review of Related Literature and Studies

This unit presents the literature and related studies which have direct bearing on facility

layout and design. It will discuss on how the facility layout and design can improve the work

flow in every production.

Related articles were compiled for the researchers‟ reference. These literatures provided

and additional information is necessary for the researcher in the conduct of the research process.

Facility Layout and Design

Facility layout and design is an important component of a business„s operation, both in

term of maximizing the effectiveness of the production process and meeting the needs of

employees. According to Prof. Serrano, A. (2015) the basic objective of layout is to ensure a

smooth flow of work, materials, and information through system, and basic meaning of facility is

the space in which a business „activities take place. Layout and design of the space impact

greatly how the work is done such as the flow of work, materia ls, and information through the

system. A good facility layout and design is the integrated of the need of people personnel and

customer, materials like raw material and in process, and machinery in such a way that they

create a single, well-functioning system.

According to the study of Quincena J.H.B., Granada, M.E.V., Llagas, K.J.R., Villaflor,

R.A. Jr. and Palero, M.I., authors of “Production on Layout Improvement through Facilities

Planning”, one of the problem that makes processing time too long was due to its present facility

layout, the machines are not place based on the sequence of operation that‟s why it took long
FACILITIES IMPROVEM ENT 21

time to transfer parts from its next operation. The researchers also concluded that the

arrangement of machines is based on the design of the jacket, so the process will change if the

jacket design changed. In order to improve the process, the researchers suggested that every new

design of jackets they manufacture the J&C garments should arrange their machines to avoid

overtime and achieve their quota. (Quincena, Granada, Llagas, Villaflor, Palero, 2013)

Layout is an important component of any business because it can affect the process and

operator itself, facility should be designed to be suitable for everyone who is involved in the

operation to ensure smooth flow of work. Because of its relative performance, facility layout

probably is one of the most crucial elements affecting efficiency. An efficient layout can reduce

unnecessary material handling, help to keep cost low, and maintain product flow though the

facility.

Types of Layout.There are several alternative layout types that are appropriate for

different product mixes and production volume based on the book entitled “Niebel‟s Method

Standards, & Work Design” Thirteenth Edition International 2014 by Freivalds, A. and Niebel,

B.W.. Determination of the layout type is a major design because it impacts on so many other

aspects of the production system.

Process Layout. It is one of the main focuses of the researchers in this study; it is

otherwise called as functional layout or job shop layout. Process Layout is handiness for

inspection and supervision. In Industrial engineering, Process Layout is the ground plan of the

plant, which is fits by industrial engineers to get better the competence organizing tools

consistent with their purpose. In this layout, the major plan is to fix up or collect machinery or

equipment‟s of the similar role keen on one group or division. Process Layout is also called as

functional layout. Similar machines or similar operations are situated at one rest by mean of the
FACILITIES IMPROVEM ENT 22

functions (Freivalds, Niebel, 2014). Process layout is facility configuration in which operation of

a similar nature of a function are group together. Improving process layout involves the

minimization of transportation cost, distance, or time. To accomplish this some firm use what is

known as a muter grid, where subjected information is summarized on a grid displaying various

combinations of department, work group, or machine part.

Advantage of process layout includes:

Flexibility. The firm has ability to handle a variety of processing requirement.

Cost. Sometimes, the general – purpose equipment utilized may be less costly to

purchase and less costly and easier to maintain than specialized equipment.

Motivation. Employees in this type of layout will probably be able to perform a variety of

task on multiple machines, as opposed to a boredom of performing a repetitive task on an

assembly line. A process layout also allows the employer to use some type of individual

incentive system.

System Protection. Since there are multiple machine available, process layout are not

particularly vulnerable to equipment failures.

Disadvantages of process layouts includes:

Utilization. Equipment utilization rates in process layout are frequently very low, because

machine usage is dependent upon a variety of output requirements.

Cost. If batch processing is used, in process inventory could be high. Low volume means

higher per –unit cost. More specialized attention is necessary for both products and customers.

Setups are more frequent, hence higher setup cost. Material handling is slower and more
FACILITIES IMPROVEM ENT 23

efficient. The span of supervision is small due to job complexities (routing ,setup, etc.) so

supervisory cost are higher .Additionally , in this type of layout accounting , inventory control

and purchasing usually are highly involved.

Confusion. Constant changing schedules and routing makes joggling process requirements

more difficult.

Product Layout. It is the design of finished tangible items. Paced and outpaced are the

two types of lines that is used in products layout. Paced lines is machine like conveyor that is

used to move along the products continuously while unpaved line is more like a waiting line of

workers.

Product layout efficiency will be enhanced though the used of line balancing because it

will minimizes the amount of time that some workstations are idle, due to waiting parts from

certain process in order to accommodate large volume of products in a short time with a low unit

cost. (3G Elearning, 2015).

Fixed-position layout. It is a design area for heavy or large equipment. It is appropriate

for product that is too large or too heavy to move.

Combination layout. It is a design wherein two or more process layouts are combine

according to process requirements.

Cellular layout. It is a design area for a group of machine arrange according to its

process sequence.
FACILITIES IMPROVEM ENT 24

Production Management

Production management is a system which concerned with the process of combination

and transformation of various resources into a product based on the book published by 3G

Elearning FZ LLC (2015). Production function is responsible in conversion of various resources

into desired quality of products. Production is a process of manufacturing goods. The production

systems are classified into Job shop, batch, and mass and continuous production system.

Job Shop Production is only producing ordered products in a specific time and costs.

Batch Production is only producing limited quantity of a product at regular intervals.

Mass Production is producing large number of products in a specific time, continuous

production is a sequence processing parts of a product before it turns into a finished products.

Operation Management. It is a system who facilitates the process of combination and

transformation of various resources into a product. Having an efficient system of production

planning and control helps better service to customers, fewer rush orders, better control of

inventory, and more effective use of equipment, reduced idle time, improved plant morale, good

public image and lower capital requirements.

Operation management are concerned with the various discipline such as design of goods

and services, quality of a product, design process and capacity, site selection, design layout,

human resources and design work, supply chain management, inventory decisions, scheduling

decisions and maintenance of the quality of a finished products.

Manufacturing is a process of converting a raw material to useful forms and eventually

into finished products made by hand or machinery and tools. Manufacturing systems
FACILITIES IMPROVEM ENT 25

management is focused on converting product design into economical, environment friendly and

reusable product.

Time and Motion Studies

A time-motion study is a business efficiency technique combining the time study work of

Frederick Winslow Taylor with the motion study work of Frank and Lillian Gilbreth (Camilar-

Serrano, 2016). It is a major part of scientific management. A time motion study is used to

determine the amount of time required for a specific activity, work function, or mechanical

process can reduce and control costs, improve working conditions and environment, and

motivate people. Motion and time study is considered to be the backbone of industrial

engineering, industrial technology, and industrial management programs because the information

that time studies generate affects so many other areas, including cost estimating, production and

inventory control, plant layout, materials and processes, quality and safety.

Thus, as the name suggests “time motion study” is concerned primarily with increasing

performance by measuring and then minimizing the time taken to perform various operations

without compromising the quality of services.

Motion study offers a great potential for savings in any area of human effort. We can

reduce the cost by combining elements of one task with elements of another. It uses the

principles of motion economy to develop work stations that are friendly to the human body and

efficient in their operation. It must consider the operator‟s safety. It comes first before the setting

of time standards. Motion study is a detailed analysis of the work method in an effort to improve
FACILITIES IMPROVEM ENT 26

it. It is for cost reduction, and time study is for cost control. Motion study is the creative activity

of motion and time study. It is design, while time study is measurement.

According to Mr. Eric B. Bermillo the author of “Production Efficiency Improvement

through Time and Motion Study” his evaluation on the findings and results of the study‟s

investigations yielded a reduced idle time of Machine Operators 1 and 2 for Go Life Angled

from 65% percent to only 25% percent. The researcher also evaluated the new process design‟s

implementable feasibility through a cost-benefit analysis to show potential savings generated

through the idle time reduction and transportation waste production output against the cost of

two (2) additional trimming machine tools. Furthermore the researcher‟s assumption and

objective is that: idle time percent can be converted productively through automated trimming

machinery, then both manpower and machine downtime can be converted productively; and; if

the trimming transportation problem can be minimized or eliminated, the overall production

improvement. The researcher also used the Time and Motion Study principles and concepts to

prove that a solution to the company‟s present problem can be reached using all IE basic tools in

project development and problem solving in order to achieve improvement of production

efficiency.

Flow Process Chart.Lontoc, et al. (2012), it helps in setting out the sequence of the flow

of a product or a procedure by recording all events under review using appropriate process chart

symbols. This tool is a graphical or symbolic representation of a process. Each step in the

process is represented by different symbols and contains a short description of the process step. It

covers symbols for operation, inspection, storage, delay and transportation.


FACILITIES IMPROVEM ENT 27

The researchers used the flow process charts to analyze the flow of the process in the

production area of Rodilla‟s Yema Cake. The proponents can identify if there will be any

irregularity in the flow of the process.

Lean Concept

Lean enterprise is progressively more applied to manufacturing, service and non-profit

organization. Lean enterprise as of this date has been extended by combining lean production

idea to six sigma. Although, not all organization can apply this concept, but other which have

successfully applied these combined concepts have experienced noteworthy upgrade in their

performance in term of operation.

Bozarth & Handfield defined lean manufacturing as follows, which is essentially the

same to JIT: „Lean is a philosophy of production that emphasizes the minimization of the amount

of all the resources (including time) used in the various activities of the enterprise‟. The aim of

lean operation is to achieve a stable flow of products and services that could be delivered to

customer at the quality level and time they want in order to satisfy customers‟ needs. In addition,

lean operation could guarantee the production process to be more flexible when the demand is

uncertain.

According to Mayer, RR (2014) lean enterprise must be identify production and lean

thinking; and enumerate different types of waste and their banner of elimination: name

components of lean production system: and discuss new advances in lean production. In

addition, there is strong evidence that the concurrent implementation of internally- focused and

externally- focused lean practices yields greater performance benefits than selective lean
FACILITIES IMPROVEM ENT 28

production implementation. Thus, this study contributes to the theory of lean production by

providing insights into the mediated and moderated effects of lean production on inventory

leanness and financial performance.

The researchers investigate the relationship between lean production, inventories and

performance. The empirical analysis is based on survey and secondary data from US

manufacturing firms. The effect of lean production on performance is partially mediated by

inventory leanness. The concurrent implementation of lean practice bundles yields greater

performance benefits.

Assembly Line Balancing

The Balancing of assembly lines is one of the most important problems among the other

problems of assembly lines like designing and managing. In today's highly competitive

manufacturing environment increasing system flexibility, reducing failure sensitivity, improving

system balance and productivity are crucial.

Parallel assembly lines provide some opportunities in improving these objectives

especially when the capacity of production system is insufficient. Unlike the traditional assembly

lines there are a few studies on balancing parallel assembly lines in the present literature. Parallel

assembly line balancing is a NP-hard problem similar to other assembly lines. In this paper, a

novel multiple-colony ant algorithm is developed for balancing bi-objective parallel assembly

lines.

Assembly lines are designed as flow oriented production systems which perform

operations on standardized products in a serial manner, that was according to Ozbakir, L.,
FACILITIES IMPROVEM ENT 29

Baykasoglu, A., Gorkemli, B., Gorkemli, L., authors of “Multiple-colony ant algorithm for

parallel assembly line balancing problem” in Applied Soft Computing (Volume 11, Issue 3,

April 2011, Pages 3186–3198).

The researchers used assembly line balancing to increase such as minimizing wastes in

terms of waiting time, transportation and motion, reduce failure and improved system. The

researchers believe if the line is balanced it has smooth flow of work because it minimizes

wastes such as waiting, rework, transportation and unnecessary motion.

Just-in-time

Just-in-time (JIT) is „producing the necessary item in the necessary quantity at the

necessary time is an eternal diver of production and operations management‟. The ultimate

objective of JIT is to enhance flexibility of the whole system, which is one of the competitive

factors in future manufacturing and services systems.

Definition of JIT is quite consistent in many studies (or even textbooks) to the one

mentioned in previous section. For example Bozarth & Handfield defined JIT as: „A philosophy

of manufacturing based on planned elimination of all waste and on continuous improvement of

productivity. In the broad sense, it applies to all forms of manufacturing and to many service

industries as well‟. JIT requires elimination of waste which means that JIT systems could lead to

delivery of „perfect‟ products or services at the „exact‟ time they are required main purpose of

JIT systems is to identify and to eliminate as many kinds of wastes as possible through

improving production activities within a company.


FACILITIES IMPROVEM ENT 30

A JIT system could be an „effective tool‟ for assisting a company to reduce cost and then

to obtain higher profits. JIT can be considered as one of the variants of production planning and

control systems, which are pivotal management tools for satisfying increasingly high client

demands and expectations in the business market, although traditional production planning and

control systems are „push‟ in nature, which means planning department decides the production

schedule and transmits to all production processes according to forecast of the demand of

market.

According to Furlan, A., Dal Pont, G., Vinelli, A., authors of “ Towards High

Performance Manufacturing”, in International Journal of Production Economics (Volume 133,

Issue 2, October 2011, Pages 489–495), the sequential nature of the improvement initiatives has

neglected the synergistic effects among practices and literature lacks research on

complementarily between internal and external bundles of practices. The aim of this paper is to

test the existence of complementarily among internal and external just-in-time bundles. The

researchers ran statistical analysis using the third round of High Performance Manufacturing

international research project data set and found that upstream and downstream JIT are

complements. This finding suggests the importance of managing the inter-dependencies both in

designing and implementing upstream and downstream JIT in order to maximize operational

performance. Various benefits, for example, inventory reduction, improved in operations

efficiency, and faster response, have been studied widely in previous research. Therefore,

successful implementation of JIT is vital to many companies. The main objective of this research

is to make use of a case study to present various issues surrounding implementation of JIT for an

automotive company. This case study also provides evidences for supporting the benefits of
FACILITIES IMPROVEM ENT 31

employing JIT. The conclusion of this research indicates that JIT system is successful, and

operating JIT system can lead to many advantages to the case company.

The researchers therefore conclude that waste in time is a very important subject, for it

affects the productivity of every manufacturing organization. Reducing time waste is a never

ending process. Application of Just-In-Time system in the process workflow, a serious effort is

made to reduce not only moving and waiting time but also processing time. It is very important

to study carefully how time spent in the production process.

Material Handling

Material handling includes motion, time, place, quantity and space constraints. First,

material handling must ensure that parts, raw material, in-process materials, finished products

and supplies are moved periodically from the location to location. Second, as each operation

requires materials and supplies at a particular time, material handing ensures that no production

process or customer is hampered by either the early or late arrival of materials. Third, material

handling must ensure that materials are delivered to the correct place. Fourth, material handling

must ensure that materials are delivered at each location without damage and in the proper

quantity. Finally, material handling must consider storage space, both temporary and dormant.

A study conducted by the Material Handling Institute revealed that between 30 and 85

percent of the cost of bringing a product to market is associated with material handling.

Axiomatically, the best part is the least manually handled part. Whether the distances of the

moves are large or small, these moves should be scrutinized. There are five points that should be

considered for reducing the time spent in material handling, first is reducing time spent in
FACILITIES IMPROVEM ENT 32

picking up material; use mechanized or automated equipment; make better use of existing

handling facilities; handle material with greater care; consider the application of bar coding for

inventory and related applications. A good example of the application of these five points is the

evolution of warehousing; the former stage center has become an automated distribution center.

Today, the automated warehouse uses computer control for material movement, as well as

information flow through data processing. In this type of automated warehouse, receiving,

transporting, storing, retrieving and controlling inventory are treated as an integrated function.

Companies become more interested in the manufacturing of material handling equipment

for the sustainability of their products (Shevtshenko, E., Bashkite, V., Maleki, M., Yan Wang,

authors of “Sustainable Design of Material Handling Equipment: A Win-win Approach for

Manufacturers and Customers” at Volume 18, No. 5 (2012). One possible approach to make

material handling equipment more sustainable is to make it re-configurable, reusable and

reliable. Those products are likely to be reused when customers‟ requirements change. More

sustainable material handling equipment can be much easier sold in the future, due to the

possibility to be reconfigured in accordance to the new customer requirements is high.


FACILITIES IMPROVEM ENT 33

Unit III

Methods and Procedures

This unit discussed about research design, research environment, research procedures and

design concepts for better understanding of the study. It also includes the industrial engineering

tools and principles for the development of this study.

Research Design

This study used research and development to describe the improvement of new

arrangements of equipment in Rodilla‟s Yema cake. The researchers establish a new design of

facility layout, charts and diagrams that may serve as a prototype for this study. This study is

begun with the interview and observations in the research environment and through researches

found in books and studies. This study aims to improve the current facility layout of Rodilla‟s

Yema cake by eliminating unnecessary movements or motions using industrial engineering

analysis to figure out the best solutions to improve the current process and layout.

The researchers decided to achieve an efficient production flow by focusing on the

facility layout. Improving actual layout can be reduced until 30% through an effective facility

planning. Re-lay outing facility design could improve the performance of production line such as

decrease bottleneck rate, minimized material handling cost, reduces idle time, raise the efficiency

and utilization of labor, equipment and space.


FACILITIES IMPROVEM ENT 34

The researchers used a research and development to describe the improvement of new

arrangement of equipment at Rodilla‟s Yema cake. The researcher gather data through interview,

observation, researches and principles found in books and other related studies.

Research Environme nt

This study was conducted in the production area of Rodilla‟s Yema cake located at Brgy.

Ilayang Wakas Tayabas, Quezon. The researchers gathered all the data to be used in the

improvement of facility layout at Rodilla‟s Yema Cake from field of observations, interviews of

the head of the operations and the employees, and other data provided by the process group

department. These would also serve as guide for the researchers to obtain the best design of

facility layout that would improve the process. The sources of information for the present and

proposed layout were differing from each other. The sources of data that were used in obtaining

the necessary information for the research study are the following:

In the observation of the proponents to the production area of Rodilla‟s Yema Cake in

minimum of twice a month to familiarize the actual procedure and the production process of

yema cakes, the researchers need to take note all the important things which are regarding the

activity in the environment of the production area. It is the process of observing come one

carefully in order to gain information. In this scenario, the researchers observed the actual

transaction of yema cakes inside and outside the production area. Truly then, the researcher

know the condition of their production area and process, what they need to do some

improvement.
FACILITIES IMPROVEM ENT 35

Interview was conducted at the main office of Rodilla‟s Yema Cake; it was considered as

one if its research environments. In this case, interview is one of the mean points that the

researchers used in this proposed study.

Researchers read and gathered other information in the Internet Research using the Wi-Fi

of Enverga University to guide the researchers. The researchers were able to conduct an

intensive research regarding the production and distribution of Cakes. With this way, they are

able to gain related studies from different countries which are meet knowledge able to a

proposed study.

The researchers gathered their data by means library research using the books of Enverga

University, which would help the researchers to understand the ongoing study. Library technique

was conducted by the researchers in order to achieve the objectives of the study that they had

constructed at Rodilla‟s Yema Cake.

Procedures

This section provides details on how the study was conducted. In performing the project

study, the researcher first conducted data gathering to identify problems.

Data Gathering. Is an important aspect of any type of research study, it consists of

different means in collecting data needed. The important data in this study are the following: the

current facility layout, the problem and lapses encountered in production area, knowledge in

facility layout and design, knowledge in time and motion study. The following are the means of

data gathering that the researcher used.


FACILITIES IMPROVEM ENT 36

Direct Observation. One way to gather data is to carefully observe the current situation

of the workplace in Rodilla‟sYema Cake.

Interview.Interviewing 4 operators and the supervisor helped the researchers to determine

problems in Rodilla‟sYema Cake. These interviews were necessary to gather data for the

development of the study.

Research.The researchers used two kinds of research using Internet research (it is the

most useful and easiest way to gather data and information needed) and Library research

(information such as concepts, techniques and methodologies of facility improvement can also

be obtained from the books).

Video-Camcorders.Recording every interview with the operators and the supervisor and

recording processes from raw materials to the finished product helped the researcher to easily

gather data.

Data Analysis. It is the action or process of observing something or someone in order to

gain information. The researchers conduct a regular observation in the Rodilla‟sYema cake to

determine all possible lapses and gaps in the production area.

The discussion between two or more people where in questions are being asked by the

interviewer to obtain the particulars or statements from the interviewee. The researchers

interviewed head of the operation and some workers from the different area of the production to

know their actual experience in the production line.

The researcher has used Why why analysis to understand the main reason of possible

defects and slow transportation after the collection of data. The researcher mapped the current
FACILITIES IMPROVEM ENT 37

process using the process flow chart. Upon analysis of the problem the researcher validates all

the probable reasons to determine the root cause.

Design of Improved Facilities Layout. The researchers began with the project

discussion stage or the identification of the problem. After the researchers identify the problems

and lapses experienced in the facility and improved plans to define what the project would

provide; when would it be done; who would benefit; and what should be maintained.

After the researchers identified and classified the actual situation, the researcher tried to

improve the layout by using various IE tools to reach the objectives in design improvement

facility and machine layout using time and motion study and line balancing.

Development of Improved Facilities Layout. The researchers observed the facilities

and started to interview the head of production. The researcher identified the root cause of the

problem that they encounter during the production process. The researchers inspect all the

aspects on how to develop the productivity by elaborating the objective of the study. The

developed layouts were applied to achieve greater productivity. The researchers estimated the

proposed project in terms of functionality, effectiveness, efficiency and cost.

Evaluation. The researchers evaluated their recommended output by comparing the

actual and propose layout of the company. The evaluation of the study is necessary to determine

the functionality effectiveness, efficiency and cost of the proposed layout.

The researchers use five point Likert scale to qualify the numeric conclusions. The scale shown

in the table 1. The qualitative descriptions in the likert scale use are as follows: (5) strongly

agree, (4) agree, (3) neutral, (2) disagree, and (1) strongly disagree.
FACILITIES IMPROVEM ENT 38

Table 1.

Modified Likert scale

Verbal Interpretation base


Numerical Rating Arithmetic Mean Rating
on Questionnaire

5 4.21-5.00 Strongly Agree

4 3.41-4.20 Agree

3 2.61-3.40 Neutral

2 1.81-2.60 Disagree

1 1.00-1.80 Strongly Disagree

The table 1 follows the Likert scale that contains the categories and its corresponding

ratings that used by the researcher in evaluating the improved facilities layout at Rodilla‟s Yema

Cake.

Design Concepts

In this project study, the selection of material is an important tool of successful facility

layout. The researcher considered the theories learned from facility planning and layout. In order

to perform this activity, there are methods and research that needs to be done. This step by step

process and action will give a detailed through understanding of what is needed to address the

problem. The methods used are discussed in the following:

Time and motion study. It is for the researchers to enhance work performance through

analysis and improvement of body and hand movement as well as determining the standard cost
FACILITIES IMPROVEM ENT 39

of a particular work. Through the use of this tool, the researcher can identify the results of total

time and movements of the employees.

Line Balancing. Line Balancing is leveling the workload across all processes in a cell or

value stream to remove bottlenecks and excess capacity. A constraint slows the process down

and results if waiting for downstream operations and excess capacity results in waiting and

absorption of fixed costs. The researchers will use this to match the production rate after all

waste has been removed to takt time at each process of the value stream.

Work Station Design. Since the researchers‟ objective is to improve the facility layout,

workstation will contributes to productivity and the quality of the products and takes care of the

health and well-being of the workers. Conversely, the poorly designed workstation will result in

low productivity, quality problems and is likely to cause or contribute to the development of

health complaints or chronic occupational diseases.

Flow Process Chart. This is an analyzing process particularly in looking up to eliminate

sources of waste or delay. The flow process chart is a graphical and symbolic representation of

the processing activities performed on the work piece. The chart can selectively be used to show

what happens to selected people, materials or equipment.

Computer Aided Drafting. It is a software application for computer aided design (CAD)

and drafting. It aims to simplify the drawing of the proposed layout. The researchers used

computer aided drawing (CAD) to illustrate an improved facilities layout.

Cost- Benefit Analysis. It is a comparative assessment of all the benefits you anticipate

from the project and all the costs to introduce the projects, perform it, and support the changes

resulting from it. It is used for the researchers to estimate and total up the equivalent money
FACILITIES IMPROVEM ENT 40

value of the benefits and costs to the community of projects to establish whether they are

worthwhile.

Relationship Activity Chart. It is a list of all departments on the relationship chart, it

also defines criteria for assigning closeness between relationships and it establishes relationships

value. It is used for the researchers to allow everyone to contribute something to the development

of the relationship chart it also minimizing unnecessary transportation in industrial facility

Travel Chart. It is a simple table where there are multiple movements between places. It

is a variation on the check sheet, indicating movements between places. It is a variation on the

check sheet for the researchers to indicate movements from and to any combination of a given

set of locations.
FACILITIES IMPROVEM ENT 41

Unit IV

Results and Discussions

The information provided in this unit is based on the collected data. This collected data

are used to the effectiveness of the proposed project study. This unit also presents the step by

step method for the better understanding on how the proposed study will be incorporated in the

existing process.

Data Gathering

The researchers gather data in the production area of Rodilla’s Yema Cake, its present or

existing facility layout, present workflow diagram, and present flow process chart to come up

with the proposed facility layout design. To design an improved facility layout, the researchers

gathered all the relevant data regarding the company by interviewing the manager and workers,

and also by doing field observation in the production area.

The first step of Systematic Layout Planning requires gathering and analyzing data

required for the study. This must occur before any planning of relationships, space or

adjustments. The input variables for every SLP are P, Q, R, S and T. Product (P) is the material

that will be processed. For this study, the products are the yema cakes. Quantity (Q) is the

volume of each product to be processed. The volume in this study refers to the output of each

product. It relies on the total time used to build a unit of product. Routing (R) is the path a

product travels to be processed. The routing (R) in this study is obtained from the company’s

process specific document(PSD) for yema cakes. Time(T) refers to the overall time required to

complete processing. Data collection of the cycle time for each process is done by time studies.
FACILITIES IMPROVEM ENT 42

Existing Set-Up.The production area produces four different types of cake with flavors

original yema, chocolate, mocha and ube. A flowchart is used toa type of diagram that represents

an algorithm, workflow or process, showing the steps as boxes of various kinds, and their order

by connecting them with arrows. This diagrammatic representation illustrates a solution model to

a given problem.

Flowcharts are used in analyzing, designing, documenting or managing a process or

program in various fields. This production area uses various types of machines like egg mixers,

flour mixers, icing mixers, and big and small ovens. It operates eight hours a day, six times a

week. The workers compensation is paid based on the policy of Rodilla’s Yema Cake. The yema

cake production was composed of 12 processes which are operated by 25-30 workers.

In analyzing processes, particular actions along the way are often significant, especially if

you are looking to eliminate sources of waste (ormuda, as the Japanese call it). The chart can

selectively be used to show what happens to selected people, materials or equipment.

The 12 processes on how the production area of Rodilla’s operates are: 1.) Receiving of raw

materials. 2.) Storing of raw materials into storage or stock room. 3.) Issuing of materials to

production. 4.) Pre mixing. 5.) First baking. 6.) Second mixing. 7.) Second baking. 8.) Cooling.

9.) Slicing. 10.) Icing and cheesing. 11.) Packing. 12.) Loading of finished products.
FACILITIES IMPROVEM ENT 43

Start

Receiving of raw materials

Storing of raw materials into storage or stock room

Issuing of materials to production

Pre-mixing

First baking

Second mixing

Second baking

No Yes
Let it cool Does the
dough cool? Slicing

Icing and cheesing

Packing

Loading of finished

End

Figure 2.Present flow process chart


FACILITIES IMPROVEM ENT 44

Present Flow Diagram. Industrial Engineering tools help the researchers to elaborate the

problems in the production area of Rodilla’s Yema Cake and also help to establish a better

design of the facility layout. Figure 3 shows how the actual process of producing yema cakes. It

also shows the arrangement of facilities and the spaces between each machine. There were 11

ovens, 2 mixers for flour and sugar mixing, 6 big mixers for making chiffon cake, 8 mixers for

icing, 6 racks and 7 tables in the finishing area.

Figure 3.Present flow diagram

Process begins with incoming material at the production area. However this process is not

included in the scope of this case study. After that, the pre mixing assembly is performed by the

operator in the lower building of the production. After that they have to transfer the mixed

ingredient to the next process which is chiffon making. The chiffon making process will take

about 6 minutes in each mixer of dough. Upon completion, operator has to transfer the mixed

dough into the oven section; this will take about 30 minutes in each batch of cakes per oven.
FACILITIES IMPROVEM ENT 45

After the baking of cakes in the oven it proceeds to the next process which is cooling. When the

cakes are cool enough operator transfer them to the finishing section located at a different

building above the baking section. This process requires the usage of racks. Therefore long

travelling distance and time occurs when the operator has to wait for the cakes to cool and

travelling occurs to-and-from from the ovens to the finishing section.

After the transferring of cakes to the finishing sections, cakes are going to 3 same

assemblies of slicing, icing and cheesing. The processes are being done in three different

assembly tables all at the same time before it is transferred to another table which is boxing.

Present Relationship Diagram.Figure 4 shows the actual layout or location of the

different departments in the production area of yema cakes. These departments are the icing

section, storage area, washing area, mixing areas, oven section, racks area, icing and slicing area,

boxing and packing area.

Figure 4.Present relationship diagram


FACILITIES IMPROVEM ENT 46

Present Facility Layout.The existing layout of the production area of Rodilla’s Yema

Cake is given in Figure 2 below. In this layout, the dimensions of the area and the existing

assemblies or process sections are shown.

Figure 5.Present facility layout

Present Standard Time. Standard provides information essential for the successful

operation of an organization. To calculate standard time for each operation, time study is

conducted in the production area. To do this, the researcher selects one operator from each

operation. Then, each operation is taken for at least three cycles to get better results. Once time

study is made by collecting raw data the performance rating is given to each operator and actual

time is calculated for particular operation.

Standard Time determination is the observed time (OT) of the given element is

determined by taking the mean of 5observations. The sample size, n, is then calculated to show
FACILITIES IMPROVEM ENT 47

its sufficiency. Normal Time (NT) is found by multiplying the observed time by the average

rating.

By using one of the oldest used rating systems, the Westinghouse rating system

considering four factors in evaluating the performance of the operator: skill (as proficiency at

following a given method), effort (is representative of the speed with which skill is applied, and

can be controlled to a high degree by the operator), conditions (referred to in this performance

rating procedure affect the operator and not the operation, and they include temperature,

ventilation, light, and noise.), and consistency (as being in conformity with a set of rules,

guidelines or policies), the researchers determined the value of the rating factor.

Normal Time = Observed Time*Average Rating

The rating used here is 119% for the overall rating factor of all the operators:

Skill B2 +0.18
Effort B1 +0.10
Condition D 0.0
Consistency C +0.01
Algebraic Sum: +0.19
Performance Factor: 1.19

Standard Time= Normal Time/ (1- Allowances)

Allowances for this project are: Personal needs 5%, Unavoidable delay 1%, Basic Fatigue

4 %, Total = 10%

Actual Computation:

Observed Time: 3032.4 seconds (small) 3017.4 seconds (big)

Normal Time: 3032.4*1.19 = 3608.56 3017.4 *1.19 = 3590.71

Standard Time: (3608.56) (1+.10) = 3969.42 (3590.71) (1+.10) = 3949.78


FACILITIES IMPROVEM ENT 48

Table 2.
Present time study for small cakes
Activity : Yema Cake Production ( Small )

Date : 2016
Operator: BSIE
Circle appropriate Method & type :
Method: Present Proposed

Remarks

Event Description Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Average Time


(sec) (sec) (sec) (sec) (sec) (sec)
Mixing the Flour 67 65 63 66 64 65
Transferring of mixed flour 32 29 31 28 30 30
Making of chiffon cake 390 390 390 390 390 390

Baking of chiffon cake in the 1830 1830 1830 1830 1830 1830
oven
Transferring of baked chiffon 115 125 122 120 118 120
cake racks
Cooling of cakes in the racks 480 480 480 480 480 480

Transferring of racks to the 58 122 60 59 61 72


finishing section
Slicing of cakes ( small Yema 4 4 4 4 4 4
Cake )
Icing of cakes 22 23 21 19 20 21
Cheesing of cakes 10 8 6 9 7 8
Transferring of cakes 5 4 6 6 4 5
Boxing of cakes 9 7 7 6 8 7.4
Arranging of finished cakes 2 2 2 2 2 2
for the delivery

Total 3024 3089 3022 3019 3018 3034.4


FACILITIES IMPROVEM ENT 49

Table 3.
Present time study for big cakes

Activity : Yema Cake Production ( Big )

Date : 2016

Operator: BSIE

Circle appropriate Method & type :


Method: Present Proposed

Remarks

Event Description Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Average Time


(sec) (sec) (sec) (sec) ((sec) (sec)
Mixing the Flour 67 65 63 66 64 65

Transferring of mixed flour 32 29 31 28 30 30

Making of chiffon cake 390 390 390 390 390 390

Baking of chiffon cake in the 1830 1830 1830 1830 1830 1830
oven

Transferring of baked chiffon 120 123 117 123 117 120


cake racks

Cooling of cakes in the racks 480 480 480 480 480 480

Transferring of racks to the 58 62 60 59 61 60


finishing section

Slicing of cakes ( big Yema 2 2 2 2 2 2


Cake )

Icing of cakes 23 17 21 19 20 20

Cheesing of cakes 5 4 6 7 8 6

Transferring of cakes 5 4 6 6 4 5

Boxing of cakes 9 7 7 6 8 7.4

Arranging of finished cakes 2 2 2 2 2 2


for the delivery

Total 3023 3015 3015 3018 3016 3017.4


FACILITIES IMPROVEM ENT 50

Table 4.
Summation of the present time study for small and big cakes
`Location: Rodillas Yema Cake `Location: Rodillas Yema Cake
Activity :Yema Cake Production (small) Activity :Yema Cake Production (big)

Date: 2016 Date: 2016


Operator: BSIE Operator: BSIE

Circle appropriate Method & type : Circle appropriate Method & type :
Method: Present Proposed Method: Present Proposed

Remarks: Remarks:

Event Description Time Event Description Time


(sec) (sec)
Mixing the flour 65 Mixing the flour 65

Transferring of mixed flour 30 Transferring of mixed flour 30

Making of chiffon cake 390 Making of chiffon cake 390

Baking of chiffon cake in the oven 1830 Baking of chiffon cake in the oven 1830

Transferring of baked chiffon cake to 120 Transferring of baked chiffon 120


the racks cake to the racks
Cooling of cakes in the racks 480 Cooling of cakes in the racks 480

Transferring of racks to the finishing 72 Transferring of racks to the 60


section finishing section
Slicing of cakes( small Yema Cake ) 4 Slicing of cakes( big Yema Cake ) 2

Icing of cakes 21 Icing of cakes 20

Cheesing of cakes 8 Cheesing of cakes 6

Transferring of cakes 5 Transferring of cakes 5

Boxing the cakes 7.4 Boxing the cakes 7.4

Arranging of finished cakes for the 2 Arranging of finished cakes for 2


delivery the delivery
FACILITIES IMPROVEM ENT 51

Table 5.
Present time study data

Description Time
Small Cakes Big Cakes
Observed time (sec/unit) 3034.4 3017.4
Standard time (sec/unit) 3969.42 3949.78
Working hours 28800 28800
Output 500-700 500-700
Total travel time 227 215

From the data gathered, the total time of processing for a single cake is 3034.4 seconds

for a small cake and 3017.4 for a big cake. With the standard working days per month of 22

days, the output yields 11000-15400 small and big yema cakes per month. It can be seen that the

travelling time is high due to frequent travelling between 2 buildings. The travelling time is

about 210-230 seconds which is higher than the assembly and cueing time.

Present Flow Process Chart.A facility layout is an arrangement of everything needed

for production of goods or delivery of services. It means planning for the locations of all

machines, utilities, employee workstations, material storage area, aisles, offices and storage

rooms. This is for the flow patterns of materials and people around, into and within buildings.

In the production of yema cake, operation starts by mixing different ingredients from

different areas in the production. The flow process chart illustrates the delayed process in making

yema cake including all activities such as the operations, transportations, delays and storage.

This helps the researchers in setting out the sequence of the flow of a product by recording all

events under review using appropriate process chart symbols.


FACILITIES IMPROVEM ENT 52

`Location: Rodillas Yema Cake Summary


Activity :Yema Cake Production (small) Event Present Proposed Savings
No. Time No. Time
(sec) (sec)
Date: 2016 Operation 7 2327.4
Operator: BSIE Transport 4 227

Circle appropriate Method & type : Delay 1 480


Method: Present Proposed
Storage 0 0

Inspection 0 0

Total 13 3034.4
Remarks:
Total Distance 21 meters
Process Description Symbol Time Distance Method
(sec) (meter) Recommendation
Mixing the flour 65

Transferring of mixed 30 1.5


flour
Making of chiffon 390
cake
Baking of chiffon cake 1830
in the oven
Transferring of baked 120 12.5
chiffon cake to the
racks
Cooling of cakes in the 480
racks
Transferring of racks 72 6
to the finishing section
Slicing of cakes( Small 4
Yema Cake )
Icing of cakes 21

Cheesing of cakes 8

Transferring of cakes 5 1

Boxing the cakes 7.4

Arranging of finished 2
cakes for the delivery

Figure 6.Present flow process chart for small cakes


FACILITIES IMPROVEM ENT 53

`Location: Rodillas Yema Cake Summary


Activity :Yema Cake Production (big) Event Present Proposed Savings
No Time No Time
(sec) (sec)
Date: 2016 Operation 7 2322.4
Operator: BSIE Transport 4 215
Circle appropriate Method & type : Delay 1 480
Method: Present Proposed Storage 0 0
Inspection 0 0
Total 13 3017.4
Remarks: Total distance 21 meters
Process Description Symbol Time Distance Method
(sec) (meter) Recommendation
Mixing the flour 65

Transferring of mixed 30 1.5


flour
Making of chiffon 390
cake
Baking of chiffon cake 1830
in the oven
Transferring of baked 120 12.5
chiffon cake to the
racks
Cooling of cakes in the 480
racks
Transferring of racks 60 6
to the finishing section
Slicing of cakes(Big 2
Yema Cake )
Icing of cakes 20

Cheesing of cakes 6

Transferring of cakes 5 1

Boxing the cakes 7.4

Arranging of finished 2
cakes for the delivery

Figure 7.Present flow process chart for big cakes


FACILITIES IMPROVEM ENT 54

In getting the data of the flow process chart, the researcher used the standard time of each

operation computed in the time study table. The transportation distances was got from measuring

the distance of each station to the next station based on the sequence of the process while the

transportation time is computed by taking up the average of the 5 trials of the observed time

collected by the researcher. The total flow time of producing yema cake is computed.

Data Analysis

The results of the interview and observation in the production area, the researchers found

out that the common problem that the production area of Rodilla’s Yema Cake usually

encountered is long processing time between each processes because of their distances from each

other. To be able to understand the roots of the problem, and how will it be prevented, the

researchers use of various root cause analysis tools as shown in the following figures.

Table 6.
Whys Analysis – Causes of the problem in Rodilla’s Yema Cake
Why’s Because
Why Rodilla’s cannot produce yema cake in There having a hard time in the production of
time? yema cake.

Why Rodilla’s having a hard time in the There is a long transportation of each
production of yema cake? operations/stations.

Why was there a long transportation of each The production area has a poor production
operations/stations? system.

Why the production area has a poor production The operations are not in proper arrangement?
system?
Why was there a improper arrangement? Because the production area has a poor facility
layout.
FACILITIES IMPROVEM ENT 55

In Table 5, the causes of the error in production of yema cake were shown using the 5

whys analysis. From the last reason, the answer to the problem was found out to redesign of an

improve facility layout of the production area.

Figure 8.Ishikawa Diagram

Validation of Root Cause


Table 7.
Validation of Root Cause Using Why’s Analysis
Primary causes Secondary causes Validation of root cause
Rodilla’s cannot produce yema There having a hard time in the Not a true cause
cake in time production of yema cake
Rodilla’s having a hard time in the There is a long transportation of Not a true cause
production of yema cake each operations/stations
Rodilla's has a long transportation The production area has a poor Not a true cause
of each operations/stations production system
The production area of Rodilla's The operations are not in proper Not a true cause
has a poor production system arrangement
The operation in production area The production area has a poor True cause
of Rodilla's has a improper facility layout.
arrangement
FACILITIES IMPROVEM ENT 56

Table 8.

Validation of Root Cause Using Ishikawa Diagram

Primary causes Secondary causes Validation of root cause


Over Fatigue Not a true cause
Not properly trained Not a true cause
Man
Not flexible Not a true cause
Unnecessary movements Not a true cause
Overused True cause
Machine Under maintenance Not a true cause
Poor production yield Not a true cause
Delayed cooling of cakes Not a true cause
Line balancing True cause
Method
Material handling Not a true cause
Transferring of cake True cause
Far location of storage Not a true cause
Undersupply of raw materials Not a true cause
Material
Mixing of ingredients Not a true cause
Poor quality of eggs Not a true cause
Weather condition Not a true cause
Poor lighting Not a true cause
Environment
Facility Layout True cause
Getting hit by other operators Not a true cause

Design of Improved Facility Layout

Activity Relationship Chart.In this stage, the identification of the relationships between

resources is discussed. The resources are the various processes involved in the manufacturing of

the product. The information regarding where a product is received from and the destination of

the product upon completion is gathered.

The results are tabulated in an activity relationship chart. The relationship chart displays

which entities are related to others and it also rates the importance of the closeness between

them. This makes the chart the most effective tool for layout planning and is the best way of
FACILITIES IMPROVEM ENT 57

planning the arrangement of a plant layout having little flow of materials. The quantitative

descriptions used in activity relationship chart are as follows: (A) absolutely necessary, (E)

especially important, (I) Important, (O) ordinary closeness, (U) unimportant, and (X)

undesirable.

Figure 9.Activity relationship chart

Space Relationship Diagram. The space relationship diagram is a visual display of the

activity relationship chart. Each entity on the chart is translated to a symbol to be placed on the

diagram and then lines are connected to show the value of the relationship. Figure 10 shows the

space relationship diagram of the production area of Rodilla’s Yema Cake. The numbers and

types of lines are used to distinguish the importance between each process are as follows; (A)

four straight lines, (E) three straight lines, (I) two straight lines, (O) one straight lines, (U) no

line, (X) zigzag line.


FACILITIES IMPROVEM ENT 58

Figure 10.Space relationship diagram

Absolutely necessary relationship occurs between the assembly line of slicing/icing and

boxing. Locating them close together is absolutely necessary as the products share these 2

processes. Rework process, which requires travelling to and fro among these 2 processes, is also

the highest. Especially important relationship occurs among mixing process, baking and oven

and cooling as these processes occur back to back and are also shared between products.

Block Diagram. This shows the new actual layout or location of the different

departments in the production area of yema cakes. These departments are the icing section,

storage area, washing area, mixing areas, oven section, racks area, icing and slicing area, boxing

and packing area.


FACILITIES IMPROVEM ENT 59

Figure 11.Block diagram

Standard Time. Standard provides information essential for the successful operation of

an organization. To calculate standard time for each operation, time study is conducted in the

production area. To do this, the researcher selects one operator from each operation. Then, each

operation is taken for at least three cycles to get better results. Once time study is made by

collecting raw data the performance rating is given to each operator and actual time is calculated

for particular operation.

The researchers then make a new time table to test the proposed facility layout that has

been implemented at the production area of Rodilla’s Yema Cake. The data is shown in the

figure below.
FACILITIES IMPROVEM ENT 60

Table 9.
Proposed time study for small cakes

Activity : Yema Cake Production ( Small )

Date : 2016

Operator: BSIE

Circle appropriate Method & type :


Method: Present Proposed
Type : Material WorkerMachine
Remarks

Event Description Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Average Time


(sec) (sec) (sec) (sec) (sec) (sec)

Mixing the Flour 67 65 63 66 64 65

Transferring of mixed flour 8 8 8 8 8 8

Making of chiffon cake 308 308 308 308 308 308

Baking of chiffon cake in the 1830 1830 1830 1830 1830 1830
oven

Transferring of baked chiffon 60 60 60 60 60 60


cake racks
Cooling of cakes in the racks 433 437 436 434 435 435

Transferring of racks to the 15 15 15 15 15 15


finishing section

Slicing of cakes (small Yema 4 4 4 4 4 4


Cake)

Icing of cakes 18 16 20 16 20 18

Cheesing of cakes 6 8 6 7 8 7

Transferring of cakes 1 1 1 1 1 1

Boxing of cakes 6 8 7 6 8 7

Arranging of finished cakes 2 2 2 2 2 2


for the delivery

Total 2758 2762 2760 2757 2763 2760


FACILITIES IMPROVEM ENT 61

Table 10.
Proposed time study for big cakes

Activity : Yema Cake Production ( BIg )


Date : 2016
Operator: BSIE
Circle appropriate Method & type :
Method: Present Proposed
Type : Material Worker Machine
Event Description Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Average
(sec) (sec) (sec) (sec) (sec) Time (sec)
Mixing the Flour 59 61 63 60 57 60
Transferring of mixed 7 8 8 8 9 8
flour
Making of chiffon cake 308 308 308 308 308 308

Baking of chiffon cake 1830 1830 1830 1830 1830 1830


in the oven
Transferring of baked 60 60 60 60 60 60
chiffon cake racks
Cooling of cakes in the 435 431 433 437 439 435
racks
Transferring of racks to 13 15 17 15 15 15
the finishing section
Slicing of cakes ( big 2 2 2 2 2 2
Yema Cake )
Icing of cakes 17 15 16 17 15 16
Cheesing of cakes 4 4 4 3 5 4
Transferring of cakes 1 1 1 1 1 1

Boxing of cakes 7 6 8 6 8 7
Arranging of finished 2 2 2 2 2 2
cakes for the delivery
Total 2745 2743 2752 2751 2751 2748
FACILITIES IMPROVEM ENT 62

`Location:Rodillas Ye ma Cake Summary

Activity :Yema Cake Production Event Present Proposed Saved


(small) time
No Time No Time (sec)
(sec) (sec)
Date: 2016 Operation 7 2327.4 8 2241 86.4
Operator: BSIE Transport 4 227 4 84 143
Circle appropriate Method & type : Delay 1 480 1 435 45
Method: Present Proposed Storage 0 0 0 0 0
Inspection 0 0 0 0 0
Total 13 3034.4 13 2760 274.4
Remarks: Total distance 21 meters
Process Description Symbol Time Distance Method
(sec) (meter) Recommendation
Mixing the flour 65

Transferring of mixed 8 1.5


flour
Making of chiffon 308
cake
Baking of chiffon cake 1830
in the oven
Transferring of baked 60 12.5
chiffon cake to the
racks
Cooling of cakes in the 435
racks
Transferring of racks 15 6
to the finishing section
Slicing of cakes( Small 4
Yema Cake )
Icing of cakes 18

Cheesing of cakes 7

Transferring of cakes 1 1

Boxing the cakes 7

Arranging of finished 2
cakes for the delivery

Figure 12.Proposed flow process chart for small cakes


FACILITIES IMPROVEM ENT 63

`Location:RodillasYema Cake Summary

Activity :Yema Cake Production (big) Event Present Proposed Saved


time
No Time No Time (sec)
(sec) (sec)
Date: 2016 Operation 7 2322.4 8 2229 93.4
Operator: BSIE Transport 4 215 4 84 131
Circle appropriate Method & type : Delay 1 480 1 435 45
Method: Present Proposed
Storage 0 0 0 0 0

Inspection 0 0 0 0 0

Total 13 3017.4 13 2748 269.4


Remarks:
Total distance 21 meters
Process Description Symbol Time Distance Method
(sec) (meter) Recommendation
Mixing the flour 60

Transferring of mixed 8 1.5


flour
Making of chiffon 308
cake
Baking of chiffon cake 1830
in the oven
Transferring of baked 60 12.5
chiffon cake to the
racks
Cooling of cakes in the 435
racks
Transferring of racks 15 6
to the finishing section
Slicing of cakes( Small 2
Yema Cake )
Icing of cakes 16

Cheesing of cakes 4

Transferring of cakes 1 1

Boxing the cakes 7

Arranging of finished 2
cakes for the delivery

Figure 13.Proposed flow process chart for big cakes


FACILITIES IMPROVEM ENT 64

Development

The proposed layout is based on the activity relationship chart and the theme of reducing

travelled distance. Altering the positions between several departments will ensure smooth flow

of materials as well as it will reduce total travelled distance throughout the production unit.

Proposed flow diagram.In this diagram, the machines were arranged according to the

flow of the process. The machines that are related to each other were put up together in the same

line to minimize the long transportation and long processing time. Same as the present flow

diagram, the black arrow starts from the mixing area of flour and sugar to the boxing section. As

shown in the figure 6, the layout is much more systematic and organized than the present layout

because the operators will not have longer distance to transfer their part to the next operation.

Figure 14.Proposed flow diagram


FACILITIES IMPROVEM ENT 65

Proposed Facility Layout.In order to arrive at the proposed facility layout, the

researchers analyze the gathered data and the present arrangement of the facility because those

knowledge will be the basis of the design of new facility layout that will improve the process in

producing yema cakes, minimize its processing, increase their production per day w/o overtime,

improve their flow time and saves costs.

Figure 15.Proposed facility layout

In the proposed layout assembly tables in the finishing section are arranged in line

according to the sequence of their process. This was done because the tables were not in

sequence based on their processes and the operators are having an unspecific direction all over

the area.
FACILITIES IMPROVEM ENT 66

The purpose of this proposed facility layout is to decrease time travel and to have a

standardized production system process at Rodilla’s. In creating the facility layout of Rodilla’s

Yema Cake, the researcher use process layout type as the basis because through the study of

literature on the various types of facility layout, the researchers learned that flow processing type

of manufacturing such as baking, the process layout would be suited in producing yema cakes.

Designing the proposed facility layout is the arrangement of the assembly lines.

Evaluation

In order to evaluate whether the propose facility layout is efficient and effective,

applicable and cost saving this part will compare the present and proposed layout. Also, this will

show how the proposed layout overcomes the present layout.

Table 11.
Comparison of Total Time between the Present and Proposed Layout of Small Yema Cakes
Process Description Time (sec)

Present Proposed Saved time

Mixing the flour 65 65 0

Transferring of mixed flour 30 8 22

Making of chiffon cake 390 308 82

Baking of chiffon cake in the oven 1830 1830 0

Transferring of baked chiffon cake to the 120 60 60


racks
Cooling of cakes in the racks 480 435 45

Transferring of racks to the finishing 72 15 57


section
FACILITIES IMPROVEM ENT 67

Slicing of cakes( small Yema Cake ) 4 4 0

Icing of cakes 21 18 3

Cheesing of cakes 8 7 1

Transferring of cakes 5 1 4

Boxing the cakes 7.4 7 0.4

Arranging of finished cakes for the 2 2 0


delivery
TOTAL 3034.4 2760 274.4

Table 12.
Comparison of Total Time between the Present and Proposed Layout of Big Yema Cakes

Process Description Time (sec)

Present Proposed Saved time

Mixing the flour 65 60 5

Transferring of mixed flour 30 8 22

Making of chiffon cake 390 308 82

Baking of chiffon cake in the oven 1830 1830 0

Transferring of baked chiffon cake 120 60 60


to the racks
Cooling of cakes in the racks 480 435 45

Transferring of racks to the 60 15 45


finishing section
Slicing of cakes( big Yema Cake ) 2 2 0
FACILITIES IMPROVEM ENT 68

Icing of cakes 20 16 4

Cheesing of cakes 6 4 2

Transferring of cakes 5 1 4

Boxing the cakes 7.4 7 0.4

Arranging of finished cakes for the 2 2 0


delivery
TOTAL 3017.4 2748 269.4

According to the result, the time required to produce a single yema cake was reduced to 5

minutes compared to the present time.

2000 Comparison of Present and Proposed Time of Small Cakes


1800

1600

1400

1200

1000

800
Present
600 Proposed
400

200

Figure 16.Graphical representation of the compared present and proposed time study
FACILITIES IMPROVEM ENT 69

2000 Comparison of Present and Proposed Time for Big Cakes


1800

1600

1400

1200

1000

800
Present
600 Proposed
400

200

Figure 17.Graphical representation of the compared present and proposed time study

This happens because of the new systematic arrangement of each machines and

operations from a proposed facility layout. The figure above shows the graph to see the actual

differences between the time in each operation of the present and proposed layout.

Survey Result

In the post survey that the researchers had prepared, the data collection is based on self-

completion schemas, which the selected target group or the workers of Rodilla’s has received by

letter.
FACILITIES IMPROVEM ENT 70

In this survey the researchers collected a fairly answers from a large amount of persons,

within a relatively short time span, and a relatively limited economic range. The respondents get

the possibility to answer the questionnaire when they feel like it and can find the time and space.

In this manner, the respondents can use more time to think about difficult or complex questions

when it is required, in order to provide the best answers.

Table 13.
Survey Result
Items 5 4 3 2 1 Total

Effectiveness

1. Usefulness of the improved layout 30 0 0 0 0 30


2. Improved layout is effective in maximizing the
capacity of the business 18 10 2 0 0 30

3. Reduce of unnecessary movements 19 9 2 0 0 30

Efficiency

4. Suitability of the improved layout for everyone 20 8 2 0 0 30

5. Synchronized with the previous and next previous and


next process 24 5 1 0 0 30
6. Enhanced present time due to improved layout 23 7 0 0 0 30

Cost

7. Less losses incurred as a result of the layout 30 0 0 0 0 30

8. Enhanced quality of the product have not been


sacrificed 24 4 2 0 0 30

9. Savings due to reduction of process time 30 0 0 0 0 30

After the questionnaire is completed, each item may be analyzed separately or in some

cases item responses may be summed to create a score for a group of items. Hence, Likert scales
FACILITIES IMPROVEM ENT 71

are often called summative scales. Used mainly in training course evaluations and market

surveys, Likert scales usually have five potential choices (strongly agree, agree, neutral,

disagree, strongly disagree) but sometimes go up to ten or more. The final average score

represents overall level of accomplishment or attitude toward the subject matter.

Table 14.
Result of the survey based on Likert Scale
Criteria SA (5) A (4) N (3) D (2) SD (1) Total
F W % F W % F W % F W% F W% F M
Usefulness of 30 150 100 0 0 0 0 0 0 0 0 0 0 0 0 30 5 Strongly
the improved Agree
layout
Improved 18 90 60 10 40 33 2 6 7 0 0 0 0 0 0 30 4.5 Strongly
layout is Agree
effective in
maximizing
the capacity of
the business
Reduce of 19 95 63 9 36 30 2 6 7 0 0 0 0 0 0 30 4.6 Strongly
unnecessary Agree
movements
Suitability of 20 100 67 8 32 27 2 6 7 0 0 0 0 0 0 30 4.6 Strongly
the improved Agree
layout for
everyone
Synchronized 24 120 80 5 20 17 1 3 3 0 0 0 0 0 0 30 4.8 Strongly
with the Agree
previous and
next previous
and next
process
Enhanced 23 115 77 7 28 23 0 0 0 0 0 0 0 0 0 30 4.8 Strongly
present time Agree
due to
improved
layout
Less losses 30 150 100 0 0 0 0 0 0 0 0 0 0 0 0 30 5 Strongly
incurred as a Agree
result of the
layout
FACILITIES IMPROVEM ENT 72

Enhanced 24 120 80 4 16 13 2 6 7 0 0 0 0 0 0 30 4.7 Strongly


quality of the Agree
product have
not been
sacrificed
Savings due to 30 150 100 0 0 0 0 0 0 0 0 0 0 0 0 30 5 Strongly
reduction of Agree
process time
Average 4.7 Strongly
weighted mean Agree

Cost Benefit Analysis

Table 15.
Cost benefit analysis
Criteria Present Proposed Saved

Estimated Daily Total Walk Time 0.418 hour/day 0.163 hour/day 0.25 hour/day
Estimated Daily Total Cost Php 14.63/day Php 5.705 /day Php 8.75 /day
Estimated Monthly Total Cost Php 321.86/month Php 125.51/month Php
192.5/month
Estimated Annually Total Cost Php Php Php
3862.32/annual 1506.12/annual 2310/annual

In the cost benefits of the time saved, using the same flow process chart, the

Rodilla’sYema Cake would have a projected savings of 0.25 hour per day, yearly with 61%

efficiency.
FACILITIES IMPROVEM ENT 73

Estimated Daily Total Walk Time Saved = Present – proposed

= 0.418 -0.163

= 0.25 hour/day

% efficiency= x100% = 0.610 or 61%

In the cost benefits of the worker, using the same flow process chart, the Rodilla’s Yema

Cake would have a projected savings of Php 8.75 per day, or Php 192.5 per month, or Php 2310

per year, with a yearly efficiency of 59.8%.

Estimated Daily Total Savings Cost = Present – proposed

= 14.63-5.705

= Php 8.75 /day

% efficiency= x100% = 0.598 or 59.8%

Estimated Monthly Total Savings Cost = Present – proposed

= 321.86-125.51

= Php 192.5/month

% efficiency= x100% = 0.598 or 59.8%

Estimated Annually Total Savings Cost = Present – proposed


FACILITIES IMPROVEM ENT 74

= 3862.32-1506.12

= Php 2310/annual

% efficiency= x100% = 0.598 or 59.8%

Summary of Findings

All in all, if the results were being summarized, the effectiveness and efficiency of the

proposed facility layout was a great success and help to Rodilla’s Yema Cake. The sum of total

savings of the workers and the total time savings of the outgoing goods has a big effect on the

annual savings of the Rodilla’s Yema Cake. As shown in table 12, an amount of Php 2310is

projected to be saved through the improvement efforts studied by the researchers.


FACILITIES IMPROVEM ENT 75

Unit V

Conclusions and Recommendations

This unit dealt with the conclusion and recommendation of the researchers concern in the

facility layout of the Production area of Yema Cake. This unit includes all the important

information that was found in the study. It shows the generalizations and answers to the

objectives stated at the beginning of the study. Furthermore, it also includes a suggestion or

proposed answers for the problems encountered during the study.

Conclusions

To develop a proposed solution, design of an effective new facility layout to the problems

encountered of the Production area of Yema Cake, the following conclusions were established:

1. The researchers designed an improved facility layout at the production area of Rodilla’s

Yema Cake. The improved layout such as new arrangements of machines and working

areas helped to decrease the distance and time consumption during the process or

operations of producing yema cakes, these results in an increase in the productivity.

2. The researchers developed the improved facilities layout at Rodilla’s Yema that helped

the Production area to increase their output per day and helped them to minimize their

processing time in slicing and icing cakes, saves cost, saves energy, minimize errors, and

deliver their products to the franchisers on time.

3. The researchers evaluated the improved facility layout in terms of effectiveness,

efficiency and cost using time and motion study principles the researchers determined the

wastes such a long transportation of materials and products and idle time that should be

lessen or eliminated in the whole process to decrease the flow of processing the product.
FACILITIES IMPROVEM ENT 76

Recommendations

In conducting this study, the researchers have proposed the following suggestions for the

improvement based on the findings and conclusions derived:

1. The researchers recommend to the next researchers to conduct study on the design and

layout of next process. Continuously improve the process in to produce more cost down

activity for the company.

2. The developed process layout and must be monitored and act on the items that Facilities

planning and design requires the use of different tools and techniques, in order for it to

operate at low cost and provide fast delivery but not sacrificing the quality being

produced. It also defines layout as an integral part of a Lean Manufacturing strategy.

3. Sustaining the implementation of proposed layout in the company will be a good start to

improve production line productivity. The company should arrange their product or its

flow in a way that the efficiency and productivity will not suffer.
FACILITIES IMPROVEM ENT 77

References

Prof AngelitaOngCamilar-Serrano. (2016) Facilities Planning and Management.Intramuros

Manila: Unlimited Books Library Services and Publishing Inc.

Prof AngelitaOngCamilar-Serrano. (2016) Productivity and Quality Management.Intramuros

Manila: Unlimited Books Library Services and Publishing Inc.

Service Operation Management (2014) www. 3gelearning.com. UAE: 3G Elearning FZ LLC

3g E-learning fzllc.(2015) Production and Operations Management Basics. UAE: 3G Elearning

FZ LLC

Frievalds, Niebel et al. (2014) Process Layout. NY: McGraw-Hill

Lontoc, et al. (2012) Facility Layout

Miranda, Joshua. (2011) “Facilities Layout and Design”

Bermillo, E.B. et al. (2013) Production Efficiency Improvement through Time and Motion Study

Complete, R.M, et al (March 2014) Cost Reduction through Development of Fleet Management

System at the Red system Company Inc.

Quicena, J.H.B., Granada, M.E.V., Llagas K.J.R., VillaflorJr, R.A., Palero, M.I. (March 2013)

Production Layout Improvement through Facilities Planning

Maniya, K.D., Bhatt M.G. (2011) An alternative multiple attribute decision making methodology

for solving optimal facility layout design selection problems in Computer & Industrial

Engineering
FACILITIES IMPROVEM ENT 78

Hofer C., Eroglu C., Hofer A.R. (2012) The effect of lean product of financial performance: The

mediating role of inventory leanness

Ozbakir, L., Baykasoglu A., Gorkeml L. (2011) Multiple Colony ant algorithm for parallel

assembly line balancing problem in Applied Soft Computing

Furlan, A., Dal Pont, G., Vineli, A. (2011) Towards High Performance Manufacturing in

International Journal of Production Economics

Shevshenko, E., Bashkite, V., Maleki, M., Yan Wang. (2012) Sustainable Design of Material

Handling Equipment: A Win-win Approach for Manufacturers and Customer

K, Alexander (2013) Facility Management: Theory and Practices. Retrieved from

https://scholar.google.com.ph/scholar?hl=en&as_sdt=0,5&q=facilities+management+refe

rence

B, Atkins, A Brooks (2011) Total Facilities Management. Retrieved from

https://books.google.com.ph/books?hl=en&lr=&id=QRZj4PULVwcC&oi=fnd&pg=PR5

&dq=facilities+management+book&ots=cbDNRcJLH-

Ramazan Şahin (April 2011) A simulated annealing algorithm for solving the bi-objective facility

layout problem.Retrived from

http://www.sciencedirect.com/science/article/pii/S0957417410010742

ArashShahin, Mehdi Poormostafa (Nov 2011) Facility Layout Simulation and Optimization:

an Integration of Advanced Quality and Decision Making tools and Techniques.

Retrieved from http://www.ccsenet.org/journal/index.php/mas/article/view/10520


FACILITIES IMPROVEM ENT 79

Erik Sundin , Mats Björkman, Mats Eklund, Jörgen Eklund, Inga-Lill Engkvist (June 2011)

Improving the layout of recycling centres by use of lean production principles. Retrieved

from http://www.sciencedirect.com/science/article/pii/S0956053X11000092
FACILITIES IMPROVEM ENT 80

Appendices

Appendix A

Project Study Gantt Chart

JUNE JULY AUG UST SEPTEMB ER OCTOB ER NOVEMB ER DECEMB ER


Activity
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
1. Data gathering
through:
a. Brainstorming
b. Conduct survey
c. Acquiring data
from respective
organization.
2. Formulation of
Running tile
3. Preparation of
Units 1 to 3 of the
Study
4. Proposal defense
5. Submission of
Final Proposal paper
6. Data gathering
and analysis
7. Design of
improved production
process
8. Development of
the facility layout
9. Implementation of
the improved facility
layout and design
10. Evaluation
11. Continuation and
Completion of the
manuscript
12. Final defense
13. Submission of
hardbound.
FACILITIES IMPROVEM ENT 81

Appendix B

Result of Interviews & Observations

This appendix contains samples of all the participant interviews. When the researcher

began the interview process, the line of questions concerning the production process and the

material-transition process were viewed as separate entities. After, the first four interviews with

the workers of Rodilla’s Yema Cake from different areas of production, the supervisor toured the

researcher around the production area which in fact flowed into the follow-up interviews with

her. Separate conclusions concerning production process and the material-transition process were

derived from the data.

1st PARTICIPANTS DATA

WORKERS FROM PACKING AND ICING/SLICING INTERVIEW

The interview was held in the main office of Rodilla’s Yema Cake, July 12, 2016. The

researcher's time with them was limited to 30 minutes by their schedule. The interview

proceeded on a very structured path defined by the preliminary question set used by the

interviewer to assure coverage of the topics of importance to the researcher. The interview got

off to a bumpy start, as Participant 1 agreed to record the session.

When will you usually start the production?

The production usually starts at 5:30 in the morning every day except for Sunday. We are

here by 5 o’clock to prepare things. Some of us start by 5 sharp, those are the workers

assigned in the mixing and baking.


FACILITIES IMPROVEM ENT 82

How many workers are working in the production for ordinary days?

We are 25 to 30 people working here together. We are divided into 2 wherein boys are on

the mixing and baking area and girls are in the icing, slicing and packing.

During peak season like Christmas and New Year, How many workers work here?

During peak season we hire extras and we most likely are 35-40 workers doing the

production.

Is your work here comfortable and stress free during the production?

Yes. But there is a time we stand and work too long, that’s when we have plenty of

orders from the customers. But that’s just once in a blue moon now because if we have

too much order we hire extra workers.

Is the ventilation in your work place good enough so you can work productively?

Yes. We are air-conditioned in the girl’s area. The boys’ area wherein there are ovens and

racks also has good ventilation because they have 2 big electric fans there.

What part of your job is the most tiring and uneasy?

I worked here 3 years already and I am used to my job so well. If there is something

uneasy for me it is when we transfer cakes from icing to slicing to packing because we

have to carry each cake from one table to another.

Is there anything aside from transferring cakes uneasy in your job?

I don’t think there is anything else. My job as a packer and sometimes slicer, it is the only

thing that is uneasy for me.


FACILITIES IMPROVEM ENT 83

2nd PARTICIPANT DATA

WORKER FROM MIXING AND BAKING INTERVIEW

The interview was held in the main office of Rodilla’s Yema Cake, July 12, 2016. The

researcher's time with them was limited to 30 minutes by their schedule. The interview

proceeded on a very structured path defined by the preliminary question set used by the

interviewer to assure coverage of the topics of importance to the researcher. Participant 2 gave

very tight concise answers to the questions and kept the discussion on track to an on time

conclusion.

When will you usually start the production?

The production in our area usually starts at 5:00 in the morning every day except for

Sunday. We are the first step in the production so we cannot be delayed or else the whole

production will be delayed too.

How many workers are working in your area for ordinary days?

We are 12 to 15 people working here together. We are divided into 2, mixing and baking.

Is your work here comfortable and stress free during the production?

Yes it’s fine. We worked here for years already and we got used to the daily routine. We

are well divided for each task so we don’t exert too much force in our jobs.

Is the ventilation in your work place good enough so you can work productively?

Yes. We have two big electric fans to somehow eliminate the heat coming from the seven

big ovens.
FACILITIES IMPROVEM ENT 84

What part of your job is the most tiring and uneasy?

For me as a mixer, I think probably the most uneasy one is when I get the sacks of flour,

sugar and baking powder in their area to the mixing room. I carry them manually.

Though it is not that far but it is still not that easy.

Is there anything aside from transferring cakes uneasy in your job?

I don’t think there is anything else. In my job as a mixer the only thing that makes my job

uneasy for me is the transferring of ingredients to the mixing room.

3rd PARTICIPANT DATA

SUPERVISOR INTERVIEW

The interview was held in the production area of Rodilla’s Yema Cake, July 12, 2016.

The researcher's time with them was limited to 30 minutes by their schedule. The interview

proceeded on a very structured path defined by the preliminary question set used by the

interviewer to assure coverage of the topics of importance to the researcher. Participant 3 gave

very tight concise answers to the questions and kept the discussion on track to an on time

conclusion as she toured as in the whole production area.

What is the hardest part in the production?

The hardest part in the production is the transferring of materials (in-process goods and

raw materials) from one place to another. Though we use racks, we still can’t avoid to

sometimes carrying things manually.


FACILITIES IMPROVEM ENT 85

What is the main reason that usually causes delays in the production?

The waiting of cakes to get cooked in the oven and the waiting of cakes to get cool before

the icing process.

Thus this causes idle time for the workers?

Sometimes, but sometimes not because we do other things like assembling the boxes

while waiting for the cakes to cool down.

Do you face any uneasiness in the production area aside from the things that are mentioned

before?

Not really, no. There’s nothing more because we are just a small business here in Quezon

so we got used to do a lot of things here in the production area manually. Besides it’s a food

manufacturing business so we don’t let machines do all the works. Deliciousness in our yema

cakes still comes from the hands of our workers.

Interviewees:

1. Mixer:

2. Baker:

3. Slicer/Icing Personnel:

4. Packer:

5. Supervisor:
FACILITIES IMPROVEM ENT 86

Appendix C

Result of Surveys

This appendix contains the sample of the post survey form. When the researcher finished

the implementation of the proposed layout a post survey form was given to the workers, the line

of questions concerning the production process and the material-transition process were viewed

as separate entities.

Demographic Profile

Name (Optional): ____________________________________________________


Gender : Female Male

Directions: Please rate each item using the following scale:


5 – Strongly Agree 4 – Agree 3 – Neutral 2 – Disagree 1 – Strongly Disagree

Items 5 4 3 2 1
Effectiveness
1. Usefulness of the improved layout

2. Improved layout is effective in maximizing the capacity of


the business

3. Reduce of unnecessary movements


Efficiency
4. Suitability of the improved layout for everyone
5. Synchronized with the previous and next previous and next
process
6. Enhanced present time due to improved layout
Cost

7. Less losses incurred as a result of the layout


8. Enhanced quality of the product have not been sacrificed
9. Savings due to reduction of process time
FACILITIES IMPROVEM ENT 87

Items 5 4 3 2 1 Total

Effectiveness
1. Usefulness of the improved layout 30 0 0 0 0 30

2. Improved layout is effective in maximizing the 18 10 2 0 0 30


capacity of the business

3. Reduce of unnecessary movements 19 9 2 0 0 30

Efficiency

4. Suitability of the improved layout for everyone 20 8 2 0 0 30

5. Synchronized with the previous and next previous and 24 5 1 0 0 30


next process

6. Enhanced present time due to improved layout 23 7 0 0 0 30

Cost

7. Less losses incurred as a result of the layout 30 0 0 0 0 30

8. Enhanced quality of the product have not been 24 4 2 0 0 30


sacrificed

9. Savings due to reduction of process time 30 0 0 0 0 30

Computation of average weighted mean in likert scale


1. Usefulness of the improved layout
( ) ( ) ( ) ( ) ( )

2. Improved layout is effective in maximizing the capacity of the business


( ) ( ) ( ) ( ) ( )

3. Reduce of unnecessary movements


( ) ( ) ( ) ( ) ( )

4. Suitability of the improved layout for everyone


FACILITIES IMPROVEM ENT 88

( ) ( ) ( ) ( ) ( )

5. Synchronized with the previous and next previous and next process
( ) ( ) ( ) ( ) ( )

6. Enhanced present time due to improved layout


( ) ( ) ( ) ( ) ( )

7. Less losses incurred as a result of the layout


( ) ( ) ( ) ( ) ( )

8. Enhanced quality of the product have not been sacrificed


( ) ( ) ( ) ( ) ( )

9. Savings due to reduction of process time


( ) ( ) ( ) ( ) ( )
FACILITIES IMPROVEM ENT 89

Appendix D

Cost Benefit Analysis

Criteria Present Proposed Saved

Estimated Daily Total Walk Time 0.418 hour/day 0.163 hour/day 0.25 hour/day
Saved
Estimated Daily Total Savings php 14.63/day php 5.705 /day php 8.75 /day
Cost
Estimated Monthly Total Savings php 321.86/month php 125.51/month php
Cost 192.5month
Estimated Annually Total Savings Php Php Php
Cost 3862.32/annual 1506.12/annual 2310/annual

Saved
Estimated Daily Total Walk Time Saved = Total Time Saved per Unit x Unit per batch
= 131 seconds/batch x 7 batches/day
= 917 seconds/day
= 15.28 minutes/day
= 0.25 hour/day
Estimated Daily Total Savings Cost = Average Daily Walk Time Saved x Direct Labor
Cost
= 0.25 hour/day x Php 35/hour
= php 8.75 /day
Estimated Monthly Total Savings Cost = Daily Total Savings Cost x 22 days/month
= 8.75/day x 22 days
= php 192.5month
Estimated Annually Total Savings Cost = Monthly Total Savings Cost x 12 month
= PHp 227.5/month x 12 months
= Php 2310/annual
FACILITIES IMPROVEM ENT 90

Present
Estimated Daily Total Walk Time Saved = Total Time Saved per Unit x Unit per batch
= 215seconds/batch x 7 batches/day
= 1505 seconds/day
= 25.08 minutes/day
= 0.418 hour/day
Estimated Daily Total Savings Cost = Average Daily Walk Time Saved x Direct Labor
Cost
= 0.418hour/day x Php 35/hour
= php 14.63/day
Estimated Monthly Total Savings Cost = Daily Total Savings Cost x 22 days/month
= 14.63/day x 22days
= php 321.86/month
Estimated Annually Total Savings Cost = Monthly Total Savings Cost x 12 month
= PHp 321.86/month x 12 months
= Php 3862.32/annual

Proposed
Estimated Daily Total Walk Time Saved = Total Time Saved per Unit x Unit per batch
= 84seconds/batch x 7 batches/day
= 588 seconds/day
= 9.8 minutes/day
= 0.163 hour/day
Estimated Daily Total Savings Cost = Average Daily Walk Time Saved x Direct Labor
Cost
= 0.163 hour/day x Php 35/hour
= php 5.705 /day
FACILITIES IMPROVEM ENT 91

Estimated Monthly Total Savings Cost = Daily Total Savings Cost x 22 days/month
= 5.705 /day x 22days
= php 125.51/month
Estimated Annually Total Savings Cost = Monthly Total Savings Cost x 12 month
= PHp 125.51/month x 12 months
= Php 1506.12/annual
92

Curriculum Vitae

Yvonne R. Casas
Carillo St. Brgy. Parang
Pagbilao, Quezon
Contact No. 09060084216
Email Address : yvonnecasas28@yahoo.com.ph

PERSONAL INFORMATION: TRAININGS/SEMINARS ATTENDED:

Birthdate: February 28, 1995 1. 10th IEshikawa Seminar held at Henry


Birthplace: San Andres Quezon Lee Irwin Theater, Ateneo de Manila
Age: 21 yrs. old University last Nov. 21, 2015 with the
Civil Status: Single theme“Nexus: X Marks the Spot-
Name of Father: Casius P. Casas Converging Minds Across the Years.
Name of Mother: Nida R. Casas 2. 10th IEshikawa Seminar held at Henry
Citizenship: Filipino Lee Irwin Theater, Ateneo de Manila
Religion: Roman Catholic University last Nov. 21, 2015: themed “
Sex: Female Nexus: X Marks the Spot-
Language Spoken: Tagalog and English Converging Minds Across the Years.
3. Sports FIEsta 2015 held at University
EDUCATIONAL ATTAINMENT: of Philippines Los Baños, last Oct.30,
2015
Tertiary: Bachelor of Science in 4. 12th PIIE National Student Congress
Industrial Engineering held at Mapua Institute of Technology
MSEUF- Lucena Gymnasium, Manila last Feb. 7, 2015
5. Sports FIEsta 2014 held at Colegio De
Secondary: Casa Del Ñino Jesus de San Juan De Letran- Calamba,last Oct.
Pagbilao 25, 2015
Pagbilao, Quezon 6. FCG Scholar Seminar held at Veterans
Distinction Memorial Hospital last January 3, 2016
S.Y. 2007-2012 7. 11th IEshikawa Seminar held at Henry
Lee Irwin Theater, Ateneo de Manila
Primary: Pagbilao West Elementary University last Nov.12 , 2016 with the
School theme “ PARALLAX: Shifting Focus
S.Y. 2001-2007

ORGANIZATION: CHARACTER REFERENCES:


Name of Organization: PIIE-NSC
Position: Ambassador for Communication Engr. James Louie R. Meneses.
Inclusive Dates: 2016-present CIE-AAE – Lucena City,
09494247437
Name of Organization: PIIE-SC
Position: Member Engr. Ferdinand Christian M. Catapangan
Inclusive Dates: 2015-2016 REE, RME- Pagbilao, Quezon
09463305737
SKILLS:
Communication Skills: both oral and written Violeta Guevarra Rafa
Management leadership skills: work independently, Teacher in Casa Del Ñino Jesus de Pagbilao
organized in work load 09394623177
Technical Skills: microsoft skill

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

YVONNE R. CASAS
Signature over printed name
93

Aaron Justine E. Abuel


Rodriguez Subdivision, Brgy. Balubal
Sariaya, Quezon
Phone Number: 09212210676
Email Address: aeron_jaztine@yahoo.com.ph

PERSONAL DATA
SKILLS
Birthdate: November 04 1995 Can perform multitasking
Birthplace: Sariaya, Quezon Can apply knowledge about Industrial
Age: 20 Engineering Tools
Civil Status: Single Good Leadership
Name of Father: JuanitoAbuel Fast Learner
Name of Mother: Elma Abuel Computer Literate
Citizenship: Filipino
Religion: Catholic TRAINING/S EMINARS ATTENDED
Sex: Male 1. Leadership Empowerment Seminar Manuel
Language Spoken: Filipino, English S. Enverga University Foundation 2014
2. 6th Southern Tagalog Industrial Engineering
EDUCATIONAL BACKGROUND: Seminar
3. University of Philippines, Los Baños,
Tertiary:
Laguna 2014
th
Bachelor of Science in Industrial 4. 5 PIIE Regional Congress Seminar
Engineering University of Philippines, Los Baños,
Laguna 2015
Manuel S. Enverga University 5. 12th PIIE National Congress Seminar Mapua
Foundation, University Site, Institute of Technology, ManilA2015
Lucena City 6. 10th IEshikawa Workshop and Seminar
2012 until present
Ateneo de Manila University, Loyola
Heights, Quezon City, Manila 2015
Secondary:
Sariaya Institute Inc.
Sariaya Quezon CHARACTER REFERENCE:
2008 - 2012
Engr. James Louie R. Meneses, 09494247437
Primary: Professor,Manuel S. Enverga University
Foundation
Central Main Elementary School University Site, Lucena City
Sariaya Quezon
2002 – 2008 Dr. Guillermo M. Rago Jr., 710 - 3151
Dean of the College of Engineering and
ORGANIZATIONS Technical Department,
PHILIPPINE INSTITUTE OF INDUSTRIAL Manuel S. Enverga University Foundation
ENGINEERS – University Site, Lucena City
MSEUF STUDENT CHAPTER
Assistant Vice President - Internal Engr. Agnes Aviles 09228620376
A.Y. 2015 - 2016 Professor,Manuel S. Enverga University
Foundation
University Site, Lucena City

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

AARON JUSTINE E. ABUEL


Signature over printed name
94

SHARMAINE V. COMINTAN
247 U. Camacho St. Brgy. 4,
Quezon,Quezon
CP # 09254737265
E-mail: sharmaine_comintan@yahoo.com

PERSONAL DATA:
Resourceful and willingness to learn new concepts
Birth Date : November 28,1995 and apply them to yield s uccessful results
Birth Place : Gumaca Quezon
Age : 20 TRAININGS/SEMINARS ATTENDED:
Civil Status : Single
Name of Father : Vicente V.Comintan On the Job Training
Name of Mother : Lesaida V. Comintan PETER PAUL CORPORATION
Citizenship : Filipino Production Office Staff
Religion : Roman Catholic Brgy.Pahinga Candelaria Quezon
Sex : Female
Language Spoken : Tagalog and English 6 th PIIE Regional Congress “Limitless:
Unlocking Possibilities with Product Design
EDUCATIONAL BACKGROUND: January 30, 2016

Tertiary: BACHELOR OF SCIENCE IN 12 th PIIE National Student Congress


INDUSTRIAL ENGINEERING February 7, 2015
Manuel S. Enverga University Foundation
5 th PIIE Regional Congress “IntensifIEd
Secondary: Thingking:Decision Making Under Risk and
Name of School: Cometa National High School Uncertainty”
Annex Quezon,QuezonDate January 17, 2015
Graduated: 2011-2012
6 th Southern Tagalog Industrial Engineering
Primary: Seminar
Name of School: Quezon Elementary School September 13, 2014
Quezon,Quezon
Date Graduated: 2007-2008 CHARACTER REFERENCES:

ORGANIZATION: Engr. James Louie R. Meneses, 09494247437


Professor,Manuel S. Enverga University
Name of Organization: Philippine Foundation
Institute of Industrial Engineers University Site, Lucena City
Position: Active Member
Inclusive Dates: 2014-Present Dr. Guillermo M. Rago Jr., 710 - 3151
Dean of the College of Engineering and
Name of Organization: CFC Youth for Technical Department,
Christ Manuel S. Enverga University Foundation
Position: Member University Site, Lucena City
Inclusive Dates: 2009-Present

SKILLS:
Engr. Agnes Aviles 09228620376
Good Communication skills both written Professor,Manuel S. Enverga
and verbal University Foundation University
Can easily adapt to a working environment Site, Lucena City

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

SHARMAINE V.COMINTAN
Signature over printed name
95

ARMANDO F. ANADING III


St, Jude phase 2B Blk17 lot14-15 Mayao
Lucena City
0942-832-7772
microanading@gmail.com

PERSONAL DATA:
Birthdate: February, 1, 1996 Work independently, Organized work load
Birthplace: Sta. Rosa Laguna
Age: 20
Civil Status: Single TRAININGS/SEMINARS ATTENDED:
Name of Father: Rodante L. Anading 1. 10 TH IEshikawa seminar held at
Name of Mother: Fely F. Anading Henry Lee Theater, Ateneo de
Citizenship: Filipino Manila University last
Religion: Christian November 21, 2015: Themed
Sex: Male “Nexus: X Marks the spot-
Language Spoken: Filipino, English converging minds Across the year
2. Sports FIEsta 2015 held at
EDUCATIONAL BACKGROUND: University of the Philippines Los
Baños , Last October 25,2015
Tertiary: BACHELOR OF SCIENCE IN 3. 12 th PIIE National Congress held at
INDUSTRIAL ENGINEERING Mapuá Institute of Technology
Manuel S. Enverga University Foundation Gymnasium, Manila Last February
7,2015
Secondary: 4. Sport FIEsta 2014 held at Colegio
Name of School: Manuel S. Enverga University De san Juan De Letran – Calamba,
Foundation Last January 3, 2014
Awards Received: GLEE CLUB Membership
Award/ Boy Scout of the
Philippines COMMUNITY SERVICES:
Date Graduated: 2012 Christmas Gift Giving for
Homeless
Primary: Feeding program
Name of School: ELVIRA RAZON Tree Planting
ARANNILA ELEMENTARY
SCHOOL CHARACTER REFERENCES:
Awards Received: Boy Scout of the Philippines ENGR. James Meneses
Date Graduated: 2008 Proffessor at Manuel S. Enverga
University Faundation
Lucena City
ORGANIZATION: 0949 424 7437
Name of Organization:
Philippine Institute of Industrial Engineering ENGR. Gervin Espinosa
Position: Member Proffessor at Manuel S. Enverga
Inclusive Dates: 2015-2016 University Faundation
Lucena City
SKILLS:
Computer literate (Microsoft Word, Microsoft Power Dr. Guillermo M. Rago, Jr.
Point), Dean, College of Engineering and
Welding, Ability to learn systems and procedures in a
workplace.

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

ARMANDO F. ANADING III


Signature over printed name
96

JOY E. PANALIGAN
ZONE 11, Poblacion Sta Elena
Camarines Norte
Contact No. : 0939-808-2091
E-mail: joy_panaligan28@ymail.com

PERSONAL DATA: Can easily adapt to given work


Birthdate: May 1, 1996
Birthplace: Lopez, Quezon TRAININGS/SEMINARS ATTENDED:
Age: 19y/o
Civil Status: Single 1. 6 th PIIE Regional Congress
Name of Father: John C. Panaligan Theme: “Limitless: Unlocking Possibilities
Name of Mother: Yolanda E. Panaligan with Product Design”
Citizenship: Filipino 2. 10 th IEshikawa
Religion: Roman Catholic Theme: “Nexus: X Marks the Spot –
Sex: Female Converging Minds Across the Years”
Language Spoken: Filipino, English
3. Leadership Empowerment Seminar 2015
EDUCATIONAL BACKGROUND: Theme: “Empowering Leaders of the 21st
Century, Brewing Sustainability to the Future
Tertiary: Society”
BACHELOR OF SCIENCE IN INDUSTRIAL 4. 23 rd International Conference on
ENGINEERING Production Research
Name of School: Manuel S. Enverga University Marriot Hotel Manila Pasay City
Foundation 5. 12 th PIIE National Student Congress
Awards Received: Dean’s Lister, A.Y 2015-2016 (1st 6. 5 th PIIE Regional Congress
semester) Theme: “IntensifIEd Thinking: Decision
Dean’s Lister, A.Y 2016-2017 (1st Making under Risk and Uncertainty”
semester) 7. 6 th Southern Tagalog Industrial
Secondary:
Engineering Seminar
Name of School: St. Peter’s School Calauag Inc.
Theme: “Fast Forward: Reconstructing our
Awards Received: Academic Performance Award &
National Identity Through Industrial
Arts and Culture Award
Date Graduated: March 2012 Evolution”
8. “Certification for Industrial Engineers”
Primary:
Name of School: Seventh-Day Adventist School
CHARACTER REFERENCES:
Awards Received: Class Salutatorian & Academic
Dr. Guillermo M. Rago, Jr.
Award
Dean, College of Engineering & Technical
Date Graduated: March 2008
Dep’t
MSEUF, Lucena City
ORGANIZATION: Contact No. : 710-31-51

Engr. Agnes L. Aviles, PIE


Name of Organization: Philippine Institute of
Adviser, PIIE-SC
Industrial Engineers – Student Chapter (PIIE-SC)
MSEUF, Lucena City
Position: Vice-President External Affairs
Contact No. : 0922-862-0376
Inclusive Dates: September2014 - June2017

SKILLS: Engr. James Louie R. Meneses, CIE, AAE


Adviser, PIIE-SC
Computer Literate
MSEUF, Lucena City
With good communication skills in English and
Contact No. : 0949-424-7437
Filipino

I hereby certify that the above information is true and correct to the best of my knowledge and belief.