A Project Study
by
Yvonne R. Casas
Sharmaine V. Comintan
Joy E. Panaligan
May 2017
FACILITIES IMPROVEM ENT 2
Approval Sheet
Rodilla’sYema Cake”, prepared and submitted by Aaron Justine E. Abuel, Armando F. Anading
III, Yvonne R. Casas, Sharmaine V. Comintan, and Joy E. Panaligan, is here by recommended
Approval in partial fulfillment of the requirements for the Degree of Bachelor of Science
in Industrial Engineering by Oral Examination panel, November 2016 with the rating of
_________________.
Accepted in partial fulfillment of the requirements for the Degree of Bachelor of Science
in Industrial Engineering.
Acknowledgement
The researchers would like to acknowledge the supports and efforts of the following
people:
Firstly, we would like to express our sincere gratitude to our adviser, Engr. James Louie
R. Meneses, Engr. Gervin S. Espinosa and Engr. Agnes Aviles for the continuous support of our
study and related research, for their patience, motivation, and immense knowledge. Their
guidance helped us in all the time of research and writing of this thesis.
Beside our advisers, we would like to thank thehead thesis committee: Dr. Guillermo M.
Rago Jr., for his insightful comments and encouragement to widen our research from various
perspectives.
My sincere thanks also go to Mr. and Mrs. Vincent and Juliet Rodilla, who gave access to
their production facilities. Without their precious support it would not be possible to conduct this
research.
We thank our fellow classmates in for the stimulating discussions, for the sleepless nights
we were working together before deadlines, and for all the fun we have had in the last four years.
To our parents for all the support for our financial needs to finish this study also for
And lastly, to our Almighty God, the great source of the researcher’s self-confidence,
Dedication
As one of the authors, I would like to extend my sincerest thank with deepest gratitude
Above all, to Almighty God for His presence, love, wisdom and guidance, to God be thy
glory.
To my family; my sisters, Janine and Jessah; to my brother and niece, Jeff and Jacob,
most especially to my parents who never stopped supporting me in whatever I do and who
inspired me the most finish this study.These two persons gave me the tools and values necessary
to be where I am standing today. My parents support me on every step I make, and decision I
take; but is necessary to understand that they let me take my decisions alone in order for me to
learn from my personal mistake and as my father says to “learn and grow from each seatback”.
My thanks and gratitude to them will never end for all the opportunities that they have offered
and gave me, for all the teachings that they have taught me and for every advise that come out of
their mouth. I am so grateful with them for trusting me that I would do a good job in the
To PIIE MSEUF-SC, my classmates and friends, and especially to my thesis mates who
To everyone I love, thank you for inspiring me and bringing out the best in me. .
Joy E. Panaligan
FACILITIES IMPROVEM ENT 5
I would like to dedicate this work to those people who supported me through my ups and
downs. First is to God for giving me life, strength, wisdom, and guidance that they given us . To
my Family for supporting me financially, emotionally, and mentally, and encourage me to study
well .To my professors for their endless support and guidance throughout my college life. To my
Friends who are always there to help me and especially my teammates who supported me
throughout the process. For giving their time effort, and skills, I will always appreciate all they
Sharmaine V. Comintan
I would like to dedicate our project study, to my parents Casius P .Casas and Nida R.
Casas, for your love and support. To my sisters, Mary Grace and Gynica Justine thank you for
To my group mates, Anading, Abuel, Sharmaine, and to our leader Joy, thanks for the
fun, grumpy days, and everything that we had gone through. “Team Relax /Attitude, will always
To my friends, especially IE Gagz , my classmates , my batch mates and PIIE, thanks for
And lastly, to Papa Jesus thank you for giving us the strength, knowledge patience and
everything we have without your guidance the lord this would have never become possible.
~yvonne
FACILITIES IMPROVEM ENT 6
As a symbol of gratitude I dedicate this project study to God Almighty. His presence has
I dedicate this project to my parents. Also to my friends who have shared with me all the
hardship and delight of being BSIE student. To my adviser, I acknowledge his contribution,
Engr. James Louie R. Meneses who share his knowledge in doing this project. And lastly I
dedicate this to myself, the fruit of my labor has finally paid off.
This is perhaps the easiest and hardest chapter in our project study to write. It will be
simple to name all the people that helped to get this done, but it will tough to thank them enough.
This piece of work is heartily dedicated to my parents and guardians, who taught me that even
the largest task can be accomplished if it is done one stage at a time, and for always reminding
me to value my vision.
I also dedicate this Project Study to my friends “IE GAGZ” , “JEG” and “Team Chaka” for
encouraging me even they bullying me and to the one who is special to me who waking me up
early when I need to do some papers in our study and to Hatchi to conquering my stress and
relieving my tiredness`
And to IE Professors who imparted their knowledge and become part of my college life.
Armando Anading
FACILITIES IMPROVEM ENT 7
Table of Contents
Title Page………………………………..………………………………..……………………….1
Approval Letter………………………………..………………………………..…………………2
Acknowledgement………………………………..………………………………..……………...3
Dedication………………………………..………………………………..………………………4
Table of Contents………………………………..………………………………..……………….7
List of Tables………………………………..………………………………..…………………...9
List of Figures………………………………..………………………………..…………………10
Abstract………………………………..………………………………..………………………..11
Unit I – Introduction……..………………………………..………………………………..……12
Conceptual Framework…………………………………………………………………..15
Definition of Terms………………………………..………………………………..……17
Acronyms……………………………………………………………………….………..18
Research Design………………………………………………………………………….32
FACILITIES IMPROVEM ENT 8
Research Environment……………………………………...……………………………33
Procedures………………………………………………………………………………..34
Design Concepts………………………………………………………………………....37
Data Gathering………………………………………………...…………………………41
Data Analysis………………………………………………………………………….…53
Development……………………………………………………………………………..62
Evaluation…………………………………………………………………………….….64
Conclusions………………………………………………………………………………72
Recommendations………………………………………………………………………..73
References………………………………………………………………………………..74
Appendices…………………………………………………………………………….....77
C. Survey Result………………….…………………………..………………….83
Transmittal letter…………………………………………...…………………….89
Curriculum Vitae…………………………………….…………………………………..90
FACILITIES IMPROVEM ENT 9
List of Tables
4 Summation of the present time study for small and big cakes………...………...50
11 Comparison of Total Time between the Present and Proposed Layout of Small
Yema Cakes…………………………...……………………………………...….66
12 Comparison of Total Time between the Present and Proposed Layout of Big
Yema Cakes……………………………...………………………………………67
13 Survey Result……………………………….……………………………………70
List of Figures
8 Ishikawa Diagram………………………………………………………………..55
11 Block diagram……………………………………………………………...…….59
Abstract
Abuel, Aaron Justine E., Anading, Armando F. III, Casas, Yvonne R., Comintan,
Sharmaine V., Panaligan, Joy E., “Facilities Layout Improvement At Rodilla’s Yema Cake”,
Unpublished Project Study for the Degree of Bachelor of Science in Industrial Engineering,
Manuel S. Enverga University Foundation, November, 2016.
Facility planning and design is an important component of all business overall operations,
both in terms of maximizing the effectiveness of the production process and meeting the needs of
employees. Rodilla’s Yema Cake is one of the most popular and well known delicacies not just
here in Quezon but also in other places in Central Luzon. For the past years, it had encountered
error in production of yema cakes because of the substandard arrangement of the assembly lines
in the working area that causes the long transportation of the operation. Through the observations
in the workplace and interview with the owner and employees, the researchers conclude to
improve the design of facility layout of their production area using time and motion study.
In designing the layout, various factors were assessed by the researchers in creating the
proposed facility layout. Process layout was selected as type of layout because it aims to improve
efficiency in Rodilla’s production area. Another factor that they consider is the availability of the
facilities, workers, and space in the production area. As the proposed layout was evaluated, the
flow processing time of production of the existing layout which is 51.32 minutes was decreased to
46.10 minutes for the production of small yema cakes, while the flow processing time of
production of the existing layout which is 50.40 minutes was decreased to 45.58 minutes for the
production of big yema cakes. Rodilla’s Yema Cake saves 5.2 minutes in the whole processing of
small yema cakes and 4.23 minutes in the whole processing of big yema cakes. Thus, this result
has a great effect on the annual savings of the Rodilla’s Yema Cake.
FACILITIES IMPROVEM ENT 13
Unit I
Introduction
Today, Rodilla‟s Yema Cake is one of the most popular and well known delicacies not
just here in Quezon but also in other places in Central Luzon. And because of this there are so
many Rodilla‟s outlets and resellers that are scattered around the area, and therefore we cannot
stop wondering how these delicious and mouth-watering cakes are being produced. As an
Industrial Engineering students and researchers, we know that the production process is needed
to have a lower cost with a great effectiveness and much higher productivity. To achieve this
Facility planning and design is an important component of all business overall operations,
both in terms of maximizing the effectiveness of the production process and meeting the needs of
employees. The basic objective of the layout is to ensure a smooth flow of work, material, and
information through system. The basic meaning of facility is the space in which a business's
activities take place. The layout and design of that space impact greatly how the work is done, and
the flow of work, materials, and information through the system. Layout affects the cost of material
handling and the movement of time, and hence affects the overall productivity and efficiency in the
plant. The key to a good facility layout and design is the integration of the needs of people
(personnel and customers), materials (raw, finishes, and in process), and machinery in such a way
that they create a single, well-functioning system. Poor facility layout leads fatigue to the workers,
much spending in one machine to another that can result in increasing the material handling costs.
FACILITIES IMPROVEM ENT 14
Today, people are fond of discovering different variety of food that are unusual but are
very palatable. Filipinos are popularly known as food lovers and this is probably the reason why
many delectable Pinoy delicacies had risen. Filipino culture is noticeably seen from the inviting
appetizers and aperitifs, flavorful main dishes and toothsome sweets to their refreshing drinks in
festivities and celebrations. These dishes served on the table of every Filipino family reflect to
their nation‟s history as many had visited and colonized the country.
Quezon, a historic province in south of Manila, is popular for its food and spiritual
destinations. It's also famed for its numerous pasalubongs. Pasalubong giving has been a
beautiful tradition and a well-known trait of Filipinos. No wonder there are pasalubong stores all
over the archipelago. From various kalamay (Rice cakes) to a variety of delicacies like broas,
lady fingers (camachile), pastillas, yema cakes, and boat tarts, there's never a shortage of
One of the most famous pasalubong in Quezon that can be found specifically in Tayabas
is the Rodilla‟s Yema Cake. The Rodilla‟s Yema Cake is fast catching up as an irresistible,
mouth-watering dessert among food lovers. It is a creamy and delicious custard cake originates
in southern part of Luzon. This dessert is made from 2 layer chiffon cake coated with yema
frosting. The custard is almost similar to brazo de mercedez and dulce de leche that consists of
The researchers interviewed the manager/head of the operations and some of the workers
at the production area of Rodilla‟s Yema Cake; they informed us that one of the major problems
they encounter during their production is the unstandardized time in the process of making yema
FACILITIES IMPROVEM ENT 15
cake and the FLP (Facility Layout Problem). We were able to observe the present facility area
and the present production area wherein they do the process of baking, mixing, cooling, slicing,
icing, cheesing, packing and loading of the finished products; and we discover that the causes of
the problem are the imbalance line, slow transportation and long processing time because of a
Facility layout considers available space, final product, safety of users and facility and
convenience of operations. An effective facility layout ensures that there is a smooth and steady
flow of production material, equipment and manpower at minimum cost. Facility layout looks at
physical allocation of space for economic activity in the production area. Therefore, the main
objective of the facility layout planning is to design effective work flow as to make equipment
In response to the mentioned problem above, the researchers chose to make an improved
facility planning and design at Rodilla‟s Yema Cake production area. This project study proposes
to use Systematic Layout Planning (SLP) as the infrastructure for layout optimization and
entitled the study “Facilities Layout Improvement at Rodilla‟s YemaCake”. This study will
tackle on how the researcher came up with the design and effective facility layout that will help
eliminate the problems and improve the productivity inside the Rodilla‟s Yema Cake Factory.
The main objective of the study is to design and develop an improved facility layout at
Rodilla‟s Yema Cake production area; thus this study aims to achieve the following specific
objectives:
FACILITIES IMPROVEM ENT 16
3. To evaluate the improved facilities layout in terms of effectiveness, efficiency and cost.
Conceptual Framework
The project can be better understood through the guiding concepts as stated in (Input,
Process, and Output) model. The paradigm in Figure 1 shows the structure on how to conduct
Necessary processing time data would be gathered in this study. The current layout and
unnecessary movements would be carefully studied and considered inputs. The Input includes,
present work flow layout. The process comprises data gathering, time and motion study, design
of process layout, and process layout development. And the output: facilities layout improvement
This research only focuses in designing much better facility layout that would
improve the facility layout in the production area of yema cake at Rodilla‟s. It is only
concentrated in the existing layout of the workplace, the arrangements of machines, other
facilities and workers assigned, the sequence of operations, number of facilities and workers, takt
time, and the shifting operations of every worker, on which we would be used. All other stuffs
that are not related to the study would not be included. This project study only focuses on the
This research would tackle all different types of facility layout with their advantages
and disadvantages, especially the machine layout which it would be as the proposed facility
layout. The time and motion study, worker-machine process, line balancing and right-hand- left-
hand rule would also be discuss in this research to show the effectiveness of the proposed layout.
The proposed process facility layout provides significant contribution on Rodilla‟s Yema
Cake like a fully maximize lines improve the overall productivity of the team. The importance of
Company and Management. Implementation of the proposed facility layout that would
improve the process flow cycle, the time in baking, the time in baking, the arrangement of
workers and machines, and the elimination of bottleneck in the operation. To attain of higher
Employees. They will have a comfortable working environment, much safer, and much
easier work. The proposed layout would make their work easier and lessen their fatigue, but in
the other hand they will have greater satisfaction and higher productivity.
Customers. They would be more satisfied that Rodilla‟s Yema Cake will meet their
expected taste and quality and ordered on time because of the improvement of proposed facility
layout.
Students. This research can be used as guide and reference for those students who will be
undertaking similar activities. It would capture their interest for further research and studies.
Researcher. They will have much benefit in this study in terms of verification and
application of the theories and concept with regards to their profession. They were able to apply
Definition of Terms
The following are words define operationally to easily help the readers to comprehend in
the study;
Processing Time is the duration of time in each process of producing yema cake.
FACILITIES IMPROVEM ENT 19
Process Improvement is the changes being made in the production area of Rodilla‟s
Acronyms
LB – Line balancing
Unit II
This unit presents the literature and related studies which have direct bearing on facility
layout and design. It will discuss on how the facility layout and design can improve the work
Related articles were compiled for the researchers‟ reference. These literatures provided
and additional information is necessary for the researcher in the conduct of the research process.
term of maximizing the effectiveness of the production process and meeting the needs of
employees. According to Prof. Serrano, A. (2015) the basic objective of layout is to ensure a
smooth flow of work, materials, and information through system, and basic meaning of facility is
the space in which a business „activities take place. Layout and design of the space impact
greatly how the work is done such as the flow of work, materia ls, and information through the
system. A good facility layout and design is the integrated of the need of people personnel and
customer, materials like raw material and in process, and machinery in such a way that they
According to the study of Quincena J.H.B., Granada, M.E.V., Llagas, K.J.R., Villaflor,
R.A. Jr. and Palero, M.I., authors of “Production on Layout Improvement through Facilities
Planning”, one of the problem that makes processing time too long was due to its present facility
layout, the machines are not place based on the sequence of operation that‟s why it took long
FACILITIES IMPROVEM ENT 21
time to transfer parts from its next operation. The researchers also concluded that the
arrangement of machines is based on the design of the jacket, so the process will change if the
jacket design changed. In order to improve the process, the researchers suggested that every new
design of jackets they manufacture the J&C garments should arrange their machines to avoid
overtime and achieve their quota. (Quincena, Granada, Llagas, Villaflor, Palero, 2013)
Layout is an important component of any business because it can affect the process and
operator itself, facility should be designed to be suitable for everyone who is involved in the
operation to ensure smooth flow of work. Because of its relative performance, facility layout
probably is one of the most crucial elements affecting efficiency. An efficient layout can reduce
unnecessary material handling, help to keep cost low, and maintain product flow though the
facility.
Types of Layout.There are several alternative layout types that are appropriate for
different product mixes and production volume based on the book entitled “Niebel‟s Method
Standards, & Work Design” Thirteenth Edition International 2014 by Freivalds, A. and Niebel,
B.W.. Determination of the layout type is a major design because it impacts on so many other
Process Layout. It is one of the main focuses of the researchers in this study; it is
otherwise called as functional layout or job shop layout. Process Layout is handiness for
inspection and supervision. In Industrial engineering, Process Layout is the ground plan of the
plant, which is fits by industrial engineers to get better the competence organizing tools
consistent with their purpose. In this layout, the major plan is to fix up or collect machinery or
equipment‟s of the similar role keen on one group or division. Process Layout is also called as
functional layout. Similar machines or similar operations are situated at one rest by mean of the
FACILITIES IMPROVEM ENT 22
functions (Freivalds, Niebel, 2014). Process layout is facility configuration in which operation of
a similar nature of a function are group together. Improving process layout involves the
minimization of transportation cost, distance, or time. To accomplish this some firm use what is
known as a muter grid, where subjected information is summarized on a grid displaying various
Cost. Sometimes, the general – purpose equipment utilized may be less costly to
purchase and less costly and easier to maintain than specialized equipment.
Motivation. Employees in this type of layout will probably be able to perform a variety of
assembly line. A process layout also allows the employer to use some type of individual
incentive system.
System Protection. Since there are multiple machine available, process layout are not
Utilization. Equipment utilization rates in process layout are frequently very low, because
Cost. If batch processing is used, in process inventory could be high. Low volume means
higher per –unit cost. More specialized attention is necessary for both products and customers.
Setups are more frequent, hence higher setup cost. Material handling is slower and more
FACILITIES IMPROVEM ENT 23
efficient. The span of supervision is small due to job complexities (routing ,setup, etc.) so
supervisory cost are higher .Additionally , in this type of layout accounting , inventory control
Confusion. Constant changing schedules and routing makes joggling process requirements
more difficult.
Product Layout. It is the design of finished tangible items. Paced and outpaced are the
two types of lines that is used in products layout. Paced lines is machine like conveyor that is
used to move along the products continuously while unpaved line is more like a waiting line of
workers.
Product layout efficiency will be enhanced though the used of line balancing because it
will minimizes the amount of time that some workstations are idle, due to waiting parts from
certain process in order to accommodate large volume of products in a short time with a low unit
Combination layout. It is a design wherein two or more process layouts are combine
Cellular layout. It is a design area for a group of machine arrange according to its
process sequence.
FACILITIES IMPROVEM ENT 24
Production Management
and transformation of various resources into a product based on the book published by 3G
into desired quality of products. Production is a process of manufacturing goods. The production
systems are classified into Job shop, batch, and mass and continuous production system.
Job Shop Production is only producing ordered products in a specific time and costs.
production is a sequence processing parts of a product before it turns into a finished products.
planning and control helps better service to customers, fewer rush orders, better control of
inventory, and more effective use of equipment, reduced idle time, improved plant morale, good
Operation management are concerned with the various discipline such as design of goods
and services, quality of a product, design process and capacity, site selection, design layout,
human resources and design work, supply chain management, inventory decisions, scheduling
into finished products made by hand or machinery and tools. Manufacturing systems
FACILITIES IMPROVEM ENT 25
management is focused on converting product design into economical, environment friendly and
reusable product.
A time-motion study is a business efficiency technique combining the time study work of
Frederick Winslow Taylor with the motion study work of Frank and Lillian Gilbreth (Camilar-
Serrano, 2016). It is a major part of scientific management. A time motion study is used to
determine the amount of time required for a specific activity, work function, or mechanical
process can reduce and control costs, improve working conditions and environment, and
motivate people. Motion and time study is considered to be the backbone of industrial
engineering, industrial technology, and industrial management programs because the information
that time studies generate affects so many other areas, including cost estimating, production and
inventory control, plant layout, materials and processes, quality and safety.
Thus, as the name suggests “time motion study” is concerned primarily with increasing
performance by measuring and then minimizing the time taken to perform various operations
Motion study offers a great potential for savings in any area of human effort. We can
reduce the cost by combining elements of one task with elements of another. It uses the
principles of motion economy to develop work stations that are friendly to the human body and
efficient in their operation. It must consider the operator‟s safety. It comes first before the setting
of time standards. Motion study is a detailed analysis of the work method in an effort to improve
FACILITIES IMPROVEM ENT 26
it. It is for cost reduction, and time study is for cost control. Motion study is the creative activity
through Time and Motion Study” his evaluation on the findings and results of the study‟s
investigations yielded a reduced idle time of Machine Operators 1 and 2 for Go Life Angled
from 65% percent to only 25% percent. The researcher also evaluated the new process design‟s
through the idle time reduction and transportation waste production output against the cost of
two (2) additional trimming machine tools. Furthermore the researcher‟s assumption and
objective is that: idle time percent can be converted productively through automated trimming
machinery, then both manpower and machine downtime can be converted productively; and; if
the trimming transportation problem can be minimized or eliminated, the overall production
improvement. The researcher also used the Time and Motion Study principles and concepts to
prove that a solution to the company‟s present problem can be reached using all IE basic tools in
efficiency.
Flow Process Chart.Lontoc, et al. (2012), it helps in setting out the sequence of the flow
of a product or a procedure by recording all events under review using appropriate process chart
symbols. This tool is a graphical or symbolic representation of a process. Each step in the
process is represented by different symbols and contains a short description of the process step. It
The researchers used the flow process charts to analyze the flow of the process in the
production area of Rodilla‟s Yema Cake. The proponents can identify if there will be any
Lean Concept
organization. Lean enterprise as of this date has been extended by combining lean production
idea to six sigma. Although, not all organization can apply this concept, but other which have
successfully applied these combined concepts have experienced noteworthy upgrade in their
Bozarth & Handfield defined lean manufacturing as follows, which is essentially the
same to JIT: „Lean is a philosophy of production that emphasizes the minimization of the amount
of all the resources (including time) used in the various activities of the enterprise‟. The aim of
lean operation is to achieve a stable flow of products and services that could be delivered to
customer at the quality level and time they want in order to satisfy customers‟ needs. In addition,
lean operation could guarantee the production process to be more flexible when the demand is
uncertain.
According to Mayer, RR (2014) lean enterprise must be identify production and lean
thinking; and enumerate different types of waste and their banner of elimination: name
components of lean production system: and discuss new advances in lean production. In
addition, there is strong evidence that the concurrent implementation of internally- focused and
externally- focused lean practices yields greater performance benefits than selective lean
FACILITIES IMPROVEM ENT 28
production implementation. Thus, this study contributes to the theory of lean production by
providing insights into the mediated and moderated effects of lean production on inventory
The researchers investigate the relationship between lean production, inventories and
performance. The empirical analysis is based on survey and secondary data from US
inventory leanness. The concurrent implementation of lean practice bundles yields greater
performance benefits.
The Balancing of assembly lines is one of the most important problems among the other
problems of assembly lines like designing and managing. In today's highly competitive
especially when the capacity of production system is insufficient. Unlike the traditional assembly
lines there are a few studies on balancing parallel assembly lines in the present literature. Parallel
assembly line balancing is a NP-hard problem similar to other assembly lines. In this paper, a
novel multiple-colony ant algorithm is developed for balancing bi-objective parallel assembly
lines.
Assembly lines are designed as flow oriented production systems which perform
operations on standardized products in a serial manner, that was according to Ozbakir, L.,
FACILITIES IMPROVEM ENT 29
Baykasoglu, A., Gorkemli, B., Gorkemli, L., authors of “Multiple-colony ant algorithm for
parallel assembly line balancing problem” in Applied Soft Computing (Volume 11, Issue 3,
The researchers used assembly line balancing to increase such as minimizing wastes in
terms of waiting time, transportation and motion, reduce failure and improved system. The
researchers believe if the line is balanced it has smooth flow of work because it minimizes
Just-in-time
Just-in-time (JIT) is „producing the necessary item in the necessary quantity at the
necessary time is an eternal diver of production and operations management‟. The ultimate
objective of JIT is to enhance flexibility of the whole system, which is one of the competitive
Definition of JIT is quite consistent in many studies (or even textbooks) to the one
mentioned in previous section. For example Bozarth & Handfield defined JIT as: „A philosophy
productivity. In the broad sense, it applies to all forms of manufacturing and to many service
industries as well‟. JIT requires elimination of waste which means that JIT systems could lead to
delivery of „perfect‟ products or services at the „exact‟ time they are required main purpose of
JIT systems is to identify and to eliminate as many kinds of wastes as possible through
A JIT system could be an „effective tool‟ for assisting a company to reduce cost and then
to obtain higher profits. JIT can be considered as one of the variants of production planning and
control systems, which are pivotal management tools for satisfying increasingly high client
demands and expectations in the business market, although traditional production planning and
control systems are „push‟ in nature, which means planning department decides the production
schedule and transmits to all production processes according to forecast of the demand of
market.
According to Furlan, A., Dal Pont, G., Vinelli, A., authors of “ Towards High
Issue 2, October 2011, Pages 489–495), the sequential nature of the improvement initiatives has
neglected the synergistic effects among practices and literature lacks research on
complementarily between internal and external bundles of practices. The aim of this paper is to
test the existence of complementarily among internal and external just-in-time bundles. The
researchers ran statistical analysis using the third round of High Performance Manufacturing
international research project data set and found that upstream and downstream JIT are
complements. This finding suggests the importance of managing the inter-dependencies both in
designing and implementing upstream and downstream JIT in order to maximize operational
efficiency, and faster response, have been studied widely in previous research. Therefore,
successful implementation of JIT is vital to many companies. The main objective of this research
is to make use of a case study to present various issues surrounding implementation of JIT for an
automotive company. This case study also provides evidences for supporting the benefits of
FACILITIES IMPROVEM ENT 31
employing JIT. The conclusion of this research indicates that JIT system is successful, and
operating JIT system can lead to many advantages to the case company.
The researchers therefore conclude that waste in time is a very important subject, for it
affects the productivity of every manufacturing organization. Reducing time waste is a never
ending process. Application of Just-In-Time system in the process workflow, a serious effort is
made to reduce not only moving and waiting time but also processing time. It is very important
Material Handling
Material handling includes motion, time, place, quantity and space constraints. First,
material handling must ensure that parts, raw material, in-process materials, finished products
and supplies are moved periodically from the location to location. Second, as each operation
requires materials and supplies at a particular time, material handing ensures that no production
process or customer is hampered by either the early or late arrival of materials. Third, material
handling must ensure that materials are delivered to the correct place. Fourth, material handling
must ensure that materials are delivered at each location without damage and in the proper
quantity. Finally, material handling must consider storage space, both temporary and dormant.
A study conducted by the Material Handling Institute revealed that between 30 and 85
percent of the cost of bringing a product to market is associated with material handling.
Axiomatically, the best part is the least manually handled part. Whether the distances of the
moves are large or small, these moves should be scrutinized. There are five points that should be
considered for reducing the time spent in material handling, first is reducing time spent in
FACILITIES IMPROVEM ENT 32
picking up material; use mechanized or automated equipment; make better use of existing
handling facilities; handle material with greater care; consider the application of bar coding for
inventory and related applications. A good example of the application of these five points is the
evolution of warehousing; the former stage center has become an automated distribution center.
Today, the automated warehouse uses computer control for material movement, as well as
information flow through data processing. In this type of automated warehouse, receiving,
transporting, storing, retrieving and controlling inventory are treated as an integrated function.
for the sustainability of their products (Shevtshenko, E., Bashkite, V., Maleki, M., Yan Wang,
Manufacturers and Customers” at Volume 18, No. 5 (2012). One possible approach to make
reliable. Those products are likely to be reused when customers‟ requirements change. More
sustainable material handling equipment can be much easier sold in the future, due to the
Unit III
This unit discussed about research design, research environment, research procedures and
design concepts for better understanding of the study. It also includes the industrial engineering
Research Design
This study used research and development to describe the improvement of new
arrangements of equipment in Rodilla‟s Yema cake. The researchers establish a new design of
facility layout, charts and diagrams that may serve as a prototype for this study. This study is
begun with the interview and observations in the research environment and through researches
found in books and studies. This study aims to improve the current facility layout of Rodilla‟s
analysis to figure out the best solutions to improve the current process and layout.
facility layout. Improving actual layout can be reduced until 30% through an effective facility
planning. Re-lay outing facility design could improve the performance of production line such as
decrease bottleneck rate, minimized material handling cost, reduces idle time, raise the efficiency
The researchers used a research and development to describe the improvement of new
arrangement of equipment at Rodilla‟s Yema cake. The researcher gather data through interview,
observation, researches and principles found in books and other related studies.
Research Environme nt
This study was conducted in the production area of Rodilla‟s Yema cake located at Brgy.
Ilayang Wakas Tayabas, Quezon. The researchers gathered all the data to be used in the
improvement of facility layout at Rodilla‟s Yema Cake from field of observations, interviews of
the head of the operations and the employees, and other data provided by the process group
department. These would also serve as guide for the researchers to obtain the best design of
facility layout that would improve the process. The sources of information for the present and
proposed layout were differing from each other. The sources of data that were used in obtaining
the necessary information for the research study are the following:
In the observation of the proponents to the production area of Rodilla‟s Yema Cake in
minimum of twice a month to familiarize the actual procedure and the production process of
yema cakes, the researchers need to take note all the important things which are regarding the
activity in the environment of the production area. It is the process of observing come one
carefully in order to gain information. In this scenario, the researchers observed the actual
transaction of yema cakes inside and outside the production area. Truly then, the researcher
know the condition of their production area and process, what they need to do some
improvement.
FACILITIES IMPROVEM ENT 35
Interview was conducted at the main office of Rodilla‟s Yema Cake; it was considered as
one if its research environments. In this case, interview is one of the mean points that the
Researchers read and gathered other information in the Internet Research using the Wi-Fi
of Enverga University to guide the researchers. The researchers were able to conduct an
intensive research regarding the production and distribution of Cakes. With this way, they are
able to gain related studies from different countries which are meet knowledge able to a
proposed study.
The researchers gathered their data by means library research using the books of Enverga
University, which would help the researchers to understand the ongoing study. Library technique
was conducted by the researchers in order to achieve the objectives of the study that they had
Procedures
This section provides details on how the study was conducted. In performing the project
different means in collecting data needed. The important data in this study are the following: the
current facility layout, the problem and lapses encountered in production area, knowledge in
facility layout and design, knowledge in time and motion study. The following are the means of
Direct Observation. One way to gather data is to carefully observe the current situation
problems in Rodilla‟sYema Cake. These interviews were necessary to gather data for the
Research.The researchers used two kinds of research using Internet research (it is the
most useful and easiest way to gather data and information needed) and Library research
(information such as concepts, techniques and methodologies of facility improvement can also
Video-Camcorders.Recording every interview with the operators and the supervisor and
recording processes from raw materials to the finished product helped the researcher to easily
gather data.
gain information. The researchers conduct a regular observation in the Rodilla‟sYema cake to
The discussion between two or more people where in questions are being asked by the
interviewer to obtain the particulars or statements from the interviewee. The researchers
interviewed head of the operation and some workers from the different area of the production to
The researcher has used Why why analysis to understand the main reason of possible
defects and slow transportation after the collection of data. The researcher mapped the current
FACILITIES IMPROVEM ENT 37
process using the process flow chart. Upon analysis of the problem the researcher validates all
Design of Improved Facilities Layout. The researchers began with the project
discussion stage or the identification of the problem. After the researchers identify the problems
and lapses experienced in the facility and improved plans to define what the project would
provide; when would it be done; who would benefit; and what should be maintained.
After the researchers identified and classified the actual situation, the researcher tried to
improve the layout by using various IE tools to reach the objectives in design improvement
facility and machine layout using time and motion study and line balancing.
and started to interview the head of production. The researcher identified the root cause of the
problem that they encounter during the production process. The researchers inspect all the
aspects on how to develop the productivity by elaborating the objective of the study. The
developed layouts were applied to achieve greater productivity. The researchers estimated the
actual and propose layout of the company. The evaluation of the study is necessary to determine
The researchers use five point Likert scale to qualify the numeric conclusions. The scale shown
in the table 1. The qualitative descriptions in the likert scale use are as follows: (5) strongly
agree, (4) agree, (3) neutral, (2) disagree, and (1) strongly disagree.
FACILITIES IMPROVEM ENT 38
Table 1.
4 3.41-4.20 Agree
3 2.61-3.40 Neutral
2 1.81-2.60 Disagree
The table 1 follows the Likert scale that contains the categories and its corresponding
ratings that used by the researcher in evaluating the improved facilities layout at Rodilla‟s Yema
Cake.
Design Concepts
In this project study, the selection of material is an important tool of successful facility
layout. The researcher considered the theories learned from facility planning and layout. In order
to perform this activity, there are methods and research that needs to be done. This step by step
process and action will give a detailed through understanding of what is needed to address the
Time and motion study. It is for the researchers to enhance work performance through
analysis and improvement of body and hand movement as well as determining the standard cost
FACILITIES IMPROVEM ENT 39
of a particular work. Through the use of this tool, the researcher can identify the results of total
Line Balancing. Line Balancing is leveling the workload across all processes in a cell or
value stream to remove bottlenecks and excess capacity. A constraint slows the process down
and results if waiting for downstream operations and excess capacity results in waiting and
absorption of fixed costs. The researchers will use this to match the production rate after all
waste has been removed to takt time at each process of the value stream.
Work Station Design. Since the researchers‟ objective is to improve the facility layout,
workstation will contributes to productivity and the quality of the products and takes care of the
health and well-being of the workers. Conversely, the poorly designed workstation will result in
low productivity, quality problems and is likely to cause or contribute to the development of
sources of waste or delay. The flow process chart is a graphical and symbolic representation of
the processing activities performed on the work piece. The chart can selectively be used to show
Computer Aided Drafting. It is a software application for computer aided design (CAD)
and drafting. It aims to simplify the drawing of the proposed layout. The researchers used
Cost- Benefit Analysis. It is a comparative assessment of all the benefits you anticipate
from the project and all the costs to introduce the projects, perform it, and support the changes
resulting from it. It is used for the researchers to estimate and total up the equivalent money
FACILITIES IMPROVEM ENT 40
value of the benefits and costs to the community of projects to establish whether they are
worthwhile.
also defines criteria for assigning closeness between relationships and it establishes relationships
value. It is used for the researchers to allow everyone to contribute something to the development
Travel Chart. It is a simple table where there are multiple movements between places. It
is a variation on the check sheet, indicating movements between places. It is a variation on the
check sheet for the researchers to indicate movements from and to any combination of a given
set of locations.
FACILITIES IMPROVEM ENT 41
Unit IV
The information provided in this unit is based on the collected data. This collected data
are used to the effectiveness of the proposed project study. This unit also presents the step by
step method for the better understanding on how the proposed study will be incorporated in the
existing process.
Data Gathering
The researchers gather data in the production area of Rodilla’s Yema Cake, its present or
existing facility layout, present workflow diagram, and present flow process chart to come up
with the proposed facility layout design. To design an improved facility layout, the researchers
gathered all the relevant data regarding the company by interviewing the manager and workers,
The first step of Systematic Layout Planning requires gathering and analyzing data
required for the study. This must occur before any planning of relationships, space or
adjustments. The input variables for every SLP are P, Q, R, S and T. Product (P) is the material
that will be processed. For this study, the products are the yema cakes. Quantity (Q) is the
volume of each product to be processed. The volume in this study refers to the output of each
product. It relies on the total time used to build a unit of product. Routing (R) is the path a
product travels to be processed. The routing (R) in this study is obtained from the company’s
process specific document(PSD) for yema cakes. Time(T) refers to the overall time required to
complete processing. Data collection of the cycle time for each process is done by time studies.
FACILITIES IMPROVEM ENT 42
Existing Set-Up.The production area produces four different types of cake with flavors
original yema, chocolate, mocha and ube. A flowchart is used toa type of diagram that represents
an algorithm, workflow or process, showing the steps as boxes of various kinds, and their order
by connecting them with arrows. This diagrammatic representation illustrates a solution model to
a given problem.
program in various fields. This production area uses various types of machines like egg mixers,
flour mixers, icing mixers, and big and small ovens. It operates eight hours a day, six times a
week. The workers compensation is paid based on the policy of Rodilla’s Yema Cake. The yema
cake production was composed of 12 processes which are operated by 25-30 workers.
In analyzing processes, particular actions along the way are often significant, especially if
you are looking to eliminate sources of waste (ormuda, as the Japanese call it). The chart can
The 12 processes on how the production area of Rodilla’s operates are: 1.) Receiving of raw
materials. 2.) Storing of raw materials into storage or stock room. 3.) Issuing of materials to
production. 4.) Pre mixing. 5.) First baking. 6.) Second mixing. 7.) Second baking. 8.) Cooling.
9.) Slicing. 10.) Icing and cheesing. 11.) Packing. 12.) Loading of finished products.
FACILITIES IMPROVEM ENT 43
Start
Pre-mixing
First baking
Second mixing
Second baking
No Yes
Let it cool Does the
dough cool? Slicing
Packing
Loading of finished
End
Present Flow Diagram. Industrial Engineering tools help the researchers to elaborate the
problems in the production area of Rodilla’s Yema Cake and also help to establish a better
design of the facility layout. Figure 3 shows how the actual process of producing yema cakes. It
also shows the arrangement of facilities and the spaces between each machine. There were 11
ovens, 2 mixers for flour and sugar mixing, 6 big mixers for making chiffon cake, 8 mixers for
Process begins with incoming material at the production area. However this process is not
included in the scope of this case study. After that, the pre mixing assembly is performed by the
operator in the lower building of the production. After that they have to transfer the mixed
ingredient to the next process which is chiffon making. The chiffon making process will take
about 6 minutes in each mixer of dough. Upon completion, operator has to transfer the mixed
dough into the oven section; this will take about 30 minutes in each batch of cakes per oven.
FACILITIES IMPROVEM ENT 45
After the baking of cakes in the oven it proceeds to the next process which is cooling. When the
cakes are cool enough operator transfer them to the finishing section located at a different
building above the baking section. This process requires the usage of racks. Therefore long
travelling distance and time occurs when the operator has to wait for the cakes to cool and
After the transferring of cakes to the finishing sections, cakes are going to 3 same
assemblies of slicing, icing and cheesing. The processes are being done in three different
assembly tables all at the same time before it is transferred to another table which is boxing.
different departments in the production area of yema cakes. These departments are the icing
section, storage area, washing area, mixing areas, oven section, racks area, icing and slicing area,
Present Facility Layout.The existing layout of the production area of Rodilla’s Yema
Cake is given in Figure 2 below. In this layout, the dimensions of the area and the existing
Present Standard Time. Standard provides information essential for the successful
operation of an organization. To calculate standard time for each operation, time study is
conducted in the production area. To do this, the researcher selects one operator from each
operation. Then, each operation is taken for at least three cycles to get better results. Once time
study is made by collecting raw data the performance rating is given to each operator and actual
Standard Time determination is the observed time (OT) of the given element is
determined by taking the mean of 5observations. The sample size, n, is then calculated to show
FACILITIES IMPROVEM ENT 47
its sufficiency. Normal Time (NT) is found by multiplying the observed time by the average
rating.
By using one of the oldest used rating systems, the Westinghouse rating system
considering four factors in evaluating the performance of the operator: skill (as proficiency at
following a given method), effort (is representative of the speed with which skill is applied, and
can be controlled to a high degree by the operator), conditions (referred to in this performance
rating procedure affect the operator and not the operation, and they include temperature,
ventilation, light, and noise.), and consistency (as being in conformity with a set of rules,
guidelines or policies), the researchers determined the value of the rating factor.
The rating used here is 119% for the overall rating factor of all the operators:
Skill B2 +0.18
Effort B1 +0.10
Condition D 0.0
Consistency C +0.01
Algebraic Sum: +0.19
Performance Factor: 1.19
Allowances for this project are: Personal needs 5%, Unavoidable delay 1%, Basic Fatigue
4 %, Total = 10%
Actual Computation:
Table 2.
Present time study for small cakes
Activity : Yema Cake Production ( Small )
Date : 2016
Operator: BSIE
Circle appropriate Method & type :
Method: Present Proposed
Remarks
Baking of chiffon cake in the 1830 1830 1830 1830 1830 1830
oven
Transferring of baked chiffon 115 125 122 120 118 120
cake racks
Cooling of cakes in the racks 480 480 480 480 480 480
Table 3.
Present time study for big cakes
Date : 2016
Operator: BSIE
Remarks
Baking of chiffon cake in the 1830 1830 1830 1830 1830 1830
oven
Cooling of cakes in the racks 480 480 480 480 480 480
Icing of cakes 23 17 21 19 20 20
Cheesing of cakes 5 4 6 7 8 6
Transferring of cakes 5 4 6 6 4 5
Table 4.
Summation of the present time study for small and big cakes
`Location: Rodillas Yema Cake `Location: Rodillas Yema Cake
Activity :Yema Cake Production (small) Activity :Yema Cake Production (big)
Circle appropriate Method & type : Circle appropriate Method & type :
Method: Present Proposed Method: Present Proposed
Remarks: Remarks:
Baking of chiffon cake in the oven 1830 Baking of chiffon cake in the oven 1830
Table 5.
Present time study data
Description Time
Small Cakes Big Cakes
Observed time (sec/unit) 3034.4 3017.4
Standard time (sec/unit) 3969.42 3949.78
Working hours 28800 28800
Output 500-700 500-700
Total travel time 227 215
From the data gathered, the total time of processing for a single cake is 3034.4 seconds
for a small cake and 3017.4 for a big cake. With the standard working days per month of 22
days, the output yields 11000-15400 small and big yema cakes per month. It can be seen that the
travelling time is high due to frequent travelling between 2 buildings. The travelling time is
about 210-230 seconds which is higher than the assembly and cueing time.
for production of goods or delivery of services. It means planning for the locations of all
machines, utilities, employee workstations, material storage area, aisles, offices and storage
rooms. This is for the flow patterns of materials and people around, into and within buildings.
In the production of yema cake, operation starts by mixing different ingredients from
different areas in the production. The flow process chart illustrates the delayed process in making
yema cake including all activities such as the operations, transportations, delays and storage.
This helps the researchers in setting out the sequence of the flow of a product by recording all
Inspection 0 0
Total 13 3034.4
Remarks:
Total Distance 21 meters
Process Description Symbol Time Distance Method
(sec) (meter) Recommendation
Mixing the flour 65
Cheesing of cakes 8
Transferring of cakes 5 1
Arranging of finished 2
cakes for the delivery
Cheesing of cakes 6
Transferring of cakes 5 1
Arranging of finished 2
cakes for the delivery
In getting the data of the flow process chart, the researcher used the standard time of each
operation computed in the time study table. The transportation distances was got from measuring
the distance of each station to the next station based on the sequence of the process while the
transportation time is computed by taking up the average of the 5 trials of the observed time
collected by the researcher. The total flow time of producing yema cake is computed.
Data Analysis
The results of the interview and observation in the production area, the researchers found
out that the common problem that the production area of Rodilla’s Yema Cake usually
encountered is long processing time between each processes because of their distances from each
other. To be able to understand the roots of the problem, and how will it be prevented, the
researchers use of various root cause analysis tools as shown in the following figures.
Table 6.
Whys Analysis – Causes of the problem in Rodilla’s Yema Cake
Why’s Because
Why Rodilla’s cannot produce yema cake in There having a hard time in the production of
time? yema cake.
Why Rodilla’s having a hard time in the There is a long transportation of each
production of yema cake? operations/stations.
Why was there a long transportation of each The production area has a poor production
operations/stations? system.
Why the production area has a poor production The operations are not in proper arrangement?
system?
Why was there a improper arrangement? Because the production area has a poor facility
layout.
FACILITIES IMPROVEM ENT 55
In Table 5, the causes of the error in production of yema cake were shown using the 5
whys analysis. From the last reason, the answer to the problem was found out to redesign of an
Table 8.
Activity Relationship Chart.In this stage, the identification of the relationships between
resources is discussed. The resources are the various processes involved in the manufacturing of
the product. The information regarding where a product is received from and the destination of
The results are tabulated in an activity relationship chart. The relationship chart displays
which entities are related to others and it also rates the importance of the closeness between
them. This makes the chart the most effective tool for layout planning and is the best way of
FACILITIES IMPROVEM ENT 57
planning the arrangement of a plant layout having little flow of materials. The quantitative
descriptions used in activity relationship chart are as follows: (A) absolutely necessary, (E)
especially important, (I) Important, (O) ordinary closeness, (U) unimportant, and (X)
undesirable.
Space Relationship Diagram. The space relationship diagram is a visual display of the
activity relationship chart. Each entity on the chart is translated to a symbol to be placed on the
diagram and then lines are connected to show the value of the relationship. Figure 10 shows the
space relationship diagram of the production area of Rodilla’s Yema Cake. The numbers and
types of lines are used to distinguish the importance between each process are as follows; (A)
four straight lines, (E) three straight lines, (I) two straight lines, (O) one straight lines, (U) no
Absolutely necessary relationship occurs between the assembly line of slicing/icing and
boxing. Locating them close together is absolutely necessary as the products share these 2
processes. Rework process, which requires travelling to and fro among these 2 processes, is also
the highest. Especially important relationship occurs among mixing process, baking and oven
and cooling as these processes occur back to back and are also shared between products.
Block Diagram. This shows the new actual layout or location of the different
departments in the production area of yema cakes. These departments are the icing section,
storage area, washing area, mixing areas, oven section, racks area, icing and slicing area, boxing
Standard Time. Standard provides information essential for the successful operation of
an organization. To calculate standard time for each operation, time study is conducted in the
production area. To do this, the researcher selects one operator from each operation. Then, each
operation is taken for at least three cycles to get better results. Once time study is made by
collecting raw data the performance rating is given to each operator and actual time is calculated
The researchers then make a new time table to test the proposed facility layout that has
been implemented at the production area of Rodilla’s Yema Cake. The data is shown in the
figure below.
FACILITIES IMPROVEM ENT 60
Table 9.
Proposed time study for small cakes
Date : 2016
Operator: BSIE
Baking of chiffon cake in the 1830 1830 1830 1830 1830 1830
oven
Icing of cakes 18 16 20 16 20 18
Cheesing of cakes 6 8 6 7 8 7
Transferring of cakes 1 1 1 1 1 1
Boxing of cakes 6 8 7 6 8 7
Table 10.
Proposed time study for big cakes
Boxing of cakes 7 6 8 6 8 7
Arranging of finished 2 2 2 2 2 2
cakes for the delivery
Total 2745 2743 2752 2751 2751 2748
FACILITIES IMPROVEM ENT 62
Cheesing of cakes 7
Transferring of cakes 1 1
Arranging of finished 2
cakes for the delivery
Inspection 0 0 0 0 0
Cheesing of cakes 4
Transferring of cakes 1 1
Arranging of finished 2
cakes for the delivery
Development
The proposed layout is based on the activity relationship chart and the theme of reducing
travelled distance. Altering the positions between several departments will ensure smooth flow
of materials as well as it will reduce total travelled distance throughout the production unit.
Proposed flow diagram.In this diagram, the machines were arranged according to the
flow of the process. The machines that are related to each other were put up together in the same
line to minimize the long transportation and long processing time. Same as the present flow
diagram, the black arrow starts from the mixing area of flour and sugar to the boxing section. As
shown in the figure 6, the layout is much more systematic and organized than the present layout
because the operators will not have longer distance to transfer their part to the next operation.
Proposed Facility Layout.In order to arrive at the proposed facility layout, the
researchers analyze the gathered data and the present arrangement of the facility because those
knowledge will be the basis of the design of new facility layout that will improve the process in
producing yema cakes, minimize its processing, increase their production per day w/o overtime,
In the proposed layout assembly tables in the finishing section are arranged in line
according to the sequence of their process. This was done because the tables were not in
sequence based on their processes and the operators are having an unspecific direction all over
the area.
FACILITIES IMPROVEM ENT 66
The purpose of this proposed facility layout is to decrease time travel and to have a
standardized production system process at Rodilla’s. In creating the facility layout of Rodilla’s
Yema Cake, the researcher use process layout type as the basis because through the study of
literature on the various types of facility layout, the researchers learned that flow processing type
of manufacturing such as baking, the process layout would be suited in producing yema cakes.
Designing the proposed facility layout is the arrangement of the assembly lines.
Evaluation
In order to evaluate whether the propose facility layout is efficient and effective,
applicable and cost saving this part will compare the present and proposed layout. Also, this will
Table 11.
Comparison of Total Time between the Present and Proposed Layout of Small Yema Cakes
Process Description Time (sec)
Icing of cakes 21 18 3
Cheesing of cakes 8 7 1
Transferring of cakes 5 1 4
Table 12.
Comparison of Total Time between the Present and Proposed Layout of Big Yema Cakes
Icing of cakes 20 16 4
Cheesing of cakes 6 4 2
Transferring of cakes 5 1 4
According to the result, the time required to produce a single yema cake was reduced to 5
1600
1400
1200
1000
800
Present
600 Proposed
400
200
Figure 16.Graphical representation of the compared present and proposed time study
FACILITIES IMPROVEM ENT 69
1600
1400
1200
1000
800
Present
600 Proposed
400
200
Figure 17.Graphical representation of the compared present and proposed time study
This happens because of the new systematic arrangement of each machines and
operations from a proposed facility layout. The figure above shows the graph to see the actual
differences between the time in each operation of the present and proposed layout.
Survey Result
In the post survey that the researchers had prepared, the data collection is based on self-
completion schemas, which the selected target group or the workers of Rodilla’s has received by
letter.
FACILITIES IMPROVEM ENT 70
In this survey the researchers collected a fairly answers from a large amount of persons,
within a relatively short time span, and a relatively limited economic range. The respondents get
the possibility to answer the questionnaire when they feel like it and can find the time and space.
In this manner, the respondents can use more time to think about difficult or complex questions
Table 13.
Survey Result
Items 5 4 3 2 1 Total
Effectiveness
Efficiency
Cost
After the questionnaire is completed, each item may be analyzed separately or in some
cases item responses may be summed to create a score for a group of items. Hence, Likert scales
FACILITIES IMPROVEM ENT 71
are often called summative scales. Used mainly in training course evaluations and market
surveys, Likert scales usually have five potential choices (strongly agree, agree, neutral,
disagree, strongly disagree) but sometimes go up to ten or more. The final average score
Table 14.
Result of the survey based on Likert Scale
Criteria SA (5) A (4) N (3) D (2) SD (1) Total
F W % F W % F W % F W% F W% F M
Usefulness of 30 150 100 0 0 0 0 0 0 0 0 0 0 0 0 30 5 Strongly
the improved Agree
layout
Improved 18 90 60 10 40 33 2 6 7 0 0 0 0 0 0 30 4.5 Strongly
layout is Agree
effective in
maximizing
the capacity of
the business
Reduce of 19 95 63 9 36 30 2 6 7 0 0 0 0 0 0 30 4.6 Strongly
unnecessary Agree
movements
Suitability of 20 100 67 8 32 27 2 6 7 0 0 0 0 0 0 30 4.6 Strongly
the improved Agree
layout for
everyone
Synchronized 24 120 80 5 20 17 1 3 3 0 0 0 0 0 0 30 4.8 Strongly
with the Agree
previous and
next previous
and next
process
Enhanced 23 115 77 7 28 23 0 0 0 0 0 0 0 0 0 30 4.8 Strongly
present time Agree
due to
improved
layout
Less losses 30 150 100 0 0 0 0 0 0 0 0 0 0 0 0 30 5 Strongly
incurred as a Agree
result of the
layout
FACILITIES IMPROVEM ENT 72
Table 15.
Cost benefit analysis
Criteria Present Proposed Saved
Estimated Daily Total Walk Time 0.418 hour/day 0.163 hour/day 0.25 hour/day
Estimated Daily Total Cost Php 14.63/day Php 5.705 /day Php 8.75 /day
Estimated Monthly Total Cost Php 321.86/month Php 125.51/month Php
192.5/month
Estimated Annually Total Cost Php Php Php
3862.32/annual 1506.12/annual 2310/annual
In the cost benefits of the time saved, using the same flow process chart, the
Rodilla’sYema Cake would have a projected savings of 0.25 hour per day, yearly with 61%
efficiency.
FACILITIES IMPROVEM ENT 73
= 0.418 -0.163
= 0.25 hour/day
In the cost benefits of the worker, using the same flow process chart, the Rodilla’s Yema
Cake would have a projected savings of Php 8.75 per day, or Php 192.5 per month, or Php 2310
= 14.63-5.705
= 321.86-125.51
= Php 192.5/month
= 3862.32-1506.12
= Php 2310/annual
Summary of Findings
All in all, if the results were being summarized, the effectiveness and efficiency of the
proposed facility layout was a great success and help to Rodilla’s Yema Cake. The sum of total
savings of the workers and the total time savings of the outgoing goods has a big effect on the
annual savings of the Rodilla’s Yema Cake. As shown in table 12, an amount of Php 2310is
Unit V
This unit dealt with the conclusion and recommendation of the researchers concern in the
facility layout of the Production area of Yema Cake. This unit includes all the important
information that was found in the study. It shows the generalizations and answers to the
objectives stated at the beginning of the study. Furthermore, it also includes a suggestion or
Conclusions
To develop a proposed solution, design of an effective new facility layout to the problems
encountered of the Production area of Yema Cake, the following conclusions were established:
1. The researchers designed an improved facility layout at the production area of Rodilla’s
Yema Cake. The improved layout such as new arrangements of machines and working
areas helped to decrease the distance and time consumption during the process or
2. The researchers developed the improved facilities layout at Rodilla’s Yema that helped
the Production area to increase their output per day and helped them to minimize their
processing time in slicing and icing cakes, saves cost, saves energy, minimize errors, and
efficiency and cost using time and motion study principles the researchers determined the
wastes such a long transportation of materials and products and idle time that should be
lessen or eliminated in the whole process to decrease the flow of processing the product.
FACILITIES IMPROVEM ENT 76
Recommendations
In conducting this study, the researchers have proposed the following suggestions for the
1. The researchers recommend to the next researchers to conduct study on the design and
layout of next process. Continuously improve the process in to produce more cost down
2. The developed process layout and must be monitored and act on the items that Facilities
planning and design requires the use of different tools and techniques, in order for it to
operate at low cost and provide fast delivery but not sacrificing the quality being
3. Sustaining the implementation of proposed layout in the company will be a good start to
improve production line productivity. The company should arrange their product or its
flow in a way that the efficiency and productivity will not suffer.
FACILITIES IMPROVEM ENT 77
References
FZ LLC
Bermillo, E.B. et al. (2013) Production Efficiency Improvement through Time and Motion Study
Complete, R.M, et al (March 2014) Cost Reduction through Development of Fleet Management
Quicena, J.H.B., Granada, M.E.V., Llagas K.J.R., VillaflorJr, R.A., Palero, M.I. (March 2013)
Maniya, K.D., Bhatt M.G. (2011) An alternative multiple attribute decision making methodology
for solving optimal facility layout design selection problems in Computer & Industrial
Engineering
FACILITIES IMPROVEM ENT 78
Hofer C., Eroglu C., Hofer A.R. (2012) The effect of lean product of financial performance: The
Ozbakir, L., Baykasoglu A., Gorkeml L. (2011) Multiple Colony ant algorithm for parallel
Furlan, A., Dal Pont, G., Vineli, A. (2011) Towards High Performance Manufacturing in
Shevshenko, E., Bashkite, V., Maleki, M., Yan Wang. (2012) Sustainable Design of Material
https://scholar.google.com.ph/scholar?hl=en&as_sdt=0,5&q=facilities+management+refe
rence
https://books.google.com.ph/books?hl=en&lr=&id=QRZj4PULVwcC&oi=fnd&pg=PR5
&dq=facilities+management+book&ots=cbDNRcJLH-
Ramazan Şahin (April 2011) A simulated annealing algorithm for solving the bi-objective facility
http://www.sciencedirect.com/science/article/pii/S0957417410010742
ArashShahin, Mehdi Poormostafa (Nov 2011) Facility Layout Simulation and Optimization:
Erik Sundin , Mats Björkman, Mats Eklund, Jörgen Eklund, Inga-Lill Engkvist (June 2011)
Improving the layout of recycling centres by use of lean production principles. Retrieved
from http://www.sciencedirect.com/science/article/pii/S0956053X11000092
FACILITIES IMPROVEM ENT 80
Appendices
Appendix A
Appendix B
This appendix contains samples of all the participant interviews. When the researcher
began the interview process, the line of questions concerning the production process and the
material-transition process were viewed as separate entities. After, the first four interviews with
the workers of Rodilla’s Yema Cake from different areas of production, the supervisor toured the
researcher around the production area which in fact flowed into the follow-up interviews with
her. Separate conclusions concerning production process and the material-transition process were
The interview was held in the main office of Rodilla’s Yema Cake, July 12, 2016. The
researcher's time with them was limited to 30 minutes by their schedule. The interview
proceeded on a very structured path defined by the preliminary question set used by the
interviewer to assure coverage of the topics of importance to the researcher. The interview got
The production usually starts at 5:30 in the morning every day except for Sunday. We are
here by 5 o’clock to prepare things. Some of us start by 5 sharp, those are the workers
How many workers are working in the production for ordinary days?
We are 25 to 30 people working here together. We are divided into 2 wherein boys are on
the mixing and baking area and girls are in the icing, slicing and packing.
During peak season like Christmas and New Year, How many workers work here?
During peak season we hire extras and we most likely are 35-40 workers doing the
production.
Is your work here comfortable and stress free during the production?
Yes. But there is a time we stand and work too long, that’s when we have plenty of
orders from the customers. But that’s just once in a blue moon now because if we have
Is the ventilation in your work place good enough so you can work productively?
Yes. We are air-conditioned in the girl’s area. The boys’ area wherein there are ovens and
racks also has good ventilation because they have 2 big electric fans there.
I worked here 3 years already and I am used to my job so well. If there is something
uneasy for me it is when we transfer cakes from icing to slicing to packing because we
I don’t think there is anything else. My job as a packer and sometimes slicer, it is the only
The interview was held in the main office of Rodilla’s Yema Cake, July 12, 2016. The
researcher's time with them was limited to 30 minutes by their schedule. The interview
proceeded on a very structured path defined by the preliminary question set used by the
interviewer to assure coverage of the topics of importance to the researcher. Participant 2 gave
very tight concise answers to the questions and kept the discussion on track to an on time
conclusion.
The production in our area usually starts at 5:00 in the morning every day except for
Sunday. We are the first step in the production so we cannot be delayed or else the whole
How many workers are working in your area for ordinary days?
We are 12 to 15 people working here together. We are divided into 2, mixing and baking.
Is your work here comfortable and stress free during the production?
Yes it’s fine. We worked here for years already and we got used to the daily routine. We
are well divided for each task so we don’t exert too much force in our jobs.
Is the ventilation in your work place good enough so you can work productively?
Yes. We have two big electric fans to somehow eliminate the heat coming from the seven
big ovens.
FACILITIES IMPROVEM ENT 84
For me as a mixer, I think probably the most uneasy one is when I get the sacks of flour,
sugar and baking powder in their area to the mixing room. I carry them manually.
I don’t think there is anything else. In my job as a mixer the only thing that makes my job
SUPERVISOR INTERVIEW
The interview was held in the production area of Rodilla’s Yema Cake, July 12, 2016.
The researcher's time with them was limited to 30 minutes by their schedule. The interview
proceeded on a very structured path defined by the preliminary question set used by the
interviewer to assure coverage of the topics of importance to the researcher. Participant 3 gave
very tight concise answers to the questions and kept the discussion on track to an on time
The hardest part in the production is the transferring of materials (in-process goods and
raw materials) from one place to another. Though we use racks, we still can’t avoid to
What is the main reason that usually causes delays in the production?
The waiting of cakes to get cooked in the oven and the waiting of cakes to get cool before
Sometimes, but sometimes not because we do other things like assembling the boxes
Do you face any uneasiness in the production area aside from the things that are mentioned
before?
Not really, no. There’s nothing more because we are just a small business here in Quezon
so we got used to do a lot of things here in the production area manually. Besides it’s a food
manufacturing business so we don’t let machines do all the works. Deliciousness in our yema
Interviewees:
1. Mixer:
2. Baker:
3. Slicer/Icing Personnel:
4. Packer:
5. Supervisor:
FACILITIES IMPROVEM ENT 86
Appendix C
Result of Surveys
This appendix contains the sample of the post survey form. When the researcher finished
the implementation of the proposed layout a post survey form was given to the workers, the line
of questions concerning the production process and the material-transition process were viewed
as separate entities.
Demographic Profile
Items 5 4 3 2 1
Effectiveness
1. Usefulness of the improved layout
Items 5 4 3 2 1 Total
Effectiveness
1. Usefulness of the improved layout 30 0 0 0 0 30
Efficiency
Cost
( ) ( ) ( ) ( ) ( )
5. Synchronized with the previous and next previous and next process
( ) ( ) ( ) ( ) ( )
Appendix D
Estimated Daily Total Walk Time 0.418 hour/day 0.163 hour/day 0.25 hour/day
Saved
Estimated Daily Total Savings php 14.63/day php 5.705 /day php 8.75 /day
Cost
Estimated Monthly Total Savings php 321.86/month php 125.51/month php
Cost 192.5month
Estimated Annually Total Savings Php Php Php
Cost 3862.32/annual 1506.12/annual 2310/annual
Saved
Estimated Daily Total Walk Time Saved = Total Time Saved per Unit x Unit per batch
= 131 seconds/batch x 7 batches/day
= 917 seconds/day
= 15.28 minutes/day
= 0.25 hour/day
Estimated Daily Total Savings Cost = Average Daily Walk Time Saved x Direct Labor
Cost
= 0.25 hour/day x Php 35/hour
= php 8.75 /day
Estimated Monthly Total Savings Cost = Daily Total Savings Cost x 22 days/month
= 8.75/day x 22 days
= php 192.5month
Estimated Annually Total Savings Cost = Monthly Total Savings Cost x 12 month
= PHp 227.5/month x 12 months
= Php 2310/annual
FACILITIES IMPROVEM ENT 90
Present
Estimated Daily Total Walk Time Saved = Total Time Saved per Unit x Unit per batch
= 215seconds/batch x 7 batches/day
= 1505 seconds/day
= 25.08 minutes/day
= 0.418 hour/day
Estimated Daily Total Savings Cost = Average Daily Walk Time Saved x Direct Labor
Cost
= 0.418hour/day x Php 35/hour
= php 14.63/day
Estimated Monthly Total Savings Cost = Daily Total Savings Cost x 22 days/month
= 14.63/day x 22days
= php 321.86/month
Estimated Annually Total Savings Cost = Monthly Total Savings Cost x 12 month
= PHp 321.86/month x 12 months
= Php 3862.32/annual
Proposed
Estimated Daily Total Walk Time Saved = Total Time Saved per Unit x Unit per batch
= 84seconds/batch x 7 batches/day
= 588 seconds/day
= 9.8 minutes/day
= 0.163 hour/day
Estimated Daily Total Savings Cost = Average Daily Walk Time Saved x Direct Labor
Cost
= 0.163 hour/day x Php 35/hour
= php 5.705 /day
FACILITIES IMPROVEM ENT 91
Estimated Monthly Total Savings Cost = Daily Total Savings Cost x 22 days/month
= 5.705 /day x 22days
= php 125.51/month
Estimated Annually Total Savings Cost = Monthly Total Savings Cost x 12 month
= PHp 125.51/month x 12 months
= Php 1506.12/annual
92
Curriculum Vitae
Yvonne R. Casas
Carillo St. Brgy. Parang
Pagbilao, Quezon
Contact No. 09060084216
Email Address : yvonnecasas28@yahoo.com.ph
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
YVONNE R. CASAS
Signature over printed name
93
PERSONAL DATA
SKILLS
Birthdate: November 04 1995 Can perform multitasking
Birthplace: Sariaya, Quezon Can apply knowledge about Industrial
Age: 20 Engineering Tools
Civil Status: Single Good Leadership
Name of Father: JuanitoAbuel Fast Learner
Name of Mother: Elma Abuel Computer Literate
Citizenship: Filipino
Religion: Catholic TRAINING/S EMINARS ATTENDED
Sex: Male 1. Leadership Empowerment Seminar Manuel
Language Spoken: Filipino, English S. Enverga University Foundation 2014
2. 6th Southern Tagalog Industrial Engineering
EDUCATIONAL BACKGROUND: Seminar
3. University of Philippines, Los Baños,
Tertiary:
Laguna 2014
th
Bachelor of Science in Industrial 4. 5 PIIE Regional Congress Seminar
Engineering University of Philippines, Los Baños,
Laguna 2015
Manuel S. Enverga University 5. 12th PIIE National Congress Seminar Mapua
Foundation, University Site, Institute of Technology, ManilA2015
Lucena City 6. 10th IEshikawa Workshop and Seminar
2012 until present
Ateneo de Manila University, Loyola
Heights, Quezon City, Manila 2015
Secondary:
Sariaya Institute Inc.
Sariaya Quezon CHARACTER REFERENCE:
2008 - 2012
Engr. James Louie R. Meneses, 09494247437
Primary: Professor,Manuel S. Enverga University
Foundation
Central Main Elementary School University Site, Lucena City
Sariaya Quezon
2002 – 2008 Dr. Guillermo M. Rago Jr., 710 - 3151
Dean of the College of Engineering and
ORGANIZATIONS Technical Department,
PHILIPPINE INSTITUTE OF INDUSTRIAL Manuel S. Enverga University Foundation
ENGINEERS – University Site, Lucena City
MSEUF STUDENT CHAPTER
Assistant Vice President - Internal Engr. Agnes Aviles 09228620376
A.Y. 2015 - 2016 Professor,Manuel S. Enverga University
Foundation
University Site, Lucena City
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
SHARMAINE V. COMINTAN
247 U. Camacho St. Brgy. 4,
Quezon,Quezon
CP # 09254737265
E-mail: sharmaine_comintan@yahoo.com
PERSONAL DATA:
Resourceful and willingness to learn new concepts
Birth Date : November 28,1995 and apply them to yield s uccessful results
Birth Place : Gumaca Quezon
Age : 20 TRAININGS/SEMINARS ATTENDED:
Civil Status : Single
Name of Father : Vicente V.Comintan On the Job Training
Name of Mother : Lesaida V. Comintan PETER PAUL CORPORATION
Citizenship : Filipino Production Office Staff
Religion : Roman Catholic Brgy.Pahinga Candelaria Quezon
Sex : Female
Language Spoken : Tagalog and English 6 th PIIE Regional Congress “Limitless:
Unlocking Possibilities with Product Design
EDUCATIONAL BACKGROUND: January 30, 2016
SKILLS:
Engr. Agnes Aviles 09228620376
Good Communication skills both written Professor,Manuel S. Enverga
and verbal University Foundation University
Can easily adapt to a working environment Site, Lucena City
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
SHARMAINE V.COMINTAN
Signature over printed name
95
PERSONAL DATA:
Birthdate: February, 1, 1996 Work independently, Organized work load
Birthplace: Sta. Rosa Laguna
Age: 20
Civil Status: Single TRAININGS/SEMINARS ATTENDED:
Name of Father: Rodante L. Anading 1. 10 TH IEshikawa seminar held at
Name of Mother: Fely F. Anading Henry Lee Theater, Ateneo de
Citizenship: Filipino Manila University last
Religion: Christian November 21, 2015: Themed
Sex: Male “Nexus: X Marks the spot-
Language Spoken: Filipino, English converging minds Across the year
2. Sports FIEsta 2015 held at
EDUCATIONAL BACKGROUND: University of the Philippines Los
Baños , Last October 25,2015
Tertiary: BACHELOR OF SCIENCE IN 3. 12 th PIIE National Congress held at
INDUSTRIAL ENGINEERING Mapuá Institute of Technology
Manuel S. Enverga University Foundation Gymnasium, Manila Last February
7,2015
Secondary: 4. Sport FIEsta 2014 held at Colegio
Name of School: Manuel S. Enverga University De san Juan De Letran – Calamba,
Foundation Last January 3, 2014
Awards Received: GLEE CLUB Membership
Award/ Boy Scout of the
Philippines COMMUNITY SERVICES:
Date Graduated: 2012 Christmas Gift Giving for
Homeless
Primary: Feeding program
Name of School: ELVIRA RAZON Tree Planting
ARANNILA ELEMENTARY
SCHOOL CHARACTER REFERENCES:
Awards Received: Boy Scout of the Philippines ENGR. James Meneses
Date Graduated: 2008 Proffessor at Manuel S. Enverga
University Faundation
Lucena City
ORGANIZATION: 0949 424 7437
Name of Organization:
Philippine Institute of Industrial Engineering ENGR. Gervin Espinosa
Position: Member Proffessor at Manuel S. Enverga
Inclusive Dates: 2015-2016 University Faundation
Lucena City
SKILLS:
Computer literate (Microsoft Word, Microsoft Power Dr. Guillermo M. Rago, Jr.
Point), Dean, College of Engineering and
Welding, Ability to learn systems and procedures in a
workplace.
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
JOY E. PANALIGAN
ZONE 11, Poblacion Sta Elena
Camarines Norte
Contact No. : 0939-808-2091
E-mail: joy_panaligan28@ymail.com
I hereby certify that the above information is true and correct to the best of my knowledge and belief.