Name of Work :-P & F IPB from main dhana to H/o Mahasingh to H/o khem pandit and h/o

maheash singh Pandit vill.


Baiyanpur M.C. Sonipat.
ABSTRACT OF COST
Sr. Qyt. Unit Rate C.P.% Amount
HSR NO. Particulars of items
No
Dismantling of cement concrete plain 1:2: 4 mi (Note:- Disposal of
1 8.6d Dismantled/Excavated malba will be dune by agency at their own cost and no 37.34 Cum 71.85 550 17437.78
extra payment will not be paid for disposal upto lead 8 Km
Dismantling brick or flagged stone slab flooring without concrete 452.25
2 8.28 Sqm 1.7 550 4997.36
base
4.1a + Earth work in filling with in a lead 5 km
3 415.96 Cum 23.75 450 54334.12
5.2b
Preparation of sub grade, including trenching, rough dressing of spoil
4 24.1 final dressing of earth,to given levels and camber, watering, rolling 1808.50 Sqm 0.83 370 7054.96
with road roller, and compacting the bed HSR 24.1

Cement Concrete 1:8:16 with brick ballast


5 10.26 40mm nominal size in foundation and plinth. HSR 10.26 13.26 Cum 300.20 450 21893.59

1st Class Brick Work 1:5 HSR 11.3


6 11.3 41.26 Cum 407.60 600 117728.74
Drain Type -II HSR 29.54
7 29.54 520.00 Rmt 69.00 350 161460.00
W.b.m with stone
aggregate 40mm nominal size in foundation and plinth.
8 N.S 135.61 Cum 1283.00 0 173987.63

Providing and laying 80mm thick interlocking paver blocks of all


shapes and colours in design mix cement M-35 over a bed of 30mm
9 10.159 180.90 Sqm 65.00 10 12934.35
thick fine sand complete in all respect. ( L. R)

Providing and laying 80mm thick interlocking paver blocks of all


shapes and colours in design mix cement M-35 over a bed of 30mm
10 10.159 1175.20 Sqm 450.00 10 581724.00
thick fine sand complete in all respect. New tiles
Conglomerate floor 50 mm thick cement
11 14.10 concrete topping 1:2:4 HSR 14.10 119.60 Sqm 37.60 400 22484.80

Total 1176037.33
Add 1% Contingency Charges 11760.37
1187797.70
Says Rs. 11.87 lacs
Junior Engineer Municipal Engineer Executive Engineer
M.C. Sonipat M.C. Sonipat M.C. Sonipat.
1
Name of Work :-P & f IPB from main dhana to H/o Mahasingh to H/o khem pandit and h/o maheash singh Pandit vill. Baiyanpur M.C. Sonipat.

MEASUREMENT OF QUANTITIES
HSR MEASUREMENTS
Sr No ITEM DESCRIPTION OF ITEM
No Nos. L B H Quantity UNIT
Dismantling of cement concrete plain 1:2: 4 mi (Note:-
Disposal of Dismantled/Excavated malba will be dune by
1 8.6d agency at their own cost and no extra payment will not be
paid for disposal upto lead 8 Km
H/o Maha singh to H/o khem singh 1 70 7.62 0.10 53.34 Cum
D/d 30% Missing area -16.00 Cum
Total 37.34 Cum

Dismantling brick or flagged stone slab flooring


2 8.28
without concrete base
H/o khem singh to H/o mahesh singh 1 90 6.70 603.00 Sqm
Total 603.00 Sqm
D/d 25% Missing area -150.75 Sqm
Net 452.25 Sqm
4.1a + Earth work in filling with in a lead 5 km
3
5.2b
H/o Maha singh to H/o khem singh 1 70.00 7.65 0.23 123.17 Cum
H/o khem singh to H/o mahesh singh 1 90.00 6.70 0.23 138.69 Cum
H/o mahavir to H/o surender 1 100.00 6.70 0.23 154.10 Cum
Total 415.96 Cum

Preparation of sub grade, including trenching, rough


dressing of spoil final dressing of earth,to given levels
4 24.1 and camber, watering, rolling with road roller, and
compacting the bed

H/o Maha singh to H/o khem singh 1 70.00 7.65 535.50 Sqm
H/o khem singh to H/o mahesh singh 1 90.00 6.70 603.00 Sqm
H/o mahavir to H/o surender 1 100.00 6.70 670.00 Sqm
Total 1808.50 Sqm

Cement Concrete 1:8:16 with brick ballast


5 10.26 40mm nominal size in foundation and plinth.
Under side B/W

H/o Maha singh to H/o khem singh 2 70.00 0.34 0.075 3.57 Cum
H/o khem singh to H/o mahesh singh 2 90.00 0.34 0.075 4.59 Cum
H/o mahavir to H/o surender 2 100.00 0.34 0.075 5.10 Cum
Total 13.26 Cum

6 11.3 1st Class Brick Work 1:5


2 70.00 0.23 0.23 7.41 Cum
2 90.00 0.23 0.23 9.52 Cum
2 100.00 0.23 0.23 10.58 Cum
2 70.00 0.115 0.23 3.70 Cum
2 90.00 0.115 0.23 4.76 Cum
2 100.00 0.115 0.23 5.29 Cum
Total 41.26 Cum
7 29.54 Drain Type -II
H/o Maha singh to H/o khem singh 2 70.00 140.00 Rmt
H/o khem singh to H/o mahesh singh 2 90.00 180.00 Rmt
H/o mahavir to H/o surender 2 100.00 200.00 Rmt
Total 520.00 Rmt

W.b.m with stone


8 N,S aggregate 40mm nominal size in foundation and plinth.

H/o Maha singh to H/o khem singh 1 70.00 5.91 0.100 41.37 Cum
H/o khem singh to H/o mahesh singh 1 90.00 4.96 0.100 44.64 Cum
H/o mahavir to H/o surender 1 100.00 4.96 0.100 49.60 Cum
Total 135.61 Cum

Providing and laying 80mm thick interlocking paver


blocks of all shapes and colours in design mix cement
9 10.159 M-35 over a bed of 30mm thick fine sand complete in
all respect.

Old tiles
L. R for old Tiles 40% of area as useable quantity
as per item no 2= 452.25 *40%=180.90 sqm 1 180.90 Sqm

Providing and laying 80mm thick interlocking paver


blocks of all shapes and colours in design mix cement
10 10.159 M-35 over a bed of 30mm thick fine sand complete in
all respect.

New tiles
H/o Maha singh to H/o khem singh 1 70.00 5.91 413.70 Sqm
H/o khem singh to H/o mahesh singh 1 90.00 4.96 446.40 Sqm
H/o mahavir to H/o surender 1 100.00 4.96 496.00 Sqm
1356.10 Sqm
D/d Useable Tiles area -180.90 Sqm
Total 1175.20 Sqm

Conglomerate floor 50 mm thick cement


11 14.10 concrete topping 1:2:4

H/o Maha singh to H/o khem singh 2 70.00 0.23 32.20 Sqm
H/o khem singh to H/o mahesh singh 2 90.00 0.23 41.40 Sqm
H/o mahavir to H/o surender 2 100.00 0.23 46.00 Sqm
Total 119.60 Sqm

Junior Engineer Municipal Engineer Executive Engineer


M.C. Sonipat M.C. Sonipat M.C. Sonipat.