Shear Reinforcement Calculation in Cut and cover

Date: 12-Nov-2016

Submitted by
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

EXTENDED PORTAL (Loading Calculation)


Input
I Tunnel geometry
1 Shape of the tunnel = box + horshoe
2 Length of tunnel = 1m
3 Height of tunnel = 10.626 m
4 Width of tunnel = 10.626 m
5 Proposed thickness of tunnel = 1.1 m
6 Clear width of tunnel = 10.626 m
7 Clear height of tunnel = 10.626 m
8 Overburden height of soil mass (H1) = 7m
9 Surcharge factor considered = 0.0
10 Total height of tunnel from base to ground level (H )= 18.726 m

II Soil properties
1 Dry density of soil mass (ɣ dry) = 18 kN/m³
2 Saturated density of soil mass(ɣ sat) = 22 kN/m³
3 Unit weight of water (ɣw) = 10 kN/m³
4 Submerged unit weight of soil mass(ɣ sub) = 12 kN/m³
5 Overburden height of soil mass = 7m
6 Cohesion of the soil mass ( C ) = 0
7 Angle of inernal friction (ɸ ) = 30
8 At-rest lateral earth coefficient ( = 1-sin(ɸ) = 0.5
9 Active lateral earth coefficient (K= 1-sin(ɸ)/1+sin(ɸ = 0.33

III Structural analysis of Cut-and-Cover Structure


Load Diagram

H1 = 7 m

H2 = 10.626 m

Cut-and-Cover (Max overburden)


CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Structural analysis of Cut-and-Cover structure is done by considering the following 4 conditions:


1 Dry condition
2 Fully submerged condition (Water table up to GL).
3 Partially submerged condition (Water table up to crown )
4 Saturated condition

IV Load calculation for different conditions


1 Dry condition

H1 = 7 m

H2 = 10.626 m

(ka*ɣdry*H) (Ka*Q) (Ka*Q) (ka*ɣdry*H)

(i) Surcharge load


Surcharge factor considered = 0.0
Dry density of soil mass (ɣ dry) = 18 kN/m³
Total surcharge (Q ) = 0 kN/m²

(ii) Overburden pressure


Overburden height of soil mass (H1) = 7m
Dry density of soil mass (ɣ dry) = 18 kN/m³
Over burden pressure = 126 kN/m²
Total overburden pressure = 126 kN/m²

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016


13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

(iii) Lateral earth pressure


(a) Minimum lateral earth pressure
Active lateral earth coefficient (Ka) = 0.33
Overburden height of soil mass (H1) = 7m
Dry density of soil mass (ɣ dry) = 18 kN/m³
Total surcharge (Q ) = 0 kN/m²
Minimum lateral earth pressure = (Ka*Q)+(ka*ɣdry*H1)
= 41.58 kN/m²
(b) Maximum lateral earth pressure
Active lateral earth coefficient (Ka) = 0.33
Dry density of soil mass (ɣ dry) = 18 kN/m³
Total height of tunnel from ground level (H ) = 18.726 m
Total surcharge (Q ) = 0 kN/m²
Maximum lateral earth pressure = (Ka*Q)+(ka*ɣdry*H)
= ###

H1 = 7 m
126 kN/m²

41.58 kN/m² 41.58 kN/m²

H2 = 10.626 m

### 111.23244 kN/m²

2 Fully Submerged condition


( i) Surcharge load
Active lateral earth coefficient (Ka) = 0.33
Saturated density of soil mass(ɣ sat) = 22 kN/m³
Surcharge factor considered = 0.0
Total surcharge (Q ) = 0 kN/m²

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016


13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Q
Water table

H1 = 7 m

H2 = 10.626 m

ɣw*H ɣw*H

ka*ɣSub*H Ka*Q Ka*Q ka*ɣSub*H

( ii) Overburden pressure


Active lateral earth coefficient (Ka) = 0.33
Saturated density of soil mass(ɣ sat) = 22 kN/m³
Overburden height of soil mass = 7m
Over burden pressure = 154 kN/m²
Total overburden pressure = 154 kN/m²

(iii) Lateral earth pressure


(a) Minimum lateral earth pressure
Active lateral earth coefficient (Ka) = 0.33
Overburden height of soil mass (H1) = 7m
Unit weight of water (ɣw) = 10 kN/m³
Submerged unit weight of soil mass(ɣ sub) = 12 kN/m³
Total surcharge (Q ) = 0 kN/m²
Minimum lateral earth pressure = (Ka*Q)+(ka*ɣsub*H1)+(ɣw * H1 )
= 98 kN/m²

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016


13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

(b) Maximum lateral earth pressure


Active lateral earth coefficient (Ka) = 0.33
Unit weight of water (ɣw) = 10 kN/m³
Submerged unit weight of soil mass(ɣ sub) = 12 kN/m³
Total height of tunnel from ground level (H ) = 18.726 m
Total surcharge (Q ) = 0 kN/m²
Maximum lateral earth pressure = (Ka*Q)+(ka*ɣsub*H)+(ɣw * H )
= 263 kN/m²

Water table

H1 = 7 m
154 kN/m²

98 kN/m² 98 kN/m²

H2 = 10.626 m

263 kN/m² 263 kN/m²

3 Partially submerged condition (Considererd water table upto crown of tunnel )


( i ) Surcharge load
Surcharge factor considered = 0m
saturated density of soil mass (ɣ sat.) = 22 kN/m³
Total surcharge (Q ) = 0 kN/m²

(ii) Overburden pressure


Overburden height of soil mass (H1) = 7m
saturated density of soil mass (ɣ dry) = 22 kN/m³
Over burden pressure = 154 kN/m²
Total overburden pressure = 154 kN/m²

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016


13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

H1 = 7 m

Water table

ɣw*H2 H2 = 10.626 m ɣw*H2

ka*ɣSub*H Ka*Q Ka*Q ka*ɣSub*H

(iii) Lateral earth pressure


(a) Minimum lateral earth pressure At crown level (due to above soil)
Active lateral earth coefficient of top soil (Ka) = 0.33
Overburden height of soil mass = 7m
Dry density of soil mass (ɣ dry) = 18 kN/m³
Total surcharge (Q ) = 0 kN/m²
Lateral earth pressure = (Ka1*Q)+(ka*ɣdry*H1)
= 41.58 kN/m²

( b ) Maximum lateral earth pressure


Active lateral earth coefficient of satrated soil (Ka) = 0.33
Unit weight of water (ɣw) = 10 kN/m³
Dry density of soil mass (ɣ dry) = 18 kN/m³
Saturated density of soil mass(ɣ sat) = 22 kN/m³
Submerged unit weight of soil mass(ɣ sub) = 12 kN/m³
Total height of tunnel from ground level (H ) = 18.726 m
Overburden height of soil mass = 7m
Height of water table from crown = 11.726 m
Total surcharge (Q ) = 0 kN/m²
Maximum lateral earth pressure = (Ka1*Q)+(ka1*ɣsat*H)+(ɣw * H2 )
= ###

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016


13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

H1 = 7 m
154 kN/m²

Water table
41.58 kN/m² 41.58 kN/m²

H2 = 10.626 m

### 205.27496 kN/m²

4 Saturated condition
(i) Saturated density of soil mass(ɣ sat) = 22 kN/m³
Surcharge factor considered = 0m
Total surcharge (Q ) = 0 kN/m²

(ii) Overburden pressure


Surcharge load = 0 kN/m²
Overburden height of soil mass = 7m
Over burden pressure = 154 kN/m²

(iii) Lateral earth pressure


(a) Minimum lateral earth pressure
Active lateral earth coefficient (Ka) = 0.33
Saturated density of soil mass(ɣ sat) = 22 kN/m³
Submerged unit weight of soil mass(ɣ sub) = 12 kN/m³
Total surcharge (Q ) = 0 kN/m²
Minimum lateral earth pressure = (Ka*Q)+(ka*ɣsat*H1)
= 50.82 kN/m²
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

H1 = 7 m

H2 = 10.626 m

ka*ɣSub*H Ka*Q Ka*Q ka*ɣSub*H

(b) Maximum lateral earth pressure


Active lateral earth coefficient (Ka) = 0.33
Unit weight of water (ɣw) = 10 kN/m³
Saturated density of soil mass(ɣ sat) = 22 kN/m³
Submerged unit weight of soil mass(ɣ sub) = 12 kN/m³
Total height of tunnel from ground level (H ) = 18.726 m
Total surcharge (Q ) = 0 kN/m²
Maximum lateral earth pressure = (Ka*Q)+(ka*ɣsat*H)
= ###
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

H1 = 7 m
154 kN/m²

50.82 kN/m² 50.82 kN/m²

H2 = 10.626 m

### 135.95076 kN/m²

Summery
Sl. N Description Values Remarks
1 Height of tunnel 10.626 m
2 Width of tunnel 10.626 m
3 Proposed thickness of tunnel 1.1 m
4 Overburden height of soil mass 7m
5 Surcharge factor considered 0m
I Dry condition
6 Total overburden pressure 126.00 kN/m²
7 Minimum lateral earth pressure 41.58 kN/m²
8 Maximum lateral earth pressure 111.23 kN/m²
II Submerged condition
9 Total overburden pressure 154.00 kN/m²
10 Minimum lateral earth pressure 98.00 kN/m²
11 Maximum lateral earth pressure 263.00 kN/m²
III Partially submerged condition
12 Total overburden pressure 154.00 kN/m²
13 Minimum lateral earth pressure 41.58 kN/m²
14 Maximum lateral earth pressure 205.27 kN/m²
IV Saturated condition
15 Total overburden pressure 154.00 kN/m²
16 Minimum lateral earth pressure 50.82 kN/m²
17 Maximum lateral earth pressure 135.95 kN/m²
tions:

UJ
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Staad Calculation
Input for analysis

Plate Thickness

Materials

Primary Load Case

Combination Load Cases


CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Node Numbering
Overburden soil pressure = 268.4 KN/m2

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016


13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Lateral Earth Pressure


Max =252 KN/m2
Min = 163 KN/m2
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Supports

Support 2:
Type = soil support
SBC = 600 kN/m2
Considering permissible Settlement = 3 mm.
Subgrade modulus = 200000 kN/m2/m
Direction = Y.
Soil bearing capacity of soil is taken from IRC SP 91-2010. It is attached in Annexxure-XIII.
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Output of Analysis
i Max Bending moment MX

ii Max Bending moment MY


CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

iii Max Shear stress SQX

iV Max Shear stress SQY


CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

v Max axial stress SX

vi Max axial stress SY


CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

viii Node displacement

vii Reactions summary

Crown
Membrane
Sl. Mx My SQx Sqy Deflection
Condition SX SY
No.
kNm/m kNm/m N/mm2 N/mm2 mm N/mm2 N/mm2
1 Dry condition 257 16.143 0.36 0.047 18 0.675 0.007
2 Submerged 118 20.9 0.09 0.11 18 0.765 0.08
3 Partially Submerged 300.29 18.88 0.205 0.102 18 0.866 0.011
4 Saturated 362.745 18.88 0.253 0.024 18 0.763 0.044
Max 362.745 20.9 0.36 0.11 18 0.866 0.08
Side wall
Membrane
Sl. Mx My SQx Sqy Deflection
Condition SX SY
No.
kNm/m kNm/m N/mm2 N/mm2 mm N/mm2 N/mm2
1 Dry condition 296.7 83.76736 0.282 0.122 19 1.274 0.045
2 Submerged 100.768 151 0.037 0.04 19.3 0.153 0.53
3 Partially Submerged 268 101.18 0.233 0.138 0.226 1.47 0.186
4 Saturated 323 16.06 0.304 0.172 19.6 1.384 0.072
Max 323 151 0.304 0.172 19.6 1.47 0.53

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016


13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Bottom slab
Membrane
Sl. Mx My SQx Sqy Deflection
Condition SX SY
No.
kNm/m kNm/m N/mm2 N/mm2 mm N/mm2 N/mm2
1 Dry condition 143 212.53 0.324 0.213 18.86 0 0
2 Submerged 152.8 228.387 0.341 0.097 18.23 0 0
3 Partially Submerged 160 237 0.2317 0.159 18.326 0 0
4 Saturated 157.78 232.23 0.22 0.224 18.6 0 0
Max 160 237 0.341 0.224 18.86 0 0

Check for stability


1) Check for uplift
Water pressure (upward) = 17.4*10
(where 17.4 m is total height from GL to invert level and 10 Kn/m3 is density of water)
174 kN/m2
Total pressure from structure = 573.5 kN/m2

Since total pressure from structure is greater than water pressure, the structure is safe in uplift.

2) Check for deflection


Max deflection of the structure 6.198 mm in Y direction
Permissible deflection of the structure = Span / 350 (as per IS 456-2000 Clause 23.2 b)
57000/350
16.28 mm.

Since permissible deflection of the structure is greater than Max deflection of the structure
hence the structure is safe in deflection.

3) Check for safe bearing capacity (SBC)


SBC of the soil strata 600 kN/m2 (As per RMR value)
Total pressure from structure 573.56 kN/m2

Since total pressure from structure is lesser than the SBC of the soil strata, the structure is safe.
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M Date 20/01/2017
TO 13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok
G H
6 Input for Arch Side walls
7 Finished Tunnel Height = 7.42 m 7.42 m
8 Finished Tunnel Width = 7.42 m 7.42 m
9 Finished Radius = 7.42 m 7.42 m
10 Grade of Concrete (fck) = M25 M25
11 Grade of steel (fy) = Fe500 Fe500
12 Length of tunnel considered(b) = 750 mm 750 mm
13 Clear cover = 50 mm 50 mm
14 Effective depth required 934 mm 934 mm
15 Proposed D/Thickness of lining = 1000 mm 1000 mm
16 Providing spacing for bar = 100 mm 100 mm
17 Maximum deflection = 18 mm 19.6 mm
18 Total Submerged height = 15.56 m 15.156 m
19 STAAD results
20 Bending Moment, Mx = 231 kNm 2304.99 kNm
21 Bending Moment, My = 1350 kNm 370.329 kNm
22 Bending Moment, Mxy = 41.005 kNm 140 kNm
23 Max shear stress (SQX) = 0.4 N/mm² 3.371 N/mm²
24 Max shear stress (SQy) = 1.905 N/mm² 0.4488 N/mm²
25 Max axial stress (SX) = 0.642 N/mm² 30.034 N/mm²
26 Max axial stress (SY) = 4.316 N/mm² 0.488 N/mm²
27 Factor for LSM 1.5 1.5
28 Main bars
29 Diameter of reinforcement = 32 mm 32 mm
30 Spacing required = ### ###
31 Spacing provided = 100 mm 100 mm
32 Distribution bars
33 Diameter of reinforcement = 12 mm 12 mm
34 Spacing required = 160 mm 160 mm
35 Spacing provided = 150 mm 150 mm
36 Shear bars
37 Asv (as per condition) = 674.85 mm² 1283.744 mm²
38 No of strriup required = 5.97 No. 11.35 No.
39 No of strriup provided 7 No. 10 No.
40 Diameter of shear bar = 12 mm 12 mm
41 Spacing required = ### ###
42 Spacing provided = 150 mm 150 mm
Date Err:522
Err:522
Rev. No Err:522
Err:522 Err:522 Design check ###

Cut and Cover structure

Ref IS 456-2000 Cl G-1.2 For sections with compression reinforcement


Sl.
Item Arch Side wall Unit
No.
1 Finished radius 7420 mm
2 Finished height 7420 mm
3 Thickness of final lining 1000 1000 mm
4 Height upto C/L of lining 8670 mm
5 Length of tunnel considered(b) 750 750 mm
6 Grade of concrete 25 25 N/mm2
7 Grade of steel 500 500 N/mm2
8 For blast load -fy 672.75 672.75 N/mm2
9 For blast load - fck 57.5 57.5 N/mm2
10 Safe stress in concrete- fcks N/mm2
11 Clear cover on tension face 50 50 mm
12 Grade of lattice steel fys 250 250 N/mm2
13 Safe stress in structural steel- fys 125 125 N/mm2

Sl.
Item Arch Side wall Unit
No.
1 BM-Bending Moment 1350.000 2304.990 KNm
2 SF-Shear Force 1428.750 2528.250 kN
3 N-Axial force 3237.00 22525.50 kN

Factored (1.5 for LSM) BM,SF and Axial force


Arch Side wall
Sl.
Item Factored Factored Unit
No. Value Value
value value
1 BM-Bending Moment per meter 1350.000 2025.0 2304.990 3457.5 KNm
2 SF-Shear Force per meter 1428.750 2143.1 2528.250 3792.4 kN
3 Max axial stress per meter 4.316 6.474 30.034 45.051 N/mm2
4 N-Axial force per meter 3237.000 4855.5 22525.500 33788.3 kN

Sl.
Item Arch Side wall Unit
No.
1 Grade of steel fy 672.75 672.75 N/mm2
2 Grade of conrete fck 57.5 57.5 N/mm2

Sl.
Item Arch Side wall Unit
No.
1 Diameter of main steel 32 32 mm
2 Diameter of shear reinforcement 12 12 mm
3 Diameter of distribution steel 12 12 mm
Date Err:522
Err:522
Rev. No Err:522
Err:522 Err:522 Design check ###

Design of main reinforcement for axial load and bending


Ref SP-16 Cl 3.2.2 (Construction of intraction diagram)
Sl.
Item Arch Side wall Unit
No.
1 fy 500 500 N/mm2
2 fck 25 25 N/mm2
3 Width (b ) 750 750 mm
4 Depth (D) 1000 1000 mm
5 Clear cover on tension face 50 50 mm
6 cg of tention face steel 16 16 mm
7 effective cover (d') 66 66 mm
8 Effective depth (d) 934 934 mm
9 d'/D 0.066 0.066
10 Axial load (Pu) 4855.5 33788.3 KN
11 Bending Moment (Mu) 2025.0 3457.5 KNm
12 (Pu/fck*b*d) 0.277 1.929
13 (Mu/fck*b*d2) 0.124 0.211
14 Use chart for d'/D 0.1 0.1
15 From interaction chart (Chart-36 of SP-16)
p/fck= (Refer interaction diagram
16 0.01 0.02
attached)
17 Percentage of steel (p) 0.575 1.15
Providing minimum 0.8% as per Clause 26.5.3 of IS 456-2000
18 Percentage of steel (p) for shear 0.4 0.4 %
19 Percentage of steel (p) 0.8 0.8 %
20 As=p.b .D/100 6000 6000 mm2
21 Area of steel reinforcement required 6000 6000 mm2
22 Main bar dia 32 32 mm
23 Area of 32mm bars 804.57 804.57 mm2
24 Spacing of bars required 268.19 268.19 mm
25 Proposed Spacing of bars 100.00 100.00 mm

Design of shear reinforcement


Ref IS 456-2000 Cl 40.1, Cl 40.2.3, Table 19, Table 20 & Cl 40.2.1
Sl.
Item Arch Side wall Unit
No.
1 fck 25 25 N/mm2
2 Shear force (Vu) 2143.125 3792.4 kN
3 Percentage of steel (p) 0.40 0.40 %
4 tv = Vu /b.d (Cl 40.1) 3.06 5.41 N/mm2
5 tc (Table 19) 0.45 0.45 N/mm2
6 tc max (Table 20) 3.1 3.1 N/mm2
7 Vu 2143.13 3792.38 kN
8 tc b d 315.23 315.23 kN

Date Err:522
Err:522
Rev. No Err:522
Err:522 Err:522 Design check ###

Sl.
Item Arch Side wall Unit
No.
9 Vus =Vu-tc b d (Ref IS 456-2000 Cl 40.4a) 1827.90 3477.15 kN

V_us=(0.87 fy×A_Sv×d)/S_V

10 fy 500 500 N/mm2


11 Assuming stirrup dia. 12 12 mm
12 Stirrup single leg area 113.097 113.097 mm2
13 Asv=Total cross sectional area of the
674.85 1283.744 mm2
vertical legs of the stirrup
14 Number of stirrup legs required 5.97 11.35 Nos
15 Number of stirrup legs provided 7 10 Nos
16 Sv=stirrup spacing required (for7 and 10 l 176.047 132.20856 mm
17 Max permissible stirrup spacing Cl 26.5.1 300 300 mm
18 Sv =Spacing (Pitch) provided 150 150 mm

Design of distribution reinforcement


Ref IS 456-2000 Cl 26.5.2.1,IRC112
Sl.
Item Arch Side wall Unit
No.
1 Width (b ) 750 750 mm
2 Depth (D) 1000 1000 mm
3 Minimum distribution steel required @ 0 1401 1401 mm2
4 Dia of distribution steel 12 12 mm
5 Area of 12 mm bars 113.10 113.10 mm2
6 Spacing of 12 mm bars for one face 80 80 mm
7 Spacing of 12 mm bars for both face 160 160 mm
8 Maximum permissible spacing 300 300 mm
9 Spacing provided 150 150 mm
Hence ok Hence ok

Moment Capacity Calculation Ckeck

0.87fyAstd[1-Ast/bd fy/fck]
Mu = 7692.5039 7692.5039 kNm

Actual Moment (Factored) 2025.000 2304.990 kNm (As per Staad output)

Proposed Reinforcement
Sl.
Item Arch Side wall Unit
No.
1Finished radius of Cut and Cover structur 7420 mm
2Finished height of Cut and Cover structur 7420 mm
3Thickness of lining 1000 1000 mm
4Clear cover 50 50 mm
5Grade of Concrete 57.5 57.5 MPa
6Grade of steel 672.75 672.75 MPa
Main bars
7 Dia of bars 32 32 mm
8 Spacing of bars 100 100 mm

Date Err:522
Err:522
Rev. No Err:522
Err:522 Err:522 Design check ###

Sl.
Item Arch Side wall Unit
No.
Distribution bars
9 Dia of bars 12 12 mm
10 Spacing of bars 150 150 mm
Shear bars
11 Dia of bars 12 12 mm
12 Spacing of bars in longitudinal direction B 150.0 mm
13 Spacing of bars in radial direction 240 240 mm
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

I Check for crack width for front wall


Input
Diameter of Rebar(DR) = 32 mm
Grade of concrete (fck ) = M 25
BM at sevice load(Ms) = 2304.99 Nm
= 2.3050E+06 N-mm
1.5 x BM = 3.4575E+06 N-mm Since limit state craiteria
Cover (Cmin) = 50 mm
Width(b) = 750 mm
Depth(D) = 1000 mm
Area of Steel (Ast) = 6000 mm²
Elastic modulus of steel(Es) = 200000 N/mm²
Total cover (Tc) = 66 mm
Effective depth (d) = D-Total cover(T= 934 mm
Elastic modulus of concrete (Ec) = 5000 *√(fck)
= 5000*√(25)
= 25000 N/mm²
Ece = 0.5 * Ec = 12500 N/mm²
Modular ratio (m) = Es / Ece
= 200000/12500
= 16

I Determination of neutral axis at working loads


we have (bx^2)/2=m∗A_st∗(d-x)
Eq------(1)
Solving Quadratic Equation
L = 750
M = 192000
N = -179328000
Therefore, x = 633.46 mm
OR = -377.46 mm
Pick x = 633.46 mm

I_c = 1/3∗((bx^3 )+m∗A_st∗(d-x)^2


Area of Steel (Ast) = 6000.00
Width(b) = 750 mm
x = 633.46 mm Solving equation (1)
Effective depth (d) = 934 mm
Modular ratio (m) = 16.00
Ic = ((1/3)*(750*633.46^3)+16*6000*(934-633.46)^2
= 72218504430 mm⁴
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016
13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Figure shows below strain diagram, strain at any distance x1 below neutral axis is given by
fc/Ec

x = 633.46mm

d-x = 300.54mm
d = 934mm D =1000mm

Dia of bar = 32 mm
D-x =366.54mm

b = 750 fs/Es
Strain Diagram

Strain Ex1 = (Ms*(x1))/(Ece*Ic)


x1 = ?
Ic = 72218504430 mm⁴
Ece = 12500 N/mm²
Ms = 3.4575E+06 N-mm
= (3457485*x₁)/(12500*72218504430.03
Therefore, Ex1 = 3.83E-09x₁
Strain at(D-x) = 366.54 mm
Strain Ex1 at(D-x) = 1.40E-06
Strain at(d-x) = 300.54 mm
Strain Ex1 at(d-x) = 1.15E-06

II Determination of crack width (Wcr)


acr a = Total cover-(DR/2) mm
= 66-(32/2) mm
= 50 mm
Since distance from the compression face to the point at which the crack width is being calculated
a=D = 1000 mm
E1 = E*(d-x)
1.15E-06
Em = E1 - ((b(D-x)(a-x))/(3*Es*Ast*(d-x))
= 0-((750*(1000-633.46)*(1000-633.46))
/(3*200000*6000*(934-633.46)))
= -0.0001 mm
Crack width(Wcr) = 3*Cmin*Em
= 3*50*-0.0001
= -0.015 < 0.2, Hence ok

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO Date 28/11/2016


13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R1
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

III Determination of creak width at point B at bottom corner of the beam

a_cr=√((T_c^2 )+(T_c^2 ) )-
(D_R/2)

Tc = 66 mm
Diameter of Rebar(DR) = 32 mm
= (√((66^2)+(66^2)))-(32/2)
acr = 77.338 mm
E1 = E*(d-x)
E = 3.83E-09
d = 934 mm
x = 633.46 mm
= 0*300.54
E1 = 0.000001 mm²

E_m=E_1-(((b(D-x)(a-x)))/
((3∗E_s∗A_st∗(d-x)) ))

E1 = 0.000001 mm²
b = 750 mm
D = 1000 mm
a = 1000 mm
x = 633.46 mm
Es = 200000 N/mm²
Ast = 6000 mm²
d = 934 mm
= 0-((750*(1000-633.46)*(1000-633.46))
/(3*200000*6000*(934-633.46)))
Em = -0.000091981

Crack width(Wcr) W_Cr=((3∗a_cr∗E_m)/ 〖 (1+( ((2∗(a_cr-


C_min )))/((D-x) ))) 〗 )

Em = -0.000091981
acr = 77.338 mm
Cover (Cmin) = 50 mm
D = 1000 mm
x = 633.46 mm
= (3*77.34*-0.0001)/(1+((2*(77.34-50))/366.54))
Crack width(Wcr) = ### < 0.2 mm, Hence ok
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD Date 27/11/2016
12220 M TO 13950 M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok
G H
6 Input for
7 Wall Bottom slab
8 Tunnel height = 7.42 m 7.42 m
9 Tunnel width = 7.42 m 7.42 m
10 Finished Radius = 7.42 m 7.42 m
11 Grade of concrete (fck) = M57.5 M57.5
12 Grade of steel (fy) = Fe718.75 Fe718.75
13 Length of Tunnel Considered(L) = 1000 mm 1000 mm
14 Clear Cover = 50 mm 50 mm
15 Effective Depth Required 1434 mm 860 mm
16 Proposed Thickness = 1500 mm 920 mm
17 Maximum deflection of stru. = 8.57 mm 6.58 mm
18 Total Submerged height = 16.95 m 16.95 m
19 STAAD results AT CENTER AT CORNER
20 Bending Moment, Mx = ### 160 kNm
21 Bending Moment, My = 624.01 kNm 976 kNm
22 Bending Moment, Mxy = 236.9 kNm 30.51 kNm
23 Max shear stress (SQX) = 2.106 N/mm² 0.08 N/mm²
24 Max shear stress (SQy) = 0.173 N/mm² 1.099 N/mm²
25 Max axial stress (SX) = 0 N/mm² 0 N/mm²
26 Max axial stress (SY) = 0 N/mm² 0 N/mm²
27 Factor STAAD results
28 Bending Moment, Mx = ### 240 kNm
29 Bending Moment, My = 936.015 kNm 1464 kNm
30 Bending Moment, Mxy = 355.35 kNm 45.765 kNm
31 Max shear stress (SQX) = 3.159 kNm 0.12 kNm
32 Max shear stress (SQy) = 0.2595 kNm 1.6485 kNm
33 Max axial stress (SX) = 0 kNm 0 kNm
34 Max axial stress (SY) = 0 kNm 0 kNm
35 Main bars
36 Diameter of reinforcement = 32 mm 20 mm
37 Spacing required = 91 mm 108 mm
38 Spacing provided = 100 mm 150 mm
39 Distribution bars
40 Diameter of reinforcement = 16 mm 12 mm
41 Spacing required (one face) = 117 mm 110 mm
42 Spacing provided (two face ) = 200 mm 130 mm
43 Shear Rein. Calculation 0
44 Asv (as per condition) = ### ###
45 No of strriup required = 4 No. ###
46 No of strriup provided 4 No. 4 No.
47 Diameter of shear bar = 12 mm 12 mm
48 Spacing required (min reinf.) = 707.23 mm 707.23 mm
49 Spacing required (shear design) = 108 mm 221 mm
51 Spacing provided = 100 mm 100 mm
52 Allowable bending stress in = .
concrete, σcbc
53 Elastic modulus of steel(Es) = ### 200000 N/mm²
Q for Arc
Fe Constant 500
250 0.149 0.133

415 0.138
500 0.133

Q for Side walls


Fe Constant 500
250 0.149 0.149

Fe Constant 718.75

250 0.149 0.120


415 0.138
500 0.133
718.75 0.12

160 kNm
160 kNm
5.189 kNm
0.33 N/mm²
0.49 N/mm²
2.7 N/mm²
2 N/mm²

Maximum shear stress, τcmax IS 456:2000, table 20 , Page 73


Concrete τcmax N/mm 2

grade
M15 2.5 M25
M20 2.8 3.1
M25 3.1
M30 3.5
M35 3.7

415 0.138

M40 4
Sl. No. Discription Moments in KNm
Invert slab corner portion (at 1/3rd from wall)
1 Max Bending moment(BMX) at 1/3 from wall (kNm/m) 240
2 Max Bending moment(BMY) at 1/3 from wall (kNm/m) 1464
3 Max Bending moment(BMXY) at 1/3 from wall (kNm/m) 45.765
4 BMx as per Wood-Armer equation (for Bottom Rein) 285.765
5 BMy as per Wood-Armer equation (for Bottom Rein) 1509.765
6 BMx as per Wood-Armer equation 194.235
7 BMy as per Wood-Armer equation 1418.235
8 Max Shear stress( SQx) at 1/3 from wall (N/mm2) 0.12
9 Max Shear stress( SQy) at 1/3 from wall (N/mm2) 1.6485
Invert slab center portion (Middle 1/3rd )
1 Max Bending moment(BMX) at center (kNm/m) 6997.0755
2 Max Bending moment(BMY) at center (kNm/m) 936.015
3 Max Bending moment(BMXY) at 1/3 from wall (kNm/m) 355.35
4 BMX as per Wood-Armer equation (for Top Rein) 7352.4255
5 BMY as per Wood-Armer equation (for Top Rein) 1291.365
6 BMX as per Wood-Armer equation 6641.7255
7 BMY as per Wood-Armer equation 580.665
8 Max Shear stress( SQx) at center(N/mm2) 3.159
9 Max Shear stress( SQy) at center(N/mm2) 1.6485
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016
M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok
Invert top reinforcement

Input
Tunnel height = 7.42 m
Tunnel width = 7.42 m
Grade of concrete (fck) = M57.5
Grade of steel (fy) = Fe718.75
b = 1000 mm
Clear cover = 50 mm
Proposed, D = 1500 mm
Diameter of main reinforcement = 32 mm
Diameter of distribution reinforcement 16 mm
Diameter of shear bar = 12 mm
Submerged height = 16.95 m
τV = 3.159 N/mm² [As per STAAD output)
Bending Moment, Mx = 7352.4255 kNm [As per STAAD output)
Bending Moment, My = 1291.365 kNm [As per STAAD output)
Maximum bending Moment, Mu = 7352.4255 kNm
For Fe 500 Q = 0.12 fck
= 6.900
𝑀�=𝑄∗𝑏∗𝑑^2

7352.4255 * 10^6 = 6.9 * 1000 * d²


Effective depth, d = 1032.26 mm
Total depth = d + Clear cover
= 1082.26 mm
Proposed, D = 1500 mm
Reinforcement calculation
Main steel
Diameter of main bar = 32 mm
Area of 32 mm dia bar = 804 mm²
Effective depth, d = 1434 mm Safe

A_St= (0.5f_ck×b×d)/fy [1- √(1-(4.6M_u)/


(f_ck×b×d^2 ))]

((0.5 x 57.5 x 1000 x 1434)/718.75) x (1-√(1-((4.6


Ast1 = x 7352.4255 x 10^6)/(57.5 x 1000 x 1434^2))))
= 8893 mm²
Percentage of steel required 0.62 %
Area of steel provided 8042.48 mm²
Percentage of steel provided = 0.56 %
Spacing required = 91 mm
Spacing provided = 100 mm

Provide 32mm dia @100mm spacing


CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016
M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Distribution steel
Area of distribution steel = 0.12% of gross area
Minimum reinforcement = 0.12%
Area of distribution steel = 1721 mm²
Diameter of steel = 16 mm
Area of 16mm diameter bars = 201 mm²
Spacing required = 117 mm For one face
Spacing provided = 200 mm For two face

Provide 16mm dia@200mm spacing

Shear calculation

β=(0.8f_ck)/6.89P
t
[Cl.4.1, Sp.16, Pg.175]
= (0.8 x 57.5)/(6.89 x 0.56)
= 11.92
τ_c=(0.85√(0.8f_ck ) (√(1+5β)-1))/6β
[Cl.4.1, Sp.16, Pg.175]

= (0.85 x √(0.8 x 57.5) x (√(1 + 5 x 11.92)-1))/(6 x 11.92)


τc = 0.55 N/mm²

Shear calculation
Diameter of shear bar = 12 mm
Area of 12 mm dia bar = 113.1 mm²
Grade of concrete M25 = 57.5 N/mm²
τV = 3.159 N/mm² [As per STADD output]
Vu=τ_V×b×d
= 3.159 x 1000 x 1434
= 4530006 N
= 4530.01 kN
Percentage of steel provided = 0.56 %
τc = 0.55 N/mm² [Cl.4.1, Sp.16, Pg.175]
τcmax = 3.1 N/mm² [IS 456:2000, table 20, Page 73]

Condition - I. 2 τV < τc No shear Reinforcement required [IS 456:2000, cl.40, Page 72]
2τV > τc Condition Not required
Condition - II. τV < τc Min. shear Reinforcement required [IS 456:2000, cl.40, Page 72]
τV > τc Condition Not required
Condition - III. τV > τc Shear Reinforcement to be design [IS 456:2000, cl.40, Page 72]
τV > τc Condition Required, Shear Reinforcement to be design
Condition - IV. τV > τcmax Design section again [IS 456:2000, cl.40, Page 72]
τV > τcmax Condition Required, Design section again
Redesign

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016


M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Condition - I : No shear reinforcement required

Condition - II : Minimum reinforcement calculation


A_SV/(b∗S_v )=0.4/
(0.87∗f_y ) → S_V=(A_Sv×0.87f_y)/(b x 0.4)

∴ Sv = (4*113.1*0.87*718.75)/(1000*0.4)
Spacing arrived = 707.23 mm
Spacing provided = 100 mm
No strriup required = 4 No.
No strriup provided = 4 No.

Shear reinforcement is to be designed as per condition - III

Condition - III : Balance shear reinforcement

V_s=V-τ_c×b×d [IS 456-2000, cl.40.4, Pg.73]

= 4530006 - 0.55 x 1000 x 1434


= 3741306 N
= 3741.306 kN

S_V=(0.87 fy×A_Sv×d)/V_(s ) [IS 456-2000, c.l. 40.4 c, Pg.73]

∴ Sv = (0.87 x 718.75 x 113.1 x 4 x 1434)/3741306


Spacing arrived = 108 mm
Spacing provided = 100 mm
A_sv=(S_v∗V_s)/
(0.87∗f_y∗d)

Asv = 451 mm²


No strriup required = 3.98
No strriup provided = 4 No.

Provided 12 mm dia 4 legged stirrups 100 mm c/c

Condition - IV : Redesign
Check for deflection control [As per IS 456]
Percentage of steel provided = 0.56 %
f_s=0.58∗f_y∗"[(Area of cross section of steel required Ast
.req)" /"(Area of cross section of steel provided Ast.pro )"

fs = 460.96 [IS 456-2000, fig.4, Pg.38]


f1 (Modification factor) = 3 [IS 456-2000, fig.4, Pg.38]
(l/d)max = 20 x 3 [IS 456-2000, cl.23.2.1, Pg.37]
(l/d) max = 60
(l/d) provided < (l/d) max
7420 / 1434 < 20 x 3
5.17 < 60
Hence deflection control is satisfactory

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016


M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

As per IS 3370 (Part 2):2009, (cl.4.4. Pg.2) Check for crack width is required
Chech for crack width
Input
Diameter of Rebar(DR) = 32 mm
Grade of concrete (fck ) = M 57.5
BM at sevice load(Ms) = 976 Nm
= 9.7600E+05 N-mm
Mu = 1.5 x BM = 1.4640E+06 N-mm Since limit state criteria
Cover (Cmin) = 50 mm
Width(b) = 1000 mm
Elastic modulus of steel(Es) = 200000 N/mm²
Service load (Ws) = 0 kN/m
Span = 0 mm
Total cover (Tc) = 66 mm
Effective depth (d)
= D-Total cover(Tc) = 854 mm
Elastic modulus of concrete (Ec) = 5000 x√(fck)
= 5000*√(57.5)
= 37914 N/mm²
Ece = 0.5 * Ec = 18957 N/mm²
Modular ratio (m) = Es / Ece
200000/18957.19
10.55

I Determination of neutral axis at working loads


we have (bx^2)/2=m∗A_st∗(d-x) Eq------(1)
Solving Quadratic Equation

L = 1000
M = 187642.3
N = -160246524.2
Therefore, x = 504.98 mm
OR = -317.33 mm
Pick x = 504.98 mm

I_c = 1/3∗((bx^3 )+m∗A_st∗(d-x)^2


Area of Steel (Ast) = 8893.00
Width(b) = 1000 mm
x = 504.98 mm Solving equation (1)
Effective depth (d) = 854 mm
Modular ratio (m) = 10.55
Ic = ((1/3)*(1000*504.98^3)+10.55*8893*(854-
504.98)^2
= 54352927707 mm⁴

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016


M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Figure shows below strain diagram, strain at any distance x1 below neutral axis is given by
fc/Ec

x = 504.98mm

d-x = 349.02mm
d = 854mm D =920mm

Rebar Dia.= 32 mm
D-x =415.02mm

b = 1000 fs/Es
Strain Diagram

Strain Ex1 = (Ms*(x1))/(Ece*Ic)


x1 = ?
Ic = 54352927707 mm⁴
Ece = 18957 N/mm²
Ms = 1.4640E+06 N-mm
= (1464000*x₁)/(18957.19*54352927707.2
Therefore, Ex1 1.42E-09x₁
Strain at(D-x) = 415.02 mm
Strain Ex1 at(D-x) = 5.90E-07
Strain at(d-x) = 349.02 mm
Strain Ex1 at(d-x) = 4.96E-07
II Determination of crack width (Wcr)
acr a = Total cover-(DR/2)mm
= 66-(32/2) mm
= 50 mm
Since distance from the compression face to the point at which the crack width is being calculated
a=D = 920 mm
E1 = E*(d-x)
4.96E-07
Em = E1 - ((b(D-x)(a-x))/(3*Es*Ast*(d-x))
= 0-((1000*(920-504.98)*(920-504.98))
/(3*200000*8893*(854-504.98)))
= -0.0001 mm
Crack width(Wcr) = 3*Cmin*Em
= 3*50*-0.0001
= -0.015 < 0.2, Hence ok
(As per IS 3370 Part2-2009, Cl.4.4.1.2, Pg.2)

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016


M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

III Determination of creak width at point B at bottom corner of the beam

a_cr=√((T_c^2 )+(T_c^2 ) )-
(D_R/2)

Tc = 66 mm
Diameter of Rebar(DR) = 32 mm
= (√((66^2)+(66^2)))-(32/2)
acr = 77.338 mm
E1 = E*(d-x)
E = 1.42E-09
d = 854 mm
x = 504.98 mm
= 0*349.02
E1 = 0.0000 mm²
E_m=E_1-(((b(D-x)(a-x)))/
((3∗E_s∗A_st∗(d-x)) ))

E1 = 0.0000 mm²
b = 1000 mm
D = 920 mm
a = 920 mm
x = 504.98 mm
Es = 200000 N/mm²
Ast = 8893 mm²
d = 854 mm
0-((1000*(920-
= 504.98)*(920-
504.98))
/
Em = (3*200000*8893
-9.1992697E-05
Crack width(Wcr) *(854-504.98)))
W_Cr=((3∗a_cr∗E_m)/ 〖 (1+( ((2∗(a_cr-
C_min )))/((D-x) ))) 〗 )

Em = -9.1992697E-05
acr = 77.338 mm
Cover (Cmin) = 50 mm
D = 920 mm
x = 504.98 mm
= (3*77.34*-0.0001)/(1+((2*(77.34-50))/415.02))
Crack width(Wcr) = ### < 0.2 mm, Hence ok
o
CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016
M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Invert bottom reinforcement

Input
Tunnel height = 7.42 m
Tunnel width = 7.42 m
Grade of concrete (fck) = M57.5
Grade of steel (fy) = Fe718.75
b = 1000 mm
Clear cover = 50 mm
Proposed, D = 920 mm
Diameter of main reinforcement = 20 mm
Diameter of distribution reinforcement 12 mm
Diameter of shear bar = 12 mm
Submerged height = 16.95 m
τV = 1.6485 N/mm² [As per STAAD output)
Bending Moment, Mx = 285.765 kNm [As per STAAD output)
Bending Moment, My = 1509.765 kNm [As per STAAD output)
Maximum bending Moment, Mu = 1509.765 kNm
For Fe 500 Q = 0.12 fck
= 6.900
𝑀�=𝑄∗𝑏∗𝑑^2

1509.765 * 10^6 = 6.9 * 1000 * d²


Effective depth, d = 467.77 mm
Total depth = d + Clear cover
= 517.77 mm
Proposed, D = 920 mm
Reinforcement calculation
Main steel
Diameter of main bar = 20 mm
Area of 20 mm dia bar = 314 mm²
Effective depth, d = 860 mm Safe

A_St= (0.5f_ck×b×d)/fy [1- √(1-(4.6M_u)/


(f_ck×b×d^2 ))]

((0.5 x 57.5 x 1000 x 860)/718.75) x (1-√(1-((4.6


Ast1 = x 1509.765 x 10^6)/(57.5 x 1000 x 860^2))))
= 2934 mm²
Percentage of steel required 0.34 %
Area of steel provided 2094.4 mm²
Percentage of steel provided = 0.24 %
Spacing required = 108 mm
Spacing provided = 150 mm

Provide 20mm dia @150mm spacing


CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016
M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Distribution steel
Area of distribution steel = 0.12% of gross area
Minimum reinforcement = 0.12%
Area of distribution steel = 1032 mm²
Diameter of steel = 12 mm
Area of 12mm diameter bars = 113 mm²
Spacing required = 110 mm For one face
Spacing provided = 130 mm For two face

Provide 12mm dia@130mm spacing

Shear calculation

β=(0.8f_ck)/6.89P
t
[Cl.4.1, Sp.16, Pg.175]
= (0.8 x 57.5)/(6.89 x 0.24)
= 27.82
τ_c=(0.85√(0.8f_ck ) (√(1+5β)-1))/6β
[Cl.4.1, Sp.16, Pg.175]

= (0.85 x √(0.8 x 57.5) x (√(1 + 5 x 27.82)-1))/(6 x 27.82)


τc = 0.37 N/mm²

Shear calculation
Diameter of shear bar = 12 mm
Area of 12 mm dia bar = 113.1 mm²
Grade of concrete M25 = 57.5 N/mm²
τV = 1.6485 N/mm² [As per STADD output]
Vu=τ_V×b×d
= 1.6485 x 1000 x 860
= 1417710 N
= 1417.71 kN
Percentage of steel provided = 0.24 %
τc = 0.37 N/mm² [Cl.4.1, Sp.16, Pg.175]
τcmax = 3.1 N/mm² [IS 456:2000, table 20, Page 73]

Condition - I. 2 τV < τc No shear Reinforcement required [IS 456:2000, cl.40, Page 72]
2τV > τc Condition Not required
Condition - II. τV < τc Min. shear Reinforcement required [IS 456:2000, cl.40, Page 72]
τV > τc Condition Not required
Condition - III. τV > τc Shear Reinforcement to be design [IS 456:2000, cl.40, Page 72]
τV > τc Condition Required, Shear Reinforcement to be design
Condition - IV. τV > τcmax Design section again [IS 456:2000, cl.40, Page 72]
τV < τcmax Condition Not required
Shear reinforcement is required, The design is as per Condition - III as follows.

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016


M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Condition - I : No shear reinforcement required

Condition - II : Minimum reinforcement calculation


A_SV/(b∗S_v )=0.4/
(0.87∗f_y ) → S_V=(A_Sv×0.87f_y)/(b x 0.4)

∴ Sv = (4*113.1*0.87*718.75)/(1000*0.4)
Spacing arrived = 707.23 mm
Spacing provided = 100 mm
No strriup required = 4 No.
No strriup provided = 4 No.

Reinforcement required as per condition III

Condition - III : Balance shear reinforcement

V_s=V-τ_c×b×d [IS 456-2000, cl.40.4, Pg.73]

= 1417710 - 0.37 x 1000 x 860


= 1099510 N
= 1099.51 kN

S_V=(0.87 fy×A_Sv×d)/V_(s ) [IS 456-2000, c.l. 40.4 c, Pg.73]

∴ Sv = (0.87 x 718.75 x 113.1 x 4 x 860)/1099510


Spacing arrived = 221 mm
Spacing provided = 100 mm
A_sv=(S_v∗V_s)/(0.87∗f_y∗d)

Asv = 452 mm² j


No strriup required = 4.00
No strriup provided = 4 No.

Reinforcement required as per condition III

Condition - IV : Redesign
Check for deflection control [As per IS 456]
Percentage of steel provided = 0.24 %
f_s=0.58∗f_y∗"[(Area of cross section of steel required Ast
.req)" /"(Area of cross section of steel provided Ast.pro )"

fs = 583.99 [IS 456-2000, fig.4, Pg.38]


f1 (Modification factor) = 3 [IS 456-2000, fig.4, Pg.38]
(l/d)max = 20 x 3 [IS 456-2000, cl.23.2.1, Pg.37]
(l/d) max = 60
(l/d) provided < (l/d) max
7420 / 860 < 20 x 3
8.63 < 60
Hence deflection control is satisfactory

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016


M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

As per IS 3370 (Part 2):2009, (cl.4.4. Pg.2) Check for crack width is required
Chech for crack width
Input
Diameter of Rebar(DR) = 20 mm
Grade of concrete (fck ) = M 57.5
BM at sevice load(Ms) = 976 Nm
= 9.7600E+05 N-mm
Mu = 1.5 x BM = 1.4640E+06 N-mm Since limit state criteria
Cover (Cmin) = 50 mm
Width(b) = 1000 mm
Elastic modulus of steel(Es) = 200000 N/mm²

Service load (Ws) = 0 kN/m


Span = 0 mm
Total cover (Tc) = 60 mm
Effective depth (d)
= D-Total cover(Tc) = 860 mm
Elastic modulus of concrete (Ec) = 5000 x√(fck)
= 5000*√(57.5)
= 37914 N/mm²
Ece = 0.5 * Ec = 18957 N/mm²
Modular ratio (m) = Es / Ece
200000/18957.19
10.55

I Determination of neutral axis at working loads


we have (bx^2)/2=m∗A_st∗(d-x) Eq------(1)
Solving Quadratic Equation

L = 1000
M = 61907.4
N = -53240364
Therefore, x = 263.76 mm
OR = -201.85 mm
Pick x = 263.76 mm

I_c = 1/3∗((bx^3 )+m∗A_st∗(d-x)^2


Area of Steel (Ast) = 2934.00
Width(b) = 1000 mm
x = 263.76 mm Solving equation (1)
Effective depth (d) = 860 mm
Modular ratio (m) = 10.55
Ic = ((1/3)*(1000*263.76^3)+10.55*2934*(860-
263.76)^2
= 17120642678 mm⁴

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016


M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

Figure shows below strain diagram, strain at any distance x1 below neutral axis is given by
fc/Ec

x = 263.76mm

d-x = 596.24mm
d = 860mm D =920mm

Dia of bar =
20 mm
D-x =656.24mm

b = 1000 fs/Es
Strain Diagram

Strain Ex1 = (Ms*(x1))/(Ece*Ic)


x1 = ?
Ic = 17120642678 mm⁴
Ece = 18957 N/mm²
Ms = 1.4640E+06 N-mm
= (1464000*x₁)/(18957.19*17120642678.4
Therefore, Ex1 4.51E-09x₁
Strain at(D-x) = 656.24 mm
Strain Ex1 at(D-x) = 2.96E-06
Strain at(d-x) = 596.24 mm
Strain Ex1 at(d-x) = 2.69E-06
II Determination of crack width (Wcr)
acr a = Total cover-(DR/2)mm
= 60-(20/2) mm
= 50 mm
Since distance from the compression face to the point at which the crack width is being calculated
a=D = 920 mm
E1 = E*(d-x)
2.69E-06
Em = E1 - ((b(D-x)(a-x))/(3*Es*Ast*(d-x))
= 0-((1000*(920-263.76)*(920-263.76))
/(3*200000*2934*(860-263.76)))
= -0.0004 mm
Crack width(Wcr) = 3*Cmin*Em
= 3*50*-0.0004
= -0.06 < 0.2, Hence ok
(As per IS 3370 Part2-2009, Cl.4.4.1.2, Pg.2)

CONSTRUCTION OF HYDRAULIC TUNNEL FROM RD 12220 M TO 13950 Date 27/11/2016


M OF KHARKAI RIGHT MAIN CANAL Rev. No R0
Cont. M/s WCPL-RRCIIPL CONSORTIUM Design check ok

III Determination of creak width at point B at bottom corner of the beam

a_cr=√((T_c^2 )+(T_c^2 ) )-
(D_R/2)

Tc = 60 mm
Diameter of Rebar(DR) = 20 mm
= (√((60^2)+(60^2)))-(20/2)
acr = 74.853 mm
E1 = E*(d-x)
E = 4.51E-09
d = 860 mm
x = 263.76 mm
= 0*596.24
E1 = 0.0000 mm²
E_m=E_1-(((b(D-x)(a-x)))/
((3∗E_s∗A_st∗(d-x)) ))

E1 = 0.0000 mm²
b = 1000 mm
D = 920 mm
a = 920 mm
x = 263.76 mm
Es = 200000 N/mm²
Ast = 2934 mm²
d = 860 mm
0-((1000*(920-
= 263.76)*(920-
263.76))
/
Em = (3*200000*2934
-0.0004076024
Crack width(Wcr) *(860-263.76)))
W_Cr=((3∗a_cr∗E_m)/ 〖 (1+( ((2∗(a_cr-
C_min )))/((D-x) ))) 〗 )
W_Cr=((3∗a_cr∗E_m)/ 〖 (1+( ((2∗(a_cr-
C_min )))/((D-x) ))) 〗 )

Em = -0.0004076024
acr = 74.853 mm
Cover (Cmin) = 50 mm
D = 920 mm
x = 263.76 mm
= (3*74.85*-0.0004)/(1+((2*(74.85-50))/656.24))
Crack width(Wcr) = ### mm < 0.2 mm, Hence ok
Reinforcement summary for 8m Overburden
(As per new Drawing)
Sr. No. Reinforcement details Arch Side wall

1 Main reinforcement 32mm @ 100mm C/C 32mm @100mm C/C

2 Aditional main reinforcement NA NA

3 Distribution reinforcement 12mm @150mm C/C 12mm @150mm C/C

4 Shear reinforcement 12mm @150mm C/C 12mm @150mm C/C


m Overburden
ng)
Invert
Top Rein. Bottom rein.

32mm @100mm C/C 20mm @150mm C/C

12mm @150mm c/c 8mm @250mm c/c

16mm @200mm C/C 12mm @130mm C/C

12mm @100mm C/C 12mm @100mm C/C


General arrangment drawing

1) Structural analysis of Cut-and-Cover Structure

Structural analysis of the cut and cover structure is done by considering the following four conditi

a) Fully dry condition


b) Partially submerged condition (Water table up to crown of Cut-and-Cover)
c) Fully submerged condition (Water table up to GL).
d) Saturated soil.

Load Diagram

Cut-and-Cover at CH: 13390m (Max overburden

a) Fully dry condition


b) Partially submerged condition

c) Fully submerged condition

d) Saturated soil
Staad Results from four conditions are tabulated below:

Crown

Mx My SQx SQy Deflectio


Sl. No. Condition
(kNm/m) (kNm/m) (N/mm2) (N/mm2) n (mm)

1 Dry condition 26.196 152.715 0.055 0.258 5.714


2 Submerged 15.813 35.33 0.035 0.088 4.439
3 Partially Submerged 23.323 135.034 0.054 0.229 5.745
4 Saturated 28.695 167.29 0.06 0.282 6.232
Max 28.695 167.29 0.06 0.282 6.232

Side wall

Mx My SQx SQy Deflectio


Sl. No. Condition
(kNm/m) (kNm/m) (N/mm2) (N/mm2) n (mm )
1 Dry condition 35.706 219.83 0.014 0.264 4.222
2 Submerged 49.217 297.624 0.017 0.672 3.87
3 Partially Submerged 41.369 255.308 0.013 0.407 4.347
4 Saturated 38.864 239.297 0.015 0.287 4.6
Max 49.217 297.624 0.017 0.672 4.6

Bottom slab

Mx My SQx SQy Deflectio


Sl. No. Condition
(kNm/m) (kNm/m) (N/mm2) (N/mm2) n (mm)
1 Dry condition 444.493 76.496 0.999 0.062 3.673
2 Submerged 428.17 73.51 1.15 0.046 3.643
3 Partially Submerged 467.907 80.513 1.109 0.059 3.889
4 Saturated 484.748 83.422 1.089 0.068 3.999
Max 484.748 83.422 1.15 0.068 3.999
Check for stability for 11m overburden

1) Check for uplift

Water pressure (upward) = 17.4*10 (where 17.4 m is total height from


GL to invert level and 10 Kn/m3 is density of water)
= 174 kN/m2

Total pressure from structure 573.5 kN/m2

Since total pressure from structure is greater than water pressure, the structure is safe in uplift.

2) Check for deflection

Max deflection of the structure = 6.198 mm in Y direction

Permissible deflection of the structure = Span / 350 (as per IS 456-2000 Clause 23.2 b)

= 57000/350
= 16.28 mm.

Since permissible deflection of the structure is greater than Max deflection of the structure
hence the structure is safe in deflection.

3) Check for safe bearing capacity (SBC)

SBC of the soil strata = 600 kN/m2 (As per RMR value)

Total pressure from structure = 573.56 kN/m2


Since total pressure from structure is lesser than the SBC of the soil strata, the structure is
safe.

Input for analysis

Plate Thickness
Materials

Primary Load Case

Combination Load Cases


Node Numbering

Overburden soil pressure = 268.4 KN/m2


Lateral Earth Pressure
Max =252 KN/m2
Min = 163 KN/m2

Supports
Support 2:

Type = soil support


SBC = 600 kN/m2
Considering permissible Settlement = 3 mm.
Subgrade modulus = 200000 kN/m2/m
Direction = Y.
Soil bearing capacity of soil is taken from IRC SP 91-2010. It is attached in Annexxure-XIII.

Output of Analysis

i Max Bending moment MX


ii Max Bending moment MY

iii Max Shear stress SQX


iV Max Shear stress SQY

v Max axial stress SX


vi Max axial stress SY

viii Node displacement

vii Reactions summary


dering the following four conditions
Membrane
Membrane
SY(N/mm2
SX(N/mm2)
)
0.148 1.514
0.146 1.666
0.16 1.66
0.162 1.656
0.162 1.666

Membrane
Membrane
SY(N/mm2
SX(N/mm2)
)
0.28 1.823
0.302 1.992
0.304 1.99
0.305 1.988
0.305 1.992

Membrane
Membrane
SY(N/mm2
SX(N/mm2)
)
0 0
0 0
0 0
0 0
0 0
10 Kn/m3 is density of water)

the structure is safe in uplift.

(as per IS 456-2000 Clause 23.2 b)

deflection of the structure

MR value)

soil strata, the structure is


attached in Annexxure-XIII.
Reinforcement Spacing Calculation for 11 m overburden
Invert
SL Description Arch Side wall Top
Reinforcement
1 Main reinforcement
Area of steel required 6000 6000 8893
Main bar -1
Dia of bar 32 32 32
Area of bars 804.57 804.57 804.57
No of bars required 8 8
Spacing required 268.19 268.19
Spacing provided 100.00 100.00 100
Area of bars 8042.48
Additional main bar -2 REQ
Additional area of bars required 850.52
Dia of bar NA NA 12
Area of bars 113.04
No of bars required 8
Spacing required 250
Spacing provided 150
2 Distribution Reinforcement
Area of steel required 1401 1401 1720.8
Dia of bar 12 12 16
Area of bars 113.14 113.14 201.14
No of bars required 13 13 9
Spacing required(two face) 160 160 234
Spacing provided(two face) 150 150 200
3 Shear Reinforcement
Area of steel required 674.85 1283.744 450.6098950525
Dia of bar 12 12 12
Area of bars 113.04 113.04 113.04
No of bars required 5.97 11.35 4.00
No of bars Provided 7 10 4
Spacing required (min reinf.) NA NA 707.23
Spacing required (shear design) 176.047 132.2086 108
Spacing provided 150 150 100
erburden
Invert
Bottom
Bottom

2934

20
314.29

150
2094.4
REQ
839.6
8
50.24
17
117
250

1032
12
113.14
10
220
130

451.8516741629
12
113.04
4.00
4
707.23
221
100
Date 11/17/2016
Shear Reinforcement Calculation in Cut and cover
Rev. No R0
Client - Design check OK

Input datas
τV = 0.622 N/mm2 [As per STADD output)
Pt % Provided = 0.500%
τc = 0.32 N/mm2 [IS 456, Table No.23, Pg.84]
b = 1000 mm
d = 545 mm Dia of bar in mm
Area in mm^2
fy = 415 N/mm2 8 50.24 8
Area of 8 mm Dia bar = 50.24 mm2 10 78.5 50.2
No of Legged in strriup required = 4 No 12 113.04
Providing spacing for bar = 150 mm 16 200.96
20 314
Shear calculation for Crown portion 25 490.625
Material property =
Permissible stress in steel, σsv = 275 N/mm2
Grade of concrete M25 = 25 N/mm2
τV = 0.622 N/mm2 [As per STADD output)
V=τ_V×b×d

= 0.622 x 1000 x 545


= 338990 N
= 338.99 KN
Pt % Provided = 0.500%
τc = 0.32 N/mm2 [IS 456, Table No.23, Pg.84]
τV > τc
Shear Reinforcement will be design

V_s=V-τ_c×b×d [IS 456, B-5.4, Pg.84]


= 338990 - 0.32 x 1000 x 545
= 164590 N
= 164.59 KN

No of stirrups provided = 4 No.

S_V=(0.87 fy×A_Sv×d)/V_(s ) [IS 456, B-5.4, Pg.84]

275 x 50.24 x 4 x 545


∴ Sv =
164590
= 182.99338 mm
Provided 8 mm dia 4 legged stirrups 150 mm c/c
1
Date 11/17/2016
Shear Reinforcement Calculation in Cut and cover
Rev. No R0
Client - Design check OK
2
Date 11/17/2016
Shear Reinforcement Calculation in Cut and cover
Rev. No R0
Client - Design check OK
3
Date 11/17/2016
Shear Reinforcement Calculation in Cut and cover
Rev. No R0
Client - Design check OK
4
Date 11/17/2016
Shear Reinforcement Calculation in Cut and cover
Rev. No R0
Client - Design check OK
5
V=τV×b×d

V_s=V-τ_c×b×d

S_V=(σ_Sv×A_Sv×d)/V_
(s )