NO.

ACTIVITY DURATION Start Finish 30 Months 12 Months


June 2018 July 2018 August 2018 September 2018 October 2018 November 2018 December 2018 January 2018 June 2021 July 2021 June 2022

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4
Pre-Engineering Stage

1 Data Collection & Desk Study 1 Week 20.6.2018 26.6.2018

2 Engineering Field Survey & Reconnaissance 4 weeks 2.7.2018 23.7.2018

3 Preparation of Route Location Report & Route Selection 3 Weeks 23.7.2018 17.8.2018

4 Environmental Impact Assesment 6 weeks 20.8.2018 1.10.2018

5 Conceptual Design Report 1 week 3.9.2018 10.9.2018

6 S.I Field Works & Lab Test 4 Weeks 3.9.2018 03.10.2018

ENGINEERING DESIGN STAGE

7 Preliminary Design with pre-cost estimate 3 Weeks 3.9.2018 23.9.2018

8 Detailed Design with revised cost estimate 4 Weeks 24.9.2018 24.10.2018

9 Preparation Of Land Acquicsition Plan 4 Weeks 24.9.2018 24.10.2018

10 Preparation of Tender Documentation 5 weeks 24.9.2018 29.10.2018

TENDERING `STAGE

10 Tender Adverstisment & Bidding Period 5 weeks 1.11.2018 07.12.2018

11 Tender Evaluation & Award 3 weeks 8.12.2018 28.12.2018

12 CONSTRUCTION STAGE 30 Months 28.12.2018 28.6.2021

13 DEFECT LIABILITY PERIOD 12 Months 28.6.2021 27.6.2022