ELECTRICAL INSPECTION CHECKLIST
Electrical Switchboard Grouping Test
Date : ________________ Inspector :_______________________________________________________________________________________________________
Project : _________________________________________________________________________________________________________________________________
Location : _________________________________________________________________________________________________________________________________
Comments : ________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
Comments
ELECTRICAL INSPECTION CHECKLIST
Electrical Switchboard Inspections
Date : ________________ Inspector :_______________________________________________________________________________________________________
Project : _________________________________________________________________________________________________________________________________
Location : _________________________________________________________________________________________________________________________________
Comments : ________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
2. Verify that in - out feeder cable have been tested insulation cable (megger)
3. Verify that main breaker, sub main breakers, distributions breakers have been installed
4. Verify that connection main breaker, sub main breakers, distributions breakers have is boisterous.
Verify that connection busbar (phase, neutral, earth) to isolator and cable have is boisterous make sure
5.
any marking on bolt-nut.
Verify that control equipment ( fuse, Incator light, relay, terminal bloc, contactor, timer) have been
6.
installed
Verify that connection wiring control equipment ( fuse, relay, terminal bloc, contactor, timer) have been
7.
installed
Verify that Measurement equipment ( Current transformers, Analog Ammeter, Analog Volt meter, Analog
8.
Frequence Meter, analog kWH meter, analog Cosø meter, Digital meter ) have been installed
Check that Measurement equipment ( Current transformers, Analog Ammeter, Analog Volt meter, Analog
9.
Frequence Meter, analog kWH meter, analog Cosø meter, Digital meter ) have been Function
10. Check that safety signage sticker (caution ! Electrical shock hazard inside) at the door have been install
11. Check that metal updect cover at side in have been install
12. Check that grounding connection to the door have beer install and boisterous
13. Check that Colour marking the busbar, vinil cable have according to requariment
14. Check that safety signage sticker (Danger high voltage)at the hande of the door have been install
Check that safety signage sticker (Don't Remove while electric still live) at the acrilic cover of busbar,
15.
breaker tongue cover have been install
PROJECT INSPECTION CHECKLIST
Date : Inspector :
Project :
Location :
System : Electrical Fire Alarm Voice / Data Security System Public Address
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
PROJECT ENGINEERING BRIEF
Date : Engineer :
Project :
Location :
19.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
ELECTRICAL INSPECTION CHECKLIST
Wiring Methods and Devices
Date : ________________ Inspector :______________________________________________
Project : _______________________________________________________________________
Location : _______________________________________________________________________
Comments : _______________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
1. Identify the wiring methods in use and verify their Various Chapter 3
suitability for the occupancy and conditions. articles
4. Check wiring methods for spacing from edges of 300.4(A), (B), (D),
framing and for protection from nails and screws. (E), and (F)
Check for insulating bushings or grommets where NM
5. cable is installed through metal studs or where insulated 300.4(B)(1) and
conductors 4 AWG or larger enter enclosures. (G)
6. Check cover, fill, protection, and allowances for ground 300.5 and Table
movement on underground conductors and raceways. 300.5
11.
Check for adequate length of free conductors in boxes. 300.14
12. Verify that boxes are installed at junction, splice, outlet,
switch, and pull points. 300.15
13.
Check conductor fill in raceways. 300.17
4.
Verify that raceways and cables are secured to boxes. 314.17(B) and (C)
8.
Verify that boxes are securely fastened and supported. 314.23
14.
Verify that all boxes are accessible. 314.29
Verify that support means for nonmetallic boxes are
15. outside the box or otherwise isolated from contact with
conductors. 314.43
3.
Check for closure of conductor openings. 312.5(A)
Verify that cables are secured to cabinets and cutout
4. boxes or that the conditions for cables with nonmetallic
sheaths are met. 312.5(C)
7. Verify that switches and receptacles are used within 404.14, 406.2(A),
their ratings. 430.109
13. Check receptacles for proper polarity and for grounding 406.3, 250.146,
and bonding connections. 200.11
ods
Comments
dies
Comments
oxes
Comments
cles
Comments