ELECTRICAL INSPECTION CHECKLIST

General Requirements Inspections


Date : ________________ Inspector :_________________________________________________________________
Project : __________________________________________________________________________________________
Location : __________________________________________________________________________________________
Comments : __________________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________

General Requirements Inspections

✔ Item Inspection Activity NEC Reference Comments


Identify installations or parts of installations that are
1. 90.2(A) and (B)
covered by the NEC.

Verify that installations have been made in


2. accordance with the instructions included in listing 90.7, 110.3(B)
and labeling of materials and equipment.

Identify installations and equipment requiring special 90.4, 90.7, 110.2,


3.
approval or investigation. 110.3

Verify that interrupting ratings are adequate for the


4. 110.9
conditions of the installation.

Verify that unused openings have been effectively


5. 110.12(A), 408.7
closed.

Check for broken or damaged parts and


6. 110.12(C)
contamination by foreign materials.

Check for secure mounting and adequate ventilation


7. 110.13
space for equipment.

Check for proper use and ratings of splices and


8. 110.14(A) and (B)
terminations

9. Check temperature ratings of terminations. 110.14(C)

Check for arc flash protection warning signs in


10. 110.16
nondwelling occupancies.

Check for markings on enclosures and verify


11. 110.20
appropriate ratings for the environment.

Verify adequate working clearances, dedicated 110.26(A), (E), and


12.
spaces, and headroom around equipment. (F)

Verify that working space and dedicated space are not


13. 110.26(B)
used for storage.
Check adequacy of entrance to and egress from
working space in general and verify that spaces 110.26(C),
14.
containing large equipment have at least two 110.26(C)(2)
entrances/exits or the equivalent.
Verify that working spaces have adequate
15. 110.26(D)
illumination.
Check for identification of disconnecting means and
16. circuit directories for panelboards, switchboards, and 110.22, 408.4
similar equipment.
ELECTRICAL INSPECTION CHECKLIST
General Requirements Inspections
Date : ________________ Inspector :_________________________________________________________________
Project : __________________________________________________________________________________________
Location : __________________________________________________________________________________________
Comments : __________________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________

General Requirements Inspections


NEC
✔ Item Inspection Activity Reference Comments
Identify installations or parts of installations that
1. 90.2(A) and (B)
are covered by the NEC.
Verify that installations have been made in
2. accordance with the instructions included in 90.7, 110.3(B)
listing and labeling of materials and equipment.
Identify installations and equipment requiring 90.4, 90.7,
3.
special approval or investigation. 110.2, 110.3

Verify that interrupting ratings are adequate for


4. 110.9
the conditions of the installation.

Verify that unused openings have been 110.12(A), 408.7


5.
effectively closed.

Check for broken or damaged parts and


6. 110.12(C)
contamination by foreign materials.

Check for secure mounting and adequate


7. 110.13
ventilation space for equipment.

Check for proper use and ratings of splices and 110.14(A) and
8.
terminations (B)

9. Check temperature ratings of terminations. 110.14(C)

Check for arc flash protection warning signs in


10. 110.16
nondwelling occupancies.

Check for markings on enclosures and verify


11. 110.20
appropriate ratings for the environment.

Verify adequate working clearances, dedicated 110.26(A), (E),


12.
spaces, and headroom around equipment. and (F)

Verify that working space and dedicated space


13. 110.26(B)
are not used for storage.
Check adequacy of entrance to and egress from
working space in general and verify that spaces 110.26(C),
14.
containing large equipment have at least two 110.26(C)(2)
entrances/exits or the equivalent.
Verify that working spaces have adequate
15. 110.26(D)
illumination.
Check for identification of disconnecting means
16. and circuit directories for panelboards, 110.22, 408.4
switchboards, and similar equipment.
ELECTRICAL INSPECTION CHECKLIST
Receptacles Polarity Test Plug
Date : Inspector :
Project :
Location :
Comments :

Receptacles Polarity Test Plug


Group Polarity Result
✔ Item Panel Name Label Comments
Number Phase Neutral Earth Pass Fail
1.
2.

3.
4.
5.
6.
7.

8.
9.

10.
11.
12.

13.
14.
15.
16.
17.
18.

19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
ELECTRICAL INSPECTION CHECKLIST
Electrical Switchboard Grouping Test
Date : ________________ Inspector :_______________________________________________________________________________________________________
Project : _________________________________________________________________________________________________________________________________
Location : _________________________________________________________________________________________________________________________________
Comments : ________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________

Electrical Switchboard Grouping Test


Distributi Polarity Result
Main SUB Main
Panel on Group
✔ Item Breaker Breaker Label Phase
Name Breaker Number Neutral Earth
(A) (A)
(A) R S T Pass Fail
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
____________________
_________________
________________
________________
______________
______________
______________

Comments
ELECTRICAL INSPECTION CHECKLIST
Electrical Switchboard Inspections
Date : ________________ Inspector :_______________________________________________________________________________________________________
Project : _________________________________________________________________________________________________________________________________
Location : _________________________________________________________________________________________________________________________________
Comments : ________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________

Electrical Switchboard Inspections


Distributi Polarity
Main SUB Main Result
Panel on Group
✔ Item Breaker Breaker Label Phase Comments
Name Breaker Number Neutral Earth
(A) (A)
(A) R S T Pass Fail
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
Electrical Switchboard Equipment Inspections

✔ Item Inspection Activity Reference Comments

1. Verify that Documentation tect record panel maker manufacturing

2. Verify that in - out feeder cable have been tested insulation cable (megger)

3. Verify that main breaker, sub main breakers, distributions breakers have been installed

4. Verify that connection main breaker, sub main breakers, distributions breakers have is boisterous.

Verify that connection busbar (phase, neutral, earth) to isolator and cable have is boisterous make sure
5.
any marking on bolt-nut.

Verify that control equipment ( fuse, Incator light, relay, terminal bloc, contactor, timer) have been
6.
installed

Verify that connection wiring control equipment ( fuse, relay, terminal bloc, contactor, timer) have been
7.
installed

Verify that Measurement equipment ( Current transformers, Analog Ammeter, Analog Volt meter, Analog
8.
Frequence Meter, analog kWH meter, analog Cosø meter, Digital meter ) have been installed

Check that Measurement equipment ( Current transformers, Analog Ammeter, Analog Volt meter, Analog
9.
Frequence Meter, analog kWH meter, analog Cosø meter, Digital meter ) have been Function

10. Check that safety signage sticker (caution ! Electrical shock hazard inside) at the door have been install

11. Check that metal updect cover at side in have been install

12. Check that grounding connection to the door have beer install and boisterous

13. Check that Colour marking the busbar, vinil cable have according to requariment

14. Check that safety signage sticker (Danger high voltage)at the hande of the door have been install

Check that safety signage sticker (Don't Remove while electric still live) at the acrilic cover of busbar,
15.
breaker tongue cover have been install
PROJECT INSPECTION CHECKLIST
Date : Inspector :
Project :
Location :

System : Electrical Fire Alarm Voice / Data Security System Public Address

MVAC Plumbing Sprinkler

✔ Item Location Description Comments Advise By

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
PROJECT ENGINEERING BRIEF
Date : Engineer :
Project :
Location :

System : Electrical Fire Alarm Voice / Data Public Address

MVAC Plumbing Sprinkler

✔ Item Requirement Agree Description Note

1.0 Electrical N N+1 2N+1


1.2 Power source PLN Upgrade Downgrade New connected
1.3 Genset Backup 100% 50%
1.4 UPS Backup N N+1 2N+1
1.5 Switchboard Existing New
1.6 kWH Meter By Building By tenant
1.7 Rack Power Distribution Ceeform 1P32A Ceeform 1P32A
1.8 Rack Power Distribution system 1UPS-1PLN 2UPS(1source) 2UPS(2Source)
1.9 Lighting Server Room 100% Batt 2H 50% Batt 2H
1.10 Cable trunking Power Server Room Ceiling Race way Under Raised flr
1.11 Cable Basket VD Server Room Ceiling Race way Under Raised flr
1.12 Enviromental Monitoring System (EMS)

2.0 Fire Suppression FM 200 Cillinder


2.1 Fire Alarm Panel Notifier Adress Notifier Conpent
2.2 Fire Alarm Interfacing croos zone Crack unit FCU Damper Bldg FA
Access control UPS Main SB
2.3 Fire Alarm Accessories Gong ( 2Ri-Ro ) Stb Lg ( 2Ri-Ro ) Sign ( Evac-Ri ) Sign ( GasD-Ri )
M Pull S - Abort Stb Lg ( 2Ri-Ro ) Sign ( Evac-Ri ) Sign ( GasD-Ri )

19.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
ELECTRICAL INSPECTION CHECKLIST
Wiring Methods and Devices
Date : ________________ Inspector :______________________________________________
Project : _______________________________________________________________________
Location : _______________________________________________________________________
Comments : _______________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

General Wiring Methods


NEC
✔ Item Inspection Activity Reference

1. Identify the wiring methods in use and verify their Various Chapter 3
suitability for the occupancy and conditions. articles

2. Verify that all conductors of a circuit are grouped 300.3(B) and


together. 210.4(D)

3. Check insulation values where conductors of different 300.3(C)(1) and (2)


systems share common enclosures.

4. Check wiring methods for spacing from edges of 300.4(A), (B), (D),
framing and for protection from nails and screws. (E), and (F)
Check for insulating bushings or grommets where NM
5. cable is installed through metal studs or where insulated 300.4(B)(1) and
conductors 4 AWG or larger enter enclosures. (G)

6. Check cover, fill, protection, and allowances for ground 300.5 and Table
movement on underground conductors and raceways. 300.5

7. Verify that electrical raceways and cable trays are used


exclusively for electrical conductors. 300.8

8. Check for continuity and completeness in metal


raceways and enclosures. 300.10
Verify that wiring methods are securely fastened in 300.11 and ap-
9. place, supported independently of suspended ceilings, plicable Chapter 3
and not used as supports. article(s)

11.
Check for adequate length of free conductors in boxes. 300.14
12. Verify that boxes are installed at junction, splice, outlet,
switch, and pull points. 300.15

13.
Check conductor fill in raceways. 300.17

14. Verify that raceway systems are complete prior to


installation of conductors. 300.18(A)

15. Check vertical raceways for adequate conductor


supports. 300.19

16. Verify that fire ratings have been restored at electrical


penetrations. 300.21
Check installations of wiring in ducts, plenums, and
17. other air-handling spaces for proper methods and
materials. 300.22
Verify that access to equipment behind removable
18. panels is not compromised by cables, raceways, or
equipment. 300.23

Boxes and Conduit Bodies


NEC
✔ Item Inspection Activity Reference

1. Identify wet and damp locations and the suitability of


boxes and fittings. 314.15

2. Check boxes and conduit bodies for adequate space for


conductors. 314.16

3. Verify that boxes for conductors and conduit bodies 4


AWG and larger are adequately sized. 314.28

4.
Verify that raceways and cables are secured to boxes. 314.17(B) and (C)

5. Check for closure of unused openings other than those 314.17(A),


permitted as part of the design of listed equipment. 110.12(A)
Verify that boxes in walls and ceilings are flush with the
6. finished surface or, if surfaces are noncombustible,
within 1⁄4 in (6 mm) of the finished surface. 314.20

7. Check for excessive gaps between edges of boxes and


plaster, plasterboard, or drywall surfaces. 314.21

8.
Verify that boxes are securely fastened and supported. 314.23

9. Check boxes for adequate depth for the equipment that


will be installed within them. 314.24
10.
Check for covers or canopies on boxes. 314.25, 314.28(C)

11. 314.27(A), (B), and


Check lighting fixture outlet boxes for suitability. (E)

12. Check floor boxes and receptacle/cover assemblies for


listing. 314.27(C)

13. Check listing and installation of boxes used for support


of ceiling-suspended (paddle) fans. 314.27(D), 422.18

14.
Verify that all boxes are accessible. 314.29
Verify that support means for nonmetallic boxes are
15. outside the box or otherwise isolated from contact with
conductors. 314.43

Cabinets and Cutout Boxes


NEC
✔ Item Inspection Activity Reference

1. Verify that cabinets or cutout boxes are suitable and


properly installed in any wet or damp locations. 312.2
Verify that cabinets in walls do not have excessive gaps
at the edges and are flush with the finished surface or, if
2. surfaces are noncombustible, within 1⁄4 in (6 mm) of the
finished surface. 312.3, 312.4

3.
Check for closure of conductor openings. 312.5(A)
Verify that cables are secured to cabinets and cutout
4. boxes or that the conditions for cables with nonmetallic
sheaths are met. 312.5(C)

5. Check wiring and bending space in cabinets and cutout


boxes. 312.6

6. Check cabinets and cutout boxes for adequate space for


conductors and for splices and taps where they exist. 312.7, 312.8

Switches and Receptacles


NEC
✔ Item Inspection Activity Reference

1. Verify that all switching is done in the ungrounded


conductors. 404.2

2. Verify that any switches in wet locations are properly


installed in weatherproof enclosures. 404.4
Verify that switches are located not over 6 ft 7 in (2.0 m)
3. high and that they can be operated from readily 404.8(A),
accessible places unless otherwise permitted. 240.24(A)
Verify that the voltage between adjacent grouped or
4. ganged devices is not over 300 volts or that barriers are
installed. 404.8(B) and (C)

5. Verify that metal switch boxes, switches, and any metal


faceplates are grounded. 404.9(B), 404.12

6. Verify that switches or receptacles in boxes have their 404.10(B),


plaster ears seated against the wall surface or the box. 406.4(A), and (B)

7. Verify that switches and receptacles are used within 404.14, 406.2(A),
their ratings. 430.109

8. Verify that general-use dimmers are installed only for


control of permanently installed incandescent lighting. 404.14(E)

9. Check the listing and marking of any switches or 404.14(C),


receptacles used with aluminum conductors. 406.2(C), 110.14

10. Check receptacles in wet or damp locations for proper


covers and enclosures and weather-resistant ratings. 406.8
Verify that isolated ground receptacles are properly
11. identified and connected to isolated grounding
conductors. 406.2(D)
Check that receptacles project from metal faceplates or
12. are flush with nonmetallic faceplates and that the
faceplates cover openings. 406.4(D)

13. Check receptacles for proper polarity and for grounding 406.3, 250.146,
and bonding connections. 200.11

14. Verify that receptacle ratings and branch-circuit ratings


are compatible. 210.21, 210.24
ECKLIST
Devices
___________________________________________
___________________________________________
___________________________________________
___________________________________________
_______________________________
_______________________________
_______________________________

ods

Comments
dies

Comments
oxes

Comments

cles

Comments

Вам также может понравиться