Вы находитесь на странице: 1из 4

HENSCHA PHILS. INC.

CONCRETE POURING CHECKLIST


PROJECT: ______________________________________________ Date:
CONTRACTOR:__________________________________________

Concrete Strength, psi: Structure:


Allowable Slump, in.: ( ) Footing & Wall Footing
Estimated Volume, cu.m.: ( ) RC Column
Req'd No. of Samples: ( ) BEAM
( ) Slab-on-Grade
Concrete Mixing ( ) Suspended Slab
( ) Ready-Mix Supplier: ( ) Roof Deck Slab
( ) Job Site Mix Ratio: ( ) Canopy
( ) Others (Pls. specify)

Checklist: Status
1.0 Attached Plan 6.0 Formworks
a. Indicative plan of areas for pouring a. Quality of form boards used
b. Location of embedded items - form surfaces free from damages, deformities and delama
- cleanliness of form surface and adequate application of fo
2.0 Elevation and dimension of the structure (e.g. l,w,d) b. Placement of formworks
- watertightness (e.g. without holes)
3.0 Founding level surface preparation - blockouts for all opening (size & location)
a. Removal of debris and standing water - alignment and plumbness
b. Placement of gravel bedding (min 50mm) c. Support and Bracing
c. Soil Poisoning - adequacy of ties, bolts, clamps installed
d. Damp-Proofing/Vapor Barrier - spacing of horizontal and vertical studs
e. Waterstops - installation of knee and cross bracings
f. Construction joints - base/stablizer plates for vertical supports (in contact with g
d. Removal of deons & waste stuck in forms
4.0 Reinforcements (using air compressor for suspended members)
a. Size
b. Quantity 7.0 Pouring Equipment
c. Spacing a. Pumpcrete
d. Splicing b. Chute/Conveyor
e. G.I. Ties c. Jib Hoist
f. Dowels e. Buggy
g. Spacers (e.g. Chair bar, Concrete blocks) d. Bucket
h. Pipe Sleeves e. Vibrator
f. Others (Pls. Specify)
5.0 Embedded Provisional items
a. Plumbing
- breakage & factory defects along pipielengths
- Cleanliness and snug-fit of joinery works
- provision of ties to secure pipes in place
- initial leak & flow test for pipes for embedment
- removal of standing water from pipes
- tightness of cap/plug at open ends
b. Electrical
- breakage & factory defects (conduits & aux items)
- Cleanliness and snug-fit of joinery works
- provision of ties to secure conduits & aux items)
- removal of standing water (conduits & aux items)
- tightness & completeness of caps/plugs

Remarks and Recommendations (by Project Engineer)

Checked By: Noted by:

CHESTER H. CARPIO ADRIAN CHRISTOPHER CRUZ

JOHNMAR G. TIGSON

MARK GIL C. DAJOTOY


Location

Status

rom damages, deformities and delamation


surface and adequate application of form release oil

without holes)
ening (size & location)

olts, clamps installed


al and vertical studs
and cross bracings
s for vertical supports (in contact with ground/soil)
& waste stuck in forms
or for suspended members)

Вам также может понравиться