Вы находитесь на странице: 1из 18

CONTENT OF PROPOSAL DRAWING PACK

PAGE No.

00 COVER PAGE

01 SITE LOCATION MAP


02 SITE LOCALITY MAP
03 SITE PROFILE
04 SITE LEVELS, RETAINING WALL AND ROAD DETAIL
05 SITE LAYOUT PLAN
06 POWER LAYOUT PLAN
07 EARTHING LAYOUT
08 ELEVATION & MOUNTING DETAILS
09 EQUIPMENT SLAB
10 GENERATOR SLAB
BERLIN WALL DETAILS
11 BUKAMBA
12 GUARD HOUSE DETAILS
13 BOUNDARY WALL
ETO/UG/20155/JIN
14 ELECTRICAL LAYOUT
15 CIRCUIT DIAGRAM
0.70353

GREEN FIELD.
BASIC WIND SPEED: 40m/S
ACTUAL SOIL BEARING CAPACITY=420.8 kpa
FOUNDATION USED =200 kpa
OUT DOOR

50M RAMBOLL TOWER


BUKAMBA SITE LOCATION MAP OWNER:

To Kayunga

To Buguvu
CONTRACTOR:

BUKAMBA Distances
TOWN
A-B=100M
B-C=1KM NOTE:

B C-D=500M 1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE


SPECIFIED.

2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE


CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
REPORTED TO THE ENGINEER IMMEDIATELY.

3. THIS DRAWING TO BE READ IN CONJUNCTION WITH


ALL OTHER RELEVANT DRAWINGS.

4. ALL WORK TO BE PERFORMED ACCORDING TO


EATON TOWERS, AND CLIENT SITE STRUCTURE
SPECIFICATION.

REV. DATE HISTORY


C A
B
C

Eaton-BUKAMBA COMPASS DIRECTION:


Proposed site
Coordinates

KIRINDI
TRADING CLIENT:
CENTRE

SITE TYPE:

GREENFIELD ROOFTOP

EXISTING TOWER OTHER


KISWA CO-LOCATE SITE

SITE COORDINATES :
LATITUDE : LONGITUDE :
ELEVATION: m

SITE NAME :

BUKAMBA

EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION

Bukamba Town Eastern


- ETO/UG/20155/JIN

DRAWING TITLE :
SITE LOCATION MAP

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D TO FIT


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
01
05/09/2017
OWNER:
BUKAMBA SITE LOCALITY MAP

CONTRACTOR:

To Bukamba
Town
NOTE:

15000 1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE


1125 1745

1000
2 SPECIFIED.
Rock 12380

1000
830
1150
1125 3390

3490 2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE

2550
Rock
CABLE TRAY
1600

2100
250
1125

CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE


5500

A B 2680

5000
Cat Ladder

FLOOD

9520

1650
LIGHT WALL CHIPPED

REPORTED TO THE ENGINEER IMMEDIATELY.

7000
MOUNTED STONES

11920
1200
FLOOD LIGHT
Tower Height = 50m

950

15000
WALL

00
MOUNTED
(RAMBOLL)
3

12170

12170
1

55
1560
950
DCDB

1620 680

2300
600

540
3. THIS DRAWING TO BE READ IN CONJUNCTION WITH
900

660
600
EQUIPMENT
SLAB
Chequered
C plate

ON BOUNDWALL
1000 300 1200

GENSET
2200
1300

3540
1500

ALL OTHER RELEVANT DRAWINGS.

3750
Rock

800
PIT ACDB
GUARD

Rock

2040
900
LATRINE

2080
HOUSE Wall

14820
1360 1540

1040
mounted

250
ATS

FLOOD LIGHT
900 WALL MOUNTED

4. ALL WORK TO BE PERFORMED ACCORDING TO


2960
Main
Entrance to Site

1900
Metre
(steel sheet gate)
Box
Access Ramp
5480

EATON TOWERS, AND CLIENT SITE STRUCTURE


3805 3095

4
5510
SPECIFICATION.

B REV. DATE HISTORY


A
B
C
COMPASS DIRECTION:

NOTES
1. Site is on a high ground and will need access
road to site of 500m
A
2. Site in rocky area. CLIENT:

3. Distance A-B=500m.
SITE TYPE:

4. Site in garden GREENFIELD ROOFTOP

To Kirindi EXISTING TOWER

CO-LOCATE SITE
OTHER

Trading 5. Site has 30cm of top soil to be removed SITE COORDINATES :


LATITUDE : LONGITUDE :

Centre 6. Site requires a Retaining wall


ELEVATION: m

SITE NAME :

BUKAMBA

7. Acquired space=15 x 15m EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION

Bukamba Town Eastern


- ETO/UG/20155/JIN

DRAWING TITLE :

SITE LOCALITY MAP

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D TO FIT


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
02
05/09/2017
OWNER:
BUKAMBA SITE PROFILE

CONTRACTOR:

NOTE:

1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE


SPECIFIED.

2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE


CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
REPORTED TO THE ENGINEER IMMEDIATELY.

3. THIS DRAWING TO BE READ IN CONJUNCTION WITH


ALL OTHER RELEVANT DRAWINGS.

4. ALL WORK TO BE PERFORMED ACCORDING TO


EATON TOWERS, AND CLIENT SITE STRUCTURE
SPECIFICATION.

REV. DATE HISTORY


A
B
C
COMPASS DIRECTION:

CLIENT:

SITE TYPE:

GREENFIELD ROOFTOP

EXISTING TOWER OTHER

CO-LOCATE SITE

SITE COORDINATES :
LATITUDE : LONGITUDE :
ELEVATION: m

SITE NAME :

BUKAMBA

BUKAMBA SITE PROFILE EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION

ELEVATIONS=3672ft,3696ft,3703ft -
Bukamba Town
ETO/UG/20155/JIN Eastern

Distance=875ft, DRAWING TITLE :


SITE PROFILE
Elevation Gain=18.7ft,-36.8ft
DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D TO FIT


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
03
05/09/2017
OWNER:
BUKAMBA SITE LEVELS, RETAINING WALL AND ROAD DETAILS

ROAD DETAIL

CONTRACTOR:

CLEARING WIDTH FOR ROAD WORKS


10,000mm WIDE

A
9000

(0.00m)
A (-0.97m)
4000mm 3500mm

A B NOTE:
Back slope

Ground line
1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE
SPECIFIED.

2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE


SLOPING AT 7 O TO ALLOW FOR Leveled Ground fill slope
CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
WATER TO FLOW REPORTED TO THE ENGINEER IMMEDIATELY.
4,800mm WIDE
3. THIS DRAWING TO BE READ IN CONJUNCTION WITH
Retaining wall 900mm WIDE
DRAINAGE DITCH
ALL OTHER RELEVANT DRAWINGS.

4. ALL WORK TO BE PERFORMED ACCORDING TO


Road construction table EATON TOWERS, AND CLIENT SITE STRUCTURE
Carriage way SPECIFICATION.

4.8m
Running REV. DATE HISTORY
length A
500m
B

14400
C
SECTION A-A COMPASS DIRECTION:
HEIGHT OF WALL WILL
VARY FROM 500mm TO
1400mm
300

(This height will


vary along

of the wall)
the length

50
600
330

98

900
CLIENT:

5
200
250
300
SITE TYPE:

GREENFIELD ROOFTOP
D C
(-0.36m) (-1.40m) EXISTING TOWER OTHER
455 600
CO-LOCATE SITE

Gravity retaining wall table( SITE COORDINATES :


LATITUDE : LONGITUDE :
5275 Calculations done using 0.6m height) ELEVATION: m
Gravity Wall SITE NAME :
(Stones &
Mortar)
(0.9x0.2x0.6x0.985 x28.675)=3.050m3 BUKAMBA
Drainage
gutter EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION
(0.2 x 0.455x28.675) -
(0.5x3.14x0.1652x28.675)=1.38376 m3
Bukamba Town Eastern
- ETO/UG/20155/JIN

DRAWING TITLE :
SITE SETTING OUT PLAN

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D TO FIT


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
03
05/09/2017
BUKAMBA (PROPOSED) SITE LAYOUT OWNER:

2
12380

830
CONTRACTOR:

1150
1125 3390

2550
CABLE TRAY
1600

2100
250
5500

5000 A B 2680
NOTE:
Cat Ladder

FLOOD 1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE

1650
LIGHT WALL CHIPPED SPECIFIED.

7000
MOUNTED STONES
BTS 2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE
CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
REPORTED TO THE ENGINEER IMMEDIATELY.

1200 3. THIS DRAWING TO BE READ IN CONJUNCTION WITH


FLOOD LIGHT
Tower Height = 50m
950
MAN ALL OTHER RELEVANT DRAWINGS.
WALL

00
HOLE
MOUNTED
(RAMBOLL) 4. ALL WORK TO BE PERFORMED ACCORDING TO

1
12170

12170
3

55
EATON TOWERS, AND CLIENT SITE STRUCTURE
1560

SPECIFICATION.
BATTERY
950
DCDB BANK

REV. DATE HISTORY

1620 680 A
2300

B
600 C

540
ELTEK
900 OIL

660
COMPASS DIRECTION:

600
RECTIFIER EQUIPMENT MAN
HOLE
SLAB
Chequered
C plate

ON BOUNDWALL
1000 300 1200

GENSET
2200
1300

3540
1500
3750

CLIENT:

800
100
PIT ACDB
330

GUARD
2040
900

LATRINE HOUSE Wall SITE TYPE:


460
1360 1540

1040
mounted GREENFIELD ROOFTOP
250

ATS EXISTING TOWER OTHER

CO-LOCATE SITE
FLOOD LIGHT

300
WALL MOUNTED SITE COORDINATES :
900
2960

360
LATITUDE : LONGITUDE :
Main
Entrance to Site ELEVATION: m
1900

890
Metre
(steel sheet gate) SITE NAME :

Box BUKAMBA
Access Ramp
5480 EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION

3805 3095 -
Bukamba Town
ETO/UG/20155/JIN Eastern

DRAWING TITLE :

4 (PROPOSED) SITE LAYOUT

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D 1:80


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
04
05/09/2017
BUKAMBA (PROPOSED) POWER LAYOUT OWNER:

2
12380

830
1150
CONTRACTOR:
1125 3390

2550
CABLE TRAY
1600

2100
250
5500

A B 2680
5000

Cat Ladder NOTE:

FLOOD
LIGHT WALL 1650 CHIPPED
1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE
SPECIFIED.
7000

MOUNTED STONES
BTS 2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE
CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
REPORTED TO THE ENGINEER IMMEDIATELY.
1200
FLOOD LIGHT 3. THIS DRAWING TO BE READ IN CONJUNCTION WITH
Tower Height = 50m
950

MAN ALL OTHER RELEVANT DRAWINGS.


WALL

00
HOLE
MOUNTED
(RAMBOLL)
1
4. ALL WORK TO BE PERFORMED ACCORDING TO
12170

12170
3

55
1560

EATON TOWERS, AND CLIENT SITE STRUCTURE


BATTERY SPECIFICATION.
950
DCDB BANK

REV. DATE HISTORY


1620 680 A
2300

B
600 C

540
ELTEK
900 OIL

660
600

EQUIPMENT
RECTIFIER
MAN
HOLE
from Umeme MB to Eaton MB to COMPASS DIRECTION:
SLAB
Chequered proposed ATS to Genset/ACDB to
C plate Eltek rectifier =30M OF MATERIAL

ON BOUNDWALL
1000 300 1200

GENSET
2200
1300

3540
1500

house.=40M OF MATERIAL
3750

Alarm cables( size=2") from Genset CLIENT:

to rectifier=30M OF MATERIAL
800
100
PIT ACDB
GUARD
330
2040
900

LATRINE HOUSE DC 50mm power cables from Eltek


Wall
460 SITE TYPE:
1360 1540
1040

mounted Rectifier to ACDB to Battery bank & ZTE


250

GREENFIELD ROOFTOP
ATS RBS=50M OF MATERIAL EXISTING TOWER OTHER

CO-LOCATE SITE
FLOOD LIGHT

300
900 WALL MOUNTED SITE COORDINATES :
2960
360

Main LATITUDE : LONGITUDE :


Entrance to Site
1900

890 ELEVATION: m
Metre
(steel sheet gate) SITE NAME :
Box BUKAMBA
Access Ramp
5480 EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION
3805 3095 Bukamba Town
- ETO/UG/20155/JIN Eastern

4 DRAWING TITLE :
(PROPOSED) POWER LAYOUT

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D 1:80


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
05
05/09/2017
(PROPOSED) EARTHING LAYOUT OWNER:

2 EATON TOWERS
KATONGA ROAD,
12380 NAKASERO,
KAMPALA,UGANDA.

830
1150
CONTRACTOR:
1125 3390

Buzz

2550
bar
CABLE TRAY
1600

2100
LEADCOM UGANDA LTD
250 PLOT 2, NEPTUNE AVENUE
5500 MBUYA,

A B 2680
KAMPALA,UGANDA.
5000

NOTE:
Cat Ladder

FLOOD 1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE

1650
LIGHT WALL CHIPPED SPECIFIED.
7000

MOUNTED STONES
BTS 2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE
Buzz CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
bar Buzz REPORTED TO THE ENGINEER IMMEDIATELY.
1200 bar
FLOOD LIGHT 3. THIS DRAWING TO BE READ IN CONJUNCTION WITH
Tower Height = 50m
950

MAN ALL OTHER RELEVANT DRAWINGS.


WALL

00
HOLE
MOUNTED
(RAMBOLL) 4. ALL WORK TO BE PERFORMED ACCORDING TO

1
12170

12170
3

55
EATON TOWERS, AND CLIENT SITE STRUCTURE
1560

SPECIFICATION.
BATTERY
950
DCDB BANK

REV. DATE HISTORY

1620 680 A
2300

B
600 Buzz bar C
Buzz

540
ELTEK
900 OIL KEY

660
600

bar RECTIFIER EQUIPMENT COMPASS DIRECTION:


MAN
SLAB HOLE
Chequered
C plate
ER Earth Rod=15 EARTH RODS

ON BOUNDWALL
1000 300 1200

GENSET
2200
16mm Dia x 1200 long Copper coasted steel
1300

3540
1500

Buzz
25x3mm COPPER RIBBON.
3750

bar Distance between rods should be less than CLIENT:

800
2.4m=70M LONG OF MATERIAL
100
PIT ACDB
330

GUARD
2040
900

LATRINE HOUSE Wall


1360 1540 460
04 Earth bars SITE TYPE:
1040

mounted GREENFIELD ROOFTOP


250

ATS EXISTING TOWER OTHER

CO-LOCATE SITE
FLOOD LIGHT

300
900 WALL MOUNTED SITE COORDINATES :
2960
360
LATITUDE : LONGITUDE :
Main
Entrance to Site ELEVATION: m
1900

890
Metre
(steel sheet gate) SITE NAME :
Box BUKAMBA
Access Ramp
5480 EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION

3805 3095 -
Bukamba Town
ETO/UG/20155/JIN Eastern

DRAWING TITLE :
4 (PROPOSED) EARTHING LAYOUT

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D 1:80


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
06
05/09/2017
OWNER:

BUKAMBA (PROPOSED)TOWER DETAILS & ELEVATIONS


Solar
Aviation
Earthing Spike
Light 50m Tower (TOPO -)

GSM
Antennae CONNECTION OF
STEEL WIRE RAZOR WIRE
RAZOR WIRE
+2900
Microwave

435
Dish@48m

75
CONTRACTOR:
BRICK PIERS

75x75x3 RHS

2500
500

120 250

70
100
135
750
LEADCOM UGANDA LTD
DPC
PLOT 2, NEPTUNE AVENUE

500
+0.0m MBUYA,
G/L KAMPALA,UGANDA.

DRAINAGE PIPES
3200 c/c CONCRETE
12" EVERY 2m ACCESS RAMP BEAM NOTE:

SITE FRONT ELEVATION 4 1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE


SPECIFIED.

2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE


CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
REPORTED TO THE ENGINEER IMMEDIATELY.

CONNECTION OF 3. THIS DRAWING TO BE READ IN CONJUNCTION WITH


ALL OTHER RELEVANT DRAWINGS.
RAZOR WIRE
50M TOWER

RAZOR WIRE
+2900
4. ALL WORK TO BE PERFORMED ACCORDING TO
EATON TOWERS, AND CLIENT SITE STRUCTURE

435
SPECIFICATION.

REV. DATE HISTORY


A
B

2500
C
COMPASS DIRECTION:

200
DPC

+0.0m
G/L

DRAINAGE PIPES
12" EVERY 2m SIDE ELEVATIONS 1 & 2
CLIENT:

CONNECTION OF
STEEL WIRE RAZOR WIRE SITE TYPE:
RAZOR WIRE
+2900
GREENFIELD ROOFTOP
435

EXISTING TOWER OTHER

CO-LOCATE SITE

SITE COORDINATES :
BRICK PIERS LATITUDE : LONGITUDE :
2500

ELEVATION: m

SITE NAME :

BUKAMBA
CONNECTION OF

+2900
RAZOR WIRE STEEL WIRE RAZOR WIRE
DPC
EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION
435

BRICK PIERS
+0.0m +00
-
Bukamba Town
ETO/UG/20155/JIN Eastern
75x75x3 RHS

2500

500
750

+0.0m
DPC DRAWING TITLE :
CONCRETE
500

SIDE ELEVATION 3 DRAINAGE PIPES


G/L +00

ACCESS RAMP (PROPOSED) TOWER DETAILS & SITE


DRAINAGE PIPES CONCRETE BEAM 12" EVERY 2m
12" EVERY 2m SITE FRONT ELEVATION 4 BEAM
ELEVATIONS

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D TO FIT


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
07
05/09/2017
OWNER:
BUKAMBA (PROPOSED) EQUIPMENT SLAB DETAILS

300 1200
100 100
CONTRACTOR:

BILL OF QUANTITIES
DIAMETER UNIT WT WEIGHT
NO. QUANTITY LENGTH(m)
(mm) (Kg/m) (Kg)
L

5 12 14 0.89 1.4 17.44


1 2 3 4
4 12 8 0.89 7.1 50.55
NOTE:
3 12 8 0.89 7.1 50.55
1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE
2 12 35 0.89 1.775 55.29 SPECIFIED.

2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE


1 12 35 0.89 1.6 49.84 CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
REPORTED TO THE ENGINEER IMMEDIATELY.
TOTAL REINFORCEMENT (Kg)=223.67 3. THIS DRAWING TO BE READ IN CONJUNCTION WITH
ALL OTHER RELEVANT DRAWINGS.

4. ALL WORK TO BE PERFORMED ACCORDING TO


EATON TOWERS, AND CLIENT SITE STRUCTURE
SPECIFICATION.
110mm Sleeve.
(See pipe layout for
sleeve location) 5 REV. DATE HISTORY
7000
6900

6900

A
500
B

150
150
C

30 COMPASS DIRECTION:
300 0
4 3 Trimmed C25 concrete.
Edges 2/2cm
1200 300

75
GL Gravel 20-40mm

300

225
Aggregate size
CLIENT:

Compacted Nylon Sheet


existing soil 1500 under all SITE TYPE:
casting area GREENFIELD ROOFTOP
SECTION A - A
EXISTING TOWER OTHER

A A 2
CO-LOCATE SITE

SITE COORDINATES :

1200 LATITUDE : LONGITUDE :


100

75
300 ELEVATION: m

100
SITE NAME :

BUKAMBA

100 100 1 EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION


100

100
1500
Bukamba Town Eastern
1400 - ETO/UG/20155/JIN

DRAWING TITLE :
TOP VIEW (PROPOSED) EQUIPMENT SLAB DETAILS

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D 1:25


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
08
05/09/2017
OWNER:

BUKAMBA (PROPOSED) GENERATOR SLAB DETAILS

Security concrete wall for fuel tank CONTRACTOR:

Concrete support wall


Length (m)
No. Item Size Quantity Illustration Comments
each sub total
For the To be covered by

1600
1 Reinforcement 46 856mm 39.46m 150 708 fuel tank
security wall
a checked plate
For the
2 Reinforcement 03 9560mm 28.68m 3250
fuel tank

500
1280 1280 500
security wall
3250

C25 concrete

50
NOTE:
(1:1.5:3)
3500 1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE
SPECIFIED.
Concrete Q'ty
Sand(m )
Aggregate
Cement(m ) Water(litres)
Section C-C through the protective wall 2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE
Calculation course(m )
CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
Concrete mix for REPORTED TO THE ENGINEER IMMEDIATELY.
0.585 0.719 320.63 119.87
Total One(mE)
3. THIS DRAWING TO BE READ IN CONJUNCTION WITH
Concrete mix ALL OTHER RELEVANT DRAWINGS.
0.575 0.863 433.26 143.85
Total Volume
100 100 4. ALL WORK TO BE PERFORMED ACCORDING TO
BILL OF QUANTITIES
EATON TOWERS, AND CLIENT SITE STRUCTURE
DIAMETER UNIT WT WEIGHT SPECIFICATION.
NO. QUANTITY LENGTH(m)
(mm) (Kg/m) (Kg)

5 12 9 0.89 900 7.19 REV. DATE HISTORY


A
4 12 9 0.89 3600 28.77
B
3 12 9 0.89 3600 28.77 50mm
50mm C
concrete 150 1300 150 COMPASS DIRECTION:
2 12 19 0.89 1700 28.68 concrete
cover
1 12 19 0.89 1700 cover
28.68 1 2 3 4
TOTAL REINFORCEMENT (Kg)=122.09

520
C25 CONCRETE(1:1.5:3)
C25 concrete.
Trimmed
Edges
GL

3550
2/2cm Gravel 20-40mm

300
Aggregate size
50mm concrete cover
340

340
3 Y20 @ 160mm c/c 50mm concrete cover Compacted Nylon Sheet
1600 CLIENT:
46 Y20 @200mm c/c existing soil under all
SECTION D-D THRU BUNDWALL casting area

C 17 200 C25 CONCRETE(1:1.5:3) 15 200


C
H

50

(T/B) (T/B) + 200 4 3 2 SITE TYPE:


+ 150 + 150 D D 1500

100
5 GREENFIELD ROOFTOP

100
GL+0.0 GL+0.0 300
EXISTING TOWER OTHER
-100 1

150
150
100

100
1500 15 CO-LOCATE SITE
150 0
SITE COORDINATES :
C10 CONCRETE LATITUDE : LONGITUDE :
100 100
ELEVATION: m
3500
1600
SITE NAME :
SECTION B-B THRU BUNDWALL PLAN VIEW BUKAMBA
H = RANGES FROM 0.5M TO
1.2M DEPENDING ON BASE EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION
TANK HEIGHT. -
Bukamba Town
ETO/UG/20155/JIN Eastern

DRAWING TITLE :
(PROPOSED) GENERATOR SLAB DETAILS

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D 1:25


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
09 05/09/2017
OWNER:
BUKAMBA (PROPOSED) BERLIN WALL DETAILS

1 1150
@150mm C/C 1570

310
190 20 1150 20 190 20
190

310
@150mm C/C @150mm C/C 190
25 730 30
190 190
20 CONTRACTOR:
A
@150mm C/C 1150 @150mm C/C

465
215 730 220 @150mm C/C
275

310

310
@150mm C/C
1150 2 1570 @150mm C/C
@150mm C/C

4 BBS BBS @150mm C/C


1165

BBS
200
730

@150mm C/C
1365

1365

1510
@150mm C/C

1510
B B 200
BBS
310

Front View (door side)


@150mm C/C @150mm C/C
500

1160

1160
75 75

1820
@150mm C/C
@150mm C/C

150
1510

1510
200

200

FIXED MOVABLE @150mm C/C


@150mm C/C

200
A 50 50

100
@150mm C/C

@150mm C/C
1560
Existing Concrete slab NOTE:
Existing Concrete slab

150

200150
3
Metallic Plate

200
BERLIN WALL PLAN MOVABLE WALL UNIT Metallic Plate underneath the
1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE
NOTES: underneath the bound wall
bound wall SPECIFIED.
1.The spacing between the Anti burglar de-mountable tube should be Equipment slab Equipment slab VIEW B - B
100mm for the sides and 50mm for the back, VIEW A - A 2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE

then 100mm for the front. Elevation 3 Elevation 4 CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
210 1150 210 REPORTED TO THE ENGINEER IMMEDIATELY.
220 730 215
BBS 1560 3. THIS DRAWING TO BE READ IN CONJUNCTION WITH
2. All concrete edges to have 30mm 45 deg chamfers
310

310
BBS TWO BBS Security walls Insitu (Movable) ALL OTHER RELEVANT DRAWINGS.

3. Concrete cover to 25mm to sides, 30mm at top and 50mm bottom. 200 4. ALL WORK TO BE PERFORMED ACCORDING TO
Length (m) Comments EATON TOWERS, AND CLIENT SITE STRUCTURE
No. Item Size Quantity Sample
Each Sub Total SPECIFICATION.
100 100
4. concrete class =C25 (1:1.5:3) HORIZONTAL

1160
1820

OUTER

400/260

400/260
11 2.46 27.06
1510

1510
MOVABLE FIXED (Permanent Wall) REV. DATE HISTORY
5. Concrete strength after 28 days of cured moulds=25Mpa. FIXED 1 Reinforcement A
6
0

T-01
10

HORIZONTAL B
OUTER
11 2.18 23.98 (Moveable Wall) C

200150
500

1460 COMPASS DIRECTION:


100 100 HORIZONTAL
Equipment slab Equipment slab 11 2.18 23.98 INNER

330/190

330/190
800
PLATE 2- (Permanent Wall)
2 Pieces 2 Reinforcement
800 Elevation 2 T-02
Elevation 1 HORIZONTAL
11 1.9 20.9 INNER
(Moveable Wall)
6

1320
Concrete table

75
VERTICAL
Back 3 Reinforcement 16 1.515 24.24 OUTER
T -03 (Permanent Wall)
Permanent 1440

75
VERTICAL
Wall 4 Reinforcement 14 1.515 21.21
1500

INNER
Front T -04 (Permanent Wall) CLIENT:
Moveable 1440 155

5
12
Wall

250
VERTICAL
5 Reinforcement 10 2.044 20.44 INNER

75
(Moveable Wall)
Total T -05
SITE TYPE:
PLATE 1-1 Piece 1440 GREENFIELD ROOFTOP

75

75
VERTICAL EXISTING TOWER OTHER
6 Reinforcement 18 1.25 22.5 INNER & OUTER
T -06 1100
(Moveable Wall)
CO-LOCATE SITE

SITE COORDINATES :

100

100
HORIZONTAL
LATITUDE : LONGITUDE :
7 Reinforcement 11 1.66 18.26 FOOTING
(Moveable Wall)
T -07 1460
ELEVATION: m

SITE NAME :
Total 202.57
BUKAMBA

EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION

Bukamba Town Eastern


- ETO/UG/20155/JIN

DRAWING TITLE :
BERLIN WALL DETAILS

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D 1:25


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
010 05/09/2017
OWNER:
BUKAMBA (PROPOSED) GUARD HOUSE DETAILS

Vent
DOOR AND WINDOW SCHEDULE
Roof construction notes .
pre-coated gauge 26 sheets

580
75 x 50 purlins on
75 x 50 rafters, struts
75 x 50 tie beam on,
75 x 50 wall plate, CONTRACTOR:
200 x 25 fascia

2100
ELEVATION 3 ELEVATION 2
150

2200
2050
150
1450

200 x 250

200
hole 750

GL GL NOTE:
Metallic door
- 40 mm sand cement screed TYPE 1-(D01,D02) 1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE
- floor slab to Eng, details SPECIFIED.
rc slab to 450 X 450 - 1000g polythene sheet
Note:DO2=800 Wide
2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE
Str.Eng details concrete ground - slab base & pit to Eng.details CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
beam - 12mm plaster to pit walls REPORTED TO THE ENGINEER IMMEDIATELY.

3. THIS DRAWING TO BE READ IN CONJUNCTION WITH


ALL OTHER RELEVANT DRAWINGS.
ELEVATION 1

300
ELEVATION 4 4. ALL WORK TO BE PERFORMED ACCORDING TO
EATON TOWERS, AND CLIENT SITE STRUCTURE
SPECIFICATION.
600
GUARD HOUSE-ELEVATIONS 1.0m wide x
3.6 x 5m deep REV. DATE HISTORY
pit
Top hung glass window
A
TYPE A -( W01) B

3 C

A
V.I.P LATRINE -SECTION X-X COMPASS DIRECTION:

500 330
BAR BENDING SCHEDULE
2250 600 600 120 250
300

70
Length (m)

100
135
750 No. Item Size Quantity Each Total Illustration Comments
COVER
250 mm X
800 For 16no
lockable with
opening
1. Reinforcement 16 x 4 0.95m 61m 150 columns
830

135mm
umeme 700 For 16nos.
1500 150 paddlock
18 gauge(1.2mm 2. Reinforcement 16 x 10 0.90m 144m footing pads

100

100
thick) sheet for columns-C1
500

1500 GL GL
CLIENT:

40x40x5 mm
2260

1960

600

angle frame
100 400

GUARD
500

2 4 130 Rings for SITE TYPE:

PIT HOUSE 250


5. Reinforcement T 08 3 x 20 0.60m 36m 130
130
130 50 Columns C1
GREENFIELD ROOFTOP
250 250
40 X40 Casted in 12 2.05m 25m 50 1950 50 Rebars for EXISTING TOWER OTHER
830

LATRINE Notes: concrete 6. Reinforcement


8 3m 24m 50 2900 50
the Ramp
CO-LOCATE SITE
1. Meter Box should not be very close to fence; SITE COORDINATES :
CONCRETE DETAILS
LATITUDE : LONGITUDE :
2. Box should be made with 40x40x5 mm angle frame CONCRETE FOR ELEVATION: m
THE RAMP
and 18 gauge sheet to cover and proper concrete must be
3450 A casting for box frame.
FOOTINGS FOR SQUARE
COLUMNS-C1 footing
SITE NAME :

BUKAMBA
SQUARE COLUMNS-C1
C25 concrete Height=0.5m

1 3. One Neutral bar will be placed in the meter box (1:1.5:3)


EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION
and one hole with brass nut, bolt and washers for meter
Bukamba Town Eastern
TOTAL - ETO/UG/20155/JIN
box grounding.

GUARD HOUSE:FLOOR PLAN C10 concrete DRAWING TITLE :


TO FOOTINGS FOR SQUARE
4. should have a timber piece at the back bolted firmly with COLUMNS-C1
(PROPOSED) GUARD HOUSE DETAILS
lock nuts.
METER BOX DETAILS CONCRETE & BAR SCHEDULE DETAILS FOR COLUMNS-C1 GROUND BEAMS(ON PAGE 10)
DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D 1:50,80


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
011 05/09/2017
OWNER:

BUKAMBA (PROPOSED) BOUNDARY WALL & COLUMN DETAILS


3000 3000 3000 2000 230
CONCRETE CONCRETE
REBAR MESH
RAMP BEAM .

100
8@250 GRAVEL 20-40MM
IN 0
2200 800 2200 800 2200 800 OUT
-100
AGGREGATE SIZE

-200

Footing pad

150
GEOFABRIC

C1 C1
MEMBRANE

500
to column-C1

230
150 MASONRY
STONE
COMPACTED
SOIL H=350MM BUT MAY
400 VARY ACCORDING TO

3000 C/C 230 STONE


SITE LEVEL

column-C1 MASONRY

RAMP DETAILS

ColumnC1 -pad Relation

100
40x40x4 RSA x 500mm LG ARM FOR 40x40x4 RSA x 500mm LG ARM FOR

150
500
350

150
Y Y Y Y
350mm thick concrete block

100
75x75x3 RHS x 3275mm LG
piers to plinth walls at

75
125
3000mm maximum centres.

50
115 25

140
50x50x3 RHS 50x50x3 RHS

130
NOTE:
E Middle slidding bolt inside E on
AT Cover Strip AT
PL the firstPLgate
350
B
180
LL LL 1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE

1175
FI FI
350 IN IN

865
m m

75x75x3 RHS

75x75x3 RHS
120mm x 120mm SPECIFIED.
230

2m 2m
Lockable opening in

120
second gate leaf for H=500MM BUT MAY
VARY ACCORDING TO
120 locking sliding bolt. 2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE

450
20 SITE LEVEL
HINGES CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
25

2500
130

50
REPORTED TO THE ENGINEER IMMEDIATELY.

50x50x3 RHS

50x50x3 RHS
PLAN DETAIL (S) OF BLOCK COLUMN 3. THIS DRAWING TO BE READ IN CONJUNCTION WITH
ALL OTHER RELEVANT DRAWINGS.

915
Side Cover

1175
400 400 3000
Strip long drop bolt inside
on the first gate leaf 4. ALL WORK TO BE PERFORMED ACCORDING TO
EATON TOWERS, AND CLIENT SITE STRUCTURE
SPECIFICATION.

650
130
285

B S

140
50x50x3 RHS 50x50x3 RHS
400

T12-150B1

50
75
6050 1395 50 50 1395 50 60 REV. DATE HISTORY
4035

500
1495(Shutter) 15(Gap) 1495 (Shutter)
A
800

3200 c/c

BOUNDARY WALL LAYOUT


X X NOTES X X

10
B
230
T12-150B2

1.INFIL ~ 2mm PLATE 200

2.GATE POSTS ~75x75x3 RHS C


3.GATE FRAMES~50x50x3 RHS
400

COMPASS DIRECTION:
T08-200 4.TO BE HOT-DIP GALVANISED
Links(a.b.r)
285

GATE DETAILS

Y bars with razor


coil at the top PC Copping saddle back finish

COLUMN TYPE C1 (20No.) Coping with saddle


Outside inside
back finish.
230x230mm the wall the wall CLIENT:
2500

230mm thick wall block SITE TYPE:

2500
plinth wall rendered both sides. GREENFIELD ROOFTOP
Plastered and EXISTING TOWER OTHER
700

T08-200 apply rough cast to CO-LOCATE SITE


Links(a.b.r) drain pipe. both sides of wall
900

Dpc 200mm thick DPC SITE COORDINATES :


BRICK WORK
4T16 200 Crushed well compacted
LATITUDE : LONGITUDE :
ELEVATION: m
GL stones(100mm thick)
150

gravel SITE NAME :


200

BUKAMBA
Well
700

rammed
900

EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION


murram 230mm thick Rc Column & 900mm high.
200

T12-150EW Expansion joint at Fairfaced -


Bukamba Town
ETO/UG/20155/JIN Eastern

every 6100 centresplinths


COLUMN TYPE C1 (20No.) DRAWING TITLE :
(PROPOSED) BOUNDARY WALL &
800
230x230mm BOUNDARY WALL ELEVATION COLUMN-C1 DETAILS
SECTION THRU BOUNDARY WALL
DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D NTS


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
012 05/09/2017
BUKAMBA (PROPOSED) SITE ELECTRICAL LAYOUT

LIGHTNING SPIKE

SOLAR AVIATION LIGHTS

50m (Top) 50.0m


GSM Panels @ 47m(Bottom);

47m

DIESEL
ARMORED CABLE RECTIFIER
GENSET NOTE:

1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE


Power Meter AVIATION LIGHTS SPECIFIED.

ARMORED CABLE
2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE
CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
UMEME ARMORED CABLE ATS Outdoor REPORTED TO THE ENGINEER IMMEDIATELY.

3. THIS DRAWING TO BE READ IN CONJUNCTION WITH

DCDB BTS 1

50M TOWER
ALL OTHER RELEVANT DRAWINGS.

4. ALL WORK TO BE PERFORMED ACCORDING TO


EATON TOWERS, AND CLIENT SITE STRUCTURE
SPECIFICATION.

REV. DATE HISTORY


A
50mm DC B
Cable
ARMORED CABLE ACDB C
COMPASS DIRECTION:

CLIENT:
XLPE Cable

XLPE Cable

SITE TYPE:

GREENFIELD ROOFTOP
GUARD HOUSE EXISTING TOWER OTHER
INDOOR LIGHT CO-LOCATE SITE
XLPE Cable

SITE COORDINATES :
LATITUDE : LONGITUDE :
ELEVATION: m
0.0m
SITE NAME :
AC SOCKETS OUTDOOR LIGHTS LEG A LEG LEG C
BUKAMBA
B,D
4 x 250W EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION

Bukamba Town Eastern


- ETO/UG/20155/JIN

DRAWING TITLE :
(PROPOSED) SITE ELECTRICAL LAYOUT

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D NTS


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
013 05/0/2017
BUKAMBA (PROPOSED) SITE CIRCUIT DIAGRAM

DISTRIBUTION BOX SUPPORT DETAILS

75

300 300 200 NOTE:

1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE

400

400
SPECIFIED.

2. ALL DETAILS OF EXISTING CONSTRUCTION TO BE


CONFIRMED ON SITE. ANY DISCREPANCIES ARE TO BE
REPORTED TO THE ENGINEER IMMEDIATELY.

3. THIS DRAWING TO BE READ IN CONJUNCTION WITH


ALL OTHER RELEVANT DRAWINGS.

850

850

850
4. ALL WORK TO BE PERFORMED ACCORDING TO
EATON TOWERS, AND CLIENT SITE STRUCTURE
SPECIFICATION.

REV. DATE HISTORY


A

500

500

500
B
C
COMPASS DIRECTION:

500
500
500

Notes:
CLIENT:
1. Distribution Box should not be very close to fence;

2. Box pole should be made with 75mm diameter pole with


SITE TYPE:
(2) PL300x40x4mm plates welded at box position having GREENFIELD ROOFTOP
holes to receive the box support. EXISTING TOWER OTHER

CO-LOCATE SITE
3. Pole support should have anchor bars welded to increase
SITE COORDINATES :

stiffness of support pole before casting concrete. LATITUDE : LONGITUDE :


ELEVATION: m

SITE NAME :

BUKAMBA

EATON SITE ID SITE ADDRESS CLIENT SITE ID REGION

Bukamba Town Eastern


- ETO/UG/20155/JIN

DRAWING TITLE :
(PROPOSED) SITE CIRCUIT DIAGRAM

DRAWN BY: CHECKED BY: APPROVED BY: SCALE :

NAME: NAME: J.D NTS


APPROVED BY: EATON TOWERS APPROVED BY: Client
SIGNATURE: SIGNATURE:
SHEET NO : DATE : ISSUE DATE:
014 05/09/2017
BAR BENDING SCHEDULE NOTES ON GENERIC FOUNDATION DRAWING
DIA LENGTH NOS./ NOS./ UNIT WT.
MARK DESCRIPTION
(mm) (mm) LEG TOWER (kg/m) (kg)
0.50 LVL
A

0.00 LVL B

E1

E2

E3

-3.00 LVL F

TOTAL STEEL WT = 1058.6 kg.


ELEVATION GFT08A-TOWER SPECIFICATION
SPLICES & WASTAGE (5%) = 51.1 kg.
1109.7 kg.

QUANTITIES

RELEASED FOR CONSTRUCTION

(TOWER TYPE : GFT08A)

SECTION "A-A" SECTION "B-B"

CHIMNEY SECTION 5 0 _ G F T 0 8 A _ 2 0 0 k P a _ N W T 0
EXCAVATION LAYOUT
GENERAL NOTES
GENERAL & MATERIAL CURING

LEGEND

TECHNICAL SPECIFICATIONS

EXCAVATION & BACKFILLING

RELEASED FOR CONSTRUCTION

(TOWER TYPE : GFT08A)

5 0 _ G F T 0 8 A _ 2 0 0 k P a _ N W T 0

Вам также может понравиться