Академический Документы
Профессиональный Документы
Культура Документы
Group:
• Alibek Faiznur
• Mukhammed Almakhan
• Miras Mengdibayev
Supervisors:
• Valerii Ermekbayevich Dzhundibayev
• Serik Khairaliyev
Introduction
Conveyor- Transporter
1- Reducer gear
2-Drive pulley
3- Belt
4-Drum Pulley
5- Belt Tightener
6- Roller Bearings
7- Frame
8- Electromotor
Scope and Objective
3 students can be involved to implement this project, allocating separate work to each
student and to design separate parts of conveyor:
All three graduate students doing general parametric calculation of the conveyor on
the basis of a given technology enterprise productivity and economic justification of
the selected type of industrial vehicles. In addition, general view of the machine
would be drawn. This project involves not only individual tasks, but also team
works such as designing 3D model, constructing model prototype and simulating a
model.
RESEARCH AND DEVELOPMENT PERT CHART
Study Similar Products in Market
Interviews
Pictures
Surveys
Meet Panel of Experts
30.09.2014
Obtain Technical Data
Practical Experience 30.112014
10.02.2014
12.03.2014
Organize Information
Study the Problem 15.04.2014
PROTOTYPE MOCK-UP
Construct Model
Internet
Books
Journals
Previous Research Reports
Patent Databases
Gantt Chart
Methods
Team Members
CALCULATION Responsibilities:
Parametric calculation Miras:
Stress-Strain calculation Belt Material and Frame
Economic analysis
Roller Bearing
SOLIDWORKS
Mukhammed:
3D model
Simulation
Belt Tightening
Real Conveyor Model Drum Pulley
Alibek:
Electromotor
Drive Pulley
Deliverables
Operating conditions of each node separately and requirements of its technical operation;
Patents, including the republic of Kazakhstan, and gain the skills to work with them
Budget
THANK YOU !!!