Вы находитесь на странице: 1из 38

Ag Leader Technology Cotton Picker Installation

JD 9960 (including 9900-9950)

Installation Instructions for John Deere cotton picker model:

2-row and All-row systems included.

CAUTION: Ensure the model numbers shown above correspond to the machine
model. If you receive the incorrect installation instructions, contact Ag Leader
Technology Technical Support at (515) 232-5363 ext. 1.

PN: 2005828 January 2010 – Rev A 1


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Note: Indented items indicate parts included in an Quantity by
assembly listed above Rows Monitored
2 Rows 4 Rows 5 Rows
Part Name/Description Part Number Monitored Monitored Monitored
Instruction Kit – JD 99x0 4101071 1 1 1

Emitter Assembly 4000924 2 4 5

Detector Assembly 4000615 2 4 5

Header Sensor – Reversed 2000322-1 1 1 1

Arm Assy (18 in rod, S-hook, chain, spring) 2000311-2 1 1 1

Template – Welded (Cotton duct) 3000715 1 1 1

Template – Flat Strap (Cotton duct) 3000716 1 1 1

Mounting Plate – Cotton Sensor 3000721 4 8 10

Mounting Plate Shim 3000218 8* 8*

Ladder Shield – Cotton Sensor 3000725 1 1 1

Antenna Mounting Plate (with dual lock) 3000654 1 1 1

Module Kit – Speed 4101049 1 1 1


Mounting plate 4000244 1 1 1
Speed Sensor module (Rev 8) 4001005 1 1 1
Module installation kit 4101005 1 1 1
Drill bit – 13/64 in. 2001000-20 1 1 1
Drill bit – 9/32 in. 2001000-28 1 1 1
Transfer punch – 11/32 in. 2001003-34 1 1 1
Hex head cap screw – 1/4 x 3/4 in. 2002001-25075 5 5 5
Hex nut – 1/4 in. 2002051-25 5 5 5
Split lock washer – 1/4 in. 2002061-25 5 5 5
External tooth lock washer – 1/4 in. 2002063-25 3 3 3
Self-tapping screw – 1/4 x 3/4 in. 2002075-25075 3 3 3
Hex serrated flange nut – 1/4 in. 2002225 5 5 5
Sheet metal screw – #14 x 1/2 in. 2002232-14050 3 3 3

Cable Kit – Cotton, 2 rows (99x0) 4101069 1


Cable Kit – Cotton, 4 rows (99x0) 4101068 1
Cable Kit – Cotton, 5 rows (99x0) 4101067 1
Display cable 4001608-12 1 1 1
Power cable 2000452-7 1 1 1
Power control relay 4000708-1 1 1 1
Header height adapter cable 4000236-2 1 1 1

* Mounting plate shims used only on 9900-9950 models.

2 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
Note: Indented items indicate parts included in an Quantity by
assembly listed above Rows Monitored
2 Rows 4 Rows 5 Rows
Part Name/Description Part Number Monitored Monitored Monitored
CAN Bus harness – 2 sensor 4000676 1
CAN Bus harness – 4 sensor 4001027 1
CAN Bus harness – 5 sensor 4001028 1
CAN Bus stub – 1 ft. 4000219-1 1 1 1
Fan speed cable – 10 ft. 4000675-10 1 1 1
Ground speed cable – 10 ft. 4000235-10 1 1 1
Cable installation kit 2000901-1 1 1 1
Alcohol swab pack 2002811 2 2 2
Gray plastic cable clamps 2002812 6 6 6
Cable tie – 15 in. 2002817-15 20 20 20
Cable tie – 6 in. 2002817-6 40 40 40
Adhesive mounting base – 2 way 2002821-2 6 6 6
Grommet – 3/4 in. ID x 1-7/16 in. P.H D. 2002825-75 1 1 1

Parts Kit – Cotton, 2 row 2001336-6 1


Parts Kit – Cotton, All row 2001336-7 1 1
Header Sensor Inst. Kit – Generic 2000330-15 1 1 1
S-Hook 2000329-3 1 1 1
Cap screw – 5/16 x 1 in. 2002001-31100 2 2 2
Lock Nut – 5/16 in. 2002055-31 2 2 2
Flat Washer – 5/16 in. 2002071-31 12 12 12
Cab wall plate kit 2000644-2 1 1 1
Cab wall plate 2000128 1 1 1
Phillips screw – #6 x 1/2 in. 2002031-06050 4 4 4
Hex nut – #6 2002051-06 4 4 4
Internal tooth lock washer – #6 2002062-06 4 4 4
Self-tapping screw – 1/4 x 3/4 in. 2002075-25075 4 4 4
Drill bit – 9/32 in. 2001000-28 1 1 1
Drill bit – 11/32 in. 2001000-34 1 1 1
Transfer punch – 13/32 in. 2001003-41 1 1 1
Square file – 5/16 in. 2001006 1 1 1
File handle 2001019 1 1 1
RTV silicon sealant 2001011 1 1 1
Monitor bracket installation kit 2001304-9 1 1 1
Drill Bit – 13/64 in. 2001000-20 1 1 1
Self tapping screw – 1/4 x 3/4 in. 2002075-25075 4 4 4
Cap screw – 1/4 x 3/4 in. 2002001-25075 2 2 2
Hex Nut – 1/4 in. 2002051-25 2 2 2
Split Lock washer – 1/4 in. 2002061-25 2 2 2
Flat Washer – 1/4 in. 2002071-25 4 4 4
Hardware kit – 37 pieces 2001339-1 1
Hardware kit – 75 pieces 2001339-2 1 1
Slotted truss head screw – 1/4 x 3/4 in. 2002250-25075 37 75 75
Split lock washer – 1/4 in. 2002061-25 37 75 75
Hex nut – 1/4 in. 2002051-25 37 75 75
Permanent marker 2002813 1 1 1
Post bracket 3000693 1 1 1
Ladder rail 3000717 1 1 1

PN: 2005828 January 2010 – Rev A 3


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Important Please carefully follow these step-by-step instructions. If you have questions,
Notices contact Ag Leader Technology at 515-232-5363 x 1.

Direction words (LEFT and RIGHT) are commonly used when describing an
installation procedure. Interpret direction words as if sitting in operator seat.

Signal words (DANGER, WARNING, CAUTION and NOTE) are provided to


draw attention to information that is important for the safe/correct installation and
operation of this product.

• – Indicates an imminently hazardous situation that, if not


avoided, will result in death or serious injury.

• – Indicates a potentially hazardous situation that, if not


avoided, could result in death or serious injury.

• – Indicates a potentially hazardous situation that, if not


avoided, may result in minor or moderate injury.

• CAUTION – Indicates practices that may result in property damage, but do


not involve personal injury.

• NOTE – The preferred signal word to address practices not involving property
damage, or personal injury.

Section Item Page


Contents System Layout 5
Installing Display 6
Installing Display Cable 8
Installing Power Cable 9
Installing Speed Sensor Module 10
Installing Fan Speed Cable 11
Installing Ground Speed Cable 12
Installing Header Height Sensor 13
Installing Cotton Flow Sensors 16
Installing CAN Bus Harness 35
Final Inspection 36
Operational Checkout 37

4 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
System • This section illustrates the general layout of the cotton yield monitoring
Layout system. The purpose of the illustration is to aid in the installation procedure.
Use this section for reference as needed when installing the system
components.

Figure 1. System Layout

PN: 2005828 January 2010 – Rev A 5


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Installing Parts required for procedure:
Display
• (1) Display
• (1) Bracket
• (1) U-bracket
• (1) Marking pen or scribe
• (1) Punch
• (1) Drill bit – 13/64 in.
• (4) Self-tapping screw – 1/4 x 3/4 in.
• (2) Hex head cap screw – 1/4 x 3/4 in.
• (2) Split lock washer – 1/4 in.
• (2) Hex nut – 1/4 in.

NOTE: Recommended mounting position is on right side of cab above


window as shown in Figure 2. This places the display within easy reach
and in a convenient viewing position.

Figure 2. Monitor bracket installed

6 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
Step-by-Step 1. Attach U-bracket to wall bracket using 1/4 in. hardware from monitor
Procedure installation kit as shown in Figure 3.

NOTE: The display brackets have several mounting slots for flexibility
in mounting. Determine which combination is most desirable before
tightening cap screws.

Figure 3. U-bracket assembled to ceiling bracket

2. Position bracket assembly along right side of cab. Move assembly forward or
backward to obtain optimum position for viewing as shown in Figure 2.

3. Using bracket as template, mark (3) mounting holes on cab wall above right
window.

4. Center punch and drill mounting holes with provided 13/64 in. drill bit.

5. Attach bracket to cab wall with (3) 1/4 x 3/4 in. self-tapping screws.

6. Mount display to U-bracket.

PN: 2005828 January 2010 – Rev A 7


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Installing Parts required for procedure:
Display Cable
• (1) Display cable
• (1) Power control relay
• (1) Cab wall plate
• (1) Center punch
• (1) Drill bit – 13/64 in.
• (4) Phillips screw – #6 x 1/2 in.
• (4) Internal tooth lock washer – #6
• (4) Hex nut – #6
• (4) Self-tapping screw – 1/4 x 3/4 in.
• (1) Alcohol swab packet
• (1) Grommet – 3/4 in. ID x 1-7/16 in. P.H.D.
• Cable clips

Step-by-Step 1. Connect smaller round connector of display cable to mating connector on back
Procedure of display.

CAUTION: Never use force to mate electrical connectors. If


connectors do not mate easily, they are not aligned properly

2. Route opposite end of display cable to right-rear corner of cab floor. Secure
with adhesive backed cable clips as necessary.

3. Connect power control relay (See Figure 1) to mating connector of display


cable.

4. Lift floor mat to expose round hole in right-rear corner of cab. If necessary,
remove seal that may be covering hole.

5. Align wall plate on cab floor so that the center hole of floor plate is centered in
hole in cab floor. Mark locations for (4) mounting holes of square plate onto
cab floor using a permanent marker or scribe.

6. Punch and drill mounting holes using provided punch and 13/64 in. drill bit.
Secure plate to floor using provided 1/4 x 3/4 in. self-tapping screws.

7. Pass ethernet connector of display cable down through hole in square plate
first, then pass remaining connectors down through cab floor. Power control
relay, 9-pin GPS, and 2-pin power-out pigtails of display cable should remain
inside cab.

8. Cut provided 3/4 in. I.D. x 1-7/16 in. P.H.D. grommet and install it around
wires exiting cab. Insert grommet into hole in wall plate.

8 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
Installing Parts required for procedure:
Power cable
• (1) Power cable
• Cable ties

Step-by-Step 1. Locate battery compartment on right side of machine as shown in Figure 4.


Procedure

Batteries

Figure 4. Battery location

2. Connect ring terminals of power cable to appropriate posts of battery. Red,


fused wire should be connected to positive post. Black wire without fuse
should be connected to negative post. Check for 12-volt nominal power across
battery posts.

3. Route power cable forward to area under cab where display cable is located.

4. Connect 3-socket tower connector of power cable to mating 3-pin shroud


connector of display cable.

5. Secure power cable with provided zip ties as necessary to keep it clear of
moving parts.

PN: 2005828 January 2010 – Rev A 9


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Installing Parts required for procedure:
Speed Sensor
Module • (1) Speed Sensor module
• (1) Punch
• (1) Drill bit – 13/64 in.
• (2) Self-tapping screw – 1/4 x 3/4 in.
• (2) Flat washer – 1/4 in.

• Extra fasteners are provided

Step-by-Step 1. Position Speed Sensor module on side of chassis beneath cab as shown in
Procedure Figure 5. Module should be positioned near display cable as it exits cab.

Figure 5. Speed Sensor module installed

2. Mark locations for middle holes in each flange of Speed Sensor module onto
picker chassis.

3. Punch and drill (2) holes using provided punch and 13/64 in. drill bit.

4. Secure Speed Sensor module using provided 1/4 in. self-tapping screws and
flat washers.

10 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
Installing Parts required for procedure:
Fan Speed
Cable • (1) Fan speed cable
• Cable ties

Step-by-Step 1. Locate shaft speed sensor at front end of fan as shown in Figure 6.
Procedure

Shaft sensor
connector

Figure 6. Fan speed cable connected to sensor

2. Install tee end of fan speed cable between existing wiring harness and fan
speed sensor as shown in Figure 6.

3. Route fan speed cable to Speed Sensor module located beneath cab as shown
in Figure 5. Route cable along existing wires, hoses, or tubes. Secure with
cable ties to keep clear of moving parts.

4. Connect fan speed cable to 6-pin “Shaft Speed” connector of Speed Sensor
module. Coil and secure excess cable with cable ties.

PN: 2005828 January 2010 – Rev A 11


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Installing Parts required for procedure:
Ground Speed
Cable • (1) Ground speed cable
• Cable ties

Step-by Step 1. Locate ground speed sensor on top of transmission as shown in Figure 7.
Procedure

Sensor
connector

Figure 7. Top view of transmission

2. Install tee end of ground speed cable between existing wiring harness and
sensor.

3. Route ground speed cable to Speed Sensor module located beneath cab as
shown in Figure 5. Route cable along existing wires, hoses, or tubes. Secure
with cable ties to keep clear of moving parts.

4. Connect ground speed cable to 2-pin “Ground Speed” connector of Speed


Sensor module. Coil and secure excess cable with cable ties.

12 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
Installing Parts required for procedure:
Header Height
Sensor • (1) Header height sensor with integral cable
• (1) Arm assembly (18 in. rod, S-hook, chain, spring)
• (1) S-hook
• (1) Punch
• (1) Drill bit – 11/32 in.
• (2) Hex head cap screw – 5/16 x 1 in.
• (4) Flat washer – 5/16 in.
• (2) Lock nut – 5/16 in.
• Cable ties

Step-by-Step NOTE: The header sensor frame is designed to be versatile in mounting.


Procedure The following instructions provide suggestions for proper installation. If
an alternate mounting solution is available, but not detailed in this section,
sensor may be installed at your discretion. Ensure that sensor will not
interfere with moving parts.

1. Position header sensor under right side of cab as illustrated in Figures 8.

2. Determine best location for mounting and mark locations for (2) slots of
header sensor frame onto mounting bracket.

Header sensor mount

Figure 8. Bracket for mounting header sensor

PN: 2005828 January 2010 – Rev A 13


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
3. Center punch and drill mounting holes in the center of each marked slot using
provided punch and 11/32 in. drill bit.

4. Install header sensor using (2) 5/16 x 1 in. cap screws, washers and lock nuts.

5. Install arm assembly into hole of sensor pivot shaft using a nut and lock
washer on each side of shaft.

6. It may be necessary to bend threaded rod to prevent interference with other


components.

7. Secure chain to an available anchor point on a row unit. It is possible that a


hole must be drilled if an adequate anchor point does not exist.

CAUTION: Ensure chain will be clear of rotating shafts and


does not pull the rod at an extreme angle.

8. If header sensor does not move adequately when row units are raised and
lowered, adjust travel by removing chain links as necessary.

14 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)

Figure 9. Header sensor installation complete

9. Connect header sensor adapter cable to integral cable of header sensor.

10. Route header sensor cable back to where Speed Sensor module is located.

11. Connect header sensor to 8-pin “Position Sensor” connector of Speed Sensor
module.

12. Coil and secure excess cable with cable ties as necessary.

PN: 2005828 January 2010 – Rev A 15


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Installing Parts required for procedure (quantities vary depending on # of rows monitored):
Flow Sensors
on Ducts • Emitter/Detector pair (Figure 13)
• Mounting plate
• Template – welded
• Template – flat strap
• Slotted truss head screws – 1/4 x 3/4 in.
• Split lock washers – 1/4 in.
• Hex nuts – 1/4 in.
• RTV silicon sealant

General Information

• Each duct requires an Emitter and Detector to sense cotton flow as shown in
Figure 10. Each Emitter has (5) individual infrared light emitters within each
housing. Likewise, each Detector has (5) individual sensors to correspond
with each emitter.

Detector Emitter
(Back of Hood) (Front of Hood)

Figure 10. Emitter and detector pair

• For a 2-row monitoring system, install sensors on the following ducts for best
performance.

• 2-Row: Rows 1 & 2


• 4-Row: Rows 1 & 4
• 5-Row: Rows 1 & 5

• When ducts are referenced by a number, they are numbered from left to right
across machine as if sitting in operator seat as shown in Figure 11.

16 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)

Duct #s

Figure 11. Duct designations

• The Flow Sensor installation is split into several sections due to variations in
ducts and the ability to monitor 2-Rows vs. All-Rows. Refer to Table 1 and
proceed to the applicable section.

Sensor Configuration Duct Installations Page


Calculating shim requirements (9900-9950 models only) 18
2-Row Installing on Metal Ducts with Ladder 20
Installing on Outside Ducts without Ladder 25

Installing on Metal Ducts behind Cab 28


All-Row
Installing Duct Restraint 32
Table 1. Flow sensor installation sections

PN: 2005828 January 2010 – Rev A 17


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Step-by-Step Calculating Shim Requirements for Mounting Brackets
Procedure (Models: 9900-9950 only)

CAUTION: If Installing on a 9960, skip to “Installing on Metal


Duct with Ladder” section on page 20.

1. Front and back walls of ducts on 9900-9950 models may not be parallel due to
tapered design. If they are not parallel, shims must be used to properly align
front and back mounting brackets for flow sensors.

2. A few (3) measurements must be taken in order to calculate shim


requirements. See Figure 12 for an illustration.

NOTE: It does not matter where the top measurement is taken. If the
length measurement is accurate, the angle of taper can be calculated.

Top

Length

Bottom

Figure 12. Duct measurements

18 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
3. With measurements shown in Figure 13 recorded, calculate shim requirements
as follows:

a. Top – Bottom = ________ x 3 = ________ / Length = ________ inches.

b. Subtract 0.12 in. from value calculated in step (a) to account for integral
shim of mounting plate.

c. Provided shims are 1/16 in. (.063) thick. Calculate number of shims
required to add up to dimension calculated in step (b).

d. When installing sensors, use number of shims calculated in step (c) on both
front and back mounting brackets of tapered ducts. Shims should be
installed on bottom end of mounting brackets as shown in Figure 13.

Shims

Figure 13. Shims installed under mounting bracket

4. With shim requirements calculated, begin flow sensor installation. If any


ducts require shims, it will likely be ducts located behind cab. Install on those
ducts last using techniques detailed in following (2) sections. Install required
shims on front mounting bracket before determining location for back
mounting bracket.

PN: 2005828 January 2010 – Rev A 19


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Step-by-Step Installing on Metal Duct with Ladder
Procedure (Models: All)

1. Remove ladder duct from machine. Place back side of duct on floor.

2. Measure 51 in. up from bottom of ladder as shown in Figure 14. Make a mark
on each sidewall of ladder. Connect marks with a straight line across duct.

3. Measure 5 in. down (toward bottom of ladder) from previous line as shown in
Figure 14. Make a mark on each sidewall and then draw a straight line as in
previous step.

4. Using a cutting tool, cut along marked lines to completely remove a 5-inch
section from each ladder rail shown in Figure 14.

Figure 14. Modification to metal ladder duct

5. Center a ladder replacement rail over section that was removed. See Figure 15.

6. With replacement rail centered in position, mark locations for mounting holes
onto existing ladder rail. Repeat procedure for other side of ladder rail.

7. Center punch and drill (8) mounting holes using provided 9/32 in. drill bit.

NOTE: Set replacement rails aside for now. They will be installed later.

20 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)

Ladder rails

Figure 15. Replacement ladder rails installed

8. Position a mounting bracket on duct so that top edge of bracket is in-line with
top edge of removed rail section as shown in Figure 15. Threaded studs of
bracket should be toward outlet (or top) of duct. Center mounting bracket
side-to-side on duct by marking a vertical centerline on duct and positioning
center holes of mounting bracket over centerline.

9. With mounting bracket firmly held in position, mark center rectangular hole
and (6) mounting holes using a permanent marker.

10. Remove bracket. Center punch and drill (6) mounting holes using provided
punch and 9/32 in. drill bit.

11. Cut rectangular hole using a plasma cutter if available. If not, a high-speed air,
or electric cutting disk will work fine. Saber and jigsaws are not recommended
because they do not make as clean of a cut.

12. When cutting and drilling is complete, file perimeter of rectangular hole to
remove sharp edges.

CAUTION: Filing is not complete until all burrs have been


removed. Burrs may catch “stringers” and cause yield errors.

PN: 2005828 January 2010 – Rev A 21


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
13. Fasten mounting bracket to duct using (6) 1/4 x 3/4 in. truss head screws with
lock washers and hex nuts. Install screws from inside so nuts are on outside
of duct.

14. With mounting bracket securely fastened to front side of duct, attach hinged
template to mounting bracket as shown in Figure 16. Ensure hinged template
is fully engaged into hinge, then install (2) nuts to secure template to mounting
bracket.

Figure 16. Attaching hinged template

15. Attach another mounting bracket to template flat strap using (2) nuts as shown
in Figure 17.

Figure 17. Flat strap template attached to mounting plate

22 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)

16. Slide assembly shown in Figure 17 onto U-shaped shown in Figure 16.
Template assembly should be slid on until bracket is tight against duct.

17. With back bracket in position, mark locations for (6) mounting holes and
rectangular cutout just as was done for bracket on front side of duct. Remove
template.

CAUTION: Due to irregularly shaped ducts, the locations marked


for the back bracket may not be centered side to side on duct. That is
normal. It is more important that the sensors be lined up properly
using the provided alignment template than being centered side to side
on the duct.

18. Drill and cut holes just as was done for bracket on front side of duct. Remove
burrs.

19. Secure mounting bracket using (6) 1/4 x 3/4 in. truss head screws with lock
washers and nuts. Install screws from inside so nuts are on outside of duct.
It is a good idea to use template to double check alignment before tightening
fasteners. With optimum alignment achieved, securely tighten fasteners.

20. Install replacement ladder rails. Fasten the ladder rails using (6) 1/4 x 3/4 in.
truss head screws with lock washers and hex nuts. Do not install screws in
positions indicated in Figure 18 yet. A shield must be installed that will utilize
indicated mounting holes.

21. Install (2) 1/4 x 1 in. cap screws into remaining mounting holes that were left
open in step 20. Screws should be inserted from outside with hex nuts loosely
installed on inside edge of rail.

22. Position sensor shield so that loosely installed cap screws will engage pivot
holes near top of shield.

23. With cap screws partially engaged in pivot holes of sensor shield, tighten hex
nuts on each side to secure shield on cap screws.

24. Install lock nuts on each pivot screw to ensure that shield will not fall off.

25. After shield is securely in place, install emitter (sensor with integral cable)
assembly to mounting bracket. Hinge up and fasten captive nuts to check for
interference. Remove emitter.

PN: 2005828 January 2010 – Rev A 23


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)

Shield mtg
holes

Figure 18. Complete assembly with emitter and ladder rails installed

26. Seal gaps between mounting plates and duct with provided RTV silicon. This
is most easily done before ducts are reinstalled on machine.

27. Reinstall duct on machine.

28. Install emitter in front mounting bracket and detector in back mounting
bracket. Hinge up and tighten captive nuts.

24 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
Step-by-Step Installing on Outside Ducts without Ladder
Procedure (Models: All)

1. Before removing ducts from machine, measure 43 inches from bottom of duct
on front side. Place top of mounting bracket (with sensor installed) at this
mark. Make certain there is no interference on front or back of duct. If there
are obstructions that cannot be moved, adjust sensor location accordingly.
Check for interference in harvest and transport mode. The goal is to mount
sensor as high as possible on duct to prevent interference from lower
telescoping duct.

2. Remove duct from machine. Place back side of duct on floor. Measure 43 in.
from lower end of duct as shown in Figure 19 and make (2) marks across
width of duct. Using a straight edge, connect marks with a straight line across
duct.

Figure 19. Mounting plate measurement

3. Line up top of mounting bracket with line on duct. Orient bracket so studs of
bracket are toward outlet (or top) of duct. Center mounting bracket side-to-
side on duct by marking a vertical centerline on duct and positioning center
holes of mounting bracket over centerline.

PN: 2005828 January 2010 – Rev A 25


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
4. With mounting bracket firmly held in position, mark center rectangular hole
and (6) mounting holes using a permanent marker.

5. Remove bracket. Center punch and drill (6) mounting holes using provided
punch and 9/32 in. drill bit.

6. Cut rectangular hole using a plasma cutter if available. If not, a high-speed air,
or electric cutting disk will work fine. Saber and jigsaws are not
recommended because they do not make as clean of a cut.

7. When cutting and drilling is complete, file perimeter of rectangular hole to


remove sharp edges.

8. Fasten mounting bracket to duct using (6) 1/4 x 3/4 in. truss head screws with
lock washers and hex nuts. Install screws from inside so nuts are on outside
of duct.

9. With mounting bracket securely fastened to front side of duct, attach hinged
template to mounting bracket as shown in Figure 20. Ensure hinged template
is fully engaged into hinge, then install (2) nuts to secure template to mounting
bracket.

Figure 20. Attaching hinge template

10. Attach another mounting bracket to template flat strap using (2) nuts as shown
in Figure 21.

26 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)

Figure 21. Flat strap template attached to mounting plate

11. Slide assembly shown in Figure 21 onto U-shaped strap shown in Figure 20.
Template assembly should be slid on until bracket is tight against duct.

12. With back bracket in position, mark locations for (6) mounting holes and
rectangular cutout just as was done for bracket on front side of duct. Remove
template.

13. Drill and cut holes just as was done for bracket on front side of duct. Remove
burrs.

14. Secure mounting bracket using (6) 1/4 x 3/4 in. truss head screws with lock
washers and nuts. Install screws from inside so nuts are on outside of duct.
It is a good idea to use template to double check alignment before tightening
fasteners. With optimum alignment achieved, securely tighten fasteners.

15. Seal gaps between mounting plates and duct with provided RTV silicon. This
is most easily done before ducts are reinstalled on machine.

16. Reinstall duct on machine.

17. Install emitter in front mounting bracket and detector in back mounting
bracket. Hinge up and tighten captive nuts.

PN: 2005828 January 2010 – Rev A 27


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Step-by-Step Installing on Metal Ducts behind Cab
Procedure (Models: 9960 only)

CAUTION: This section is for All-Row monitoring only. If only


monitoring 2-Rows, proceed to “Installing CAN Bus Harness” section.

CAUTION: If installing on a 9900-9950 model, proceed to


“Installing CAN Bus Harness” section.

1. Remove ducts from behind cab.

2. Measure 45-1/4 in. from bottom of duct as shown in Figure 22. Make (2)
marks across width of duct. Using a straight edge, connect marks with a
straight line across duct.

Figure 22. Duct measurement

3. Line up top of mounting bracket with line on duct. Orient bracket so studs of
bracket are toward outlet (or top) of duct. Center mounting bracket side-to-
side on duct by marking a vertical centerline on duct and positioning center
holes of mounting bracket over centerline. See Figure 23.

28 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)

4. With mounting bracket held firmly in position, mark center rectangular hole
and (6) mounting holes using a permanent marker.

5. Remove bracket. Center punch and drill (6) mounting holes using provided
punch and 9/32 in. drill bit.

Figure 23. Mounting bracket in position for marking

6. Cut rectangular hole using a plasma cutter if available. If not, a high-speed air,
or electric cutting disk will work fine. Saber and jigsaws are not
recommended because they do not make as clean of a cut.

7. When cutting and drilling is complete, file perimeter of rectangular hole to


remove sharp edges.

CAUTION: Filing is not complete until all burrs have been


removed. Burrs may catch “stringers” and cause yield errors.

8. Fasten mounting bracket to duct using (6) 1/4 x 3/4 in. truss head screws with
lock washers and hex nuts. Install screws from inside so nuts are on outside
of duct.

PN: 2005828 January 2010 – Rev A 29


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
9. With mounting bracket securely fastened to front side of duct, attach hinged
template to mounting bracket as shown in Figure 24. Ensure hinged template
is fully engaged into hinge, then install (2) nuts to secure template to mounting
bracket.

Figure 24. Hinged template in position

10. Attach another mounting bracket to template flat strap using (2) nuts as shown
in Figure 25.

Figure 25. Flat strap template attached to mounting plate

11. Slide assembly shown in Figure 25 onto U-shaped strap shown in Figure 24.
Template assembly should be slid on until bracket is tight against duct.

30 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)

12. With back bracket in position, mark locations for (6) mounting holes and
rectangular cutout just as was done for bracket on front side of duct. Remove
template.

CAUTION: Due to irregularly shaped ducts, the locations marked


for the back bracket may not be centered side to side on duct. That is
normal. It is more important that the sensors be lined up properly
using the provided alignment template than being centered side to side
on the duct.

13. Drill and cut holes just as was done for bracket on front side of duct. Remove
burrs.

14. Secure mounting bracket using (6) 1/4 x 3/4 in. truss head screws with lock
washers and nuts. Install screws from inside so nuts are on outside of duct.
It is a good idea to use template to double check alignment before tightening
fasteners. With optimum alignment achieved, securely tighten fasteners.

15. Seal gaps between mounting plates and duct with provided RTV silicon. This
is most easily done before ducts are reinstalled on machine.

16. Reinstall duct on machine.

17. Install emitter in front mounting bracket and detector in back mounting
bracket. Hinge up and tighten captive nuts.

PN: 2005828 January 2010 – Rev A 31


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
Step-by-Step Installing Duct Restraint
Procedure (Models: 9960 only)

CAUTION: This section is for All-Row monitoring only. If only


monitoring 2-Rows, proceed to “Installing CAN Bus Harness” section.

CAUTION: An All-row system requires a duct restraint be


installed to protect rear cab window when ducts are lowered. Ag
Leader will not warranty damaged sensors, or be liable for bodily
injury or damage to machine if restraint is not installed. If restraint
is not installed, mounting brackets and sensors must be removed
before lowering basket.

1. Raise ducts into harvesting position and lock into place for safety.

2. Drill hole for duct restraint as shown in Figure 26. Measure up 16-1/4 in.
from existing hole in tubing and make a mark centered on SIDE of tube.
Center punch and drill a hole through both sides of tube using provided punch
and 11/32 in. drill bit.

Figure 26. Mounting hole for restraint

32 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)

Angle
adjustment

Figure 27. Duct angle measurement

3. Install provided 5/16 x 2 in. cap screw through drilled hole and install a lock
nut.

NOTE: For now, the duct restraint installation is complete. After the
flow sensors have been installed and all ducts in place on machine, the
ducts may require adjustment as detailed in the following steps.

CAUTION: The duct restraint may cause interference between


the sensors and the cab and also between the ducts and the basket.
The following instructions detail how to eliminate the interference
if necessary.

4. Carefully raise and lower basket to determine if angle adjustments must be


made to ducts to eliminate interference. Interference is most likely to occur
between sensors and cab, or between top of ducts and basket.

5. If interference exists, proceed to make an angle adjustment to the ducts as


illustrated in Figure 27.

PN: 2005828 January 2010 – Rev A 33


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
6. If unable to achieve proper adjustment due to interference between basket and
ducts when switching from harvest to transport mode, there are (4) options as
follows. Options (a) or (b) are recommended over options (c) and (d). Options
(c) and (d) are more of a temporary fix than a solution.

a. It is likely that interference is between basket and only (1) duct. If so, it
may be possible to place washers or spacers between duct and its
mounting plate. This fix will work for outside ducts, which are more
likely to cause interference.

b. Trim off enough of upper end of duct to eliminate interference when


switching from harvest to transport mode.

c. Position basket in “Intermediate” mode when traveling from field to


field. Refer to Operator Manual to learn more about this procedure.
Some pickers do not have this option.

d. Make a temporary adjustment for transporting machine. If any


adjustments are made, make sure duct restraint is in place before
harvesting for safety purposes. If basket is being raised and lowered
often, a temporary adjustment is not recommended.

34 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
Installing Parts required for procedure:
CAN Bus
Harness • (1) CAN Bus harness
• (1) Static grounding cable (necessary for plastic ducts)
• Cable ties

Step-by-Step CAUTION: The CAN Bus harness must be secured with cable ties
Procedure to prevent damage from cotton and other debris. When securing CAN
Bus to machine, make sure it will move appropriately when ducts are
raised or lowered when switching to and from transport mode. CAN
Bus harness may be damaged if care is not taken when securing it.

1. Locate end of CAN Bus harness that is labeled “Sensor 1.” Connect “Sensor
1” connector of CAN Bus harness with mating connector of left-most detector
installed on machine.

2. Connect emitter pigtail (located on front side of duct) to mating connector on


CAN Bus harness.

3. Proceed to connect CAN Bus harness to corresponding sensor sets from left to
right across machine until all sensor sets have been connected.

4. Route remainder of CAN Bus harness down to display cable that was routed
through cab floor in a previous section.

5. Plug CAN Bus into display cable. Black female connector of display cable
mates with black male connector of Y-Splice on CAN Bus.

6. Plug black female connector of speed module stub into remaining male
connector (light color) of Y-Splice on CAN Bus.

7. Plug gray female connector of speed module stub into 4-pin “CAN Bus”
connector of Speed Sensor module.

8. Coil and secure excess CAN Bus harness near display cable.

9. Replace rear panel of metal compartment that protects cables.

NOTE: To limit static electricity buildup, sensor mounting plates on


plastic ducts must be grounded with provided grounding cable.

10. Remove nut from mounting plate for each detector and attach lug of static
ground cable as shown in Figure 28.

PN: 2005828 January 2010 – Rev A 35


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)
11. Route grounding cable with CAN Bus harness to a location where grounding
cable can be attached to picker chassis. Ensure lug attached to chassis has a
good connection by removing paint as necessary for metal-to-metal contact.

Emitter
Pigtail

Ground
Wire
CAN Bus
Harness

Figure 28. CAN Bus harness and ground wire connected to Sensor 1

Final Installation is complete. Walk around machine to verify the following:


Inspection
• Duct restraint has been installed (All-Row systems only – see page 32)

• All cable connections have been made.

• Excess cable has been tied out of way to avoid interference.

• All tools have been removed from machine.

• All cap screws and captive nuts are tight on sensor mounts.

• Safety shields have been replaced.

36 January 2010 – Rev A


Ag Leader Technology Cotton Picker Installation
JD 9960 (including 9900-9950)
Operational An operational checkout cannot be performed until a harvest configuration has
Checkout been created and activated. Refer to Quick Reference Sheet (see instruction kit) or
Operator’s Manual for instructions.

Step-by-Step 1. Press and release power button.


Procedure
2. Create and activate a harvest configuration.
a. Refer to Quick Reference Sheet and/or Operator’s Manual.

3. Verify CAN modules are powered and communicating.


a. Each module has an LED indicator. It should flash green.

4. From RUN screen, touch SYSTEM button in top right corner of screen.
Touch CAN tab. All modules should be displayed in the list. You should see
(1) Speed Sensor module and as many Flow Sensor modules as are installed
on the machine. If all modules are not in list, cycle power to display. A
machine monitoring (2) rows should have a list that looks like this:

208 FLOW SENSOR


209 FLOW SENSOR
239 SPEED MODULE

5. Touch Diagnostics tab within SYSTEM screen.


a. Verify FAN SPEED (RPM) signal.
1. Fan speed should register zero with fan off.
2. Engage fan. Display should register an RPM value. At full throttle,
fan speed should be greater than 2500 RPM.

b. Verify GROUND SPEED (MPH) signal.


1. Ground speed should register zero with picker at rest.
2. Move picker slowly. Display should register MPH value at low
speeds (below 1 MPH).

NOTE: If using wheels as primary speed sensor, ground speed reading on


display may not agree with picker readout until system has been calibrated.

c. Verify HEADER HEIGHT (%) signal


1. Raise and lower header. Header height % should increase and
decrease respectively.

PN: 2005828 January 2010 – Rev A 37


Cotton Picker Installation Ag Leader Technology
JD 9960 (including 9900-9950)

Revision History
Date Revision Initials Changes
Jan 2007 N/C SLH - Initial release of instructions
Jan 2010 A WDS - Changed display cable

38 January 2010 – Rev A

Вам также может понравиться