Case Study
URA K2 Development
Building Services Designs
URA K2 Comprehensive Development
Case Study on Building Services Designs
„ The Development :

„ At the juncture of Argyle Street, Portland Street, Shanghai


Street, Shang Tung Street and Reclamation Street of
Mongkok. Site area is around 12,000 m2 and total GFA
equals to 170,500 m2

„ Consists of a 60 storeys Office Building exceeding 250 m


high, Retail Block with an atrium of 137000 m3 in volume,
750 rooms Hotel Building with Integration of a GIC and
Public Light Bus Terminus

„ Completion Expected Mid 2004 for Hotel and Late 2004 for
office and Retail Areas
URA K2 Comprehensive Development
Case Study on Building Services Designs

HOTEL RETAIL & OFFICE


Hotel Office & Retail
Major BS Design Facts
„ Total installed AC loading is 10150 RT and all chillers to
use fresh water cooling towers for energy efficiency

„ Direct Digital Control Variable Air Volume (VAV) AC


system for office to achieve best energy efficiency and
operation flexibility

„ Office floor to floor 3900 mm with finished ceiling height of


2620 mm including a 150 mm raised floor for
telecom,data and power wirings

„ 17 nos. 1.5 MVA transformer and 27 nos. 1.0 MVA


transformer with substations either above or below ground
to maximise commercial values of ground floor space.
Major BS Design Facts (cont’d)
„ Oversized Retail Atrium with volume exceeding 137,000
m3 requiring fire engineering design approach to satisfy
FSD’s requirements

„ Fully addressable digital automatic fire alarm system with


special ‘long throw sprinkler’ design for the retail atrium
base where ceiling height exceeding 60 m

„ Daily Potable Water Consumption estimated 1060 m3

„ Over 60 nos. of high performance VVVF drive lifts with


speed up to 8 m/s and 50 nos. of escalator fitted with
variable speed drive
Sustainable BS Designs
1. Office Lighting

„ Energy Efficient T5 fluorescent fitting producing


average 500 lux at 15.7 W/m2 or better

„ Good Colour Rendering Ra 85 or better

„ Good direct and indirect light distribution to


eliminate ’Dark Cave’ lighting effect.

„ Daylight sensor dimming control for perimeter offices

„ Glare Control

„ Good Utilisation factor and high maintenance factor


Typical Office Lighting Design
„ UF = 0.6

„ Uniformity = 0.53

„Watt/m2 = 17

„2x 24 w high
output T5 lamp

„Direct & indirect


lighting
BS Designs (cont’d)

Traditional cat.2 fitting K2 adopted direct/indirect fitting


BS Designs (cont’d)

Actual installation on Site direct/indirect lighting fitting


Sustainable BS Designs (cont’d)

2. Heating Ventilation & Air-conditioning Design


„ Water cooled chiller system for the whole
development was adopted after lengthy liaison with
the Water Authority. This can achieve over 25 %
energy saving (represent around HK$ 8.0 M) in AC
power annually

„ Variable speed drive control for retail chillers to cope


with the frequently AC varying load characteristics of
the retail areas. This can reduce the AC power
energy by a further 8 to 10 %

„ Variable Air Volume (VAV) control system for the


office areas for better energy management
Sustainable BS Designs (cont’d)

2. Heating Ventilation & Air-conditioning Design


(cont’d)

„ DDC system for the hotel guestroom fan coil system

„ Retail to adopt ‘fresh air on demand’ design


concept

„ Water source heat recovery heat pump for hotel hot


water supply system with electric boiler as back up
„ Selection of Office curtain wall
glass
„ Solar gain through curtain wall
represents around 25% of the
total A/C loading
„ “Steel Blue” double glazing
low-E glass with SC 0.18 is
selected to comply OTTV
requirement to < 30 w/m2
Sustainable BS Designs (cont’d)

Glass Air Gap Glass

100 Units
energy

9 Units Glass Characteristics


•“Steel Blue”
Outside
Inside
•Double Glazing Low- E coating

•Shading Coefficient = 0.18


21 Units •U Value 1.6 W/m2K
70 Units energy
Low-E Coating
absorbed and gradually
emits back to outside
atmosphere

Office Double Glazing “Low-E” Glass


Sustainable BS Designs (cont’d)
3. Other Energy Saving Proposals

3.1 Variable Speed Drives

„ Variable Speed Drives are very effective means


to save electricity by varying the E&M
equipment output to closely meet the load
demand. We have adopted variable speed
drive fans, pumps and motors in various E&M
equipment of this development to achieve
energy saving
Sustainable BS Designs (cont’d)

3.2 Retail Variable Drive Chiller Systems

„ Used because retail loads are more fluctuating and


individual chiller capacity is larger where part load
performance efficiency is better
Sustainable BS Designs (cont’d)

3.3 Variable Air Volume Design (VAV)

„ Office using Variable Air Volume (VAV) Design and this is


in fact nearly a standard design for most first class office
buildings in Hong Kong
Sustainable BS Designs

3.4 Variable speed Drive


Escalators.

„ Escalators will run on


low speed during low
load condition and
run at normal rated
speed upon
detection of
passenger for energy
saving.

„ Payback period is
around 2 years
Actual Site escalator
installation in
progress at the grand
atrium area
Sustainable BS Designs (cont’d)

3.5 ‘Fresh Air on Demand’ for the Retail


Arcade Areas

„ Pre-cooled fresh air will be supplied to the retail area


at a rate of 120 m3/sec and controlled by means of
CO2 sensors at returned air plenum

„ Due to variation in nos of retail shoppers during


different times of the day, supply of fresh air will be
suitably controlled such it is directly proportional to
population of the retail area for energy saving
Sustainable BS Designs (cont’d)

3.6 Full Energy Reset Control for Hotel Guestrooms

„ Hotel room lighting and A/C will be controlled by key tag


and BMS to achieve energy saving

„ Guest room AC will be reset to higher room temperature


around 26 C with fan speed running at low speed
automatically when guest leaves the room

„ Hotel operator can remotely control via BMS and reset


guest room AC condition to suit energy management
scheme
Sustainable BS Designs (cont’d)

3.7 Heat Pumps for AC heat recovery for hotel hot water supply

„ Waste heat recovery heat pumps form the base hot


water heating plant of the hotel

„ Average COP is around 3.5 compared to electric or gas


boiler of which the COP is normally less than 1
Sustainable BS Designs (cont’d)

3.8 Air to Water heat pump for hotel swimming pool/Jacuzzi


pool heating and filtration plant room cooling

„ Package air source heat pumps are used for pool


heating and plant room cooling simultaneously.
4. Other Special BS Design Adopted
4.1 Jump Lift to replace construction external pin &
rack lifts
4. Other Special BS Design Adopted

4.2 Enhanced Lift Control Design using proprietry lift


control system, Schindler’s ‘Miconic 10’ (improve 15 to 20
% up peak lift performance using same nos. of lifts)

M10 Control Pad


4. Other Special BS Design Adopted

4.3 A/C condensing water recovery system for irrigation,


cleansing and cooling tower make up purpose

4.4 Computerised ON/OFF control of all interior and


exterior public areas lighting with timed control
functions to suit different operation schedule
4. Other Special BS Design Adopted

4.5 ‘EPAMS’ Syphonic


Rainwater Drainage
System was adopted
for the retail roof to
minimise drainage
down pipes. As a
result rain pipes were
reduced from 10 to
only 3 nos.
4. Other Special BS Design Adopted
retail elevation
4.6 Special LPC approved ‘Long Throw Sprinkler’ design was
adopted to protect the atrium base on L4

Grand Atrium
Office & Retail Section

Grand Atrium Possible Activity


4.6 Special LPC approved ‘Long Throw Sprinkler’ design was
adopted to protect the atrium base on L4

Long Throw Sprinkler Head


Long Throw Sprinkler Protection
4.7 Aspirating smoke detection system (VESDA) was adopted
for the grand atrium area to suit the high ceiling void of
the area
Typical BS Designs
5.1 AC System
5.1.1 Chiller Plant Schematic
Typical BS Designs (cont’d)
5.1.2 Chiller Plant Room Layout Plan
Typical BS Designs (cont’d)
5.1.3 Chiller Plant Room

Chiller Chilled Water Pump


Typical BS Designs (cont’d)
5.1.4 Hot Water Supply in Hotel

Heat Pump Hot Water Plant Room


Typical BS Designs (cont’d)
5.1.5 Typical office AC Layout
Typical BS Designs (cont’d)
5.1.5 Typical office AC Layout
Typical BS Designs (cont’d)
5.1.6 Air Handling Unit
Typical BS Designs (cont’d)
5.1.7 Cooling Tower
Typical BS Designs (cont’d)
5.2 Electrical System
5.2.1 H.V. Schematic
Typical BS Designs (cont’d)
5.2.2 L.V. Switch Room Layout Plan
Typical BS Designs (cont’d)
5.2.3 L.V. Switch Room
Typical BS Designs (cont’d)
5.2.4 Generator System

Generator set Electrical Control Panel for


Generator
Typical BS Designs (cont’d)
5.3 Fire Service System
5.3.1 Sprinkler Pumps Schematic
Typical BS Designs (cont’d)
5.3.2 Sprinkler Pumps Room Layout Plan
Typical BS Designs (cont’d)
5.3.3 Sprinkler Pumps Room

Sprinkler Pump Sets Control Panel for Sprinkler Pumps


Typical BS Designs (cont’d)
5.4 Pumping & Drainage System
5.4.1 Drainage Schematic
Typical BS Designs (cont’d)
5.4.2 Drainage Layout Plan
Typical BS Designs (cont’d)
5.4.3 Potable Water Pump Room

Potable Water Pumps Potable Water Pumps & Pneumatic


Units
Typical BS Designs (cont’d)
5.5 Multi-disciplinary Services within ceiling void

Sprinkler Pipe

Air Duct

Smoke Detector
Conduit
Exit Sign

Typical Corridor in Hotel