PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE

PLOT NO :- 5310279
SUMMARY CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FEED FROM : DEWA CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

RATING-AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE &


PVC/* XLPE REMARKS
FAULT Length No. OF kwh Meters
CIRCUIT/ FEEDER
SP/TP DUTY of Cable ECC SIZE 1C mm2
DB NO. MCCB / 1-PH 3-PH LV/HV
F/S ISO. KA SWA/ PVC 2/4/ X 1C mm2 2/3/ X 4C mm2 (Mtrs.) R-PH KW Y-PH KW B-PH KW TOTAL KW
ACB (1) (2) CT (4)

INCOMER 117.98 114.36 116.43 348.78 2

METER CAB. 1 4P 300A 50 By Dewa 2x1Cx150mm2 58.02 56.76 56.27 171.05 1 300/5A CT

METER CAB. 2 4P 400A 50 By Dewa 2x1Cx150mm2 59.96 57.60 60.16 177.73 1 400/5A CT

MDB CONNECTED TO:DEWA LV DB/Transf. SMDB


TOTAL CONNECTED LOAD PER PHASE: 117.98 114.36 116.43 348.78 2 TOTAL
CONNECTED TO: MDB:

DEMAND FACTOR: 0.9 MAX. DEMAND 313.90 kW TOTAL CONNECTED LOAD (3 PH): 348.78

TYPE OF METER (RATING OF INCOMER) : (1) Upto 60A - 1 Phase (2) Upto 100A - 3 Phase (3) 125 - 160A - 3Phase (4) LV CT ……./…..A / HV CT…../…..A

113
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO :- 5310279
MDB-01 CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : METER CAB.1 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

RATING-AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE &


PVC/* XLPE REMARKS
FAULT Length of No. OF kwh Meters
CIRCUIT/ FEEDER
SP/TP DUTY Cable ECC SIZE 1C mm2
DB NO. MCCB / 1-PH 3-PH LV/HV
F/S ISO. KA SWA/ PVC 2/4/ X 1C mm2 2/3/ X 4C mm2 (Mtrs.) R-PH KW Y-PH KW B-PH KW TOTAL KW
ACB (1) (2) CT (4)

INCOMER-1 300A 50 XLPE/SWA/PVC 4C 240MM2 1C 120MM2 58.02 56.76 56.27 171.05

OUT GOING:
DB-01 TP 63A 25 XLPE/SWA/PVC 4C 25MM2 1C 16MM2 5.95 6.10 6.10 18.15

DB-01 A TP 40A 25 XLPE/SWA/PVC 4C 16MM2 1C 10MM2 4.62 4.50 4.38 13.50

DB-02 TP 40A 25 XLPE/SWA/PVC 4C 16MM2 1C 10MM2 4.22 4.63 3.88 12.72

DB-04 TP 63A 25 XLPE/SWA/PVC 4C 25MM2 1C 16MM2 6.75 6.75 6.58 20.08

DB-04 A TP 63A 25 XLPE/SWA/PVC 4C 25MM2 1C 16MM2 7.78 7.78 8.33 23.90

SMDB-E TP 200A 35 XLPE/SWA/PVC 4C 120MM2 1C 70MM2 28.70 27.00 27.00 82.70

CAP. BANK 1 TP 160 25 XLPE/SWA/PVC 4C 70MM2 1C 35MM2 65KVAR CAPACITOR BANK


MDB CONNECTED TO:DEWA LV DB/Transf. SMDB
TOTAL CONNECTED LOAD PER PHASE: 58.02 56.76 56.27 171.05 TOTAL
CONNECTED TO: MDB:

DEMAND FACTOR: 0.9 MAX. DEMAND 153.95 kW TOTAL CONNECTED LOAD (3 PH): 171.05 kW

TYPE OF METER (RATING OF INCOMER) : (1) Upto 60A - 1 Phase (2) Upto 100A - 3 Phase (3) 125 - 160A - 3Phase (4) LV CT ……./…..A / HV CT…../…..A
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO :- 5310279
MDB-02 CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : METER CAB.2 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

RATING-AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE &


PVC/* XLPE REMARKS
FAULT Length of No. OF kwh Meters
CIRCUIT/ FEEDER
SP/TP DUTY Cable ECC SIZE 1C mm2
DB NO. MCCB / 1-PH 3-PH LV/HV
F/S ISO. KA SWA/ PVC 2/4/ X 1C mm2 2/3/ X 4C mm2 (Mtrs.) R-PH KW Y-PH KW B-PH KW TOTAL KW
ACB (1) (2) CT (4)

INCOMER-1 400A 50 XLPE/SWA/PVC 4C 300MM2 1C 150MM2 59.96 57.60 60.16 177.73

OUT GOING:
DB-03 TP 40A 25 XLPE/SWA/PVC 4C 10MM2 1C 10MM2 4.63 4.88 5.49 15.01

DB-OFF/LL TP 63A 25 XLPE/SWA/PVC 4C 25MM2 1C 16MM2 10.09 7.65 9.78 27.52

DB- EXT TP 32A 25 XLPE/SWA/PVC 4C 10MM2 1C 10MM2 2.64 2.47 2.29 7.40

DB-ECBS TP 32A 25 XLPE/SWA/PVC 4C 10MM2 1C 10MM2 1.00 1.00 1.00 3.00

SMDB-AC TP 250A 35 XLPE/SWA/PVC 4C 150MM2 1C 70MM2 41.60 41.60 41.60 124.80

CAP. BANK 2 TP 160 25 XLPE/SWA/PVC 4C 70MM2 1C 35MM2 65KVAR CAPACITOR BANK


MDB CONNECTED TO:DEWA LV DB/Transf. SMDB
TOTAL CONNECTED LOAD PER PHASE: 59.96 57.60 60.16 177.73 TOTAL
CONNECTED TO: MDB:

DEMAND FACTOR: 0.9 MAX. DEMAND 159.95 kW TOTAL CONNECTED LOAD (3 PH): 177.73 kW

TYPE OF METER (RATING OF INCOMER) : (1) Upto 60A - 1 Phase (2) Upto 100A - 3 Phase (3) 125 - 160A - 3Phase (4) LV CT ……./…..A / HV CT…../…..A

313
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO :- 5310279
SMDB - E CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-01 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

RATING-AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE &


PVC/* XLPE REMARKS
FAULT Length of No. OF kwh Meters
CIRCUIT/ FEEDER
SP/TP DUTY Cable ECC SIZE 1C mm2
DB NO. MCCB / 1-PH 3-PH LV/HV
F/S ISO. KA SWA/ PVC 2/4/ X 1C mm2 2/3/ X 4C mm2 (Mtrs.) R-PH KW Y-PH KW B-PH KW TOTAL KW
ACB (1) (2) CT (4)

INCOMER-1 200A 35 XLPE/SWA/PVC 4C 120MM2 1C 70MM2 28.70 27.00 27.00 82.70

OUT GOING:
FIRE PUMP TP 160A 25 XLPE/SWA/PVC 4C 95MM2 1C 50MM2 21.67 21.67 21.67 65.00 ELS+ALARM

JOCKEY PUMP TP 20A 25 XLPE/SWA/PVC 2C 6MM2 1C 4MM2 1.50 1.50 30mA ELCB

DIESEL PUMP TP 20A 25 XLPE/SWA/PVC 2C 6MM2 1C 4MM2 0.20 0.20 30mA ELCB

WATER PUMP TP 32A 25 XLPE/SWA/PVC 4C 10MM2 1C 10MM2 2.00 2.00 2.00 6.00

LIFT TP 32A 25 XLPE/SWA/PVC 4C 10MM2 1C 10MM2 3.33 3.33 3.33 10.00


MDB CONNECTED TO:DEWA LV DB/Transf. SMDB
TOTAL CONNECTED LOAD PER PHASE: 28.70 27.00 27.00 82.70 TOTAL
CONNECTED TO: MDB:

DEMAND FACTOR: 0.9 MAX. DEMAND 74.43 kW TOTAL CONNECTED LOAD (3 PH): 82.70 kW

TYPE OF METER (RATING OF INCOMER) : (1) Upto 60A - 1 Phase (2) Upto 100A - 3 Phase (3) 125 - 160A - 3Phase (4) LV CT ……./…..A / HV CT…../…..A
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO :- 5310279
SMDB - AC CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-02 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

RATING-AMPS CABLE SIZE CONNECTED LOAD - KW PROPOSED TYPE &


PVC/* XLPE REMARKS
FAULT Length of No. OF kwh Meters
CIRCUIT/ FEEDER
SP/TP DUTY Cable ECC SIZE 1C mm2
DB NO. MCCB / 1-PH 3-PH LV/HV
F/S ISO. KA SWA/ PVC 2/4/ X 1C mm2 2/3/ X 4C mm2 (Mtrs.) R-PH KW Y-PH KW B-PH KW TOTAL KW
ACB (1) (2) CT (4)

INCOMER-1 250A 35 XLPE/SWA/PVC 4C 150MM2 1C 70MM2 41.60 41.60 41.60 124.80

OUT GOING:
AHU-01 TP 63A 25 XLPE/SWA/PVC 4C 25MM2 1C 16MM2 8.77 8.77 8.77 26.30

AHU-02 TP 63A 25 XLPE/SWA/PVC 4C 25MM2 1C 16MM2 8.77 8.77 8.77 26.30

AHU-03 TP 63A 25 XLPE/SWA/PVC 4C 25MM2 1C 16MM2 7.77 7.77 7.77 23.30

AHU-04 TP 63A 25 XLPE/SWA/PVC 4C 25MM2 1C 16MM2 7.77 7.77 7.77 23.30

FAHU TP 63A 25 XLPE/SWA/PVC 4C 25MM2 1C 16MM2 8.53 8.53 8.53 25.60


MDB CONNECTED TO:DEWA LV DB/Transf. SMDB
TOTAL CONNECTED LOAD PER PHASE: 41.60 41.60 41.60 124.80 TOTAL
CONNECTED TO: MDB:

DEMAND FACTOR: 0.9 MAX. DEMAND 112.32 kW TOTAL CONNECTED LOAD (3 PH): 124.80 kW

TYPE OF METER (RATING OF INCOMER) : (1) Upto 60A - 1 Phase (2) Upto 100A - 3 Phase (3) 125 - 160A - 3Phase (4) LV CT ……./…..A / HV CT…../…..A

513
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO : - 5310279
DB NO : DB-OFF/LL CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-02 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

CONNECTED LOADS / POINTS LOAD PER CIRCUIT - WATT


RATING OF

RATING OF
INCOMER

CCT ECT
MCB
ELCB
SL. CIR WIRE WIRE WATT/
RTG IN ROOM / AREA 13A 20A 40A WAT. UNIT
REMARKS
NO. NO. SIZE SIZE C. EX. SH 13A 16A HD/ 45A W SPLIT
AMPS
mm2 mm2
LTG TW W/H WP WP PUM FCU OTHER R Y B
FAN FAN S/O S/O ISO WM CCU A/C A/C P
S/O ISO ISO

1 R1 10 2.5 2.5 RECEPTION 7 30 210

2 Y1 10 2.5 2.5 RECEPTION 7 30 210

40 A 4P 3 B1 10 2.5 2.5 SALES MGR 2 40 80


100mA
(1) 4 R2 10 2.5 2.5 AFTER SALES 2 40 80

5 Y2 10 2.5 2.5 CORRIDOR 6 52 312

6 B2 10 2.5 2.5 ACCOUNTS 2 40 80

7 R3 10 2.5 2.5 IT ROOM 2 40 80

8 Y3 10 2.5 2.5 ACCOUNTS MANAGER 2 40 80

40 A 4P 9 B3 10 2.5 2.5 CONFERENCE ROOM 2 40 80


100mA
(2) 10 R4 10 2.5 2.5 SERVER ROOM 2 40 80

11 Y4 10 2.5 2.5 MD ROOM 8 30 240

12 B4 10 2.5 2.5 STORE ROOM 2 40 80

13 R5 10 2.5 2.5 PRAYER ROOM 2 40 80

14 Y5 10 2.5 2.5 MD ROOM COVE LIGHT 1 100 100

40 A 4P 15 B5 10 2.5 2.5 RECEPTION COVE LIGHT 1 100 100


100mA
(3) 16 R6 10 2.5 2.5 FEMALE TOILET 3 18 54

17 Y6 10 2.5 2.5 DINING AREA 6 40 240


63A TP ISOLATOR

18 B6 10 2.5 2.5 MALE TOILET 4 18 72

19 R6 10 2.5 2.5 TOILET 3 18 54


40 A 4P
100mA 20 Y6 10 2.5 2.5 TOILET 4 18 72
(4)
21 B6 10 2.5 2.5 ELECTRICAL ROOM 1 36 36

22 R7 20 4 4 TOILET 1 400 400

23 Y7 20 4 4 DINING AREA 2 400 800


PRAYER ROOM &
40 A 4P 24 B7 20 4 4 2 200 400
RECEPTION
30mA
(5) 25 R7 20 4 4 PRAYER ROOM 1 400 400

26 Y7 20 4 4 RECEPTION 4 400 1600

27 B7 20 4 4 SALES MGR 3 400 1200

28 R8 20 4 4 ACCOUNTS 3 400 1200

29 Y8 20 4 4 AFTER SALES 3 400 1200

30 B8 20 4 4 IT ROOM 3 400 1200

31 R8 20 4 4 ACCOUNTS MANAGER 3 400 1200


40 A 4P
30mA 32 Y8 20 4 4 CONFERENCE ROOM 4 400 1600
(6)
SERVER ROOM & STORE
33 B8 20 4 4 2 400 800
ROOM
34 R9 20 4 4 MD ROOM 2 400 800

35 Y9 20 4 4 MD ROOM 3 400 1200

36 B9 20 4 4 MD ROOOM 1 200 200

37 R9 32 6 6 RECEPTION & PRAYER 1 5450 5450


40 A 4P
100mA 38 Y9 32 6 6 SPACE
(7)
39 B9 32 6 6 OFFICES AREA 1 5450 5450

TOTAL 10088 7654 9778 27520


CABLE SIZE: 1X 4C 25mm2 Cu./PVC-XLPE/SWA/PVC & 1x 1C 16mm2 Cu, G/Y PVC, ECC W/H =Water Heater, 'A/C' = FCU, W/M=WASHING MACHINE, FR-FRIDGE
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO : - 5310279
DB NO : DB-01 CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-01 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

CONNECTED LOADS / POINTS LOAD PER CIRCUIT - WATT


RATING OF

RATING OF
INCOMER

CCT ECT
MCB
ELCB
SL. CIR WIRE WIRE WATT/
RTG IN ROOM / AREA 13A 20A 40A WAT.
UNIT
REMARKS
NO. NO. SIZE SIZE C. EX. SH 13A 16A HD/ 45A 20A SPLIT
AMPS LTG TW W/H WP WP PUM FCU OTHER R Y B
mm2 mm2 FAN FAN S/O SO ISO WM CCU ISO A/C P
SO ISO ISO

1 R1 10 2.5 2.5 FERRARI+OTHER BRANDS 3 150 450


40 A 4P
100mA 2 Y1 10 2.5 2.5 FERRARI+OTHER BRANDS 4 150 600
(1)
3 B1 10 2.5 2.5 FERRARI+OTHER BRANDS 4 150 600

4 R2 20 4 4 FERRARI+OTHER BRANDS 1 1000 1000


40 A 4P
30mA 5 Y2 20 4 4 FERRARI+OTHER BRANDS 1 1000 1000
(2)
6 B2 20 4 4 ROLLING SHETTER 1 1000 1000

7 R3 32 6 6 1000
40 A 4P
30mA 8 Y3 32 6 6 FERRARI+OTHER BRANDS 1 3000 1000 CAR LIFT
63A TP ISOLATOR

(3)
9 B3 32 6 6 1000

10 R4 32 6 6 1000
40 A 4P
30mA 11 Y4 32 6 6 FERRARI+OTHER BRANDS 1 3000 1000 CAR LIFT
(4)
12 B4 32 6 6 1000

13 R5 32 6 6 1000
40 A 4P
30mA 14 Y5 32 6 6 FERRARI+OTHER BRANDS 1 3000 1000 CAR LIFT
(5)
15 B5 32 6 6 1000

16 R6 32 6 6 1000
40 A 4P
30mA 17 Y6 32 6 6 FERRARI+OTHER BRANDS 1 3000 1000 CAR LIFT
(6)
18 B6 32 6 6 1000

19 R7 32 6 6 500
40 A 4P
30mA 20 Y7 32 6 6 FERRARI+OTHER BRANDS 1 1500 500 CAR LIFT
(7)
21 B7 32 6 6 500

TOTAL 5950 6100 6100 18150


CABLE SIZE: 1X 4C 25mm2 Cu./PVC-XLPE/SWA/PVC & 1x 1C 16mm2 Cu, G/Y PVC, ECC W/H =Water Heater, 'A/C' = FCU, W/M=WASHING MACHINE, FR-FRIDGE
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO : - 5310279
DB NO : DB-01 A CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-01 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

CONNECTED LOADS / POINTS LOAD PER CIRCUIT - WATT


RATING OF

RATING OF
INCOMER

CCT ECT
MCB
ELCB
SL. CIR WIRE WIRE WATT/
RTG IN ROOM / AREA 13A 20A 40A REMARKS
NO. NO. SIZE SIZE C. EX. SH 13A 16A HD/ 45A 20A SPLIT WAT. UNIT
AMPS LTG TW W/H WP WP FCU OTHER R Y B
mm2 mm2 FAN FAN S/O SO ISO WM CCU ISO A/C PUMP
SO ISO ISO

1 R1 10 2.5 2.5 ENGINE BUILDING ROOM 8 40 320


40 A 4P
100mA 2 Y1 10 2.5 2.5 SPARE PARTS DISTRIBUTION 5 40 200
(1)
3 B1 10 2.5 2.5 OFFICE 2 40 80

4 R2 20 4 4 ENGINE BUILDING ROOM 2 400 800


40 A 4P
30mA 5 Y2 20 4 4 SPARE PARTS DISTRIBUTION 2 400 800
(2)
6 B2 20 4 4 OFFICE 2 400 800
40A TP ISOLATOR

7 R3 32 6 6 1000
40 A 4P
30mA 8 Y3 32 6 6 FERRARI+OTHER BRANDS 1 3000 1000 CAR LIFT
(3)
9 B3 32 6 6 1000

10 R4 32 6 6 1000
40 A 4P
30mA 11 Y4 32 6 6 FERRARI+OTHER BRANDS 1 3000 1000 CAR LIFT
(4)
12 B4 32 6 6 1000

13 R5 32 6 6 500
40 A 4P
30mA 14 Y5 32 6 6 FERRARI+OTHER BRANDS 1 1500 500 CAR LIFT
(5)
15 B5 32 6 6 500

16 R6 32 6 6 1000
40 A 4P
30mA 17 Y6 32 6 6 FERRARI+OTHER BRANDS 1 3000 1000 CAR LIFT
(6)
18 B6 32 6 6 1000

TOTAL 4620 4500 4380 13500


CABLE SIZE: 1X 4C 16mm2 Cu./PVC-XLPE/SWA/PVC & 1x 1C 10mm2 Cu, G/Y PVC, ECC W/H =Water Heater, 'A/C' = FCU, W/M=WASHING MACHINE, FR-FRIDGE
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO : - 5310279
DB NO : DB-02 CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-01 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

CONNECTED LOADS / POINTS LOAD PER CIRCUIT - WATT


RATING OF

RATING OF
INCOMER

CCT ECT
MCB
ELCB
SL. CIR WIRE WIRE WATT/
RTG IN ROOM / AREA 13A 20A 40A REMARKS
NO. NO. SIZE SIZE C. EX. SH 13A 16A HD/ 45A W SPLIT WAT. UNIT
AMPS LTG TW W/H WP WP FCU OTHER R Y B
mm2 mm2 FAN FAN S/O SO ISO WM CCU A/C A/C PUMP
SO ISO ISO

1 R1 10 2.5 2.5 BODY SHOP 3 150 450

2 Y1 10 2.5 2.5 BODY SHOP 4 150 600

40 A 4P 3 B1 10 2.5 2.5 BODY SHOP 3 150 450


100mA
(1) 4 R2 10 2.5 2.5 CAR WASH 2 150 300

5 Y2 10 2.5 2.5 SPARE PARTS STORE 4 40 160

6 B2 10 2.5 2.5 SPARE PARTS STORE 4 40 160


40A TP ISOLATOR

7 R3 20 4 4 SPRAY BOOTH 3 400 1200

8 Y3 20 4 4 CAR WASH 2 400 800

40 A 4P 9 B3 20 4 4 ROLLING SHETTER 1 1000 1000


30mA
(2) 10 R4 20 4 4 SPACE

11 Y4 20 4 4 SPARE PARTS STORE 2 400 800

12 B4 20 4 4 SPACE

13 R5 32 6 6 1000
40 A 4P
30mA 14 Y5 32 6 6 BODY SHOP 1 3000 1000 CAR LIFT
(3)
15 B5 32 6 6 1000

16 R6 20 6 6 1267
40 A 4P
100mA 17 Y6 20 6 6 SPARE PARTS STORE 1 3800 1267 AC
(4)
18 B6 20 6 6 1267
TOTAL 4217 4627 3877 12720
CABLE SIZE: 1X 4C 16mm2 Cu./PVC-XLPE/SWA/PVC & 1x 1C 10mm2 Cu, G/Y PVC, ECC W/H =Water Heater, 'A/C' = FCU, W/M=WASHING MACHINE, FR-FRIDGE
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO : - 5310279
DB NO : DB-03 CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-02 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

CONNECTED LOADS / POINTS LOAD PER CIRCUIT - WATT


RATING OF

RATING OF
INCOMER

CCT ECT
MCB
ELCB
SL. CIR WIRE WIRE WATT/
RTG IN ROOM / AREA 13A 20A 40A
UNIT
REMARKS
NO. NO. SIZE SIZE C. EX. SH 13A 16A HD/ 45A W SPLIT WAT.
AMPS LTG TW W/H WP WP FCU OTHER R Y B
mm2 mm2 FAN FAN S/O SO ISO WM CCU A/C A/C PUMP
SO ISO ISO

1 R1 10 2.5 2.5 BODY SHOP 6 150 900


40 A 4P
100mA 2 Y1 10 2.5 2.5 BODY SHOP 5 150 750
(1)
3 B1 10 2.5 2.5 OFFICE 1 & PAINT MIXING RM 4 40 160

4 R2 20 4 4 BODY SHOP 1 400 400


40 A 4P
30mA 5 Y2 20 4 4 OFFICE 1 & PAINT MIXING RM 2 400 800
40A TP ISOLATOR

(2)
6 B2 20 4 4 BODY SHOP 2 1000 2000

7 R3 32 6 6 500
40 A 4P
30mA 8 Y3 32 6 6 BODY SHOP 1 1500 500 CAR LIFT
(3)
9 B3 32 6 6 500

10 R4 32 6 6 500
40 A 4P
30mA 11 Y4 32 6 6 BODY SHOP 1 1500 500 CAR LIFT
(4)
12 B4 32 6 6 500

13 R5 32 6 6 2333
40 A 4P
30mA 14 Y5 32 6 6 PAINT BOOTH 1 7000 2333
(5)
15 B5 32 6 6 2333

TOTAL 4633 4883 5493 15010


CABLE SIZE: 1X 4C 16mm2 Cu./PVC-XLPE/SWA/PVC & 1x 1C 10mm2 Cu, G/Y PVC, ECC W/H =Water Heater, 'A/C' = FCU, W/M=WASHING MACHINE, FR-FRIDGE
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO : - 5310279
DB NO : DB-04 CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-01 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

CONNECTED LOADS / POINTS LOAD PER CIRCUIT - WATT


RATING OF

RATING OF
INCOMER

CCT ECT
MCB
ELCB
SL. CIR WIRE WIRE WATT/
RTG IN ROOM / AREA 13A 20A 40A REMARKS
NO. NO. SIZE SIZE C. EX. SH 13A 16A HD/ 45A W SPLIT WAT. UNIT
AMPS LTG TW W/H WP WP FCU OTHER R Y B
mm2 mm2 FAN FAN S/O SO ISO WM CCU A/C A/C PUMP
SO ISO ISO

1 R1 10 2.5 2.5 PORSCHE SECTION 3 150 450


40 A 4P
100mA 2 Y1 10 2.5 2.5 PORSCHE SECTION 3 150 450
(1)
3 B1 10 2.5 2.5 OFFICE-02 2 40 80

4 R2 20 4 4 PORSCHE SECTION 2 400 800


40 A 4P
30mA 5 Y2 20 4 4 OFFICE-02 2 400 800
(2)
6 B2 20 4 4 ROLLING SHETTER 1 1000 1000

10 R4 32 6 6 1000
40 A 4P
30mA 11 Y4 32 6 6 PORSCHE SECTION 1 3000 1000 CAR LIFT
(3)
12 B4 32 6 6 1000
63A TP ISOLATOR

13 R5 32 6 6 1000
40 A 4P
30mA 14 Y5 32 6 6 PORSCHE SECTION 1 3000 1000 CAR LIFT
(4)
15 B5 32 6 6 1000

16 R6 32 6 6 1000
40 A 4P
30mA 17 Y6 32 6 6 PORSCHE SECTION 1 3000 1000 CAR LIFT
(5)
18 B6 32 6 6 1000

19 R7 32 6 6 500
40 A 4P
30mA 20 Y7 32 6 6 PORSCHE SECTION 1 1500 500 CAR LIFT
(6)
21 B7 32 6 6 500

16 R6 32 6 6 1000
40 A 4P
30mA 17 Y6 32 6 6 PORSCHE SECTION 1 3000 1000 CAR LIFT
(7)
18 B6 32 6 6 1000

19 R7 32 6 6 1000
40 A 4P
30mA 20 Y7 32 6 6 PORSCHE SECTION 1 3000 1000 CAR LIFT
(8)
21 B7 32 6 6 1000

TOTAL 6750 6750 6580 20080


CABLE SIZE: 1X 4C 25mm2 Cu./PVC-XLPE/SWA/PVC & 1x 1C 16mm2 Cu, G/Y PVC, ECC W/H =Water Heater, 'A/C' = FCU, W/M=WASHING MACHINE, FR-FRIDGE
PROJECT: PROPOSED GROUND SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO : - 5310279
DB NO : DB-04 A CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-01 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

CONNECTED LOADS / POINTS LOAD PER CIRCUIT - WATT


RATING OF

RATING OF
INCOMER

CCT ECT
MCB
ELCB
SL. CIR WIRE WIRE WATT/
RTG IN ROOM / AREA 13A 20A 40A REMARKS
NO. NO. SIZE SIZE C. EX. SH 13A 16A HD/ 45A 20A W SPLIT WAT. UNIT
AMPS LTG TW W/H WP WP FCU OTHER R Y B
mm2 mm2 FAN FAN S/O SO ISO WM CCU ISO A/C A/C PUMP
SO ISO ISO

1 R1 10 2.5 2.5 PORSCHE SECTION 3 150 450


40 A 4P
100mA 2 Y1 10 2.5 2.5 PORSCHE SECTION 3 150 450
(1)
3 B1 10 2.5 2.5 SPACE

4 R2 20 4 4 PORSCHE SECTION 1 1000 1000


40 A 4P
30mA 5 Y2 20 4 4 PORSCHE SECTION 1 1000 1000
(2)
6 B2 20 4 4 ROLLING SHETTER 2 1000 2000

7 R3 32 6 6 1000
40 A 4P
30mA 8 Y3 32 6 6 PORSCHE SECTION 1 3000 1000 CAR LIFT
(3)
9 B3 32 6 6 1000
63A TP ISOLATOR

10 R4 32 6 6 1000
40 A 4P
30mA 11 Y4 32 6 6 PORSCHE SECTION 1 3000 1000 CAR LIFT
(4)
12 B4 32 6 6 1000

13 R5 32 6 6 500
40 A 4P
30mA 14 Y5 32 6 6 PORSCHE SECTION 1 1500 500 CAR LIFT
(5)
15 B5 32 6 6 500

16 R6 32 6 6 1000
40 A 4P
30mA 17 Y6 32 6 6 PORSCHE SECTION 1 3000 1000 CAR LIFT
(6)
18 B6 32 6 6 1000

19 R7 32 6 6 1000
40 A 4P
30mA 20 Y7 32 6 6 PORSCHE SECTION 1 3000 1000 CAR LIFT
(7)
21 B7 32 6 6 1000

19 R7 32 6 6 1833
40 A 4P
30mA 20 Y7 32 6 6 PORSCHE SECTION 1 5500 1833
(8)
21 B7 32 6 6 1833

TOTAL 7783.33 7783.33 8333.33 23900


CABLE SIZE: 1X 4C 25mm2 Cu./PVC-XLPE/SWA/PVC & 1x 1C 16mm2 Cu, G/Y PVC, ECC W/H =Water Heater, 'A/C' = FCU, W/M=WASHING MACHINE, FR-FRIDGE
PROJECT: PROJECT G+M SHED LOAD DISTRIBUTION SCHEDULE
PLOT NO : - 5310279
DB NO : DB-EXT CLIENT: ALEX RENNER MOTOR GARAGE
LOCATION :- SAIH SHUAIB 2
FED FROM : MDB-02 CONSULTANT: ALGAFRY CONSULTING ARCHITECTS ENGINEERS

CONNECTED LOADS / POINTS LOAD PER CIRCUIT - WATT


RATING OF

RATING OF
INCOMER

CCT ECT
MCB
ELCB
SL. CIR WIRE WIRE WATT/
RTG IN ROOM / AREA 20A 40A REMARKS
NO. NO. SIZE SIZE C. EX. SH 16A HD/ 45A W SPLIT WAT. UNIT
AMPS LTG W/H WP WP FCU OTHER R Y B
mm2 mm2 FAN FAN S/O ISO WM CCU A/C A/C PUMP
ISO ISO

1 R1 10 2.5 2.5 BOUNDARY WALL 9 60 540

2 Y1 10 2.5 2.5 BOUNDARY WALL 9 60 540

3 B1 10 2.5 2.5 BOUNDARY WALL 9 60 540

4 R2 10 2.5 2.5 BOUNDARY WALL 9 60 540


40 A 4P
100mA 5 Y2 10 2.5 2.5 BOUNDARY WALL 9 60 540
(1)
6 B2 10 2.5 2.5 BOUNDARY WALL 9 60 540

7 R3 10 2.5 2.5 STREET LIGHT 2 250 500

8 Y3 10 2.5 2.5 EXTERNAL WALL 8 36 288


32A TP ISOLATOR

9 B3 10 2.5 2.5 EXTERNAL WALL 8 36 288

10 R4 10 2.5 2.5 EXTERNAL WALL 8 36 288

11 Y4 10 2.5 2.5 EXTERNAL WALL 9 36 324

40 A 4P 12 B4 10 2.5 2.5 CAR PARKING 3 36 108


100mA
(2) 13 R5 10 2.5 2.5 CAR PARKING 3 36 108

14 Y5 10 2.5 2.5 CAR PARKING 3 36 108

15 B5 10 2.5 2.5 CAR PARKING 4 36 144

16 R6 20 4 4 333
40 A 4P
30mA 17 Y6 20 4 4 ENTRANCE NAME BOARD SIGN 1 1000 333
(3)
18 B6 20 4 4 333

19 R7 20 4 4 333
40 A 4P
30mA 20 Y7 20 4 4 ENTRANCE NAME BOARD SIGN 1 1000 333
(4)
21 B7 20 4 4 333
TOTAL 2643 2467 2287 7396
CABLE SIZE: 1X 4C 10mm2 Cu./PVC-XLPE/SWA/PVC & 1x 1C 10mm2 Cu, G/Y PVC, ECC W/H =Water Heater, 'A/C' = FCU, W/M=WASHING MACHINE, FR-FRIDGE