Journal of the Technical University – Sofia


Plovdiv branch, Bulgaria
“Fundamental Sciences and Applications” Vol. 21, 2015
International Conference on Engineering, Technologies and Systems
TECHSYS 2015
BULGARIA

ISO 22400 KEY PERFORMANCE INDICATORS


FOR SOFTWARE INDUSTRY
PLAMEN VASILEV
Abstract: The importance of Metric-driven approach of Management in Software Industry
can be explained by finding the necessary indicators showing the execution of set goals and
allocation of opportunities for improvement. These indicators can be introduced following
industrial standards ANSI/ISA 95, ISO 22400, and the application of Manufacturing
Operations Management (MES/MOM) system for the purposes of Software Industry. The
Key Performance Indicators described in the standard have to be transformed in order to
be meaningful to the needs of Software Industry processes.

Key words: ISA-95, ISO 22400, MES/MOM, MOM4, KPI, Software Industry

Copyright  2015 by Technical University - Sofia, Plovdiv branch, Bulgaria ISSN 1310 - 8271
1. Introduction
The software industry is one of the fastest
growing industries worldwide. Characteristic of the 2. ISO 22400
software industry is that it goes through the stages
of development through which passed the The standard ISO 22400 Automation
traditional manufacturing industry, but within a few systems and integration - Key performance
decades, the emergence of software companies from indicators (KPIs) for manufacturing operations
only a few people to large international companies management, comes as a natural extension of the
with multiple centers around the world and standard ANSI/ISA-95 (IEC 62264) [5, 6]. Since
hundreds of thousands of employees and customers. the standard ANSI/ISA-95 can be applied for the
Each company aims to compete with global purpose of the software industry [8], the
companies to ensure same or rapidly increasing information collected from an ANSI/ISA-95 based
quality at lower prices (Outsourcing), with an MES/MOM system should be analyzed and
increasing level of standard of living. [1,2] presented in a meaningful manner with the help of
This requires the introduction of new methods of specific KPIs for the software industry.
management of the software industry, ensuring the To realize the intended benefits for the software
achievement of high efficiency and reducing losses industry, the information about the process,
as their main source of raising the price of the final employees, used documentation and equipment,
product. [7] collected by the system must be efficiently used in
Since the software development has become a fast- order to improve productivity of the company’s
developing industry in which every company has its resources.
own Business Process Model, a conclusion can be Following ANSI/ISA-95, Figure 1 illustrates the
made that for the modeling of the software kinds of data that are presented in the Key
development process an industrial standard such as Performance Indicators generated at Level 3.
ANSI/ISA-95 can be used.
ISA-95 is the international standard for integration
of enterprise and control systems. ISA-95 consists
of models and terminology for covering all the
activities of for production, maintenance, inventory
and quality. These can be used to determine which
information has to be exchanged between systems
for sales, finance, and logistics and systems for
production, maintenance, and quality. This
information is structured in UML models that cover
all objects in the industry such as Personnel,
Equipment, Material and Process Segment used for
scheduling, execution and analysis tasks.[3]
Key Performance Indicators may also be considered
as economic indicators used to assess the progress
or degree of compliance with regard to important Fig. 1. KPIs in MES/MOM systems
objectives or critical success factors within an
organization. An economic indicator serves as a The Key Performance Indicators can be grouped
basis for decisions (problem identification, in the following categories:
presentation, information extraction), for control
 Temporal Key Performance Indicators
(target / actual comparison), for documentation
and/or for coordination (behavior management) of  Key Performance Indicators by Order
important facts and relationships within the  Key Performance Indicators by
company. Production Unit
KPIs alone are not sufficient factors to perform the
necessary management and execution operations for
an enterprise. For many of the indicators, the actual
threshold may have to be defined as company-
specific. If the value of the indicator exceeds or falls
below the limit, actions are intended to be initiated
to improve efficiency. It is necessary to define
warning and action limits. Warning limits help to
detect the trends in process and equipment changes
before enterprise-defined thresholds are violated.[4]
Fig.2. Time lines for order processing

Fig. 4. State transitions of Production Order and


Work Order

Example of state transition for Production Order:


• DRAFT – The Production Order (PO) enters in
state "DRAFT" by default when created in the
system. PO can be edited and deleted, and is open to
group additional Customer Orders.
• ACK - capable of handling PO, PO is accepted for
planning and closed for grouping of new Customer
Fig. 3. Time lines for Production Unit Orders (if there are such objects in the system). The
PO can be deleted.
• OPO - "Open Production Order" in this state for
3. Key Performance Indicators For the PO are added production rules, a routing with
Software Industry Work Orders and material lots in state "Virtual" is
built. PO can be rescheduled.
The calculation of Key Performance • FPO - "Freeze Production Order" in this state the
Indicators only makes sense if it is a part of an PO is removed from any further rescheduling, any
overall system which includes Resource editing operations are not allowed. The PO takes
Management, Planning and Scheduling, Execution capacity in the calendar.
and Calendar Management. In such system all the • RELEASE - shows that the PO is ready for
objects must have the needed properties and production and the WOs can be sent for execution.
behavior which can be realized by the means of • INPROC - "In Process" is taken automatically
state transitions of these objects (i.e. Production when the first lot of the first WO enters in state
Order, Work Order, etc.). The following examples "InProcess"
of state transitions are taken from ANSI/ISA-95 • FINISHED - shows that all relevant lots to last
based MES/MOM system MOM4 of the company WO are completed. Information from PO is
NearSoft Europe GmbH.[9] recorded and archived for further reporting and
analysis.
• STOP – The PO passes at a standstill, when a WO
is stopped.
Example of state transition for Work Orders:
• DRAFT – Work Order (WO) accepts state
"DRAFT" when entered manually. WO information
can be entered and edited.
• READY – The WO accepts state "Ready" when it
is ready to be sent for execution. The PO should be
in state "RELEASE".
• RELEASE – The WO enters in state "Release"
when physical consumed batch of materials enters
in state "Reserved".
• PROD or InProcess – The WO accepts state "In
Process" when the first batch of consumed physical
materials enters instate "InProcess". The Delay Time is the sum of the preparation times
• FINISHED – The WO enters in state "Finished" of all Work Orders
when the last batch of physical material produced
Down Time (DoT, SZ) = SUM (WO DownTime)
and consumed goes into state "Finished". When the
WO is the last one for a PO, the PO changes its Shows the sum of Downtimes in one Production
state to "Finished". The PO is archived for Order
subsequent reports and analyzes. B) Temporal Key Performance Indicators
• STOP – The WO passes at a standstill, when a task for Work Order
is stopped. [10]
WO Standard Busy Time (pBT) = SUM (LOT
The following Key Performance Indicators will be StdTime)
presented for the purpose of Software Industry: Shows the sum of Standard Times for production of
A) Temporal Key Performance Indicators lot (in Software Industry a lot may be a document or
for Production Order a program code).
Time to accept PO for planning (TAPO) [hr] = WO Busy Time ( eBT) = SUM (LOT Split Consumed
EnterACK - DateCreated Time)
This indicator shows the time span between the date Shows the sum of times for consuming a lot
of creation of the Production Order and the time (reading a specification or a design document)
that the Production Order is accepted
(ACKNOWLEDGED) for Planning. WO Transport and Waiting Time (TT) = first Lot
(EnterAvailable – EnterRelease)
Time to schedule a PO (SPO) [hr] = EnterEXE -
EnterACK Shows the time between the finalization of a lot
(preparation of a document or a program) to its
Shows the time span for planning the Production approval. Includes the meetings and discussions.
Order up to the time it is sent for execution.
Planned Order duration PO (POT) [hr] = Process Time (PCT, BAZ) = SUM (LOT
ExpectedEndDate –Expected StartDate TimeInProcess) It is calculated as a sum of times
Shows the scheduled time span for execution of for processing a lot.
Production Order. WO Delay Time (DeT, SU) = WO EnterFinished -
Execution time (TPT) [hr] = ActualEndTime - WO LatestEndTime
ActualStartTime The Delay Time of Work Orders is calculated as a
Shows the actual time span for execution of the difference between the times of finishing a task
Production Order. (WO) and the scheduled latest end time for this
task.
PO OTIF = RecommendedFinishDate -
ActualEndTime WO Down Time (DoT, SZ)

Shows the Production Orders delivered on time (if It is calculated as a sum of the durations of all
possitive). Downtimes
C) Key Performance Indicators by Order
PO Standard Busy Time (pBT) = SUM (WO
Standard Busy Time) Efficiency = SUM (Standard Time/Split Consumed
Time)
It is calculated as a sum of Standard Busy Times of
the Work Orders included in the Production Orders. Efficiency is calculated as a sum of ratios between
Standard Time for “consuming” a lot and the Actual
PO Busy Time (eBT) = SUM (WO Busy Time)
Time for it.
It is calculated as a sum of Actual Busy Times of
Reworks = SUM (Reworks)
the Work Orders included in the Production Orders.
It is an important indicator, showing the sum of the
Process Time (PCT, BAZ) = BT – DeT SUM (WO
durations of reworked lots (i.e. bug found and sent
TimeInProcess)
back for development or unclear specification, etc.).
It is calculated as a difference between Busy
Time and the Delays of all Work Orders. PO Allocation Degree = BT (Busy
Time)/TPT(Execution (Lead) Time)[%]
Delay Time (DeT, SU) = SUM (WO Preparation
Time) It is calculated as a ratio between the actual Busy
Time for a Production Order and the Lead Time (the
time between receiving the order up to its The allocation efficiency is the ratio between the
finishing). The Allocation Degree is an important real allocation time of a workplace and planned
indicator, showing the “density” of the process and time for allocating the workplace.
the load of every workplace.
Efficiency = PDT / BT [%]
PO Throughput = PQ (Produced Quantity) / TPT
The efficiency is the portion of the main usage time
(Execution Time) [units/hour]
of the entire allocation time, thus it is a measure for
The Throughput is a major indicator that shows the the productivity of the workplace. Since only the
ratio between produced units (documents, operating time is value-adding and is remunerated
programs, etc.) and the Execution Time. The by the market, for a company it must be the goal to
tracking of this indicator may lead to correction of increase this portion drastically.
the standard times for execution of a product It is calculated as a ratio between Main Usage Time
(version, release, etc.) and Busy Time.
Operational Time (OT) = SUM (Shift Time) Shift Availability = PDT/PBT [%]
Duration
It is calculated as a ratio between Main Usage Time
This indicator represents the operational time in and Effectiveness = Total Standard Time / Time In
which the employees can be used. process and Planned Allocation Time
Planned Allocation Time (PBT) = OT – planned Effectiveness = Total Standard Time / Time In
stops (Total Expected Stoppages) process
It is calculated as a difference of the Operational It represents the ratio between Total Standard Time
Time and the sum of all planned stoppages (i.e. for execution of some activity and the actual Time
lunch breaks, office administration work, etc.). This in Process of the Work Order for that activity.
is the time that can be used for execution of tasks.
Quality Rate = GQ (Good Quantity Prime MLs) /
Busy Time (BT) = PBT – SUM (downtimes with PQ (Produced Quantity) [%]
mainType = SetUp and subtype != Installation II
It is calculated as a ratio of the produced lots with
Configuration (preparation times))
no quality issues and the whole produced lots.
It is calculated as a difference between Planned
OEE index = Availability*Effectiveness*Quality
Allocation Time and the sum of all Downtimes with
Rate [%]
Main Type – Setup and Sub Types that are not
Installation or Configuration (strictly for Software
Industry). In the conventional manufacturing industry Overall
Equipment Effectiveness (OEE) is a measure for
Processing Time= BT – SUM (DownTimes with
the efficiency of machines and/or plants,
Main Type != SetUp)
manufacturing cells with several machines or an
It is calculated as the difference between the Busy entire assembly line. The OEE Index forms the
Time and the sum of Downtimes which Main Type basis for improvements by better production
is not Setup. information, identification of production losses,
Main Usage Time (PDT) = TimeInProcess (PCT) and improvement of the product quality by
= PCT – SUM (Setup Times) optimized processes.
The OEE Index represents the used availability, the
It is calculated as a difference between the Time in effectiveness of the production unit, and their
Process and the sum of all Setup Times quality rate summarized in a characteristic number.
SetUpTimes (DeT) = SUM (Downtimes with For the purpose of Software development the OEE
MainType = SetUp and SubType = Installation && Index will be calculated for each workplace.
Configuration) Reworking Ratio = Rework Quantity / Produced
It represents the sum of all Downtimes with Main Quantity
Type Setup and Sub Type – Installation and An important indicator that shows the relevant
Configuration reworked quantity of lots is:
D) Key Performance Indicators by Time Utilization = Time In Process / Shift Duration
Production Unit (Workplace)
Actually this is the ratio between the “InProcess”
Allocation Efficiency = BT (Busy Time)/ PBT time spans of all WO and the shift duration.
(Planned Allocation Time) [%]
Standard Time Utilization = Total Standard Time / each request is estimated by Story Points or other
Shift Duration tangible indexes in terms of size and complexity
and usually measured in man-hours (mhrs). The
Represents the aim of the performance indicator and
request is decomposed to tasks (Work Orders) that
it is calculated as a ratio between the standard time
have to be time-estimated by some Standard Time.
and the shift duration. [6,10]
This Standard Time may be approximately set by
4. Conclusions executing a spectral analysis on a Task backlog (for
requests with similar characteristics). The Lead
All these Key Performance Indicators aim Time then can be calculated by using Standard Time
to better visualize the process of software and OEE index (if OEE index is given in %) as:
development by accentuating on temporal and
Lead Time = Standard Time / OEE index / 100
workplace metrics. Based on these calculations and
measurements, the company management is Fig. 5 illustrates some of the described KPIs by
responsible to find the opportunities for workplace. The first two charts visualize the OEE
improvement and to take the necessary actions to index as Normal Distribution and its trend by shift
gain advantages and to update the set goals. For this for a given period of time. The rest two charts
purpose, additional embedded Statistical Process represent performance and quality indicators for the
Control (SPC) tools can be used to determine given period.
averages, standard deviations, normal distributions,
correlations, norms, etc. for tasks grouped by
similar characteristics and their calculated KPIs.

Fig. 5. Examples of Software Development KPIs in


MOM4

Using fully operational MES/MOM system, such as


MOM4, where additional custom specific KPIs can
be easily configured and calculated, enables the
adoption of “Management and Control by KPIs”
concept (Metric-driven management), where a
feedback information from the whole software
development process is available and can be used
for goals revision on every workplace
(automatically or manually by the manager),
pinpointing reserves and optimizing the standards in
the company.

An example of using Key Performance Indicators


may be given for calculation of Lead Time for each
task in the scheduling phase, where depending on
the person assigned (Workplace) for a given task,
the Lead Time can vary. In the scheduling phase
REFERENCES indicators (KPIs) for manufacturing operations
management
1. http://computerworld.bg/41567_softuernata_in 7. H. Kerzner, Project Management Metrics,
dustriya_u_nas_generira_oborot_ot_okolo_750 KPIs, and Dashboards, A Guide to Measuring
_mln_lv_godishno and Monitoring Project Performance, John
Wiley & Sons, Inc., 2011
2. Стратегически изисквания на софтуерната 8. P. Vasilev, WASTE REDUCTION IN THE
индустрия за реформа на образователната SOFTWARE INDUSTRY USING ANSI/ISA-
система, БАСКОМ, 2012 S95 STANDARD, AUTOMATICS AND
3. ANSI/ISA-95.00.01-2000, Enterprise-Control INFORMATICS, prepared to be published
System Integration Part 1: Models and 9. http://nearsoft.eu/wp-
Terminology content/uploads/2013/09/MOM4Flyer-EN.pdf
4. D. Parmenter, Key Performance Indicators 10. NearSoft MOM4 Functional Documentation
Developing, Implementing, and Using Winning
KPIs, John Wiley & Sons, Inc., 2007 Authors’ Contacts
5. B. Miller, "Key Performance Indicators Address: University of Chemical
Measurement for Web Development," Technology and Metallurgy
CSPreston, 2010., Department of Industrial Automation
6. ISO Standards, IEC/ISO 22400: Automation 8 Kl. Ohridski, 1756 Sofia, Bulgaria
systems and integration - Key performance E-mail:
PLAMENVASILEV2@GMAIL.COM