Академический Документы
Профессиональный Документы
Культура Документы
Document
Material Requirement
Planning
Business Blueprint Document SCPL-BBP-PP-
Material
Requirement
Planning
Document Information
Document Identification SCPL-BBP-PP-Material Requirement Planning
Name Organization/Title
Gaurav Wani SCPL/Project Manager
Hemant Sontakke SCPL/BPO
Shirish Bhandare SCPL/Functional Team
Manish Yadav SCPL/Functional Team
Sujan Kelvalkar SCPL/Functional Team
Table of Contents
1 Process Introduction....................................................................................................................... 4
1.1 Business Process Overview: ................................................................................................. 4
2 As-Is Process Details ...................................................................................................................... 5
2.1 Description .............................................................................................................................. 5
2.2 As-Is Reporting Details ......................................................................................................... 5
3 Process on SAP (To-Be) ................................................................................................................. 6
3.1 Demand Management ........................................................................................................... 6
3.1.1 Prerequisite Master Data ............................................................................................. 6
3.1.2 SAP Transaction Codes ................................................................................................ 7
3.1.3 Customization Requirements (Application & Software) .......................................... 7
3.1.4 SAP Reports ................................................................................................................... 7
3.2 Material Requirements Planning .......................................................................................... 7
3.2.1 Prerequisite Master Data ............................................................................................. 8
3.2.2 SAP Transaction Codes ................................................................................................ 9
3.2.3 Customization Requirements (Application & Software) .......................................... 9
3.2.4 SAP Reports ................................................................................................................... 9
3.3 Consumption-based planning............................................................................................... 9
3.3.1 Description ..................................................................................................................... 9
3.3.2 Prerequisite Master Data ........................................................................................... 10
3.3.3 SAP Transaction Codes .............................................................................................. 10
3.3.4 Customization Requirements (Application & Software) ........................................ 10
3.3.5 SAP Reports ................................................................................................................. 10
4 Change implications – Benefits .................................................................................................... 11
5 Change implications – Risks ........................................................................................................ 12
6 Change implications – Action plan............................................................................................... 13
1 Process Introduction
This document identifies the business process of Production planning from the demands
flowing from different sources like Forecast and Sales Order.
2.1Description
This section describes the existing processes for production planning in SOUJANYA COLOR.
Currently, forecast, planning process and production batch scheduling are being carried out
in local ERP system i.e. Tally. In SOUJANYA, two main type of planning scenario exist as below
1) Planning of materials on forecast basis
2) Planning of materials for incoming sales orders. The detail list of planning processes
are mentioned below.
Demand forecast is prepared by the sales team and sent across to production
planning department on a monthly basis
From 20th to 22nd of every month, plan for the next month is shared with the supply
chain team
Supply chain team adjusts the plan to account for the finished good stock-in-hand.
After this, the MRP run schedule is released to the purchase department and the
production plan is released to the production planning department, on the 24th of
the same month.
From 28th of the same month, production begins for the most common / fast
moving batches
Between 05th to 07th of the subsequent month, confirmed sales orders are received
from the customers and the plans are revised accordingly
Specific raw materials are procured only when the confirmed orders are received
from customers
In case of imported items, forecast for 3 months is requested from the customer
3.1Demand Management
The function of Demand Management is to specify the requirement quantities and
delivery dates for finished or semi-finished products.
For SOUJANYA COLOR, forecast (make to stock) on the basis of last 2 to 3 months sale is
used for planning of all finished products. However, business requires to consider sales
order as well if the order quantity is more than the forecast.
Template for uploading the forecast will be designed specifically for SOUJANYA. A custom
program will be designed wherein we will use Excel format to upload the forecast.
In SAP, various planning strategies are used to cater different planning scenarios. For
SOUJANAY, we recommend strategy 40 which is planning with final assembly. If the sales
order quantity is more than the forecast then additional material will be planned.
If the incoming sales order quantity is less than the forecast then additional requirements
based on the forecast will be produced or procured. This additional production or
procurement will be used for the adjustment of next month/weeks forecast automatically
by the system.
Prerequisites:
Customer Sales Plan from Customer or Marketing Department for creating PIR or firm Sales
Order.
For SCPL, MRP will be carried out at Plant level and at material level in specific cases. As all
Finished Products are Make to stock, however we need to consider confirmed sales orders for
the planning run. Forecast and sales order will be trigger points for planning of all finished
goods. For, finished goods, semi-finished goods & PM dependent requirements will be
generated. For, semi-finished goods, RM and intermediate will be the dependent requirements
to be generated.
Net requirements are calculated during the planning run for every material. For this
calculation, the system checks whether the requirements are covered by the stock and
planned receipts from Purchasing or Production. If the requirements cannot be covered, the
planned order for in-house production and purchase requisitions / planned order for externally
procured components are created.
During the planning run scheduling is carried for the planned order to calculate the start and
finish dates for the planned order (Production).
To be configured:
3.3Consumption-based planning
3.3.1 Description
Consumption-based planning is based on historical data and uses material forecasts or
statistical procedures to determine future requirements. Consumption-based planning
procedures do not refer to the production plan, i.e. requirements calculation is not triggered
by independent or dependent requirements. It is either triggered by the available stock level
falling below the reorder point or by forecast requirement calculated from historical data.
Re-order point planning: In reorder point planning, the system checks whether the
available stock level falls below the reorder point defined for the material. If it does,
procurement must be triggered. You can determine the reorder point manually or, it
can also be calculated automatically using the material forecast.
In SOUJANYA COLOR, consumables will be planned using Re-Order point planning.
The reporting requirements other than the listed in above report sections will be finalized in
RICEFW sessions.
Deloitte refers to one or more of Deloitte Touche Tohmatsu Limited, a UK private company limited by guarantee, and its network of
member firms, each of which is a legally separate and independent entity. Please see www.deloitte.com/about
(http://www.deloitte.com/about) for a detailed description of the legal structure of Deloitte Touche Tohmatsu Limited and its member
firms.
This material has been prepared by Deloitte Touche Tohmatsu India LLP (“DTTILLP”), a member of Deloitte Touche Tohmatsu
Limited, on a specific request from you and contains confidential information. The information contained in this material is intended
solely for you thereby, any disclosure, copy or further distribution of this material or the contents thereof is strictly prohibited.
©2017 Deloitte Touche Tohmatsu India LLP. Member of Deloitte Touche Tohmatsu Limited