DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION,

TESTING, COMMISSIONING AND MAINTENANCE OF ELECTRIFIED


DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU

BIM MODEL QUALITY REVIEW

MODEL NAME : LABIS STATION REPORT NO. :

DATE RECEIVED : REVIEWED BY : M.ZULHUSNI CHE RAZALI DATE:27/10/2018

SECTION / BLOCK / CHAINAGE : S2 / BLOCK4 / CH616557 VERIFIED BY : SYED AHMAD FAIRUS DATE:

DISCIPLINE : ARCH / C&S / MEP CONSULTANT REP. : DATE:

No Diagram / Screenshot / Description SIPP-YTL comments Consultant’s Response Status

Design Drawings 2D / 3D Models

 Location of column shift from CAD file OPEN

NOTE: 1: Status of model


OPEN
PENDING
CLOSED
NOTE 2: All model MUST BE update based on BEP and SIPP-YTL’s comment.
Rev.2 – 31/05/2018
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION,
TESTING, COMMISSIONING AND MAINTENANCE OF ELECTRIFIED
DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU

 Floor Concrete appear in Pile Cap


OPEN
Layout

 Location of Pile Cap not accurate ( Not


OPEN
Tally With 2D

NOTE: 1: Status of model


OPEN
PENDING
CLOSED
NOTE 2: All model MUST BE update based on BEP and SIPP-YTL’s comment.
Rev.2 – 31/05/2018
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION,
TESTING, COMMISSIONING AND MAINTENANCE OF ELECTRIFIED
DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU

 Location of pilling not accurate at grid OPEN


line P7a

SSP Models With NRY Model

 Structure Model Clash With Façade


OPEN
Model

NOTE: 1: Status of model


OPEN
PENDING
CLOSED
NOTE 2: All model MUST BE update based on BEP and SIPP-YTL’s comment.
Rev.2 – 31/05/2018
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION,
TESTING, COMMISSIONING AND MAINTENANCE OF ELECTRIFIED
DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU

 Architecture Floor Clash with Structure


Beam

OPEN

 Structure Beam Clash with Façade


OPEN
model

NOTE: 1: Status of model


OPEN
PENDING
CLOSED
NOTE 2: All model MUST BE update based on BEP and SIPP-YTL’s comment.
Rev.2 – 31/05/2018
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION,
TESTING, COMMISSIONING AND MAINTENANCE OF ELECTRIFIED
DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU

 Pipe From Architecture model clash


OPEN
with Façade model

 Stair For Architecture and Structure


OPEN
Clash

NOTE: 1: Status of model


OPEN
PENDING
CLOSED
NOTE 2: All model MUST BE update based on BEP and SIPP-YTL’s comment.
Rev.2 – 31/05/2018
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION,
TESTING, COMMISSIONING AND MAINTENANCE OF ELECTRIFIED
DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU

 Facade level model inside structure


OPEN
model ( Clash issue)

 Steel Structure model clash with façade


OPEN
model

NOTE: 1: Status of model


OPEN
PENDING
CLOSED
NOTE 2: All model MUST BE update based on BEP and SIPP-YTL’s comment.
Rev.2 – 31/05/2018
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION,
TESTING, COMMISSIONING AND MAINTENANCE OF ELECTRIFIED
DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU

 Façade model Clash with Structure


OPEN
model

NOTE: 1: Status of model


OPEN
PENDING
CLOSED
NOTE 2: All model MUST BE update based on BEP and SIPP-YTL’s comment.
Rev.2 – 31/05/2018