PROJECT NAME:

PROJECT LOCATION:

Qty
Item No. Description OF Works
(A)

A. GENERAL REQUIREMENTS
1.0 General Requirements

1.10 Mobilization and Demobilization


1.20 Bonds and Insurances
1.30 Permits and Licenses
1.40 Temporary Facilities / Utilities
1.50 Provision for Scaffoldings
1.60 Site Security
1.70 Safety Occupational Hazards
1.80 As- Built Plans
1.90 Environmental Compliance Certificate EXCLUD
1.10 Testing of Materials
1.11 Clearing, cleaning, and Hauling of Debris
1.12 Equipment Cost During Construction
1.13 Handling of Materials

Other work items not mentioned in item 1.0 but necessary to complete the General Requirements (Please identify

Sub-total Cost, Item 1.0

B BUILDING
2.00 EARTHWORKS

2.1 Structural Excavation


2.2 Gravel Bedding
2.3 Backfilling and Compaction
2.4 Earthfill and Compaction
2.4 Soil Poisoning
2.5 Hauling and Disposal of unnecessary debris

Other work items not mentioned in item 2.1 but necessary to complete the Earthworks (Please identify)

Sub-total Cost, Item 2.1

3.0 CONCRETE

3.1 Concrete Forms and Accessories


3.1.1 Footing
3.1.2 Wall Footing
3.1.3 Footing Tie Beam
3.1.4 Beam
3.1.5 Column
3.1.6 Suspended Slab
3.1.7 Slab-on-Grade
3.1.8 Stairs
3.1.9 Genset Pad
3.1.10 Conrete Gutter
3.1.11 Cistern Tank
3.1.12 Fire Reserve Tank
3.1.13 Column Stiffener
3.1.14 Lintel Beams

3.2 Concrete Reinforcment


3.2.1 Footing
3.2.2 Wall Footing
3.2.3 Footing Tie Beam
3.2.4 Beam
3.2.5 Column
3.2.6 Suspended Slab
3.2.7 Slab-on-Grade
3.2.8 Stairs
3.2.9 Genset Pad
3.2.10 Conrete Gutter
3.2.11 Cistern Tank
3.2.12 Fire Reserve Tank
3.2.13 Column Stiffener
3.2.14 Lintel Beams

3.3 Cast-in-Place Concrete


3.3.1 Footing
3.3.2 Wall Footing
3.3.3 Footing Tie Beam
3.3.4 Beam
3.3.5 Column
3.3.6 Suspended Slab
3.3.7 Slab-on-Grade
3.3.8 Stairs
3.3.9 Genset Pad
3.3.10 Conrete Gutter
3.3.11 Cistern Tank
3.3.12 Fire Reserve Tank
3.3.13 Column Stiffener
3.3.14 Lintel Beams

Other work items not mentioned in item 3.0 but necessary to complete the Concrete (Please identify)

Sub-total Cost, Item 3.0

4.0 MASONRY WORKS

4.1 Unit Masonry


4.1.1 150 mm thk CHB
4.1.1.1 CHB 6"
4.1.1.2 Cement
4.1.1.3 Sand
4.1.1.4 Reinforcement (10mm dia)

4.1.2 100 mm thk CHB


4.1.2.1 CHB 4"
4.1.2.2 Cement
4.1.2.3 Sand
4.1.2.4 Reinforcement (10mm dia)

Other work items not mentioned in item 4.0 but necessary to complete the Masonry Works (Please identify)

Sub-total Cost, Item 4.0

5.0 METALS

5.1 Structural Metal Framing

5.1.1 Planted Steel Columns


5.1.1.1 PSC1 - 175 x 100 x 4MM
5.1.1.2 PSC2 - 150 x 100 x 3MM

5.1.2 Roofing Trusses


5.1.2.1 RT1 - 175 x 100 x 4mm x 6m
5.1.2.2 RT2 - 150 x 100 x 3mm x 6m
5.1.2.3 ST1 - 2 - LC 100 x 50 x 2mm x 6m
5.1.2.4 Purlins - LC 150 x 65 x 20 x 2mm x 6m
5.1.2.5 Sagrod - 10ø

Miscellaneous Items (e.g. Connection Plates, Reinforcing Plates, Stiffener


5.1.4
Plates,seat angles etc.)

5.50 Non-Structural Metal Fabrications

5.52.1 Tubular Stainless Steel Accent


5.52.1.1 100X200mm Stainless Steel Tubular
5.52.1.2 16mm THK Baseplate
5.52.1.3 3/4" dia. Anchor Bolts
5.52.1.3 50X100mmX2mm Tubular Steel Support
5.52.1.3 16mm THK Stainless Structural Baseplate
5.52.1.3 Miscellaneous

5.52.2 Stairs and Corridor Railing


5.52.2.1 25 x 25x 1.5mm Tubular
5.52.2.1 50 x 50 x 1.5mm Tubular
5.52.2.1 10mm THK Clear Tempered Glass
5.52.2.1 50 x 100mm Stainless Tubular
5.52.2.1 ACCU Grating Stainless Steel Tubuilar
5.52.2.1 Miscellaneous

Other work items not mentioned in item 5.0 but necessary to complete the Metals (Please identify)
Sub-total Cost, Item 5.0

7.00 THERMAL AND MOISTURE PROTECTION

7.1 Waterproofing
7.1.1 Waterproofing - Floor T&B Area, 5 fly Membrane
7.1.2 Waterproofing - Roof Deck Slab, 5 fly Membrane

7.2 Thermal Protection


7.2.1 Roofing Insulation (Double)
7.2.2 1/2 Marine Plywood

7.3 Roofings
7.3.1 G.A. 22 Rib Type Long Span Metal Roofing
7.3.2 Stainless Steel Gutter Gauge 24

7.4 Skylight Roofing


7.4.1 Polycarbonate Roofing-2 (Verify Color/Pattern)
7.4.2 Polycarbonate Roofing-3 (Verify Color/Pattern)
7.4.3 100 x 200mm Aluminum Framing (Dark Color)
7.4.4 Aluminum Clading complete w/ waterproofing sealant
7.4.5 Miscellaneous

7,5 Entrance Gate


7.5.1 25X50X1.5mm Tubular
7.5.2 50X50X1.5mm Tubular
7.5.3 Miscellaneous

Other work items not mentioned in item 7.0 but necessary to complete the Thermal & Moisture Protection (Please

Sub-total Cost, Item 7.0

8.00 OPENINGS

8.10 Doors including Jambs & Finish Hardware


D1 - 10mm thk Glass Door Panel with 50x150mm Powder Coated Aluminum
8.10.1
Frame
8.10.2 D2 - PVC Swing Type Door
8.10.3 D3 - Stainless Steel Double Swing Door
8.10.4 D4 - Stainless Steel Swing Type Door
8.10.5 D5 - PVC Swing Type Door
D6 - 10mm thk Glass Door Panel with 50x150mm Powder Coated Aluminum
8.10.6
Frame

8.50 Windows including Frames, Accessories & Finish Hardwares


W1 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.1
Frame
W2 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.2
Frame
W4 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.3
Frame
W5 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.4
Frame
W6 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.5
Frame
W7 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.6
Frame
8.5.7 W8 - Stainless Steel Air Vent Window Louver Type Window
8.5.8 W9 - Sliding Type Glass Window with Black Aluminum Frame Glass Window

8.5.9 W10 - Sliding Type Glass Window with Black Aluminum Frame Glass Window

8.5.11 W11- Sliding Type Glass Window with Black Aluminum Frame Glass Window

8.5.11 W12 - Fixed Type Glass Window with Black Aluminum Frame Glass Window

8.5.11 W13 - Fixed Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W14- Stainless Steel Air Vent Window Louver Type Window

Other work items not mentioned in item 8.0 but necessary to complete the Openings (Please identify)

Sub-total Cost, Item 8.0

9.00 FINISHES

9.20 Plaster
9.20.1 20mm thk Cement Plaster for 150mm CHB
9.20.1.1 Cement
9.20.1.2 Sand
9.20.2 20mm thk Cement Plaster for 100mm CHB
9.20.2.1 Cement
9.20.2.2 Sand

9.50 Ceilings
9.50.1 Hardiflex ceiling on metal furring
9.50.2 Exposed Slab

9.60 Floorings
400mm x 400mm Stain Proof Homogeous Anti-Slip Porcelain Tiles w/ Anti-
9.60.1
Microbial, Anti-Stain Grout
200mm x 200mm Stain Proof Homogeous Anti-Slip Porcelain Tiles w/ Anti-
9.60.1
Microbial, Anti-Stain Grout
9.60.2 300 x 300mm Non Skid Ceramic Tiles
9.60.3 Plain Cement Finish

9.70 Wall Finishes


9.70.4 300 x 300mm Glossy Finsh Porcelain Tiles

9.90 Paint and Coatings


9.90.1 Exterior Paintings
9.90.2 Interior Paintings
9.90.3 Hardiflex Ceiling Paint
9.90.4 Exposed Slab
9.90.5 Metal Paints

Other work items not mentioned in item 9.0 but necessary to complete the Finishes (Please identify)

Sub-total Cost, Item 9.0

10.00 SPECIALTIES

10.10 Toilet, Bath and Laundry Accessories


10.1.1 Laminated Finish Toilet Cubicle Partition
10.1.2 Urinal Partition, Phenolic Board Finish with Moisture Resistant with Accessories
10.1.3 Mirrors
10.1.4 PWD Grab Bar
10.1.5 Granite Counter Slab
10.1.6 Façade Siganage (By Specialty Contractor)
10.1.8 Left Side Façade Aluminum Cladding (By Specialty Contractor)

Other work items not mentioned in item 10.0 but necessary to complete the Specialties (Please identify)

Sub-total Cost, Item 10.0

5.00 Heating Ventilation and Air Conditioning

5.1 Airconditioning Units


5.1.1 FCU/ACCU 1F-1 to 1F-11, 4-way Ceiling Cassette
Single-Split Type Air Conditioning Units, R-410A Inverter Type
Cooling Capacity : 8.0 KW
Electrical Capacity (Outdoor) : 220V, 1Ph, 60Hz

5.1.2 FCU/ACCU 2F-1 to 2F-13, 4-way Ceiling Cassette


Single-Split Type Air Conditioning Units, R-410A Inverter Type
Cooling Capacity : 8.0 KW
Electrical Capacity (Outdoor) : 220V, 1Ph, 60Hz

5.1.3 Equipment Hanger and Supports


5.1.4 Load/Equipment Side Electrical Works, includes ECB, Wires, and Conduits.
5.1.5 Refrigerant Charge, Miscellaneous, and Consumables

Other work items not mentioned in item 5.1 but necessary to complete the Heating Ventilation and Air Conditionin

Sub-total Cost, Item 23.1

5.2 Airconditioning Piping Works


5.2.1 Refrigrant Line Piping
5.2.2 5/8” (15.87 mm) dia Copper Pipe
5.2.3 3/8” (9.52 mm) dia Copper Pipe
5.2.4 Thermal elastomeric Insulation
25 mm thick Flexible Elastomeric Closed Cell Rubber Insulation for 15.9mm
5.2.5
dia.
5.2.6 25 mm thick Flexible Elastomeric Closed Cell Rubber Insulation for 9.5mm dia.

5.2.7 Condensate Drain Line Piping


5.2.8 1” (25 mm) dia Polyvynil Chloride (PvC) Pipe "blue"
5.2.9 Thermal elastomeric Insulation
5.2.10 25 mm thick Flexible Elastomeric Closed Cell Rubber Insulation for 25mm dia.

5.2.11 Pipes Hanger and Support


5.2.12 Miscellaneous and Consumables

Other work items not mentioned in item 5.2 but necessary to complete the Air Conditioning Pipimg Works (Please

Sub-total Cost, Item 23.2

5.3 Testing, Adjusting and Balancing


5.3.1 Nitrogen Gas needed for copper pipe leak testing
Cladding, painting, civil and electrical works and all standard materials like GI
sheets gage #20 for pipe and duct sleeve, gauge #16 saddle support, flat,
5.3.2
angle and round bar, and elastic cement, also including accessories such as
aluminum tape, gasket clamps, bolt, nut and washer
5.3.3 Testing and Commissioning including Start Up of Air Conditioning Systems

Other work items not mentioned in item 5.3 but necessary to complete the Testing, Adjusting and Balancing (Plea

Sub-total Cost, Item 23.3

5.4 Ventilating Units and Accessories


5.4.1 EF 1 ; Axial Exhaust Fan Ducted Type
Capacity : 850 CMH x 150 Pa
Power : 0.40kW, 220V, 1Ph, 60Hz

5.4.2 EF 2 ; Axial Exhaust Fan Ducted Type


Capacity : 1200 CMH x 200 Pa
Power : 0.60kW, 220V, 1Ph, 60Hz

5.4.3 EF 3 ; Axial Exhaust Fan Ducted Type


Capacity : 850 CMH x 150 Pa
Power : 0.40kW, 220V, 1Ph, 60Hz

5.4.4 EF 4 ; Axial Exhaust Fan Ducted Type


Capacity : 3100 CMH x 250 Pa
Power : 1.0kW, 220V, 1Ph, 60Hz

5.4.5 EF 5 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 255 CMH x 186Pa
Power : 0.06kW, 220V, 1Ph, 60Hz

5.4.6 EF 6 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 128CMH x 75Pa
Power : 0.04kW, 220V, 1Ph, 60Hz

5.4.7 EF 7 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 595CMH x 200Pa
Power : 0.26kW, 220V, 1Ph, 60Hz

5.4.8 EF 8 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 1020CMH x 200Pa
Power : 0.26kW, 220V, 1Ph, 60Hz

5.4.9 EF 9 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 255 CMH x 186Pa
Power : 0.06kW, 220V, 1Ph, 60Hz

5.4.10 EF 10 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 255 CMH x 186Pa
Power : 0.06kW, 220V, 1Ph, 60Hz

5.4.11 EF 11 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 128CMH x 75Pa
Power : 0.03kW, 220V, 1Ph, 60Hz

5.4.12 CF 1 ; Ceiling Fan


Capacity : 255CMH x 100Pa
Power : 0.04kW, 220V, 1Ph, 60Hz

5.4.13 EF 1F-1 to 1F-11 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 462CMH x 100Pa
Power : 0.27kW, 220V, 1Ph, 60Hz

5.4.14 SF 1F-1 to 1F-11 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 462CMH x 100Pa
Power : 0.27kW, 220V, 1Ph, 60Hz

5.4.15 EF 2F-1 to 2F-13 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 462CMH x 100Pa
Power : 0.27kW, 220V, 1Ph, 60Hz

5.4.16 SF 2F-1 to 2F-13 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 462CMH x 100Pa
Power : 0.27kW, 220V, 1Ph, 60Hz

5.4.17 Equipments Hanger and Support


5.4.18 Equpment Accessories and Miscellaneous Materials
5.4.19 Testing and Commissioning including Start Up of Ventilation System

Other work items not mentioned in item 5.4 but necessary to complete the Ventilating units and Accessories (Plea

Sub-total Cost, item 5.4

5.5 Grilles and Other Related Works


5.5.1 Air Terminals
5.5.2 300 x 300 - Exhaust Air Grille
5.5.3 750 x 500 - Exhaust Air Grille
5.5.4 300 x 300 - Bellmouth with Expanded Aluminum Screen
5.5.5 150 x 150 Air Louver
5.5.6 350 x 350 Air Louver
5.5.7 800 x 550 - Exhaust Air Grille

5.5.8 Ventilation Duct Works


5.5.8.1 0.8mm Thick Galvanized Iron Sheet

All standard accessories needed for installation such as vibration isolator,


5.5.9
angle corner, duct clip, dasket, bolt, nut and washer

Other work items not mentioned in item 5.5 but necessary to complete the Grilles and Other Related Works (Plea

Sub-total Cost, Item 5.5

6.00 ELECTRICAL AND AUXILIARY

6.1 FEEDER & SUB-FEEDER :


Panelboards, Ckt Breakers &
Disconnect Switches :
GE Brand

6.1.1 LPAD
Main :
40AT, 3PCB, 400V, BO
Branches :
22-20AT, 1PCB, 230V, BO

6.1.2 PPAD
Main :
40AT, 3PCB, 400V, BO
Branches :
16-20AT, 1PCB, 230V, BO

6.1.3 DPAD
Main :
100AT, 3PCB, 400V, BO
Branches :
2-20AT, 3PCB, 400V, BO
3-40AT, 3PCB, 400V, BO
1-50AT, 3PCB, 400V, BO

6.1.4 FPS
Main :
150AT, 3PCB, 400V, BO
Branches :
1-150AT, 3PCB, 400V, BO
1-20AT, 3PCB, 400V, BO

6.1.5 LVSG
Main :
800AT, 3PCB, 400V, BO
Branches :
1-100AT, 3PCB, 400V, BO
2-150AT, 3PCB, 400V, BO
2-175AT, 3PCB, 400V, BO

6.1.6 (Metering)-1
Ckt. Breaker Gutter in
NEMA-1 w/ Bolt-on Breaker
11-50AT, 1PCB, 230V, BO
( 2.5m x 0.35m x 0.30m )

6.1.7 (Metering)-1
BusBar Gutter in NEMA-1
w/ 4-Bus Bar, Rated 150A
Main :
4-60 sq.mm Terminal Lugs
Branches :
22-8.0 sq.mm Terminal Lugs
( 2.5m x 0.35m x 0.30m )

6.1.8 (Metering)-2
Ckt. Breaker Gutter in
NEMA-1 w/ Bolt-on Breaker
13-50AT, 1PCB, 230V, BO
( 3.0m x 0.35m x 0.30m )

6.1.9 (Metering)-2
BusBar Gutter in NEMA-1
w/ 4-Bus Bar, Rated 175A
Main :
4-80 sq.mm Terminal Lugs
Branches :
26-8.0 sq.mm Terminal Lugs
( 3.0m x 0.35m x 0.30m )

6.1.10 Wire Gutter in NEMA-1 Enclosure

6.1.11 800AT, 3PCB, 400V, BO


in NEMA-3R Enclosure
6.1.12 150AT, 3PCB, 400V, BO
in NEMA-3R Enclosure
6.1.13
150AT, 3PCB, 400V, BO
in NEMA-1 Enclosure

6.1.14 175AT, 3PCB, 400V, BO


in NEMA-1 Enclosure

6.1.15 20AT, 3PCB, 400V, BO


in NEMA-3R Enclosure

6.1.16 50AT, 3PCB, 400V, BO


in NEMA-3R Enclosure

6.1.17 2 x 800AT, 3PCB, 400V, BO


Automatic Transfer Switch

Other work items not mentioned in item 6.1 but necessary to complete the Feeder and Sub-feeder (Please identif

Sub-total Cost, Item 6.1

6.2 LIGHTING & SMALL POWER SYSTEM :


6.2.1 Wiring Devices :
6.2.1.1 PANASONIC Wide Series Brand
6.2.1.1.1 Duplex Convenience Outlet
6.2.1.1.2 Signboard Outlet
6.2.1.1.3 Hand Dryer Outlet
6.2.1.1.4 Emergency Light Outlet

6.2.2 Switches :
6.2.2.1 PANASONIC Wide Series Brand
6.2.2.2 Single Pole Switch
6.2.2.3 2-Gang Switch
6.2.2.4 3-Way Switch
6.2.2.5 Blank Plate Cover

Other work items not mentioned in item 6.2 but necessary to complete the Feeder and Sub-feeder (Please identif

Sub-total Cost, Item 6.2

6.3 LIGHTING FIXTURES :


6.3.1 Lighting Fixtures :
6.3.1.1 Pinlight Outlet
6.3.1.2 Spot light
6.3.1.3 1x40W Fluorescent Lamp
6.3.1.4 Wall Lamp Outlet

Other work items not mentioned in item 6.3 but necessary to complete the Ligthing Fixtures (Please identify)

Sub-total Cost, Item 6.3

6.4 TELEPHONE SYSTEM :


6.4.1 Telephone System Equipment :
PANASONIC Wide Series Brand
6.4.1.1 Tel.Modular Jack Outlet
6.4.1.2 WIFI Outlet
6.4.1.3 Square Box (unit)
6.4.1.4 Tel.Pull Box
6.4.1.5 Tel.Terminal Cabinet (TTC)

Other work items not mentioned in item 6.4 but necessary to complete the Telephone System (Please identify)

Sub-total Cost, Item 6.4

6.4 FIRE ALARM SYSTEM :


6.4.1 Fire Alarm Equipment :
NITTAN Brand
6.4.1.1 FACP (addressable)-1-loop
6.4.1.2 Fire Alarm Manual Station
6.4.1.3 Fire Alarm Bell
6.4.1.4 Smoke Detector
6.4.1.5 Heat Detector
6.4.1.6 Square box
6.4.1.7 Pullbox

Other work items not mentioned in item 6.4 but necessary to complete the Telephone System (Please identify)

Sub-total Cost, Item 6.5

6.5 CCTV SYSTEM :


6.5.1 CCTV System Equipment :
PANASONIC Brand
6.5.5.1 CCTV Camera
6.5.5.2 TV Monitor, B&W
6.5.5.3 CCTV Workstation
6.5.5.4 Telephone Plate Cover
6.5.5.5 CCTV Pull Box (CCTVPB)

Other work items not mentioned in item 6.5 but necessary to complete the CCTV System (Please identify)
Sub-total Cost, Item 6.6

6.7 PA/BGM SYSTEM :


6.7.1 PA/BGM Equipment :
TOA Brand
6.7.1.1 Ceiling Mounted Speaker
6.7.1.2 Paging Amplifier
6.7.1.3 Pull box
6.7.1.4 Pull box (main)

Other work items not mentioned in item 6.7 but necessary to complete the PA/BGM System (Please identify)

Sub-total Cost, Item 6.7

6.8 GROUNDING SYSTEM :


6.8.1 Grounding Equipment :
ORDINARY Brand (Galvanized)
6.8.1.1 Grd. Rod (25mm dia. x 3m)
6.8.1.2 Grd.Clamp Solderless Con.

Other work items not mentioned in item 6.8 but necessary to complete the Grounding System (Please identify)

Sub-total Cost, Item 6.8

6.9 CONDUITS AND FITTINGS :


RSC Pipe, NICHI Brand, +10% on Mla Price
PVC Pipe, EMERALD Brand (base price)

6.9.1 RSC Pipe :


6.9.1.1 80 mm dia. x 3m RSC Pipe
6.9.1.2 80 mm dia. RSC Coupling
6.9.1.3 80 mm dia. Entrance Cap
6.9.1.4 80 mm dia. RSC Elbow
6.9.1.5 80 mm dia. RSC L&B

6.9.2 PVC Pipe :


6.9.1.2.1 75 mm dia. x 3m PVC Pipe
6.9.1.2.2 75 mm dia. PVC Coupling
6.9.1.2.3 75 mm dia. PVC Elbow
6.9.1.2.4 75 mm dia. PVC Adapter
6.9.1.2.5 75 mm dia. PVC L&B

6.9.3 63 mm dia. x 3m PVC Pipe


6.9.1.3.1 63 mm dia. PVC Coupling
6.9.1.3.2 63 mm dia. Entrance Cap
6.9.1.3.3 63 mm dia. PVC Elbow
6.9.1.3.4 63 mm dia. PVC Adapter
6.9.1.3.5 63 mm dia. PVC L&B

6.9.4 40 mm dia. x 3m PVC Pipe


6.9.1.4.1 40 mm dia. PVC Coupling
6.9.1.4.2 40 mm dia. PVC Elbow
6.9.1.4.3 40 mm dia. PVC Adapter
6.9.1.4.4 40 mm dia. PVC L&B

6.9.5 25 mm dia. x 3m PVC Pipe


6.9.1.5.1 25 mm dia. PVC Coupling
6.9.1.5.2 25 mm dia. PVC Adapter
6.9.1.5.3 25 mm dia. PVC L&B

6.9.6 20 mm dia. x 3m PVC Pipe


6.9.1.6.1 20 mm dia. PVC Coupling
6.9.1.6.2 20 mm dia. PVC Adapter
6.9.1.6.3 20 mm dia. PVC L&B 730.17

Other work items not mentioned in item 6.9 but necessary to complete the Conduits and Fittings (Please identify)

Sub-total Cost, Item 6.9

6.10. WIRES AND CABLES :

6.10.1 Power System :


PHILFLEX Brand, +43%
6.10.1 250 sq.mm THHN Wire
6.10.2 80 sq.mm THHN Wire
6.10.3 60 sq.mm THHN Wire
6.10.4 50 sq.mm THHN Wire
6.10.5 30 sq.mm THHN Wire
6.10.6 22 sq.mm THHN Wire
6.10.7 14 sq.mm THHN Wire
6.10.8 8.0 sq.mm THHN Wire
6.10.9 5.5 sq.mm THHN Wire
6.10.10 3.5 sq.mm THHN Wire
6.10.11 3.5 sq.mm THHN Wire (grd/switch)

6.10.2 Telephone System :


6.10.2.1 CAT-6 (4prs)

6.10.3 Fire Alarm System :


6.10.3.1 #1.25 sq.mm TF Wire(twisted)
6.10.4 CCTV System :
6.10.4.1 4 prs BELDEN Brand CAT-6

6.10.5 Paging System :


6.10..5.1 #16 twisted pair

6.10.6 Grounding System :


6.10.6.1 14 sq.mm BCW Wire
6.10.6.2 38 sq.mm BCW Wire

Other work items not mentioned in item 6.10 but necessary to complete the Wires and Cables (Please identify)

Sub-total Cost, Item 6.10

6.11 BOXES :
For All System
FUMACO Brand
6.11.1 J.Box (4" x 4" x 2-1/8")
6.11.2 J.Box Cover
6.11.3 U.Box (2" x 4" x 2-1/8")
6.11.4 Sq.Box (4" x 4" x 2-1/8")
6.11.5 Sq.Box (4 11/16" x 4 11/16")
6.11.6 Pull Box (6" x 6" x 4")
6.11.7 Pull Box (8" x 8" x 6")
6.11.8 Pull Box (10" x 10" x 8")
6.11.9 Pull Box (power)
6.11.10 Pull Box (gset)

Other work items not mentioned in item 6.11 but necessary to complete the Boxes (Please identify)

Sub-total Cost, Item 6.11

6.12 CONSUMABLES :
For All System :
6.12.1 PVC Tape
6.12.2 Hacksaw Blade
6.12.3 GI Wire, GA-#16
6.12.4 PVC Cement
6.12.5 Red Lead Paint
6.12.6 1/2" PVC Flexible Conduit
6.12.7 1/2" Straight Connector
6.12.8 Screws, Tox and Others
6.12.9 Hangers/Support

Other work items not mentioned in item 6.12 but necessary to complete the Consumables (Please identify)
Sub-total Cost, Item 6.12

7.00 PLUMBING WORKS


PIPING SYSTEM
7.1 Storm Drainage Lines
7.1.1 PVC Pipes
7.1.1.1 75mm dia
7.1.1.2 100mm dia
7.1.1.3 150mm dia
7.1.1.4 200mm dia

7.1.2 PPVC Pipes


7.1.2.1 100mm dia

7.1.3 PVC Blue Pipes


7.1.3.1 25mm dia
7.1.3.2 32mm dia

7.1.4 Insulation (for AC drains)


7.1.4.1 25mm dia
7.1.4.2 32mm dia

7.1.5 Catch Basin

7.1.6 Gutter Drain


7.1.6.1 100mm dia

7.1.7 Deck Drain


7.1.1.1 100mm dia

7.1.8 Floor clean Out


7.1.8.1 100mm dia

7.1.9 Floor Drain


7.1.9.1 100mm dia

7.1.10 Trench Drain


7.1.10.11 100mm dia

7.1.11 Pipe Connectors, Fittings and Accessories


7.1.12 Hanger and Support
7.1.13 Hardwares and Consumables

Sub-total amount, Item 7.1

7.20 Sewer and Vent Lines


7.2.1 PVC Pipes
7.2.2.1 50mm dia
7.2.2.2 100mm dia
7.2.2.3 150mm dia

7.2.2 Floor Clean Out


7.2.2.1 100mm dia

7.2.3 Floor Drain


7.2.3.1 100mm dia

7.2.4 Pipe Connectors, Fittings and Accessories


7.2.5 Hanger and Support
7.2.6 Hardwares and Consumables

Sub-total amount, Item 7.2

7.30 Water Supply System


7.3.1 PPR Pipe
7.3.1.1 20mm dia
7.3.1.2 32mm dia
7.3.1.3 40mm dia
7.3.1.4 50mm dia
7.3.1.5 75mm dia
7.3.1.6 Pipe Connectors, Fittings and Accessories
7.3.1.7 Hanger and Support
7.3.1.8 Hardwares and Consumables

Sub-total amount, Item 7.3

7.40 Valves and Water Control


7.4.1 Gate Valve
7.4.1.1 20mm dia
7.4.1.2 25mm dia
7.4.1.3 32mm dia
7.4.1.4 40mm dia
7.4.1.5 50mm dia
7.4.1.6 75mm dia
7.4.1.7 100mm dia

7.4.2 Check Valve


7.4.2.1 32mm dia
7.4.2.2 65mm dia

7.4.3 Flexible Connector


7.4.3.1 32mm dia
7.4.3.2 65mm dia

7.4.4 Wye Strainer


7.4.4.1 32mm dia
7.4.4.2 65mm dia

7.4.5 Water Hammering Arrester

7.4.6 Equalization Valve


7.4.6.1 100mm dia

7.4.7 Surge Anticipating Valve


7.4.8 Float Valve

7.4.9 Water Meter


7.4.9.1 50mm dia

9.4.10 Hardwares and Consumables

Sub-total amount, Item 22.1.4

7.50 Plumbing Fixtures & Other Accessories

7.5.1 Water Closet Tank type w/ complete accessories


7.5.2 Urinals w/ complete accessories
7.5.3 Lavatory w/ Faucet & P-Trap w/ complete accessories
7.5.4 Hosebib
7.5.5 Hardwares and Consumables

Sub-total amount, Item 22.2

7.60 Pumps and Accessories


Constant Pressure Booster Pump; Duplex type booster pump; 70 gpm; 90ft
7.6.1
TDH; 2.5 Hp; 3500rpm; 380V; 3Ø; 60Hz
Constant Pressure Booster Pump ; Duplex type booster pump; 3500rpm; 380V;
7.6.2
3Ø; 60He ; 143 gpm; 90ft TDH; 5 Hp;
7.6.3 Testing and Commissioning

Sub-total amount, Item 22.3

Other work items not mentioned in item 7.0 but necessary to complete the Plumbing (Please identify)

8.00 FIRE PROTECTION SYSTEM

8.1 FIRE PUMP EQUIPMENTS

8.1.1 Fire Pump - UL listed / FM approved,


Vertical Turbine complete with discharge assembly, air release and pressure
gauge, coupled to an electric motor, complete with controller (UL listed / FM
approved) and standard accessories
Capacity : 350 GPM
Total Head : 80 ft
Motor Power : 25Hp, 400V, 3Ph, 60Hz

8.1.2 Jockey Pump - UL listed / FM approved


Electricc Motor Driven, Complete with Controller (UL listed / FM approved) and
standard accessories
Capacity : 10 GPM
Total Head : 90 Ft
Motor Power : 2Hp, 220V, 1Ph, 60Hz

8.1.3 Testing and Commissioning


Other work items not mentioned in item 8.1 but necessary to complete the Fire Pump Equipments (Please identif

Sub-total Cost, Item 8.1

8.2 VALVES AND OTHER RELATED MATERIALS

8.2.1 4" (100mm) dia Automatic Alarm Check Valve including trim and accessories

8.2.2 4" (100mm) dia Pressure Reducing Valve


8.2.3 4" (100mm) dia Gate Valve (OS&Y)
8.2.4 4" (100mm) dia Gate Valve w/ Supervisory Switch
8.2.5 2" (50mm) dia Gate Valve (OS&Y)
8.2.6 4" (100mm) dia Check Valve
8.2.7 1-1/4" (32mm) dia Inspection / Alarm Test Valve
8.2.8 1" (25mm) dia Auxiillary Drain Valve
8.2.9 2-1/2" (65mm) dia. Fire Hose Valve with cap and chain
8.2.10 1-1/2" (40mm) dia. Flush Valve
8.2.11 1/2" (15mm) dia Ball Valve
8.2.12 1/4" (6.4mm) dia Globe Valve
8.2.13 2-1/2" (65mm) dia - two way valve ( Fire Dep't Connection )
8.2.14 2- way FDC Flush Mount Brass Wall Plate
8.2.15 Flow Metering Device
8.2.16 Water Flow Switch
8.2.17 4" (150mm) dia Flexible Rubber Connector
8.2.18 0-200 psi - Pressure Gauge
8.2.19 Sigth Glass
8.2.20 Miscellaneous and Consumable Materials

Other work items not mentioned in item 8.2 but necessary to complete the Valves and Other Related Materials (P

Sub-total Cost, Item 8.2

8.3 FIRE PROTECTION DISTRIBUTION MATERIALS


8.3.1 4" (100mm) dia x 6M Schedule 40 B.I. Pipe
8.3.2 3" (75mm) dia x 6M Schedule 40 B.I. Pipe
8.3.3 2" (50mm) dia x 6M Schedule 40 B.I. Pipe
8.3.4 1-1/2" (40mm) dia x 6M Schedule 40 B.I. Pipe
8.3.5 1-1/4" (32mm) dia x 6M Schedule 40 B.I. Pipe
8.3.6 1" (25mm) dia x 6M Schedule 40 B.I. Pipe
8.3.7 B.I. Fittings
8.3.8 Sprinkler Head; Pendent Type including spare
8.3.9 Sprinkler Head; SideWall Type including spare
8.3.10 Fire Hose Cabinet complete w/ angle valve and other accessories.
8.3.11 10lbs - Portable Fire Extinguisher ( ABC - Dry Chemical )
8.3.12 Pipe Hanger and Support
8.3.13 Miscellaneous and Consumable Materials

Other work items not mentioned in item 8.3 but necessary to complete the Fire Protection Distribution Materials (P

Sub-total Cost, Item 8.3

9.00 CIVIL DEVELOPMENT WORKS

9.1 Road Pavement


9.1.1 Aggregate Base Course
9.1.2 Reinforcement
9.1.3 Formworks
9.1.4 200mm thk Portland Cement Concrete Pavement

9.2 Drainage System


Manhole
9.2.1 50mm x 50mm x 6mm thk Angular Bar
9.2.2 Ladder Rung
9.2.3 Reinforcement
9.2.4 Formworks
9.2.5 Portland Cement Concrete Pavement

9.3 RC Pipiline
Earthworks
9.3.1 RCP 600mmø inclusive of mortar and laying
9.3.2 RCP 375mmø inclusive of mortar and laying

Sub-total Cost, Item 9.0

Other work items not mentioned in item 9.0 but necessary to complete the Civil Development Works (Please iden

Note: *This BOQ is for budgetary puposes only


BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT
Unit Direct Unit Cost MARK-UP IN PERCENT TOTAL MARK-UP
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)

lot
lot
lot
lot
lot
lot
lot
lot
EXCLUDED
lot
lot
lot
lot

Requirements (Please identify)

cu.m.
cu.m.
cu.m.
cu.m.
sq.m.
lot

ks (Please identify)

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

(Please identify)
pcs
bags
cu.m
kgs

pcs
bags
cu.m
kgs

Works (Please identify)

pcs
pcs

pcs
pcs
pcs
pcs
pcs

lot

lm
sq.m
pcs
lm
sq.m
lot

lm
lm
lm
lm
lm
lm

ease identify)
sq.m
sq.m

sq.m
sq.m

sq.m
lm

lot
lot
lot
lot
lot

lm
lm
lot

& Moisture Protection (Please identify)

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

sq.m

sq.m

sq.m
sq.m

sq.m

sq.m
sq.m
sq.m

sq.m

sq.m

sq.m

sq.m
sq.m

(Please identify)

bags
cu.m.

bags
cu.m.

sq.m
sq.m

sq.m

sq.m
sq.m
sq.m

sq.m

sq.m
sq.m
sq.m
sq.m
lm

Please identify)

sets
sq.m
sq.m
set
sq.m
set
set

es (Please identify)

Unit

Unit

lot
lot
lot

entilation and Air Conditioning (Please identify)

Lm
Lm
Lm

Lm

Lm

Lm

lot
lot

ioning Pipimg Works (Please identify)

lot

lot

lot

djusting and Balancing (Please identify)

Unit

Unit

Unit

Unit

Unit

Unit
Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

lot
lot
lot

g units and Accessories (Please identify)


pcs
pcs
pcs
pcs
pc
pcs

sqm

lot

d Other Related Works (Please identify)

assy

assy

assy

assy
assy

assy

assy

assy

assy

lms

assy
assy

assy

assy

assy

assy

assy

nd Sub-feeder (Please identify)

sets
sets
sets
sets

sets
sets
sets
sets

nd Sub-feeder (Please identify)

sets
sets
sets
sets

ixtures (Please identify)

sets
sets
assy
assy
assy

e System (Please identify)

sets
sets
sets
sets
sets
sets
sets

e System (Please identify)

sets
sets
sets
sets
assy

stem (Please identify)


sets
sets
sets
sets

System (Please identify)

sets
sets

g System (Please identify)

lghts
sets
sets
sets
sets

lghts
sets
sets
sets
sets

lghts
sets
sets
sets
sets
sets

lghts
sets
sets
sets
sets

lghts
sets
sets
sets

lghts
sets
sets
sets

and Fittings (Please identify)

lms
lms
lms
lms
lms
lms
lms
lms
rls.
rls.
rls.

lms

rls.
lms

rls.

lms
lms

nd Cables (Please identify)

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

Please identify)

rls.
pcs.
lms.
cans
gals.
lms.
pcs.
lot
lot

ables (Please identify)


sq.m
lgth
lgth
lgth
lgth

lgth

lght
lght

lght
lght

units

pcs

pcs

pcs

pcs

pcs

lot
lot
lot

lgth
lgth
lgth
pcs

pcs

lot
lot
lot

lgth
lgth
lgth
lgth
lgth
lot
lot
lot

pcs
pcs
pcs
pcs
pcs
pcs
pcs

pcs
pcs

pcs
pcs

pcs
pcs

pcs

pc

pc
pc

pc

lot

sets
sets
sets
pcs
lot

set

set
lot

(Please identify)

set

set

lot
p Equipments (Please identify)

pc

pc
pcs
pcs
pc
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pc
pc
pcs
pc
pcs
pcs
lot

d Other Related Materials (Please identify)

lgth
lgth
lgth
lgth
lgth
lgth
lot
pcs
pcs
pcs
pcs
lot
lot

ction Distribution Materials (Please identify)

cu.m
kgs
sq.m
cu.m

kgs
l.m
kgs
sq.m
cu.,

cu.m
l.m
l.m

elopment Works (Please identify)

GRA
COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
VALUE INDIRECT VALUE
(H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
GRAND TOTAL COST OF THE PROJECT
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)
(L=I+K) (N)

xxxxxx

xxxxxxx
xxxxxx
xxxxxxx
xxxxxxx

xxxxxx
xxxxxx
xxxxxxx

xxxxxxxx

xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx

xxxxxxx
xxxxxxx

xxxxxx

xxxxxx
xxxxxx

xxxxxx

xxxxxx
xxxxxxx
xxxxxxx

xxxxxxx
xxxxxx

xxxxxx
xxxxx

xxxxx
xxxxxx

xxxxxx

xxxxxx
xxxxxx

xxxxxx
xxxxx

xxxxxx

xxxxxx
Qty
Item No. Description OF Works
(A)

B BUILDING
2.00 EARTHWORKS

2.1 Structural Excavation


2.2 Gravel Bedding
2.3 Backfilling and Compaction
2.4 Earthfill and Compaction
2.4 Soil Poisoning
2.5 Hauling and Disposal of unnecessary debris

Other work items not mentioned in item 2.1 but necessary to complete the Earthworks (Please identify)

Sub-total Cost, Item 2.1

TOT
Note: *This BOQ is for budgetary puposes only
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT
Unit Direct Unit Cost MARK-UP IN PERCENT TOTAL MARK-UP
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)

cu.m.
cu.m.
cu.m.
cu.m.
sq.m.
lot

ks (Please identify)

TOTAL COST EARTWORKS/GEN REQ


COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
VALUE INDIRECT VALUE
(H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)
(L=I+K) (N)

xxxxxxx

xxxxxxxxx
Qty
Item No. Description OF Works

(A)

B BUILDING
3.0 CONCRETE

3.1 Concrete Forms and Accessories


3.1.1 Footing
3.1.2 Wall Footing
3.1.3 Footing Tie Beam
3.1.4 Beam
3.1.5 Column
3.1.6 Suspended Slab
3.1.7 Slab-on-Grade
3.1.8 Stairs
3.1.9 Genset Pad
3.1.10 Conrete Gutter
3.1.11 Cistern Tank
3.1.12 Fire Reserve Tank
3.1.13 Column Stiffener
3.1.14 Lintel Beams

3.2 Concrete Reinforcment


3.2.1 Footing
3.2.2 Wall Footing
3.2.3 Footing Tie Beam
3.2.4 Beam
3.2.5 Column
3.2.6 Suspended Slab
3.2.7 Slab-on-Grade
3.2.8 Stairs
3.2.9 Genset Pad
3.2.10 Conrete Gutter
3.2.11 Cistern Tank
3.2.12 Fire Reserve Tank
3.2.13 Column Stiffener
3.2.14 Lintel Beams

3.3 Cast-in-Place Concrete


3.3.1 Footing
3.3.2 Wall Footing
3.3.3 Footing Tie Beam
3.3.4 Beam
3.3.5 Column
3.3.6 Suspended Slab
3.3.7 Slab-on-Grade
3.3.8 Stairs
3.3.9 Genset Pad
3.3.10 Conrete Gutter
3.3.11 Cistern Tank
3.3.12 Fire Reserve Tank
3.3.13 Column Stiffener
3.3.14 Lintel Beams

Other work items not mentioned in item 3.0 but necessary to complete the Concrete (Please identify)

Sub-total Cost, Item 3.0

Note: *This BOQ is for budgetary puposes only


BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT TOTAL MARK-UP
Unit Direct Unit Cost
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

(Please identify)

TOTAL COST STRUCTURAL


COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
VALUE INDIRECT VALUE
(H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)

(L=I+K) (N)
xxxxxxxxxxx

xxxxxxxxxx
Qty
Item No. Description OF Works

(A)

B BUILDING
4.0 MASONRY WORKS

4.1 Unit Masonry

4.1.1 150 mm thk CHB


4.1.1.1 CHB 6"
4.1.1.2 Cement
4.1.1.3 Sand
4.1.1.4 Reinforcement (10mm dia)

4.1.2 100 mm thk CHB


4.1.2.1 CHB 4"
4.1.2.2 Cement
4.1.2.3 Sand
4.1.2.4 Reinforcement (10mm dia)

Other work items not mentioned in item 4.0 but necessary to complete the Masonry Works (Please identify)

Sub-total Cost, Item 4.0

5.0 METALS

5.1 Structural Metal Framing

5.1.1 Planted Steel Columns


5.1.1.1 PSC1 - 175 x 100 x 4MM
5.1.1.2 PSC2 - 150 x 100 x 3MM

5.1.2 Roofing Trusses


5.1.2.1 RT1 - 175 x 100 x 4mm x 6m
5.1.2.2 RT2 - 150 x 100 x 3mm x 6m
5.1.2.3 ST1 - 2 - LC 100 x 50 x 2mm x 6m
5.1.2.4 Purlins - LC 150 x 65 x 20 x 2mm x 6m
5.1.2.5 Sagrod - 10ø

Miscellaneous Items (e.g. Connection Plates, Reinforcing Plates, Stiffener


5.1.4
Plates,seat angles etc.)

5.50 Non-Structural Metal Fabrications

5.52.1 Tubular Stainless Steel Accent


5.52.1.1 100X200mm Stainless Steel Tubular
5.52.1.2 16mm THK Baseplate
5.52.1.3 3/4" dia. Anchor Bolts
5.52.1.3 50X100mmX2mm Tubular Steel Support
5.52.1.3 16mm THK Stainless Structural Baseplate
5.52.1.3 Miscellaneous

5.52.2 Stairs and Corridor Railing


5.52.2.1 25 x 25x 1.5mm Tubular
5.52.2.1 50 x 50 x 1.5mm Tubular
5.52.2.1 10mm THK Clear Tempered Glass
5.52.2.1 50 x 100mm Stainless Tubular
5.52.2.1 ACCU Grating Stainless Steel Tubuilar
5.52.2.1 Miscellaneous

Other work items not mentioned in item 5.0 but necessary to complete the Metals (Please identify)

Sub-total Cost, Item 5.0

7.00 THERMAL AND MOISTURE PROTECTION

7.1 Waterproofing
7.1.1 Waterproofing - Floor T&B Area, 5 fly Membrane
7.1.2 Waterproofing - Roof Deck Slab, 5 fly Membrane

7.2 Thermal Protection


7.2.1 Roofing Insulation (Double)
7.2.2 1/2 Marine Plywood

7.3 Roofings
7.3.1 G.A. 22 Rib Type Long Span Metal Roofing
7.3.2 Stainless Steel Gutter Gauge 24

7.4 Skylight Roofing


7.4.1 Polycarbonate Roofing-2 (Verify Color/Pattern)
7.4.2 Polycarbonate Roofing-3 (Verify Color/Pattern)
7.4.3 100 x 200mm Aluminum Framing (Dark Color)
7.4.4 Aluminum Clading complete w/ waterproofing sealant
7.4.5 Miscellaneous

7,5 Entrance Gate


7.5.1 25X50X1.5mm Tubular
7.5.2 50X50X1.5mm Tubular
7.5.3 Miscellaneous

Other work items not mentioned in item 7.0 but necessary to complete the Thermal & Moisture Protection (Please

Sub-total Cost, Item 7.0

8.00 OPENINGS

8.10 Doors including Jambs & Finish Hardware


D1 - 10mm thk Glass Door Panel with 50x150mm Powder Coated Aluminum
8.10.1
Frame
8.10.2 D2 - PVC Swing Type Door
8.10.3 D3 - Stainless Steel Double Swing Door
8.10.4 D4 - Stainless Steel Swing Type Door
8.10.5 D5 - PVC Swing Type Door
D6 - 10mm thk Glass Door Panel with 50x150mm Powder Coated Aluminum
8.10.6
Frame

8.50 Windows including Frames, Accessories & Finish Hardwares


W1 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.1
Frame
W2 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.2
Frame
W4 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.3
Frame
W5 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.4
Frame
W6 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.5
Frame
W7 - 10mm thk. Glass Wall Partition in 50x150mm Powder Coated Aluminum
8.5.6
Frame
8.5.7 W8 - Stainless Steel Air Vent Window Louver Type Window
8.5.8 W9 - Sliding Type Glass Window with Black Aluminum Frame Glass Window

8.5.9 W10 - Sliding Type Glass Window with Black Aluminum Frame Glass Window

8.5.11 W11- Sliding Type Glass Window with Black Aluminum Frame Glass Window

8.5.11 W12 - Fixed Type Glass Window with Black Aluminum Frame Glass Window

8.5.11 W13 - Fixed Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W14- Stainless Steel Air Vent Window Louver Type Window

Other work items not mentioned in item 8.0 but necessary to complete the Openings (Please identify)

Sub-total Cost, Item 8.0

9.00 FINISHES

9.20 Plaster
9.20.1 20mm thk Cement Plaster for 150mm CHB
9.20.1.1 Cement
9.20.1.2 Sand
9.20.2 20mm thk Cement Plaster for 100mm CHB
9.20.2.1 Cement
9.20.2.2 Sand

9.50 Ceilings
9.50.1 Hardiflex ceiling on metal furring
9.50.2 Exposed Slab

9.60 Floorings
400mm x 400mm Stain Proof Homogeous Anti-Slip Porcelain Tiles w/ Anti-
9.60.1
Microbial, Anti-Stain Grout
200mm x 200mm Stain Proof Homogeous Anti-Slip Porcelain Tiles w/ Anti-
9.60.1
Microbial, Anti-Stain Grout
9.60.2 300 x 300mm Non Skid Ceramic Tiles
9.60.3 Plain Cement Finish

9.70 Wall Finishes


9.70.4 300 x 300mm Glossy Finsh Porcelain Tiles

9.90 Paint and Coatings


9.90.1 Exterior Paintings
9.90.2 Interior Paintings
9.90.3 Hardiflex Ceiling Paint
9.90.4 Exposed Slab
9.90.5 Metal Paints

Other work items not mentioned in item 9.0 but necessary to complete the Finishes (Please identify)

Sub-total Cost, Item 9.0

10.00 SPECIALTIES

10.10 Toilet, Bath and Laundry Accessories


10.1.1 Laminated Finish Toilet Cubicle Partition
10.1.2 Urinal Partition, Phenolic Board Finish with Moisture Resistant with Accessories
10.1.3 Mirrors
10.1.4 PWD Grab Bar
10.1.5 Granite Counter Slab
10.1.6 Façade Siganage (By Specialty Contractor)
10.1.8 Left Side Façade Aluminum Cladding (By Specialty Contractor)

Other work items not mentioned in item 10.0 but necessary to complete the Specialties (Please identify)

Sub-total Cost, Item 10.0

T
Note: *This BOQ is for budgetary puposes only
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT TOTAL MARK-UP
Unit Direct Unit Cost
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)

pcs
bags
cu.m
kgs

pcs
bags
cu.m
kgs

Works (Please identify)


ease identify)

sq.m
sq.m

sq.m
sq.m

sq.m
lm

lot
lot
lot
lot
lot

lm
lm
lot

& Moisture Protection (Please identify)

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

sq.m

sq.m

sq.m

sq.m

sq.m

sq.m
sq.m
sq.m

sq.m

sq.m

sq.m

sq.m
sq.m

(Please identify)

bags
cu.m.

bags
cu.m.

sq.m
sq.m
sq.m

sq.m
sq.m
sq.m

sq.m

sq.m
sq.m
sq.m
sq.m
lm

Please identify)

sets
sq.m
sq.m
set
sq.m
set
set

es (Please identify)

TOTAL COST ARCHITECTURAL


COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
VALUE INDIRECT VALUE
(H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)

(L=I+K) (N)

xxxxxx
xxxxxxx

xxxxxxx
xxxxxxx
xxxxxxx

xxxxxxx

xxxxxxx
Item No. Description OF Works

B BUILDING

5.00 Heating Ventilation and Air Conditioning

5.1 Airconditioning Units


5.1.1 FCU/ACCU 1F-1 to 1F-11, 4-way Ceiling Cassette
Single-Split Type Air Conditioning Units, R-410A Inverter Type
Cooling Capacity : 8.0 KW
Electrical Capacity (Outdoor) : 220V, 1Ph, 60Hz

5.1.2 FCU/ACCU 2F-1 to 2F-13, 4-way Ceiling Cassette


Single-Split Type Air Conditioning Units, R-410A Inverter Type
Cooling Capacity : 8.0 KW
Electrical Capacity (Outdoor) : 220V, 1Ph, 60Hz

5.1.3 Equipment Hanger and Supports


5.1.4 Load/Equipment Side Electrical Works, includes ECB, Wires, and Conduits.
5.1.5 Refrigerant Charge, Miscellaneous, and Consumables

Other work items not mentioned in item 23.0 but necessary to complete the Heating Ventilation and Air Condition

Sub-total Cost, Item 23.1

5.2 Airconditioning Piping Works


5.2.1 Refrigrant Line Piping
5.2.2 5/8” (15.87 mm) dia Copper Pipe
5.2.3 3/8” (9.52 mm) dia Copper Pipe
5.2.4 Thermal elastomeric Insulation
5.2.5 25 mm thick Flexible Elastomeric Closed Cell Rubber Insulation for 15.9mm dia.
5.2.6 25 mm thick Flexible Elastomeric Closed Cell Rubber Insulation for 9.5mm dia.

5.2.7 Condensate Drain Line Piping


5.2.8 1” (25 mm) dia Polyvynil Chloride (PvC) Pipe "blue"
5.2.9 Thermal elastomeric Insulation
5.2.10 25 mm thick Flexible Elastomeric Closed Cell Rubber Insulation for 25mm dia.

5.2.11 Pipes Hanger and Support


5.2.12 Miscellaneous and Consumables

Other work items not mentioned in item 23.2 but necessary to complete the Air Conditioning Pipimg Works (Pleas
Sub-total Cost, Item 23.2

5.3 Testing, Adjusting and Balancing


5.3.1 Nitrogen Gas needed for copper pipe leak testing
Cladding, painting, civil and electrical works and all standard materials like GI
sheets gage #20 for pipe and duct sleeve, gauge #16 saddle support, flat, angle and
5.3.2
round bar, and elastic cement, also including accessories such as aluminum tape,
gasket clamps, bolt, nut and washer
5.3.3 Testing and Commissioning including Start Up of Air Conditioning Systems

Other work items not mentioned in item 23.3 but necessary to complete the Testing, Adjusting and Balancing (Ple

Sub-total Cost, Item 23.3

5.4 Ventilating Units and Accessories


5.4.1 EF 1 ; Axial Exhaust Fan Ducted Type
Capacity : 850 CMH x 150 Pa
Power : 0.40kW, 220V, 1Ph, 60Hz

5.4.2 EF 2 ; Axial Exhaust Fan Ducted Type


Capacity : 1200 CMH x 200 Pa
Power : 0.60kW, 220V, 1Ph, 60Hz

5.4.3 EF 3 ; Axial Exhaust Fan Ducted Type


Capacity : 850 CMH x 150 Pa
Power : 0.40kW, 220V, 1Ph, 60Hz

5.4.4 EF 4 ; Axial Exhaust Fan Ducted Type


Capacity : 3100 CMH x 250 Pa
Power : 1.0kW, 220V, 1Ph, 60Hz

5.4.5 EF 5 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 255 CMH x 186Pa
Power : 0.06kW, 220V, 1Ph, 60Hz

5.4.6 EF 6 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 128CMH x 75Pa
Power : 0.04kW, 220V, 1Ph, 60Hz

5.4.7 EF 7 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 595CMH x 200Pa
Power : 0.26kW, 220V, 1Ph, 60Hz

5.4.8 EF 8 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 1020CMH x 200Pa
Power : 0.26kW, 220V, 1Ph, 60Hz

5.4.9 EF 9 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 255 CMH x 186Pa
Power : 0.06kW, 220V, 1Ph, 60Hz

5.4.10 EF 10 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 255 CMH x 186Pa
Power : 0.06kW, 220V, 1Ph, 60Hz

5.4.11 EF 11 ; Ceiling Cassette-Ducted Type Exhaust Fan


Capacity : 128CMH x 75Pa
Power : 0.03kW, 220V, 1Ph, 60Hz

5.4.12 CF 1 ; Ceiling Fan


Capacity : 255CMH x 100Pa
Power : 0.04kW, 220V, 1Ph, 60Hz

5.4.13 EF 1F-1 to 1F-11 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 462CMH x 100Pa
Power : 0.27kW, 220V, 1Ph, 60Hz

5.4.14 SF 1F-1 to 1F-11 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 462CMH x 100Pa
Power : 0.27kW, 220V, 1Ph, 60Hz

5.4.15 EF 2F-1 to 2F-13 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 462CMH x 100Pa
Power : 0.27kW, 220V, 1Ph, 60Hz

5.4.16 SF 2F-1 to 2F-13 ; Centrifugal-Ducted Type Exhaust Fan


Capacity : 462CMH x 100Pa
Power : 0.27kW, 220V, 1Ph, 60Hz

5.4.17 Equipments Hanger and Support


5.4.18 Equpment Accessories and Miscellaneous Materials
5.4.19 Testing and Commissioning including Start Up of Ventilation System

Other work items not mentioned in item 23.4 but necessary to complete the Ventilating units and Accessories (Ple

Sub-total Cost, item 5.4

5.5 Grilles and Other Related Works


5.5.1 Air Terminals
5.5.2 300 x 300 - Exhaust Air Grille
5.5.3 750 x 500 - Exhaust Air Grille
5.5.4 300 x 300 - Bellmouth with Expanded Aluminum Screen
5.5.5 150 x 150 Air Louver
5.5.6 350 x 350 Air Louver
5.5.7 800 x 550 - Exhaust Air Grille

5.5.8 Ventilation Duct Works


5.5.8.1 0.8mm Thick Galvanized Iron Sheet

All standard accessories needed for installation such as vibration isolator, angle
5.5.9
corner, duct clip, dasket, bolt, nut and washer

Other work items not mentioned in item 23.5 but necessary to complete the Grilles and Other Related Works (Ple
Sub-total Cost, Item 23.5

TOT
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT
Qty Unit Direct Unit Cost
COST
OCM % PROFIT %
(A) (B) (C) (D=AxC) (E) (F)

Unit

Unit

lot
lot
lot

e Heating Ventilation and Air Conditioning (Please identify)

Lm
Lm

Lm
Lm

Lm

Lm

lot
lot

e Air Conditioning Pipimg Works (Please identify)


lot

lot

lot

e Testing, Adjusting and Balancing (Please identify)

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit

Unit
Unit

Unit

Unit

Unit

Unit

Unit

lot
lot
lot

e Ventilating units and Accessories (Please identify)

pcs
pcs
pcs
pcs
pc
pcs

sqm

lot

e Grilles and Other Related Works (Please identify)


TOTAL COST MECHANICAL
TITIES
INDIRECT COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
% VALUE INDIRECT VALUE
(G=E+F) (H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)

(L=I+K) (N)

xxxxx
xxxxx
xxxxx
xxxxxx

xxxxxx
Item No. Description OF Works

B BUILDING
6.00 ELECTRICAL AND AUXILIARY

6.1 FEEDER & SUB-FEEDER :


Panelboards, Ckt Breakers &
Disconnect Switches :
GE Brand

6.1.1 LPAD
Main :
40AT, 3PCB, 400V, BO
Branches :
22-20AT, 1PCB, 230V, BO

6.1.2 PPAD
Main :
40AT, 3PCB, 400V, BO
Branches :
16-20AT, 1PCB, 230V, BO

6.1.3 DPAD
Main :
100AT, 3PCB, 400V, BO
Branches :
2-20AT, 3PCB, 400V, BO
3-40AT, 3PCB, 400V, BO
1-50AT, 3PCB, 400V, BO

6.1.4 FPS
Main :
150AT, 3PCB, 400V, BO
Branches :
1-150AT, 3PCB, 400V, BO
1-20AT, 3PCB, 400V, BO

6.1.5 LVSG
Main :
800AT, 3PCB, 400V, BO
Branches :
1-100AT, 3PCB, 400V, BO
2-150AT, 3PCB, 400V, BO
2-175AT, 3PCB, 400V, BO

6.1.6 (Metering)-1
Ckt. Breaker Gutter in
NEMA-1 w/ Bolt-on Breaker
11-50AT, 1PCB, 230V, BO
( 2.5m x 0.35m x 0.30m )

6.1.7 (Metering)-1
BusBar Gutter in NEMA-1
w/ 4-Bus Bar, Rated 150A
Main :
4-60 sq.mm Terminal Lugs
Branches :
22-8.0 sq.mm Terminal Lugs
( 2.5m x 0.35m x 0.30m )

6.1.8 (Metering)-2
Ckt. Breaker Gutter in
NEMA-1 w/ Bolt-on Breaker
13-50AT, 1PCB, 230V, BO
( 3.0m x 0.35m x 0.30m )

6.1.9 (Metering)-2
BusBar Gutter in NEMA-1
w/ 4-Bus Bar, Rated 175A
Main :
4-80 sq.mm Terminal Lugs
Branches :
26-8.0 sq.mm Terminal Lugs
( 3.0m x 0.35m x 0.30m )

6.1.10 Wire Gutter in NEMA-1 Enclosure

6.1.11 800AT, 3PCB, 400V, BO


in NEMA-3R Enclosure

6.1.12 150AT, 3PCB, 400V, BO


in NEMA-3R Enclosure
6.1.13
150AT, 3PCB, 400V, BO
in NEMA-1 Enclosure
6.1.14 175AT, 3PCB, 400V, BO
in NEMA-1 Enclosure

6.1.15 20AT, 3PCB, 400V, BO


in NEMA-3R Enclosure

6.1.16 50AT, 3PCB, 400V, BO


in NEMA-3R Enclosure

6.1.17 2 x 800AT, 3PCB, 400V, BO


Automatic Transfer Switch

Sub-total Cost, Item 6.1

6.2 LIGHTING & SMALL POWER SYSTEM :


6.2.1 Wiring Devices :
6.2.1.1 PANASONIC Wide Series Brand
6.2.1.1.1 Duplex Convenience Outlet
6.2.1.1.2 Signboard Outlet
6.2.1.1.3 Hand Dryer Outlet
6.2.1.1.4 Emergency Light Outlet

6.2.2 Switches :
6.2.2.1 PANASONIC Wide Series Brand
6.2.2.2 Single Pole Switch
6.2.2.3 2-Gang Switch
6.2.2.4 3-Way Switch
6.2.2.5 Blank Plate Cover

Sub-total Cost, Item 6.2

6.3 LIGHTING FIXTURES :


6.3.1 Lighting Fixtures :
6.3.1.1 Pinlight Outlet
6.3.1.2 Spot light
6.3.1.3 1x40W Fluorescent Lamp
6.3.1.4 Wall Lamp Outlet

Sub-total Cost, Item 6.3

6.4 TELEPHONE SYSTEM :


6.4.1 Telephone System Equipment :
PANASONIC Wide Series Brand
6.4.1.1 Tel.Modular Jack Outlet
6.4.1.2 WIFI Outlet
6.4.1.3 Square Box (unit)
6.4.1.4 Tel.Pull Box
6.4.1.5 Tel.Terminal Cabinet (TTC)

Sub-total Cost, Item 6.4

6.4 FIRE ALARM SYSTEM :


6.4.1 Fire Alarm Equipment :
NITTAN Brand
6.4.1.1 FACP (addressable)-1-loop
6.4.1.2 Fire Alarm Manual Station
6.4.1.3 Fire Alarm Bell
6.4.1.4 Smoke Detector
6.4.1.5 Heat Detector
6.4.1.6 Square box
6.4.1.7 Pullbox

Sub-total Cost, Item 6.5

6.5 CCTV SYSTEM :


6.5.1 CCTV System Equipment :
PANASONIC Brand
6.5.5.1 CCTV Camera
6.5.5.2 TV Monitor, B&W
6.5.5.3 CCTV Workstation
6.5.5.4 Telephone Plate Cover
6.5.5.5 CCTV Pull Box (CCTVPB)

Sub-total Cost, Item 6.6

6.7 PA/BGM SYSTEM :


6.7.1 PA/BGM Equipment :
TOA Brand
6.7.1.1 Ceiling Mounted Speaker
6.7.1.2 Paging Amplifier
6.7.1.3 Pull box
6.7.1.4 Pull box (main)

Sub-total Cost, Item 6.7

6.8 GROUNDING SYSTEM :


6.8.1 Grounding Equipment :
ORDINARY Brand (Galvanized)
6.8.1.1 Grd. Rod (25mm dia. x 3m)
6.8.1.2 Grd.Clamp Solderless Con.
Sub-total Cost, Item 6.8

6.9 CONDUITS AND FITTINGS :


RSC Pipe, NICHI Brand, +10% on Mla Price
PVC Pipe, EMERALD Brand (base price)

6.9.1 RSC Pipe :


6.9.1.1 80 mm dia. x 3m RSC Pipe
6.9.1.2 80 mm dia. RSC Coupling
6.9.1.3 80 mm dia. Entrance Cap
6.9.1.4 80 mm dia. RSC Elbow
6.9.1.5 80 mm dia. RSC L&B

6.9.2 PVC Pipe :


6.9.1.2.1 75 mm dia. x 3m PVC Pipe
6.9.1.2.2 75 mm dia. PVC Coupling
6.9.1.2.3 75 mm dia. PVC Elbow
6.9.1.2.4 75 mm dia. PVC Adapter
6.9.1.2.5 75 mm dia. PVC L&B

6.9.3 63 mm dia. x 3m PVC Pipe


6.9.1.3.1 63 mm dia. PVC Coupling
6.9.1.3.2 63 mm dia. Entrance Cap
6.9.1.3.3 63 mm dia. PVC Elbow
6.9.1.3.4 63 mm dia. PVC Adapter
6.9.1.3.5 63 mm dia. PVC L&B

6.9.4 40 mm dia. x 3m PVC Pipe


6.9.1.4.1 40 mm dia. PVC Coupling
6.9.1.4.2 40 mm dia. PVC Elbow
6.9.1.4.3 40 mm dia. PVC Adapter
6.9.1.4.4 40 mm dia. PVC L&B

6.9.5 25 mm dia. x 3m PVC Pipe


6.9.1.5.1 25 mm dia. PVC Coupling
6.9.1.5.2 25 mm dia. PVC Adapter
6.9.1.5.3 25 mm dia. PVC L&B

6.9.6 20 mm dia. x 3m PVC Pipe


6.9.1.6.1 20 mm dia. PVC Coupling
6.9.1.6.2 20 mm dia. PVC Adapter
6.9.1.6.3 20 mm dia. PVC L&B

Sub-total Cost, Item 6.9


6.10. WIRES AND CABLES :

6.10.1 Power System :


PHILFLEX Brand, +43%
6.10.1 250 sq.mm THHN Wire
6.10.2 80 sq.mm THHN Wire
6.10.3 60 sq.mm THHN Wire
6.10.4 50 sq.mm THHN Wire
6.10.5 30 sq.mm THHN Wire
6.10.6 22 sq.mm THHN Wire
6.10.7 14 sq.mm THHN Wire
6.10.8 8.0 sq.mm THHN Wire
6.10.9 5.5 sq.mm THHN Wire
6.10.10 3.5 sq.mm THHN Wire
6.10.11 3.5 sq.mm THHN Wire (grd/switch)

6.10.2 Telephone System :


6.10.2.1 CAT-6 (4prs)

6.10.3 Fire Alarm System :


6.10.3.1 #1.25 sq.mm TF Wire(twisted)

6.10.4 CCTV System :


6.10.4.1 4 prs BELDEN Brand CAT-6

6.10.5 Paging System :


6.10..5.1 #16 twisted pair

6.10.6 Grounding System :


6.10.6.1 14 sq.mm BCW Wire
6.10.6.2 38 sq.mm BCW Wire

Sub-total Cost, Item 6.10

6.11 BOXES :
For All System
FUMACO Brand
6.11.1 J.Box (4" x 4" x 2-1/8")
6.11.2 J.Box Cover
6.11.3 U.Box (2" x 4" x 2-1/8")
6.11.4 Sq.Box (4" x 4" x 2-1/8")
6.11.5 Sq.Box (4 11/16" x 4 11/16")
6.11.6 Pull Box (6" x 6" x 4")
6.11.7 Pull Box (8" x 8" x 6")
6.11.8 Pull Box (10" x 10" x 8")
6.11.9 Pull Box (power)
6.11.10 Pull Box (gset)

Sub-total Cost, Item 6.11

6.12 CONSUMABLES :
For All System :
6.12.1 PVC Tape
6.12.2 Hacksaw Blade
6.12.3 GI Wire, GA-#16
6.12.4 PVC Cement
6.12.5 Red Lead Paint
6.12.6 1/2" PVC Flexible Conduit
6.12.7 1/2" Straight Connector
6.12.8 Screws, Tox and Others
6.12.9 Hangers/Support

Sub-total Cost, Item 6.12

TOTAL CO
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT
Qty Unit Direct Unit Cost
COST
OCM % PROFIT %
(A) (B) (C) (D=AxC) (E) (F)

assy

assy

assy

assy

assy
assy

assy

assy

assy

lms

assy

assy

assy
assy

assy

assy

assy

sets
sets
sets
sets

sets
sets
sets
sets

sets
sets
sets
sets

sets
sets
assy
assy
assy

sets
sets
sets
sets
sets
sets
sets

sets
sets
sets
sets
assy

sets
sets
sets
sets

sets
sets
lghts
sets
sets
sets
sets

lghts
sets
sets
sets
sets

lghts
sets
sets
sets
sets
sets

lghts
sets
sets
sets
sets

lghts
sets
sets
sets

lghts
sets
sets
sets
lms
lms
lms
lms
lms
lms
lms
lms
rls.
rls.
rls.

lms

rls.

lms

rls.

lms
lms

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

rls.
pcs.
lms.
cans
gals.
lms.
pcs.
lot
lot

TOTAL COST ELECTRICAL AUXILIARY


TITIES
INDIRECT COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
% VALUE INDIRECT VALUE
(G=E+F) (H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)

(L=I+K) (N)
50,085.00
xxxxxx

xxxxx

xxxxx
xxxxx

xxxxx

xxxxx

xxxxx
xxxxx

xxxxx
xxxxxx
xxxxx

xxxxx

xxxxxxx
Qty
Item No. Description OF Works

(A)

B BUILDING
7.00 PLUMBING WORKS
PIPING SYSTEM
7.1 Storm Drainage Lines
7.1.1 PVC Pipes
7.1.1.1 75mm dia
7.1.1.2 100mm dia
7.1.1.3 150mm dia
7.1.1.4 200mm dia

7.1.2 PPVC Pipes


7.1.2.1 100mm dia

7.1.3 PVC Blue Pipes


7.1.3.1 25mm dia
7.1.3.2 32mm dia

7.1.4 Insulation (for AC drains)


7.1.4.1 25mm dia
7.1.4.2 32mm dia

7.1.5 Catch Basin

7.1.6 Gutter Drain


7.1.6.1 100mm dia

7.1.7 Deck Drain


7.1.1.1 100mm dia

7.1.8 Floor clean Out


7.1.8.1 100mm dia

7.1.9 Floor Drain


7.1.9.1 100mm dia

7.1.10 Trench Drain


7.1.10.11 100mm dia

7.1.11 Pipe Connectors, Fittings and Accessories


7.1.12 Hanger and Support
7.1.13 Hardwares and Consumables
Sub-total amount, Item 7.1

7.20 Sewer and Vent Lines


7.2.1 PVC Pipes
7.2.2.1 50mm dia
7.2.2.2 100mm dia
7.2.2.3 150mm dia

7.2.2 Floor Clean Out


7.2.2.1 100mm dia

7.2.3 Floor Drain


7.2.3.1 100mm dia

7.2.4 Pipe Connectors, Fittings and Accessories


7.2.5 Hanger and Support
7.2.6 Hardwares and Consumables

Sub-total amount, Item 7.2

7.30 Water Supply System


7.3.1 PPR Pipe
7.3.1.1 20mm dia
7.3.1.2 32mm dia
7.3.1.3 40mm dia
7.3.1.4 50mm dia
7.3.1.5 75mm dia
7.3.1.6 Pipe Connectors, Fittings and Accessories
7.3.1.7 Hanger and Support
7.3.1.8 Hardwares and Consumables

Sub-total amount, Item 7.3

7.40 Valves and Water Control


7.4.1 Gate Valve
7.4.1.1 20mm dia
7.4.1.2 25mm dia
7.4.1.3 32mm dia
7.4.1.4 40mm dia
7.4.1.5 50mm dia
7.4.1.6 75mm dia
7.4.1.7 100mm dia

7.4.2 Check Valve


7.4.2.1 32mm dia
7.4.2.2 65mm dia

7.4.3 Flexible Connector


7.4.3.1 32mm dia
7.4.3.2 65mm dia

7.4.4 Wye Strainer


7.4.4.1 32mm dia
7.4.4.2 65mm dia

7.4.5 Water Hammering Arrester

7.4.6 Equalization Valve


7.4.6.1 100mm dia

7.4.7 Surge Anticipating Valve

7.4.8 Float Valve

7.4.9 Water Meter


7.4.9.1 50mm dia

9.4.10 Hardwares and Consumables

Sub-total amount, Item 22.1.4

7.50 Plumbing Fixtures & Other Accessories

7.5.1 Water Closet Tank type w/ complete accessories


7.5.2 Urinals w/ complete accessories
7.5.3 Lavatory w/ Faucet & P-Trap w/ complete accessories
7.5.4 Hosebib
7.5.5 Hardwares and Consumables

Sub-total amount, Item 22.2

7.60 Pumps and Accessories


Constant Pressure Booster Pump; Duplex type booster pump; 70 gpm; 90ft
7.6.1
TDH; 2.5 Hp; 3500rpm; 380V; 3Ø; 60Hz
Constant Pressure Booster Pump ; Duplex type booster pump; 3500rpm; 380V;
7.6.2
3Ø; 60He ; 143 gpm; 90ft TDH; 5 Hp;
7.6.3 Testing and Commissioning

Sub-total amount, Item 22.3

Other work items not mentioned in item 7.0 but necessary to complete the Plumbing (Please identify)

Note: *This BOQ is for budgetary puposes only


BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT TOTAL MARK-UP
Unit Direct Unit Cost
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)

sq.m
lgth
lgth
lgth
lgth

lgth

lght
lght

lght
lght

units

pcs

pcs

pcs

pcs

pcs

lot
lot
lot
lgth
lgth
lgth

pcs

pcs

lot
lot
lot

lgth
lgth
lgth
lgth
lgth
lot
lot
lot

pcs
pcs
pcs
pcs
pcs
pcs
pcs

pcs
pcs

pcs
pcs
pcs
pcs

pcs

pc

pc

pc

pc

lot

sets
sets
sets
pcs
lot

set

set
lot

(Please identify)

TOTAL COST PLUMBING


COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
VALUE INDIRECT VALUE
(H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)

(L=I+K) (N)

59,193.79
51,583.90
66,984.35
167,548.16
32,079.77
xxxxxx

xxxxxx

xxxxxx
xxxxxxx

xxxxxxx

xxxxxx

xxxxxxx
Qty
Item No. Description OF Works

(A)

B BUILDING
8.00 FIRE PROTECTION SYSTEM

8.1 FIRE PUMP EQUIPMENTS

8.1.1 Fire Pump - UL listed / FM approved,


Vertical Turbine complete with discharge assembly, air release and pressure
gauge, coupled to an electric motor, complete with controller (UL listed / FM
approved) and standard accessories
Capacity : 350 GPM
Total Head : 80 ft
Motor Power : 25Hp, 400V, 3Ph, 60Hz

8.1.2 Jockey Pump - UL listed / FM approved


Electricc Motor Driven, Complete with Controller (UL listed / FM approved) and
standard accessories
Capacity : 10 GPM
Total Head : 90 Ft
Motor Power : 2Hp, 220V, 1Ph, 60Hz

8.1.3 Testing and Commissioning

Other work items not mentioned in item 8.1 but necessary to complete the Fire Pump Equipments (Please identif

Sub-total Cost, Item 8.1

8.2 VALVES AND OTHER RELATED MATERIALS

8.2.1 4" (100mm) dia Automatic Alarm Check Valve including trim and accessories

8.2.2 4" (100mm) dia Pressure Reducing Valve


8.2.3 4" (100mm) dia Gate Valve (OS&Y)
8.2.4 4" (100mm) dia Gate Valve w/ Supervisory Switch
8.2.5 2" (50mm) dia Gate Valve (OS&Y)
8.2.6 4" (100mm) dia Check Valve
8.2.7 1-1/4" (32mm) dia Inspection / Alarm Test Valve
8.2.8 1" (25mm) dia Auxiillary Drain Valve
8.2.9 2-1/2" (65mm) dia. Fire Hose Valve with cap and chain
8.2.10 1-1/2" (40mm) dia. Flush Valve
8.2.11 1/2" (15mm) dia Ball Valve
8.2.12 1/4" (6.4mm) dia Globe Valve
8.2.13 2-1/2" (65mm) dia - two way valve ( Fire Dep't Connection )
8.2.14 2- way FDC Flush Mount Brass Wall Plate
8.2.15 Flow Metering Device
8.2.16 Water Flow Switch
8.2.17 4" (150mm) dia Flexible Rubber Connector
8.2.18 0-200 psi - Pressure Gauge
8.2.19 Sigth Glass
8.2.20 Miscellaneous and Consumable Materials

Other work items not mentioned in item 8.2 but necessary to complete the Valves and Other Related Materials (P

Sub-total Cost, Item 8.2

8.3 FIRE PROTECTION DISTRIBUTION MATERIALS


8.3.1 4" (100mm) dia x 6M Schedule 40 B.I. Pipe
8.3.2 3" (75mm) dia x 6M Schedule 40 B.I. Pipe
8.3.3 2" (50mm) dia x 6M Schedule 40 B.I. Pipe
8.3.4 1-1/2" (40mm) dia x 6M Schedule 40 B.I. Pipe
8.3.5 1-1/4" (32mm) dia x 6M Schedule 40 B.I. Pipe
8.3.6 1" (25mm) dia x 6M Schedule 40 B.I. Pipe
8.3.7 B.I. Fittings
8.3.8 Sprinkler Head; Pendent Type including spare
8.3.9 Sprinkler Head; SideWall Type including spare
8.3.10 Fire Hose Cabinet complete w/ angle valve and other accessories.
8.3.11 10lbs - Portable Fire Extinguisher ( ABC - Dry Chemical )
8.3.12 Pipe Hanger and Support
8.3.13 Miscellaneous and Consumable Materials

Other work items not mentioned in item 8.3 but necessary to complete the Fire Protection Distribution Materials (P

Sub-total Cost, Item 8.3

TOTAL C
Note: *This BOQ is for budgetary puposes only
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT TOTAL MARK-UP
Unit Direct Unit Cost
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)

set

set

lot

p Equipments (Please identify)

pc

pc
pcs
pcs
pc
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pc
pc
pcs
pc
pcs
pcs
lot

d Other Related Materials (Please identify)

lgth
lgth
lgth
lgth
lgth
lgth
lot
pcs
pcs
pcs
pcs
lot
lot

ction Distribution Materials (Please identify)

TOTAL COST FOR FIRE PROTECTION SYSTEM


COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
VALUE INDIRECT VALUE
(H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
M
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)

(L=I+K) (N)

xxxxxx
xxxxxx

xxxxx

xxxxxx
Qty
Item No. Description OF Works
(A)

B BUILDING
7.00 CIVIL DEVELOPMENT WORKS

7.10 Road Pavement


7.1.1 Aggregate Base Course
7.1.2 Reinforcement
7.1.3 Formworks
7.1.4 200mm thk Portland Cement Concrete Pavement

7.2 Drainage System


7.2.1 Manhole
7.2.2 50mm x 50mm x 6mm thk Angular Bar
7.2.3 Ladder Rung
7.2.4 Reinforcement
7.2.5 Formworks
7.2.6 Portland Cement Concrete Pavement

7.30 RC Pipiline
Earthworks
7.3.1 RCP 600mmø inclusive of mortar and laying
7.3.2 RCP 375mmø inclusive of mortar and laying

Sub-total Cost, Item 7.0


BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT
Unit Direct Unit Cost MARK-UP IN PERCENT TOTAL MARK-UP
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)

cu.m
kgs
sq.m
cu.m

kgs
l.m
kgs
sq.m
cu.,

cu.m
l.m
l.m
COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
VALUE INDIRECT VALUE
(H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)
(L=I+K) (N)

xxxxxx