RESUMEN DE G
HIDROELÉCTRICO
EMPRESAS
(MWh)
PROGRAMADO EJECUTADO
E7 TERMOCHILCA
E35 PETRAMAS
E51 SHOUGESA
E55 ETEN
E57 SAMAY I
GENERACIÓN
EMPRESAS
KALLPA GENERACION
ELECTROPERU
ENGIE
ENEL PERÚ
FENIX POWER
TERMOCHILCA
STATKRAFT
ENEL GREEN POWER PERU S.A
EGEMSA
ENGIE
ENEL PERÚ
FENIX POWER
TERMOCHILCA
STATKRAFT
ENEL GREEN POWER PERU S.A
EGEMSA
EGASA
ORAZUL
ENEL PIURA
CHINANGO
SAN GABAN
CELEPSA
TRES HERMANAS
INLAD ENERGY
ENERGIA EOLICA
HUALLAGA
EGEHUANZA
EGESUR
SDF ENERGIA
GEPSA
PARQUE EÓLICO MARCONA
HUANCHOR
EGEJUNÍN
HUAURA POWER GROUP
CELEPSA RENOVABLES
AIPSA
HIDROLECTRICA SANTA CRUZ
PANAMERICANA SOLAR
PETRAMAS
MOQUEGUA FV SOLAR
TACNA SOLAR
GTS MAJES
GTS REPARTICION
SINERSA
HIDROCAÑETE
ELÉCTRICA RIO DOBLE
EGECSAC
ELÉCTRICA YANAPAMPA
AGUA AZUL
MAJA
ELEC. SANTA ROSA
TERMOSELVA
SHOUGESA
AGROAURORA S.A.C.
ETEN
MINERA CERRO VERDE
SAMAY I
INFRAESTRUCTURA Y ENERGÍA DEL PERÚ
EGE SANTA ANA
HYDRO PATAPO
AGROAURORA S.A.C.
ETEN
MINERA CERRO VERDE
SAMAY I
INFRAESTRUCTURA Y ENERGÍA DEL PERÚ
EGE SANTA ANA
HYDRO PATAPO
ANDEAN POWER
ELSE
LA VIRGEN
RESUMEN DE GENERACIÓN DE ENERGÍA ELÉCTRICA POR EMPRESAS INTEGRANTES DE
AS
RACION
ROPERU
ENGIE
EL PERÚ
POWER
OCHILCA
ATKRAFT
ERU S.A
EGEMSA
ENGIE
EL PERÚ
POWER
OCHILCA
ATKRAFT
ERU S.A
EGEMSA
EGASA
ORAZUL
L PIURA
NANGO
GABAN
CELEPSA
MANAS
ENERGY
EOLICA
UALLAGA
HUANZA
EGESUR
NERGIA
GEPSA
ARCONA
NCHOR
GEJUNÍN
GROUP
OVABLES
AIPSA
TA CRUZ
A SOLAR
TRAMAS
V SOLAR
A SOLAR
S MAJES
RTICION
SINERSA
CAÑETE
DOBLE
EGECSAC
APAMPA
UA AZUL
MAJA
TA ROSA
MOSELVA
OUGESA
RA S.A.C.
ETEN
O VERDE
SAMAY I
EL PERÚ
NTA ANA
PATAPO
RA S.A.C.
ETEN
O VERDE
SAMAY I
EL PERÚ
NTA ANA
PATAPO
POWER
ELSE
VIRGEN
TEGRANTES DEL COES
EÓLICO TOTAL
(MWh) (MWh)
AS NO INTEGRANTES COES
EÓLICO TOTAL
(MWh) (MWh)
00 20,000 25,000
PARTICIPACIÓN
%
16.6%
15.0%
13.2%
11.6% La máxima demanda del domingo, 30 de Setiembre de 2018 ocurrió
10.0%
5.4%
4.2%
2.7%
2.3% DEMA
1.8%
MW
1.8%
6,900
1.6%
6,700
1.4%
1.3% 6,500
1.3% 6,300
1.2% 6,100
1.2% 5,900
1.1%
5,700
0.9%
0.8%
5,500
0.6% 5,300
5,100
4,900
5,500
5,300
0.5% 5,100
0.4% 4,900
0.4% 4,700
0.3%
4,500
0.3%
0.3%
4,300
0.3% 4,100
0.1% 3,900
0.1% 3,700
0.1%
3,500
0.1%
: 30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00
0.1% 00 01 01 02 02 03 03 04 04 05 05 06 06
0.1%
EJE
0.1%
0.1%
0.1%
0.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
100%
PARTICIPACION
%
27.9%
59.5%
12.6%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
100%
etiembre de 2018 ocurrió a las 20:00 horas con un valor de 6307.29378 MW, 40.85 MW menos de lo program
EJECUTADO PROGRAMADO RE
MW menos de lo programado , (-0.64 %)
REPROGRAMADO
0 00 :30 :00
:
23 23 00
Sunday, September 30, 2018
HN TN SN EN HC TC
RESUMEN DE GE
NORTE CENTRO
HORA
Generación Generación Generación Generación
Generación Generación
Hidroeléctrica Termeléctrica Hidroeléctrica Termeléctrica
Solar Norte Eólico Norte
Norte Norte Centro Centro
H T S E H T
MW
SC EC HS TS SS ES N
S E H T S E TOTAL
MW GENER
7,000
6,000
5,000
4,000
3,000
2,000
MW
GENERACIÓN ELÉCTRICA POR ÁREAS OPERATIVAS DEL SEIN
1,000
0
30 30 30 30 30 30
0: 1: 2: 3: 4: 5:
TÉR
Generación COES Generación COES Generación COES
Sur Centro Norte
0
30 30 30 30 30 30
0: 1: 2: 3: 4: 5:
TÉR
Generación COES Generación COES Generación COES
Sur Centro Norte
C S H T S
H T S
0
30 30 30 30 30 30 30 30 30 30 :3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
0: 1: 2: 3: 4: 5: 6: 7: 8: 9: 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2
RH RT RS RE
E TOTAL_R
700
600
500
400
300
200
100
0
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 :3
0
:3
0
:3
0
1 8: 1 9: 2 0: 2 1: 2 2: 2 3: 0: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10 11 12 1
TOTAL RER
274.34
275.65
271.36
262.30
253.81
229.83
224.54
210.71
200.30
167.10
166.58
201.72
309.44
394.13
444.32
489.77
508.39
527.79
580.09
613.43
645.79
685.31
694.95
720.38
720.20
725.82
716.51
718.77
714.54
708.84
696.49
675.27
614.05
533.34
472.11
457.20
457.49
442.52
400.05
387.80
346.94
328.03
307.98
300.76
291.34
292.81
317.33
344.80
10,661.53
TOTAL RER
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
:3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3
10 11 12 13 14 15 16 17 18 19 20 21 22 23
GENE
CENTRALES
L ICO UE
O
E -E NIQ 254.89
S
PQ UPI
C
N AS
O
O LIC MA
E R
QE- HE I
P RES R A
T AY
W
367.09
PA
M
T IPA 146.50
IN
A 161.02
AN
IC 145.05
ER
M
NA R 133.58
PA OLA O N
S CI
RTI 138.35
PA
RE 8.631
E R
H 446.
A 392.14
CAY
RU 33.25
YA
III 228.25
LO
T UL 169.11
N A
RU 36.84
L LO
Y
CHA 70.23
N
CA C
UA
III 228.25
LO
T UL 169.11
N A
RU 36.84
L LO
Y
CHA 70.23
N
CA
U AC
RH 153.25
CA
I 149.65
E LI
G 120.40
ÁN
YA
138.79
JO
LA 4.84
19.21
R
A DO
NC
63.80
RO
33.80
A P
A M
79.61
AP
N
YA I 110.00
UAS
H 63.53
A SA
HU 22.68
AVA
BR 202.62
Ñ A
CA 190.61
N GA
O
A M 28.80
R
PA 67.65 V
GA
62.75
IN
GR
LA 0.00
P LE
A
M 0.00 200.00 400
2171 213 216 198
O 1,161.78
LIC UE
IQ 254.89
SN
A S
AN 561.44
M
I
RA
AY 1,47
W
367.09
PA
M
PA 146.50
A 161.02
AN
145.05
133.58
ON
ICI
RT 138.35
8.63
1
R
HE 446.06
A 392.14
CAY
RU 33.25
III 228.25
LO
UL 169.11
36.84
L LO
Y
HA 70.23
C
UA
III 228.25
LO
UL 169.11
36.84
L LO
Y
HA 70.23
UAC
A RH 153.25
II 149.65
GEL
N 120.40
YA
138.79
JO
LA 4.84
19.21
R
A DO
C 63.80
33.80
A
P
A M
79.61
P
I 110.00
UAS
A H 63.53
22.68
A
R AV
B 202.62
190.61
N GA
O
M 28.80
67.65
V
G A
62.75
IN
0.00
LE
AP
M 0.00 200.00 400.00 600.00 800.00 1,000.00 1,200.00 1,40
201 226 215 238
ES RER (MWh)
1,161.78
1,586.70
1,637.08
1,471.58
0.00 1,200.00 1,400.00 1,600.00 1,800.00
MWh
247 214 223 211
EÓLICO; 48.79%
2175 2178 2181 2184
TÉRMICO; 3.28%
SOLAR; 24.04%
228 260 258 259
TÉRMICO; 3.28%
2128 2135 2152 2165
TACNA PANAMERICANA
MAJES REPARTICION
SOLAR SOLAR
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.21
0.72 0.63 0.00 1.24
2.63 2.26 0.24 2.27
5.20 4.55 0.79 4.90
7.77 6.96 1.84 9.41
10.29 9.87 3.83 16.16
12.49 12.05 5.57 17.64
14.21 13.82 7.75 17.45
15.58 15.21 12.79 17.20
16.81 16.45 18.12 17.05
17.89 17.33 15.72 16.95
18.53 17.73 18.10 17.15
18.77 17.96 18.11 17.12
18.78 18.00 18.16 17.30
18.44 18.11 17.96 17.52
17.82 17.60 17.98 17.54
16.87 16.41 18.07 17.44
15.64 14.84 18.17 17.43
13.93 13.47 18.08 17.36
11.87 11.54 17.99 17.07
9.45 9.33 17.60 16.40
6.89 6.82 16.67 15.03
4.09 4.15 15.03 10.90
1.76 1.82 9.30 3.28
0.27 0.25 2.22 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
TOTAL
RER
MW
274.34
275.65
271.36
262.30
253.81
229.83
224.54
210.71
200.30
167.10
166.58
201.72
309.44
394.13
444.32
489.77
508.39
527.79
580.09
613.43
645.79
685.31
694.95
720.38
720.20
725.82
716.51
718.77
714.54
708.84
696.49
675.27
614.05
533.34
472.11
457.20
457.49
442.52
400.05
387.80
346.94
328.03
307.98
300.76
291.34
292.81
317.33
344.80 TÉRMICO SOLAR EÓLICO
GF
202 232 5002 5000
26.5
26.0
25.5
25.0
24.5
30 30 30 30 30 30 30 30 30 30 :3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
0: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10 11 12 13 14 15 16
MAPLE OQUENDO TG1
24.5
30 30 30 30 30 30 30 30 30 30 :3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
0: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10 11 12 13 14 15 16
MAPLE OQUENDO TG1
ACIÓN DEL SEIN
0 0 0 0 0 0 0 0 0 0 0 0
:3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3
13 14 15 16 17 18 19 20 21 22 23
OQUENDO TG1
0 0 0 0 0 0 0 0 0 0 0 0
:3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3
13 14 15 16 17 18 19 20 21 22 23
OQUENDO TG1
Sunday, September 30, 2018
REPORTE POTENCIA GENERADA POR TIPO DE RECURSO
HORA H. DE PASADA H.REGULACION GN CAMISEA GN MALACAS
P R GN GM
MW
7,000.00
6,000.00
5,000.00
4,000.00
3,000.00
2,000.00
1,000.00
0.00
3 0 00 30 0 0 3 0 00 3 0 0 0 30 0 0 30 0 0 30
0 : 1: 1: 2 : 2 : 3: 3 : 4 : 4: 5: 5: 6 : 6:
GA GI C D R500
DIAGRAMA DE CARGA POR TIPO DE RECURSO
3 0 0 0 30 0 0 30 0 0 30 00 3 0 0 0 30 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0
3 : 4 : 4: 5: 5: 6 : 6: 7: 7 : 8 : 8: 9 : 9 : 10 : 10 : 1 1 : 1 1 : 12 : 1 2 : 1 3 : 1 3 : 14 : 1 4 : 15 : 15 : 16 : 1 6 : 17 : 1 7 : 1 8 : 18 : 19 :
BIOGAS BAGAZO RESIDUAL R6 RESIDUAL R500 DIESEL CARBÓN GN LA ISLA GN AGUAYTIA GN MALACAS GN CAMISEA H
RESIDUAL R6 BAGAZO BIOGAS SOLAR EOLICO TOTAL
R6 B BG S E TOTAL
DE RECURSO
GN MALACAS; 1
30 0 0 3 0 00 30 0 0 30 00 3 0 00 30 00 3 0 00 3 0 0 0 3 0 00 3 0 00
4 : 15 : 15 : 16 : 1 6 : 17 : 1 7 : 1 8 : 18 : 19 : 1 9 : 2 0 : 20 : 21 : 21 : 22 : 22 : 2 3 : 23 : 0 :
212 CELEPSA
150 CHINANGO
149
105
106
107
2165
151 EGASA
152
153
154
260 EGECSAC
251 EGEHUANZA
258 EGEJUNÍN
259
163 EGEMSA
127 EGENOR
126
216
198
170 EGESUR
223 ELEC. SANTA ROSA
247 ELÉCTRICA RIO DOBLE
238 ELÉCTRICA YANAPAMPA
101 ELECTROPERU
102
191 ENERSUR
766
211 GEPSA
2175
2178
2181
228 HIDROCAÑETE
201 HIDROLECTRICA SANTA CRUZ
226
188 HUANCHOR
755 INLAND ENERGY
214 MAJA
182 SAN GABAN
215 SINERSA (C.H. POECHOS 2)
266 STATKRAFT
117
119
118
120
189
0 121
0 122
775 HUALLAGA
777
796 KALLPA
2146
HIDROELECTRICA HIDROELECTRICA
CENTRAL
DE PASADA DE REGULACION
PLATANAL 1,720.7
CHIMAY 1,508.9
YANANGO 342.1
HUINCO 2,556.0
MATUCANA 1,979.2
CALLAHUANCA
MOYOPAMPA 892.3
HUAMPANI 592.5
HER 1 8.6
CHARCANI I,II,III 162.9
CHARCANI IV 282.2
CHARCANI V 1,736.5
CHARCANI VI 175.0
CANCHAYLLO 36.8
HUANZA 1,058.5
RUNATULLO II 169.1
RUNATULLO III 228.3
MACHUPICCHU 3,044.6
CAÑON DEL PATO 1,823.4
CARHUAQUERO 286.4
CARHUAQUERO4 202.6
CANA BRAVA 22.7
ARICOTA 311.9
PURMACANA 4.8
PIZARRAS 63.8
YANAPAMPA 33.8
MANTARO 14,808.4
RESTITUCION 4,791.4
YUNCAN 1,621.4
QUITARACSA 476.7
LA JOYA 138.8
ÁNGEL I 120.4
ÁNGEL II 149.7
ÁNGEL III 153.3
NIMPERIAL 70.2
STACRUZ_1_2 63.5
HUASAHUASI 110.0
HUANCHOR 409.7
SANTA TERESA 1,579.6
RONCADOR 19.2
SAN GABAN II 1,723.1
POECHOS2 79.6
CHEVES 1,471.1
YAUPI 1,980.0
MALPASO 955.9
OROYA/PACHACHACA 379.3
CAHUA 470.1
ARCATA 91.9
PARIAC 35.9
GALLITO CIEGO 57.1
PCH CHAGLLA 0.0
CHAGLLA 1,178.1
CERRO DEL ÁGUILA 6,874.1
PCH CERRO DEL ÁGUILA 66.4
POTRERO 33.2
MARAÑÓN 334.6
YARUCAYA 392.1
RENOVANDES 446.1
LA VIRGEN 0.0
PATAPO 0.0
CARHUAC
17,719.8 42,604.8
P R
DA; 13.6%
101 102 147 103
E1 E1 E1 E2
HORA
HC HC TN HC
H H T H
C C N C
1 1 1 1
1H 1H 1T 1H
R P R6 R
104 106 107 2165
E2 E2 E2 E2
C C C C
1 1 1 1
1H 1H 1H 1H
R P P P
110 208 109 144
E2 E2 E2 E2
ENEL PERÚ
STAROSA STAROSA
UTI_5 UTI_6
TG7 TG8
0.0 0.0 0.0 0.0
TC TC TC TC
T T T T
C C C C
1 1 1 1
1T 1T 1T 1T
GN GN GN GN
113 114 193 150
E2 E2 E2 E3
CHINANGO
TC TC TC HC
T T T H
C C C C
1 1 1 1
1T 1T 1T 1H
GN GN GN R
149 266 117 119
CHINANGO STATKRAF
HC HC HC HC
H H H H
C C C C
1 1 1 1
1H 1H 1H 1H
P R P R
118 120 189 121
STATKRAFT
OROYA
CAHUA ARCATA PARIAC
PACHACHACA
HC HC HS HN
H H H H
C C S N
1 1 1 1
1H 1H 1H 1H
P P P P
122 142 143 125
E46 E9 E9 E9
SHOUGESA
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
16.7
16.5
16.1
16.2
15.9
16.2
16.5
57.1 0.0 0.0 0.0
HN TC TC TC
H T T T
N C C C
1 1 1 1
1H 1T 1T 1T
R R500 R500 R500
187 288 115 239
E9 E5 E5 E5
ENEL PIURA
89.1
89.1
89.0
89.0
89.1
89.1
89.0
89.1
89.1
89.2
89.2
89.2
89.2
89.2
88.9
88.6
88.0
87.5
86.9
86.6
87.3
87.3
87.4
87.3
87.5
87.6
87.7
88.0
88.2
88.3
88.5
88.4
88.4
88.2
88.3
88.6
91.3
91.4
91.4
91.5
91.5
91.5
91.6
91.6
91.5
91.5
91.5
89.0
0.0 0.0 2,138.2 0.0
TC TN TN TN
T T T T
C N N N
1 1 1 1
1T 1T 1T 1T
D GM GM D
127 126 216 198
E4 E4 E4 E4
ORAZUL
CAÑON
CARHUAQUERO CARHUAQUERO4 CANA BRAVA
DEL PATO
H H H H
N N N N
1 1 R R
1H 1H RH RH
R R P P
138 139 163 170
E8 E8 E11 E12
AGUAYTIA AGUAYTIA
MACHUPICCHU ARICOTA
TG1 TG2
129.0 6.2
126.2 6.6
127.9 6.5
129.3 5.8
122.6 5.2
126.1 5.6
125.6 5.6
127.3 6.1
127.4 6.3
127.6 6.4
125.1 5.7
130.2 5.7
129.7 6.0
127.3 6.2
129.6 6.3
132.3 5.6
124.0 5.7
131.9 7.9
127.0 10.0
118.6 10.0
128.8 9.9
127.5 10.3
129.3 10.6
130.0 10.5
131.1 11.3
128.7 11.0
125.6 10.6
127.1 17.3
124.4 20.4
129.8 20.4
123.6 20.3
122.7 20.3
122.5 24.2
123.3 24.6
126.2 25.7
127.6 26.9
120.6 25.9
122.7 25.6
128.3 26.2
122.1 26.1
127.0 26.2
130.9 26.8
127.8 22.0
128.9 12.8
124.4 8.7
124.3 8.6
127.4 5.2
131.6 6.1
0.0 0.0 3,044.6 311.9
TC TC HS HS
T T H H
C C S S
1 1 1 1
1T 1T 1H 1H
GA GA P R
219 191 766 174
EGESUR
ILO2
INDEPENDENCIA YUNCAN QUITARACSA
TV CARB1
TC HC HN TS
T H H T
C C N S
1 1 1 1
1T 1H 1H 1T
GN R R C
240 241 242 995
ENGIE
TS TS TS TS
T T T T
S S S S
1 1 1 1
1T 1T 1T 1T
D D D D
996 997 194 196
ENGIE
CHILCA1 CHILCA1
NEPI TG42 NEPI TG43
TG1 TG2
147.2 147.2
140.7 140.9
110.7 110.8
108.4 108.7
109.3 109.3
108.6 108.6
107.2 107.3
111.2 110.9
110.7 110.9
110.4 110.5
112.3 112.3
109.3 109.9
103.5 105.5
108.8 108.5
111.7 111.5
110.1 110.3
110.0 109.9
110.2 110.6
104.8 105.9
108.3 108.3
117.0 116.7
106.9 107.6
107.8 107.7
81.5 81.3
80.1 80.0
83.0 82.8
81.9 81.7
83.6 83.4
83.0 82.8
80.4 80.3
80.2 80.1
80.5 80.3
82.1 81.9
84.3 84.1
103.1 102.8
109.4 107.3
150.9 153.2
149.1 151.0
158.1 155.3
158.6 157.4
158.8 157.6
159.4 155.9
150.4 148.9
142.6 143.4
108.7 111.3
109.6 111.8
108.0 110.7
113.5 112.4
0.0 0.0 2,683.0 2,683.8
TS TS TC TC
T T T T
S S C C
1 1 1 1
1T 1T 1T 1T
D D GN GN
207 236 795 285 2148
TC TC TC TC SS
T T T T S
C C C C S
1 1 1 1 R
1T 1T 1T 1T RS
GN GN GN GN S
151 152 153 154
EGASA
CHARCANI
CHARCANI IV CHARCANI V CHARCANI VI
I,II,III
HS HS HS HS
H H H H
S S S S
1 1 1 1
1H 1H 1H 1H
P R R R
756 217 218 156
EGASA
MOLLENDO
CHILINA TG PISCO TG1 PISCO TG2
1, 2, 3
0.0 0.0 0.0 0.0
TS TC TC TS
T T T T
S C C S
1 1 1 1
1T 1T 1T 1T
D GN GN D
155 182 197 203
SAN GABAN
CHILINA
SAN GABAN II KALLPA TG1 KALLPA TG2
(SULZ 1,2)
TS HS TC TC
T H T T
S S C C
1 1 1 1
1T 1H 1T 1T
R500 R GN GN
204 230 209 796
KALLPA
TC TC TC HC
T H
T T
C C C C
1 1 1 1
1T 1T 1T 1H
GN GN GN R
2146 252 249 250
FENIX POWER
HC TC TC TC
H T T T
C C C C
1 1 1 1
1H 1T 1T 1T
P GN GN GN
248 2159 263 265
188.1 100.9
189.0 101.0
188.7 100.8
187.1 100.9
185.6 101.2
187.0 101.6
188.4 100.7
187.0 101.6
188.2 101.3
188.2 101.6
188.6 101.0
188.0 100.7
188.4 101.4
190.7 101.9
189.4 101.8
189.9 102.0
190.0 101.8
189.3 101.2
190.3 102.9
190.1 103.3
189.4 102.8
190.0 103.3
190.4 103.2
189.4 103.9
190.4 103.0
190.4 103.5
189.8 102.9
189.6 103.6
189.0 103.6
189.0 103.4
190.9 103.4
191.3 103.9
189.7 103.9
189.4 103.7
190.8 103.2
189.6 103.0
189.2 103.0
190.0 102.7
190.3 102.7
189.5 103.0
189.5 102.8
189.9 102.9
190.3 102.8
190.3 102.9
189.8 103.3
188.2 103.3
189.8 102.8
189.6 102.5
4,543.7 2,459.4 0.0 0.0
TC TC TN TN
T T T T
C C N N
1 2 1 1
1T 1T 1T 1T
GN GN D D
758 786 787 788
TN TS TS TS
T T T T
N S S S
1 1 1 1
1T 1T 1T 1T
D D D D
789 212 251 188
TS HC HC HC
T H H H
S C C C
1 1 1 1
1T 1H 1H 1H
D R R P
755 775 777 924
67.4 0.0
68.0 0.0
65.6 0.0
64.9 0.0
64.4 0.0
64.6 0.0
68.3 0.0
68.2 0.0
68.0 0.0
65.6 0.0
63.8 0.0
64.7 0.0
68.0 0.0
64.4 0.0
67.1 0.0
65.5 0.0
58.2 0.0
66.2 146.9
60.9 153.5
67.2 0.0
68.4 0.0
65.7 152.2
65.9 155.4
67.6 148.3
71.5 159.2
65.9 153.7
65.9 149.7
65.7 150.9
66.4 155.2
67.4 156.5
65.9 150.6
63.6 149.7
63.8 147.1
64.3 227.5
65.3 0.0
65.7 0.0
63.6 0.0
62.2 0.0
66.2 0.0
62.7 0.0
65.8 0.0
66.6 0.0
66.0 0.0
69.8 0.0
66.5 0.0
65.6 0.0
65.9 0.0
68.5 0.0
1,579.6 0.0 1,178.1 0.0
HS HC HC TC
H H H T
S C C C
1 1 1 1
1H 1H 1H 1T
P P R D
926 202 213 232
SDF
NFR. Y ENERGÍA DEL PERÚ AIPSA AGROAURORA
ENERGIA
OQUENDO
RF PTO MALDONADO PARAMONGA MAPLE
TG1
26.0 12.0
26.3 12.1
26.3 12.1
26.5 12.2
26.4 11.1
26.3 1.2
26.4 9.6
26.2 11.5
26.1 11.2
26.3 10.3
26.1 11.0
26.1 10.5
26.4 9.9
26.2 10.5
26.5 10.4
26.2 10.3
26.1 9.2
26.2 9.1
26.0 9.5
26.1 9.6
25.7 10.0
25.7 9.2
25.6 9.0
25.5 9.1
25.8 9.1
25.2 9.4
25.5 9.3
25.2 9.9
25.2 9.3
25.4 9.3
25.5 9.4
25.6 8.5
25.5 8.3
25.8 8.2
25.8 8.5
26.0 7.1
26.2 7.0
25.9 6.8
26.3 7.3
25.9 7.1
25.8 6.0
26.0 0.0
26.0 0.0
26.1 0.0
26.0 0.0
26.1 0.0
26.3 0.0
26.1 0.0
0.0 623.2 190.6 0.0
TS TC TC TN
T T T T
S C C N
1 1 R R
1T 1T RT RT
D GN B B
225 760 2171 201
TC TC TC HN
T T T H
C C C N
R R R R
RT RT RT RH
BG BG BG P
226 215 238 247
ELÉCTRICA ELÉCTRICA
H. SANTA CRUZ SINERSA
YANAPAMPA RIO DOBLE
HC HN HC HN
H H H H
C N C N
R R R R
RH RH RH RH
P P P P
214 223 211 2175
ELECTRICA
MAJA GEPSA
STA ROSA
HC HC HS HS
H H H H
C C S S
R R R R
RH RH RH RH
P P P P
2178 2181 228 260
HS HS HC HC
H H H H
S S C C
R R R R
RH RH RH RH
P P P P
258 259 2128 2131
HC HC HN HC
H H H H
C C N C
R R R 1
RH RH RH RH
P P P P
2135 2152 2154 2167
HUAURA POWER
EGE SANTA ANA LA VIRGEN HYDRO PATAPO
GROUP
16.3 19.1
16.4 18.9
16.4 19.2
16.3 18.8
16.4 18.3
16.5 18.7
16.2 18.7
16.4 18.9
16.4 19.2
16.4 19.0
16.4 18.9
16.2 18.5
15.9 18.9
16.6 19.5
16.8 19.4
16.1 19.5
16.4 19.6
16.2 19.1
16.3 19.3
16.6 18.6
16.4 18.8
16.0 19.1
16.4 19.0
16.2 18.7
16.3 19.5
16.3 18.9
16.2 18.7
16.4 18.7
16.3 18.8
16.2 18.9
16.2 18.3
16.3 18.2
16.6 18.3
16.3 18.4
16.6 18.0
16.3 18.1
16.8 17.6
16.3 17.6
16.1 18.0
16.3 18.0
16.3 18.0
16.3 18.2
16.1 17.9
16.5 17.7
16.3 17.7
16.4 17.7
16.4 17.5
16.3 17.8
392.1 446.1 0.0 0.0
HC HC HC HN
H H H H
C C C N
R R 1 1
RH RH RH RH
P P P P
2184 233 234 235
TACNA
CARHUAC MAJES REPARTICION
SOLAR
HC SS SS SS
H S S S
C S S S
R R R R
RH RS RS RS
S S S
237 261 2150 2161
MOQUEGUA FV
PANA. SOLAR ENEL GREEN POWER PERU S.A
SOLAR
PANAMERICANA
MOQUEGUA RUBÍ WAYRA I
SOLAR
SS SS SS EC
S S S E
S S S C
R R R R
RS RS RS RE
S S S E
253 770 257 256
EC EC EN EN
E E E E
C C N N
R R R R
RE RE RE RE
E E E E
6000 6001 6002 222
NC3
MW MW MW CENTRALES ELOR
GF GF GF HC
GF GF GF H_NC
GF GF GF C
GF GF GF 1
GF GF GF 1H_NC
GF GF GF
199 200 221
SINERSA ANDINO
HN HN HN
N N C
1 1 1
1H_NC 1H_NC 1H_NC
224 227 5000
NC5 NC4
EGRANTES COES
PIAS1 TABLAZO MW
29.0 51.2
29.0 51.0
29.0 50.9
29.0 50.5
29.0 51.3
29.0 53.1
29.0 53.0
29.1 53.2
29.1 53.3
29.1 53.5
29.2 53.7
29.2 53.5
29.2 53.2
29.1 52.9
28.9 55.4
28.8 55.2
28.6 55.3
28.3 54.6
28.1 53.9
27.8 53.4
27.5 49.9
27.2 49.0
27.2 51.0
27.6 50.7
27.6 50.5
27.4 50.6
27.4 49.9
28.1 49.8
28.5 50.0
28.6 49.9
28.4 50.2
28.1 50.4
28.1 50.4
28.2 50.1
28.2 50.1
28.3 64.1
28.5 67.4
28.7 67.4
28.8 67.6
28.9 67.7
28.9 55.9
28.9 56.1
28.8 56.0
28.9 56.4
28.9 56.8
29.0 57.2
29.0 48.6
29.0 49.4
HN TN
H T_NC
N N
R 1
RH 1T_NC
8000 8001 8002
RESERVA FRÍA
SAN JUAN
HORA INDISPONIBILIDAD
RESERVA FRÍA
MANTENIMINETO
TERMOELÉCTRICAS
TERMOELÉCTRICAS
(MW)
(MW)
kV
SAN JUAN
Hz GPS
Sunday, September 30, 2018
ELECTROPERU
6
101 102
HORA
MANTARO RESTITUCION
DÍa
EMPRESA E1 E1
AREAS CN Y S CN CN
RECURSO AREA HC HC
RECURSO H H
AREA C C
RER 1 1
RECURSO RER 1H 1H
RECURSO AREAS CN Y S HCN HCN
PROGRAMACIÓN DIARIA
ERU
171.8 86.8
132.9 85.6
127.6 85.6
86.1 85.6
86.1 85.6
99.7 85.6
94.3 85.6
96.9 85.6
86.1 85.6
86.1 85.6
86.1 85.6
101.6 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
41.0 85.6
77.8 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
86.1 85.6
151.5 85.6
203.7 101.2
203.7 101.2
203.7 101.2
203.7 101.2
203.7 101.2
203.7 101.2
203.7 101.2
203.7 101.2
203.7 101.2
203.7 101.2
203.7 101.2
203.7 101.2
130.5 87.4
0.0 2,910.6 2,149.7
E1 E2 E2
CN CN CN
TN HC HC
T H H
N C C
1 1 1
1T 1H 1H
TCN HCN HCN
EN
E2 E2 E2
CN CN CN
HC HC HC
H H H
C C CN
1 1 R
1H 1H RH
HCN HCN HCN
ENEL PERÚ
STAROSA STAROSA
UTI_5
TG7 TG8
0.0 0.0 0.0
E2 E2 E2
CN CN CN
TC TC TC
T T T
C C C
1 1 1
1T 1T 1T
TCN TCN TCN
144 113 114
VENTANILLA VENTANILLA
UTI_6
TG3 TG4
142.0 142.0
136.3 136.3
116.6 116.6
122.4 122.4
108.1 108.1
94.7 94.7
94.7 94.7
94.7 94.7
97.9 97.9
94.7 94.7
94.7 94.7
94.7 94.7
94.7 94.7
94.7 94.7
94.7 94.7
94.7 94.7
94.7 94.7
94.7 94.7
94.7 94.7
94.7 94.7
94.7 94.7
94.9 94.9
105.5 105.5
112.4 112.4
115.4 115.4
117.1 117.1
104.5 104.5
94.7 94.7
94.7 94.7
104.5 104.5
108.7 108.7
97.3 97.3
133.1 133.1
132.8 132.8
130.9 130.9
142.0 142.0
142.0 142.0
147.6 147.6
148.0 148.0
149.4 149.4
149.4 149.4
142.0 142.0
142.0 142.0
142.0 142.0
142.0 142.0
142.0 142.0
142.0 142.0
134.3 134.3
0.0 2,777.7 2,777.7
E2 E2 E2
CN CN CN
TC TC TC
T T T
C C C
1 1 1
1T 1T 1T
TCN TCN TCN
CHINANGO
VENTANILLA
CHIMAY YANANGO
TV
E2 E3 E3
CN CN CN
TC HC HC
T H H
C C C
1 1 1
1T 1H 1H
TCN HCN HCN
ST
OROYA
CAHUA ARCATA
PACHACHACA
SHOUGESA
PARIAC GALLITO CIEGO
TV1
0.0 0.0 0.0
E46 E46 E9
CN CN CN
HN HN TC
H H T
N N C
1 1 1
1H 1H 1T
HCN HCN TCN
SHOUGESA
E9 E9 E9
CN CN CN
TC TC TC
T T T
C C C
1 1 1
1T 1T 1T
TCN TCN TCN
ENEL PIURA
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
0.0 2,231.9 0.0
E5 E5 E5
CN CN CN
TN TN TN
T T T
N N N
1 1 1
1T 1T 1T
TCN TCN TCN
ORAZUL
CAÑON
CARHUAQUERO CARHUAQUERO4
DEL PATO
E4 E4 E4
CN CN CN
HN HN HN
H H H
N N N
1 1 R
1H 1H RH
HCN HCN HCN
Sunday 30 de September de 2018
TERMOSELVA
AGUAYTIA AGUAYTIA
CANA BRAVA
TG1 TG2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.3
1.3
1.3
1.3
3.9
3.3
2.3
2.0
1.3
1.7
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.7
2.0
2.0
2.0
2.0
1.7
1.7
1.7
1.3
1.3
0.0
0.0
27.6 0.0 0.0
E4 E8 E8
CN CN CN
HN TC TC
H T T
N C C
R 1 1
RH 1T 1T
HCN TCN TCN
2018
EGEMSA EGESUR
ILO2
YUNCAN QUITARACSA
TV CARB1
61.1 17.7
61.1 17.7
61.1 17.7
61.1 17.7
60.4 17.7
55.4 17.7
57.9 17.7
56.8 17.7
54.2 17.7
54.2 17.7
52.7 17.7
50.7 17.7
36.3 17.7
30.9 17.7
32.0 17.7
39.6 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 30.8
88.9 24.0
88.9 29.9
88.9 28.4
88.9 26.8
88.9 17.7
88.9 23.8
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
54.2 17.7
57.1 17.7
58.8 17.7
67.4 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
88.9 17.7
84.0 17.7
60.4 17.7
1,759.4 453.8 0.0
CHARCANI
INTIPAMPA CHARCANI IV
I,II,III
70.6 7.9
68.2 6.2
57.5 8.1
46.6 4.9
37.1 8.7
50.3 8.7
60.7 0.6
47.5 8.7
54.9 8.7
58.9 8.7
56.2 8.7
35.8 8.6
15.8 7.0
15.8 0.0
15.8 0.0
15.8 0.0
59.3 8.7
74.9 8.7
69.8 8.7
69.9 8.7
70.8 8.7
70.6 8.7
69.4 8.7
69.9 8.7
55.7 8.7
36.7 8.7
45.7 7.2
70.2 8.7
51.8 8.7
55.3 0.6
46.1 8.7
69.7 8.7
15.8 0.0
42.7 2.2
15.8 5.8
73.6 8.7
138.2 8.9
143.0 8.9
143.0 8.9
143.0 8.9
143.0 8.9
141.0 8.9
134.0 8.9
81.0 8.7
81.0 8.7
81.0 8.7
77.5 8.7
76.4 8.7
1,611.5 174.3 0.0
MOLLENDO
PISCO TG1 PISCO TG2
1, 2, 3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
30.8
30.8
30.8
30.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0 61.5 0.0
CHILINA
SAN GABAN II KALLPA TG1
(SULZ 1,2)
80.4 141.4
79.0 141.4
78.0 141.4
77.3 141.4
76.8 141.4
77.2 141.4
76.4 141.4
77.7 141.4
77.5 141.4
78.0 141.4
76.5 141.4
69.0 141.4
54.9 141.4
30.2 141.4
26.4 141.4
27.7 141.4
74.5 141.4
76.3 141.4
75.9 141.4
77.4 141.4
77.9 141.4
78.3 141.4
78.6 141.4
77.7 141.4
75.8 141.4
74.5 141.4
74.3 141.4
75.4 141.4
75.2 141.4
75.2 141.4
75.3 141.4
76.8 141.4
53.0 141.4
78.7 141.4
76.1 141.4
77.4 141.4
112.9 141.5
112.9 156.0
112.9 156.0
112.9 156.0
112.9 156.0
112.9 156.0
112.9 155.5
112.9 141.4
112.9 141.4
90.3 141.4
22.4 141.4
20.1 141.4
0.0 1,858.2 3,437.4
354.5 2.8
354.5 2.8
354.5 2.8
345.4 2.8
335.5 2.8
325.2 2.8
322.3 2.8
317.1 2.8
322.8 2.8
312.5 2.8
311.1 2.8
321.1 2.8
285.6 2.8
300.4 2.8
241.7 2.8
266.5 2.8
309.4 2.8
348.7 2.8
350.1 2.8
295.3 2.8
291.3 2.8
315.6 2.8
273.9 2.8
233.9 2.8
224.6 2.8
231.1 2.8
269.1 2.8
327.6 2.8
248.7 2.8
232.8 2.8
240.1 2.8
244.2 2.8
224.5 2.8
244.7 2.8
344.1 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
354.5 2.8
0.0 7,464.7 67.2
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
197.3 98.6
4,734.8 2,367.4 0.0
E22 E10 E7
CN CN CN
HC HC HC
H H H
C C C
1 1 1
1H 1H 1H
HCN HCN HCN
INLAND ENERGY HUALLAGA
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
63.7
1,529.2 0.0 0.0
OQUENDO
RF PUCALLPA RF PTO MALDONADO
TG1
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
0.0 0.0 648.0
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
13.0 2.8
312.0 0.0 67.2
TACNA
MAJES REPARTICION
SOLAR
PANAMERICANA
MOQUEGUA RUBÍ
SOLAR
PQE-EOLICO PQE-EOLICO
WAYRA I
MARCONA TRES HERMANAS
PQE-EOLICO
TALARA CENTRALES ELOR
CUPISNIQUE
HN HN HN
H_NC H_NC H_NC
N N N
1 1 1
1H_NC 1H_NC 1H_NC
AGUA Y SDE
E. PERU PIURA
224 227 9000
OFERTA
PIAS1 TABLAZO
(SOLO COES)
27.0 5,497.6
27.0 5,392.3
27.0 5,284.9
27.0 5,220.5
27.0 5,159.3
27.0 5,140.2
27.0 5,104.3
27.0 5,108.9
27.0 5,101.6
27.0 5,090.4
27.0 5,089.2
27.0 5,057.4
27.0 4,941.6
27.0 4,904.1
27.0 4,943.4
27.0 5,040.4
27.0 5,136.8
27.0 5,259.1
27.0 5,336.0
27.0 5,388.1
27.0 5,406.5
27.0 5,479.8
27.0 5,513.4
27.0 5,517.1
27.0 5,500.7
27.0 5,477.8
27.0 5,467.3
27.0 5,427.7
27.0 5,446.8
27.0 5,422.8
27.0 5,416.1
27.0 5,379.8
27.0 5,398.4
27.0 5,439.7
27.0 5,515.3
27.0 5,718.3
27.0 6,193.8
27.0 6,276.9
27.0 6,348.1
27.0 6,347.0
27.0 6,296.9
27.0 6,232.6
27.0 6,189.7
27.0 6,046.8
27.0 5,848.4
27.0 5,649.4
27.0 5,485.8
27.0 5,275.5
0.0 648.0 131,457.2
T_COES
NC5 CNC4 T_COES
T_COES
HN TN T_COES
H_NC T_NC T_COES
N N T_COES
1 1 T_COES
1H_NC 1T_NC T_COES
T_COES
T_COES
T_COES
T_COES
T_COES
T_COES
1221 -1 1310
5,409.2 301.9
5,298.3 303.0
5,192.1 304.4
5,130.0 304.6
5,070.0 302.7
5,052.4 300.5
5,017.5 300.5
5,022.1 297.8
5,015.9 297.5
5,004.9 297.8
5,003.9 295.0
4,972.6 297.6
4,861.6 296.6
4,825.1 292.2
4,866.2 279.8
4,963.8 269.8
5,026.5 287.2
5,148.7 274.3
5,222.4 273.5
5,278.4 268.8
5,297.6 269.5
5,368.3 268.9
5,403.2 271.1
5,407.5 266.0
5,392.8 266.7
5,370.4 266.8
5,361.9 253.5
5,327.8 244.1
5,341.4 260.7
5,316.3 269.7
5,307.7 267.4
5,272.4 263.6
5,322.9 252.2
5,362.9 254.9
5,425.7 285.3
5,634.7 286.8
6,098.6 267.3
6,176.4 262.2
6,246.8 266.3
6,245.0 268.4
6,192.6 273.1
6,130.6 271.6
6,092.4 267.6
5,942.0 281.9
5,752.4 278.3
5,560.5 281.7
5,385.8 300.9
5,183.9 296.8
129,151.1 0.0 6,704.4
1318 1311 1316
Flujo Chimbote-Trujillo 220 kV Flujo Paramonga-Chimbote 220 kV Flujo Pomacocha-San Juan 220 kV
Flujo Trujillo - Guadalupe 220 kV Flujo Campo Armiño - Cotaruse 220 kV Flujo Ocoña - San Jose 500 kV
Flujo San Jose - Montalvo 500 kV Flujo Tintaya Nueva - Socabaya 220 kV Flujo Socabaya - Moquegua 220 kV
Flujo Carabayllo - Chimbote 500 kV Flujo Guadalupe - Reque 220 kV Flujo La Niña - Piura 220 kV
Flujo Carabayllo - Chilca 500 kV Flujo San Juan - Industriales 220 kV Flujo Chilca CTM - La Planicie 220 kV
Flujo La Planicie - Carabayllo 220 kV Flujo Ventanilla - Chavarria 220 kV Flujo Ventanilla - Zapallal 220 kV
Flujo Huanza - Carabayllo 220 kV Cmg SEIN NCP(US$/MWh) Cmg Santa Rosa NCP(US$/MWh)
T_SEIN
T_SEIN
T_SEIN
T_SEIN T H
T_SEIN
T_SEIN
T_SEIN
T_SEIN
PROGRAMACION INTEG
GENERACION GENERACION
GENERACION GENERACION
TERMICA (COES) HIDRAULICA COES
SOLAR EÓLICO
(CENTRO + NORTE) (CENTRO + NORTE)
0.0 69.4 2,702.3 2,339.1
0.0 68.4 2,684.1 2,261.2
0.0 66.4 2,622.7 2,223.9
0.0 66.4 2,640.6 2,161.7
0.0 63.4 2,596.1 2,147.6
0.0 64.4 2,554.1 2,156.0
0.0 65.4 2,554.1 2,131.5
0.0 67.4 2,554.1 2,124.2
0.0 69.4 2,564.3 2,097.4
0.0 72.4 2,554.1 2,088.7
3.1 75.4 2,554.1 2,085.7
15.1 79.4 2,554.1 2,066.0
46.4 100.2 2,541.1 1,949.8
98.1 101.2 2,527.6 1,916.7
143.7 99.2 2,554.1 1,889.7
181.7 95.2 2,554.1 1,951.4
210.9 116.6 2,413.1 2,022.7
223.7 117.6 2,421.7 2,105.2
231.0 129.6 2,483.5 2,105.1
232.8 157.1 2,545.7 2,064.2
235.8 171.1 2,538.0 2,071.9
236.7 178.1 2,554.8 2,120.3
237.4 207.1 2,587.8 2,088.5
238.2 235.1 2,609.4 2,042.2
237.3 271.1 2,619.0 1,990.7
237.4 279.1 2,624.3 1,974.8
237.5 297.1 2,584.9 1,978.3
235.8 303.1 2,473.8 2,015.7
231.9 314.1 2,551.2 1,969.0
226.2 318.1 2,584.6 1,931.8
214.7 318.1 2,597.9 1,910.3
194.0 317.1 2,562.2 1,906.4
152.1 307.1 2,674.2 1,966.2
99.3 288.1 2,673.3 2,021.8
44.6 277.1 2,667.3 2,188.7
9.8 271.1 2,702.3 2,330.4
0.0 228.6 2,948.1 2,512.1
0.0 216.6 3,030.6 2,519.9
0.0 192.6 3,062.9 2,582.9
0.0 185.6 3,067.1 2,584.5
0.0 170.6 3,067.1 2,549.4
0.0 168.6 3,044.1 2,512.1
0.0 165.6 3,011.2 2,512.1
0.0 164.6 2,905.3 2,529.3
0.0 159.6 2,853.4 2,393.2
0.0 158.6 2,738.2 2,332.9
0.0 152.6 2,702.3 2,291.4
0.0 149.6 2,678.1 2,111.6
2,227.5 4,104.8 63,944.5 51,913.2
S E TCN HCN
GRAMACION INTEGRANTES COES
HS SS ES TOTAL_S
FIN
Sunday, September 30, 2018
DOM ELECTROPERU
101 102 147
STAROSA STAROSA
HER 1 UTI_5
TG7 TG8
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
16.8 0.0 0.0 0.0
E2 E2 E2 E2
CN CN CN CN
HC TC TC TC
H T T T
C C C C
R 1 1 1
RH 1T 1T 1T
HCN TCN TCN TCN
144 113 114 193
OROYA
MALPASO CAHUA ARCATA
PACHACHACA
SHOUGESA SHOUGESA
PARIAC GALLITO CIEGO
TV1 TV2
0.0 0.0 0.0 0.0
E46 E46 E9 E9
CN CN CN CN
HN HN TC TC
H H T T
N N C C
1 1 1 1
1H 1H 1T 1T
HCN HCN TCN TCN
SHOUGESA ENEL PIURA
125 187 288 115
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
79.6
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
0.0
0.0 0.0 0.0 2,178.7
E9 E9 E5 E5
CN CN CN CN
TC TC TN TN
T T T T
C C N N
1 1 1 1
1T 1T 1T 1T
TCN TCN TCN TCN
IURA ORAZUL
239 127 126 216
MALACAS3 CAÑON
CARHUAQUERO CARHUAQUERO4
TG 5 DEL PATO
AGUAYTIA AGUAYTIA
CANA BRAVA MACHUPICCHU
TG1 TG2
0.0 116.7
0.0 116.7
0.0 116.7
0.0 116.7
0.0 116.7
0.0 116.7
0.0 116.7
0.0 116.7
0.0 116.7
0.0 116.7
0.0 116.7
0.0 116.7
1.3 116.7
1.3 116.7
1.3 116.7
1.3 116.7
3.9 116.7
4.0 116.7
3.5 116.7
4.6 116.7
3.0 116.7
1.8 116.7
1.7 116.7
1.7 116.7
1.3 116.7
1.3 116.7
1.3 116.7
1.3 116.7
1.3 116.7
1.3 116.7
1.7 116.7
1.7 116.7
1.3 116.7
1.3 116.7
1.3 116.7
1.3 116.7
1.3 116.7
3.8 116.7
4.0 116.7
4.0 116.7
4.0 116.7
3.8 116.7
3.4 116.7
1.3 116.7
1.3 116.7
1.3 116.7
0.0 116.7
0.0 116.7
37.0 0.0 0.0 2,799.7
E4 E8 E8 E11
CN CN CN S
HN TC TC HS
H T T H
N C C S
R 1 1 1
RH 1T 1T 1H
HCN TCN TCN HS
EGESUR
170 219 191 766
ILO2
RF ILO2 TG1 RF ILO2 TG2 RF ILO2 TG3
TV CARB1
0.0 0.0 0.0 0.0
E13 E13 E13 E13
S S S S
TS TS TS TS
T T T T
S S S S
1 1 1 1
1T 1T 1T 1T
TS TS TS TS
ENGIE
995 996 997 194
CHILCA1
NEPI TG41 NEPI TG42 NEPI TG43
TG1
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
89.3
92.6
98.5
102.1
107.0
93.3
93.4
93.4
94.8
94.8
94.8
94.8
94.8
94.8
68.4
68.4
94.8
105.2
113.9
120.7
154.8
156.9
156.9
156.9
156.9
156.9
154.8
153.2
120.7
120.7
120.7
120.7
0.0 0.0 0.0 2,785.2
E13 E13 E13 E13
S S S CN
TS TS TS TC
T T T T
S S S C
1 1 1 1
1T 1T 1T 1T
TS TS TS TCN
196 207 236 795
CHILCA2 CHARCANI
INTIPAMPA CHARCANI IV
TV I,II,III
81.3 7.9
69.1 7.5
67.6 7.5
58.6 6.2
57.9 6.3
48.5 8.7
55.6 2.6
49.5 8.7
60.1 8.7
52.8 8.7
43.3 8.7
28.1 8.5
15.8 7.1
15.8 0.0
15.8 0.0
15.8 0.0
68.8 8.9
69.2 8.9
69.8 8.9
70.4 8.9
71.2 8.9
70.6 8.7
75.8 8.7
70.2 8.7
49.9 8.7
48.7 8.7
36.7 8.7
23.3 8.7
46.6 0.9
34.9 6.4
35.7 8.7
49.5 8.7
15.8 0.0
71.8 8.7
73.3 8.7
82.6 8.9
143.0 8.9
143.0 8.9
143.0 8.9
143.0 8.9
143.0 8.9
136.5 8.9
139.8 8.9
82.6 8.9
82.6 8.9
82.6 8.9
81.0 8.7
81.0 8.7
1,635.9 180.3 0.0 0.0
E14 E14 E14 E14
S S S CN
HS HS TS TC
H H T T
S S S C
1 1 1 1
1H 1H 1T 1T
HS HS TS TCN
SAN GABAN
218 156 155 182
MOLLENDO CHILINA
PISCO TG2 SAN GABAN II
1, 2, 3 (SULZ 1,2)
90.4
67.8
63.5
59.1
62.1
62.8
63.7
63.6
62.2
63.5
63.2
61.8
33.5
23.5
20.1
20.1
68.6
76.1
75.9
73.9
75.3
78.2
78.5
76.3
63.5
37.8
29.6
59.3
69.3
63.3
66.7
75.8
27.7
66.4
66.4
66.4
112.9
112.9
112.9
112.9
112.9
112.9
112.9
105.6
86.9
78.6
44.2
40.0
0.0 0.0 0.0 1,660.6
E14 E14 E14 E15
CN S S S
TC TS TS HS
T T T H
C S S S
1 1 1 1
1T 1T 1T 1H
TCN TS TS HS
KALLPA
197 203 204 230
LFLORES TG1 CERRO DEL ÁGUILA PCH CERRO DELÁGUILA FENIX GT11
108.5
108.5
108.5
108.5
108.5
99.0
97.3
78.6
108.5
48.9
108.5
89.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
45.6
45.6
20.8
20.8
20.8
28.1
217.1
217.1
217.1
217.1
217.1
217.1
217.1
217.1
205.2
49.7
0.0
0.0
0.0 0.0 0.0 1,673.1
E52 E52 E52 E22
S S S CN
TS TS TS HC
T T T H
S S S C
1 1 1 1
1T 1T 1T 1H
TS TS TS HCN
EMGHUANZA HUANCHOR INLAND ENERGY HUALLAGA
251 188 755 775
OQUENDO
CHAGLLA RF PUCALLPA RF PTO MALDONADO
TG1
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
189.0 27.0
157.3 27.0
147.2 27.0
147.2 27.0
147.2 27.0
147.2 27.0
147.2 27.0
147.2 27.0
147.2 27.0
147.2 27.0
147.2 27.0
147.2 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
0.0 27.0
909.3 0.0 0.0 648.0
E51 E55 E55 E20
CN CN S CN
HC TC TS TC
H T T T
C C S C
1 1 1 1
1H 1T 1T 1T
HCN TCN TS TCN
AIPSA AGROAURORA PETRAMAS
213 232 225 760
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
2.5
4.9
7.5
9.9
12.1
14.0
15.6
16.9
17.8
18.3
18.5
18.5
18.2
17.7
16.8
15.5
13.8
11.7
9.4
6.7
4.1
1.7
0.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 0.0 0.0 136.4
E62 E61 E63 E32
CN CN CN S
HN HC HC SS
H H H S
N C C S
1 1 R R
1H 1H RH RS
HCN HCN HCN SS
GTS TACNA MOQUEGUA FV
PANA. SOLAR
REPARTICION SOLAR SOLAR
234 235 237 261
TACNA PANAMERICANA
REPARTICION MOQUEGUA
SOLAR SOLAR
PQE-EOLICO PQE-EOLICO
RUBÍ WAYRA I
MARCONA TRES HERMANAS
PQE-EOLICO
TALARA CENTRALES ELOR CURUMUY
CUPISNIQUE
9.0 15.0
9.0 15.0
7.0 15.0
7.0 15.0
5.0 13.0
5.0 13.0
5.0 13.0
5.0 13.0
5.0 13.0
5.0 13.0
5.0 13.0
5.0 13.0
5.0 15.0
5.0 15.0
5.0 15.0
5.0 15.0
4.0 19.0
4.0 19.0
4.0 28.0
4.0 28.0
4.0 35.0
4.0 35.0
9.0 49.0
9.0 49.0
16.0 68.0
16.0 68.0
20.0 74.0
20.0 74.0
22.0 77.0
22.0 77.0
20.0 77.0
20.0 77.0
16.0 74.0
16.0 74.0
16.0 68.0
16.0 68.0
15.0 57.0
15.0 57.0
13.0 45.0
13.0 45.0
12.0 35.0
12.0 35.0
12.0 32.0
12.0 32.0
12.0 28.0
12.0 28.0
12.0 24.0
12.0 24.0
253.0 902.0 0.0 0.0
E39 E39 SD SD
CN CN
EN EN
E E
N N
R R
RE RE
ECN ECN
AGUA Y SDE
SINERSA CASA
E. PERU PIURA
200 221 224 227
T H S
REPROGRAMACION INTEGRANTES COES
5561 5562 5563 5564
GENERACION TERMICA GENERACION GENERACION SOLAR
GENERACION
(COES) HIDRAULICA COES COES
EÓLICO
(CENTRO + NORTE) (CENTRO + NORTE) (CENTRO + NORTE)
69.4 2,702.3 2,297.1
68.4 2,702.3 2,230.3
66.4 2,702.3 2,128.2
66.4 2,702.3 2,080.1
63.4 2,702.3 2,019.4
64.4 2,669.0 2,036.5
65.4 2,691.9 1,985.3
67.4 2,634.9 2,034.2
69.4 2,686.4 1,963.6
72.4 2,688.8 1,953.9
75.4 2,654.3 1,993.1
79.4 2,643.7 1,971.6
100.2 2,590.7 1,901.3
101.2 2,599.8 1,830.0
99.2 2,621.3 1,806.7
95.2 2,701.8 1,788.3
116.6 2,413.1 1,997.8
117.6 2,427.8 2,084.1
129.6 2,454.5 2,112.0
157.1 2,470.4 2,119.7
171.1 2,492.6 2,097.5
178.1 2,430.9 2,251.1
207.1 2,431.7 2,242.3
235.1 2,431.7 2,225.6
271.1 2,437.8 2,187.2
279.1 2,437.8 2,184.3
297.1 2,437.8 2,174.1
303.1 2,437.8 2,112.8
314.1 2,437.8 2,095.5
318.1 2,374.9 2,124.6
318.1 2,318.8 2,176.0
317.1 2,308.0 2,146.8
307.1 2,424.4 2,221.1
288.1 2,484.6 2,154.6
277.1 2,523.9 2,259.1
271.1 2,702.3 2,311.8
228.6 2,906.6 2,518.0
216.6 2,957.9 2,558.7
192.6 2,997.5 2,584.1
185.6 2,997.5 2,589.8
170.6 2,988.2 2,573.9
168.6 2,967.8 2,559.2
165.6 2,931.0 2,551.9
164.6 2,892.1 2,518.0
159.6 2,745.7 2,506.1
158.6 2,725.8 2,335.2
152.6 2,675.7 2,269.0
149.6 2,484.0 2,269.0
4,104.8 62,921.1 52,565.5 0.0
ECN TOTAL_CN TS HS
5569 5570 5571
GENERACION SOLAR GENERACION EÓLICA
COES COES TOTAL SUR
(SUR) (SUR)
0.0 407.6
0.0 371.7
0.0 365.9
0.0 349.0
0.0 351.6
0.0 349.6
0.0 340.8
0.0 351.4
0.0 360.5
0.0 354.5
3.1 347.7
15.1 342.6
46.4 329.6
98.1 351.8
143.7 394.1
181.7 432.0
210.9 588.2
223.7 608.9
231.0 617.9
232.8 618.3
235.8 623.5
236.7 626.6
237.4 636.3
238.2 629.3
237.3 602.0
237.4 575.1
237.5 557.5
235.8 572.0
231.9 580.1
226.2 571.6
214.7 570.7
194.0 573.0
152.1 425.5
99.3 491.2
44.6 437.9
9.8 412.7
0.0 509.8
0.0 509.8
0.0 509.8
0.0 509.8
0.0 509.8
0.0 503.3
0.0 506.6
0.0 442.1
0.0 418.1
0.0 409.7
0.0 364.9
0.0 360.6
2,227.5 0.0 11,336.5 FIN
SS ES TOTAL_S
T_SEIN
T_SEIN
T_SEIN
T_SEIN T H S E TCN HCN SCN ECN
T_SEIN
T_SEIN
T_SEIN
T_SEIN
TOTAL_CN TS HS SS ES TOTAL_S
101 101 101 102 102
1 1 1 2 1 1
HORA
MANTARO RESTITUCION
EJE REPROG PROG EJE - PROG EJE REPROG
0:30 643.52 642.93 642.93 0.59 208.24 204.47
1:00 642.99 642.93 642.93 0.06 208.16 204.47
1:30 644.76 642.93 642.93 1.83 207.52 204.47
2:00 640.15 642.93 642.93 -2.78 204.85 204.47
2:30 635.10 642.93 642.93 -7.83 205.33 204.47
3:00 637.61 642.93 642.93 -5.32 205.51 204.47
3:30 637.67 642.93 642.93 -5.26 206.38 204.47
4:00 643.10 642.93 642.93 0.17 207.79 204.47
4:30 645.15 642.93 642.93 2.22 208.52 204.47
5:00 638.72 642.93 642.93 -4.21 206.42 204.47
5:30 639.97 642.93 642.93 -2.96 206.52 204.47
6:00 630.15 642.93 642.93 -12.78 202.56 204.47
6:30 634.98 642.93 642.93 -7.95 204.01 204.47
7:00 641.37 642.93 642.93 -1.56 206.93 204.47
7:30 594.73 629.05 629.05 -34.32 192.82 200.06
8:00 593.86 629.05 629.05 -35.19 192.30 200.06
8:30 595.37 629.05 629.05 -33.68 193.72 200.06
9:00 584.55 629.05 629.05 -44.50 190.77 200.06
9:30 593.82 629.05 629.05 -35.23 193.32 200.06
10:00 597.28 629.05 629.05 -31.77 191.95 200.06
10:30 593.29 629.05 629.05 -35.76 194.56 200.06
11:00 596.15 595.94 629.05 -32.90 192.87 189.53
11:30 597.69 595.94 629.05 -31.36 194.06 189.53
12:00 595.33 595.94 629.05 -33.72 191.34 189.53
12:30 601.32 595.94 629.05 -27.73 196.09 189.53
13:00 597.47 595.94 629.05 -31.58 193.68 189.53
13:30 596.17 595.94 629.05 -32.88 194.19 189.53
14:00 596.21 595.94 629.05 -32.84 192.88 189.53
14:30 595.59 595.94 629.05 -33.46 194.21 189.53
15:00 600.32 595.94 629.05 -28.73 195.28 189.53
15:30 590.02 595.94 629.05 -39.03 192.41 189.53
16:00 588.79 595.94 629.05 -40.26 192.19 189.53
16:30 588.96 595.94 629.05 -40.09 191.28 189.53
17:00 592.54 595.94 629.05 -36.51 193.32 189.53
17:30 595.87 645.61 645.61 -49.74 192.12 205.33
18:00 598.25 645.61 645.61 -47.36 193.34 205.33
18:30 589.89 642.93 642.93 -53.04 194.95 204.47
19:00 594.66 642.93 642.93 -48.27 192.30 204.47
19:30 643.05 642.93 642.93 0.12 206.39 204.47
20:00 641.34 642.93 642.93 -1.59 206.71 204.47
20:30 642.98 642.93 642.93 0.05 206.81 204.47
21:00 645.33 642.93 642.93 2.40 207.14 204.47
21:30 640.99 642.93 642.93 -1.94 206.44 204.47
22:00 638.79 642.93 642.93 -4.14 205.54 204.47
22:30 634.85 642.93 642.93 -8.08 203.70 204.47
23:00 633.80 642.93 642.93 -9.13 204.99 204.47
23:30 632.69 642.93 642.93 -10.24 203.60 204.47
0:00 639.57 642.93 642.93 -3.36 206.71 204.47
EJEC (MWh) 14808.38 15078.97 15294.19 4791.36 4795.67
102 147 147 147 103 103
1 2 1 1 1 2 1 1
ENEL PERÚ
CHINANGO
STATKRAFT
SHOUGESA
ENEL PIURA
ORAZUL
TERMOSELVA
EGEMSA
EGESUR
ILO 4
PLANTA RESERVA FRIA ILO
PROG EJE - PROG EJE REPROG PROG EJE - PROG EJE REPROG
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
995 194 194 194 196 196
1 2 1 1 1 2 1 1
ENGIE
ILO 4
CHILCA TG1 CHILCA TG2
PROG EJE - PROG EJE REPROG PROG EJE - PROG EJE REPROG
0.00 147.23 120.66 120.66 26.57 147.23 120.66
0.00 140.74 120.66 120.66 20.09 140.88 120.66
0.00 110.66 120.66 120.66 -10.00 110.82 120.66
0.00 108.42 120.66 120.66 -12.24 108.65 120.66
0.00 109.29 120.66 120.66 -11.36 109.25 120.66
0.00 108.62 120.66 120.66 -12.04 108.58 120.66
0.00 107.17 120.66 120.66 -13.48 107.31 120.66
0.00 111.21 120.66 120.66 -9.45 110.94 120.66
0.00 110.73 120.66 120.66 -9.93 110.94 120.66
0.00 110.42 120.66 120.66 -10.24 110.49 120.66
0.00 112.34 120.66 120.66 -8.32 112.31 120.66
0.00 109.34 120.66 120.66 -11.32 109.88 120.66
0.00 103.50 120.66 117.77 -14.27 105.47 120.66
0.00 108.79 120.66 114.77 -5.98 108.46 120.66
0.00 111.72 120.66 120.66 -8.93 111.55 120.66
0.00 110.11 120.66 120.66 -10.55 110.28 120.66
0.00 110.02 89.32 89.32 20.70 109.92 89.32
0.00 110.17 92.59 91.22 18.95 110.64 92.59
0.00 104.75 98.51 104.97 -0.22 105.88 98.51
0.00 108.26 102.05 118.79 -10.54 108.26 102.05
0.00 116.97 107.00 117.08 -0.12 116.66 107.00
0.00 106.95 93.28 120.66 -13.71 107.62 93.28
0.00 107.79 93.45 120.66 -12.87 107.67 93.45
0.00 81.54 93.45 120.66 -39.11 81.30 93.45
0.00 80.15 94.81 120.66 -40.51 79.97 94.81
0.00 82.96 94.81 120.66 -37.69 82.78 94.81
0.00 81.93 94.81 120.66 -38.73 81.75 94.81
0.00 83.60 94.81 102.81 -19.21 83.43 94.81
0.00 83.00 94.81 120.01 -37.01 82.83 94.81
0.00 80.42 94.81 120.66 -40.23 80.26 94.81
0.00 80.24 68.38 120.66 -40.42 80.07 68.38
0.00 80.51 68.38 120.66 -40.14 80.34 68.38
0.00 82.11 94.81 120.66 -38.54 81.94 94.81
0.00 84.28 105.21 120.66 -36.38 84.10 105.21
0.00 103.11 113.93 120.66 -17.55 102.83 113.93
0.00 109.43 120.66 120.66 -11.23 107.29 120.66
0.00 150.90 154.80 165.55 -14.65 153.21 154.80
0.00 149.05 156.91 165.55 -16.50 151.03 156.91
0.00 158.05 156.91 165.55 -7.50 155.33 156.91
0.00 158.57 156.91 165.55 -6.98 157.44 156.91
0.00 158.78 156.91 165.55 -6.77 157.59 156.91
0.00 159.40 156.91 165.55 -6.15 155.86 156.91
0.00 150.40 154.80 165.55 -15.15 148.86 154.80
0.00 142.55 153.19 156.13 -13.58 143.44 153.19
0.00 108.67 120.66 144.58 -35.91 111.33 120.66
0.00 109.59 120.66 120.66 -11.07 111.80 120.66
0.00 107.96 120.66 120.66 -12.70 110.71 120.66
0.00 113.54 120.66 120.66 -7.12 112.36 120.66
0.00 2682.96 2785.18 3027.98 2683.77 2785.18
196 207 207 207 207 995 995
1 2 1 1 1 2
ENGIE
EGASA
SAN GABAN
SAN GABAN
KALLPA GENERACIÓN
KALLPA GENERACIÓN
FENIX POWER
TERMOCHILCA
SAMAY I
CELEPSA
HUALLAGA INFR
AGROAURORA PETRAMAS
PETRAMAS
GEPSA
HIDROCAÑETE EGECSAC
EGECSAC EGEJUNÍN
PATAPO
RENOVANDES LA VIRGEN
PROG EJE - PROG EJE REPROG PROG EJE - PROG EJE REPROG
19.50 -0.42 0.00
19.50 -0.57 0.00
19.50 -0.32 0.00
19.50 -0.73 0.00
19.50 -1.20 0.00
19.50 -0.84 0.00
19.50 -0.81 0.00
19.50 -0.61 0.00
19.50 -0.33 0.00
19.50 -0.53 0.00
19.50 -0.60 0.00
19.50 -0.96 0.00
19.50 -0.57 0.00
19.50 -0.01 0.00
19.50 -0.12 0.00
19.50 0.02 0.00
19.50 0.14 0.00
19.50 -0.43 0.00
19.50 -0.17 0.00
19.50 -0.87 0.00
19.50 -0.67 0.00
19.50 -0.45 0.00
19.50 -0.53 0.00
19.50 -0.78 0.00
19.50 -0.03 0.00
19.50 -0.61 0.00
19.50 -0.77 0.00
19.50 -0.76 0.00
19.50 -0.68 0.00
19.50 -0.61 0.00
19.50 -1.19 0.00
19.50 -1.29 0.00
19.50 -1.22 0.00
19.50 -1.12 0.00
19.50 -1.47 0.00
19.50 -1.44 0.00
19.50 -1.88 0.00
19.50 -1.90 0.00
19.50 -1.51 0.00
19.50 -1.54 0.00
19.50 -1.45 0.00
19.50 -1.30 0.00
19.50 -1.62 0.00
19.50 -1.76 0.00
19.50 -1.84 0.00
19.50 -1.81 0.00
19.50 -1.99 0.00
19.50 -1.73 0.00
468.00 0.00 0.00 0.00 0.00 0.00
2167 2184 2184 2184 2184 233 233
1 2 1 1 1 2 1 1
PATAPO CARHUAC
MAJES
PROG EJE - PROG EJE REPROG PROG EJE - PROG EJE REPROG
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.72 0.00
0.00 0.00 2.63 0.65
0.00 0.00 5.20 2.45
0.00 0.00 7.77 4.89
0.00 0.00 10.29 7.51
0.00 0.00 12.49 9.93
0.00 0.00 14.21 12.12
0.00 0.00 15.58 13.96
0.00 0.00 16.81 15.55
0.00 0.00 17.89 16.85
0.00 0.00 18.53 17.76
0.00 0.00 18.77 18.26
0.00 0.00 18.78 18.51
0.00 0.00 18.44 18.53
0.00 0.00 17.82 18.24
0.00 0.00 16.87 17.72
0.00 0.00 15.64 16.76
0.00 0.00 13.93 15.47
0.00 0.00 11.87 13.76
0.00 0.00 9.45 11.71
0.00 0.00 6.89 9.37
0.00 0.00 4.09 6.74
0.00 0.00 1.76 4.07
0.00 0.00 0.27 1.72
0.00 0.00 0.00 0.25
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 138.35 136.39
233 234 234 234 235 235
1 2 1 1 1 2 1 1
C.E. CUPISNIQUE
PROG EJE - PROG
15.00 15.67
15.00 16.86
15.00 10.18
15.00 7.20
13.00 4.04
13.00 6.42
13.00 3.41
13.00 6.70
13.00 6.86
13.00 2.42
13.00 -1.81
13.00 -3.79
15.00 -4.00
15.00 -3.63
15.00 -5.67
15.00 0.53
19.00 1.10
19.00 9.96
28.00 23.94
28.00 30.74
35.00 32.98
35.00 37.62
49.00 22.77
49.00 28.87
68.00 9.36
68.00 11.44
74.00 5.39
74.00 6.94
77.00 4.26
77.00 4.02
77.00 3.91
77.00 3.09
74.00 7.33
74.00 7.00
68.00 12.22
68.00 13.01
57.00 24.08
57.00 20.30
45.00 11.90
45.00 10.91
35.00 15.25
35.00 24.36
32.00 16.31
32.00 18.55
28.00 10.64
28.00 10.28
24.00 14.31
24.00 5.30
902.00 FIN
EJECUTADO COES PROGRAMADO COES EJE - PROG
HORA
MW MW MW
EXPORTACIÓN A
GENERACIÓN TOTAL SEIN
ECUADOR
ENERGIA (MWh)
130240.99 130240.99 0.00
6307.29 6348.14
20:00 19:30
MÍNIMA -13.4
MEDIA -66.9
MÁXIMA -85.3
OGRAMADO SIN EXPORTACIÓN
DESVIACIÓN (%)
HORA
DESVIO PROMEDIO SEIN
MEDIA -66.9
MÁXIMA -85.3
101 102 147 103 104
HORA
STAROSA STAROSA
MOYOPAMPA HUAMPANI HER 1 UTI_5
TG7 TG8
CHINANGO
STATKRAFT
OROYA
CHEVES YAUPI MALPASO CAHUA ARCATA
PACHACHACA
SHOUGESA
AGUAYTIA AGUAYTIA
CANA BRAVA MACHUPICCHU ARICOTA INDEPENDENCIA
TG1 TG2
ILO2
YUNCAN QUITARACSA RF ILO2 TG1 RF ILO2 TG2 RF ILO2 TG3
TV CARB1
ENGIE
EGASA
MOLLENDO
CHARCANI V CHARCANI VI CHILINA TG PISCO TG1 PISCO TG2
1, 2, 3
CHILINA
SAN GABAN II KALLPA TG1 KALLPA TG2 KALLPA TG3 KALLPA TV
(SULZ 1,2)
OLLEROS TG1 OLLEROS TV1 ETEN TG1 ETEN TG2 RECKA P BRV TG1
SDF
INLAND ENERGY HUALLAGA INFR. Y ENERGÍA DEL PERÚ
ENERGIA
RF PTO OQUENDO
SANTA TERESA PCH CHAGLLA CHAGLLA RF PUCALLPA
MALDONADO TG1
E60
TACNA
LA VIRGEN PATAPO CARHUAC MAJES REPARTICION
SOLAR
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.4
0.5 0.7
0.9 1.2
1.5 1.8
2.0 2.3
2.4 2.8
2.9 3.3
3.3 3.6
3.6 3.8
3.7 3.8
3.7 3.8
3.6 3.9
3.3 3.7
2.9 3.2
2.5 2.7
2.0 2.2
1.4 1.6
0.8 1.1
0.4 0.7
0.0 0.3
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0 0.0 20.6 23.5 0.0
HC HN HC SS SS SS
H H H S S S
C N C S S S
1 1 R R R R
RH RH RH RS RS RS
237 261 2150 2161 253 770
E59 E59
MOQUEGUA FV
PANA. SOLAR ENEL GREEN POWER PERU S.A CEM PE TRES HERMANAS
SOLAR
PQE-EOLICO
TALARA
CUPISNIQUE
MVAR CURUMUY
SDE
SINERSA ANDINO ELECTRO ORIENTE
PIURA
AGUA Y TOTAL
E. PERU NO COES
PIAS1 MVAR
0.0 3.3
0.0 2.9
0.0 2.4
0.0 2.9
0.0 2.1
0.0 1.6
0.0 3.8
0.0 4.0
0.0 3.7
0.0 3.9
0.0 4.0
0.0 3.4
0.0 1.7
0.0 1.8
0.0 2.4
0.0 2.7
0.0 3.7
0.0 3.8
0.0 3.7
0.0 5.2
0.0 3.9
0.0 4.3
0.0 5.3
0.0 4.8
0.0 4.8
0.0 5.0
0.0 4.4
0.0 3.9
0.0 3.7
0.0 3.4
0.0 3.2
0.0 3.6
0.0 3.4
0.0 3.0
0.0 4.3
0.0 4.4
0.0 4.4
0.0 6.8
0.0 6.8
0.0 7.0
0.0 6.4
0.0 5.5
0.0 4.5
0.0 3.7
0.0 2.5
0.0 1.8
0.0 1.3
0.0 0.9
0.0 90.0
HN
H_NC
N
1
1H_NC
Sunday, September 30, 2018
POTENCIA DE LOS GRANDES USUARIOS LIBRES (MW)
GRANDES USARIOS LIBRES DEL ÁREA NO
FECHAHORA
BARRICK ALTO CEMENTOS
BARRICK PIERINA GOLD FIELD MARSA
CHICAMA PACASMAYO
Nota:
Información proporcionada por la empresas
DATOS ESTIMADOS
SIN DATOS
180.0
160.0
140.0
120.0
100.0
80.0
140.0
120.0
100.0
80.0
60.0
40.0
20.0
0.0
30 30 30 30 30 30 30 30 30 30 :3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
0: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10 11 12 13 14 15 16
ACEROS
MISKIMAYO SIDER PERU TEXTIL PIURA YANACOCHA CHINALCO
AREQUIPA
140.0
120.0
100.0
80.0
120.0
100.0
80.0
60.0
40.0
20.0
0.0
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
1 2: 1 3: 1 4: 1 5: 1 6: 1 7: 1 8: 1 9: 2 0: 2 1: 2 2: 2 3: 0: 1: 2: 3: 4: 5: 6: 7:
QUIMPAC QUIMPAC
GLORIA MEPSA MILPO-DESIERTO PANASA
PARAMONGA OQUENDO
BUENAVENTURA
EL BROCAL CASAPALCA LAS BAMBAS ARES-CALLALLI ARES-COTARUSE
(ARES)
DEMANDA AREA
FECHAHORA
IMPORTACIÓN
SEIN NORTE CENTRO
ECUADOR
0:30 0.00 5,579.95 766.33 3,334.75
1:00 0.00 5,473.91 751.72 3,261.67
1:30 0.00 5,372.46 739.27 3,181.08
2:00 0.00 5,220.60 727.16 3,055.92
2:30 0.00 5,152.21 717.72 3,000.55
3:00 0.00 5,131.02 690.56 3,007.10
3:30 0.00 5,085.95 676.96 2,980.05
4:00 0.00 5,097.72 710.26 2,955.95
4:30 0.00 5,107.19 710.98 2,954.00
5:00 0.00 5,051.52 691.29 2,909.62
5:30 0.00 5,067.24 723.10 2,912.49
6:00 0.00 4,978.05 711.88 2,842.36
6:30 0.00 4,862.92 675.60 2,764.42
7:00 0.00 4,865.36 672.94 2,798.89
7:30 0.00 4,947.03 692.11 2,844.29
8:00 0.00 5,003.28 665.93 2,913.58
8:30 0.00 5,120.10 705.28 2,993.51
9:00 0.00 5,233.77 697.68 3,120.84
9:30 0.00 5,272.18 716.42 3,138.76
10:00 0.00 5,256.21 715.05 3,127.13
10:30 0.00 5,385.01 698.71 3,266.12
11:00 0.00 5,440.96 734.12 3,278.34
11:30 0.00 5,473.17 742.56 3,297.41
12:00 0.00 5,480.12 732.04 3,311.56
12:30 0.00 5,410.53 717.28 3,263.96
13:00 0.00 5,395.57 739.22 3,233.73
13:30 0.00 5,396.32 728.65 3,258.32
14:00 0.00 5,400.04 712.30 3,245.73
14:30 0.00 5,394.13 722.51 3,230.46
15:00 0.00 5,349.71 718.87 3,195.59
15:30 0.00 5,267.98 707.24 3,133.17
16:00 0.00 5,241.24 690.50 3,093.50
16:30 0.00 5,272.64 705.38 3,114.22
17:00 0.00 5,400.14 686.34 3,252.83
17:30 0.00 5,437.73 731.16 3,219.47
18:00 0.00 5,675.48 720.57 3,392.95
18:30 0.00 6,077.03 841.22 3,642.21
19:00 0.00 6,227.18 920.98 3,709.29
19:30 0.00 6,281.15 888.80 3,836.06
20:00 0.00 6,307.29 886.01 3,880.01
20:30 0.00 6,256.13 867.06 3,864.16
21:00 0.00 6,205.19 876.07 3,812.44
21:30 0.00 6,020.74 823.68 3,689.71
22:00 0.00 5,875.76 818.48 3,581.14
22:30 0.00 5,719.34 782.83 3,480.62
23:00 0.00 5,524.92 760.21 3,328.72
23:30 0.00 5,408.35 705.96 3,275.48
0:00 0.00 5,279.45 736.90 3,133.19
DATOS ESTIMADOS
SIN DATOS
1,600
1,400
1,200
1,000
800
600
400
200
NORTE SUR
0
3 0 00 30 00 30 0 0 3 0 00 3 0 0 0 30 00 30 00 30 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0
0 : 1: 1: 2: 2: 3 : 3 : 4: 4 : 5 : 5: 6: 6: 7: 7: 8 : 8 : 9 : 9 : 10 : 10 : 11 : 11 : 12 : 1 2 :
EAS OPERATIVAS (MW)
3006 3007 3008 3009
EA SUBAREAS
(Valores SCADA)
4,500
4,000
3,500
3,000
2,500
2,000
1,500
1,000
500
ORTE SUR CENTRO
0
0 30 0 0 3 0 00 3 0 0 0 30 0 0 30 00 30 00 30 0 0 30 0 0 3 0 0 0 3 0 0 0 30 00 30 00 30 00 30 0 0 3 0 00
9 : 10 : 10 : 11 : 11 : 12 : 1 2 : 13 : 1 3 : 1 4 : 1 4 : 1 5 : 1 5 : 16 : 16 : 17 : 17 : 18 : 18 : 19 : 1 9 : 2 0 : 2 0 : 2 1 : 2 1 : 22 : 22 : 23 : 23 : 0:
3010 3012 3013 3014 5000
SUBAREAS
MW
ÁREA CENTRO
4,500
4,000
3,500
3,000
2,500
2,000
1,500
1,000
500
0
0 0 0
:0 :3 :0
23 23 0
Sunday, September 30, 2018
9808 9812 9505 9473 4671
POTENCIA ACTIVA LÍNEAS DE TRANSMISIÓN DEL SEIN
SS.EE S.E. ZORRITOS S.E. TALARA S.E. PIURA OES
Nota:
Información proviene de datos instantáneos de potencia cada 30 minutos (Valores SCA
DATOS ESTIMADOS
SIN DATOS
EQUIPOS INTERVIENEN EN DEMANDA POR ÁREAS Y CONGESTIONES
4676 4681 5362 163 362 25198
N N N N N N
N: Norte
minutos (Valores SCADA) C: Centro
S: Sur
GESTIONES
25038 25051 25187 25104 3431 155
N N C N N N
S.E. CAJAMARCA
S.E. GUADALUPE S.E. CEMENTOS PACASMAYO
NORTE
N N N N N N
N N N N N N
N N N N N N
N N N N N N
S.E. CHIMBOTE 1
N N N N N N
S.E. CHIMBOTE
S.E. CHIMBOTE1 S.E. PARAMONGA EXISTENTE S.E. PARAMONGA
NUEVA
N N N N N N
N N N N N N
N N N N N N
AT73-523 AT74-523
TRA1 L-6554 L-652 TRA1
220kV 220kV
23.1 23.0 57.9 -23.2 -15.9 44.4
22.2 22.0 55.4 -22.5 -14.7 42.0
20.8 21.0 53.5 -23.2 -11.2 40.2
15.0 15.2 51.2 -22.5 -10.4 38.4
12.2 11.5 49.5 -22.5 -10.0 37.2
15.2 15.3 48.3 -21.9 -9.6 36.0
8.3 7.9 48.1 -21.5 -9.1 35.4
4.8 4.3 47.4 -21.2 -8.9 34.8
8.3 7.7 48.5 -21.2 -8.8 35.4
5.5 6.0 49.0 -21.5 -8.9 35.4
4.1 4.2 48.8 -22.2 -8.7 35.4
5.9 6.9 45.7 -20.6 -7.8 33.6
7.8 7.8 42.9 -18.9 -6.1 31.8
24.7 25.1 43.0 -18.3 -5.7 29.4
26.0 25.9 44.4 -19.3 -6.8 31.2
41.8 41.4 47.1 -19.6 -7.2 33.0
47.3 48.0 50.4 -20.2 -8.0 34.8
86.4 87.1 53.2 -19.9 -8.1 36.6
198.6 198.4 55.7 -22.9 -11.3 39.6
206.6 206.0 55.8 -23.8 -12.4 40.2
205.4 205.1 57.0 -23.8 -12.6 41.4
202.8 202.6 57.0 -23.2 -12.3 42.0
208.3 207.9 56.9 -23.8 -12.9 42.6
203.5 203.1 55.7 -23.5 -12.7 43.2
201.5 201.1 56.2 -22.9 -12.3 43.2
202.7 203.3 56.8 -21.5 -13.1 46.2
201.7 200.8 56.1 -20.9 -12.6 46.2
200.6 200.5 55.5 -20.6 -12.3 45.6
199.7 199.1 54.2 -19.6 -14.8 45.0
197.4 197.7 53.5 -19.3 -14.6 44.4
195.3 194.1 53.8 -19.3 -14.6 43.8
196.2 195.7 53.2 -19.3 -14.5 43.2
196.0 195.9 53.2 -19.6 -14.6 43.2
184.7 184.9 53.2 -18.3 -13.7 43.2
53.5 54.0 51.6 -17.9 -12.8 42.6
42.9 42.9 53.7 -18.9 -15.1 48.0
42.9 42.5 66.7 -25.1 -22.8 58.2
38.4 38.2 68.9 -25.5 -23.9 60.0
42.7 42.7 70.2 -25.8 -24.0 61.2
38.1 38.6 69.5 -25.8 -24.1 61.2
38.7 38.6 68.8 -25.5 -23.8 58.5
39.7 39.5 68.0 -27.4 -22.0 55.8
37.6 37.4 66.3 -26.8 -21.1 54.6
35.2 35.4 63.5 -25.5 -19.8 51.6
34.6 34.6 60.0 -24.5 -18.3 49.2
33.4 33.9 57.2 -23.5 -16.7 45.6
37.8 37.0 53.0 -22.2 -15.0 42.6
38.6 38.8 50.2 -21.5 -13.6 39.6
208.3 207.9 70.2 -17.9 -5.7 61.2
4.1 4.2 42.9 -27.4 -24.1 29.4
86.1 86.0 54.9 -22.1 -13.5 43.1
N N C C C C
TRANSMANTARO EDELNOR
1958 330 316 1155 1168 1770
C C C C C C
C C C C C C
C C C C C C
C C C C C C
C.H. MOYOPAMPA S.E. SANTA ROSA NUEVA S.E. SANTA ROSA NUEVA
C C C C C C
S.E. SANTA ROSA NUEVA S.E. SANTA ROSA S.E. SANTA ROSA ANTIGUA
C C C C C C
C C C C C C
C C C C C C
3223 1903 4078 4070 1227 5843
C C C C C C
INLAND ENERGY
3184 3187 9579 9582 8 151
C C C C C C
9425 9429 20702 800 795 881
C C C C C C
S.E. CHILCA REP S.E. ASIA S.E. CHILCA CTM (500 Kv)
C C C C C
C C C C C
C C C C C C
C C C C C
C C C C C C
C C C C C C
CHINALCO RED D
294 204 225 5430 6056 7045
C C C C C C
C C C C C
STATKRAFT
6043 3521 3525 3529 20307
TR-220/60 T2 T3 T4 T5
C C C C C
C C C C C
C C C C C
C C C C C C
C C C C C C
RED DE ENERGIA
MINERA ANTAMINA ISA PERU ISA PERU ETESELVA
DEL PERU
1443 246 229 1439 2177 2179
C C C C C C
C C S S S
KALLPA TRANSMANTARO
2024 2040 21351 21356 5746 5741
S S S S S S
S S S S S S
S.E. SOCABAYA S.E. SOCABAYA S.E. CERRO VERDE S.E. CERRO VERDE
S S S S S S
MINERA CERRO
MINERA CERRO VERDE TESUR REP
VERDE
5671 2648 2647 2154 2172
S S S S S
S S S S S S
S S S S S S
S S S S S S
S S S S S S
S S S S S S
S S S S S S
S S S S S S
RED DE ENERGIA
EGEMSA MINERA LAS BAMBAS REDESUR
DEL PERU
9623 5513 1677 21253 21231
S.E. SAN GABÁN S.E. MOQUEGUA S.E. ILO MACHUPICCHU II S.E. SURIRAY
S S S S S
AT89-212 AT90-212
L-2059 L-2050 L-2060
(220kV) (220kV)
41.5 -27.3 -52.4 34.5 16.7
42.9 -28.3 -53.0 35.9 16.0
41.4 -28.1 -51.6 35.0 15.7
39.9 -25.8 -51.0 34.3 16.0
40.0 -23.2 -50.3 34.4 16.5
41.7 -26.9 -50.2 34.6 15.7
42.1 -26.4 -52.6 36.0 15.4
42.9 -28.9 -52.4 36.1 15.3
42.7 -29.6 -53.2 36.9 15.7
39.7 -27.4 -51.2 33.4 15.9
40.7 -28.2 -50.4 34.1 15.8
43.6 -32.4 -52.9 37.5 14.5
42.0 -26.9 -51.9 35.8 16.6
40.9 -27.1 -51.1 33.1 16.7
42.8 -28.6 -53.1 36.6 16.4
44.2 -33.6 -53.3 37.7 15.0
36.6 -26.4 -47.2 30.4 16.6
41.6 -29.5 -52.0 36.0 16.3
39.0 -26.9 -50.2 32.3 17.5
44.2 -29.4 -54.5 37.1 16.3
43.9 -28.4 -53.9 36.6 16.6
40.1 -27.3 -51.5 34.3 16.8
40.5 -27.6 -51.4 34.1 16.6
41.6 -28.1 -51.5 34.9 16.3
44.7 -29.1 -53.1 36.8 16.2
40.9 -27.9 -51.8 34.6 16.3
40.9 -26.4 -50.9 34.1 16.3
40.4 -25.4 -50.6 34.0 16.6
41.1 -26.6 -50.8 33.9 16.0
42.6 -28.3 -52.1 36.2 15.8
40.2 -25.7 -50.4 33.1 16.3
38.6 -25.5 -49.7 32.1 16.5
36.1 -20.8 -48.5 29.3 18.4
35.7 -21.1 -48.1 28.8 18.8
38.0 -22.3 -49.5 30.7 18.1
32.0 -13.6 -46.8 23.5 22.4
25.9 -5.7 -42.3 17.2 24.9
24.6 -3.1 -42.8 15.5 24.4
31.4 -14.0 -46.9 22.8 23.2
28.4 -10.3 -44.1 20.2 23.3
31.8 -13.5 -46.9 22.9 22.2
35.5 -20.5 -49.3 28.3 20.7
35.9 -19.0 -48.7 28.2 20.0
38.4 -21.7 -51.6 30.9 19.3
38.5 -20.9 -50.1 31.6 18.2
38.0 -23.4 -48.7 31.4 16.9
40.8 -26.8 -51.1 34.3 16.1
44.4 -31.5 -53.5 37.9 14.7
44.7 -3.1 -42.3 37.9 24.9
24.6 -33.6 -54.5 15.5 14.5
39.2 -24.5 -50.4 32.3 17.5
S S S S S
TRANSMANTARO
Sunday, September 30, 2018
4264 4268 366
INTERCONEXIÓN
SS.EE CENTRO - NORTE
KIMAN AYLLU KIMAN AYLLU CHIMBOTE1
HORA L-2269 L-2270 L-2215
0:30 29.6 29.9 35.5
1:00 27.5 27.5 35.0
1:30 30.2 30.1 34.3
2:00 26.7 26.8 34.4
2:30 26.2 27.7 32.8
3:00 23.4 23.6 29.3
3:30 26.3 26.2 0.0
4:00 30.2 29.7 0.0
4:30 31.6 30.4 0.0
5:00 30.0 30.9 0.0
5:30 31.7 31.9 0.0
6:00 31.9 32.1 0.0
6:30 30.1 29.5 0.0
7:00 30.7 30.6 0.0
7:30 32.0 32.8 0.0
8:00 18.6 19.4 31.5
8:30 19.5 19.7 31.8
9:00 24.0 24.2 29.6
9:30 99.3 102.4 138.0
10:00 91.5 92.6 147.0
10:30 87.2 87.8 136.6
11:00 99.8 101.0 141.2
11:30 102.0 103.2 144.8
12:00 96.8 96.2 141.9
12:30 95.0 94.7 134.8
13:00 101.4 100.2 140.9
13:30 99.0 99.3 136.6
14:00 96.3 94.5 132.8
14:30 90.1 90.3 131.0
15:00 87.5 87.4 129.4
15:30 85.0 87.4 124.9
16:00 82.0 81.5 128.3
16:30 85.1 86.8 122.0
17:00 64.8 66.0 108.9
17:30 20.1 20.1 24.3
18:00 19.9 20.0 24.0
18:30 30.9 30.9 33.9
19:00 31.8 32.0 35.0
19:30 30.7 30.9 32.8
20:00 32.8 32.6 0.0
20:30 32.7 32.9 0.0
21:00 29.1 29.1 0.0
21:30 29.7 29.6 0.0
22:00 33.1 33.1 0.0
22:30 31.2 31.3 0.0
23:00 29.2 30.0 0.0
23:30 23.6 24.2 0.0
0:00 20.2 20.2 32.8
MINIMO 18.6 19.4 0.0
MÁXIMO 102.0 103.2 147.0
PROMEDIO 49.1 49.4 65.4
MW
MW
CH
L-
1,300.0
1,200.0
1,100.0
1,000.0
900.0
800.0
700.0
600.0
500.0
400.0
300.0
200.0
100.0
0.0
0:30 1:00 1:30 2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00
TOTAL_EJECUTADO TOTAL_GPROGRAMA
(*) LIMITE 6 CENTRO SUR (*) LIMITE 7 CENTRO
0.0
0:30 1:00 1:30 2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00
TOTAL_EJECUTADO TOTAL_GPROGRAMA
(*) LIMITE 6 CENTRO SUR (*) LIMITE 7 CENTRO
1343 5067 8000 2177
INTERCONEXIÓN ENTRE SISTEMAS OPERATIVOS DEL SEIN
NTRO - NORTE C
CHIMBOTE1 CHIMBOTE NUEVA CAMPO ARMIÑO
TOTAL
L-2216 L-5006 L-2051
34.4 429.8 559.2 207.2
33.6 419.7 543.2 204.3
35.1 410.5 540.1 205.1
33.9 406.3 528.1 204.6
34.0 405.0 525.6 201.7
30.1 388.7 495.1 202.4
40.7 393.3 486.5 200.1
44.9 409.4 514.2 203.1
46.1 407.5 515.5 205.8
42.0 395.4 498.3 212.1
47.6 420.0 531.2 209.0
46.2 409.5 519.7 202.4
42.7 379.7 482.0 200.1
43.0 376.7 481.0 181.7
45.9 399.9 510.7 173.1
32.2 367.5 469.2 162.8
30.6 366.9 468.4 158.8
30.2 346.8 454.8 185.6
140.4 0.0 480.1 182.8
147.8 0.0 478.8 171.7
138.5 0.0 450.2 169.8
140.1 0.0 482.1 172.2
144.0 0.0 494.0 168.2
141.5 0.0 476.4 159.2
134.4 0.0 458.9 167.2
139.9 0.0 482.4 166.9
137.6 0.0 472.5 169.5
131.8 0.0 455.3 175.1
132.2 0.0 443.6 174.7
130.1 0.0 434.4 168.5
129.1 0.0 426.4 170.2
121.2 0.0 413.0 181.7
125.9 0.0 419.9 193.5
108.6 0.0 348.3 217.6
25.2 348.1 437.8 190.3
24.2 352.5 440.6 208.0
30.8 441.1 567.6 202.9
33.5 471.9 604.2 198.1
34.2 466.3 594.9 191.8
37.1 484.4 586.8 195.1
36.2 470.4 572.2 192.8
34.6 461.9 554.8 191.4
32.6 453.5 545.3 190.5
32.9 450.5 549.6 196.1
32.2 424.6 519.4 194.4
29.9 410.0 499.2 190.8
25.9 372.7 446.4 194.0
25.7 386.9 485.8 186.4
24.2 0.0 348.3 158.8
147.8 484.4 604.2 217.6
68.1 273.5 494.7 188.6
CHI MBOTE1 CHI MBOTE1 CHIMBOTE NUEVA KIMAN AYLLU KIMAN AYLLU
L-2216 L-2215 L-5006 L-2270 L-2269
0 2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:0010:3011:0011:3012:0012:3013:0013:3014:0014:3015:0015:3016:0016:
L_EJECUTADO TOTAL_GPROGRAMADO (*) LIMITE 1 CENTRO SUR (*) LIMITE 2 CENTRO SUR (*) LIMITE 3 CENTRO SUR
MITE 6 CENTRO SUR (*) LIMITE 7 CENTRO SUR (*) LIMITE 8 CENTRO SUR (*) LIMITE 9 CENTRO SUR (*) LIMITE 10 CENTRO SUR
0 2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:0010:3011:0011:3012:0012:3013:0013:3014:0014:3015:0015:3016:0016:
L_EJECUTADO TOTAL_GPROGRAMADO (*) LIMITE 1 CENTRO SUR (*) LIMITE 2 CENTRO SUR (*) LIMITE 3 CENTRO SUR
MITE 6 CENTRO SUR (*) LIMITE 7 CENTRO SUR (*) LIMITE 8 CENTRO SUR (*) LIMITE 9 CENTRO SUR (*) LIMITE 10 CENTRO SUR
2179 24789 5582 5000
OS DEL SEIN
CENTRO - SUR
CAMPO ARMIÑO POROMA POROMA
TOTAL
L-2052 L-5033 L-5034
205.4 343.1 386.9 1,142.5
202.9 334.3 381.1 1,122.7
202.0 337.3 384.0 1,128.4
197.7 332.0 373.8 1,108.1
205.1 329.1 377.8 1,113.8
201.9 327.9 374.3 1,106.5
201.7 326.2 373.6 1,101.7
200.5 327.4 374.9 1,105.8
203.3 330.3 374.0 1,113.5
209.7 324.2 380.3 1,126.3
205.8 324.3 377.6 1,116.7
201.0 310.7 367.1 1,081.2
197.4 318.5 362.4 1,078.4
181.0 285.3 325.9 973.8
170.1 271.2 310.3 924.8
159.8 251.1 298.1 871.8
155.7 234.6 281.1 830.2
183.2 189.8 247.1 805.6
181.4 189.8 248.2 802.3
170.2 190.0 251.5 783.4
169.9 192.4 246.0 778.2
167.7 200.5 254.0 794.4
164.3 200.9 256.1 789.5
156.3 214.5 264.8 794.8
165.5 225.0 265.9 823.7
163.6 216.5 263.1 810.1
168.5 213.0 260.3 811.3
175.0 220.9 265.9 836.9
172.1 215.1 261.6 823.5
167.7 208.6 248.1 792.8
167.4 210.2 257.7 805.5
179.0 223.7 275.7 860.1
193.7 243.5 292.5 923.2
213.9 266.3 315.5 1,013.2
187.4 336.1 379.1 1,092.8
203.4 369.7 405.1 1,186.3
202.0 356.6 405.6 1,167.1
194.7 351.7 389.5 1,134.0
189.4 324.9 372.3 1,078.4
190.1 323.3 376.4 1,084.8
190.7 313.1 364.1 1,060.7
189.3 313.6 356.7 1,051.0
192.5 304.8 353.8 1,041.7
192.5 309.6 358.2 1,056.4
195.4 308.1 357.0 1,054.8
188.8 297.5 354.7 1,031.8
191.2 312.3 370.4 1,067.9
183.4 314.7 373.7 1,058.2
155.7 189.8 246.0 778.2
213.9 369.7 405.6 1,186.3
186.5 280.5 329.0 984.6
INTERCONE
MW
1400.0
1200.0
1000.0
800.0
600.0
400.0
200.0
600.0
400.0
200.0
0.0
0:30 1:00 1:30 2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00 6:30 7:
POROMA
L-5034
013:0013:3014:0014:3015:0015:3016:0016:3017:0017:3018:0018:3019:0019:3020:0020:3021:0021:3022:0022:3023:0023:30 0:00
UR (*) LIMITE 3 CENTRO SUR (*) LIMITE 4 CENTRO SUR (*) LIMITE 5 CENTRO SUR
UR (*) LIMITE 10 CENTRO SUR
013:0013:3014:0014:3015:0015:3016:0016:3017:0017:3018:0018:3019:0019:3020:0020:3021:0021:3022:0022:3023:0023:30 0:00
UR (*) LIMITE 3 CENTRO SUR (*) LIMITE 4 CENTRO SUR (*) LIMITE 5 CENTRO SUR
UR (*) LIMITE 10 CENTRO SUR
TOTAL_GPROGRAMA
DO
1100.28175
1097.71951
1097.85429
1098.25509
1097.2122
1096.47108
1094.99833
1094.83396
1094.44884
1094.84348
1095.85465
1091.66993
1079.68107
1076.288
1036.91575
1007.52027
859.53302
837.51918
842.14286
833.61976
839.19558
847.97183
848.70374
844.4468
844.10245
848.08427
836.13995
828.53487
862.96723
879.87885
877.32517
875.07685
1034.76896
1045.03976
1147.53564
1170.25232
1112.61381
1086.55293
1104.30563
1101.04987
1108.93744
1091.13766
1086.46327
1117.72129
1088.9529
1090.78863
1156.37427
1137.61936
0
HORA
C.T. PARAMONGA C.T. MAPLE ETANOL C.E. CENTRAL C.S. RUBI -
TV01 - VOLUMEN TV - VOLUMEN DE EOLICA WAYRA I RADIACIÓN SOLAR
DE BAGAZO (Tn) BAGAZO (Tn) (m/s) (W/m2)
DATOS ESTIMADOS
SIN DATOS
FUENTE DE ENERGÍA PRIMARIA DE
GTS
MOQUEGUA FV
ENERGÍA EÓLICA S.A. ENGIE GTS MAJES S.A.C REPARTICION
S.A.C.
S.A.C.
C.S. REPARTICION
C.E. PARQUE C.E. PARQUE C.S. INTIPAMPA - C.S. MAJES SOLAR C.S. MOQUEGUA FV
SOLAR 20T -
EOLICO EOLICO TALARA RADIACIÓN SOLAR 20T - RADIACIÓN - RADIACIÓN
RADIACIÓN SOLAR
CUPISNIQUE (m/s) (m/s) (W/m2) SOLAR (W/m2) SOLAR (W/m2)
(W/m2)
7.10 6.60
6.90 6.50
6.90 6.50
6.60 5.90
6.00 6.40
6.10 5.80
5.80 5.60
6.20 5.00
6.20 5.80
5.90 5.10 0.00 0.78
5.20 5.60 0.00 19.83
4.90 5.70 3.00 8.00 0.00 62.84
5.00 6.30 169.00 86.00 215.00 133.90
5.20 5.30 410.00 221.00 350.00 263.85
5.00 5.80 698.00 359.00 485.00 447.93
5.40 3.70 930.00 498.00 613.00 914.94
5.90 3.70 1,025.00 626.00 725.00 1,088.48
6.40 3.90 1,053.00 743.00 824.00 1,093.69
8.10 4.30 1,068.00 846.00 909.00 1,096.56
8.30 4.20 1,071.00 932.00 978.00 1,096.16
9.10 4.90 1,068.00 1,001.00 1,023.00 1,094.78
9.30 6.00 1,073.00 1,050.00 1,046.00 1,087.12
9.40 5.20 1,083.00 1,076.00 1,048.00 1,088.59
9.90 5.70 1,085.00 1,084.00 1,029.00 1,092.81
10.30 5.80 1,087.00 1,072.00 996.00 1,093.00
10.80 5.30 1,093.00 1,042.00 941.00 1,094.73
11.50 5.60 1,091.00 989.00 844.00 1,091.29
11.60 5.30 1,067.00 916.00 754.00 1,079.51
11.50 5.70 1,074.00 824.00 664.00 1,068.18
11.40 6.00 1,055.00 717.00 555.00 1,038.14
11.40 5.80 1,030.00 596.00 432.00 982.70
10.60 5.70 925.00 464.00 296.00 879.18
11.30 6.80 688.00 322.00 125.00 666.74
11.40 7.20 438.00 148.00 92.00 239.80
10.90 7.60 210.00 24.00 8.26
11.50 7.80
10.70 8.20
10.10 7.80
8.80 7.60
8.50 8.00
8.10 8.30
8.80 7.80
8.30 7.60
8.20 7.50
7.60 8.80
7.40 8.50
7.30 8.50
7.50 9.20
1 1 1 1 1 1
A PRIMARIA DE LAS UNIDADES RER
PARQUE EOLICO
PANAMERICANA PARQUE EOLICO
TRES HERMANAS PETRAMA
SOLAR SAC. MARCONA S.R.L.
S.A.C.
C.S.
PANAMERICANA C.E. PARQUE C.E. PARQUE HUAYCOLORO G1 - HUAYCOLORO G2 - HUAYCOLORO G3 -
SOLAR - EOLICO MARCONA EOLICO 3 VOLUMEN DE VOLUMEN DE VOLUMEN DE
RADIACIÓN SOLAR (m/s) HERMANAS (m/s) BIOGAS (m3) BIOGAS (m3) BIOGAS (m3)
(W/m2)
SÓLIDO, GASEOSO
TIPO COMBUSTIBLE UNIDAD 30/Sep
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
GAS m3 0.000
DIESEL B5 m3 0.000
GAS m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
AGUA m3 47.400
GAS m3 665755.200
DIESEL B5 m3 0.000
RESIDUAL R500 m3 0.000
RESIDUAL R500 m3 0.000
DIESEL B5 m3 0.000
RESIDUAL R500 m3 0.000
DIESEL B5 m3 0.000
GAS m3 0.000
GAS m3 0.000
RESIDUAL R500 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
RESIDUAL R500 m3 0.000
DIESEL B5 m3 0.000
RESIDUAL R500 m3 0.000
DIESEL B5 m3 0.000
RESIDUAL R500 m3 0.000
RESIDUAL R500 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
CARBON Tn 0.000
GAS m3 815304.000
GAS m3 814515.000
GAS m3 908856.000
GAS m3 925462.000
GAS m3 1708519.000
RESIDUAL R6 m3 0.000
DIESEL B5 m3 0.000
RESIDUAL R6 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
GAS m3 192900.100
DIESEL B5 m3 0.000
GAS m3 0.000
GAS m3 839405.000
GAS m3 0.000
GAS m3 0.000
BAGAZO Tn 652.727
GAS m3 928365.000
GAS m3 0.000
GAS m3 17814.655
GAS m3 29557.333
GAS m3 29557.333
GAS m3 30612.180
BIOGAS m3 19113.610
BIOGAS m3 18961.920
BIOGAS m3 0.000
BAGAZO Tn 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
GAS m3 0.000
DIESEL B5 m3 0.000
GAS m3 1168766.000
DIESEL B5 m3 0.000
GAS m3 1155158.000
GAS m3 1275691.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
BIOGAS m3 21115.990
BIOGAS m3 19932.770
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
GAS m3 383915.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
DIESEL B5 m3 0.000
GAS m3 0.000
BIOGAS m3 17475.300
BIOGAS m3 0.000
Presiones de Gas Natural de las Centrales Termoeléctricas
Fecha Inicio: 30/09/2018
Fecha Fin: 30/09/2018
REPORTE DE GPS
GPS S.E. S
Frecuencia mínima
Indicador de Calidad
Hora
GPS S.E. SA
Frecuencia mínima
Indicador de Calidad
Hora
GPS CHI
Frecuencia mínima
Indicador de Calidad
Hora
GPS P
Frecuencia mínima
Indicador de Calidad
Hora
GPS CHICLAYO
ia mínima Frecuencia máxima Transgresiones
Hz Hora Hz Hora Hz
GPS PIURA
ia mínima Frecuencia máxima Transgresiones
Hz Hora Hz Hora Hz
0
0
Transgresiones
Acumuladas mes
0
0
Transgresiones
Acumuladas mes
0
0
Transgresiones
Acumuladas mes
0
0
FECHA INICIO FINAL EMPRESA UBICACIÓN
SAN DIEGO
AUT-501
T74-523
T73-523
CENTRAL
GT11
R-10MVAr
CENTRAL
TG3
TG4
SVC
CENTRAL
RESERV. SHEQUE
CENTRAL
CENTRAL
CENTRAL
CENTRAL
BARRA138KV
BC-04
BARRA A 60
T40-13
T41-13
CENTRAL
TG2
SVC-1
CENTRAL
RESTRICCIONES OPERATIVAS
DESCRIPC
Indisponible el embalse San Diego, opera la C.H. Cañon del Pato de pasada.
No se puede variar taps desde el SCADA. ATN toma 4 horas para tener operador en la subestación.
Operación del grupo G5 con caudal mínimo con la generación de por menos de 18 MW en total de la suma de los grupos G1, G2, G3 y G4 q
Interruptor por
Restricción en by-pass.
temperatura:
Límite superior: 815 MW
Límite inferior: 530 MW
Limitado a +5 MVAr hasta +13.5 MVAr debido a las corrientes circulantes que se generan en el SVC.
Presión máxima de gas del sistema de la C.T. Malacas (TGN4, TG5 y TG6) de 280 PSI.
Capacidad mínima del embalse 150 000 m3 por aseguramiento de caudal para SEDAPAL, según lo informado por la empresa Enel Generaci
No puede parar debido a que no cuentan con alimentación para los servicios auxiliares, que era proveniente desde Callahuanca.
Capacidad de vertimiento maximo permanente igual a 10 m3/s. Capacidad de vertimiento maximo temporal igual a 16 m3/s.
El CC-EGASA limitó la capacidad del transformador 138 kV/33 kV a 50 MVA por deterioro del aislamiento.
Indisponibilidad de la celda del banco de condensadores debido a que continuan deshabilitadas sus protecciones.
Máxima tensión que puede operar es 63 kV debido a alarma en los servicios auxiliares.
Problemas de regulación de TAPS en nivel 3 (se regula a TAP 1 inmediatamente). En nivel 2 si se puede operar normalmente.
Falla en los mandos de la variación de los TAPS (si se realiza la maniobra la posición del TAP se sitúa en el mínimo).
Limitado a una potencia mínima de 19.59 MW, por problemas en los sellos de las válvulas eléctricas.
No puede parar debido a que no puede cerrar la compuerta a la entrada de la presa a los desarenadores.