BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 2 Betz 7R-30 semi
1/2" O/D s.s Anti Foulant 1G-39
of 3 bulk
1-RA-3b Sheet 2 1P83/84-10"-B5(1G-
1/2" O/D s.s Anti Foulant 1G-39
of 3 8/8AX suction lines)
1-RA-3b Sheet 2
3" steam out 1C-1 Top Atmosphere
of 3
1-RA-3b Sheet 2 Tower bottom shut down
Air Receiver 1C-18
of 3 Panel
1-RA-3a Sheet 1 BFW Header to steam
1 1BFW1-3"-C23 31BFW31-4"-D24 1BFW3,4,5-2"-C23 NA 320
of 3 generator (IE22/23)
Crude
1-RA-3/50-RA-11 1P1-12"-C1 Crude 1P807/849-12"-C1/1E-2 400 60 300 60 450 315
pump/Tankage
5P1-4"-B1 Kerosene 1P64-6"-B1 Plant 5
1IA1-3/4"-A1 Inst air 35IA6/1RA-5 1F-1 160 70
Reduced crude/HGO
2P1-8"-B1 1P94-8"-B1 1-BA-17 190 340 143 340 220 102
feed to VDU
1-RA-3b Sheet 3 15FO128-6"-B1/ 1-
1FO1-4"-B1 Fuel oil supply Header 1F-1 burner 305 200
of 3 RA-5

1-RA-5 1FG1-6"-B12 Fuel Gas header 15FG116-10"-B12 1FG2/3/4 95 35

1-RA-3b Sheet 2
1K1-1*1/2"-B1 Corrosion Inhibitor 1G-19X 1P79-1*1/2"-B1 150 95
of 3
1-RA-3b Sheet 1 O.H. Accum. Water (Sour
1PW1-3"-B19 1C-2 1G-16 60 250 45 250 70 29
of 3 water)
1-RA-5 1CW1-3"-A2 Cooling water header 32CW21-8"-A2 1CW3/14/34 100 40
Cooling water supply to
1-RA-5 19CW1-1*1/2"-A2 1CW1-3"-A2 19G-1 100 40
19G-1
Utility station near 1GT-
1-RA-5 1UW1-4"-A1 Utility water header 31BFW34 113 70
1A/etc
Utility station near 1GT-
1-RA-5 1UA1-3"-A1 Utility Air header 35UA26-6"-A1 190 100
1A/etc
1-RA-3b Sheet 1
1TW001-6"-AB Tempered Water 31-RA-2 1E-40 105 60 90 60 135 90
of 3
1-RA-4(3/3) 1HS1-6"-D24 600 # steam header 31HS20-12"-D24 1HS2/3/4 690 700 625 700 1205 600
1-RA-4(3/3) 1MS1-8"-C23 200# steam header 31MS22-12"-C23 1MS7/12 etc 276 412 207 388 360 200
1-RA-4(3/3) 1LS1-14"-B23 50# steam header 1LS8/9/11/34 etc 31LS22 66 312 50 298 110 50

LINE LIST Page 1/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig

1-RA-4(3/3) 1LC1-2"-B23 50# Condensate header 1LC2/3 31LC21 66 312 50 298 110 50

1-RA-3a Sheet 1 1E-23A&B/1LS4-


2 1LS2-8"-B23 50# steam 50# steam header/1LS1 66 312 50 298 110 50
of 3 6"-B23
1-RA-3a Sheet
1HS2-6"-D24 600# steam 1HS1 1GT-1AX 690 700 625 700 1205 600
3of 3
1-RA-3b Sheet 3
1FO2-3"-B1 Fuel oil return header 1F-1 burner 15FO104 305 200
of 3
1-RA-3b Sheet 3
1FG2-6"-B2 Fuel Gas 1FG3/4 1F-1 burner 95 35
of 3
MHB-9021 1P2-12"-C1 Crude 1P848-12"-C1 Desalter (1C-6) 470 232 360 232 540 285
1-RA-3b Sheet 2
1K2-1*1/2"-B1 Corrosion Inhibitor 1G-18X 1P37-18"-B1 150 90
of 3
1-RA-3b Sheet 1
1PW2-3"-B19 O.H. Accum. water 1PW1-3"-B19 1G-16A 60 250 45 250 70 29
of 3
1G-15 (desalter water
1-RA-5 1UW2-3"-A1 Utility Water 1UW1-4"-A1 113 70
make up)
1-RA-5 19CW2-1*1/2"-A2 Cooling water return 19G-1 1CW20-3"-A2 100 28
1-RA-3b Sheet 1 Tempered Water (1E-40
1TW002-6"-AB 1TW001-6"-AB 1TW003-6"-AB 105 60 90 60 135 90
of 3 s/s bypass line)
1-RA-3a Sheet 1 1MS1 (200# steam
1MS2-6"-C23 200 # steam 1E-22 top 276 412 207 388 360 215
of 3 header)
1-RA-3a Sheet 2 1E-11/1LS35-2"-
1LC2-1"-B23 50 # steam condensate 1LC1 66 312 50 298 110 50
of 3 B23
1-RA-3b Sheet 1
3 1UW3-3"-A1 Fresh water 36PW6-4"-B1 1PW2-3"-B19 113 70
of 3
A (service point) / 1-
1-RA-5 1UA3-1*1/2"-A1 Utility air 1UA1/utility header 190 100
RA-5
1-RA-3a Sheet 1-RA-5/1CW1-3"-
1CW3-1"-A2 Cooling Water inlet 1G-1A 100 40
3of 3 A2
1-RA-3a Sheet
1P3-12"-C1 Crude 1E-3 Desalter(1C-6) 470 257 360 257 540 250
3of 3
1-RA-3b Sheet 3
1LC3-1"-B23 50# steam condensate 1D-2 1LC1 66 312 50 298 110 50
of 3
1-RA-3b Sheet 2
1K3-1*1/2"-B1 ammonia solution 1G-24AX 1P79-1*1/2"-B1 150 95
of 3

LINE LIST Page 2/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 1
1PW3-3"-C19 Process water 1G-16A 1PW4/7-3"-C19 329 250 294 110 441 294
of 3
1E-40 (Overhead
1-RA-3b Sheet 1
1TW003-6"-AB Tempered Water naphtha trim 1E-39 (t/s inlet) 105 116 90 116 135 90
of 3
cooler)
1-RA-3b Sheet 2
1HS3-4"-D24 HP steam 1HS1 1GT-3AX 690 700 625 700 1205 600
of 3
1-RA-3a Sheet 1
1BD3-3"-B23 BlowDown 1E-23A CONCRETE SUMP 90 60
of 3
1-RA-4(3/3) 15BD3-2"-B19 Sour Gas header 15C-2 9F-2 50 100 38 100 57 2
1-RA-3a Sheet 1
1BFW3-2"-C23 BFW 1BFW1-3"-C23 1E-23B 500 320
of 3
20% caustic to ISOM
MHB-7403 16K3-2"-B32 Caustic 36G-11A/11 NA NA
unit
1-RA-5 1FG3-12"-B12 Fuel Gas Fuel gas header Fuel Gas Pot 95 35
1-RA-3a Sheet 1
4 1LS4-6"-B23 50# Steam 1E23-A/B relieves 1LS2-8"-B23 66 312 50 298 110 60
of 3
1-RA-3a Sheet 1
1BD4-3"-B23 BlowDown 1E-23B CONCRETE SUMP 90 60
of 3
1-RA-3b Sheet 3
1K4-1*1/2"-B1 10% ammonia sol. 1D-2 1G-24 150 5
of 3
1-RA-3b Sheet 1
1PW4-3"-C19 sour water 1G-16 1PW2005-3"-C19 470 250 360 110 540 294
of 3
1-RA-3a Sheet 3 Tempered Water (1E-39
1TW004-6"-AB 1TW003-6"-AB 1TW005-6"-AB 105 116 90 116 135 90
of 3 bypass line)

1-RA-5 1UA4-1*1/2"-A1 Utilitty air 1UA1/utility header A (service point) 190 100

1-RA-3b Sheet 2 Cooling water supply for 1RA-5/1CW1-3"-


1CW4-1*1/2"-A2 1G-3/3A 100 40
of 3 pump gland cooling A2
1-RA-3b Sheet 2
1HS4-3"-D24 600# steam 1HS1 1GT-8AX 690 700 625 700 1205 600
of 3
1-RA-3a Sheet 1
1BFW4-2"-C23 BFW 1BFW1-3"-C23 1E-23A NA 320
of 3
1-RA-4(3/3) 1MS4-2"-C23 200# steam 1MS1-8"-C23 1G-20 turbine 276 412 207 388 360 200
Fuel gas Sulphur plant incinerator
1-RA-5 1FG4-1*1/2"-B12 Fuel Gas 95 35
header/1FG1/3 (9F-2)

LINE LIST Page 3/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3a Sheet 1P3-12"-C1
5 1P5-8"-C1 Crude Desalter bypass line 470 252 360 252 540 215
3of 3 (Desalter inlet)
1-RA-3b Sheet 3
1K5-2"-B1 Ammonia header Ammonia cylinder 1D-2 150 93
of 3
1-RA-3b Sheet 1
1PW5-4"-C19 Fresh water/sour water 1PW2005-3"-C19 1E-20© 470 269 360 269 540 330
of 3
1-RA-3a Sheet 3
1TW005-6"-AB Cooling water 1E-39 outlet 31-RA-2/36TW4 105 218 90 218 135 90
of 3
1-RA-3b Sheet 1
1HS5-3"-D24 HP steam 1HS1 1GT-2AX 690 700 625 700 1205 600
of 3
1-RA-3a Sheet 1
1BFW5-2"-C23 BFW 1BFW1-3"-C23 1E-22 NA 320
of 3
1-RA-3a Sheet 1
1BD5-2"-B23 BlowDown 1E-23A CONCRETE SUMP 90 60
of 3
Spent caustic from Isom
MHB-7403 16B5-2"-B32 16G-9/9A 1K406-2"-B32 NA
unit
50# steam to service
1-RA-4 (2/3) 1LS5-1*1/2"-B23 1LS16-1*1/2"-B23 Service Point 66 312 50 298 110 50
point
1-RA-5 1UW5-1*1/2"-A1 Utility water 1UW1-4"-A1 W 113 70

1-RA-5 1UA5-1*1/2"-A1 Utilitty air 1UA1/utility header A (service point) 190 100

1-RA-3a Sheet 1
6 1BD6-2"-B23 BlowDown 1E-23B CONCRETE SUMP 90 60
of 3
1-RA-3b Sheet 1-RA-5/1CW1-3"-
1CW6-1*1/2"-A2 Cooling Water inlet 1G-4AX/6Y 100 40
1of 3 A2
1-RA-3b Sheet 2
1K6-1"-b1 Corrosion inhibitor Inhibitor tank 1G-18X/19X 150 5
of 3
1-RA-3b Sheet 2
1FG6-3"-B12 fuel gas 1FG1 1P48-24"-B1/1E-9 95 35
of 3
1-RA-3b Sheet 1
1PW6-3"-C19 Fresh Water 1G-15 1PW5-4"-C19 470 250 360 250 540 330
of 3
MHB-9023 1TW006-1"-A8 Tempered water 1TW003-6"-AB TSV 826 105 116 90 116 135 Intermittent
50 # steam to service
1-RA-4(2/3) 1LS6-1*1/2"-B23 1LS1 Service Point 66 312 50 298 110 50
point
1-RA-5 1UW6-1*1/2"-A1 Utility water 1UW1-4"-A1 W 113 70

1-RA-5 1UA6-1*1/2"-A1 Utilitty air 1UA1/utility header A (service point) 190 100

LINE LIST Page 4/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 1-RA-5/1CW1-3"-
7 1CW7-1*1/2"-A2 Cooling Water inlet 1G-4 100 40
1of 3 (1-RA-5) A2
1-RA-3a Sheet
1FG7-1*1/2"-B12 Fuel Gas for pump out 1FG1 1C-6/Desalter inlet 95 35
3of 3
1-RA-3a Sheet Desalter outlet/1C-
1P7-12"-C1 Crude 1G-1A 470 252 360 252 540 210
3of 3 6
1-RA-3b Sheet 3
1MS7-8"-C23 200# Decoking steam 1MS1 1F-1 Decoking Header 276 412 207 388 360 200
of 3
1-RA-3b Sheet 1
1PW7-3"-C19 Process Water 1PW3-3"-C19 1PW6-3"-C19 329 250 329 60 494 330
of 3
MHB-9023 1TW007-1"-A8 Tempered water TSV 826 1TW003-6"-A8 105 116 90 116 135 Intermittent
50# steam to service
1-RA-4(3/3) 1LS7-1*1/2"-B23 1LS23-1*1/2"-B23 Service Point 66 312 50 298 110 50
point
1-RA-5 1UW7-1*1/2"-A1 Utility water 1UW1-4"-A1 W 113 70

1-RA-5 1UA7-1*1/2"-A1 Utilitty air utility header/1UA1 A (service point) 190 100

1-RA-3a Sheet Process water to caustic Combine in caustic line


8 1PW8-4"-C19 1E-20 (A) 470 250 360 250 540 290
3of 3 line & enter 1P3-12"-C1
1-RA-3a Sheet
1P8-12"-C1 Crude 1P7-12"-C1 1G-1 470 252 360 252 540 210
3of 3
1-RA-3b Sheet 3
1FG8-1*1/2"-B12 Pilot Gas 1NG100-2"-B12 1F-1 burner 95 35
of 3
1-RA-3a Sheet 3 1RA-5/1CW1-3"-
1CW8-1"-A2 Cooling water 1G-7/7A 100 40
of 3 A2
1-RA-3b Sheet 2
1K8-1*1/2"-B32 Caustic 1G-29 1P7 400 210
of 3

1-RA-4(2/3) 1LS8-10"-B23 50 # steam from 1GT-1A 1GT-1AX 1RA-4/1LS1-14"-B23 66 312 50 298 110 50

1-RA-5 1UW8-1*1/2"-A1 Utility water 1UW1-4"-A1 W 113 70


MHB-9023 1TW008-1"-A8 Tempered water 1TW005-6"-AB TSV 837 105 218 90 218 135 Intermittent

1-RA-5 1UA8-1*1/2"-A1 Utilitty air 1UA7-1*1/2"-A1 A (service point)(1C-1) 190 100

1-RA-3a Sheet
9 1FG9-1*1/2"-B12 Fuel Gas 1FG7-1*1/2"-B12 1C-6AX 95 35
3of 3
1-RA-5 1UW9-1*1/2"-A1 Utility water 1UW1-4"-A1 W 113 70

LINE LIST Page 5/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3a Sheet
1P9-12"-C1 Crude 1G-1 1P10-12"-C1 470 253 440 253 660 440
3of 3
1-RA-3b Sheet 3 1UA1/ Utility 1F-1 Decoking air
1UA9-3"-A1 Utility Air 190 100
of 3 Header header
1-RA-3b Sheet 3
1UA9-2"-A1 Utility Air 1UA9-3"-A1 1F-1 Soot Blower-12" 190 100
of 3
1-RA-3b Sheet 2
1LS9-8"-B23 50# LP steam 1GT-3AX 1LS1/14 66 312 50 298 110 50
of 3
1-RA-3b Sheet 2 1RA-5/1CW1-3"-
1CW9-1*1/2"-A2 Cooling water 1G-5/5A 100 40
of 3 A2
MHB-9023 (1/2) 1TW009-1"-A8 Tempered water TSV 837 1TW005-6"-A8 105 218 90 218 135 Intermittent
1-RA-3b Sheet
10 1P10-12"-C1 Crude 1G-1A 1E-3 470 252 440 252 660 440
1of 3
1-RA-3a Sheet
1K10-1/2"-B32 Caustic Caustic tank 1P3-12"-C1 400 240
3of 3
1-RA-3b Sheet 2 Cooling water to 1G-8
1CW10-1*1/2"-A2 1CW1 1G-8/8A 100 40
of 3 gland
MHB-9023 (1/2) 1TW010-1"-A8 Tempered water 1TW005-6"-A8 TSV830 105 218 90 218 135 Intermittent
50# steam to service
1-RA-4(2/3) 1LS10-1*1/2"-B23 1LS14 Service Point 66 312 50 298 110 50
point
1-RA-5 1UW10-1*1/2"-A1 Utility water 1UW1-4"-A1 W(1C-1) 113 70
1-RA-3b Sheet 3 Stripping steam/200#
11 1MS11-8"-C23 1-RA-4 1F-1 convection 276 412 207 388 360 200
of 3 Steam
1-RA-3b Sheet 2
1LS11-6"-B23 50 # Steam 1GT-8AX 1RA-4/1LS14-6"-B23 66 312 50 298 110 50
of 3
1-RA-3a Sheet 1
1CW11-14"-A1 Cooling Water 32CW30-16"-A2 1E-16B 100 40
of 3
MHB-9023 (1/2) 1TW011-1"-A8 Tempered water TSV830 1TW005-6"-A8 105 218 90 218 135 Intermittent
1-RA-3a Sheet 2
1BD11-1*1/2"-C23 BlowDown 1E-22 31BD31 510 215
of 3
1-RA-4(3/3) 4BD11-6"-B1 BlowDown 4C-10 1BD50-10"-B1 NA
1-RA-5 1UW11-1*1/2"-A1 Utility water 1UW13-4"-A1 W (service point) 113 70
Caustic Storage tank
1-RA-5 1UA11-1*1/2"-A1 Utility air 1UA1-3"-A1 190 100
1D-1

LINE LIST Page 6/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1P178-12"-
1-RA-3a Sheet
12 1P12-12"-C1 Crude C1/1P3-12"-C1 1E-5 470 320 420 320 630 420
3of 3
(Desalter inlet)
Blow down drum bottom
1-RA-4(3/3) 19P12-6"-B1 19C-1 19G-1 NA
line
1-RA-3b Sheet 3
1MS12-3"-C23 Atomizing steam 1MS1 1F-1 burner 276 412 207 388 360 200
of 3
1-RA-3b Sheet 3 50# steam for heating
1LS12-1*1/2"-B23 1LS14 1D-2 66 312 50 298 110 50
of 3 purpose
1-RA-3b Sheet 3
1UW12-2"-A1 Utility water 1UW1 1UW21-1*1/2"-A1/1D-2 113 70
of 3

1-RA-5 1UA12-1*1/2"-A1 Utilitty air 1UA1/utility header A (service point) 190 100

1-RA-3a Sheet 1
1CW12-14"-A2 Cooling Water 32CW30-16"-A2 1E-16A 100 40
of 3
1-RA-3a Sheet 1
1BD12-3"-B23 BlowDown 1E-22 bottom CONCRETE SUMP 510 215
of 3
1-RA-4(3/3) 1K12-1*1/2"-B32 Caustic 1G-26/1Ra-3 cap/50RA-12(S2of6) 400 30
1-RA-3a Sheet 1
13 1K13-1*1/2"-C1 Phosphate injection line 1RA-4 1E-22,23A&B (TOP) 650 420
of 3
1-RA-3a Sheet Desalter bottom
1PW13-4"-C19 Desalter drain water 1E-20 (a) 215 275 215 275 323 215
3of 3 outlet 1C-6
50# steam to service
1-RA-4(2/3) 1LS13-1*1/2"-B23 1LS1/14 Service Point 66 312 50 298 110 50
point

1-RA-4(3/3) 19P13-4"-B1 blow down pump out lien 19G-1 slops or slops tanks NA

1-RA-3 1P13-12"-C1 Crude 1E-5 1E-8 470 445 330 445 590 390
1-RA-5 1UW13-4"-A1 Utility water 1UW1-4"-A1 1RA-3/W/(1F-1) 113 70
A (service point)(1C-
1-RA-5 1UA13-1*1/2"-A1 Utilitty air 1UA7-1*1/2"-A1 190 100
3,4,5)
1-RA-3a Sheet To BFW treatment plant
14 1K14-1*1/2"-B32 1RA-3/1G-25 CAP/1-RA-4/50RA-12 150 25
3of 3 36/Caustic
1-RA-3a Sheet 1-RA-5/1CW1-3"-
1CW14-1"-A2 Cooling water 1G-1 100 40
3of 3 A2
1-RA-3b Sheet 2 Overhead accumulator
1PW14-1"-C19 1PW4-3"-C19 1P48-24"-B1 350 250
of 3 water

LINE LIST Page 7/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-4(2/3) 1LS14-6"-B23 50# steam header 1LS9 1LS33/36/37/38/39/40 66 312 50 298 110 50
1-RA-5 1UA14-1*1/2"-A1 Utilitty air 1UA9-3"-A1 A (service point)(IF-1) 190 100
15 1-RA-3b 1LS15-1"-B23 Seal Quench steam 1LS1 1G-6 66 312 50 298 110 50
1-RA-3a Sheet
1K15-1"-B1 Demulsifier Demulsfier tank 1G-23 150 5
3of 3
1-RA-3a Sheet
1P15-12"-C1 Crude 1E-8 1P16/17-8"-C1 470 524 360 524 540 360
2of 3
1-RA-3b Sheet 3
1MS15-8"-C24 200# steam 1F-1 1MS17-8"-C24 275 720 207 650 360 200
of 3

Flushing Water, divide in


1-RA-3b Sheet 2 four branch and enter into
1PW15-3/4"-C19 1PW14-1"-C19 1E-9 350 250
of 3 the inlet header of fin fan
cooler

Utility water to caustic


1-RA-5 1UW15-2"-A1 1UW1-4"-A1 1D-1 113 70
storage stank (1D-1)
1-RA-5 1UA15-1*1/2"-A1 Utilitty air 1UA9-3"-A1 A (service point)(IF-1) 190 100
1-RA-3a Sheet
16 1K16-3/4"-C1 Demulsifier 1G-23 1P3-12"-C1 400 250
3of 3
1-RA-3b Sheet 3
1P16-8"-C1 Crude 1P15-12"-C1 Into 4 branches 470 524 360 524 540 360
of 3
1-RA-3b Sheet 3
1UA16-2"-A1 Utility Air 1UA9-2"-A1 1F-1 190 100
of 3

Flushing Water, divide in


1-RA-3b Sheet 2 four branch and enter into
1PW16-3/4"-C19 1PW14-1"-C19 1E-9 350 250
of 3 the inlet header of fin fan
cooler

50# steam to service 1LS14-6"-B23(LP


1-RA-4(2/3) 1LS16-1*1/2"-B23 Service Point 66 312 50 298 110 50
point steam Header)
1-RA-3a Sheet
17 1K17-1"-C1 Demulsifier 1G-23 1P1-12"-C1 450 315
3of 3
1-RA-3b Sheet 3
1P17-8"-C1 Crude 1P15-12"-C1 Into 4 branches 470 524 360 524 540 360
of 3
1-RA-3b Sheet 3
1UA17-2"-A1 Utility Air 1UA9-2"-A1 1F-1 190 100
of 3

LINE LIST Page 8/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 2 Stripping steam & steam strippers as stripping
1MS17-8"-C24 1MS15-8"-C24 275 720 207 650 360 200
of 3 out steam 1MS19/20/21

Flushing Water, divide in


1-RA-3b Sheet 2 four branch and enter into
1PW17-3/4"-C19 1PW14-1"-C19 1E-9 350 250
of 3 the inlet header of fin fan
cooler

50# steam to service


1-RA-4(2/3) 1LS17-1*1/2"-B23 1LS16-1*1/2"-B23 Service Point 66 312 50 298 110 50
point
1-RA-3b Sheet 3
18 1P18-6"-C1 Crude 1P16-8"-C1 1F-1 470 524 360 524 540 360
of 3

Flushing Water, divide in


1-RA-3b Sheet 2 four branch and enter into
1PW18-3/4"-C19 1PW14-1"-C19 1E-9 350 250
of 3 the inlet header of fin fan
cooler

MHB-7403 1K18-1*1/2"-B12 20 wt% caustic line 1K410-1*1/2"-B32 50-BA-12/3 (Plant 7) 271 110 271 110 450 231

outlet to silencer or
1-RA-4(3/3) 1LS18-4"-B23 50# steam 1G-20 out 66 312 50 298 110 50
header
1-RA-3b Sheet 3
19 1P19-6"-C1 Crude 1P16-8"-C1 1F-1 470 524 360 524 540 360
of 3
1-RA-3b Sheet 2
1MS19-3"-C24 stripping steam 1MS17-8"-C24 1C-5 275 720 207 650 360 200
of 3
1-RA-3a Sheet 3
1LS19-1"-B23 Quench steam 1LS14 1G-7 66 312 50 298 110 50
of 3
1-RA-3b Sheet 3
20 1P20-6"-C1 Crude 1P16-8"-C1 1F-1 470 524 360 524 540 360
of 3
1-RA-3b Sheet 3
1LS20-3"-B23 50# Steam For steam out 1LS14 1MS17-8"-C24 66 312 50 298 110 50
of 3
1-RA-3b Sheet 2
1MS20-4"-C24 stripping steam 1MS17-8"-C24 1C-4 275 720 207 650 360 200
of 3
1-RA-3b Sheet 3
1K20-1*1/2"-B1 10% ammonia solution 1K4-1*1/2"-B1 1G-25 150 5
of 3
1-RA-5 1UW20-1*1/2"-A1 Utility water 1UW13-4"-A1 W (service point) 113 70
Cooling water return from
1-RA-5 1CW20-3"-A2 1G-1/3/4/5/6/7/8 32CW3 100 28
pumps

LINE LIST Page 9/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 3
21 1P21-6"-C1 Crude 1P16-8"-C1 1F-1 470 524 360 524 540 360
of 3
1-RA-3b Sheet 2
1MS21-4"-C24 stripping steam 1MS17-8"-C24 1C-3 275 720 207 650 360 200
of 3
1-RA-3b Sheet 3
1UW21-1*1/2"-A1 Utility make up water 1UW12-2"-A1 1D-4 113 70
of 3
1-RA-3b Sheet 3
1K21-1*1/2"-B1 10% ammonia solution 1G-25 1D-4 150
of 3
1-RA-3a Sheet 4 # relief valve of crude
1LS21-3"-B23 50# steam 1LS14 66 312 50 298 110 50
2of 3 column/1C-1
MHB-7402 1PW21-1*1/2"-B19 Wate drain 1C-12 drain 100 200
1-RA-3a Sheet
22 1CW22-1"-A2 Cooling Water 1G-1A 1-RA-5/1CW20-3"-A2 100 28
3of 3
1-RA-3a Sheet
1LS22-1*1/2"-B23 steam 1LS8-10"-B23 4C-10,1C-13,1C-11 66 312 50 298 110 50
3of 3 /1RA-4
1-RA-3b Sheet 3
1P22-6"-C1 Crude 1P17-8"-C1 1F-1 470 524 360 524 540 360
of 3
line from 1D-2 to
1-RA-3b Sheet 3
1K22-1*1/2"-B1 10% ammonia solution 1D-4 1G24AX & 1K4-1*1/2"- 150
of 3
B1
MHB-7402 1PW22-1*1/2"-B19 Drain water 1C-14 drain 125 200
1-RA-3b Sheet 3
23 1P23-6"-C1 Crude 1P17-8"-C1 1F-1 470 524 360 524 540 360
of 3
1-RA-3b Sheet 2 Cooling water return from
1CW23-1*1/2"-A2 1G3/3A 1RA-5/1CW20-3"-A2 100 28
of 3 pump gland
MHB-7402 1PW23-1*1/2"-B19 Drain water 1C-11 drain 100 200

MHB-7402 1LS23-1*1/2"-B23 50 # steam for steam out 1LS1 1C-12/14,4C-11 66 312 50 298 110 50

1-RA-3b Sheet 3
24 1P24-6"-C1 Crude 1P17-8"-C1 1F-1 470 524 360 524 540 360
of 3
1-RA-3b Sheet 3
1MS24-4"-C23 200# Decoking steam 1MS7-8"-C23 1P18-6"-C1 275 412 207 388 360 200
of 3
1-RA-3a Sheet 3
1LS24-1"-B23 Quench steam 1LS14 1G-7A 66 312 50 298 110 50
of 3
1-RA-3b Sheet 3
25 1P25-6"-C1 Crude 1P17-8"-C1 1F-1 470 524 360 524 540 360
of 3

LINE LIST Page 10/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 3
1MS25-4"-C23 200# Decoking steam 1MS7-8"-C23 1P19-6"-C1 275 412 207 388 360 200
of 3
1-RA-3b Sheet
1CW25-1*1/2"-A2 Cooling Water outlet 1G-4AX/6Y 1-RA-5/1CW20-3"-A2 100 28
1of 3 (1-RA-5)
1-RA-3a Sheet
1LS25-1*1/2"-B23 For steam out (50#) 1LS1 Desalter(1C-6) 66 312 50 298 110 50
3of 3
1-RA-3b Sheet 1
1PW25-3"-C19 Desalter sour water 1E-20 outlet To SWS or plant 15 296 250 223 250 334 23
of 3
1-RA-3b Sheet
26 1CW26-1*1/2"-A2 Cooling Water outlet 1G-4 1-RA-5/1CW20-3"-A2 100 28
1of 3 (1-RA-5)
1-RA-3b Sheet 3
1MS26-4"-C23 200# Decoking steam 1MS7-8"-C23 1P20-6"-C1 275 412 207 388 360 200
of 3
1-RA-3b Sheet 1
1PW26-2"-C19 Fresh water 1G-15 (discharge) 1P82-3"-B1 115 390
of 3
27 2"C27 BFW 1BFW3-2-C23 1E-23B NA 320
1-RA-3b Sheet 3
1MS27-4"-C23 200# Decoking steam 1MS7-8"-C23 1P21-6"-C1 275 412 207 388 360 200
of 3
1-RA-3b Sheet 2 1RA-4/1LS12-
1LS27-1"-B23 Steam outlet to trap 66 312 50 298 110 50
of 3 1*1/2"-B23
1-RA-3a Sheet 3
1CW27-1"-A2 Cooling water 1G-7/7A 1RA-5/1CW20-3"-A2 100 28
of 3
1-RA-3b Sheet 3
28 1P28A/B-5"-B8 Crude 1F-1 1P36-30"-B8 60 730 45 730 70 40
of 3
1-RA-3b Sheet 3
1MS28-4"-C23 200# Decoking steam 1MS7-8"-C23 1P22-6"-C1 275 412 207 388 360 200
of 3
1-RA-3b Sheet 2 Cooling water for pump
1CW28-1*1/2"-A2 1G-5/5A 1RA-5/1CW20-3"-A2 100 28
of 3 gland cooling
1-RA-3b Sheet 3
29 1P29A/B-5"-B8 Crude 1F-1 1P36-30"-B8 60 730 45 730 70 40
of 3
1-RA-3b Sheet 3
1MS29-4"-C23 200# Decoking steam 1MS7-8"-C23 1P23-6"-C1 275 412 207 388 360 200
of 3
50# steam to service
1-RA-4(2/3) 1LS29-1*1/2"-B23 1LS1/14 Service Point 66 312 50 298 110 50
point
1-RA-3b Sheet 2 Cooling water return from
1CW29-1*1/2"-A2 1G-8/8A 1CW20-3"-A2 100 28
of 3 pump gland
1-RA-3b Sheet 2 1P48-24"-B1(crude col.
30 1K30-1"-B 52 265 39 265 60 27
of 3 overhead line)

LINE LIST Page 11/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 3
1MS30-4"-C23 200# Decoking steam 1MS7-8"-C23 1P24-6"-C1 275 412 207 388 360 200
of 3
1-RA-3b Sheet 3
1P30A/B-5"-B8 Crude 1F-1 1P36-30"-B8 60 730 45 730 70 40
of 3
50# steam to service
1-RA-4(2/3) 1LS30-1*1/2"-B23 1LS1/14 Service Point 66 312 50 298 110 50
point
Cooling water supply to
1-RA-5 32CW30-16"-A2 7CW8 1-RA-3 80 150 80 150 425 50
plant 1
1-RA-3a Sheet
31 1K31-3/4"-C1 Demulsifier 1G-23 1PW13-4"-C19 215 275 215 275 323 215
3of 3
1-RA-3b Sheet 3
1P31A/B-5"-B8 Crude 1F-1 1P36-30"-B8 60 730 45 730 70 40
of 3
1-RA-3b Sheet 3
1MS31-4"-C23 200# Decoking steam 1MS7-8"-C23 1P25-6"-C1 275 412 207 388 360 200
of 3
1-RA-3a Sheet 1
1CW31-14"-A1 Cooling Water 1E-16B 32CW36-16"-A2 100 28
of 3
50# steam to service
1-RA-4(2/3) 1LS31-1"-B23 1LS1 Service Point 66 312 50 298 110 50
point
1-RA-3a Sheet
32 1K32-3/4"-C1 Demulsifier 1G-23 1P3-12"-C1 470 257 360 257 540 250
3of 3
1-RA-3b Sheet 3
1P32A/B-5"-B8 Crude 1F-1 1P36-30"-B8 60 730 45 730 70 40
of 3
1-RA-3b Sheet 1 Fresh water (1E-20
1PW32-2"-C19 1PW5-4"-C19 1PW8-4"-C19 470 269 360 269 540 330
of 3 bypass line s/s)
1-RA-3a Sheet 1
1CW32-14"-A2 Cooling Water 1E-16B 32CW36-16"-A2 100 28
of 3

1-RA-4(3/3) 1LS32-3"-B23 50# steamtracing header 31LS22 1RA-4 66 312 50 298 110 50

1-RA-3b Sheet 3
33 1P33A/B-5"-B8 Crude 1F-1 1P36-30"-B8 60 730 45 730 70 40
of 3
1-RA-3b Sheet 2 1G-8AX
1P33-8"-C1 Reduced crude 1P15-12"-C1 470 525 360 525 540
of 3 (Discharge)
1-RA-3b Sheet 3 200# Snuffing Steam snuffing steam
1MS33-6"-C23 31MS22-12"-C23 275 412 207 388 360 200
of 3 header header(1F-1)
1-RA-3b Sheet 1 1E-20 bypass
1PW33-2"-C19 Desalter sour water 1PW13-4"-C19 215 275 215 275 323 215
of 3 line(1PW25-3"-C19)
1-RA-4 (1/3) 1LS33-1*1/2"-B23 Purge Steam 1LS14 9F-2 66 312 50 298 110 50

LINE LIST Page 12/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3a Sheet 1-RA-5/1CW1-3"- Sample cooler for
34 1CW34-1"-A2 Cooling water 100 28
3of 3 A2 desalter crude inlet
1-RA-3b Sheet 3
1P34A/B-5"-B8 Crude 1F-1 1P36-30"-B8 60 730 45 730 70 40
of 3
1-RA-3b Sheet 2
1K34-3/4"-B1 Inhibitor Inhibitor tank 285
of 3
1-RA-3b Sheet 1
1PW34-2"-C19 Fresh water 1G-15 (discharge) 1PW89-2"-C19 451 282
of 3
1-RA-3b Sheet 1
1LS34-4"-B23 LP steam 1GT-2AX 1LS1/14 66 312 50 298 110 50
of 3
1-RA-3a Sheet
35 1K35-1"-B32 Antifoulant Storage (AP2302) 1G-31 285
3of 3
1-RA-3b Sheet 3
1P35A/B-5"-B8 Crude 1F-1 1P36-30"-B8 60 730 45 730 70 40
of 3
1-RA-3a Sheet 2 1RA-3/1E-11/1LC2-1"-
1LS35-2"-B23 steam 1LS1/14 66 312 50 298 110 50
of 3 B23
1-RA-3a Sheet
36 1K36-3/4"-B32 Antifoulant 1G-31 1P7-12"-C1 470 252 360 252 540 210
3of 3
1-RA-3b Sheet 3 1F-1 outlet
1P36-30"-B8 Crude 1C-1 60 730 45 730 70 40
of 3 combine header
1-RA-3b Sheet 3
1MS36-3"-C23 Soot Blowers /MP Steam 1MS1 1F-1 275 412 207 388 360 200
of 3
1-RA-3b Sheet 2
1PW36-3"-B1 Water 36PW6-4"-B1 1P48-24"-B1 285
of 3
1-RA-3b Sheet 2
1LS36-2"-B23 steam out/1F-1 1LS14 1P33-8"-C1 66 312 50 298 110 50
of 3
Sample cooler for
1-RA-3a Sheet 1 1RA-5/1CW1-3"-
1CW36-1*1/2"-A2 Cooling Water Residue sample line 100 28
of 3 A2
from 1P94-8"-B1
1-RA-5 32CW36-16"-A2 Cooling water return 1-RA-3 32CW3 100 28
1-RA-3b Sheet 2
37 1P37-18-"-B1 Top Reflux 1C-1 (34 tray) 1G-3 87 290 66 290 100 60
of 3
1-RA-3b Sheet 3
1MS37-3"-C24 steam 1MS15-8"-C24 1F-1 stack ducting 275 412 207 388 360 200
of 3
1-RA-3b Sheet 1
1PW37-3"-C19 Process water 1PW3-3"-C19 1RA-4 740
of 3

LINE LIST Page 13/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 2
1LS37-1"-B23 Quench steam 1LS1/14 1G-5 66 312 50 298 110 50
of 3

Cooling water to
1-RA-3a Sheet 1 Sample cooler
1CW37-1*1/2"-A2 blowdown sample cooler 1CW1-3"-A2 100 28
of 3 1E22/23A&B
(3nos) of1E22/23A&B

MHB-7402 1K37-4"-B1 Salt fill line to 1C-12 storage 1C-12 top 285
1-RA-3b Sheet 2
38 1P38-18"-B1 Top Reflux 1P37-18"-B1 1G-3A 87 290 66 290 100 60
of 3
1-RA-3a Sheet
1PW38-2"-C19 Water 1PW6-3"-C19 Desalter inlet 470 250 360 250 540 330
3of 3
1-RA-3a Sheet
1CW38-1*1/2"-A2 Cooling water 1G-1 1CW20-3"-A2 100 28
3of 3
1-RA-3b Sheet 3
1MS38-3"-C22 Atomizing steam 1MS12-3"-C23 1F-1, 50% Burners 275 412 207 388 360 200
of 3
1-RA-3b Sheet 2
1LS38-1"-B23 Quench steam 1LS14 1G-5A 66 312 50 298 110 50
of 3
1-RA-3b Sheet 2
39 1P39-16"-B1 Top Reflux 1G-3 1P40-16"-B1 151 290 124 290 186 124
of 3
1-RA-3b Sheet 2
1LS39-1"-B23 Quench steam 1LS14 1G-8 66 312 50 298 110 50
of 3
MHB-7403 1PW39-2"-B19 Water MHB-7401 16B5-2"-B32 285
1-RA-3b Sheet 1
40 1P40-16"-B1 Top Reflux 1G-3 1P803-16"-B1 151 290 124 290 186 124
of 3
1-RA-3a Sheet
1MS40-8"-C23 200# steam 1GT-1AX 1-RA-4/1MS1 276 412 207 388 360 200
3of 3
1-RA-3b Sheet 2
1LS40-1"-B23 Quench steam 1LS14 1G-8A 66 312 50 298 110 50
of 3
1-RA-3a Sheet 1
1CW40-1/1/2"-A2 Cooling water 1CW37-1*1/2"-A2 CONCRETE SUMP 100 28
of 3
MHB-7403 1PW40-2"-B32 Water 1PW39-2"-B19 50-BA-11/3/34EA2 285
1-RA-3b Sheet 2
41 1P41-16"-B1 Top Reflux 1E-1 1C-1 (37 tray) 151 180 114 180 180 94
of 3
1-RA-3a Sheet 1LS25-1*1/2"-
1LS41-1*1/2"-B22 For steam out (50#) 1LS400-1*1/2"-B23 66 312 50 298 110 50
3of 3 B23/1-RA-3
1-RA-3a Sheet 2
1CW41-6"-A2 Cooling Water 1E-24 (a) 1-RA-5/32CW36 100 28
of 3

LINE LIST Page 14/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 2 Kero draw from crude
42 1P42-8"-B1 1C-1/ 25th tray 1C-3 57 430 40 430 65 33
of 3 column
1-RA-3a Sheet 2
1CW42-6"-A2 Cooling water 1-RA-5 1E-24 (b) 100 40
of 3
1-RA-3b Sheet 2
43 1P43-10"-B1 Vapor return from 1C-3 1C-3 top 1C-1 (26 tray) 54 420 40 420 60 28
of 3
1-RA-3a Sheet 2
1CW43-6"-A2 Cooling water 1RA-5 1E-26 100 40
of 3
1-RA-3a Sheet 2
44 1CW44-6"-A2 Cooling water 1E-26 1RA-5 100 28
of 3
1-RA-3b Sheet 2
46 1P46-6"-B5 HGO 1C-1 1C-5 62 645 49 645 75 45
of 3
1-RA-3a Sheet 2 MDFI injection into LGO
21K46-1*1/2"-B1 1BA-17 1P220-8"-B1 285
of 3 R/D
1-RA-3b Sheet 2
47 1P47-6"-B5 Vapor+Steam 1C-5 1C-1 54 635 41 635 65 31
of 3
1-RA-3a Sheet 2
1CW47-3"-A2 Cooling water 1RA-5 1E-25 100 40
of 3

1C-1 Overheads/Naphtha
1-RA-3b Sheet 2 1E-9 second inlet
48 1P48-12"-B1 minus+Steam 1P48-24"-B1 52 265 39 265 60 27
of 3 header

1-RA-3b Sheet 2
1P48-24"-B1 Overheads from 1C-1 1C-1 1E-9 52 265 39 265 60 27
of 3
1-RA-3a Sheet 2
1CW48-3"-A1 Cooling water 1E-25 1RA-5 100 28
of 3

From overhead naphtha


49 MHB-9023 1P49-12"-B1 1E-9 1C-2/1P827-12"-B1 55 250 42 250 65 20
condenser 1E-9

1-RA-3b Sheet 1
50 1P50-8"-B1 Naphtha product 1P830-10"-B1 1G-2X (Suction) 62 250 47 250 70 24
of 3
1BD56/57/58/59/6
1-RA-4(2/3) 1BD50-10"-B1 Blow down 19C-1/Blow down drum 60
2
1-RA-3b Sheet 1 1P50/1P830-10"-
51 1P51-8"-B1 Naphtha product 1G-2AX (Suction) 62 250 47 250 70 24
of 3 B1
1-RA-4(2/3) 1BD51-6"-B1 Blow down 1C-2 1BD50-10"-B1 60

LINE LIST Page 15/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 1 1G-2AX
52 1P52-6"-B1 Naphtha product 1P53-6"-B1 200 110 150 110 225 108
of 3 (Discharge)
1-RA-3b Sheet 1 1-RA-4 (To blow down
1BD52-6"-B1 Light Gases 1C-2 60
of 3 drum 19C-1)
1-RA-3a Sheet 2 MDFI injection into LGO
1K52-1*1/2"-B1 1K46-1*1/2"-B1 1P72-6"-B1 175 125 135 125 200 130
of 3 R/D
1-BA-17 (Naphtha to
1-RA-3b Sheet 1
53 1P53-6"-B1 Naphtha product 1G-2X hydrotreater drum 6C- 200 110 150 110 225 108
of 3
30)
1-RA-3a Sheet
1BD53-10"-B1 Overpressure relief Desalter relief 1C-1 60
3of 3
1-RA-3b Sheet 2
54 10P54-2"-B1 syn naphtha from 4G-2 4P59-2"-b1 1P42-8"-B1 83 125 81 125 125 81
of 3
1-RA-3b Sheet 2 12" outlet from 1C-
55 1P55-12"-B6 Inter reflux 1G-5 73 570 55 570 85 50
of 3 1
1-RA-3b Sheet 2
56 1P56-12"-B6 Inter reflux 1P55-12"-B6 1G-5A (Suction) 73 570 55 570 85 50
of 3
1-RA-4(2/3) 1BD56-4"-B1 Blow down 1C-11 1BD50-10"-B1 60
1-RA-3b Sheet 2
57 1P57-10"-C6 Inter reflux 1G-5A 1P58-10"-C6 140 570 115 570 175 115
of 3
MHB-7402 1BD57-6"-B1 Kerosene PSV10/1C-12 1-RA-4/1BD50-10"-B1 60
1-RA-3a Sheet 2
58 1P58-10"-C6 Inter reflux 1G-5 1E-5 (f) 140 570 115 570 175 115
of 3
1-RA-3a Sheet 2
59 1P59-10"-B1 Inter reflux 1E-5(a) 1C-1 (18 tray) 370 370 153 85
of 3
1-RA-4(2/3) 1BD59-6"-B1 Blow down 1C-14 1BD50-10"-B1 60
1-RA-3b Sheet 1
60 1P60-8"-B1 Kerosene 1C-3 1G-4 400 55 400 85 40
of 3

Header, provide
1-RA-3b Sheet 3 Decoking of furnace Decoke KO pot Ex 22C-
1BD60-10"-B1 spool pieces for 60
of 3 tubes 4
hook up to passes

1-RA-3b Sheet 1
61 1P61-8"-B1 Kerosene 1P60-8"-B1 1G-4AX 73 400 400 85 40
of 3

1-RA-3b Sheet 1
62 1P62-6"-B1 Kerosene 1G-4/4AX 1E-2 180 400 151 400 230 151
of 3

LINE LIST Page 16/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig

1-RA-4(3/3) 1BD62-1*1/2"-B1 Fuel gas K.O 4C-11 1BD50-10"-B1 60

1-RA-3b Sheet 1
63 1P63-6"-B1 Kero/LGO 1G-4AX 1P62-6"-B1 180 400 151 400 230 151
of 3
1-RA-3b Sheet 1
64 1P64-6"-B1 Kerosene 1E-2(SS) 1E-10 (MHB-7401) 180 272 140 272 200 140
of 3

65 MHB-7401 1P65-6"-B1 Kerosene 1E-10 (A&B) MHB-7402/1P250-6"-B1 180 100 130 100 195 130

1-RA-3b Sheet 1
66 1P66-8"-B1 LGO 1C-4 1G-6Y 65 540 50 540 90 40
of 3
1-RA-3a Sheet 2
1BD66-8"-B1 Relief valve discharge PSV 38 1RA-4 NA
of 3
1-RA-3b Sheet 1
67 1P67-8"-B1 LGO 1P66-8"-B1 1G-4AX 73 540 55 540 85 40
of 3
1-RA-3b Sheet 1
68 1P68-6"-B1 LGO 1P63-6"-B1 1P69-6"-B1 1--- 540 151 540 286 151
of 3
1-RA-3b Sheet 1
69 1P69-6"-B1 LGO 1G-6Y 1E-3 1-6 540 151 540 280 151
of 3
1-RA-3a Sheet 3
70 1P70-4"-B1 LGO 1P146-6"-B1 4C-2 297 140 297 210 140
of 3
1-RA-3a Sheet 2
71 1P71-6"-B1 LGO 1P146-6"-B1 1E-11 (Air cooler) 297 140 297 210 140
of 3
1-RA-3a Sheet 2
72 1P72-6"-B1 LGO 1E-11 1P258-6"-B1 175 125 135 125 200 130
of 3
1-RA-3a Sheet 3
73 1P73-6"-B6 HGO 1C-5 1G-7 60 615 46 615 70 35
of 3
1-RA-3a Sheet 3
74 1P74-6"-B6 HGO 1P73-6"-B6 1G-7A 60 615 46 615 70 35
of 3
1-RA-3a Sheet 3
75 1P75-4"-C6 HGO 1G-7A 1P76-4"-C6 135 615 100 615 150 100
of 3
1-RA-3a Sheet 3
76 1P76-4"-C6 HGO 1G-7 1P822-4"-C6 135 615 100 615 150 100
of 3
1-RA-3a Sheet 2
1P76-4"-C6 HGO 1P824-4"-C6 1E-4 (s/s inlet) 135 615 100 615 150 100
of 3
1-RA-3a Sheet 2
77 1P77-4"--B1 HGO 1E-4 outlet 1P95-10"-B1 135 322 97 322 150 85
of 3

LINE LIST Page 17/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3a Sheet 1
78 1P78-10"-B1 Red Crude + HGO 1E-16(A&B) Storage or slops 200 175 150 175 280 60
of 3

Ammonia,corrosion
1-RA-3b Sheet 2
79 1P79-1*1/2"-B1 inhibitor injection to crude 1P82-3"-B1 1P48-24"-B1 146 110 113 110 170 110
of 3
column overhead line

80 1-RA-4(3/3) 4P80-2"-B1 4C-11 1P120-3"-B1 160 125 120 125 210


Naphtha for solution
1-RA-3b Sheet 1
82 1P82-3"-B1 making of ammonia & 1P53-6"B1 1P79-1*1/2"-B1 146 110 113 110 170 110
of 3
corrosion inhibitor
1-RA-3b Sheet 2
83 1P83-10"-B5 Reduced crude 1C-1 Bottom 1G-8X 60 695 46 695 78 32
of 3
1-RA-3b Sheet 2
84 1P84-10"-B5 Reduced crude 1P83-10"-B5 1G-8AX 60 695 46 695 78 32
of 3
1-RA-3b Sheet 2 1G-8AX
85 1P85-8"-C5 Reduced crude 1P86-8"-C5 180 695 162 695 260 162
of 3 (Discharge)
1-RA-3a Sheet 2
86 1P86-8"-C5 Reduced crude 1G-8 1E-8 (a) 180 695 162 695 260 162
of 3
1-RA-3a Sheet 2
88 1P88-8"-C1 Reduced crude 1E-8(d) 1E-22 190 485 143 485 220 142
of 3
1-RA-3a Sheet 2
89 1P89-8"-C1 Reduced crude 1E-22 1P90/91/6"-C1 190 430 143 430 220 132
of 3
1-RA-3b Sheet 1
1PW89-2"-C19 Fresh water 1PW34-2"-C19 1P849-12"-C1 NA
of 3
1-RA-3a Sheet 1
90 1P90-6"-C1 Reduced Crude 1P89-8"-C1 1E-23(A) 190 430 143 430 220 132
of 3

1-RA-4(3/3) 4P90-4"-B1 Plant 4 slops (Kero/LGO) 4P82 1P105-8"-B1 150 125 113 125 175 70

1-RA-3a Sheet 1
91 1P91-6"-C1 Reduced crude 1P89-8-C1 1E-23B 190 430 143 430 220 132
of 3
1-RA-3a Sheet 1
92 1P92-6"-B1 Reduced Crude 1E-23A 1P94-8"-B1 190 340 143 340 220 102
of 3
1-RA-3a Sheet 1
93 1P93-6"-B1 Reduced crude 1E-23B 1P94-8"-B1 190 340 143 340 220 102
of 3
1-RA-3a Sheet 1
94 1P94-8"-B1 Reduced crude 1P92/93-6"-B1 1P95-10"-B1 190 340 143 340 220 102
of 3

LINE LIST Page 18/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3a Sheet 1 1E-16 A&B (Red crude
95 1P95-10"-B1 Reduced crude 1P94-8"-B1 190 340 143 340 220 77
of 3 +HGO cooler)
1-RA-3a Sheet 1 Reduced crude bypass
96 1P96-6"-B1 1P94-8"-B1 1P78-10"-B1 190 340 143 340 220 77
of 3 line
1-RA-3a Sheet 2
98 1P98-6"-B1 LGO to storage 1P175-4"-B1 Tank 310/21-RA-2 178 125 133 125 200 65
of 3
1-RA-3b Sheet 3 Natural Gas/ Pilot
100 1NG100-2"-B12 90-BA-12 1FG8-1*1/2"-b12 95 35
of 3 Gas
102 MHB-7402 1P102-6"-B1 Kerosene 1P842-6"-B1 1C-12 178 100 133 100 200 70
103 MHB-7402 1P103-6"-B1 1C-12 bypass line 1C-12 bypass 178 100 133 100 200 70
104 MHB-7402 1P104-6"-B1 Kerosene 1C-12 Tank 200/24-RA-2 178 100 133 100 200 65

1-RA-4(3/3) 19BD104-24"-B1 19BD102/7BD6 19C-1/Blow down drum 285

105 1-RA-4(3/3) 19BD105-30"-B1 19C-1 50RA-12 285


1P106/107/108/10
1-RA-4(3/3) 1P105-8"-B1 Slops to slops tanks Tank 302/303/21-RA-2 200 400 150 400 225
9 etc.

106 MHB-7402 1P106-4"-B1 Kerosene to slop header 1P104-6"-b1 1P105-8"-B1/1RA-4 176 100 100 225 65

107 1-RA-4(3/3) 1P107-4"-b1 Naphtha 1-RA-3 1P105-8"-B1 200 110 110 225 108
1-RA-4(3/3) 4P107-1*1/2"-B1 syn naphtha 1-RA-3 1P105-8"-B1 200 400 150 400 225
108 1-RA-4(3/3) 1P108-4"-B1 L.G.O 1-RA-3 1P105-8"-B1 176 125 125 225 65
109 1-RA-4(3/3) 1P109-8"-B1 Red Crude & HGO 1-RA-3 1P105-8"-B1 200 175 175 225 60
Vessel pump out pump 19P13-4"-B1/1P137-3"-
110 1-RA-4(3/3) 1P110-3"-B1 1G-20 dis 200 400 400 225 100
discharge line(1G-20) B1
1-RA-3b Sheet 1
112 1P112-12"-C1 Crude 1P3-12"-C1 1P10-12"-C1 470 252 440 252 660 440
of 3
1-RA-3b Sheet 1
113 1P113-3"-B1/ 3/4"-B1 Gland oil Return header 1RA-3/1G-4AX/6Y/ 1P138-4"-B1 400 200
of 3
1-RA-3b Sheet 2
114 1P114-3"-B1 Reduced crude 1P83-10"-B5 1P113-3"-B1 400 200
of 3
1-RA-3b Sheet 2
115 1P115-2"-B1 Kerosene 1P60-8"-B1 1P113-3"-B1 400 200
of 3
MHB-7402 4BD115-6"-B1 Blow down PSV35/4C-27 1BD402-6"B1
1-RA-3b Sheet 2
116 1P116-2"-B1 LGO 1P66-8"-B1 1P113-3"-B1 400 200
of 3

LINE LIST Page 19/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 2
117 1P117-2"-B1 HGO 1P73-6"-B6 1P113-3"-B1 400 200
of 3
1-RA-3b Sheet 1 1P113-3"-B1 (Gland oil
118 1P118-2"-B1 Drain of oil from 1C-2 1C-2 110 200
of 3 header)
120 MHB-7402 1P120-3"-B1 Kero 1C-12 1-RA-4/1P138-4"-B1 100 200
1-RA-3a Sheet 1P138/1-RA-4/1P120-
121 1P121-3"-B1 1C-6/1P240-3"-C1 252 200
3of 3 3"-B1
1C-14/1PW22- 1P138/1-RA-4/1P120-
124 MHB-7402 1P124-3"-B1 Kerosene 125 200
1*1/2"-B19 3"-B1
1-RA-3a Sheet
125 1P125-12"-C2 Crude 1E-8© 1E-8(b) 497 497 570 380
2of 3
1-RA-3a Sheet
126 1P126-8"-C1 Reduced crude 1E-8(b) 1E-8© 550 550 225 150
2of 3
1-RA-3b Sheet 1 1P127-2"-B1 (3/4"- 1-RA-4/1P1-12"-
127 Gland oil supply Pumps Gland 130 144 98 120 150 65
of 3 B1) C1
1P128-1*1/2"-
1-RA-3b Sheet 1 Vent Crude column 1C-1 /
128 B1/Pump Vent 1G-4/4AX/6Y 70 60 53 60 80
of 3 Header/Hydrocarbon 1P148-10"-B8
header
1-RA-3a Sheet 3
130 1P130-4"-B1 Kerosene MHB-7401/1E-10 1P70 180 140 272 210 140
of 3
1-RA-3b Sheet 2
132 1P132-2"-B1 2" Flushing line 1P127-2"-B1 1P83-10"-B5 125 150
of 3
1-RA-3b Sheet 2
133 1P133-8"-C1 Reduced crude/crude 1P85-8"-C5 1P15-12"-C1 470 525 360 525 540
of 3
1-RA-3a Sheet 2
134 1P134-2"-B1 Gland Oil / LGO 1P72-6"-B1 1P127-2"-B1 130 125 98 125 150 55
of 3
1-RA-3a Sheet 1 Hot pump out from slops 1RA-4/1P110-3"- 1P95-10"-B1/Hot pump
137 1P137-3"-B1 400 230
of 3 pump 1G-30/20 B1 out to 1E-16
138 1-RA-4(3/3) 1P138-4"-B1 Blow down line 19P12-6"-B1 1G-20 400 200
1-RA-3a Sheet To 1G-1A suction for start
141 1P141-8"-C1 1P105 1P7-12"-C1 125 540
3of 3 up recirculation
1-RA-3a Sheet 2
142 1P142-3"-B1 LGO 1P72-6"-B1 1P78-10"-B1 125 200 130
of 3
1-RA-3a Sheet 2
144 1P144-10"-B2 Inter reflux 1E-5© 1P59-10"-B1 500 158 105
of 3
1-RA-3b Sheet 2
145 1P145-4"-B1 Reduced Crude 1C-1 Bottom Drain point 70 53 400 80
of 3

LINE LIST Page 20/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 3
146 1P146-6"-B1 LGO 1E-39 (s/s) 1P71-6"-B1 226 340 140
of 3
1-RA-3b Sheet 2 1C-1 (Just below the 1st
147 1P147-6"-B8 Steam 1MS17-8"-C24 275 720 207 650 360 200
of 3 tray)
1BD53-10"-
1-RA-3b Sheet 2 B1/1P128-1*1/2"-
148 1P148-10"B8 Miscell 1C-1 Below 1st tray 200 280 150 280 230 18
of 3 B1/1P152-1*1/2"-
C1
1-RA-3b Sheet 1 1P10-12"-C1 (1G- 1P1-12"-C1 (Crude
149 1P149-8"-C1 Crude 252 665
of 3 1A) charge)
1-RA-3b Sheet 2 Gland oil return to column
151 1P151-3"-B8 1P113-2"-B1 1C-1 200
of 3 (1C-1)
1-RA-3b Sheet 2
152 1P152-1*1/2"-C1 1*1/2" vent line 1P33-8"-C1/1P15 1BD53-10"B1 470 525 360 525 540
of 3
1-RA-3a Sheet 3
154 1P154-6"-B1 LGO 1P78/1P237-6"-B1 1-BA-17/1P837 60 115 90
of 3
1-RA-3a Sheet 2
155 1P155-4"-C1 Reduced crude 1P88-8"-C1 1P156-4"-B1 190 485 143 485 220 142
of 3
1-RA-3a Sheet 2
156 1P156-4"-B1 Reduced crude 1P94-8"-B1 1P157-4"-B1 190 340 143 340 220 102
of 3
1-RA-3a Sheet 2 1P155/1P156-4"-
157 1P157-4"-B1 Reduced crude 1P159 190 485 143 485 220 142
of 3 B1
1-RA-3a Sheet 2
158 1P158-4"-b1 LGO 1P146-6"-B1 5P1 226 340 140
of 3
1-RA-3a Sheet 2
159 1P159-6"-B1 HGO 1P157/5P1/ 1E-24 (a) 285
of 3
1-RA-3b Sheet 2
160 1P160-3"-B1 Reduced Crude OR 1P156-4"-B1 1C-1 190 340 143 340 220 102
of 3
161
1-RA-3b Sheet 1 1P52-6"-B1 (1G-
162 1P162-6"-B1 Naphtha 1P50-8"-B1 200 110 150 110 225 108
of 3 2AX dis line)
1-RA-3b Sheet 1
163 1P163-1"-B1 Naphtha 1P53-6"-B1 1P130-4"-B1 200 110 150 110 225 108
of 3
1-RA-3b Sheet 1
164 1P164-2"-B1 Gland/T Rerflux 1E-1 1P113-3"-B1 400 257 360 257 450 310
of 3
1-RA-3a Sheet 2
165 1P165-2"-B1 Gland oil 1E-5 (s/soutlet) 1P113-3"-B1 370 370 153 85
of 3

LINE LIST Page 21/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig

1-RA-3b Sheet 2 1P113-3"-B1 (Pump out


166 1P166-2"-B1 T Reflux 1P37-18"-B1 87 290 66 290 100 60
of 3 line, Gland oil Return)

1-RA-3b Sheet 2 1P113-3"-B1 (Pump out


167 1P167-2"-B1 T Reflux return 1P41-16"-B1 151 180 114 180 180 94
of 3 line, Gland oil Return)

1-RA-3b Sheet 2 1P113-3"-B1 (Pump out


168 1P168-2"-B1 Inter reflux return 1P59-10"-B1 370 370 153 85
of 3 line, Gland oil Return)

1-RA-3b Sheet 2 Reduced crude (LIC 1C-1 Column


169 1P169-1*1/2"-C8 1C-1 Below 1st tray 60 695 46 695 78 32
of 3 Taping line) bottom
1-RA-3b Sheet 2 Reduced crude (LG 1C-1 Column
170 1P170-1*1/2"-B8 1C-1 Below 1st tray 60 695 46 695 78 32
of 3 Taping line) bottom
1-RA-3a Sheet 3
171 1P171-3"-B1 Kerosene 1E-10/MHB-7401 1P222-3"-B1 285
of 3
172
1-RA-3b Sheet 2
173 1P173-2"-B1 syn naphtha from 4G-2 4P59-2"-b1 1P828-12"-B1 83 125 81 125 125 81
of 3
174
176
1-RA-3a Sheet 1P12-12"-C1/1P3-12"-
178 1P178-12"-C1 Crude 1E-4 470 320 420 320 630 420
3of 3 C1
179
1-RA-3a Sheet 2
180 1P180-12"-C1 Crude 1P12-12"-C1 1E-5 © 470 320 420 320 630 420
of 3
1-RA-3a Sheet 2
181 1P181-12"-C1 Crude 1E-5(e) 1P13-12"-C1 470 445 330 445 590 390
of 3
Kero pump out line from
183 MHB-7401 1P183-3"-B1 1P410-3"-B1 1-RA-4 195 400 195 400 450 85
1C-6AX
1-RA-3a Sheet
184 1P184-6"-C1 Extra line Desalter bypass line 470 257 360 257 540 250
3of 3
1-RA-3b Sheet 1
191 1P191-6"-B1 Naphtha 1P53-6"-B1 1P41-16"-B1 200 110 150 110 225 108
of 3
1-RA-3b Sheet 2
192 1P192-1*1/2"-B1 1-BA-17 1P46-6"-B5 285
of 3

LINE LIST Page 22/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig

1-RA-3b Sheet 1
194 1P194-6"-B1 Kerosene 1E-2 Shell Side bypass line 180 400 151 400 230 151
of 3

1-RA-3a Sheet 1
195 1P195-4"-B1 HGO 1P77-4"-B1 1P157-4"-B1 135 322 97 322 150 85
of 3
1-RA-3a Sheet 2 210-
2P195-4"-B1 LGO cutter stock to VDU 1P146-6"-B1 Upstream of 2E-6 176 350 140 350 140
of 3 450
1-RA-3a Sheet 2
196 1P196-6"-B1 HGO 1E-24(a) 1P154 285
of 3
1-RA-3a Sheet 2
197 1P197-6"-B1 LGO / Inter reflux 1P59-10"-B1 1P146-6"-B1 370 370 153 85
of 3
1-RA-3b Sheet 1
198 1P198-6"-B1 LGO 1P69-6"-B1 1P213-10"-C6 1-6 540 151 540 280 151
of 3
1-RA-3b Sheet 1 1P10-12"-C1 (1G-
200 1P2004-12"-C1 Crude 1P206-12"-C1 (1E-4) 470 252 440 252 660 440
of 3 1A)
1-RA-3a Sheet 2
1P2001-4"-B1 LGO 1P72-6"-B1 2P195-4"-B1 175 125 135 125 200 130
of 3
1-RA-3b Sheet 1
203 1P203-3"-B1 Naphtha 1P82-3"-B1 1P830-10"-B1 146 110 113 110 170 110
of 3
1-RA-3b Sheet 1 1P849-12"-C1/1P807- 540/11
1PW2003-4"-C19 PIC bypass 1PW8-4"-C19 470 269 360 269 382
of 3 12"-C1 25
1-RA-3b Sheet 1 334/11
205 1PW2005-3"-C19 Sour water 1PW4-3"-C19 1PW25-3"-C19 296 250 223 250 23
of 3 25
1-RA-3a Sheet 2 1E-2/1P2004-12"-
206 1P206-12"-C1 Crude 1E-4 470 252 440 252 660 440
of 3 C1
1-RA-3b Sheet 1 1-BA-17 (To 2E-21 or 243/11
1PW2006-3"-C19 Process sour water 1PW25-3"-C19 215 275 162 275 65
of 3 plant 15) 25
1-RA-3b Sheet 1
207 1P207-12"-C1 Crude 1E-3 (b) 1E-3(a) 450
of 3
1-RA-3b Sheet 1 494/11
1PW2007-2"-C19 Fresh Water 1PW6-3"-C19 1PW2008-2"-A1 329 250 329 60 329
of 3 25
1-RA-3b Sheet 1
208 1P208-12"-C1 Crude 1E-3 1P246-12"-C1 450
of 3
1-RA-3b Sheet 1
1PW2008-2"-A1 Fresh Water 1PW2007-2"-C19 1G-15 (Suction line) 66 250 66 60 99/450 66
of 3
210

LINE LIST Page 23/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 1
212 1P212-4"-B1 Kerosene 1G-4 1E-10 180 400 151 400 230 151
of 3
1-RA-3a Sheet 2
213 1P213-10"-C6 Inter reflux 1P58-10"-C6 1E-5 (e) 140 570 115 570 175 115
of 3
1-RA-3a Sheet 1 150-
216 2P216-4"-B1 HGO to VDU 2E-10A/B 1P195-4"-B1 2P210/217/2-BA-36 135 322 97 322 85
of 3 450
1-RA-3a Sheet 2
217 1P217-4"-B1 LGO 1P146-6"-B1 1P831-4"-B1 226 340 140
of 3
1-RA-3a Sheet 2
218 1P218-6"-B1 LGO 1P831-4"-B1 1C-16 (LGO drier) 226 223 226 223 339 235
of 3
1P238-6"-B1(1G-
219 MHB-9026 1P219-2"-B1 LGO 1P220-8"-B1(1G-32 suc) 285
32 dis)
1-RA-3a Sheet 2
220 1P220-8"-B1 LGO 1C-16 1G-32 285
of 3
1-RA-3a Sheet 2
221 1P221-12"-B1 1C-16 1E-25 285
of 3
1-RA-3a Sheet 1
222 1P222-3"-B1 1P171-3"-B1 1E-16 (B) inlet line 285
of 3
1-RA-3a Sheet 2
227 1P227-10"-C6 Inter reflux 1E-5(e) 1E-5(b) 175
of 3
1-RA-3a Sheet 2
228 1P228-10"-C6 Inter reflux 1E-5(f) 1E-5(d) 175
of 3
1-RA-3b Sheet 1 6P401-6"-B1(Naphtha to
234 1P234-6"-B1 Naphtha 1P53-6"-B1 200 110 150 110 225 108
of 3 6C-40)
1-RA-3a Sheet 2
236 1P236-6"-B1 LGO 1P98 1E-24(b) 285
of 3
1-RA-3a Sheet 2 1P98/50-RA-11/3(LGO
237 1P237-6"-B1 LGO 1E-24(b) 285
of 3 to storage)
1-RA-3a Sheet 2
238 1P238-6"-B1 LGO 1G-32 1E-26 285
of 3
1-RA-3a Sheet 2
239 1P239-6"-B1 LGO 1E-26 1P257-6"-B1 285
of 3
1-RA-3a Sheet 1C-6 Desalter
240 1P240-3"-C1 Recirculation 1C-6 Desalter inlet (T) 740
3of 3 outlet (B)
1-RA-3a Sheet 2
241 1P241-6"-B1 inter reflux 1P59-10"-B1 1P95-10"-B1(1E-16) 370 370 153 85
of 3

LINE LIST Page 24/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3a Sheet 1
242 1P242-6"-B1 1E-16A outlet line 1P59-10"-B1 280
of 3
1-RA-3b Sheet 1
1P2---12"-C1 Crude 1P866-12"-C1 1E-3 400 212 360 212 450 300
of 3
1-RA-3b Sheet 2
243 1P243-12"-B6 Vapor+Steam 1C-4 1C-1 285
of 3
245
1-RA-3a Sheet
246 1P246-12"-C1 Crude 1P208-12"-C1 1P3-12"-C1 450
3of 3
1-RA-3a Sheet 2
247 1P247-1*1/2"-B1 HGO 1P77-4"-B1 1P255-1*1/2"-B1 135 322 97 322 150 85
of 3
1-RA-3a Sheet 2
248 1P248-1*1/2"-B1 HGO 1P249-1*1/2"-B1 1P236-6"-B1 285
of 3
1-RA-3a Sheet 2
249 1P249-1*1/2"-B1 from spike HGO 1P159-6"-B1 1P237-6"-B1 285
of 3
250 MHB-7402 1P250-6"-B1 Kerosene 1P65-6"-B1 1P404-6"-B1 180 100 130 100 195 130
1-RA-3a Sheet 2
252 1P252-6"-B1 1P236-6"-B1 1P159-6"-B1 285
of 3
1-RA-3a Sheet 3
253 1P253-6"-B1 HGO 1P159-6"-B1 1P154 285
of 3
254 MHB-7402 1P254-4"-B1 Kero 1C-12 Flame Arrestor 285
1-RA-3a Sheet 2
255 1P255-1*1/2"-B1 HGO 1P247-1*1/2"-B1 1P218-6"-B1 135 322 97 322 150 85
of 3
1-RA-3b Sheet 1
256 1P256-4"-B1 Naphtha 1P53-6"-B1 1P234-6"-B1 200 110 150 110 225 108
of 3
1-RA-3a Sheet 2
257 1P257-6"-B1 LGO 1P239-6"-B1 1P258-6"-B1 285
of 3
1-RA-3a Sheet 2
258 1P258-6"-B1 LGO 1P257-6"-B1 1P98-6"-B1 285
of 3
1-RA-3a Sheet 2
261 1P261-1*1/2"-B1 HGO 1P255-1*1/2"-B1 1P158-4"-B1 135 322 97 322 150 85
of 3
1-RA-3a Sheet 1
262 1P262-1*1/2"-B23 Flushing line 1P271-1*1/2"-B23 1P90-6"-C1 285
of 3
1-RA-3a Sheet 1
263 1P263-1*1/2"-B23 Flushing line 1P271-1*1/2"-B23 1P88-8"-C1 285
of 3
1-RA-3a Sheet 1
264 1P264-1*1/2"-B23 Flushing line outlet 1P93-6"-B1 1P265-1.5"-B23 190 340 143 340 220 102
of 3

LINE LIST Page 25/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3a Sheet 1
265 1P265-1*1/2"-B23 Flushing line outlet 1P89-8"-C1 1P113-3"-B1 190 430 143 430 220 132
of 3
1-RA-3a Sheet 1
266 1P266-1*1/2"-B23 Flushing line outlet 1P92-6"-B1 1P265-1.5"-B23 190 340 143 340 220 102
of 3
267 1-BA-6 1P267-6"-B20 Sour Gas 1C-29 1P268/269
1-RA-3b Sheet 3
268 1P268-3"-B20 Sour Gas 1P267 South cabin of 1F-1 285 85
of 3
1-RA-3b Sheet 3
269 1P269-3"-B20 Sour Gas 1P267 North Cabin of 1F-1 285 85
of 3
1-RA-3a Sheet 1 Flushing lines to steam
271 1P271-1*1/2"-B23 1P127-2"-B1 1P91-6"-C1/1E-23B 285
of 3 generator (1E22/23)
285
1-RA-3a Sheet 3
286 1P286-3"-C1 LVGO 2G-26 1P7-12"-C1 740
of 3
1-RA-3b Sheet 2 Header (3*1" spray
301 1FW301-3"-A4 Fire water 1RA-4 428
of 3 water noz's)

1-RA-3b Sheet 1 2E-18/1-BA-17


341 2PW341-4"-C19 water 1PW5-4"-C19 740
of 3 (From sw stripper)

LCV 020/MHB-
400 MHB-7401 1PW400-2"-B19 water 7401 (From 1C- 1PW25-3"-C19/2C-7 195 150 195 150 450 10
21)
MHB7403/4G-
MHB-7401 1K400-1*1/2"-B32 2% caustic 1P404-6"-B1 193 110 193 110 450 70
42/42A
1C-21 (water water
MHB-7401 1LS400-1*1/2"-B32 50# steam 1LS41-1*1/2"-B23 66 315 66 315 450 50
tower)

MHB-7401 1P400-6"-B1 Kerosene 1P64-6"-B1 1E-10(c&d)/1P402-6"-B1 195 400 195 400 450 121

Blow down from relief of


MHB-7401 1BD400-6"-B1 1C-6AX 1BD405-6"-B4/1BD50 20 675 20 675 450 Negl.
1C-6AX
1-RA-5 (1UW1-4"- 1D-13 (Water break
MHB-7401 1UW400-2"-A1 Utility Water 45 60 45 60 200 40
A1) tank)

MHB-7403 1UA400-1*1/2"-A1 Utility air 35UA28-1*1/2"-A1 1D-12 120 80 120 80 200 100

401 MHB-7401 1P401-6"-B1 Kerosene 1E-10 (c&d) out 1P65-6"-B1/1FV-32 195 400 195 400 450 117
1LS400-1*1/2"-
MHB-7401 1LS401-1*1/2"-B32 50# steam 1C-6AX 66 315 66 315 450 50
B32

LINE LIST Page 26/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
Blow down to relief
MHB-7401 1BD401-10"-B1 1C-21/PSV 53 Tie into relief header 20 675 20 675 450 Negl.
header
MHB-7401 1UW401-3"-A1 Utility Water 1D-13 bottom 1G-43/43A suction 2.2 60 2.2 60 200 1.1
MHB-7401 1PW401-2"-C19 water 1C-21 LCV 020 195 150 195 150 450 44
MHB-7402 1K401-4"-B1 Salt fill line to 1C-14 storage 1C-14 Atmos Amb. - - 450 NNF
402 MHB-7401 1P402-6"-B1 Kerosene 1P400-6"-B1 TCV011/1P403-6"-B1 195 400 195 400 450 121

Water from kero caustic


MHB-7401 1PW402-2"-B19 1C-6AX bottom LCV 019/drain 195 150 195 150 450 47
seprator to drain

1G-43/43A
MHB-7401 1UW402-2"-A1 Utility Water FCV 083 147 60 147 60 200 121
Discharge
31LS21-18"-
MHB-7402 1LS402-1*1/2"-B23 50# Steam For steam out 1C-22A/B 66 315 66 315 450 50
B23/Header
Blow down from relief
MHB-7402 1BD402-6"-B1 PSV54 Header 19BD105-30" 20 675 20 675 450 Negl.
valve
Caustic from RT to1D-12
MHB-7403 1K402-2"-B32 Road Tanker 1D-12 Atmos Amb. - - 450 NNF
top
403 MHB-7401 1P403-6"-B1 Kerosene TCV 011 1P401-6"-B1 195 400 195 400 450 117
1C-21 (water wash
MHB-7401 1UW403-2"-A1 Utility Water FCV 083 147 60 147 60 200 111
tower)
Blow down from relief
MHB-7402 1BD403-6"-B1 PSV 55 1BD402-6"-B1 20 675 20 675 450 Negl.
valve
MHB-7402 1PW403-1*1/2"-B1 Water 1C-22A bottom drain 195 150 195 150 450 NNF
50# steam for heating
MHB-7403 1LS403-2"-B23 1LS1-14"-B23 1D-11 (2% caustic) 66 315 66 315 450 50
purpose
50# steam for heating
MHB-7403 1LS403-1*1/2"-B23 1LS403-2"-B23 1D-1X (2% caustic) 66 315 66 315 450 50
purpose
MHB-7403 1K403-4"-B32 Overflow 1D-12 drain Atmos Amb. - - 450 NNF
404 MHB-7402 1P404-6"-B1 Kerosene 1P250-6"-B1 1C-6AX/MHB-7401 195 400 195 400 450 70
MHB-7401 1UW404-3"-A1 Utility Water 1D-13 overflow to drain Atmos 60 - - 200 Atmos
MHB-7402 1PW404-1*1/2"-B1 Water 1C-22B bottom drain 195 150 195 150 450 NNF
Blow down from relief
MHB-7402 1BD404-6"-B1 PSV 58 1RA-4 20 400 20 400 450 Negl.
valve
MHB-7403 1K404-2"-B32 20 wt% caustic line 1D-12 1G-44/44A 15.5 110 15.5 110 450 1.68
MHB-7403 1LS404-1*1/2"-B23 50# steam 31LS20-12"-B23 1UA400-1*1/2"-A1 66 315 66 315 450 50

LINE LIST Page 27/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1C-21 (water wash
405 MHB-7401 1P405-6"-B1 Kerosene 1C-6AX 195 400 195 400 450 47
tower)
Blow down from relief
MHB-7401 1BD405-6"-B1 PSV059 1BD401-10"-B1 20 400 20 400 450 Negl.
valve on 1P406-6"-b1
1G-43/1UW402- 1D-13 (Water break
MHB-7401 1UW405-1*1/2"-A1 Utility Water 147 60 147 60 200 121
2"-A1 tank)
406 MHB-7401 1P406-6"-B1 Kerosene 1C-21 1P417-6"-B1 195 400 195 400 450 44
Blow down from relief MHB-7401/1BD401-10"-
MHB-7401 1BD406-6"-B1 PSV060 20 675 20 675 450 Negl.
valve B1
MHB-7403 1K406-2"-B32 20 wt% caustic line 1G-44/44A dis 1D-1X (2% caustic) 34.4 110 34.4 110 450 16.8
MHB-7403 1UW406-3"-A1 Utility Water 32UW20-4"-A1 1D-12 45 60 45 60 200 40
407 MHB-7402 1P407-6"-B1 Kero 1P250-6"-B1 1P417-6"-B1 195 400 195 400 450 44
MHB-7403 1UW407-2"-A1 Utility Water 1UW406-3"-A1 1G-44 45 60 45 60 200 40
408 MHB-7401 1P408-4"-B1 from recycle Kerosene 21P43 FCV 082 156 110 156 60 450 85

MHB-7403 1K408-3"-B32 20 wt% caustic line 1G-44/44A suction 36G-11/11A suction 15.5 110 15.5 110 450 NNF

MHB-7403 1UW408-1*1/2"-A1 Utility Water 1UW407-2"-A1 1G-44A 45 60 45 60 200 40


409 MHB-7401 1P409-4"-B1 Kerosene FCV 082 1P404-6"-B1 156 110 156 60 450 85
MHB-7403 1K409-1*1/2"-B32 2% caustic 1D-1X/11 1G-42/42A 7.1 110 7.1 110 450 Atmos
410 MHB-7401 1P410-3"-B1 Pump out purpose 1C-6AX 1P183-3"-B1 195 400 195 400 450 85
MHB-7403 1K410-1*1/2"-B32 20 wt% cautic sol. 36G-11/11A 1K18-1*1/2"-B12 271 110 271 110 450 231
411 MHB-7401 1P411-3"-B1 Kero drain 1PW401-2"-C19 1P410-3"-B1 195 400 195 400 450 85
412 MHB-7402 1P412-6"-B1 Kerosene 1P406-6"-B1 1P842-6"-B1 195 400 195 400 450 43
413 MHB-7402 1P413-6"-B1 Kerosene 1P412-6"-B1 1C-14 195 400 195 400 450 43
414 MHB-7402 1P414-6"-B1 Kerosene 1P104-6"-b1 1P417-6"-B1 160 400 160 400 450 43
415 MHB-7402 1P415-6"-B1 Kerosene 1C-14 1P417-6"-B1 160 400 160 400 450 43
416 MHB-7402 1P416-4"-B1 Kerosene 1P417-6"-B1 1P108-4"-b1 160 160 160 160 450 43
417 MHB-7402 1P417-6"-B1 Kerosene 1P406-6"-B1 1G-41/41A suction 160 400 160 400 450 30
418 MHB-7402 1P418-6"-B1 Kero 1G-41 PCV-031/1P419-6"-B1 195 400 195 400 450 131
419 MHB-7402 1P419-6"-B1 Kero 1G-41A 1P421-6"-B1/PCV031 195 400 195 400 450 131
Pump bypass line (1G-
420 MHB-7402 1P420-6"-B1 1P417-6"-B1 1P421-6"-B1 195 400 195 400 450 131
41/41A)
421 MHB-7402 1P421-6"-B1 Kerosene 1P419-6"-B1 1P422-6"-B1 195 400 195 400 450 110
422 MHB-7402 1P422-6"-B1 Kerosene 1P421-6"-B1 1C-22A 195 400 195 400 450 110

LINE LIST Page 28/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
423 MHB-7402 1P423-6"-B1 Kerosene 1P422-6"-B1 1C-22B 195 400 195 400 450 110
424 MHB-7402 1P424-6"-B1 Kerosene 1C-22A outlet 1P425-6"-B1/1P104-6" 195 400 195 400 450 35
425 MHB-7402 1P425-6"-B1 Kerosene 1C-22B outlet Treated kero to storage 195 400 195 400 450 85
426 MHB-7401 1P426-6"-B1 Kero to relief valve 1P406-6"-B1 PSV 059 160 400 160 400 450 NNF
427 MHB-7401 1P427-6"-B1 Kerosene 1P400-6"-B1 1E-10(a&b) 195 400 195 400 450 NNF
428 MHB-7402 1P428-4"-B1 Kerosene 1C-14 Flame Arrestor 50 295 50 400 450 NNF
429 MHB-7401 1P429-1*1/2"-B1 OWS 1C-21 Drain 195 400 195 400 450 NNF
1-RA-3b Sheet 1
800 1P800-12"-C1 Crude 1P801/802/1E-1 1P848/866-12"-C1 400 253 360 253 450 300
of 3
801 MHB-9021 (1/2) 1P801-12"-C1 Crude 1E-1A 1P800-12"-C1 400 253 360 253 450 300
802 MHB-9021 (1/2) 1P802-12"-C1 Crude 1E-1C 1P800-12"-C1 400 253 360 253 450 300
1-RA-3b Sheet 1
803 1P803-16"-B1 Top Reflux 1P40-16"-B1 1P804/862-16"-B1 151 339 124 339 186 124
of 3
1-RA-3b Sheet 1
804 1P804-16"-B1 Top Reflux 1P803-16"-B1 1E-1© 151 339 124 339 186 124
of 3
1-RA-3b Sheet 1
805 1P805-16"-B1 Top Reflux 1P806/863-16"-B1 1P41-16"-B1(1C-1) 151 257 114 257 180 94
of 3
806 MHB-9021 (1/2) 1P806-16"-B1 Top Reflux 1E-1(F) 1P805-16"-B1 151 257 114 257 180 94
1-RA-3b Sheet 1 1P1-12"-C1/
807 1P807-12"-C1 Crude 1P864/865/1E-1 400 55 360 55 450 315
of 3 1P808-12"-C1
1-RA-3b Sheet 1
808 1P808-12"-C1 Crude 1E-2 1P807-12"-C1 400 129 360 129 450 310
of 3
810 MHB-9021 (1/2) 1P810-2"-C1 Top Reflux/flushing oil 1P806-16"-B1 1P164-2"-B1 400 257 360 257 450 310

811 MHB-9021 (1/2) 1P811-2"-C1 Glandoil flushing/T reflux 1P863-16"-B1 1P810-2"-C1 400 257 360 257 450 310

Small segment
814 MHB-9021 (1/2) 1P814-12"-C1 introduced into 1P1-12"- 1P1-12"-C1 1P1/PIC3 400 55 360 55 450 315
C1/Crude
1-RA-3a Sheet 3 1-BA-17 (1P286-
815 1P815-3"-C1 LVGO 1E-41 (B s/s) 290 298 290 298 435 120
of 3 3"-C1)
816 MHB-9022 1P816-1"-C1 LVGO 1P815-3"-C1 TSV815 290 290 435 290
817 MHB-9022 1P817-1"-C1 LVGO TSV815 1P820-4"-B1 290 290 435 290
818 MHB-9022 1P818-4"-C1 LVGO from 1E-41(A) 1E-41(A) FIC810/1P820-4"-B1 290 495 290 495 435 110
819 MHB-9022 1P819-2-B1 FIC 810 bypass line 1P818-4"-C1 1P820-4"-B1 290 495 290 495 435 110

LINE LIST Page 29/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3b Sheet 2 1P818-4"-
820 1P820-4"-B1 LVGO from 1E-41(A) 1P821-4"-B5(1C-1) 290 495 290 495 435 50
of 3 C1/FIC810
1-RA-3b Sheet 2
821 1P821-4"-B5 1P820-4"-B1 1C-1 (8th tray) 290 495 290 495 435 32
of 3
1-RA-3a Sheet 3
822 1P822-4"-C6 HGO 1P76-4"-C6 1E-41(A) 135 629 100 629 150 100
of 3
1-RA-3a Sheet 3
823 1P823-4"-C6 HGO (1E-41 bypass line) 1P822-4"-C6 1P824-4"-C6 135 629 100 629 150 100
of 3
1-RA-3a Sheet 3
824 1P824-4"-C6 HGO 1E-41(B) 1P76-4"-C6 135 440 100 440 150 93
of 3
1-RA-3b Sheet 1
825 1P825-8"-B1 LGO 1E-3 (s/s) 1E-39 (s/s) 226 371 226 371 339 140
of 3
1P146-6"-B1/1E-11 LGO
826 MHB-9023 1P826-8"-B1 LGO 1E-39 (s/s) 226 223 226 223 339 135
cooler
1-RA-3b Sheet 1 1P49-12"-B1/
827 1P827-12"-B1 Naphtha minus+Steam 1E-40 55 250 42 250 65 40
of 3 1P828-12"-B1
1-RA-3b Sheet 2
828 1P828-12"-B1 Naphtha minus+Steam 1P827-12"-B1 1P829-12"-B1 80 250 42 250 120 40
of 3
1-RA-3b Sheet 1
829 1P829-12"-B1 Naphtha minus+Steam 1E-40 1P49-12"-B1/1C-2 80 250 42 250 120 35
of 3
1-RA-3b Sheet 1
830 1P830-10"-B1 Naphtha product 1C-2 1P50-8"-B1 62 250 47 250 70 30
of 3
1-RA-3a Sheet 2
831 1P831-4"-B1 LGO 1P217-4"-B1 1P218-6"-B1 226 223 226 223 339 235
of 3
1-RA-3a Sheet 2
832 1P832-8"-B1 LGO 1P218-6"-B1 1P835/836-6"-B1 176 175 133 175 200 130
of 3
1-RA-3a Sheet 2
833 1P833-4"-B1 LGO 1P70-4"-B1 1P236-6"-B1 176 175 133 175 200 130
of 3
5P1-4"-B1/LGO
835 MHB-9024 1P835-6"-B1 LGO 1P832-8"-B1 176 175 133 175 200 130
rundown to plant 5
1P70-4"-B1/LGO
836 MHB-9024 1P836-6"-B1 LGO 1P832-8"-B1 176 175 133 175 200 130
rundown to plant 4
1-RA-3a Sheet 2 1E-24B/1P237-6"-
837 1P837-6"/4"-B1 LGO for coalescing 1C-13X/1P838 176 98 133 98 200 125
of 3 B1
1-RA-3a Sheet 2 LGO (1C-13X bypass
838 1P838-4"-B1 1P837-4"-B1 1P839-4"-B1 176 98 133 98 200 125
of 3 line)

LINE LIST Page 30/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3a Sheet 2
839 1P839-4"-B1 LGO 1C-13X 1C-11X 176 98 133 98 200 125
of 3
1-RA-3a Sheet 2 LGO (1C-11X bypass
840 1P840-4"-B1 1P839-4"-B1 1P841-4"-B1 176 98 133 98 200 125
of 3 line)
1-RA-3a Sheet 2
841 1P841-4"-B1 LGO 1C-11X 1P877/878 176 98 133 98 200 125
of 3
842 MHB-7402 1P842-6"-B1 Kerosene 1P412-6"-B1 1P102-6"-B1 195 400 195 400 450 125
844 MHB-9025 1P844-8"-B1 Kero/LGO 1P67-8"-B1 1G-4AX 73 492 55 492 85 40
845 MHB-9025 1P845-8"-B1 Kerosene 1P61-8"-B1 1P844-8"-B1 73 354 55 354 85 45
846 MHB-9025 1P846-6"-B1 Kero/LGO 1G-4AX 1P68-6"-B1 176 492 151 492 230 151
847 MHB-9025 1P847-6"-B1 Kerosene 1P846-6"-B1 1P63-6"-B1 180 354 151 354 230 151
1-RA-3b Sheet 1
848 1P848-12"-C1 Crude to desalter (1C-6) 1P800-12"-C1 1P2-12"-C1 400 253 360 253 450 300
of 3
1-RA-3b Sheet 1 1P1-12"-C1/
849 1P849-12"-C1 Crude 1E-2 400 55 300 55 450 315
of 3 Crude pump
1-RA-3a Sheet 3 LVGO (1E-41 bypass
850 1P850-3"-C1 1P815-3"-C1 TV812/1P818-4"-B1 290 298 290 298 435 120
of 3 line)
1-RA-3a Sheet 3
851 1P851-3"-C1 LVGO 1P818-4"-B1 1P824-4"-C6 290 495 290 495 435 110
of 3
860 MHB-9021 (1/2) 1P860-2"-C1 Crude/flushing oil 1P864-12"-C1 1P810-2"-C1 400 97 360 97 450 310
861 MHB-9021 (1/2) 1P861-2"-C1 Crude/flushing oil 1P865-12"-C1 1P810-2"-C1 400 97 360 97 450 310
1-RA-3b Sheet 1
862 1P862-16"-B1 Top Reflux 1P803-16"-B1 1E-1(a) 151 339 124 339 186 124
of 3
863 MHB-9021 (1/2) 1P863-16"-B1 Top Reflux 1E-1(E) 1P805-16"-B1 151 257 114 257 180 94
864 MHB-9021 (1/2) 1P864-12"-C1 Crude 1P807-12"-C1 1E-1(F) 400 97 360 97 450 310
865 MHB-9021 (1/2) 1P865-12"-C1 Crude 1P807-12"-C1 1E-1(E) 400 97 360 97 450 310
1-RA-3b Sheet 1
866 1P866-12"-C1 Crude 1P800/848-12"-C1 1P206/275-12"-C1 400 212 360 212 450 300
of 3
868 MHB-9022 1P868-3"-C1 TV812 bypass line 1P850-3"-C1 1P850-3"-C1 290 298 290 298 435 120
1-RA-3b Sheet 3
869 1P869-8"-B1 LGO 1P825-8"-B1 1P826-8"-B1 226 371 226 371 339 140
of 3
871 MHB-9021 (1/2) 1P871-1"-C1 Crude TSV800 1P864-12"-C1 400 97 360 97 450 400
872 MHB-9021 (1/2) 1P872-1"-C1 Crude 1P864-12"-C1 TSV800 400 97 360 97 450 400
873 MHB-9021 (1/2) 1P873-1"-C1 Crude 1P865-12"-C1 TSV801 400 97 360 97 450 400
874 MHB-9021 (1/2) 1P874-1"-C1 Crude TSV801 1P865-12"-C1 400 97 360 97 450 400

LINE LIST Page 31/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 1: CRUDE UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/01/2009
Rev: 00 NA: not available
Date: 15/01/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1-RA-3a Sheet 2 Norm Norm
876 1P876-1*1/2"-B1 LVGO/HGO Spike 1P261-1*1/2"-B1 1P218-6"-B1 176 133 450
of 3 Oper Oper

877 MHB-9024 (1/2) 1P877-4"-B1 LGO Rundown Ex plant4 1P841-4"-B1 21P2302-6"-B1 176 98 133 98 200 125

878 MHB-9024 (1/2) 1P878-4"-B1 LGO Rundown Ex plant5 1P841-4"-B1 21P2305-6"-B1 176 98 133 98 200 125

879 MHB-9025 1P879-10"-B6 Inter reflux/LGO 1P55-12"-B6 1C-4 73 500 55 500 85 40


12" outlet from 1C-
880 MHB-9025 1P880-10"-B6 LV3X bypass line/LGO 1P879-10"-B6 75 500 55 500 85 40
1/1P879

LINE LIST Page 32/211


OPERATING
CONDITION

Temp.
°F

287

60

60

340

260

100

60

110

89

89

60

60

60

650
389
298

LINE LIST Page 33/211


OPERATING
CONDITION

Temp.
°F

290

298

650

260

100

232

60

110

60

105

60

394

290

60

60

89

257

290

60

LINE LIST Page 34/211


OPERATING
CONDITION

Temp.
°F

110

116

650

307

100

287

NA

100

307

307

60

110

116

60

89

650

287

394

100

LINE LIST Page 35/211


OPERATING
CONDITION

Temp.
°F

252

10

140

218

650

287

307

298

60

60

307

89

80

100

60

Intermittent

298

60

60

LINE LIST Page 36/211


OPERATING
CONDITION

Temp.
°F

89

100

252

394

60

Intermittent

298

60

60

222

252

100

89

60

298

60
Intermittent

60

100

60

LINE LIST Page 37/211


OPERATING
CONDITION

Temp.
°F

253

60

60

298

89

Intermittent

252

60

89

Intermittent

298

60

394

298

89

Intermittent

334

60

60

LINE LIST Page 38/211


OPERATING
CONDITION

Temp.
°F

320

394

298

60

60

89

334

60

60

275

298

445
60

60

60

89

110

LINE LIST Page 39/211


OPERATING
CONDITION

Temp.
°F
298
60
298

60

524

650

110

60

60

60

524

60

110

298

524

60

LINE LIST Page 40/211


OPERATING
CONDITION

Temp.
°F

650

110

298

524

110

60

298

524

650

298

524

298

650

60

60

105

LINE LIST Page 41/211


OPERATING
CONDITION

Temp.
°F

524

650

60

298

105

298

524

524

105

298

524

389

298

524

LINE LIST Page 42/211


OPERATING
CONDITION

Temp.
°F

389

105

298

110

105

389

287

389

298

105

730

389

105

730

389

298

105

265

LINE LIST Page 43/211


OPERATING
CONDITION

Temp.
°F

389

730

298

80

275

730

389

105

298

257

730

140

105

298

730

389

275

298

LINE LIST Page 44/211


OPERATING
CONDITION

Temp.
°F

105

730

298

730

298

252

730

389

298

105

105

290

389

LINE LIST Page 45/211


OPERATING
CONDITION

Temp.
°F

298

105

290

60

105

389

298

290

298

290

389

298

105

180

298

105

LINE LIST Page 46/211


OPERATING
CONDITION

Temp.
°F

430

89

420

89

105

645

635

89

265

265

105

110

110

110

LINE LIST Page 47/211


OPERATING
CONDITION

Temp.
°F

110

125

110

125

570

570

570

570

370

400

400

400

LINE LIST Page 48/211


OPERATING
CONDITION

Temp.
°F

400

272

100

540

540

540

540

297

297

125

615

615

615

615

615

322

LINE LIST Page 49/211


OPERATING
CONDITION

Temp.
°F

175

110

110

695

695

695

695

485

430

430

125

430

340

340

340

LINE LIST Page 50/211


OPERATING
CONDITION

Temp.
°F

340

340

125

100

100
100
100

175

100

110
175
125
175

400

252

LINE LIST Page 51/211


OPERATING
CONDITION

Temp.
°F

497

550

125

272

125

125

500

LINE LIST Page 52/211


OPERATING
CONDITION

Temp.
°F

297

650

280

485

340

485

297

340

110

110

257

370

LINE LIST Page 53/211


OPERATING
CONDITION

Temp.
°F

290

180

370

695

695

125

320

320

445

60

257

110

LINE LIST Page 54/211


OPERATING
CONDITION

Temp.
°F

400

322

330

370

540

252

125

110

222

110

252

275

60

60

LINE LIST Page 55/211


OPERATING
CONDITION

Temp.
°F

400

570

322

297

223

110

370

LINE LIST Page 56/211


OPERATING
CONDITION

Temp.
°F

212

322

100

322

110

322

340

LINE LIST Page 57/211


OPERATING
CONDITION

Temp.
°F

430

340

122

122

100

60

295

160

Amb.

60

60

90

295

LINE LIST Page 58/211


OPERATING
CONDITION

Temp.
°F

Amb.

60
100
NNF
160

100

60

295

Amb.

NNF

160

60

Amb.

NNF

295

295

NNF
100
60
NNF

Amb.

60
295

LINE LIST Page 59/211


OPERATING
CONDITION

Temp.
°F

100

Amb.

60

100

Amb.

60
60
100
60
60

NNF

60
60
60
60
60
60
100
100
100
100
100
100
100
100

100

100
100

LINE LIST Page 60/211


OPERATING
CONDITION

Temp.
°F
100
100
100
NNF
NNF
NNF
NNF

253

253
253

339

339

257

257

55

129

257

257

55

298

495
495

LINE LIST Page 61/211


OPERATING
CONDITION

Temp.
°F

495

495

629

629

440

371

223

130

130

104

104

223

175

175

175

175

98

98

LINE LIST Page 62/211


OPERATING
CONDITION

Temp.
°F

98

98

98

100
492
354
492
354

253

55

298

495

97
97

339

257
97
97

212

298

371

97
97
97
97

LINE LIST Page 63/211


OPERATING
CONDITION

Temp.
°F

98

98

500

500

LINE LIST Page 64/211


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
540/11
1 2-BA-40/2-BA-43 2BFW1-6"-C23 Water 31BFW2001 2BFW31 360 275 360 275 290 275
25
105/20
2-BA-40/2-BA-45 2CW1-16"-A2 Cooling Water Cooling Water Supply Header 93 75 70 75 63.5 75
0

2-BA-40/2-BA-45 2DW1-1*1/2"-A3 Potable water Potable water Header 60 70 50 70 75/225 50 60

2-BA-44 2FG1-6"-B12 Fuel Gas Plot Limit Fuel Gas Header 80 210 60 210 95/450 35 100

5% soln Na3PO4 740/11


2-BA-40/43 2K1-1*1/2"-C1 Phosphate dosing header 740 60 740 60 420 60
25
190/20
2-BA-40/44 2UA1-3"-A1 Utility Air 35UA26 2UA5 140 100 125 90 100 90
0
120/20
2-BA-40/44 2UW1-2"-A1 Utility Water Utility water Header 91 70 80 70 80 60
0
390/11
2-BA-43/38 2MS1-8"-C23 MP Steam 2MS20 2C-15 225 398 200 388 200 388
25
150/45
2-BA-40/44 2N1-2"-B1 Nitrogen N/S Piperack 2N3 125 60 133 60 100 60
0
190/20
14-BA-11/2-BA-44 2IA1-1*1/2"-A1 Instrument air 35IA6 VDU & SRU 140 100 125 90 70 90
0
215/45
2-BA-31/40 2P1-8"-B1 Atmos Residue Plot Limit 2P200 190 340 143 340 70 320
0
Full
2-BA-32/4 X2P1-2"-B20 Sour Gas X2G-100 X2P2 vac & 308 38 308 57/425 1.5 98
50
Full vac
2-BA-32/4 X2PW1-1*1/2"-B20 Oil/condensate X2C-100 X2PW2/3 & 50 308 38 308 57/425 1.5 98

2-BA-38 2PW1-4"-B19 Sour water 2C-3 2G-7 50 243 38 248 57/450 1.6 100
2-BA-34 2TW1-3"-B23 Tempered Water 2C-6 2TW-2 50 150 38 150 1 110
1090/1
2-BA-43/31 2HS1-3"-D24 HP Steam 2HS10 2GT-1A 705 700 600 700 600 700
500
2-BA-43/31 2LS1-8"-B23 LP Steam 2GT-1A 2LS27 75 320 55 298 95/450 50 298
130/45
2-BA-43/31 2MC1-1"-B23 Water 2GT-1A 2LS27 75 320 75 320 NNF
0
2-BA-32 x2LS1-1"-B23 LP Steam 2LS44 x2G-100A 75 320 55 298 95/450 50 298
2-BA-36/43 2LC1-1*1/2"-B23 Steam Condensate 2E-11 2LC9 75 320 55 298 95/450 50 298

LINE LIST Page 65


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
2-BA-31 2VA1-4"-B1 Steam PSV14 Atmos Intermittent steam relief to atmosphere
327/45
2-BA-32/44 2FO1-3"-B1 Fuel Oil Plot Limit Fuel Oil Supply Header 290 340 218 340 210 270
0
210/45
2-BA-42 2SO1-1*1/2"-B1 SRGO 2P437 2SO2 176 350 140 350 140 330
0
150/45
2-BA-40/44 2N1-2"-B1 Nitrogen N/S Pipetrack 2N3 125 60 133 60 100 60
0
540/11
2 2-BA-34/2-BA-43 2BFW2-4"-C23 Water 2BFW1 2BFW4/2BFW5 360 275 360 275 290 275
25
2-BA-45 2DW2-1*1/2"-A3 Potable water 2DW1 Safety shower 60 70 50 70 75/225 50 60
327/45
2-BA-32/44 2FO2-2"-B1 Fuel Oil Plot Limit Fuel Return Header 290 340 218 340 210 270
0
150/45
2-BA-44 2N2-2"-B1 Nitrogen 2N1 Equipment purging 125 60 133 60 100 60
0
1090/1
2-BA-43/34 2HS2-3"-D24 HP Steam 2HS10 2GT-2C 705 700 600 700 600 700
500
2-BA-43/34 2LS2-6"-B23 LP Steam 2GT-2C 2LS27 75 320 55 298 95/450 50 298

5% soln Na3PO4 740/11


2-BA-36/43 2K2-1"-C1 2K1 2K2/2K3 740 60 740 60 420 60
25
130/45
2-BA-43/34 2MC2-1"-B23 Water 2GT-2C 2LS27 75 320 75 320 NNF
0
150/45
2-BA-44 2N2-2"-B1 Nitrogen 2N1 Equipment purging 125 60 133 60 100 60
0
285/45
2-BA-31/40 2P2-8"-B1 Atmos Residue Plot Limit 2P200 252 250 189 250 133 150
0
190/20
2-BA-40/2-BA-44 2IA2-1*1/2"-A1 Instrument air 2IA1 SRU 140 100 125 90 70 90
0
Full
2-BA-32/4 X2P2-2"-B20 Sour Gas X2G-100A X2C100 vac & 308 38 308 57/425 1.5 98
50
Full vac
2-BA-32/4 X2PW2-1"-B20 Oil/condensate X2PW1 X2G-100 & 50
308 38 308 57/425 1.5 98

2-BA-38 2PW2-4"-B19 Sour water 2PW1 2G-7A 50 243 38 248 57/450 1.6 100
2-BA-34 2TW2-10"-B23 Tempered Water 2TW1&12 2G-8A 50 150 38 150 1 110
390/11
2-BA-34 2MS2-6"-C23 MP Steam 2MS93 2MS8 225 398 200 388 200 388
25

LINE LIST Page 66


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
2-BA-32 x2LS2-1"-B23 LP Steam x2LS1 x2G-100 75 320 55 298 95/450 50 298
2-BA-34/43 2LC2-1"-B23 Steam Condensate 2E-17 2LC9 75 320 55 298 95/450 50 298
2-BA-34-1 2VA2-4"-B1 Steam PSV116 Atmos Intermittent steam relief to atmosphere
301/45
2-BA-42 2SO2-1*1/2"-C1 LVGO 2P134 PCV424 274 248 206 350 170 380
0
105/20
2-BA-45/2-BA-31 2CW2-1*1/2"-A2 Cooling Water 2CW1 2G-1/1A 93 75 70 75 63.5 75
0
540/11
3 2-BA-34 2BFW3-2"-C23 Water 2BFW2 2BFW8 360 275 360 275 290 275
25
2-BA-45 2DW3-1*1/2"-A3 Potable water 2DW1 Safety shower 60 70 50 70 75/225 50 60
327/45
2-BA-32 2FO3-2"-B1 Fuel Oil 2FO1 2FO2 290 340 218 340 210 270
0
2-BA-43/34 2LS3-6"-B23 LP Steam 2GT-2D 2LS27 75 320 55 298 95/450 50 298
2-BA-31 2P3-8"-B1 Atmos Residue 2P1 2P200 190 340 143 340 215 70 320
120/20
2-BA-39/45 2UW3-1*1/2"-A1 Utility Water 2UW1 2K-27 91 70 80 70 80 60
0

5% soln Na3PO4 740/11


2-BA-36 2K3-1"-C1 2K2 2E-10A 740 60 740 60 420 60
25
Full
2-BA-32/4 X2P3-2"-B20 Sour Gas X2PW14 2P250 vac & 308 38 308 57/425 1.6 150
50
Full vac
2-BA-32/4 X2PW3-1"-B20 Oil/condensate X2PW1 X2G-100A & 50 308 38 308 57/425 1.5 98
334/45
2-BA-38/40 2PW3-3"-B19 Sour water 2G-7A 2PW301 296 243 223 248 80 100
0
2-BA-34 2TW3-10"-B23 Tempered Water 2TW2 2G-8A 50 150 38 150 50 110
150/45
2-BA-44/14-BA-11 2N3-1*1/2"-B1 Nitrogen 2N1 SRU 125 60 133 60 100 60
0
130/45
2-BA-43/34 2MC3-1"-B23 Water 2GT-2D 2LS27 75 320 75 320 NNF
0
390/11
2-BA-34 2MS3-6"-C23 MP Steam 2MS94 2MS8 225 398 200 388 200 388
25
150/45
2-BA-44/14-BA-11 2N3-1*1/2"-B1 Nitrogen 2N1 SRU 125 60 133 60 100 60
0

LINE LIST Page 67


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
1090/1
2-BA-43/34 2HS3-3"-D24 HP Steam 2HS10 2GT-2D 705 700 600 700 600 700
500
2-BA-32 x2LS3-1"-B23 LP Steam 2LS53 x2G-102 75 320 55 298 95/450 50 298
2-BA-37/43 2LC3-1"-B23 Steam Condensate 2E-13 2LC9 75 320 55 298 95/450 50 298
2-BA-34-2 2VA3-2"-B1 Steam PSV122A 2VA7 Intermittent steam relief to atmosphere
147/45
2-BA-42 2SO3-1*1/2"-B1 LVGO PCV424 2SO4 128 248 98 350 55 380
0
105/20
2-BA-45/2-BA-31 2CW3-1*1/2"-A2 Cooling Water 2G-1/1A 2CW22 57.5 100 57.5 100 57.5 100
0
540/11
4 2-BA-34 2BFW4-3"-C23 Water 2BFW2 2E-4C 360 275 360 275 290 275
25
2-BA-44/32 2FG4-6"-B12 Fuel Gas 2FG1 2C-10 80 210 60 210 95/450 35 100
2FO4-2"-B1 Fuel Oil 2FO2 FO Header
390/11
2-BA-34 2MS4-6"-C23 MP Steam 2MS95 2MS8 225 398 200 388 200 388
25
2-BA-31 2P4-10"-B1 Atmos Residue 2C-1 2P5&6 50 340 38 340 57/450 0.8 320

5% soln Na3PO4 740/11


2-BA-36 2K4-1"-C1 2K2 2E-10B 740 60 740 60 420 60
25
Full
2-BA-32/4 X2P4-2"-B20 Sour Gas X2PW16 2P249 vac & 308 38 308 57/425 1.6 150
50
Full vac
2-BA-32/4 X2PW4-1"-B20 Oil/condensate X2G-100 X2PW18 & 50 308 38 308 57/425 7.8 98
VDU Fire protection 190/20
2-BA-48/2-BA-44 2IA4-1"-A1 Instrument air 2IA1 140 100 125 90 70 90
system 0
334/45
2-BA-38 2PW4-3"-B19 Sour water 2G-7 2PW3 296 243 223 248 80 100
0
2-BA-34 2TW4-8"-B23 Tempered Water 2G-8A 2TW6 63 150 50 150 71/450 50 110
2-BA-43/36 2LS4-12"-B23 LP Steam 2GT-4A 2LS27 75 320 55 298 95/450 50 298
130/45
2-BA-43/36 2MC4-1"-B23 Water 2GT-4A 2LS27 75 320 75 320 NNF
0
2-BA-34-2 2VA4-2"-B1 Steam PSV122B 2VA8 Intermittent steam relief to atmosphere
1090/1
2-BA-43/36 2HS4-4"-D24 HP Steam 2HS10 2GT-4A 705 700 600 700 600 700
500

LINE LIST Page 68


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
2-BA-32 x2LS4-1"-B23 LP Steam x2LS53 x2G-101 75 320 55 298 95/450 50 298
LP Steam tracing
2-BA-43 2LC4-1"-B23 Steam Condensate 2LC5 75 320 55 298 95/450 50 298
traps
2-BA-42 2SO4-1*1/2"-B1 LVGO 2SO3/22 2C-16 60 248 46 350 70/450 35 120
105/20
2-BA-45/2-BA-34 2CW4-3/4"-A2 Cooling Water 2CW1 2GT-8A 93 75 70 75 63.5 75
0
5 2-BA-31 2BD5-6"-B1 Atmospheric Residue 2C-1 2C-17 10 550 10 550 50 4 320

2-BA-40 2FG5-2"-B12 Fuel Gas Plot Limit Sulphur Recovery unit 80 210 60 210 95/450 35 100

2-BA-31 2P5-10"-B1 Atmos Residue 2P4 2G-1 50 340 38 340 57/450 0.8 320
Full
2-BA-32/4 X2P5-2"-B20 Sour Gas X2G101 X2PW14 vac & 308 38 308 57/425 1.6 150
50
Full vac
2-BA-32/4 X2PW5-1"-B20 Oil/condensate X2G-100A X2PW18 & 50
308 38 308 57/425 7.8 98

5% soln Na3PO4 740/11


2-BA-34/43 2K5-1"-C1 2K1 2K7/9 740 60 740 60 420 60
25
190/20
2-BA-32/44 2UA5-2"-A1 Utility Air 2UA1 2F-1 140 100 125 90 100 90
0
2-BA-34 2TW5-8"-B23 Tempered Water 2G-8B 2TW6 63 150 50 150 71/450 50 110
120/20
2-BA-40/45 2UW5-1*1/2"-A1 Utility Water 2UW1 SRU 91 70 80 70 80 60
0
MHB-8494 2FO5-1*1/2"-B1 Fuel Oil FO Header @2F-1
2-BA-34-2 2VA5-2"-B1 Steam PSV122C 2VA9 Intermittent steam relief to atmosphere
130/45
2-BA-43/32 2MC5-1"-B23 Water 2GT-5A 2LS27 75 320 75 320 NNF
0
390/11
2-BA-34 2MS5-6"-C23 MP Steam 2MS96 2MS8 225 398 200 388 200 388
25
1090/1
2-BA-43/37 2HS5-3"-D24 HP Steam 2HS10 2GT-5A 705 700 600 700 600 700
500
2-BA-43 2LC5-1"-B23 Steam Condensate 2LC4 2LC9 75 320 55 298 95/450 50 298
2-BA-43/37 2LS5-6"-B23 LP Steam 2GT-5A 2LS27 75 320 55 298 95/450 50 298
2-BA-42 2SO5-1*1/2"-B1 LVGO 2C-16 2G-13 60 248 46 350 70/450 35 120

LINE LIST Page 69


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
105/20
2-BA-45/2-BA-34 2CW5-3/4"-A2 Cooling Water 2CW1 2GT-8A 93 75 70 75 63.5 75
0
540/11
2-BA-34 2BFW5-3"-C23 Water 2BFW2 2E-4D 360 275 360 275 290 275
25
540/11
6 2-BA-34 2BFW6-3"-C23 Water 2E-4A 2BFW8 360 275 360 275 258 375
25
MHB-8494 2FO6-1*1/2"-B1 Fuel Oil
130/45
2-BA-43/34 2MC6-1"-B23 Water 2GT-8A 2LS27 75 320 75 320 NNF
0
2-BA-31 2P6-10"-B1 Atmos Residue 2P4 2G-1A 50 340 38 340 57/450 0.8 320
Full
2-BA-32/4 X2P6-2"-B20 Sour Gas X2G102 X2PW16 vac & 308 38 308 57/425 1.6 150
50
Full vac
2-BA-32/4 X2PW6-2"-B20 Oil/condensate X2PW18 X2PW13 & 50
308 38 308 57/425 12.6 150

2-BA-34 2TW6-8"-B23 Tempered Water 2TW4&5 2TW7&8 63 150 50 150 71/450 50 110

5% soln Na3PO4 740/11


2-BA-34 2K6-1"-C1 2K7 2E-3A 740 60 740 60 420 60
25
190/20
2-BA-40/44 2UA6-2"-A1 Utility Air 2UA1 SRU 140 100 125 90 100 90
0
1090/1
2-BA-40/34 2HS6-2"-D24 HP Steam 2HS10 2GT-8A 705 700 600 700 600 700
500
HT steam tracing
2-BA-43 2LC6-1"-B23 Steam Condensate 2LC7 75 320 55 298 95/450 50 298
traps
2-BA-42 2SO6-1*1/2"-B1 LVGO 2SO5 2G-13A 60 248 46 350 70/450 35 120
2-BA-34-2 2VA6-2"-B1 Steam PSV122D 2VA10 Intermittent steam relief to atmosphere
2-BA-43/34 2LS6-4"-B23 LP Steam 2GT-8A 2LS27 75 320 55 298 95/450 50 298
540/11
7 2-BA-34 2BFW7-3"-C23 Water 2E-4B 2BFW8 360 275 360 275 258 375
25
2-BA-42/44 2FG7-1"-B12 Fuel Gas 2FG1 2C-16 80 210 60 210 95/450 35 100
2-BA-43 2LC7-1"-B23 Steam Condensate 2LC6 2LS27 75 320 55 298 95/450 50 298
2-BA-43/38 2LS7-4"-B23 LP Steam 2GT-7A 2LS27 75 320 55 298 95/450 50 298
346/11
2-BA-31 2P7-8"-C1 Atmos Residue 2G-1 2P9 307 340 231 340 208 320
25

LINE LIST Page 70


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
Full vac
2-BA-32/4 X2PW7-2"-B20 Oil/condensate 2P250 X2PW8 & 50
308 38 308 57/425 1.6 150

5% soln Na3PO4 740/11


2-BA-34 2K7-1"-C1 2K5 2E-3B 740 60 740 60 420 60
25
120/20
2-BA-43/45 2UW7-2"-A1 Utility Water 2UW1 2LC11 91 70 80 70 80 60
0
190/20
2-BA-32 2UA7-2"-A1 Utility Air 2K-2A/B 2F-1 140 100 125 90 100 90
0
2-BA-34 2TW7-6"-B23 Tempered Water 2TW6 2E-6A 63 150 50 150 71/450 50 110
2-BA-34-2 2VA7-2"-B1 Steam PSV123A Atmos Intermittent steam relief to atmosphere
147/45
2-BA-42 2SO7-1*1/2"-B1 LVGO 2G-13 2SO9 128 248 98 350 96 120
0
240/40
2-BA-32 2FW7-6"-A1 Fire Water Fire hydrant conn. 2C-5 210 70 160 70 150 60
0
MHB-8494 2FO7-2"-B1 Fuel Oil 2FO1 FO Header
8 2-BA-32 2BD8-8"-B20 Sour Gas 2P207 2BD40 30 150 50 1.6 150
240/40
2-BA-32 2FW8-6"-A1 Fire Water Fire hydrant conn. 2C-5 210 70 160 70 150 60
0
1090/1
2-BA-43 2HS8-4"-D24 HP Steam 2HS10 2MS16 705 700 600 700 600 700
500
2-BA-36 2LS8-6"-B23 LP Steam 2LS101 2LS10 75 320 55 298 95/450 50 298
346/11
2-BA-31 2P8-8"-C1 Atmos Residue 2G-1A 2P9 307 340 231 340 208 320
25
120/20
2-BA-43/45 2UW8-2"-A1 Utility Water 2UW1 2C-4 91 70 80 70 80 60
0

5% soln Na3PO4 740/11


2-BA-34 2K8-1"-C1 2K9 2E-3C 740 60 740 60 420 60
25
Full vac
2-BA-32/4 X2PW8-1"-B20 Oil/condensate X2PW7 X2PW14 & 50
308 38 308 57/425 1.6 150
2-BA-34 2TW8-6"-B23 Tempered Water 2TW6 2E-6B 63 150 50 150 71/450 50 110
147/45
2-BA-42 2SO8-1*1/2"-B1 LVGO 2G-13A 2SO9 128 248 98 350 96 120
0
130/45
2-BA-43/38 2MC8-1"-B23 Water 2GT-20A 2LS27 75 320 75 320 NNF
0
390/11
2-BA-34/43 2MS8-10"-C23 MP Steam 2MS2/3/4/5 2MS20 225 398 200 388 200 388
25
2-BA-34-2 2VA8-2"-B1 Steam PSV123B Atmos Intermittent steam relief to atmosphere

LINE LIST Page 71


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
105/20
2-BA-45/2-BA-37 2CW8-1*1/2"-A2 Cooling Water 2CW1 2G-5/5A 93 75 70 75 63.5 75
0
540/11
2-BA-34/2-BA-43 2BFW8-4"-C23 Water 2BFW6/2BFW7 2BFW32 360 275 360 275 258 375
25
9 2-BA-32 2BD9-8"-B20 Sour Gas 2P207 2BD8 30 150 50 Bypass
105/20
2-BA-45/2-BA-37 2CW9-1*1/2"-A2 Cooling Water 2G-5/5A 2CW22 57.5 100 57.5 100 57.5 100
0
2-BA-32 2FG9-8"-B12 Fuel Gas 2C-10 2FG17/18 80 210 60 210 95/450 35 100
Full vac
2-BA-32/4 X2PW9-1"-B20 Oil/condensate X2G101 X2PW6 & 50
308 38 308 57/425 12.6 150
2-BA-34 2TW9-6"-B23 Tempered Water 2E-6A 2TW11 63 150 50 150 71/450 35 150
120/20
2-BA-43 2UW9-1"-A1 Utility Water 2UW8 Drain 91 70 80 70 80 60
0
346/11
2-BA-31/36 2P9-8"-C1 Atmos Residue 2P7&8 2P 11&12 307 340 231 340 208 320
25

5% soln Na3PO4 740/11


2-BA-34 2K9-1"-C1 2K5 2E-3D 740 60 740 60 420 60
25
190/20
2-BA-32-3 2UA9-2"-A1 Utility Air 2K-2A/B 2F-1 140 100 125 90 100 90
0
147/45
2-BA-42 2SO9-1*1/2"-B1 LVGO 2SO7/8 2SO28 128 248 98 350 96 120
0
2-BA-43/11/40 2LC9-2"-B23 Steam Condensate Condensate header 75 320 55 298 95/450 50 298
2-BA-36 2LS9-6"-B23 LP Steam 2LS102 2LS10 75 320 55 298 95/450 50 298
2-BA-34-2 2VA9-2"-B1 Steam PSV123C Atmos Intermittent steam relief to atmosphere
390/11
2-BA-36 2MS9-8"-C23 MP Steam 2MS97 2MS15 225 398 200 388 200 388
25
10 2-BA-32 2BD10-1*1/2"-B1 Fuel Gas 2C-10 PSV-54A/B 80 140 60 140 95/450 35 100
2-BA-32 2FG10-2"-B12 Pilot Gas 2FG9 2FG35/48 80 210 60 210 95/450 35 100
1090/1
2-BA-40 2HS10-6"-D24 HP Steam 31HS20 2HS8 705 700 600 700 600 700
500
Full vac
2-BA-32/4 X2PW10-2"-B20 Oil/condensate 2P249 X2PW11 & 50
308 38 308 57/425 1.6 150
2-BA-34 2TW10-6"-B23 Tempered Water 2E-6B 2TW11 63 150 50 150 71/450 35 150
147/45
2-BA-42 2SO10-3/4"-B22 LVGO 2SO23 2G-1 128 248 98 350 96 120
0
MHB-9043 2N10-1*1/2"-B1 Nitrogen 2N1 Utility station 2F-2 125 60 133 60 200 100 60

LINE LIST Page 72


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
346/11
2-BA-36 2P10-6"-C1 Atmos Residue 2P9 2P 13 307 340 231 340 208 320
25
190/20
2-BA-32/44 2UA10-1.5"-A1 Utility Air 2UA5 Soot Blowers on2F-1 140 100 125 90 100 90
0
2-BA-34-2 2VA10-2"-B1 Steam PSV123D Atmos Intermittent steam relief to atmosphere
2-BA-43/40 2LC10-3"-B23 Steam Condensate 2LC9/26 31LC42 75 320 55 298 95/450 50 298
390/11
2-BA-36 2MS10-8"-C23 MP Steam 2MS98 2MS15 225 398 200 388 200 388
25
2-BA-36/43 2LS10-8"-B23 LP Steam 2LS8/9 2LS27 75 320 55 298 95/450 50 298
MHB-9043-1 2IA10-1.5"-A1 Instrument air 2IA1 IA Users @2F-2 140 100 125 90 190 70 90
105/20
2-BA-38/2-BA-45 2CW10-16"-A2 Cooling Water 2CW1 2E-14/15/16 93 75 70 75 63.5 75
0
540/11
11 2-BA-34 2BFW11-1*1/2"-C23 Water 2BFW32 2BFW13/2BFW14 360 275 360 275 258 375
25
327/45
2-BA32/33 2FO11-3/4"-B1 Fuel Oil 2FO1 2F-1 290 340 218 340 210 270
0
2-BA-43/34 2LC11-2"-B23 Steam Condensate 2LC9 2C-6 75 320 55 298 95/450 50 298
2-BA-36 2LS11-6"-B23 LP Steam 2LS99 2LS13 75 320 55 298 95/450 50 298

5% soln Na3PO4 740/11


2-BA-43/36 2K11-1"-C1 2K1 2K12/13 740 60 740 60 420 60
25
Full vac
2-BA-32/4 X2PW11-1"-B20 Oil/condensate X2PW10 X2PW16 & 50
308 38 308 57/425 1.6 150
2-BA-34 2TW11-8"-B23 Tempered Water 2TW9&10 2E-17 63 150 50 150 71/450 35 150
390/11
2-BA-36 2MS11-8"-C23 MP Steam 2MS99 2MS15 225 398 200 388 200 388
25
2-BA-34-1 2VA11-4"-B1 Steam PSV120 Atmos Intermittent steam relief to atmosphere
346/11
2-BA-36 2P11-6"-C1 Atmos Residue 2P9 2E-9C Shell 307 340 231 340 208 320
25
147/45
2-BA-42 2SO11-3/4"-B22 LVGO 2SO23 2G-1A 128 248 98 350 96 120
0
105/20
2-BA-38/2-BA-45 2CW11-16"-A2 Cooling Water 2E-14/15/16 2CW22 48.5 100 48.5 100 48.5 100
0
12 2-BA-32 2BD12-3"-B1 Fuel Gas PSV-54A/B 2BD40 30 540 50 10 140
2-BA-39 2FG12-1"-B12 Fuel Gas 2FG13 2P191 80 210 60 210 95/450 35 100
2-BA-43/38 2LC12-2"-B23 Steam Condensate 2C-15 2LS9 75 320 55 298 95/450 50 298
2-BA-36 2LS12-6"-B23 LP Steam 2LS100 2LS13 75 320 55 298 95/450 50 298

LINE LIST Page 73


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
2-BA-36 2MS12-8"-C23 MP Steam 2MS100 2MS15 225 398 200 388 200 388
25

5% soln Na3PO4 740/11


2-BA-36 2K12-1"-C1 2K11 2E-12A 740 60 740 60 420 60
25
Full vac
2-BA-32/4 X2PW12-1"-B20 Oil/condensate X2G102 X2PW9 & 50
308 38 308 57/425 12.6 150
2-BA-34-4 2VA12-3"-B1 Steam PSV160 Atmos Intermittent steam relief to atmosphere
2-BA-34 2TW12-8"-B23 Tempered Water 2E-17 2TW2 50 150 38 150 20 110
147/45
2-BA-42 2SO12-3/4"-B22 LVGO 2SO24 2G-2A 128 248 98 350 96 120
0
346/11
2-BA-36 2P12-6"-C1 Atmos Residue 2P9 2E-9D Shell 307 340 231 340 208 320
25
540/11
2-BA-34 2BFW12-1*1/2"-C23 Water 2BFW32 2BFW15/2BFW16 360 275 360 275 258 375
25
327/45
2-BA32/33 2FO12-3/4"-B1 Fuel Oil 2FO25 2F-1 290 340 218 340 210 270
0
540/11
13 2-BA-34 2BFW13-1"-C23 Water 2BFW11 2E-3A 360 275 360 275 258 375
25
2-BA-43/32 2LC13-1"-B23 Steam Condensate 2C-14 2BD131 75 320 55 298 95/450 50 298
2-BA-36/43 2LS13-10"-B23 LP Steam 2LS11/12 2LS27 75 320 55 298 95/450 50 298
356/11
2-BA-36 2P13-6"-C1 Atmos Residue 2E-9A Shell 2P15 307 450 231 450 188 390
25

5% soln Na3PO4 740/11


2-BA-36 2K13-1"-C1 2K12 2E-12B 740 60 740 60 420 60
25
2-BA-36-1 2VA13-6"-B1 Steam PSV178 Atmos Intermittent steam relief to atmosphere
Full vac
2-BA-38 X2PW13-6"-B20 Vac ovhd + cond 2P148 2C-3 & 50 308 38 308 57/425 0.6 96
MHC-5484 2TW13-6"-B23 Tempered Water Jump over at 2E-6A/B 63 150 50 150 71/450 50 110
147/45
2-BA-42 2SO13-3/4"-B22 LVGO 2SO24 2G-2B 128 248 98 350 96 120
0
2-BA-39 2FG13-1*1/2"-B12 Fuel Gas 2FG5 2PG14 80 210 60 210 95/450 35 100
327/45
2-BA32/33 2FO13-3/4"-B1 Fuel Oil 2FO25 2F-1 290 340 218 340 210 270
0
14 2-BA-32 2BD14-2"-B1 Blow Down 2OWs 2BD12 80 140 60 140 95/450 Intermittent
105/20
2-BA-45/2-BA-36 2CW14-1*1/2"-A2 Cooling Water 2CW1 2G-4/4A 93 75 70 75 63.5 75
0
2-BA-32/43 2LS14-6"-B23 LP Steam 2LS27 2C-14 75 320 55 298 95/450 50 298

LINE LIST Page 74


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
356/11
2-BA-36 2P14-6"-C1 Atmos Residue 2E-9B Shell 2P15 307 450 231 450 188 390
25
Full vac
2-BA-32/4 X2PW14-6"-B20 Oil/condensate X2PW8 X2PW15 & 50 308 38 308 57/425 1.6 150
147/45
2-BA-42 2SO14-3/4"-B22 LVGO 2SO24 2G-2C 128 248 98 350 96 120
0

5% soln Na3PO4 740/11


2-BA-36/43 2K14-1"-C1 2K1 2K16/18 740 60 740 60 420 60
25
2-BA-34 2TW14-8"-B23 Tempered Water 2TW6 2E-24 63 150 50 150 71/450 50 110
2-BA-39 2FG14-1"-B10 Fuel Gas 2FG13 2P189 50 308 38 308 57/450 35 100
2-BA-36-2 2VA14-3"-B1 Steam PSV180A Atmos Intermittent steam relief to atmosphere
327/45
2-BA32/33 2FO14-3/4"-B1 Fuel Oil 2FO26 2F-1 290 340 218 340 210 270
0
540/11
2-BA-34 2BFW14-1"-C23 Water 2BFW11 2E-3B 360 275 360 275 258 375
25
540/11
15 2-BA-34 2BFW15-1"-C23 Water 2BFW12 2E-3C 360 275 360 275 258 375
25
327/45
2-BA32/33 2FO15-3/4"-B1 Fuel Oil 2FO26 2F-1 290 340 218 340 210 270
0
1090/1
2-BA-43/38 2HS15-3"-D24 HP Steam 2HS10 2GT-20A 705 700 600 700 600 700
500
2-BA-32 2LS15-6"-B23 LP Steam 2C-14 2F-1 75 320 55 298 95/450 50 298
147/45
2-BA-42 2SO15-3/4"-B22 LVGO 2SO24 2G-2D 128 248 98 350 96 120
0
120/20
2-BA-39 2UW15-3/4"-A1 Utility Water 2UW3 2G-19 Flush line 91 70 80 70 80 60
0
390/11
2-BA-36/43 2MS15-10"-C23 MP Steam 2MS9/10/11/12 2MS20 225 398 200 388 200 388
25
MHB-9043-1 2UA15-2"-A1 Utility Air 2UA6 2F-2 140 100 125 90 187 100 90

5% soln Na3PO4 740/11


2-BA-36 2K15-1"-C1 2K16 2E-8A 740 60 740 60 420 60
25
2-BA-36-2 2VA15-3"-B1 Steam PSV180B Atmos Intermittent steam relief to atmosphere
356/11
2-BA-36 2P15-8"-C1 Atmos Residue 2P13 &14 2P17&18 307 450 231 450 188 390
25
Full vac
2-BA-32/4 X2PW15-1"-B20 Oil/condensate X2PW14 X2G-101 & 50
308 38 308 57/425 1.6 150
2-BA-34 2TW15-8"-B23 Tempered Water 2E-24 2TW6 63 150 50 150 71/450 50 110

LINE LIST Page 75


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
105/20
2-BA-45/2-BA-36 2CW15-1*1/2"-A2 Cooling Water 2G-4/4A 2CW22 57.5 100 57.5 100 57.5 100
0
16 2-BA-33 2BD16-6"-B18 Vacuum Overhead 2C-2 PSV-82A/B 50 540 37.6 540 60/450 -14.4 160
327/45
2-BA32/33 2FO16-3/4"-B1 Fuel Oil 2FO27 2F-1 290 340 218 340 210 270
0
147/45
2-BA-42 2SO16-3/4"-B22 LVGO 2SO25 2G-3 128 248 98 350 96 120
0
390/11
2-BA-43 2MS16-6"-C24 MP Steam 2HS8 2LS23 225 700 200 700 200 656
25
356/11
2-BA-36 2P16-6"-C1 Atmos Residue 2P15 2P21 307 450 231 450 188 390
25
120/20
2-BA-45 2UW16-3/4"-A1 Utility Water 2UW1 Sample cooler at VDU 91 70 80 70 80 60
0
2-BA-36-2 2VA16-3"-B1 Steam PSV180C Atmos Intermittent steam relief to atmosphere
Full vac
2-BA-32/4 X2PW16-6"-B20 Oil/condensate X2PW11 X2PW17 & 50
308 38 308 57/425 1.6 150
MHB-9043-1 2UA16-1"-A1 Utility Air 2UA15 Utility station @2F-2 140 100 125 90 187 100 90

5% soln Na3PO4 740/11


2-BA-36 2K16-1"-C1 2K14 2E-8B 740 60 740 60 420 60
25
105/20
2-BA-45/2-BA-34 2CW16-1*1/2"-A2 Cooling Water 2CW1 2G-2A/C 93 75 70 75 63.5 75
0
540/11
2-BA-34 2BFW16-1"-C23 Water 2BFW12 2E-3D 360 275 360 275 258 375
25
17 2-BA-33 2BD17-8"-B1 Vacuum Overhead PSV-82A/B 2BD-40 30 540 50 14 390
2-BA-32 2FG17-6"-B12 Fuel Gas 2FG9 2FG24/27 80 210 60 210 95/450 35 100
2-BA-32/33 2LS17-6"-B24 LP Steam 2F-1 2LS18 60 750 55 750 95/450 50 500
356/11
2-BA-36 2P17-6"-C1 Atmos Residue 2P15 2E-7C Shell 307 450 231 450 188 390
25
147/45
2-BA-42 2SO17-3/4"-B22 LVGO 2SO25 2G-3A 128 248 98 350 96 120
0
Full vac
2-BA-32/4 X2PW17-1"-B20 Oil/condensate X2PW16 X2G-102 & 50
308 38 308 57/425 1.6 150
2-BA-36-2 2VA17-3"-B1 Steam PSV180D Atmos Intermittent steam relief to atmosphere
240/40
2-BA-45 2FW17-3"-A1 Fire Water 2FW1 2FW29 210 70 160 70 150 60
0
MHB-9019-3 2UA17-2"-A1 Utility Air 2E-4A/B outlet 2F-2

LINE LIST Page 76


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
120/20
2-BA-45 2UW17-3/4"-A1 Utility Water 2UW1 Sample cooler at SWS 91 70 80 70 80 60
0

5% soln Na3PO4 740/11


2-BA-36 2K17-1"-C1 2K18 2E-8C 740 60 740 60 420 60
25
327/45
2-BA32/33 2FO17-3/4"-B1 Fuel Oil 2FO27 2F-1 290 340 218 340 210 270
0
105/20
2-BA-46/2-BA-34 2CW17-1*1/2"-A2 Cooling Water 2G-2A/C 2CW22 57.5 100 57.5 100 57.5 100
0
540/11
2-BA-36 2BFW17-2"-C23 Water 2BFW32 2BFW19/2BFW20 360 275 360 275 258 375
25
540/11
18 2-BA-36 2BFW18-2"-C23 Water 2BFW32 2BFW21/2BFW22 360 275 360 275 258 375
25
2-BA-32 2FG18-6"-B12 Fuel Gas 2FG9 2FG20/21/22/23 80 210 60 210 95/450 35 100
2-BA-43/31 2LC18-1"-B23 Steam Condensate 2GT-1A 2LC9 75 320 55 298 95/450 50 298
660
2-BA-33 2LS18-20"-B24 LP Steam 2LS17 2LS19/21 60 750 55 750 95/450 500
psia
Full vac
2-BA-32/4 X2PW18-1*1/2"-B20 Oil/condensate X2PW5 X2PW6 & 50
308 38 308 57/425 12.6 150

147/45
2-BA-42 2SO18-3/4"-B22 LVGO 2SO25 2G-4 128 248 98 350 96 120
0
2-BA-36-2 2VA18-3"-B1 Steam PSV181A 2VA14 Intermittent steam relief to atmosphere
120/20
MHD-5512 2UW18-1"-A1 Utility Water 2UW5 Fuel Gas - 91 70 80 70 80 60
0

5% soln Na3PO4 740/11


2-BA-36 2K18-1"-C1 2K14 2E-8D 740 60 740 60 420 60
25
356/11
2-BA-36 2P18-6"-C1 Atmos Residue 2P15 2E-7D Shell 307 450 231 450 188 390
25
225/45
2-BA-45 2HFW18-3"-B1 Flush water Hot flush water header 200 388 150 388 150 180
0
240/40
2-BA-45 2FW18-3"-A1 Fire Water Hot flush water header 210 70 160 70 150 60
0
327/45
2-BA32/33 2FO18-3/4"-B1 Fuel Oil 2FO28 2F-1 290 340 218 340 210 270
0
105/20
2-BA-45/2-BA-34 2CW18-1*1/2"-A2 Cooling Water 2CW1 2G-2B/D 93 75 70 75 63.5 75
0
540/11
19 2-BA-36 2BFW19-1*1/2"-C23 Water 2BFW17 2E-8A 360 275 360 275 258 375
25

LINE LIST Page 77


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
2-BA-43/34 2LC19-1"-B23 Steam Condensate 2GT-2C 2LC20 75 320 55 298 95/450 50 298
660
2-BA-33 2LS19-10"-B24 LP Steam 2LS18 2C-2 60 750 55 750 95/450 500
psia
382/11
2-BA-36 2P19-6"-C6 Atmos Residue 2E-7A Shell 2P21 307 550 231 550 168 496
25
120/20
MHD-5512 2UW19-1"-A1 Utility Water 2UW5 2G-23X/AX 91 70 80 70 80 60
0
150/45
2-BA-40/45 2K19-1.5"-B32 NaOH Soln. 1K2001 2K20 150 60 150 60 25 60
0
2-BA-36-2 2VA19-3"-B1 Steam PSV181B 2VA15 Intermittent steam relief to atmosphere
147/45
2-BA-42 2SO19-3/4"-B22 LVGO 2SO25 2G-4A 128 248 98 350 96 120
0
327/45
2-BA32/33 2FO19-3/4"-B1 Fuel Oil 2FO28 2F-1 290 340 218 340 210 270
0
240/40
2-BA-45 2FW19-3"-A1 Fire Water 2FW18 2P470 210 70 160 70 150 60
0
105/20
2-BA-45/2-BA-34 2CW19-1*1/2"-A2 Cooling Water 2G-2B/D 2CW22 57.5 100 57.5 100 57.5 100
0
20 2-BA-38 2BD20-3"-B10 Steam hydrocarbon 2C-3 PSV-275A/B 50 350 37.6 350 57/450 1.9 100
2-BA-32 2FG20-3"-B12 Fuel Gas 2FG18 2FG49/50 80 210 60 210 95/450 35 100
240/40
2-BA-45 2FW20-3"-A1 Fire Water 2FW18 2P464 210 70 160 70 150 60
0
2-BA-43/34 2LC20-1"-B23 Steam Condensate 2GT-2D 2LC20 75 320 55 298 95/450 50 298
2-BA-36-2 2VA20-3"-B1 Steam PSV181C 2VA16 Intermittent steam relief to atmosphere
MHB-9044-1 2UW20-1.5"-A1 Utility Water 2UW3 Utility station @2F-2 91 70 80 70 120 80 60
150/45
2-BA-39/45 2K20-1.5"-B32 NaOH Soln. 2K19 2D-2 150 60 150 60 25 60
0
660
2-BA-33 2LS20-10"-B24 LP Steam 2LS18 2C-2 60 750 55 750 95/450 500
psia
147/45
2-BA-42 2SO20-3/4"-B22 LVGO 2SO24 2G-5 128 248 98 350 96 120
0
390/11
2-BA-40/43 2MS20-10"-C23 MP Steam 2MS21 31MS22 225 398 200 388 200 388
25
382/11
2-BA-36 2P20-6"-C6 Atmos Residue 2E-7B Shell 2P21 307 550 231 550 168 496
25

LINE LIST Page 78


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
327/45
2-BA32/33 2FO20-3/4"-B1 Fuel Oil 2FO29 2F-1 290 340 218 340 210 270
0
540/11
2-BA-36 2BFW20-1*1/2"-C23 Water 2BFW17 2E-8B 360 275 360 275 258 375
25
21 2-BA-38 2BD21-10"-B1 Steam hydrocarbon PSV-275A/B 2BD40 30 540 50 11 350
2-BA-32 2FG21-3"-B12 Fuel Gas 2FG18 2FG51/52 80 210 60 210 95/450 35 100
240/40
2-BA-45 2FW21-2"-A1 Fire Water 2FW18 2P454 210 70 160 70 150 60
0
2-BA-43/36 2LC21-1"-B23 Steam Condensate 2GT-4A 2LC9 75 320 55 298 95/450 50 298
150/45
2-BA-39 2K21-1"-B32 NaOH Soln. 2D-2 2G-19 150 60 150 60 25 60
0
147/45
2-BA-42 2SO21-3/4"-B22 LVGO 2SO24 2G-5A 128 248 98 350 96 120
0
2-BA-36-2 2VA21-3"-B1 Steam PSV181D 2VA17 Intermittent steam relief to atmosphere
660
2-BA-33 2LS21-10"-B24 LP Steam 2LS18 2C-2 60 750 55 750 95/450 500
psia
390/11
2-BA-43 2MS21-4"-C23 MP Steam 2MS20 2MS22 225 398 200 388 200 388
25
382/11
2-BA-36/34 2P21-8"-C6 Atmos Residue 2P19 &20 2P23&24 307 550 231 550 168 496
25
327/45
2-BA32/33 2FO21-3/4"-B1 Fuel Oil 2FO29 2F-1 290 340 218 340 210 270
0
540/11
2-BA-36 2BFW21-1*1/2"-C23 Water 2BFW18 2E-8C 360 275 360 275 258 375
25
540/11
22 2-BA-36 2BFW22-1*1/2"-C23 Water 2BFW18 2E-8D 360 275 360 275 258 375
25
2-BA-32 2FG22-2"-B12 Fuel Gas 2FG18 2F-1 80 210 60 210 95/450 35 100
2-BA-43/37 2LC22-1"-B23 Steam Condensate 2GT-5A 2LC24 75 320 55 298 95/450 50 298
2-BA-36-3 2VA22-4"-B1 Steam PSV203A 2VA24 Intermittent steam relief to atmosphere
660
2-BA-33 2LS22-10"-B24 LP Steam 2LS21 2C-2 60 750 55 750 95/450 500
psia
147/45
2-BA-42 2SO22-1*1/2"-B22 LVGO 2SO28 2SO4 128 248 98 350 96 120
0
390/11
2-BA-43/32 2MS22-2"-C23 MP Steam 2MS21 2F-1 (fuel oil atmosiser) 225 398 200 388 200 388
25

LINE LIST Page 79


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
150/45
2-BA-39 2K22-1.5"-B32 NaOH Soln. 2K27 2C-8 150 60 150 60 25 60
0
382/11
2-BA-34 2P22-6"-C6 Atmos Residue 2P21 2P25 307 550 231 550 168 496
25
240/40
2-BA-45 2FW22-3"-A1 Fire Water 2FW18 2P502 210 70 160 70 150 60
0
327/45
2-BA32/33 2FO22-3/4"-B1 Fuel Oil 2FO30 2F-1 290 340 218 340 210 270
0
105/20
2-BA-40/2-BA-45 2CW22-16"-A2 Cooling Water Cooling water return header 48.5 100 48.5 100 48.5 100
0
23 2-BA-39 2BD23-4"-B1 Sour water vap PSV-457/A 2BD48 30 540 50 14 308
2-BA-32 2FG23-3"-B12 Fuel Gas 2FG18 2FG53/59 80 210 60 210 95/450 35 100
2-BA-43/38 2LC23-1"-B23 Steam Condensate 2GT-7A 2LS24 75 320 55 298 95/450 50 298
2-BA-33 2LS23-6"-B24 LP Steam 2MS16 2LS24 65 636 55 636 95/450 50 636
2-BA-36-3 2VA23-4"-B1 Steam PSV203B 2VA25 Intermittent steam relief to atmosphere
147/45
2-BA-42 2SO23-1*1/2"-B22 LVGO 2SO28 2SO10&11 128 248 98 350 96 120
0
390/11
2-BA-43/32 2MS23-3"-C23 MP Steam 2MS21 2F-1 225 398 200 388 200 388
25
382/11
2-BA-34 2P23-6"-C6 Atmos Residue 2P21 2E-2G tubes 307 550 231 550 168 496
25
150/45
2-BA-34 2K23-3"-B23 Glycol 2TW6 2C-19 150 60 150 60 25 60
0
240/40
2-BA-45 2FW23-3"-A1 Fire Water 2FW18 2P486 210 70 160 70 150 60
0
327/45
2-BA32/33 2FO23-3/4"-B1 Fuel Oil 2FO30 2F-1 290 340 218 340 210 270
0
540/11
24 2-BA-36/2-BA-43 2BFW24-1*1/2"-C23 Water 2BFW1 2BFW26/2BFW27 360 275 360 275 290 275
25
2-BA-43/34 2LC24-1"-B23 Steam Condensate 2GT-8A 2LC22 75 320 55 298 95/450 50 298
2-BA-32/43 2LS24-6"-B24 LP Steam 2LS23 2LS61/68 65 636 55 636 95/450 50 636
147/45
2-BA-42 2SO24-1*1/2"-B22 LVGO 2SO28 2SO12,13,14 128 248 98 350 96 120
0
382/11
2-BA-34 2P24-6"-C6 Atmos Residue 2P21 2E-2H tubes 307 550 231 550 168 496
25

LINE LIST Page 80


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
2-BA-43/40 2MS24-10"-C23 MP Steam 2MS20 2MS72 225 398 200 388 200 388
25
150/45
2-BA-34 2K24-3"-B23 Glycol 2C-19 2TW2 150 60 150 60 25 60
0
240/40
2-BA-45 2FW24-3"-A1 Fire Water 2FW18 2P512 210 70 160 70 150 60
0
2-BA-36-3 2VA24-4"-B1 Steam PSV204A Atmos Intermittent steam relief to atmosphere
225/45
2-BA-45 2HFW24-3"-B1 Flush water 2HFW18 2P512 200 388 150 388 150 180
0
2-BA-32 2FG24-3"-B12 Fuel Gas 2FG17 2FG28/29 80 210 60 210 95/450 35 100
327/45
2-BA32/33 2FO24-3/4"-B1 Fuel Oil 2FO1 2F-1 290 340 218 340 210 270
0
25 2-BA-39 2BD25-4"-B1 Steam PSV-487/A 2BD48 30 540 50 15 308
240/40
2-BA-45 2FW25-3"-A1 Fire Water 2FW18 2P496 210 70 160 70 150 60
0
2-BA-43/41 2LC25-1"-B23 Steam Condensate 2GT-15A 2LS27 75 320 55 298 95/450 50 298
2-BA-36-3 2VA25-4"-B1 Steam PSV204B Atmos Intermittent steam relief to atmosphere
147/45
2-BA-42 2SO25-1*1/2"-B22 LVGO 2SO28 2SO16,17,18,19 128 248 98 350 96 120
0
390/11
2-BA-43 2MS25-1*1/2"-C23 MP Steam 2MS20 2MS26 225 398 200 388 200 388
25
150/45
2-BA-39 2K25-1.5"-B32 NaOH Soln. 2K27 2C-8 150 60 150 60 25 60
0
461/11
2-BA-34 2P25-6"-C8 Atmos Residue 2E-2A tubes 2P27 307 650 231 650 148 596
25
540/11
2-BA-36/2-BA-43 2BFW25-2"-C23 Water 2BFW31 2BFW28/2BFW29 360 275 360 275 290 275
25
2-BA-32 2FG25-3"-B12 Fuel Gas 2FG17 2FG30/31 80 210 60 210 95/450 35 100
327/45
2-BA32/33 2FO25-1"-B1 Fuel Oil 2FO1 2FO12/13 290 340 218 340 210 270
0
26 2-BA-39 2BD26-3"-B1 SW Sour Gas 2C7 PSV 457/A 50 308 37.6 308 57/450 2 100
min
2-BA-45 2FW26-3"-A1 Fire Water 2FW18 2P476 210 70 160 70 150 60
240
2-BA-43/39 2LC26-3"-B23 Steam Condensate 2LC27/29 2LC9 75 320 55 298 95/450 50 298
2-BA-36-4 2VA26-4"-B1 Steam PSV223A 2VA28 Intermittent steam relief to atmosphere

LINE LIST Page 81


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
2-BA-43 2MS26-1*1/2"-C23 MP Steam 2MS25 HP Steam tracing 225 398 200 388 200 388
25
461/11
2-BA-34 2P26-6"-C8 Atmos Residue 2E-2B tubes 2P27 307 650 231 650 148 596
25
2-BA-32 2FG26-2"-B12 Fuel Gas 2FG17 2F-1 80 210 60 210 95/450 35 100
327/45
2-BA32 2FO26-1"-B1 Fuel Oil 2FO1 2FO14/15 290 340 218 340 210 270
0
540/11
2-BA-36 2BFW26-1"-C23 Water 2BFW24 2E-10A 360 275 360 275 290 275
25
105/20
2-BA-38 2CW26-12"-A2 Cooling water 2CW10 2E-14A 63.5 75
0
27 2-BA-39 2BD27-2"-B1 Steam PSV501/A 2BD48 30 308 50 18 396
2-BA-32 2FG27-3"-B12 Fuel Gas 2FG17 2F-12FG32/33 80 210 60 210 95/450 35 100
min
2-BA-45 2FW27-3"-A1 Fire Water 2FW18 2P442 210 70 160 70 150 60
240
2-BA-43/39 2LC27-1"-B23 Steam Condensate 2E-19 2LC26 75 320 55 298 95/450 50 298
2-BA-40/43 2LS27-16"-B23 LP Steam 31LS21 Steam Header 75 320 55 298 95/450 50 298
150/45
2-BA-39 2K27-1.5"-B32 NaOH Soln. 2G-19 2C-8 150 60 150 60
0
461/11
2-BA-34/32 2P27-8"-C8 Atmos Residue 2P25 & 26 2P221-228 307 650 231 650 148 596
25
2-BA-36-4 2VA27-4"-B1 Steam PSV223B 2VA29 Intermittent steam relief to atmosphere
327/45
2-BA32 2FO27-1"-B1 Fuel Oil 2FO1 2FO16/17 290 340 218 340 210 270
0
105/20
2-BA-38 2CW27-12"-A2 Cooling water 2CW10 2E-14B 63.5 75
0
540/11
2-BA-36 2BFW27-1"-C23 Water 2BFW24 2E-10B 360 275 360 275 290 275
25
28 2-BA-39 2BD28-2"-B20 Purge Gases 2P189 2BD55 30 308 57/450 Start up
min
2-BA-45 2FW28-3"-A1 Fire Water 2FW18 2P448 210 70 160 70 150 60
240
2-BA-43/39 2LC28-1"-B23 Steam Condensate 2E-21 2LC26 75 320 55 298 95/450 50 298
Full
2-BA-33/32 2P28-54"-B9 Atmos Residue 2P231-238 2C-2 vac & 800 50 800 88/450 -14.2 710
50
2-BA-36-4 2VA28-4"-B1 Steam PSV224A Atmos Intermittent steam relief to atmosphere

LINE LIST Page 82


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
147/45
2-BA-42 2SO28-1*1/2"-B22 LVGO 2SO9 2SO25 128 350 98 350 96 120
0
105/20
2-BA-38 2CW28-12"-A2 Cooling water 2E-14A 2CW29/2CW30 57.5 91
0
2-BA-32 2FG28-2"-B12 Fuel Gas 2FG24 2F-1 80 210 60 210 95/450 35 100
327/45
2-BA32 2FO28-1"-B1 Fuel Oil 2FO1 2FO18/19 290 340 218 340 210 270
0
540/11
2-BA-36 2BFW28-1*1/2"-C23 Water 2BFW25 2E-12A 360 275 360 275 290 275
25
29 2-BA-39 2BD29-3"-B1 Steam 2PW326 PSV487 50 308 37.6 308 57/450 26 269
2-BA-32 2FG29-2"-B12 Fuel Gas 2FG24 2F-1 80 210 60 210 95/450 35 100
2-BA-43/39 2LC29-3"-B23 Steam Condensate 2E-20 2LC26 75 320 55 298 95/450 50 298
Full
2-BA-33/34 2P29-8"-B8 Vac Residue 2C-2 2P31 vac & 780 38 780 88/450 -14 675
50
2-BA-36-4 2VA29-4"-B1 Steam PSV224B Atmos Intermittent steam relief to atmosphere
327/45
2-BA32 2FO29-1"-B1 Fuel Oil 2FO1 2FO20/21 290 340 218 340 210 270
0
105/20
2-BA-38 2CW29-8"-A2 Cooling water 2CW28 2E-15A 63.5 91
0
540/11
2-BA-36 2BFW29-1*1/2"-C23 Water 2BFW25 2E-12B 360 275 360 275 290 275
25
30 2-BA-39 2BD30-1*1/2"-B1 Non cond Gas 2BD29 2BD25 30 308 57/450 26 269
2-BA-32 2FG30-2"-B12 Fuel Gas 2FG25 2F-1 80 210 60 210 95/450 35 100
327/45
2-BA32 2FO30-1"-B1 Fuel Oil 2FO1 2FO22/23 290 340 218 340 210 270
0
2-BA-43/39 2LC30-1"-B23 Steam Condensate 2GT-13A 2LS27 75 320 55 298 95/450 50 298
2-BA-33 2K30-1"-B1B Amine 2G-18 2P136
2-BA-43/31 2LS30-1"-B23 LP Steam 2LS27 2GT-1/1A 75 320 55 298 95/450 50 298
147/45
2-BA-42 2SO30-3/4"-B22 LVGO 2SO23 2G-15 128 350 98 350 96 120
0
Full
2-BA-33/34 2P30-8"-B8 Vac Residue 2C-2 2P31 vac & 780 38 780 88/450 -14 675
50
2-BA-37-1 2VA30-3"-B1 Steam PSV233 Atmos Intermittent steam relief to atmosphere

LINE LIST Page 83


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
min
2-BA-45 2FW30-2"-A1 Fire Water 2FW18 2P457 210 70 160 70 150 60
240
105/20
2-BA-38 2CW30-8"-A2 Cooling water 2CW28 2E-16A 63.5 91
0
213/45
31 2-BA-39 2BD31-1*1/2"-B19 Steam 2C-9 PSV501/A 185 396 142 396 153 210
0
2-BA-43 2LC31-1"-B23 Steam Condensate 2GT-20A 2LC12 75 320 55 298 95/450 50 298
2-BA-43 2LS31-1*1/2"-B23 LP Steam 2LS27 2LS45 75 320 55 298 95/450 50 298
390/11
2-BA-32 2MS31-3/4"-C23 MP Steam 2MS22 2F-1 225 398 200 388 200 388
25
Full
2-BA-34 2P31-8"-B8 Vac Residue 2P29 & 30 2P32 - 35 vac & 780 38 780 88/450 -14 675
50
147/45
2-BA-42 2SO31-3/4"-B22 LVGO 2SO23 2G-15A 128 350 98 350 96 120
0
2-BA-38-1 2VA31-3"-B1 Steam PSV286 Atmos Intermittent steam relief to atmosphere
2-BA-32 2FG31-2"-B12 Fuel Gas 2FG25 2F-1 80 210 60 210 95/450 35 100
2-BA-33/38 2K31-1"-B1B Amine 2G-18 2P151
min
2-BA-45 2FW31-3"-A1 Fire Water 2FW18 2P489 210 70 160 70 150 60
240
105/20
2-BA-38 2CW31-12"-A2 Cooling water 2E-14B 2CW32/2CW33 57.5 91
0
32 2-BA-39 2BD32-3"-B20 SW Sour Gas 2P204 2C-17 30 308 50 8 180
2-BA-32 2FG32-2"-B12 Fuel Gas 2FG27 2F-1 80 210 60 210 95/450 35 100
2-BA-43/46 2LC32-1"-B23 Steam Condensate 2D-3 2LC9 75 320 55 298 95/450 50 298
390/11
2-BA-32 2MS32-3/4"-C23 MP Steam 2MS101 2F-1 225 398 200 388 200 388
25
Full
2-BA-34 2P32-6"-B8 Vac Residue 2P31 2G-2A vac & 780 38 780 88/450 -14 675
50
2-BA-41 2VA32-3"-B1 Steam PSV416 Atmos Intermittent steam relief to atmosphere
2-BA-42 2SO32-1*1/2"-B1B Gland oil 2SO22 2G5/5A
min
2-BA-45 2FW32-8"-A1 Fire Water 2FW33 2FW1 210 70 160 70 150 60
240
2-BA-33/38 2K32-1"-B1B Amine 2G-18 2P166

LINE LIST Page 84


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
105/20
2-BA-38 2CW32-8"-A2 Cooling water 2CW31 2E-15B 63.5 91
0
540/11
2-BA-43 2BFW32-4"-C23 Water 2BFW8 2BFW11/12/17/18 360 275 360 275 290 275
25
33 2-BA-38 2BD33-1*1/2"-B20 Steam 2C-18 PSV378A/B 50 307 37.6 308 57/450 1.6 100
2-BA-32 2FG33-2"-B12 Fuel Gas 2FG27 2F-1 80 210 60 210 95/450 35 100
2-BA-43/38 2LC33-1"-B23 Steam Condensate 2GT-7A 2LC31 75 320 55 298 95/450 50 298
2-BA-43/34 2LS33-1"-B23 LP Steam 2LS104 2G-2A 75 320 55 298 95/450 50 298
390/11
2-BA-32 2MS33-3/4"-C23 MP Steam 2MS101 2F-1 225 398 200 388 200 388
25
2-BA-42 2SO33-1*1/2"-C1 Gland oil 2SO2 2SO9
Full
2-BA-34 2P33-6"-B8 Vac Residue 2P31 2G-2B vac & 780 38 780 88/450 -14 675
50
2-BA-33 2K33-1"-B1B Neutralizing Agent 2G-21 2P136
2-BA-42 2VA33-2"-B1 Steam PSV426 Atmos Intermittent steam relief to atmosphere
105/20
2-BA-38 2CW33-8"-A2 Cooling water 2CW31 2E-16B 63.5 91
0
34 2-BA-38 2BD34-2"-B1 Steam PSV378A/B 2BD42 30 396 50 10 307
2-BA-43/42 2LC34-1"-B23 Steam Condensate 2GT-13A 2LC9 75 320 55 298 95/450 50 298
390/11
2-BA-32 2MS34-3/4"-C23 MP Steam 2MS102 2F-1 225 398 200 388 200 388
25
Full
2-BA-34 2P34-6"-B8 Vac Residue 2P31 2G-2C vac & 780 38 780 88/450 -14 675
50
2-BA-43-2 2VA34-2"-B1 Steam PSV339 Atmos Intermittent steam relief to atmosphere
2-BA-33/38 2K34-1"-B1B Neutralizing Agent 2G-21 2P151
105/20
2-BA-38 2CW34-8"-A2 Cooling water 2E-15A 2CW38 57.5 100
0
35 2-BA-41 2BD35-6"-B1 water+hydrocarbon 2C-17 2G-15 30 540 57/450 6.5 400
2-BA-32 2FG35-1/2"-B12 Fuel Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
2-BA-43/44 2LC35-1"-B23 Steam Condensate 2GT-15A 2LC18 75 320 55 298 95/450 50 298
390/11
2-BA-32 2MS35-3/4"-C23 MP Steam 2MS102 2F-1 225 398 200 388 200 388
25

LINE LIST Page 85


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
Full
2-BA-34 2P35-6"-B8 Vac Residue 2P31 2G-2D vac & 780 38 780 88/450 -14 675
50
2-BA-43-3 2VA35-8"-B1 Steam PSV451 Atmos Intermittent steam relief to atmosphere
2-BA-33/38 2K35-1"-B1B Neutralizing Agent 2G-21 2P166
105/20
2-BA-38 2CW35-8"-A2 Cooling water 2E-15B 2CW38 57.5 100
0
540/11
2-BA-43/40 2BFW35-1*1/2"-C23 Water 31BFW2001 2BFW36 360 275 360 275 290 275
25
36 2-BA-41 2BD36-6"-B1 water+hydrocarbon 2BD35 2G-15A 30 540 57/450 6.5 400
2-BA-32 2FG36-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
2-BA-43/45 2LC36-1"-B23 Steam Condensate 2V-05 2LS27 75 320 55 298 95/450 50 298
2-BA-43/36 2LS36-1"-B23 LP Steam 2LS104 2G-3/3A 75 320 55 298 95/450 50 298
2-BA-39 2K36-2"-B32 0.2% NaOH 2D-2 2K37
390/11
2-BA-32 2MS36-3/4"-C23 MP Steam 2MS103 2F-1 225 398 200 388 200 388
25
800/11
2-BA-34 2P36-4"-C8 Vac Residue 2G-2A 2P40 460 780 346 780 294 675
25
2-BA-43-3 2VA36-6"-B1 Steam PSV450 Atmos Intermittent steam relief to atmosphere
105/20
2-BA-38 2CW36-8"-A2 Cooling water 2E-16A 2CW38 57.5 100
0
540/11
2-BA-43/14-BA-11 2BFW36-1*1/2"-C23 Water 2BFW35 SRU 360 275 360 275 290 275
25
210/45
37 2-BA-41 2BD37-4"-B1 water+hydrocarbon 2G-15 2-BA-45 80 400 60 400 55 400
0
2-BA-43/36 2LS37-1"-B23 LP Steam 2LS104 2G-4/4A 75 320 55 298 95/450 50 298
390/11
2-BA-32 2MS37-3/4"-C23 MP Steam 2MS103 2F-1 225 398 200 388 200 388
25
800/11
2-BA-34 2P37-4"-C8 Vac Residue 2G-2B 2P40 460 780 346 780 294 675
25
2-BA-46 2VA37-3"-B1 Steam PSV682 Atmos Intermittent steam relief to atmosphere
2-BA-39 2K37-1.5"-B32 0.2% NaOH 2D-2 Drain
2-BA-32 2FG37-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
105/20
2-BA-38 2CW37-8"-A2 Cooling water 2E-16B 2CW38 57.5 100
0

LINE LIST Page 86


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
210/45
38 2-BA-41 2BD38-4"-B1 water+hydrocarbon 2G-15A 2BD37 80 400 60 400 55 400
0
2-BA-43 2LS38-3"-B23 LP Steam 2C-13 2LS27 75 320 55 298 95/450 50 298
390/11
2-BA-32 2MS38-3/4"-C23 MP Steam 2MS104 2F-1 225 398 200 388 200 388
25
800/11
2-BA-34 2P38-4"-C8 Vac Residue 2G-2C 2P40 460 780 346 780 294 675
25
2-BA-32-2 2VA38-4"-B1 Steam 2C-5 Atmos Intermittent steam relief to atmosphere
2-BA-39-1 2K38-3/4"-A1 Trace NaOH 2G-19 Drain
2-BA-32 2FG38-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
105/20
2-BA-38 2CW38-12"-A2 Cooling water 2CW34/2CW37 2CW11 63.5 100
0
39 2-BA-41 2BD39-18"-B1 Hydrocarbon Vapors 2C-17 19BD105 B/L 30 540 50 9.9 360
2-BA-43/37 2LS39-1"-B23 LP Steam 2LS104 2G-5/5A 75 320 55 298 95/450 50 298
390/11
2-BA-32 2MS39-3/4"-C23 MP Steam 2MS104 2F-1 225 398 200 388 200 388
25
800/11
2-BA-34 2P39-4"-C8 Vac Residue 2G-2D 2P40 460 780 346 780 294 675
25
2-BA-32 2FG39-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
105/20
2-BA-46 2CW39-1"-A2 Cooling water 2CW63 2E-23' 63.5 75
0
40 2-BA-41 2BD40-10"-B1 Hydrocarbon Vapors 2BD17 2BD48 30 540 50 11 350
2-BA-43/37 2LS40-3"-B23 LP Steam 2LS27 2E-13 75 320 55 298 95/450 50 298
390/11
2-BA-32 2MS40-3/4"-C23 MP Steam 2MS22 2F-1 225 398 200 388 200 388
25
800/11
2-BA-34 2P40-6"-C8 Vac Residue 2P36 - 39 2P43 & 44 460 780 346 780 294 675
25
MHB-9020-1 2SO40-6.75"-B22 Gland oil 2SO23 2G-1B 128 248 98 350 147 96 120
MHB-9043 2FO40-2"-C1 Fuel Oil 2FO1 2FO44 290 340 218 340 327 210 270

2-BA-45 2HFW40-3"-B1 Flush Water 2HFW24 2P646 200 388 150 388 min225 150 180

2-BA-32 2FG40-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
105/20
2-BA-46 2CW40-1"-A2 Cooling water 2E-23' 2CW65 57.5 100
0
41 2-BA-42 2BD41-3"-B1 Fuel Gas 2C-16 PSV417A/B 50 880 37.6 880 57/450 35 120

LINE LIST Page 87


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F

2-BA-45 2HFW41-3"-B1 Flush Water 2HFW18 2E-26 200 388 150 388 min225 150 180

2LC41-2"-B23 Steam Condensate Traps at 2F-2 2LC9 75 320 55 298 95/450 50 298
2-BA-43/34 2LS41-3"-B23 LP Steam 2LS27 2E-17 75 320 55 298 95/450 50 298
MHB-9019 2FO41-1"-C1 Fuel Oil 2FO40 2F-2 290 340 218 340 327 210 270
2-BA-32 2FG41-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
42 2-BA-42 2BD42-4"-B1 Fuel Gas PSV417A/B 2BD40 30 880 50 12 750
MHB-9019 2FO42-1"-C1 Fuel Oil 2FO40 2F-2 290 340 218 340 327 210 270
2-BA-43 2LS42-1"-B23 LP Steam 2LS27 Utility Station 75 320 55 298 95/450 50 298
800/11
2-BA-34 2P42-4"-C6 Vac Residue 2P44 2P47 460 780 346 780 294 675
25
2-BA-32 2FG42-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
Decoking
43 2-BA-32 2BD43-18"-B1 steam Blowdown 2C-5 30 1000 Intermittent
manifold
2-BA-43/34 2LS43-4"-B23 LP Steam 2LS27 2E-11 75 320 55 298 95/450 50 298
800/11
2-BA-34 2P43-4"-C8 Vac Residue 2P40 2E-2A Shell 460 780 346 780 294 675
25
MHB-9019 2FO43-1"-C1 Fuel Oil 2FO40 2F-2 290 340 218 340 327 210 270
2-BA-32 2FG43-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
44 2-BA-32 2BD44-2"-B1 Steam 2LS17 Atmos 30 400 50 298
MHB-9019 2FO44-1.5"-C1 Fuel Oil 2FO40 2FO2 290 340 218 340 327 210 270
2-BA-43/40 2LS44-6"-B23 LP Steam 31LS21 2LS54 75 320 55 298 95/450 50 298
800/11
2-BA-34 2P44-4"-C8 Vac Residue 2P40 2E-2B Shell 460 780 346 780 294 675
25
2-BA-32 2FG44-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
45 2-BA-32 2BD45-2"-B24 Steam 2LS17 PSV55A/B 60 750 50 750 75/450 50 298
2-BA-43 2LS45-1*1/2"-B23 LP Steam 2LS31 LP Steam tracing 75 320 55 298 95/450 50 298
611/11
2-BA-34 2P45-6"-C6 Vac Residue 2E-2G Shell 2P47 460 650 346 650 274 526
25
MHB-9019 2FO45-1.5"-C1 Fuel Oil 2FO40 2FO44 290 340 218 340 327 210 270
2-BA-32 2FG45-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
46 2-BA-32 2BD46-3"-B1 Steam PSV55A Atmos 0 750
MHB-9019 2FO46-1"-C1 Fuel Oil 2FO40 2F-2 290 340 218 340 327 210 270

LINE LIST Page 88


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
2-BA-43 2LS46-3"-B23 LP Steam 2C-4 Atmos 75 320 55 298 95/450 50 298
611/11
2-BA-34 2P46-6"-C6 Vac Residue 2E-2H Shell 2P47 460 650 346 650 274 526
25
2-BA-32 2FG46-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
47 2-BA-32 2BD47-3"-B1 Steam PSV55B Atmos 0 750
2-BA-43/42 2LS47-3"-B23 LP Steam 2GT-13A 2LS27 75 320 55 298 95/450 50 298
611/11
2-BA-34 2P47-6"-C6 Vac Residue 2P45&46 2P48 & 50 460 650 346 650 274 526
25
2-BA-32 2FG47-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
48 2-BA-41 2BD48-18"-B1 Steam 2BD61/62 2C-17 30 540 50 12.7 308
611/11
2-BA-34 2P48-4"-C6 Vac Residue 2P47 FV109 460 650 346 650 274 526
25
2-BA-32 2FG48-1/2"-B12 Pilot Gas 2FG10 2F-1 80 210 60 210 95/450 35 100
49 2-BA-32 2FG49-2"-B12 Fuel Gas 2FG20 2F-1 80 210 60 210 95/450 35 100
Full
2-BA-34/33 2P49-4"-B8 Vac Residue FV109 2C-2 Vac & 695 38 695 77/450 -14 526
50
50 2-BA-32 2FG50-2"-B12 Fuel Gas 2FG20 2F-1 80 210 60 210 95/450 35 100
2-BA-43/33 2LS50-3"-B23 LP Steam 2LS27 2LS18 75 320 55 298 95/450 50 298
611/111
2-BA-34 2P50-6"-C6 Vac Residue 2P47 2P52-55 460 650 346 650 274 526
25
51 2-BA-39 2BD51-8"-B20 Steam 2P189 PSV473B 50 308 37.6 308 57/450 18 180
390/11
2-BA-32 2MS51-2"-C23 MP Steam 2MS23 2F-1 225 398 200 388 200 388
25
105/20
2-BA-45/2-BA-35 2CW51-1*1/2"-A2 Cooling Water 2CW1 2G-3/3A 93 75 70 75 63.5 75
0
2-BA-32 2FG51-2"-B12 Fuel Gas 2FG21 2F-1 80 210 60 210 95/450 35 100
52 2-BA-39 2BD52-8"-B20 Steam 2P189 PSV473A 50 308 37.6 308 57/450 18 180
2-BA-32 2FG52-2"-B12 Fuel Gas 2FG21 2F-1 80 210 60 210 95/450 35 100
390/11
2-BA-32 2MS52-2"-C23 MP Steam 2MS23 2F-1 225 398 200 388 200 388
25
611/11
2-BA-34 2P52-3"-C6 Vac Residue 2P50 2E-3A tubes 460 650 346 650 274 526
25
105/20
2-BA-45/2-BA-35 2CW52-1*1/2"-A2 Cooling Water 2G-3/3A 2CW22 57.5 100 57.5 100 57.5 100
0

LINE LIST Page 89


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
53 2-BA-39 2BD53-10"-B1 Steam PSV473B 2BD48 30 400 50 15 298
390/11
2-BA-32 2MS53-2"-C23 MP Steam 2MS23 2F-1 225 398 200 388 200 388
25
611/11
2-BA-34 2P53-3"-C6 Vac Residue 2P50 2E-3B tubes 460 650 346 650 274 526
25
2-BA-32 2FG53-2"-B12 Fuel Gas 2FG23 2F-1 80 210 60 210 95/450 35 100
54 2-BA-39 2BD54-10"-B1 Steam PSV473A 2BD48 30 400 50 15 298
390/11
2-BA-32 2MS54-2"-C23 MP Steam 2MS23 2F-1 225 398 200 388 200 388
25
611/11
2-BA-34 2P54-3"-C6 Vac Residue 2P50 2E-3C tubes 460 650 346 650 274 526
25
2-BA-32 2FG54-2"-B12 Fuel Gas 2FG23 2F-1 80 210 60 210 95/450 35 100
55 2-BA-39 2BD55-2"-B1 Steam 2BD28 2BD25 37.6 400 57/450 startup
MHD-5558 2FG55-2"-B12 Fuel Gas 2FG18 2P183 80 210 60 210 95/450 35 100
390/11
2-BA-32 2MS55-2"-C23 MP Steam 2MS23 2F-1 225 398 200 388 200 388
25
611/11
2-BA-34 2P55-3"-C6 Vac Residue 2P50 2E-3D tubes 460 650 346 650 274 526
25
2-BA-39/2-BA- 105/20
2CW55-1*1/2"-A2 Cooling Water 32CW9 2CW57/2G12 93 75 70 75 63.5 75
40/2-BA-45 0
2-BA-39/2-BA- 105/20
56 2CW56-1*1/2"-A2 Cooling Water 2CW58 32CW3 57.5 100 57.5 100 57.5 100
40/2-BA-45 0
390/11
2-BA-32 2MS56-2"-C23 MP Steam 2MS23 2F-1 225 398 200 388 200 388
25
541/11
2-BA-34 2P56-3"-C6 Vac Residue 2E-3A tubes 2P60 460 475 346 475 224 420
25
2-BA-39 2FG56-1*1/2"-B12 Fuel Gas 2FG13 2K27
213/45
57 2-BA-39 2BD57-1*1/2"-B19 Steam 2Y-8 PSV592/A 185 396 142 396 153 210
0
390/11
2-BA-43/45 2MS57-3"-C23 MP Steam 2MS20 2V-05 225 398 200 388 200 388
25
541/11
2-BA-34 2P57-3"-C6 Vac Residue 2E-3B tubes 2P60 460 475 346 475 224 420
25
2-BA-39/2-BA- 105/20
2CW57-1*1/2"-A2 Cooling Water 2CW55 2G-12A 93 75 70 75 63.5 75
40/2-BA-45 0
58 2-BA-39 2BD58-2"-B1 Steam PSV592/A 2BD27 30 396 50 18 210

LINE LIST Page 90


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
541/11
2-BA-34 2P58-3"-C6 Vac Residue 2E-3C tubes 2P60 460 475 346 475 224 420
25
2-BA-39/2-BA- 105/20
2CW58-1*1/2"-A2 Cooling Water 2G-12A 2CW56 57.5 100 57.5 100 57.5 100
40/2-BA-45 0
213/45
59 2-BA-39 2BD59-12"-B19 Steam 2PW362 PSV 595/A 185 396 142 396 24 125
0
541/11
2-BA-34 2P59-3"-C6 Vac Residue 2E-3D tubes 2P60 460 475 346 475 224 420
25
60 MHB-9017 2FG60-4"-B12 Fuel Gas 2FG9 2FG61 80 210 60 210 min95 35 100
541/11
2-BA-34 2P60-6"-C6 Vac Residue 2P56 - 59 2P64 & 65 460 475 346 475 224 420
25
61 2-BA-39 2BD61-8"-B1 Steam PSV595A 2BD48 30 396 50 18 396
50
2-BA-32 2LS61-1*1/2"-B24 LP Steam 2LS24 2F-1 PassA 75 636 55 636 95/450 636
varies
611/11
2-BA-34 2P61-3"-C6 Vac Residue 2P52 2P60 460 650 346 650 274 526
25
390/11
2-BA-32 2MS61-4"-C23 MP Steam 2MS24 2F-1 Pass "A" 225 398 200 388 200 388
25
MHB-9019 2FG61-1.5"-B12 Fuel Gas 2FG60 2F-2 80 210 60 210 min95 35 100
62 2-BA-39 2BD62-8"-B1 Steam PSV595B 2BD48 30 396 50 18 396
50
2-BA-32 2LS62-1*1/2"-B24 LP Steam 2LS24 2F-1 Pass B 75 636 55 636 95/450 636
varies
390/11
2-BA-32 2MS62-4"-C23 MP Steam 2MS24 2F-1 Pass "B" 225 398 200 388 200 388
25
MHB-9019 2FG62-1.5"-B12 Fuel Gas 2FG60 2F-2 80 210 60 210 min95 35 100
Hydraulic package for 105/20
63 2-BA-40/2-BA-45 2CW63-1*1/2"-A2 Cooling Water 2CW1 93 75 70 75 63.5 75
2E-17 0
541/11
2-BA-34 2P63-4"-C6 Vac Residue 2P60 2P68 460 475 346 475 224 420
25
50
2-BA-32 2LS63-1*1/2"-B24 LP Steam 2LS24 2F-1 Pass C 75 636 55 636 95/450 636
varies
390/11
2-BA-32 2MS63-4"-C23 MP Steam 2MS24 2F-1 Pass "C" 225 398 200 388 200 388
25
MHB-9019 2FG63-1.5"-B12 Fuel Gas 2FG60 2F-2 80 210 60 210 min95 35 100
105/20
64 2-BA-40/2-BA-45 2CW64-1"-A2 Cooling Water 2CW63 2GT-20A
0

LINE LIST Page 91


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
50
2-BA-32 2LS64-1*1/2"-B24 LP Steam 2LS24 2F-1 Pass D 75 636 55 636 95/450 636
varies
541/11
2-BA-34 2P64-4"-C6 Vac Residue 2P60 2E-4A Shell 460 475 346 475 224 420
25
390/11
2-BA-32 2MS64-4"-C23 MP Steam 2MS24 2F-1 Pass "D" 225 398 200 388 200 388
25
MHB-9019 2FG64-1.5"-B12 Fuel Gas 2FG60 2F-2 80 210 60 210 min95 35 100

Hydraulic package 105/20


65 2-BA-40/2-BA-45 2CW65-1*1/2"-A2 Cooling Water 2CW22 57.5 100 57.5 100 57.5 100
for 2E-17 0

50
2-BA-32 2LS65-1*1/2"-B24 LP Steam 2LS24 2F-1 Pass E 75 636 55 636 95/450 636
varies
541/11
2-BA-34 2P65-4"-C6 Vac Residue 2P60 2E-4B Shell 460 475 346 475 224 420
25
390/11
2-BA-32 2MS65-4"-C23 MP Steam 2MS24 2F-1 Pass "E" 225 398 200 388 200 388
25
MHB-9019 2FG65-1.5"-B12 Fuel Gas 2NG101 2FG60 Hold 210 Hold 210 min95 Hold 100
105/20
66 2-BA-40/2-BA-45 2CW66-1"-A2 Cooling Water 2GT-20A 2CW65
0
50
2-BA-32 2LS66-1*1/2"-B24 LP Steam 2LS24 2F-1 Pass F 75 636 55 636 95/450 636
varies
519/11
2-BA-34 2P66-4"-C1 Vac Residue 2E-4C Shell 2P68 460 400 346 400 204 359
25
390/11
2-BA-32 2MS66-4"-C23 MP Steam 2MS24 2F-1 Pass "F" 225 398 200 388 200 388
25
MHB-9019 2FG66-0.5"-B12 Fuel Gas 2FG65 2F-2 Hold 210 Hold 210 min95 Hold 100
105/20
67 2-BA-40/2-BA-39 2CW67-3/4"-A2 Cooling Water 2CW55 Ph analyzer
0
50
2-BA-32 2LS67-1*1/2"-B24 LP Steam 2LS24 2F-1 Pass G 75 636 55 636 95/450 636
varies
390/11
2-BA-32 2MS67-4"-C23 MP Steam 2MS24 2F-1 Pass "G" 225 398 200 388 200 388
25
519/11
2-BA-34 2P67-4"-C1 Vac Residue 2E-4D Shell 2P68 460 400 346 400 204 359
25
MHB-9019 2FG67-0.5"-B12 Fuel Gas 2FG65 2F-2 Hold 210 Hold 210 min95 Hold 100
105/20
68 2-BA-40/2-BA-39 2CW68-3/4"-A2 Cooling Water Ph analyzer 2CW56
0

LINE LIST Page 92


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
50
2-BA-32 2LS68-1*1/2"-B24 LP Steam 2LS24 2F-1 Pass H 75 636 55 636 95/450 636
varies
390/11
2-BA-32 2MS68-4"-C23 MP Steam 2MS24 2F-1 Pass "H" 225 398 200 388 200 388
25
519/11
2-BA-34 2P68-6"-C1 Vac Residue 2P66 & 67 2P69 460 400 346 400 204 359
25
MHB-9019 2FG68-0.5"-B12 Fuel Gas 2FG65 2F-2 Hold 210 Hold 210 min95 Hold 100
105/20
69 2-BA-45 2CW69-1*1/2"-A2 Cooling Water 2CW11 To Drain
0
519/11
2-BA-34 2P69-8"-C1 Vac Fuel Oil 2P 68 2P71 & 72 460 400 346 400 100 235
25
MHB-9019 2FG69-0.5"-B12 Fuel Gas 2FG65 2F-2 Hold 210 Hold 210 min95 Hold 100
105/20
70 2-BA-45 2CW70-1*1/2"-A2 Cooling Water 2CW22 To Drain
0
MHB-9019 2FG70-1.5"-B12 Fuel Gas 2FG60 2NG101 Hold 210 Hold 210 min95 Hold 100
71 MHB-9019 2BD71-4"-B1 2P651 2BD43 210 70 160 70 240 150 60
519/11
2-BA-34 2P71-6"-C1 Vac Fuel Oil 2P 69 2E-6A Shell 460 400 346 400 100 235
25
72 MHB-9019 2BD72-4"-B1 FW connection 2BD71 210 70 160 70 240 150 60
519/11
2-BA-34 2P72-6"-C1 Vac Fuel Oil 2P 69 2E-6B Shell 460 400 346 400 100 235
25
390/11
2-BA-43/42 2MS72-6"-C23 MP Steam 2MS24 2F-1 225 398 200 388 200 388
25
50
73 2-BA-33 2LS73-4"-B23 LP Steam 2C-2 2Y-4 75 320 55 298 95/450 298
varies
519/11
2-BA-34 2P73-6"-C1 Vac Fuel Oil 2E-6A Shell 2P75 460 338 346 338 80 180
25
390/11
2-BA-43/42 2MS73-2"-C23 MP Steam 2MS20 2GT-13A 225 398 200 388 200 388
25
50
74 2-BA-33/43 2LS74-1"-B23 LP Steam 2LS81 2LS90 75 320 55 298 95/450 298
varies
519/11
2-BA-34 2P74-6"-C1 Vac Fuel Oil 2E-6B Shell 2P75 460 338 346 338 80 180
25
390/11
2-BA-42/38 2MS74-2"-C23 MP Steam 2MS20 2GT-7A 225 398 200 388 200 388
25
50
75 2-BA-33/43 2LS75-1"-B23 LP Steam 2LS27 2LS92 75 320 55 298 95/450 298
varies

LINE LIST Page 93


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
519/11
2-BA-34/40 2P75-8"-C1 Vac Fuel Oil 2P73 & 74 2P220 460 338 346 338 80 180
25
390/11
2-BA-43/41 2MS75-2"-C23 MP Steam 2MS20 2GT-15A 225 398 200 388 200 388
25
Full
76 2-BA-33/35 2P76-4"-B8 Trim Cut 2C-2 2G-3 vac & 695 38 695 77/450 -14.3 674
50
390/11
2-BA-38 2MS76-8"-C23 MP Steam 2C-15 2MS90 225 398 200 388 160 370
25
Full
77 2-BA-35 2P77-4"-B8 Trim Cut 2P76 2G-3A vac & 695 38 695 77/450 -14.3 674
50
390/11
2-BA-38 2MS77-4"-C23 MP Steam 2MS90 2H-1A 225 398 200 388 160 370
25
630/11
78 2-BA-35 2P78-3"-C8 Trim Cut 2G-3 2P196 411 695 309 695 135 674
25
390/11
2-BA-38 2MS78-4"-C23 MP Steam 2MS90 2H-1B 225 398 200 388 160 370
25
79 2-BA-45/43 2LS79-6"-B23 LP Steam 2GT-20A 2LS27 75 320 55 300 95/450 50 298
630/11
2-BA-35 2P79-3"-C8 Trim Cut 2G-3A 2P78 411 695 309 695 135 674
25
390/11
2-BA-38 2MS79-3"-C23 MP Steam 2MS90 2H-1C 225 398 200 388 160 370
25
80 MHB-9042 2CW80-1.5"-A2 Cooling Water 2CW2 2G-1B 93 75 70 75 105 63.5 75
461/11
2-BA-35/32 2P80-3"-C8 Trim Cut 2P78 2P27 307 650 231 650 135 674
25
390/11
2-BA-38 2MS80-3"-C23 MP Steam 2MS92 2H-2A 225 398 200 388 160 370
25
2-BA-41/42 2LS80-4"-B23 LP Steam 2GT-15A 2LS27 75 320 55 300 95/450 50 298
81 MHB-9042 2CW81-1.5"-A2 Cooling Water 2G-1B 2CW3 93 75 70 75 105 57.5 100
Full vac
2-BA-33/36 2P81-14"-B8 HVGO 2C-2 2G-4 & 50
600 38 600 75/450 -14.3 557
390/11
2-BA-38 2MS81-3"-C23 MP Steam 2MS92 2H-2B 225 398 200 388 160 370
25
2-BA-43 2LS81-1*1/2"-B23 LP Steam 2LS27 2LS98 75 320 55 300 95/450 50 298
Full vac
82 2-BA-36 2P82-14"-B8 HVGO 2P81 2G-4A & 50
600 38 600 75/450 -14.3 557

LINE LIST Page 94


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
2-BA-38 2MS82-1*1/2"-C23 MP Steam 2MS92 2H-2C 225 398 200 388 160 370
25
50-RA-12 2LS82-16"-B23 LP Steam 31LS21 2Y-9 vent silencer 75 320 55 300 95/450 50 298
584/11
83 2-BA-36 2P83-10"-C8 HVGO 2G-4 2P84 394 600 296 296 291 557
25
390/11
2-BA-38 2MS83-3"-C23 MP Steam 2MS91 2H-3A 225 398 200 388 160 370
25
2-BA-43/40 2LS83-12"-B23 LP Steam LP Steam header S.W.S 75 320 55 300 95/450 50 298
584/11
84 2-BA-36 2P84-10"-C8 HVGO 2G-4A 2P87 394 600 296 296 291 557
25
390/11
2-BA-38 2MS84-3"-C23 MP Steam 2MS91 2H-3B 225 398 200 388 160 370
25
2-BA-43/39 2LS84-1"-B23 LP Steam 2LS83 2E-19 75 320 55 300 95/450 50 298
584/11
85 2-BA-33/36 2P85-6"-C8 HVGO 2P87 2P229 394 600 296 296 291 557
25
390/11
2-BA-38 2MS85-1*1/2"-C23 MP Steam 2MS91 2H-3C 225 398 200 388 160 370
25
2-BA-43/39 2LS85-1"-B23 LP Steam 2LS83 2E-21 75 320 55 300 95/450 50 298
390/11
2-BA-32 2MS86-3/4"-C23 MP Steam 2MS105 2F-1 225 398 200 388 200 388
25
2-BA-43/39 2LS86-10"-B23 LP Steam 2LS83 2E-20 75 320 55 300 95/450 50 298
584/11
87 2-BA-36 2P87-10"-C8 HVGO 2P84 2P89 &90 394 600 296 600 291 557
25
390/11
2-BA-32 2MS87-3/4"-C23 MP Steam 2MS105 2F-1 225 398 200 388 200 388
25
2-BA-43/39 2LS87-10"-B23 LP Steam 2LS83 2C-8 75 320 55 300 95/450 50 298
584/11
88 2-BA-36 2P88-8"-C8 HVGO 2P90 2P93 394 600 296 600 291 557
25
390/11
2-BA-32 2MS88-3/4"-C23 MP Steam 2MS106 2F-1 225 398 200 388 200 388
25

14-BA-11/2-BA-43 2LS88-4"-B23 LP Steam LP Steam Header for SRU 75 320 55 300 95/450 50 298

584/11
89 2-BA-36 2P89-8"-C8 HVGO 2P87 2E-7A Tubes 394 600 296 600 291 557
25
390/11
2-BA-32 2MS89-3/4"-C23 MP Steam 2MS106 2F-1 225 398 200 388 200 388
25

LINE LIST Page 95


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
2-BA-43/40 2LS89-4"-B23 LP Steam 2LS88 SRU 75 320 55 300 95/450 50 298
584/11
90 2-BA-36 2P90-8"-C8 HVGO 2P87 2E-7B Tubes 394 600 296 600 291 557
25
390/11
2-BA-38 2MS90-6"-C23 MP Steam 2MS76 2MS91 225 398 200 388 160 370
25
2-BA-38 2LS90-1"-B23 LP Steam 2LS74 2P151 75 320 55 300 95/450 5 298
491/11
91 2-BA-36 2P91-8"-C6 HVGO 2E-7C Tubes 2P93 394 550 296 550 270 502
25
390/11
2-BA-38 2MS91-3"-C23 MP Steam 2MS90 2MS83/85 225 398 200 388 160 370
25
2-BA-38 2LS91-1"-B23 LP Steam 2LS90 2P166 75 320 55 300 95/450 5 298
491/11
92 2-BA-36 2P92-8"-C6 HVGO 2E-7D Tubes 2P93 394 550 296 550 270 502
25
390/11
2-BA-38 2MS92-3"-C23 MP Steam 2MS76 2MS80/81/82 225 398 200 388 160 370
25
2-BA-33 2LS92-1"-B23 LP Steam 2LS75 2P136 75 320 55 300 95/450 5 298
491/11
93 2-BA-36/34 2P93-10"-C6 HVGO 2P91 &92 2P95 & 98 394 550 296 550 270 502
25
390/11
2-BA-34 2MS93-6"-C27 MP Steam 2E-3A 2MS2 225 398 200 388 200 388
25
2-BA-43 2LS93-1"-B23 LP Steam 2LS27 Utility Station 75 320 55 300 95/450 50 298
390/11
94 2-BA-34 2MS94-6"-C27 MP Steam 2E-3B 2MS3 225 398 200 388 200 388
25
491/11
95 2-BA-36 2P95-6"-C6 HVGO 2P93 2E-8A Tubes 394 550 296 550 270 502
25
390/11
2-BA-34 2MS95-6"-C27 MP Steam 2E-3C 2MS4 225 398 200 388 200 388
25
491/11
96 2-BA-36 2P96-6"-C6 HVGO 2P93 2E-8B Tubes 394 550 296 550 270 502
25
390/11
2-BA-34 2MS96-6"-C27 MP Steam 2E-3D 2MS5 225 398 200 388 200 388
25
491/11
97 2-BA-36 2P97-6"-C6 HVGO 2P93 2E-8C Tubes 394 550 296 550 270 502
25
390/11
2-BA-36 2MS97-8"-C27 MP Steam 2E-8A 2MS9 225 398 200 388 200 388
25
491/11
98 2-BA-36 2P98-6"-C6 HVGO 2P93 2E-8D Tubes 394 550 296 550 270 502
25

LINE LIST Page 96


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
2-BA-36 2MS98-8"-C27 MP Steam 2E-8B 2MS10 225 398 200 388 200 388
25
Ejector double seal
2-BA-38 2LS98-1"-B23 LP Steam 2LS81 75 320 55 300 95/450 50 298
purges
462/11
99 2-BA-36 2P99-6"-C6 HVGO 2E-8A Tubes 2P105 394 470 296 470 250 420
25
390/11
2-BA-36 2MS99-8"-C27 MP Steam 2E-8C 2MS11 225 398 200 388 200 388
25
2-BA-36 2LS99-6"-B27 LP Steam 2E-12A 2LS11 75 320 55 300 95/450 50 298
462/11
100 2-BA-36 2P100-6"-C6 HVGO 2E-8B Tubes 2P105 394 470 296 470 250 420
25
390/11
2-BA-36 2MS100-8"-C27 MP Steam 2E-8D 2MS12 225 398 200 388 200 388
25
2-BA-36 2LS100-6"-B27 LP Steam 2E-12B 2LS12 75 320 55 300 95/450 50 298
390/11
101 2-BA-34/2-BA-43 2BD101-3/4"-C23 Boiler Blow down 2E-3A 2BD105 225 398 225 398 205 390
25
390/11
2-BA-32 2MS101-1"-C23 MP Steam 2MS22 2MS32/33 225 398 200 388 200 388
25
MHB-9019 2NG101-1.5"-B12 Natural Gas 2NG100 2FG65 Hold Hold Hold 60
462/11
2-BA-36 2P101-6"-C6 HVGO 2E-8C Tubes 2P105 394 470 296 470 250 420
25
2-BA-36 2LS101-6"-B27 LP Steam 2E-10A 2LS8 75 320 55 298 95/425 50 298
390/11
102 2-BA-34/2-BA-43 2BD102-3/4"-C23 Boiler Blow down 2E-3B 2BD105 225 398 225 398 205 390
25
390/11
2-BA-32 2MS102-1"-C23 MP Steam 2MS22 2MS34/35 225 398 200 388 200 388
25
462/11
2-BA-36 2P102-6"-C6 HVGO 2E-8D Tubes 2P105 394 470 296 470 250 420
25
2-BA-36 2LS102-6"-B27 LP Steam 2E-10B 2LS9 75 320 55 298 95/425 50 298
390/11
103 2-BA-34/2-BA-43 2BD103-3/4"-C23 Boiler Blow down 2E-3C 2BD105 225 398 225 398 205 390
25
390/11
2-BA-32 2MS103-1"-C23 MP Steam 2MS22 2MS36/37 225 398 200 388 200 388
25
2-BA-46/43 2LS103-1"-B23 LP Steam 2LS27 2D-3 75 320 55 298 95/450 50 298
390/11
104 2-BA-34/2-BA-43 2BD104-3/4"-C23 Boiler Blow down 2E-3D 2BD105 225 398 225 398 205 390
25

LINE LIST Page 97


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
2-BA-32 2MS104-1"-C23 MP Steam 2MS22 2MS38/39 225 398 200 388 200 388
25
491/11
2-BA-36 2P104-6"-C6 HVGO 2P93 2P105 394 550 296 550 250 420
25
2-BA-43 2LS104-1"-B23 LP Steam 2LS27 Pump quench steam 75 320 55 298 95/450 50 298
390/11
105 2-BA-43 2BD105-1*1/2"-C23 Boiler Blow down 2BD101 2BD133 225 398 225 398 205 390
25
390/11
2-BA-32 2MS105-1"-C23 MP Steam 2MS22 2MS86/87 225 398 200 388 200 388
25
462/11
2-BA-36 2P105-10"-C6 HVGO 2P99 - 102 2P107 & 108 394 470 296 470 250 420
25
2-BA-43/41 2LS105-1"-B23 LP Steam 2LS30 2G-15/15A 75 320 41 298 95/450 10 298
390/11
106 2-BA-34/2-BA-43 2BD106-3/4"-C23 Boiler Blow down 2E-3A 2BD110 225 398 225 398 205 390
25
390/11
2-BA-32 2MS106-1"-C23 MP Steam 2MS22 2MS88/89 225 398 200 388 200 388
25
462/11
2-BA-36 2P106-8"-C6 HVGO 2P108 2P111 394 470 296 470 250 420
25
390/11
107 2-BA-34/2-BA-43 2BD107-3/4"-C23 Boiler Blow down 2E-3B 2BD110 225 398 225 398 205 390
25
390/11
2-BA-32 2MS107-3"-C23 MP Steam 2MS20 stm manifold 225 398 200 388 200 388
25
462/11
2-BA-36 2P107-8"-C6 HVGO 2P105 2E-9A Tubes 394 470 296 470 250 420
25
390/11
108 2-BA-34/2-BA-43 2BD108-3/4"-C23 Boiler Blow down 2E-3C 2BD110 225 398 225 398 205 390
25
390/11
2-BA-32 2MS108-3"-C23 MP Steam 2MS20 stm manifold 225 398 200 388 200 388
25
462/11
2-BA-36 2P108-8"-C6 HVGO 2P105 2E-9B Tubes 394 470 296 470 250 420
25
390/11
109 2-BA-34/2-BA-43 2BD109-3/4"-C23 Boiler Blow down 2E-3D 2BD110 225 398 225 398 205 390
25
454/11
2-BA-36 2P109-8"-C1 HVGO 2E-9C Tubes 2P111 394 440 296 440 235 387
25
215/11
110 2-BA-43 2BD110-1*1/2"-C23 Boiler Blow down 2BD106 2BD131 125 353 125 325 NNF
25

LINE LIST Page 98


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
454/11
2-BA-36 2P110-8"-C1 HVGO 2E-9D Tubes 2P111 394 440 296 440 235 387
25
130/11
111 2-BA-34/2-BA-43 2BD111-3/4"-C23 Boiler Blow down 2E-10A 2BD115 75 320 75 320 55 303
25
454/11
2-BA-36 2P111-10"-C1 HVGO 2P109 & 110 2P112 & 119 394 440 296 440 235 387
25
2-BA-43/32 2LS111-3"-B23 LP Steam Snuff steam to furnaces and burners 75 320 41 298 95/450 50 298
130/11
112 2-BA-36/2-BA-43 2BD112-3/4"-C23 Boiler Blow down 2E-10B 2BD115 75 320 75 320 55 303
25
454/11
2-BA-36 2P112-8"-C1 HVGO 2P111 2P114 & 115 394 440 296 440 235 387
25
2-BA-43 2LS112-2"-B23 LP Steam Stm manifold 2LS27 75 320 41 298 95/450 50 298
130/11
113 2-BA-36/2-BA-43 2BD113-3/4"-C23 Boiler Blow down 2E-10A 2BD115 75 320 75 320 55 303
25
454/11
2-BA-36 2P113-6"-C1 HVGO 2P112 2P118 394 440 296 440 235 387
25
2-BA-43 2LS113-2"-B23 LP Steam Stm manifold 2LS27 75 320 41 298 95/450 50 298
130/11
114 2-BA-36/2-BA-43 2BD114-3/4"-C23 Boiler Blow down 2E-10B 2BD115 75 320 75 320 55 303
25
454/11
2-BA-36 2P114-6"-C1 HVGO 2P112 2E-12A tubes 394 440 296 440 235 387
25
130/45
115 2-BA-43 2BD115-1*1/2"-B23 Boiler Blow down 2BD111 2BD131 75 320 75 320 55 303
0
454/11
2-BA-36 2P115-6"-C1 HVGO 2P112 2E-12B tubes 394 440 296 440 235 387
25
390/11
116 2-BA-36/2-BA-43 2BD116-3/4"-C23 Boiler Blow down 2E-8A 2BD120 225 398 225 398 205 390
25
390/11
MHB-9041 2MS116-3"-C24 MP Steam 2MS21 2MS117 225 398 200 388 200 388
25
446/11
2-BA-36 2P116-6"-C1 HVGO 2E-12A tubes 2P118 394 410 296 410 215 357
25
390/11
117 2-BA-36/2-BA-43 2BD117-3/4"-C23 Boiler Blow down 2E-8B 2BD120 225 398 225 398 205 390
25
390/11
MHB-9019 2MS117-0.75"-C24 MP Steam 2MS116 2F-2 225 398 200 388 200 388
25
446/11
2-BA-36 2P117-6"-C1 HVGO 2E-12B tubes 2P118 394 410 296 410 215 357
25

LINE LIST Page 99


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
118 2-BA-36/2-BA-43 2BD118-3/4"-C23 Boiler Blow down 2E-8C 2BD120 225 398 225 398 205 390
25
390/11
MHB-9019 2MS118-0.75"-C24 MP Steam 2MS116 2F-2 225 398 200 388 200 388
25
446/11
2-BA-36/33 2P118-8"-C1 HVGO 2P116 & 117 2P230 394 410 296 410 215 357
25
390/11
119 2-BA-36/2-BA-43 2BD119-3/4"-C23 Boiler Blow down 2E-8D 2BD120 225 398 225 398 205 390
25
390/11
MHB-9019 2MS119-0.75"-C24 MP Steam 2MS116 2F-2 225 398 200 388 200 388
25
454/11
2-BA-36 2P119-6"-C1 HVGO 2P111 2P120 394 440 296 440 230 386
25
215/11
120 2-BA-43 2BD120-1*1/2"-C23 Boiler Blow down 2BD116 2BD133 125 353 125 353
25
390/11
MHB-9019 2MS120-1.5"-C24 MP Steam 2MS116 2F-2 225 398 200 388 200 388
25
454/11
2-BA-36 2P120-8"-C1 Vac Gas oil 2P119 & 135 2P122 & 123 394 440 296 440 130 380
25
2-BA-43 2LS120-2"-B23 LP Steam 2LS14 Utility station @2F-2 75 320 55 298 95/450 50 298
390/11
121 2-BA-36/2-BA-43 2BD121-3/4"-C23 Boiler Blow down 2E-8A 2BD125 225 398 225 398 205 390
25
390/11
MHB-9041 2MS121-6"-C24 MP Steam 2MS72 2P651 225 398 200 388 200 388
25
454/11
2-BA-36 2P121-4"-C1 Vac Gas oil 2P216 2P217 394 440 296 440 130 380
25
2-BA-43 2LS121-2"-B23 LP Steam 2LS44 Burners 75 320 55 298 95/450 50 298
390/11
122 2-BA-36/2-BA-43 2BD122-3/4"-C23 Boiler Blow down 2E-8B 2BD125 225 398 225 398 205 390
25
390/11
MHB-9019 2MS122-0.75"-C24 MP Steam 2MS116 2F-2 225 398 200 388 200 388
25
454/11
2-BA-36 2P122-6"-C1 Vac Gas oil 2P120 2E-10A tubes 394 440 296 440 130 380
25
2-BA-43 2LS122-1"-B23 LP Steam 2LS30 2G-1B 75 320 55 298 95/450 50 298
390/11
123 2-BA-36/2-BA-43 2BD123-3/4"-C23 Boiler Blow down 2E-8C 2BD125 225 398 225 398 205 390
25
390/11
MHB-9016 2MS123-6"-C24 MP Steam 2MS24 2F-2 225 398 200 388 200 388
25

LINE LIST Page 100


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
454/11
2-BA-36 2P123-6"-C1 Vac Gas oil 2P120 2E-10B tubes 394 440 296 440 130 380
25
390/11
124 2-BA-36/2-BA-43 2BD124-3/4"-C23 Boiler Blow down 2E-8D 2BD125 225 398 225 398 205 390
25
444/11
2-BA-36 2P124-6"-C1 Vac Gas oil 2E-10A tubes 2P126 394 380 296 380 110 330
25
215/45
125 2-BA-43 2BD125-1*1/2"-C23 Boiler Blow down 2BD121 2BD131 125 353 125 353 NNF
0
444/11
2-BA-36 2P125-6"-C1 Vac Gas oil 2E-10B tubes 2P126 394 380 296 380 110 330
25
130/11
126 2-BA-36/2-BA-43 2BD126-3/4"-C23 Boiler Blow down 2E-12A 2BD130 75 320 75 320 55 303
25
444/11
2-BA-36 2P126-8"-C1 Vac Gas oil 2P124 & 125 2E-11' 394 380 296 380 110 330
25
130/11
127 2-BA-36/2-BA-43 2BD127-3/4"-C23 Boiler Blow down 2E-12B 2BD130 75 320 75 320 55 303
25
444/11
2-BA-36/40 2P127-8"-C1 Vac Gas oil 2E-11' Plot Limit 394 248 296 248 80 180
25
130/11
128 2-BA-36/2-BA-43 2BD128-3/4"-C23 Boiler Blow down 2E-12A 2BD130 75 320 75 320 55 303
25
Full vac
2-BA-33/37 2P128-8"-B1 LVGO 2G-2 2G-5 & 50 430 38 430 58/450 -14.4 380
130/11
129 2-BA-36/2-BA-43 2BD129-3/4"-C23 Boiler Blow down 2E-12B 2BD130 75 320 75 320 55 303
25
Full vac
2-BA-37 2P129-8"-B1 LVGO 2P128 2G-5A & 50
430 38 430 58/450 -14.4 380
130/45
130 2-BA-43 2BD130-1*1/2"-B23 Boiler Blow down 2BD126 2BD131 75 320 75 320 55 303
0
314/11
2-BA-37 2P130-6"-C1 LVGO 2G-5 2P133 & 135 274 430 206 430 169 380
25
130/45
131 2-BA-43 2BD131-1*1/2"-B23 Boiler Blow down 2BD115 2BD132 75 320 75 320 55 303
0
314/11
2-BA-37 2P131-6"-C1 LVGO 2G-5A 2P130 274 430 206 430 169 380
25
130/45
132 2-BA-43 2BD132-1*1/2"-B23 Boiler Blow down 2BD131 2BD138 75 320 75 320 55 303
0
390/11
133 2-BA-43/2-BA-40 2BD133-1*1/2"-C23 Blow Down Blowdown Header 225 398 225 398 205 390
25

LINE LIST Page 101


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
314/11
2-BA-37 2P133-4"-C1 LVGO 2P130 2E-13' 274 430 206 430 169 380
25
390/11
134 2-BA-43 2BD134-1*1/2"-C23 Boiler Blow down 2BD133 2BD139 225 398 225 398 205 390
25
309/11
2-BA-37/33 2P134-4"-C1 LVGO 2E-13' 2P239 274 248 206 248 -14.4 120
25
215/45
135 2-BA-43 2BD135-2"-B23 Boiler Blow down 2C-13 2C-4 125 353 125 353
0
314/11
2-BA-37/36 2P135-4"-C1 LVGO 2P130 2P121 274 430 206 430 169 380
25
130/45
136 2-BA-43 2BD136-3"-B23 Boiler Blow down 2C-4 Drain 75 320 75 320 55 303
0
Full vac
2-BA-33/38 2P136-48"-B1 Vac Ovhd 2C-2 2P137 - 139 & 50
390 38 390 60/450 -14.4 160
130/45
137 2-BA-43 2BD137-2"-B23 Boiler Blow down 2C-4 2BD136 75 320 75 320 55 303
0
Full vac
2-BA-38 2P137-36"-B1 Vac Ovhd 2P136 2H-1A & 50
390 38 390 60/450 -14.4 160
130/45
138 2-BA-43 2BD138-6"-B23 Boiler Blow down 2BD132 2C-4 75 320 75 320 55 303
0
Full vac
2-BA-38 2P138-36"-B1 Vac Ovhd 2P136 2H-1B & 50 390 38 390 60/450 -14.4 160
215/45
139 2-BA-43 2BD139-6"-C23 Boiler Blow down 2BD134 2C-13 125 353 125 353 205 390
0
Full vac
2-BA-38 2P139-30"-B1 Vac Ovhd 2P136 2H-1C & 50
390 38 390 60/450 -14.4 160
Full vac
140 2-BA-38 2P140-30"-B1 Vac Ovhd 2H-1A 2P143 & 50
390 38 390 60/450 -13.5 307
390/11
141 2-BA-34 2BD141-3/4"-C23 Boiler Blow down 2BD101 2BD149 225 398 225 398 205 390
25
Full vac
2-BA-38 2P141-30"-B1 Vac Ovhd 2H-1B 2P143 & 50 390 38 390 60/450 -13.5 307
390/11
142 2-BA-34 2BD142-3/4"-C23 Boiler Blow down 2BD102 2BD150 225 398 225 398 205 390
25
Full vac
2-BA-38 2P142-24"-B1 Vac Ovhd 2H-1C 2P143 & 50
390 38 390 60/450 -13.5 307
390/11
143 2-BA-34 2BD143-3/4"-C23 Boiler Blow down 2BD103 2BD151 225 398 225 398 205 390
25
Full vac
2-BA-38 2P143-36"-B1 Vac Ovhd 2P140-142 2P144 &145 & 50
390 38 390 60/450 -13.5 307

LINE LIST Page 102


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
144 2-BA-34 2BD144-3/4"-C23 Boiler Blow down 2BD104 2BD152 225 398 225 398 205 390
25
Full vac
2-BA-38 2P144-36"-B1 Vac Ovhd 2P143 2E-14A Shell & 50 390 38 390 60/450 -13.5 307
390/11
145 2-BA-34 2BD145-3/4"-C23 Boiler Blow down 2BD106 2BD149 225 398 225 398 205 390
25
Full vac
2-BA-38 2P145-36"-B1 Vac Ovhd 2P143 2E-14B Shell & 50
390 38 390 60/450 -13.5 307
390/11
146 2-BA-34 2BD146-3/4"-C23 Boiler Blow down 2BD107 2BD150 225 398 225 398 205 390
25
Full vac
2-BA-38 2P146-3"-B1 Vac Ovhd 2E-14A Shell 2P148 & 50
390 38 390 57/450 -13.6 96
390/11
147 2-BA-34 2BD147-3/4"-C23 Boiler Blow down 2BD108 2BD151 225 398 225 398 205 390
25
Full vac
2-BA-38 2P147-3"-B1 Vac Ovhd 2E-14B Shell 2P148 & 50
390 38 390 57/450 -13.6 96
390/11
148 2-BA-34 2BD148-3/4"-C23 Boiler Blow down 2BD109 2BD152 225 398 225 398 205 390
25
Full vac
2-BA-38 2P148-4"-B1 Vac Ovhd 2P146&147 2C-3 & 50
390 38 390 57/450 -13.6 96
390/11
149 2-BA-34 2BD149-3/4"-C23 Boiler Blow down 2BD141/2BD145 Sample Cooler 225 398 225 398 205 390
25
Full vac
2-BA-38 2P149-12"-B1 Vac Ovhd 2E-14A Shell 2P151 & 50
390 38 390 57/450 -13.6 87
390/11
150 2-BA-34 2BD150-3/4"-C23 Boiler Blow down 2BD142/2BD146 Sample Cooler 225 398 225 398 205 390
25
Full vac
2-BA-38 2P150-12"-B1 Vac Ovhd 2E-14B Shell 2P151 & 50
390 38 390 57/450 -13.6 87
390/11
151 2-BA-34 2BD151-3/4"-C23 Boiler Blow down 2BD143/2BD147 Sample Cooler 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P151-16"-B1B Vac Ovhd 2P150 2P152-154 & 50 390 38 390 57/450 -13.6 87
390/11
152 2-BA-34 2BD152-3/4"-C23 Boiler Blow down 2BD144/2BD148 Sample Cooler 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P152-12"-B1B Vac Ovhd 2P151 2H-2A & 50
390 38 390 57/450 -13.6 87
390/11
153 2-BA-36 2BD153-3/4"-C23 Boiler Blow down 2BD116 2BD161 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P153-12"-B1B Vac Ovhd 2P151 2H-2B & 50
390 38 390 57/450 -13.6 87

LINE LIST Page 103


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
154 2-BA-36 2BD154-3/4"-C23 Boiler Blow down 2BD117 2BD162 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P154-10"-B1B Vac Ovhd 2P151 2H-2C & 50 390 38 390 57/450 -13.6 87
390/11
155 2-BA-36 2BD155-3/4"-C23 Boiler Blow down 2BD118 2BD163 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P155-10"-B1B Vac Ovhd 2H-2A 2P158 & 50
390 38 390 57/450 -10.06 250
390/11
156 2-BA-36 2BD156-3/4"-C23 Boiler Blow down 2BD119 2BD164 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P156-10"-B1B Vac Ovhd 2H-2B 2P158 & 50
390 38 390 57/450 -10.06 250
390/11
157 2-BA-36 2BD157-3/4"-C23 Boiler Blow down 2BD121 2BD161 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P157-8"-B1B Vac Ovhd 2H-2C 2P158 & 50
390 38 390 57/450 -10.06 250
390/11
158 2-BA-36 2BD158-3/4"-C23 Boiler Blow down 2BD122 2BD162 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P158-16"-B1B Vac Ovhd 2P155-157 2P159&160 & 50
390 38 390 57/450 -10.06 250
390/11
159 2-BA-36 2BD159-3/4"-C23 Boiler Blow down 2BD123 2BD163 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P159-12"-B1B Vac Ovhd 2P158 2E-15A Shell & 50
390 38 390 57/450 -10.06 250
390/11
160 2-BA-36 2BD160-3/4"-C23 Boiler Blow down 2BD124 2BD164 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P160-12"-B1B Vac Ovhd 2P158 2E-15B Shell & 50
390 38 390 57/450 -10.06 250
390/11
161 2-BA-36 2BD161-3/4"-C23 Boiler Blow down 2BD153/2BD157 Sample Cooler 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P161-2"-B1B Vac Ovhd 2E-15A Shell 2P163 & 50 390 38 390 57/450 -10.4 124
390/11
162 2-BA-36 2BD162-3/4"-C23 Boiler Blow down 2BD154/2BD158 Sample Cooler 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P162-2"-B1B Vac Ovhd 2E-15B Shell 2P163 & 50
390 38 390 57/450 -10.4 124
390/11
163 2-BA-36 2BD163-3/4"-C23 Boiler Blow down 2BD158/2BD159 Sample Cooler 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P163-3"-B1B Vac Ovhd 2P161&162 2C-3 & 50
390 38 390 57/450 -10.4 124

LINE LIST Page 104


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
164 2-BA-36 2BD164-3/4"-C23 Boiler Blow down 2BD156/2BD160 Sample Cooler 225 398 225 398 NNF 390
25
Full vac
2-BA-38 2P164-6"-B1B Vac Ovhd 2E-15A Shell 2P166 & 50 390 38 390 57/450 -10.3 98
390/11
165 2-BA-36 2BD165-3/4"-C23 Boiler Blow down 2BD126 2BD169 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P165-6"-B1B Vac Ovhd 2E-15B Shell 2P166 & 50
390 38 390 57/450 -10.3 98
390/11
166 2-BA-36 2BD166-3/4"-C23 Boiler Blow down 2BD127 2BD170 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P166-8"-B1B Vac Ovhd 2P164 2P167 - 169 & 50
390 38 390 57/450 -10.3 98
390/11
167 2-BA-36 2BD167-3/4"-C23 Boiler Blow down 2BD128 2BD169 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P167-6"-B1B Vac Ovhd 2P166 2H-3A & 50
390 38 390 57/450 -10.3 98
390/11
168 2-BA-36 2BD168-3/4"-C23 Boiler Blow down 2BD129 2BD170 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P168-6"-B1B Vac Ovhd 2P166 2H-3B & 50
390 38 390 57/450 -10.3 98
390/11
169 2-BA-36 2BD169-3/4"-C23 Boiler Blow down 2BD165/2BD167 Sample Cooler 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P169-4"-B1B Vac Ovhd 2P166 2H-3C & 50
390 38 390 57/450 -10.3 98
390/11
170 2-BA-36 2BD170-3/4"-C23 Boiler Blow down 2BD166/2BD168 Sample Cooler 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P170-6"-B1B Vac Ovhd 2H-3A 2P173 & 50
390 38 390 57/450 1.93 278
390/11
171 2-BA-36 2BD171-3/4"-C23 Boiler Blow down 2BD111 2BD175 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P171-6"-B1B Vac Ovhd 2H-3B 2P173 & 50 390 38 390 57/450 1.93 278
390/11
172 2-BA-36 2BD172-3/4"-C23 Boiler Blow down 2BD112 2BD176 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P172-3"-B1B Vac Ovhd 2H-3C 2P173 & 50
390 38 390 57/450 1.93 278
390/11
173 2-BA-36 2BD173-3/4"-C23 Boiler Blow down 2BD113 2BD175 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P173-8"-B1B Vac Ovhd 2P170-172 2E-16B Shell & 50
390 38 390 57/450 1.93 278

LINE LIST Page 105


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
390/11
174 2-BA-36 2BD174-3/4"-C23 Boiler Blow down 2BD114 2BD176 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P174-8"-B1B Vac Ovhd 2P173 2E-16A Shell & 50 390 38 390 57/450 1.93 278
390/11
175 2-BA-36 2BD175-3/4"-C23 Boiler Blow down 2BD171/2BD173 Sample Cooler 225 398 225 398 NNF 303
25
390/11
176 2-BA-36 2BD176-3/4"-C23 Boiler Blow down 2BD172/2BD174 Sample Cooler 225 398 225 398 NNF 303
25
Full vac
2-BA-38 2P176-1*1/2"-B1B Vac Ovhd 2E-16A Shell 2P178 & 50
390 38 390 57/450 1.93 130
177 2-BA-39 2BD177-3"-B19 water 2PW343 PSV509 50
Full vac
2-BA-38 2P177-1*1/2"-B1B Vac Ovhd 2E-16B Shell 2P178 & 50
390 38 390 57/450 1.93 130
178 2-BA-39 2BD178-4"-B19 water PSV509 OWS 50
Full vac
2-BA-38 2P178-2"-B1B Vac Ovhd 2P176 &177 2C-3 & 50
390 38 390 57/450 1.93 130
130/45
179 2-BA-43/14-BA-11 2BD179-1*1/2"-B23 Boiler Blow down SRU 2C-4 75 320 75 320 55 303
0
Full vac
2-BA-38 2P179-6"-B1B Vac Ovhd 2E-16A Shell 2P181 & 50
390 38 390 57/450 1.93 98
Full vac
180 2-BA-38 2P180-6"-B1B Vac Ovhd 2E-16B Shell 2P181 & 50
390 38 390 57/450 1.93 98
Full vac
181 2-BA-38 2P181-8"-B1B Vac Ovhd 2P179&180 2C-3 & 51
390 38 390 57/451 1.93 98
Full vac
182 2-BA-38 2P182-6"-B1B Vac Ovhd 2P158 PV235 & 51
390 38 390 57/451 -11.03 235
Full vac
183 2-BA-38 2P183-8"-B20 Sour Gas 2C-3 2C-18 & 51 225 38 225 57/451 1.9 98
Full vac
184 2-BA-38 2P184-2"-B1 Slop Oil 2C-3 2G-6 & 51
248 38 248 57/451 1.9 98
Full vac
185 2-BA-38 2P185-2"-B1 Slop Oil 2P184 2G-6A & 51
248 38 248 57/451 1.9 98
218/45
186 2-BA-38/45 2P186-1*1/2"-B1 Slop Oil 2G-6 2P438 193 248 145 248 104 98
0
218/45
187 2-BA-38 2P187-1*1/2"-B1 Slop Oil 2G-6A 2P186 193 248 145 248 104 98
0
188 2-BA-39/40 2P188-3"-B20 Sour Gas 2P189 14V-1 50 308 38 308 57/450 8 180
189 2-BA-39 2P189-16"-B19 Sour Gas 2C-8 2P188 50 308 38 308 57/450 18 180
191 2-BA-39/40 2P191-2"-B20 Sour Gas 2C-7 2P204 50 308 38 308 57/450 2 100
193 2-BA-32 2P193-8"-B20 Sour Gas 2P207 2P249&250 50 308 38 308 57/450 1.6 150

LINE LIST Page 106


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
318/45
194 2-BA-34/40 2P194-6"-B1 Cracked Gas oil Plot Limit 2P203 282 250 212 250 150 100
0
210/45
195 2-BA-34/40 2P195-4"-B1 SR Gas oil Plot Limit 2P203 176 350 140 350 140 330
0
Full vac
196 2-BA-33/35 2P196-3"-B8 Trim Cut 2P78 2C-2 & 50
695 38 695 77/450 10 674
Full vac
197 2-BA-33/35 2P197-3"-B8 Trim Cut 2P80 2P49 & 50
695 38 695 77/450 10 674
198 2-BA-31/40 2P198-6"-C1 Vac Gas oil 2P127 2P199 50 340 38 340 57/450 25 250
199 2-BA-31/40 2P199-6"-B1 Vac fuel oil 2P75 2P200 50 340 38 340 57/450 25 250
200 2-BA-31 2P200-8"-B1 Atmos Residue 2P1 2C-1 50 340 38 340 57/450 0.8 320
519/11
203 2-BA-34-4 2P203-6"-C1 LVGO Cutter stock 2P215 2P69 460 400 346 400 150 100
25
204 2-BA-39-1 2P204-3'-B20 Sour Gas 2P188 2F-1/2P193 50 308 38 308 57/450 8 180
205 2-BA-38-1 2P205-8'-B20 Sour Gas 2P183 2P207 50 225 38 225 54/450 1.9 98
206 2-BA-32-1/38 2P206-8'-B20 Sour Gas 2P207 Plot Limit 50 225 38 225 54/450 1.6 130
207 2-BA-38-1 2P207-8'-B20 Sour Gas 2C-18 2P193 50 308 38 308 54/450 1.9 98
209 2-BA-38-1 2P209-2'-B1 Slop oil 2C-18 2P184 50 248 38 248 54/450 1.6 100
454/11
210 2-BA-36-4 2P210-4"-C1 HGO 2P216 2P120 394 440 296 440 85 322
25
692/11
211 2-BA-34-1 2P211-6"-C8 Vac Residue 2E-2C Shell 2E-2E Shell 460 650 346 650 158 546
25
692/11
212 2-BA-34-1 2P212-6"-C8 Vac Residue 2E-2D Shell 2E-2F Shell 460 650 346 650 158 546
25
568/11
213 2-BA-34-1 2P213-8"-C8 Atmos Residue 2E-2E tubes 2E-2C Tubes 307 650 284 650 284 600
25
568/11
214 2-BA-34-1 2P214-8"-C8 Atmos Residue 2E-2F Tubes 2E-2D Tubes 307 650 284 650 284 600
25
2-BA-34-4/2BA- 314/11
215 2P215-4"-C1 LVGO 2P135 2P195 274 430 206 430 169 380
36-3 25
Norm Norm 150/45
216 2-BA-36-4/40 2P216-4"-B1 HGO Plot Limit 2P210 135 97 85 322
oper oper 0
444/11
217 2-BA-36-4 2P217-4"-C1 HGO 2P216 2P126 394 380 296 380 85 322
25
444/11
218 2-BA-40-1 2P218-6"-C1 VGO 2P127 2P438 394 380 296 380 80 180
25

LINE LIST Page 107


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
444/11
219 2-BA-40-1 2P219-6"-C1 VGO 2P127 2P220 394 380 296 380 80 180
25
519/11
220 2-BA-40-1 2P220-10"-C1 Vac fuel oil 2P75 Plot Limit 460 38 346 338 80 180
25
461/11
221 2-BA-32-1 2P221-4"-C8 Atmos Residue 2P27 2F-1 PassA 307 650 231 650 148 596
25
461/11
222 2-BA-32-1 2P222-4"-C8 Atmos Residue 2P27 2F-1 PassB 307 650 231 650 148 596
25
461/11
223 2-BA-32-1 2P223-4"-C8 Atmos Residue 2P27 2F-1 PassC 307 650 231 650 148 596
25
461/11
224 2-BA-32-1 2P224-4"-C8 Atmos Residue 2P27 2F-1 PassD 307 650 231 650 148 596
25
461/11
225 2-BA-32-1 2P225-4"-C8 Atmos Residue 2P27 2F-1 PassE 307 650 231 650 148 596
25
461/11
226 2-BA-32-1 2P226-4"-C8 Atmos Residue 2P27 2F-1 PassF 307 650 231 650 148 596
25
461/11
227 2-BA-32-1 2P227-4"-C8 Atmos Residue 2P27 2F-1 PassG 307 650 231 650 148 596
25
461/11
228 2-BA-32-1 2P228-4"-C8 Atmos Residue 2P27 2F-1 PassH 307 650 231 650 148 596
25
Full
229 2-BA-33 2P229-6"-B8B HVGO 2P85 2C-2 vac & 600 38 600 75/450
50
Full
230 2-BA-33 2P230-8"-B1B HVGO 2P118 2C-2 vac & 410 38 410 57/450 30 357
50
Full
231 2-BA-32-1 2P231-18"-B9A Atmos Residue Pass A (2F-1) 2P28-54"-B9A vac & 800 50 800 88/450 -14.2 710
50
Full
232 2-BA-32-1 2P232-18"-B9A Atmos Residue Pass B (2F-1) 2P28-54"-B9A vac & 800 50 800 88/450 -14.2 710
50
Full
233 2-BA-32-1 2P233-18"-B9A Atmos Residue Pass C (2F-1) 2P28-54"-B9A vac & 800 50 800 88/450 -14.2 710
50

LINE LIST Page 108


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
Full
234 2-BA-32-1 2P234-18"-B9A Atmos Residue Pass D (2F-1) 2P28-54"-B9A vac & 800 50 800 88/450 -14.2 710
50
Full
235 2-BA-32-1 2P235-18"-B9A Atmos Residue Pass E (2F-1) 2P28-54"-B9A vac & 800 50 800 88/450 -14.2 710
50
Full
236 2-BA-32-1 2P236-18"-B9A Atmos Residue Pass F (2F-1) 2P28-54"-B9A vac & 800 50 800 88/450 -14.2 710
50
Full
237 2-BA-32-1 2P237-18"-B9A Atmos Residue Pass G (2F-1) 2P28-54"-B9A vac & 800 50 800 88/450 -14.2 710
50
Full
238 2-BA-32-1 2P238-18"-B9A Atmos Residue Pass H (2F-1) 2P28-54"-B9A vac & 800 50 800 88/450 -14.2 710
50
239
240
241 2-BA-32-1 2P241-1"-B8C Quench steam 2LS61 Pass A (2F-1) 65 636 55 636 95/450 50 636
242 2-BA-32-1 2P242-1"-B8C Quench steam 2LS62 Pass B (2F-1) 65 636 55 636 95/450 50 636
243 2-BA-32-1 2P243-1"-B8C Quench steam 2LS63 Pass C (2F-1) 65 636 55 636 95/450 50 636
244 2-BA-32-1 2P244-1"-B8C Quench steam 2LS64 Pass D (2F-1) 65 636 55 636 95/450 50 636
245 2-BA-32-1 2P245-1"-B8C Quench steam 2LS65 Pass E (2F-1) 65 636 55 636 95/450 50 636
246 2-BA-32-1 2P246-1"-B8C Quench steam 2LS66 Pass F (2F-1) 65 636 55 636 95/450 50 636
247 2-BA-32-1 2P247-1"-B8C Quench steam 2LS67 Pass G (2F-1) 65 636 55 636 95/450 50 636
248 2-BA-32-1 2P248-1"-B8C Quench steam 2LS68 Pass H (2F-1) 65 636 55 636 95/450 50 636
249 2-BA-32-1 2P249-6"-B20 Sour Gas 2P193 2P262-264*274 50 308 38 308 57/450 1.6 150
250 2-BA-32-1 2P250-6"-B20 Sour Gas 2P193 2P265-67&281 50 308 38 308 57/450 1.6 150
Full vac
251 2-BA-38 2P251-3"-B1B HC condensate 2P136 2P137-139 & 50
390 38 390 60/450 -14.4 100
Full vac
252 2-BA-38 2P252-2"-B1B HC condensate 2P240 2P251 & 50
390 38 390 60/450 -14.4 100
Full vac
253 2-BA-38 2P253-2"-B1B HC condensate 2P137 2P251 & 50 390 38 390 60/450 -14.4 100
Full vac
254 2-BA-38 2P254-2"-B1B HC condensate 2P138 2P251 & 50
390 38 390 60/450 -14.4 100
Full vac
255 2-BA-38 2P255-2"-B1B HC condensate 2P139 2P251 & 50
390 38 390 60/450 -14.4 100

LINE LIST Page 109


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
Full vac
256 2-BA-38 2P256-2"-B1B HC condensate 2P251 2P137 & 50
390 38 390 60/450 -14.4 100
Full vac
257 2-BA-38 2P257-2"-B1B HC condensate 2P251 2P138 & 50 390 38 390 60/450 -14.4 100
Full vac
258 2-BA-38 2P258-2"-B1B HC condensate 2P251 2P139 & 50
390 38 390 60/450 -14.4 100
375/11
259 2-BA-34 2P259-4"-C1 Vac Fuel oil 2P69 PSV694 250 360 250 360 200 360
25
260 2-BA-34 2P260-6"-B1 Vac Fuel oil PSV694 2P199 50 340 38 340 57/450 3 340
261 2-BA-40 2P261-4"-B1 Vac Fuel oil 2P75 2P438 57/450
262 2-BA-32 2P262-1*1/2"-B20 Sour Gas 2P249 2P268/269
263 2-BA-32 2P263-1*1/2"-B20 Sour Gas 2P249 2P2708/271
264 2-BA-32 2P264-1*1/2"-B20 Sour Gas 2P249 2P272/273
265 2-BA-32 2P265-1*1/2"-B20 Sour Gas 2P250 2P275/276
266 2-BA-32 2P266-1*1/2"-B20 Sour Gas 2P250 2P277/278
267 2-BA-32 2P267-1*1/2"-B20 Sour Gas 2P250 2P279/280
268 2-BA-32 2P268-1*1/2"-B20 Sour Gas 2P262 2F-1 Burners
269 2-BA-32 2P269-1*1/2"-B20 Sour Gas 2P262 2F-1 Burners
270 2-BA-32 2P270-1*1/2"-B20 Sour Gas 2P263 2F-1 Burners
271 2-BA-32 2P271-1*1/2"-B20 Sour Gas 2P263 2F-1 Burners
272 2-BA-32 2P272-1*1/2"-B20 Sour Gas 2P264 2F-1 Burners
273 2-BA-32 2P273-1*1/2"-B20 Sour Gas 2P264 2F-1 Burners
274 2-BA-32 2P274-1*1/2"-B20 Sour Gas 2P249 2F-1 Burners
275 2-BA-32 2P275-1*1/2"-B20 Sour Gas 2P265 2F-1 Burners
276 2-BA-32 2P276-1"-B20 Sour Gas 2P265 Fire Heater Burner
277 2-BA-32 2P277-1"-B20 Sour Gas 2P266 Fire Heater Burner
278 2-BA-32 2P278-1"-B20 Sour Gas 2P266 Fire Heater Burner
279 2-BA-32 2P279-1"-B20 Sour Gas 2P267 Fire Heater Burner
280 2-BA-32 2P280-1"-B20 Sour Gas 2P267 Fire Heater Burner
281 2-BA-32 2P281-1"-B20 Sour Gas 2P250 Fire Heater Burner
282 2P282 2C20 2C3
283 2-BA-31-1 2P283-1*1/2"-B1 Vac Fuel oil 2P199 2BD35 50 340 38 340 57/450 25 250
284 MHC-5527 2P284-2"-B1 FO Blending 2P194/195/566 2P203
285 MHC-5484 2P285-6"-C1 FO Jumpover 2E-6A/B

LINE LIST Page 110


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
MHD-5590/MHB-
286 2P286-3"-C1 LVGO 2G-26 1G-1/1A
5567
Recirculation for
287 MHD-5600 2P287-1*1/2"-C1 LVGO
2G -26
288 MHD-5602 2P288-4"-C1 LVGO 2G-5/5A 2G-26
289 MHD-6041 2P289-3"-B20 Sour Gas 2P188 2P207
290 MHD-6097 2P290-3"-B20 Sour water 2P204 2C-3
291 MHD-6097 2P291-3"-B20 Sour water 2P290 2C-3
292 MHD-6399 2P292-1*1/2"-C1 LVGO 2P286 1P255
293 MHD-6402 2P293-2"-C1 LVGO 2P288 2P286
294 MHD-6691 2P294-4"-C8 Trim Cut 2P78 2P77
295 MHD-6691 2P295-1*1/2"-C8 Trim Cut 2P78 2P294
MHD-6724/MHB-
296 2P296-3"-C8 Trim Cut 2P78 2P200
6736
297 MHB-7901 2P297-6"-C8 Wash oil 2P85 2Y-1B
298 MHA-9825 2P298-6"-B1 Slops 2P218 21P1961
2PW312/15PW20 334/45
301 2-BA-39/40 2PW301-3"-B19 Sour water 2C-7 296 250 223 250 30 100
02 0
303 2-BA-39 2PW303-2"-B1 Slop oil 2C-7 2G-16 52 250 39 250 59/450 5 100
2-BA-39/40/50- 101/45
304 2PW304-2"-B1 Slop oil 2G-16 1P105 91 250 68 250 65 100
RA-11 0
305 2-BA-39 2PW305-4"-B19 Sour water 2C-7 2G-9 56 250 42 250 63/450 9 100
306 2-BA-39 2PW306-4"-B19 Sour water 2PW305 2G-9A 56 250 42 250 63/450 9 100
168/45
307 2-BA-39 2PW307-4"-B19 Sour water 2G-9 2E-18C 119 269 112 100 112 100
0
168/45
308 2-BA-39 2PW308-4"-B19 Sour water 2G-9A 2PW307 119 269 112 100 112 100
0
168/45
309 2-BA-39 2PW309-4"-B19 Sour water 2PW307 2PW310 119 269 112 100 112 100
0
144/45
310 2-BA-39 2PW310-4"-B19 Sour water 2E-18A 2C-8 119 269 96 228 96 228
0
311 2-BA-39 2PW311-2"-B1 Slop oil 2PW303 OWS 56 250 42 250 63/450 5 100
50-RA-11/50- 334/45
312 2PW312-3"-B19 Sour water 1PW25 2PW301/15PW2002 296 250 223 250 30 110
BA800 0
313 MHD-4602 2PW313-2" Slop Oil Treatment

LINE LIST Page 111


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
314 MHD-4603 2PW314-2" Slop Oil Treatment
315 2-BA-39 2PW315-8"-B19 Ovhd Water 2C-8 2G-10A 89 250 65 250 98/450 55 210
316 2-BA-39 2PW316-8"-B19 Ovhd Water 2PW315 2G-10A 89 250 65 250 98/450 55 210
230/45
317 2-BA-39 2PW317-6"-B19 Ovhd Water 2G-10 2PW352/2PW359 187 250 153 210 153 210
0
230/45
318 2-BA-39 2PW318-6"-B19 Ovhd Water 2G-10A 2PW317 187 250 153 210 153 210
0
230/45
319 2-BA-39 2PW319-3"-B19 Ovhd Water 2PW317 2C-8 tray35 187 250 153 210 153 210
0
230/45
320 2-BA-39 2PW320-3"-B19 Ovhd Water 2PW352 2PW353 187 250 153 210 153 210
0
230/45
321 2-BA-39 2PW321-3"-B19 Ovhd Water 2PW356 2PW352/2PW358 187 250 153 210 153 210
0
230/45
322 2-BA-39 2PW322-2"-B19 Slop oil 2PW357 2C-7 187 250 153 210 153 210
0
323 2-BA-39 2PW323-6"-B19 Stripped Water 2C-8 2E-20 50 269 38 269 57/450 26 269
326 2-BA-39 2PW326-20"-B1 Steam 2E-2C 2PW330/2BD29 50 269 38 269 57/450 26 269
330 2-BA-39 2PW330-16"-B1 Steam 2PW326 2C-8 50 269 38 269 57/450 26 269
333 2-BA-39 2PW333-6"-B19 Stripped Water "2E-20 2G-12 56 269 42 269 63/450 32 269
334 2-BA-39 2PW334-6"-B19 Stripped Water 2PW335 2G-12A 56 269 42 269 63/450 32 269
335 2-BA-39 2PW335-6"-B19 Stripped Water 2C-8 2PW333 56 269 42 269 63/450 32 269
557/11
336 2-BA-39 2PW336-4"-C19 Stripped Water 2G-12 2E-18A 397 269 371 269 371 269
25
557/11
337 2-BA-39 2PW337-4"-C19 Stripped Water 2G-12A 2PW336 397 269 371 269 371 269
25
557/11
338 2-BA-39 2PW338-4"-C19 Stripped Water 2PW336 2PW339 397 269 371 269 371 269
25
549/11
339 2-BA-39 2PW339-4"-C19 Stripped Water 2PW346-47 2PW340-41 397 269 366 269 366 140
25
549/11
340 2-BA-39 2PW340-3"-C19 Stripped Water 2PW339&341 2PW344 397 269 366 269 366 140
25
549/11
341 2-BA-39/40/1RA-3 2PW341-4"-C19 Stripped Water 2PW339&340 1PW4 470 269 366 269 366 140
25
2-BA-39/40/50- 243/45
342 2PW342-4"-B19 Stripped Water 1PW2001 2PW344 215 275 162 275 60 275
BA-800 0
343 2-BA-39 2PW343-4"-B19 Stripped Water 2E-21 Sewer 50 250 38 250 57/450 21 110

LINE LIST Page 112


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
344 2-BA-39 2PW344-4"-B19 Stripped Water 2PW340 2E-21 50 275 38 275 62/450 31 255
345 2-BA-39 2PW345-6"-B19 Ovhd Water 2PW362 2C-8 tray40 50 308 38 308 57/450 24 125
549/11
346 2-BA-39 2PW346-4"-C19 Stripped Water 2E-18C 2PW347&339 397 269 366 269 366 140
25
549/11
347 2-BA-39 2PW347-3"-C19 Stripped Water 2PW301 2PW339 397 269 366 269 366 140
25
557/11
350 2-BA-39 2PW350-4"-C19 Stripped Water 2PW335 2PW336 397 269 371 269 371 269
25
351 2-BA-39 2PW351-4"-B19 Stripped Water 2PW343 50 250 38 250 57/450 21 110
230/45
352 2-BA-39 2PW352-6"-B19 Ovhd Water 2PW317 2PW321/358 182 250 153 210 153 210
0
230/45
353 2-BA-39 2PW353-3"-B19 Ovhd Water 2PW320 2Y-8 187 250 153 210 153 210
0

354 2-BA-39 2PW354-1*1/2"-B19 Ovhd Water 2Y-8/2C-9 2PW363 5

230/45
355 2-BA-39 2PW355-3"-B19 Ovhd Water 2Y-8 2C-9 187 250 153 210 153 210
0
230/45
356 2-BA-39 2PW356-3"-B19 Ovhd Water 2C-9 2PW321 187 250 153 210 153 210
0
230/45
357 2-BA-39 2PW357-1*1/2"-B19 Slop Oil 2C-9 2PW322 187 250 153 210 153 210
0
230/45
358 2-BA-39 2PW358-6"-B19 Ovhd Water 2PW321/352 2E-19 185 396 153 210 34 210
0
230/45
359 2-BA-39 2PW359-6"-B19 Ovhd Water 2PW317/352 2PW358 185 396 153 210 153 210
0
230/45
360 2-BA-39 2PW360-6"-B19 Ovhd Water 2PW362 2PW352 185 396 153 210 153 210
0
230/45
361 2-BA-39 2PW361-6"-B19 Ovhd Water 2PW358 2PW345 185 396 153 210 153 210
0
209/45
362 2-BA-39 2PW362-12"-B19 Ovhd Water 2E-19 2PW345 185 396 139 396 24 125
0
209/45
363 2-BA-39 2PW363-2"-B19 Ovhd Water 2PW254 OWS 5 210
0
364 2-BA-39 2PW364-2"-B1 Stripped Water 2PW335 OWS 56 269 42 269 63/450 32 269
365 2-BA-39 2PW365-2"-B1 Sour water 2PW345 2PW301 50 308 38 308 63/450
366 2-BA-39 2PW366-2"-B1 Sour water 2P189 2C-7

LINE LIST Page 113


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
380 MHB-9011/1 2PW380-2"-B19 Sour water 2C-1 2G-17 50 250 38 250 57 1 320
381 MHB-9011/1 2PW381-1.5"-B19 Sour water 2G-17 2PW24 296 250 223 250 334 10 320
210/45
401 2-BA-31 2P401-3"-B1 Flush oil 2P437 2P200 176 350 140 350 140 330
0
210/45
402 2-BA-31 2P402-1*1/2"-B1 Flush oil 2P437 2G-1 176 350 140 350 140 330
0
210/45
403 2-BA-31 2P403-1*1/2"-B1 Flush oil 2P402 2G-1A 176 350 140 350 140 330
0
218/45
404 2-BA-31 2P404-1*1/2"-B1 Slop Oil 2G-1 2P438 193 350 145 350 140
0
218/45
405 2-BA-31 2P405-1*1/2"-B1 Slop Oil 2G-1A 2P404 193 350 145 350 140
0
218/45
406 2-BA-33 2P406-3"-B1 Slop Oil 2P134 2P409 193 350 145 350 140
0
218/45
407 2-BA-33 2P407-3"-B1 Slop Oil 2P118 2P409 193 350 145 350 140
0
218/45
408 2-BA-33 2P408-3"-B1 Slop Oil 2P85 2P409 193 350 145 350 140
0
218/45
409 2-BA-33 2P409-3"-B1 Slop Oil 2P406 thru 408 2P438 193 350 145 350 140
0
210/45
411 2-BA-34 2P411-1*1/2"-B1 Flush oil 2P437 2G-2A 176 360 140 350 140 330
0
210/45
412 2-BA-34 2P412-1*1/2"-B1 Flush oil 2P414 2G-2B 176 360 140 350 140 330
0
210/45
413 2-BA-34 2P413-1*1/2"-B1 Flush oil 2P411 2G-2C 176 360 140 350 140 330
0
210/45
414 2-BA-34 2P414-1*1/2"-B1 Flush oil 2P437 2G-2D 176 360 140 350 140 330
0
200/45
415 2-BA-34 2P415-1*1/2"-B1 Slop Oil 2G-2A 2P438 193 675 145 675 140
0
200/45
416 2-BA-34 2P416-1*1/2"-B1 Slop Oil 2G-2B 2P418 193 675 145 675 140
0
200/45
417 2-BA-34 2P417-1*1/2"-B1 Slop Oil 2G-2C 2P415 193 675 145 675 140
0
200/45
418 2-BA-34 2P418-1*1/2"-B1 Slop Oil 2G-2D 2P438 193 675 145 675 140
0

LINE LIST Page 114


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
210/45
420 2-BA-35 2P420-1*1/2"-B1 Flush oil 2P437 2G-3 176 350 140 350 140 380
0
210/45
421 2-BA-35 2P421-1*1/2"-B1 Flush oil 2P437 2G-3A 176 350 140 350 140 380
0
260/45
422 2-BA-35 2P422-1*1/2"-B1 Slop Oil 2G-3 2P438 193 675 145 675 140
0
210/45
423 2-BA-35 2P423-1*1/2"-B1 Slop Oil 2G-3A 2P422 176 350 140 350 140
0
210/45
424 2-BA-36 2P424-1*1/2"-B1 Flush oil 2P437 2G-4 176 350 140 350 140 380
0
210/45
425 2-BA-36 2P425-2"-B1 Flush oil 2P437 2G-4A 176 350 140 350 140 380
0
242/45
426 2-BA-36 2P426-1*1/2"-B1 Slop Oil 2G-4 2P438 193 557 145 557 140
0
242/45
427 2-BA-36 2P427-1*1/2"-B1 Slop Oil 2G-4A 2P438 193 557 145 557 140
0
210/45
428 2-BA-37 2P428-1*1/2"-B1 Flush oil 2P437 2G-5 176 350 140 350 140 330
0
210/45
429 2-BA-37 2P429-1*1/2"-B1 Flush oil 2P437 2G-5A 176 350 140 350 140 330
0
218/45
430 2-BA-37 2P430-1*1/2"-B1 Slop Oil 2G-5 2P438 193 380 145 380 140
0
218/45
431 2-BA-37 2P431-1*1/2"-B1 Slop Oil 2G-5A 2P438 193 380 145 380 140
0
210/45
432 2-BA-37 2P432-1*1/2"-B1 Flush oil 2P437 2E-13 176 350 140 350 140 330
0
210/45
433 2-BA-41 2P433-1*1/2"-B1 Flush oil 2P437 2G-15 176 350 140 350 140 330
0
210/45
434 2-BA-41 2P434-1*1/2"-B1 Flush oil 2P433 2G-15A 176 350 140 350 140 330
0
210/45
437 2-BA-40/45 2P437-4"-B1 Flush oil Flush Oil Header 176 350 140 350 140 330
0
210/45
438 2-BA-40/45 2P438-8"-B1 Slop Oil Slop Oil Header 176 350 140 350 140 330
0
210/45
439 2-BA-32/33 2P439-3"-B1 Flush oil 2P27 2P36 176 350 140 350 140 330
0

LINE LIST Page 115


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
210/45
440 2-BA-35/36 2P440-3"-B1 Flush oil 2P15 2P78 176 350 140 350 140 330
0
210/45
441 2-BA-36/37 2P441-3"-B1 Flush oil 2P440 2P130 176 350 140 350 140 330
0
210/45
442 2-BA-34-1 2P442-3"-B1 Flush oil wash water 2P437 2P43 176 350 140 350 140 330
0
210/45
444 2-BA-34-1 2P444-3"-B1 Flush oil wash water 2P442 2P25 176 350 140 350 140 330
0
218/45
446 2-BA-34-1 2P446-3"-B1 Slops wash water 2P23 2P447 193 350 145 350 140
0
218/45
447 2-BA-34-1 2P447-3"-B1 Slops wash water 2P45 2P438 193 350 145 350 140
0
210/45
448 2-BA-34-1 2P448-3"-B1 Flush oil wash water 2P437 2P44 176 350 140 350 140 330
0
210/45
450 2-BA-34-1 2P450-3"-B1 Flush oil wash water 2P448 2P26 176 350 140 350 140 330
0
218/45
452 2-BA-34-1 2P452-3"-B1 Slops wash water 2P24 2P453 193 350 145 350 140
0
218/45
453 2-BA-34-1 2P453-3"-B1 Slops wash water 2P46 2P438 193 350 145 350 140
0
210/45
454 2-BA-34-2 2P454-2"-B1 Flush oil wash water 2P437 2P455-56 176 350 140 350 140 330
0
210/45
455 2-BA-34-2 2P455-2"-B1 Flush oil wash water 2P454 2P52 176 350 140 350 140 330
0
210/45
456 2-BA-34-2 2P456-2"-B1 Flush oil wash water 2P454 2P53 176 350 140 350 140 330
0
210/45
457 2-BA-34-2 2P457-2"-B1 Flush oil wash water 2P437 2P458&558 176 350 140 350 140 330
0
210/45
458 2-BA-34-2 2P458-2"-B1 Flush oil wash water 2P457 2P55 176 350 140 350 140 330
0
218/45
459 2-BA-34-2 2P459-2"-B1 Slops wash water 2P56 2P463 193 350 145 350 140
0
218/45
460 2-BA-34-2 2P460-2"-B1 Slops wash water 2P57 2P463 193 350 145 350 140
0
218/45
461 2-BA-34-2 2P461-2"-B1 Slops wash water 2P462&560 2P438 193 350 145 350 140
0

LINE LIST Page 116


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
218/45
462 2-BA-34-2 2P462-2"-B1 Slops wash water 2P59 2P461 193 350 145 350 140
0
218/45
463 2-BA-34-2 2P463-2"-B1 Slops wash water 2P459-60 2P438 193 350 145 350 140
0
210/45
464 2-BA-34-3 2P464-3"-B1 Flush oil wash water 2P437 2P465-66 176 350 140 350 140 330
0
210/45
465 2-BA-34-3 2P465-3"-B1 Flush oil wash water 2P464 2P64 176 350 140 350 140 330
0
210/45
466 2-BA-34-3 2P466-3"-B1 Flush oil wash water 2P464 2P65 176 350 140 350 140 330
0
218/45
467 2-BA-34-3 2P467-3"-B1 Slops wash water 2P66 2P469 193 350 145 350 140
0
218/45
468 2-BA-34-3 2P468-3"-B1 Slops wash water 2P67 2P469 193 350 145 350 140
0
218/45
469 2-BA-34-3 2P469-3"-B1 Slops wash water 2P467-68 2P438 193 350 145 350 140
0
210/45
470 2-BA-34-4 2P470-3"-B1 Flush oil wash water 2P437 2P71 176 350 140 350 140 330
0
210/45
471 2-BA-34-4 2P471-3"-B1 Flush oil wash water 2P470 2P71 176 350 140 350 140 330
0
210/45
472 2-BA-34-4 2P472-3"-B1 Flush oil wash water 2P470 2P72 176 350 140 350 140 330
0
218/45
475 2-BA-34-4 2P475-3"-B1 Slops wash water 2P74 2P438 193 350 145 350 140
0
210/45
476 2-BA-36-1 2P476-3"-B1 Flush oil wash water 2P437 2P477-80 176 350 140 350 140 330
0
210/45
477 2-BA-36-1 2P477-3"-B1 Flush oil wash water 2P476 2P19 176 350 140 350 140 330
0
210/45
478 2-BA-36-1 2P478-3"-B1 Flush oil wash water 2P476 2P89 176 350 140 350 140 330
0
210/45
479 2-BA-36-1 2P479-3"-B1 Flush oil wash water 2P476 2P90 176 350 140 350 140 330
0
210/45
480 2-BA-36-1 2P480-3"-B1 Flush oil wash water 2P476 2P20 176 350 140 350 140 330
0
218/45
481 2-BA-36-1 2P481-3"-B1 Slops wash water 2P17 2P485 193 350 145 350 140
0

LINE LIST Page 117


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
218/45
482 2-BA-36-1 2P482-3"-B1 Slops wash water 2P91 2P481 193 350 145 350 140
0
218/45
483 2-BA-36-1 2P483-3"-B1 Slops wash water 2P18 2P484 193 350 145 350 140
0
218/45
484 2-BA-36-1 2P484-3"-B1 Slops wash water 2P92 2P481 193 350 145 350 140
0
218/45
485 2-BA-36-1 2P485-3"-B1 Slops wash water 2P481-84 2P438 193 350 145 350 140
0
210/45
486 2-BA-36-2 2P486-3"-B1 Flush oil wash water 2P437 2P487-88 176 350 140 350 140 330
0
210/45
487 2-BA-36-2 2P487-3"-B1 Flush oil wash water 2P486 2P95 176 350 140 350 140 330
0
210/45
488 2-BA-36-2 2P488-3"-B1 Flush oil wash water 2P486 2P96 176 350 140 350 140 330
0
210/45
489 2-BA-36-2 2P489-3"-B1 Flush oil wash water 2P437 2P490&559 176 350 140 350 140 330
0
210/45
490 2-BA-36-2 2P490-3"-B1 Flush oil wash water 2P489 2P98 176 350 140 350 140 330
0
218/45
491 2-BA-36-2 2P491-3"-B1 Slops wash water 2P99 2P495 193 350 145 350 140
0
218/45
492 2-BA-36-2 2P492-3"-B1 Slops wash water 2P100 2P495 193 350 145 350 140
0
218/45
493 2-BA-36-2 2P493-3"-B1 Slops wash water 2P494&561 2P438 193 350 145 350 140
0
218/45
494 2-BA-36-2 2P494-3"-B1 Slops wash water 2P102 2P493 193 350 145 350 140
0
218/45
495 2-BA-36-2 2P495-3"-B1 Slops wash water 2P491-92 2P438 193 350 145 350 140
0
210/45
496 2-BA-36-3 2P496-3"-B1 Flush oil wash water 2P437 2P497&498 176 350 140 350 140 330
0
210/45
497 2-BA-36-3 2P497-3"-B1 Flush oil wash water 2P496 2P113 176 350 140 350 140 330
0
210/45
498 2-BA-36-3 2P498-3"-B1 Flush oil wash water 2P496 2P114 176 350 140 350 140 330
0
218/45
499 2-BA-36-3 2P499-3"-B1 Slops wash water 2P116 2P501 193 350 145 350 140
0

LINE LIST Page 118


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
218/45
500 2-BA-36-3 2P500-3"-B1 Slops wash water 2P117 2P501 193 350 145 350 140
0
218/45
501 2-BA-36-3 2P501-3"-B1 Slops wash water 2P499&500 2P438 193 350 145 350 140
0
210/45
502 2-BA-36-3 2P502-3"-B1 Flush oil wash water 2P437 2P535-506 176 350 140 350 140 330
0
210/45
503 2-BA-36-3 2P503-3"-B1 Flush oil wash water 2P504 2P107 176 350 140 350 140 330
0
210/45
504 2-BA-36-3 2P504-3"-B1 Flush oil wash water 2P502 2P13 176 350 140 350 140 330
0
210/45
505 2-BA-36-3 2P505-3"-B1 Flush oil wash water 2P502 2P108 176 350 140 350 140 330
0
210/45
506 2-BA-36-3 2P506-3"-B1 Flush oil wash water 2P502 2P14 176 350 140 350 140 330
0
218/45
507 2-BA-36-3 2P507-3"-B1 Slops wash water 2P11 2P511 193 350 145 350 140
0
218/45
508 2-BA-36-3 2P508-3"-B1 Slops wash water 2P109 2P511 193 350 145 350 140
0
218/45
509 2-BA-36-3 2P509-3"-B1 Slops wash water 2P12 2P511 193 350 145 350 140
0
218/45
510 2-BA-36-3 2P510-3"-B1 Slops wash water 2P110 2P511 193 350 145 350 140
0
218/45
511 2-BA-36-3 2P511-3"-B1 Slops wash water 2P507-510 2P438 193 350 145 350 140
0
210/45
512 2-BA-36-4 2P512-3"-B1 Flush oil wash water 2P437 2P513&514 176 350 140 350 140 330
0
210/45
513 2-BA-36-4 2P513-3"-B1 Flush oil wash water 2P512 2P122 176 350 140 350 140 330
0
210/45
514 2-BA-36-4 2P514-3"-B1 Flush oil wash water 2P512 2P123 176 350 140 350 140 330
0
218/45
515 2-BA-36-4 2P515-3"-B1 Slops wash water 2P124 2P517 193 350 145 350 140
0
218/45
516 2-BA-36-4 2P516-3"-B1 Slops wash water 2P125 2P517 193 350 145 350 140
0
218/45
517 2-BA-36-4 2P517-3"-B1 Slops wash water 2P515&516 2P438 193 350 145 350 140
0

LINE LIST Page 119


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
210/45
518 2-BA-33 2P518-1"-B1 Flush oil 2P437 2C-2 inst flush 176 350 140 350 140 330
0
210/45
519 2-BA-36 2P519-3"-B1 Flush oil 2P439 2P83 176 350 140 350 140 330
0
210/45
520 2-BA-45 2P520-3"-B1 Flush oil 2P470 2P475 176 350 140 350 140 330
0
210/45
521 2-BA-45 2P521-3"-B1 Flush oil 2P464 2P536&537 176 350 140 350 140 330
0
210/45
522 2-BA-45 2P522-2"-B1 Flush oil 2P454 2P532&533 176 350 140 350 140 330
0
210/45
523 2-BA-45 2P523-3"-B1 Flush oil 2P502 2P546-49 176 350 140 350 140 330
0
210/45
524 2-BA-45 2P524-3"-B1 Flush oil 2P486 2P542&543 176 350 140 350 140 330
0
210/45
525 2-BA-45 2P525-3"-B1 Flush oil 2P512 2P552&553 176 350 140 350 140 330
0
210/45
526 2-BA-45 2P526-3"-B1 Flush oil 2P496 2P550&551 176 350 140 350 140 330
0
210/45
527 2-BA-45 2P527-3"-B1 Flush oil 2P476 2P484 176 350 140 350 140 330
0
210/45
528 2-BA-45 2P528-3"-B1 Flush oil 2P442 2P446 176 350 140 350 140 330
0
210/45
529 2-BA-45 2P529-3"-B1 Flush oil 2P448 2P453 176 350 140 350 140 330
0
210/45
530 2-BA-45 2P530-2"-B1 Flush oil 2P437 2P534-35 176 350 140 350 140 330
0
210/45
531 2-BA-45 2P531-3"-B1 Flush oil 2P489 2P544-45 176 350 140 350 140 330
0
210/45
532 2-BA-34-2 2P532-2"-B1 Flush oil 2P522 2P459 176 350 140 350 140 330
0
210/45
533 2-BA-34-2 2P533-2"-B1 Flush oil 2P522 2P460 176 350 140 350 140 330
0
210/45
534 2-BA-34-2 2P534-2"-B1 Flush oil 2P530 2P560 176 350 140 350 140 330
0
210/45
535 2-BA-34-2 2P535-2"-B1 Flush oil 2P530 2P462 176 350 140 350 140 330
0

LINE LIST Page 120


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
210/45
536 2-BA-34-3 2P536-3"-B1 Flush oil 2P521 2P467 176 350 140 350 140 330
0
210/45
537 2-BA-34-3 2P537-3"-B1 Flush oil 2P521 2P468 176 350 140 350 140 330
0
210/45
538 2-BA-36-1 2P538-3"-B1 Flush oil 2P527 2P481 176 350 140 350 140 330
0
210/45
539 2-BA-36-1 2P539-3"-B1 Flush oil 2P527 2P483 176 350 140 350 140 330
0
210/45
540 2-BA-36-1 2P540-3"-B1 Flush oil 2P527 2P482 176 350 140 350 140 330
0
210/45
541 2-BA-36-1 2P541-3"-B1 Flush oil 2P527 2P484 176 350 140 350 140 330
0
210/45
542 2-BA-36-2 2P542-3"-B1 Flush oil 2P524 2P491 176 350 140 350 140 330
0
210/45
543 2-BA-36-2 2P543-3"-B1 Flush oil 2P524 2P492 176 350 140 350 140 330
0
210/45
544 2-BA-36-2 2P544-3"-B1 Flush oil 2P531 2P561 176 350 140 350 140 330
0
210/45
545 2-BA-36-2 2P545-3"-B1 Flush oil 2P531 2P494 176 350 140 350 140 330
0
210/45
546 2-BA-36-3 2P546-3"-B1 Flush oil 2P547 2P509 176 350 140 350 140 330
0
210/45
547 2-BA-36-3 2P547-3"-B1 Flush oil 2P523 2P507 176 350 140 350 140 330
0
210/45
548 2-BA-36-3 2P548-3"-B1 Flush oil 2P523 2P510 176 350 140 350 140 330
0
210/45
549 2-BA-36-3 2P549-3"-B1 Flush oil 2P523 2P508 176 350 140 350 140 330
0
210/45
550 2-BA-36-3 2P550-3"-B1 Flush oil 2P526 2P499 176 350 140 350 140 330
0
210/45
551 2-BA-36-3 2P551-3"-B1 Flush oil 2P526 2P500 176 350 140 350 140 330
0
210/45
552 2-BA-36-4 2P552-3"-B1 Flush oil 2P525 2P515 176 350 140 350 140 330
0
210/45
553 2-BA-36-4 2P553-3"-B1 Flush oil 2P525 2P516 176 350 140 350 140 330
0

LINE LIST Page 121


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
210/45
554 2-BA-34-4 2P554-1*1/2"-B1 Flush oil 2P570 AT-150 176 350 140 350 140 330
0
210/45
558 2-BA-34-2 2P558-2"-B1 Flush oil wash water 2P457 2P54 176 350 140 350 140 330
0
210/45
559 2-BA-36-2 2P559-3"-B1 Flush oil wash water 2P489 2P97 176 350 140 350 140 330
0
218/45
560 2-BA-34-2 2P560-2"-B1 Slops 2P58 2P461 193 350 145 350 140
0
218/45
561 2-BA-36-2 2P561-3"-B1 Slops 2P101 2P493 193 350 145 350 140
0
218/45
562 2-BA-34-4 2P562-1*1/2"-B1 Slops AT-150 2P475 193 350 145 350 140
0
566 MHC-4982 2P566-3"-B1 HCGO 1P154 2P215
567 MHC-4982 2P567-3"-B1 Kero 1P104 2P215
568 MHB-5345 2P568-2"-B1 Suction to 2G-6B
569 MHB-5345 2P569-1*1/2"-B1 Discharge from 2G-6B
570 MHB-5345 2P570-1"-B1 Discharge from 2G-6B
571 2-BA-34-2 2P571-2"-B1 Flush oil wash water 2P455 2P292
572 MHB-5345 2P572-2"-B1 Slops Suction to 2G-6
573 MHB-5345 2P573-1*1/2"-B1 Slops Dischrge from 2G-6
574 MHB-7901 2P574-1*1/2"-B1 Flush oil 2P437 2Y-1 A&B
575 MHB-7901 2P575-1*1/2"-B1 Flush oil 2Y-1 A&B 2P439
576 MHB-7901 2P576-1*1/2"-B1 Flush oil 2P574-75 Drain
2-BA-34/MHB-
577 2P577-8"-C1 VGO 2P127 2E-24
7954
2-BA-34/MHB-
578 2P578-8"-C1 VGO 2E-24 2P127
7954
579 2-BA-34 2P579-3"-B1 Slop Oil 2P578 slop oil header
580 2-BA-34 2P580-3"-B1 Flush oil Flush Oil Header 2P577
581 2-BA-40 2P581-3"-B1 Cold ATB 2P2 2P567
582 2-BA-40 2P582-3"-B1 Hot ATB 2P1 2P567
583 2-BA-40 2P583-3"-B1/C1 HGO 2P216 2P215
631 MHB-9011/1 2P631-10"-B1 Atm Residue 2P4 2G-1B 50 340 38 340 57 3.6 330
632 MHB-9011/1 2P632-8"-C1 Atm Residue 2G-1B 2P7 347 340 261 340 391 313 330
633 MHB-9011/1 2P633-1.5"-B1 Atm Residue 2P631 2P402 176 350 140 350 210 140 330

LINE LIST Page 122


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 2: VACUUM DISTILLATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00 NNF: Normally no flow
Date: 13/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
MHB-
634 2P634-10"-C1 HVGO 2P118/2E-12 2E-25A 394 380 296 380 444 215 344
9013/1/2BA31-2
635 MHB-9014/1 2P635-6"-C1 LVGO 2P130 2E-13Y 274 430 206 430 309 150 298
636 MHB-9014/1 2P636-6"-C1 LVGO 2E-13Y 2FV229Y 274 430 206 430 309 105 105
637 MHB-9014/1 2P637-6"-C1 LVGO 2FV229Y 2P638 274 430 206 430 309 -14.3 105
Full
638 MHB-9015/1 2P638-6"-B1B LVGO 2P637 2C-2 vac & 430 206 430 309 -14.3 105
50
639 MHB-9012 2P639-10"-C1 HVGO 2E-25C 2C-2/2P118 394 380 296 380 444 183 320
MHB-
640 2P640-8"-C1 HVGO 2P634 2P639 394 380 296 380 444 215 344
9012/2BA31-2
641 MHB-9011 2P641-8"-B1 Atm Residue 2P2 2E-25C 252 250 189 250 285 20 158
642 MHB-9012 2P642-8"-B1 Atm Residue 2E-25A 2P2 252 340 189 340 285 1 328
643 MHB-9012 2P643-6"-B1 Atm Residue 2P641 2P642 252 250 189 250 285 20 328
644 MHB-9042/1 2P644-3"-B1 2P646 2P645 176 350 140 350 210 140 330
645 MHB-9012 2P645-3"-B1 Atm Residue 2P641 2P517 176 350 140 350 210 140 330

646 MHB-9042/1 2P646-3"-B1 Hot flush water/flush oil 2P525 2P634 176 350 140 350 210 140 330

647 MHB-9012 2P647-3"-B1 Hot flush water/flush oil 2P646 2P642 176 350 140 350 210 140 330

MHB-
648 2P648-3"-B1 Atm Residue 2P645 2P639 176 350 140 350 210 140 330
9012/2BA31-2
649 MHB-9011/1 2P649-1.5"-B1 2P632 2P404 193 350 145 350 218 140 330
650 MHB-9016/1 2P650-10"-C8 2P27 2F-2 347 561 261 561 392 165 561
651 MHB-9019/1 2P651-10"-C8 2F-2 2P27 347 650 261 650 392 123 622
652 MHB-9012 2P652-1"-B1 Atm Residue 2P642 TSV974 252 380 189 380 285 1 328
653 MHB-9012 2P653-1"-B1 Atm Residue TSV974 2P642 252 344 189 344 285 1 328
654 MHB-9014 2P654-1.5"-B1 2Y-3X 2P431 193 380 145 380 218 105 105
655 MHB-9011/1 2P655-6"-C1 2P632 2P631 347 340 261 340 390 313 330

LINE LIST Page 123


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F

1 4-BA-4/1 4BFW1-1.5"-D24 Boiler feed water 31BFW31 4LC2-2"-D24/4-BA-22

4-BA-4/2 4N1-1.5"-B1 Nitrogen 4N3 4-BA-20/4K-4B 250 -320 188 -320 376 75 Amb
4-BA-4/2 4BD1-6"-B1 Relief Header 4K-3's 4BD100 100
20ft jacketed
4-BA-4/2 4LS1-1"-B23 Steam 7LS100 66 312 50 298 83 50 298
section/Near 4K-3B
4-BA-4/3 4CW1-1.5"-A2 Cooling Water 4CW19 4E-12' 85 105 64 74 100 45 74
4-BA-4/3 4IA1-1"-A1 Instrument air 35IA9 Service air near 4C-8
4-BA-4/3 4HS1-1.5"-D24 HP Steam 4HS100 4P129/4-BA-19 690 700 600 700 1305 600 700
4-BA-4/4 4LC1-2"-B23 Condensate 4LC101 4G-5 (2BA22) 70 100 53 100 80 50 100
4-BA-4/4 4MS1-2"-C23 Snuffing steam 4MS100 4F-1(4BA25) 275 470 207 470 373 200 388
4-BA-4/4 4FG1-3"-B12 Fuel Gas 4FG4 4F-1(4BA25) 80 210 60 210 95 35 100
4-BA-4/4 4UA1-2"-A1 Regeneration Air 4UA109 4P11/Near 4C-1 140 100 125 90 190 125 90
4-BA-20 4H1-2"-E13 Hydrogen 7-RA-2 6P42/4P43 595 320 545 320 820 200 60
4-BA-27 4PW1-1.5"-B19 Process water 4C-10 Bottom Drain 160 125 120 125 180 81 125
4-BA-27 4K1-4"-B1 Salt fill line Salt source 4C-11
Compressor suc /4-BA-
2 4-BA-4/2 4N2-1.5"-B1 Nitrogen 4N3 250 -320 188 -320 376 75 Amb
16
4-BA-4/2 4PG2-1"-B12 Purge Gas 10PG102 4P87 77 100 58 100 90 60 100
4-BA-4/3 4CW2-1.5"-A2 Cooling Water 4E-12 out 4CW20 85 105 64 74 100 35 88
4-BA-4/4 4LC2-2"-E19 Condensate 4G-5 dis 4E-5/4P18 (2BA22) 725 100 544 100 1065 710 100
4-BA-4/4 4MS2-2"-C23 MP Steam 4MS100 4-BA-19/4F-2 275 470 207 470 373 200 388
4-BA-4/4 4FG2-2"-B12 Fuel Gas 4FG4 4F-2 (4BA19) 80 210 60 210 95 35 100
4LC2-2"-D24/4-
4-BA-19 4BFW2-1.5"-D24 Boiler feed water 4P28/4E-9
BA-22
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
PSV5//4K-4A Dis
4-BA-20 4BD2-2"-B1 Blow Down 4BD1 100
line
4-BA-26 4K2-4"-B1 Salt fill line Salt source 4C-27
3 4-BA-4/2 4N3-2"-B1 Nitrogen 15N3 4N1/2 250 -320 188 -320 376 75 Amb
20ft jacketed
4-BA-4/2 4LS3-1"-B23 Steam 7LS100 66 312 50 298 83 50 298
section/4P74
4-BA-22/23 4LC3-2"-E16 Condensate 4LC2 4E-3/3A/4P15 725 100 544 100 1065 710 100
4-BA-4/3 4CW3-1.5"-A2 Cooling Water 4CW19 4E-10/4-BA-16 85 105 64 74 100 45 74
4-BA-4/3 4BD3-3"-B1 Relief 4C-8 4BD100 100
4-BA-19 4PW3-2"-B19 Sour Water 4PW4/5 7-BA-13 125 40 25 125
4-BA-23 4P3-6"-B1 LGO 4C-2 Bottom 4G-1 Suction 75 290 57 290 95 52 290
4-BA-26 4K3-0.5 Anti foam 50-RA-11 4P174
4 4-BA-4/1 4N4-1"-C13 Nitrogen 15N3 4-BA-20/4K-4C suc 250 -320 188 -320 376 75 Amb
4-BA-4/3 4CW4-1.5"-A2 Cooling Water 4E-10/4-BA-16 4CW20 85 105 64 74 100 35 88
4-BA-4/3 4BD4-6"-B1 Relief 4C-2/4BA-23 4BD100 100
4-BA-4/4 4FG4-4"-B12 Fuel Gas 15FG30 7FG4 80 210 60 210 95 35 100
4-BA-19 4PW4-2"-B19 Sour Water 4C-5X Bottom 4PW3 55 125 42 125 63 25 125
4-BA-23 4P4-4"-E2 LGO 4G-1 Dis 4E-3/3A 1113 290 870 290 1435 870 290
4-BA-26 4K4-0.5 Anti static 50-RA-11 4P174
5 4-BA-4/3 4CW5-1.5"-A2 Cooling Water 4CW19 4E-11 bypass cooler 85 105 64 74 100 45 74
4-BA-4/3 4BD5-2"-B1 Relief 4C-9/4BA20 4BD100 100
4-BA-19 4PW5-1.5"-B19 Sour Water 4C-3 boot 4PW3 125 40 25 125
Untreted
4-BA-23 4P5-4"-E2 4E-3/3A 4E-1A 1111 400 856 400 1490 856 400
LGO/Kero/LCGO
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
4E-11 bypass
6 4-BA-4/3 4CW6-1.5"-A2 Cooling Water 4CW20 85 105 64 74 100 35 88
cooler
4-BA-4/3 4BD6-2"-B1 Relief 4-BA-21/PSV4 4BD100 100
4-BA-4/3 4LS6-1.5"-B23 LP Steam Dry Line near 4C-4 66 312 50 298 83 50 298
4-BA-4/4 4MS6-2"-C23 MP Steam 7MS1 4H-1 (4BA22) 275 470 207 470 373 200 388
4-BA-4/4 4UA6-2"-A1 100# air for decoke 4UA109 Near 4F-1(4BA25) 140 100 125 90 190 125 90
4-BA-4/4 4FG6-1"-B12 Pilot Gas 4FG8 4F-1(4BA25) 80 210 60 210 95 35 100
4-BA-24 4P6-4"-E8 LGO/Kero 4E-1' 4P7/8/4F-1 1097 615 825 615 1600 825 615
7 4-BA-4/3 4BD7-6"-B1 Relief 4BA-22/4C-3 4BD100 100
4-BA-4/3 4UA7-1"-A1 Utility air 4UA100 Near 4C-4 140 100 125 90 190 125 90
4-BA-4/4 4FG7-1"-B12 Fuel Gas 4FG8 4F-2 (4BA19) 80 210 60 210 95 35 100
4-BA-4/4 4LS7-1.5"-B23 LP Steam 4LS100 4P85/Near 4C-1 66 312 50 298 83 50 298
4-BA-22 4MS7-4"-B23 MP Steam 4H-1 (4BA22) Atmos 275 470 207 470 373 200 388
4-BA-25 4P7-3"-E8 LGO/Kero 4P6 4P9 1097 615 825 615 1600 825 615
8 4-BA-4/3 4UA8-1"-A1 Utility air 35UA29 Near 4C-7 140 100 125 90 190 125 90
4-BA-4/3/19 4BD8-6"-B1 Relief from PSV11 4-BA-19/4C-4 4BD12 100
4-BA-4/4 4LS8-1"-B23 LP Steam 4LS100 4G-6/A/4BA19 66 312 50 298 83 50 298
4-BA-4/4 4FG8-1.5"-B12 Fuel Gas 4FG9 Header 80 210 60 210 95 35 100
4-BA-25 4P8-3"-E8 LGO/Kero 4P6 4P10 1097 615 825 615 1600 825 615
4-BA-26 4PW8-1.5"-B19 Coalesed water 4C-26 Drain 125 40 25 125
9 4-BA-4/2 4CW9-1"-A2 Cooling water 32CW29 4K-4A 85 105 64 74 100 45 74
4-BA-4/4 4LS9-1"-B23 LP Steam 4LS8 4G-6/6A/4-BA-19 66 312 50 298 83 50 298
4-BA-4/4 4FG9-2"-B12 Fuel Gas 7NG100/15FG30 4FG8 80 210 60 210 95 35 100
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
4-BA-4/4 4UA9-1.5"-A1 Utility Air 4UA109 Near 4C-1(4BA24) 140 100 125 90 190 125 90
4-BA-25 4P9-4"-E16 LGO/Kero 4P7 4F-1 800 580 760 580 1435 760 580
4-BA-27 4BD9-3"-B1 Relief PSV19/4C-10 4BD10 100
4-BA-26 4PW9-2"-B19 Process water 4C-27 Drain 125 40 25 125
10 4-BA-4/2 4CW10-1"-A2 Cooling water 4K-4A 32CW38 85 105 64 74 100 35 88
4-BA-4/3 4LS10-8"-B23 LP Steam 4GT-1A(4BA23) 7LS100 66 312 50 298 83 50 298
4-BA-4/4 4MS10-6"-C23 Regen & Decoke 7MS1 Near 4F-1(4BA25) 275 470 207 470 373 200 388
4-BA-25 4P10-4"-E16 LGO/Kero 4P8 4F-1 800 580 760 580 1435 760 580
4-BA-27 4BD10-4"-B1 Relief PSV20 4BD11 100
11 4-BA-4/2 4CW11-1"-A2 Cooling water 32CW29 4K-3A 85 105 64 74 100 45 74
4-BA-4/4 4MS11-1.5"-C23 MP Steam 7MS1 4P4/4E-3 (4BA23) 275 470 207 470 373 200 388
4-BA-24/25 4P11-8"-E18 Reactor Feed 4F-1 4C-1 796 745 725 745 1385 725 745
4-BA-27 4BD11-6"-B1 Relief 4BD10/9 Blow down drum 100
12 4-BA-4/2 4CW12-1"-A2 Cooling water 4K-3A 32CW38 85 105 64 74 100 35 88
4-BA-4/3 4BD12-1.5"-B1 Blow Down Header 4BD101 7BD9 100
4-BA-4/4 4MS12-1.5"-C23 MP Steam 7MS1 4E-6C/4P21 275 470 207 470 373 200 388

Crank sump
4-BA-20 7LC12-1"-B23 Condensate 7LC4/21LC32/50-BA-12
heater near 4K-4C

13 4-BA-4/3 4CW13-1"-A2 Cooling water 4CW100 4GT-1A(4BA23) 85 105 64 74 100 45 74


4-BA-24 4P13-8"-E18 Treated LGO 4C-1 4E-1' 720 755 680 755 1300 680 755
14 4-BA-4/3 4CW14-1"-A2 Cooling water 4GT-1A(4BA23) 4CW102 85 105 64 74 100 35 88
4-BA-24 4P14-8"-E18 Treated LGO 4E-1A 4E-2' 700 655 660 655 1250 660 655
15 4-BA-4/2 4CW15-1"-A2 Cooling water 32CW29 4K-4B 85 105 64 74 100 45 74
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
Treated LGO/Reactor
4-BA-23/24 4P15-8"-E16 4E-2/4BA24 4E-3/3A 685 610 643 610 1210 643 610
Effluent
16 4-BA-4/2 4CW16-1"-A2 Cooling water 4K-4B 32CW38 85 105 64 74 100 35 88
17 4-BA-4/2 4CW17-1"-A2 Cooling water 32CW29 4K-3B 85 105 64 74 100 45 74
4-BA-22 4P17-8"-E13 Treated LGO+ Gases 4E-4' 4P18 655 320 623 320 1030 623 395
18 4-BA-4/2 4CW18-1"-A2 Cooling water 4K-3B 32CW38 85 105 64 74 100 35 88
4-BA-22 4P18-8"-E13 Treated LGO+ Gases 4P17 4E-5' 655 320 623 320 1030 623 320
19 4-BA-4/3 4CW19-3"-A2 Cooling water 32CW29 4CW1/3/5/105 85 105 64 74 100 45 74
4-BA-22 4P19-8"-C13 Treated LGO+ Gases 4E-5' 4C-3 655 125 611 125 920 611 125
20 4-BA-4/3 4CW20-3"-A2 Cooling water 4CW2/4/6/106 32CW38 85 105 64 74 100 35 88
21 4-BA-19 4P21-6"-C1 Treated LGO 4-BA-22/4E-4 4E-6C 150 330 114 330 172 98 330
22 4-BA-19 4P22-6"-C1 Treated LGO 4E-6A 4F-2 445 120 78 445
4-BA-27 1LS22-1.5"-B23 50# Steam 1-RA-3 4C-10 66 312 50 298 83 50 298
23 4-BA-19 4P23-6"-B2 Treated LGO 4C-4 4G-6/6A 55 560 41 560 77 39 538
4-BA-27 1LS23-1.5"-B23 50# Steam 1-RA-3 4C-11 66 312 50 298 83 50 298
24 4-BA-19 4P24-3"-C1 Treated LGO 4G-6/6A 4E-6A 185 560 177 560 332 177 538
25 4-BA-21 9P25-3"-C36 Lean Amine 7-BA-13 4C-7
26 4-BA-19 4P26-8"-C6 Treated LGO 4F-2 4C-4 560 75 50 560
28 4-BA-19 4P28-4"-B1 Stripped LGO LCV6X 4E-9' 150 410 113 410 196 105 410
29 4-BA-19 4P29-8"-B13 Naphtha vapors 4C-4 Top 4E-7 Condenser 55 560 55 560 104 30 242
30 4-BA-19 4P30-6"-B13 Naphtha vapors 4E-7 Condenser 4C-5X 55 560 55 560 104 26 125
31 4-BA-16 4P31-4"-B13 H2+HC 4C-5 4C-6 55 560 55 560 104 100 25
32 4-BA-16 4P32-4"-B13 H2+HC 4C-6 4P163 125 40 24 125
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
33 4-BA-16 4P33-3"-B13 H2+HC 4E-10 intercooler 4P31 160 260 123 260 200 100 210

35 4-BA-21 4P35-4"-C13 H2S Rich Gas 4C-3 4P36/4P76/4P123/4C7 655 125 615 125 970 615 125

36 4-BA-21 4P36-4"-C13 H2S Rich Gas 4P35 4C-7 647 125 615 125 970 615 125
38 4-BA-21 4P38-3"-C36 Rich Amine 4C-7 7-BA-13 647 152 600 152 900 600 152

Stuffing box/oil
cooler of
39 4-BA-20 32CW39-1"-A2 Cooling water Return 32CW38
compressors/4K-
4c
4P40/150/140/129/7-
4-BA-21 4P39-4"-C13 H2S free gasHC 4C-7 Top 647 110 600 110 900 600 110
BA-13
40 4-BA-20 4P40-4"-C13 HC Gas 4-BA-21/4P39 4C-9/6P42 647 110 600 110 900 597 110
Stuffing box/oil cooler
4-BA-20 32CW40-1"-A2 Cooling water Supply 32CW29
of compressors
42 4-BA-20 6P42-4"-E13 H2+HC 7-BA-13 4P43
43 4-BA-20 4P43-4"-C13 H2+Naphtha+HC+H2S 6P42 4C-9 581 232 581 232 920 581 102
45 4-BA-20 4P45-4"-E13 H2+HC 4P118 4E-2/4BA-24/4P226 880 232 775 232 1240 775 130
46 4-BA-20 4P46-3"-C13 H2+HC 4P45 4E-12' 880 232 775 232 1240 775 130
47 4-BA-20 4P47-3"-C13 H2+HC 4E-12 out 4P43 820 100 820 100 1230 572 100
48 4-BA-24 4P48-6"-E13 H2+Light HC+H2S 4E-2' 4F-1 800 495 800 495 1470 770 495
53 4-BA-19 4P53-3"-B1 LGO Reflux 4C-5X 4G-2/2A 125 42 28 125
55 4-BA-19 4P55-2"-B1 Reflux 4G-2 4C-4 125 135 90 125
56 4-BA-19 4P56-2"-B1 Naphtha 4P55/54 LIC7VX/4P59 98 125 98 125 150 93 125
57 4-BA-16 4P57-2"-B1 Condensate HC 4C-6 bottom 4G-4X 125 40 25 125
58 4-BA-16 4P58-1.5"-B1 Condensate HC 4G-4X 4P59/4-BA-19 83 125 81 125 125 81 125
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
To crude col plt.1/7BA-
59 4-BA-17 4P59-2"-B1 Naphtha 4-BA-19/LIC7VX 83 125 81 125 125 81 125
13
60 4-BA-17 4P60-1"-B1 Condensate HC 4C-8 bottom 4P59/crude col plt1 130 140 93 130
64 4-BA-20 4P64-1.5"-B13 Condensate 4C-9 Bottom 4C-2/4BA-23/1P70 102 75 50 102
65 4-BA-17 7P65-3"-B12 From Reformer Depent. 7RA-2 4P72
66 4-BA-27 5P66-1.5"-B1 Jet additive 1G-37/38 1-BA-17
67 4-BA-27 5P67-1.5"-B1 Jet additive 1-BA-17 5P68/1D-5
68 4-BA-27 5P68-1.5"-B1 Jet additive MHB-7402 1D-5
69 4-BA-20 4P69-4"-C1 LGO 4C-3 Bottom 4E-4 inlet 655 123 615 123 922 615 123
70 4-BA-19 4P70-4"-B1 Stripped LGO 4E-9' 4P223 150 125 113 125 169 91 125
4-BA-23 1P70-4"-B1 LGO/Kero Plant 1/1P146 4C-2
71 4-BA-16 4P71-3"-B13 H2+HC 4P33 4C-8/7P65 130 210 100 210 157 95 210
72 4-BA-17 4P72-4"-B13 Gas from reformer 7P65/4P71 4C-8 130 130 100 130 157 90 130
73 4-BA-17 4P73-4"-B13 H2+HC 4C-8 4P74 130 130 100 130 157 90 125
74 4-BA-17 4P74-4"-B13 H2+HC 4P73 Deethaniser/7BA-13 250 198 190 198 300 175 136
76 4-BA-20 4P76-4"-C13 H2S Rich Gas 4-BA-21/4P35 6P42/4P43 655 125 615 125 970 615 125
78 4-BA-4/3 4P78-6"-B12 Fuel Gas 4C-7/4P39 15FG118/4BA21 647 110 600 110 900 600 110

80 4-BA-27 4P80-2"-B1 LGO 4C-11 1P120/Pumpout 1RA-4 160 125 120 125 210

81 4-BA-27 4P81-4"-B1 LGO 4C-10 4C-11 150 125 113 125 175 81 125
82 4-BA-27 4P82-4"-B1 LGO 4C-11 Tk 100/24-RA-2 150 125 113 125 175 70 125
83 4-BA-4/3/19 4P83-4"-B1 Off gas to Relief 4P31/4C-5 4BD100 125 100 25 125
84 4-BA-24 4P84-8"-B6 Regen/Decoke gases 4P13 4F-1 Stack 650 40 25 650
85 4-BA-24 4P85-8"-B6 4P11 4P84 650 40 25 650
87 4-BA-4/3 4P87-1.5"-B1 Relief 4-BA-23/4C-2 4BD100 75 290 60 290 100 50 290
88 4-BA-4/3 4P88-4"-B12 Fuel Gas 4C-8 15FG118 130 130 100 130 160 90 125
4E-11 bypass
89 4-BA-17 4P89-3"-B13 H2+HC 4P71 250 198 190 198 300 175 103
cooler
92 4-BA-23 4P92-2"-B1 LGO 4G-1 Dis 1P70/4C-2
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
93 4-BA-27 4P93-4"-B1 LGO 4P81 4P82
94 4-BA-27 4P94-4"-B1 LGO 4P 4P81
95 4-BA-20 4P95-4"-E13 6P42 4P226
100 4-BA-4/1 4BD100-12"-B1 Relief Relief System track Header 100
4-BA-4/1 4MS100-3"-C23 Snuffing steam 7MS1 4-BA-4/4 275 470 207 470 373 200 388
4-BA-4/3 4HS100-4"-D24 HP Steam 31HS24 4-BA-4/4 690 700 600 700 1305 600 700
4-BA-4/3 4LS100-4"-B23 LP Steam 7LS100 4-BA-4/4 66 312 50 298 83 50 298
4-BA-4/3 4UA100-3"-A1 Utility Air 35UA29 4-BA-4/4 140 100 125 90 190 125 90
4-BA-4/3 4CW100-3"-A2 Cooling Water 32CW29 7CW7 85 105 64 74 100 45 74
4-BA-25 4P100-3"-E8 LGO/Kero 4P6 4P103/105
utility station near
101 4-BA-4/2 4UW101-1.5-A1 Utility Water 32UW17 87 70 65 70 100 55 60
comp.
utility station near
4-BA-4/2 4UA101-1.5-A1 Utility Air 35UA29 140 100 125 90 190 125 90
comp.
utility station near
4-BA-4/2 4LS101-1.5-B23 Steam 7LS100 66 312 50 298 83 50 298
comp.4K-4C
4-BA-4/3 4HS101-3"-D24 HP Steam 4HS100 4GT-1A(4BA23) 690 700 600 700 1305 600 700
4-BA-4/3 4BD101-8"-B1 Relief Header 4BD100 4BD12 100
PSV25/4K-4C dis
4-BA-20 4BD101-2"-B1 Relief 4BD1 100
line
4-BA-4/3 4LC101-2"-B23 Condensate 7LC4 4LC1/2 70 100 53 100 80 60 100
4-BA-25 4P101-3"-E8 LGO/Kero 4P6 4P102/104
utility station near 7G-
102 4-BA-4/2 4UW102-1.5-A1 Utility Water 32UW17 87 70 65 70 100 55 60
1A
utility station near 7G-
4-BA-4/2 4UA102-1.5-A1 Utility Air 35UA29 140 100 125 90 190 125 90
1A
utility station near 7G-
4-BA-4/2 4LS102-1.5-B23 Steam 7LS100 66 312 50 298 83 50 298
1A
4-BA-4/3 4CW102-3"-A2 Cooling Water 32CW38 7CW6 85 105 64 74 100 45 74
4-BA-25 4P102-3"-E13 Recycle H2 4P48 4P104
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
4-BA-27 4BD102-2"-B1 Relief 4C-13 PSV26/4BD10 100

103 4-BA-4/3 4UW103-1.5-A1 Utility Water 32UW17 utility station near 4C-7 87 70 65 70 100 55 60

4-BA-4/3 4UA103-1.5-A1 Utility Air 35UA29 utility station near 4C-7 140 100 125 90 190 125 90

4-BA-4/3 4LS103-1.5-B23 Steam 7LS100 utility station near 4C-7 66 312 50 298 83 50 298

4-BA-4/3 4CW103-1"-A2 Cooling Water 4CW100 4G-1(4BA23) 85 105 64 74 100 45 74


4-BA-25 4P103-3"-E13 Recycle H2 4P48 4P105
utility station near
104 4-BA-4/3 4UW104-1.5-A1 Utility Water 32UW17 87 70 65 70 100 55 60
exchangers
utility station near
4-BA-4/3 4UA104-1.5-A1 Utility Air 35UA29 140 100 125 90 190 125 90
exchangers
utility station near
4-BA-4/3 4LS104-1.5-B23 Steam 4LS100 66 312 50 298 83 50 298
exchangers
4-BA-4/3 4CW104-1.5"-A2 Cooling Water 4G-1(4BA23) 7CW6 85 105 64 74 100 35 88
4-BA-4/3/19 4BD104-8"-B1 Relief PSV27/4P26 4BD100 100
4-BA-25 4P104-4"-E16 LGO+Recycle H2 4P102/101 4F-1
105 4-BA-4/3 4CW105-1.5"-A2 Cooling Water 4CW19 7K-7/7K-111 85 105 64 74 100 45 74

4-BA-4/4 4UW105-1.5"-A1 Utility Water 32UW17 utility station near 4G-6 87 70 65 70 100 55 60

4-BA-4/4 4UA105-1.5"-A1 Utility Air 4UA100 utility station near 4G-6 140 100 125 90 190 125 90

4-BA-4/4 4LS105-1.5"-B23 Steam 4LS100 utility station near 4G-6 66 312 50 298 83 50 298

4-BA-4/4 4BD105-1.5"-B1 Blow Down/Drain 4C-12X/7BD102 7BD9/4BD12 100


4-BA-25 4P105-4"-E16 LGO+Recycle H2 4P103/100 4F-1
106 4-BA-4/3 4CW106-1.5"-A2 Cooling Water 7K-7/7K-111 4CW20 85 105 64 74 100 35 88
utility station near col
4-BA-4/3 4UW106-1.5-A1 Utility Water 32UW17 87 70 65 70 100 55 60
406
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
utility station near col
4-BA-4/3 4UA106-1.5-A1 Utility Air 35UA29 140 100 125 90 190 125 90
406
utility station near col
4-BA-4/3 4LS106-1.5-B23 Steam 7LS100 66 312 50 298 83 50 298
406
4-BA-4/3 4BD106-2"-B1 Relief 4C-14A/PSV28 4BD100 100
107 4-BA-18 4BD107-2"-B1 Relief 4C-14B/PSV29 4BD106 100

108 4-BA-4/4 4UW108-1.5"-A1 Utility Water 32UW17/4UW109 utility station near 4C-1 87 70 65 70 100 55 60

4-BA-4/4 4UA108-1.5"-A1 Utility Air 4UA100/4UA109 utility station near 4C-1 140 100 125 90 190 125 90

4-BA-4/4 4LS108-1.5"-B23 Steam 4LS100 utility station near 4C-1 66 312 50 298 83 50 298

4-BA-18 4BD108-2"-B1 Relief 4C-15/PSV30 4BD106 100


4-BA-22 4P108-4"-B24 To Evacuator Ejector 4P35 4H-1
109 4-BA-4/4 4UW109-1.5"-A1 Utility Water 32UW17 Header 87 70 65 70 100 55 60
4-BA-4/4 4UA109-2"-A1 Utility Air 4UA100 Header 140 100 125 90 190 125 90
4-BA-18 4BD109-1.5"-C13 Off gas vent 4C-14A Top 4BD106 100
Disch from 4PSV22 (ex
4-BA-19 4P109-4"-B13 4-BA-22/4P69 4P30/4C-5X
4E-4)
110 4-BA-16 4P110-3"-B13 H2+HC 4P162 4E-10 intercooler
4-BA-18 4BD110-1.5"-C13 Off gas vent 4C-14B Top 4BD107 100
4-BA-23 4LS110-6"-B23 LP Steam PSV24 Atmos 66 312 50 298 83 50 298
4-BA-25 4MS110-6"-C23 200# Steam 4MS10 7F-4 275 470 207 470 373 200 388
111 4-BA-4/3 4LS111-0.5-B23 Steam 4LS103 To plant 4 test shelter 66 312 50 298 83 50 298
4-BA-16 4BD111-0.5"-B1 Pump vent & seal line 4G-4X vent line 4-BA-21/4BD6 100
4-BA-17 4P111-3"-B13 H2+HC Bypass 4P74 4E-11 bypass cooler
112 4-BA-4/4 4LS112-1"-B23 Snuffing steam rings 4LS8 4-BA-24(4E-1) 66 312 50 298 83 50 298
4-BA-19 4P112-4"-C1 Relief PSV23/4P24 4P23
4-BA-26 4BD112-2"-B1 Relief PSV32 1BD402 100
113 4-BA-23 4P113-6"-B1 LGO 4P3 4G-1A
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
4-BA-27 4LS113-1.5"-B23 50# Steam 1-RA-3 4C-13 66 312 50 298 83 50 298
4-BA-26 4BD113-2"-B1 Relief PSV33 1BD402 100
114 4-BA-23 4P114-4"-E2 LGO 4G-1A Dis 4P4
4-BA-26 4BD114-2"-B1 Relief PSV34 1BD402 100
115 4-BA-23 4P115-2"-B1 LGO 4G-1A Dis 4P92
4-BA-26 4BD115-6"-B1 Relief PSV35 1BD402 100
117 4-BA-20 4P117-3"-C13 H2+HC 4P227 4K-4C/4B/4A
118 4-BA-20 4P118-4"-E13 H2+HC 4K-4C 4P45
121 4-BA-20 4P121-1"-E13 4P76 4P40
123 4-BA-20 4P123-4"-C13 Gases+H2S 4-BA-21/4P35 4P40
125 4-BA-17 4P125-4"-B1 Off gases/H2+HC 4P31/4C-5 4P88
126 4-BA-4/3/16 4P126-4"-B13 Relief 4P31/4C-6 4BD100
127 4-BA-16 4P127-3"-B13 H2+HC 4P33 7-BA-13
128 4-BA-19 4P128-4"-B1 LGO/Kero 4-BA-23 /1P70 4C-4
129 4-BA-17/19 4P129-2"-C13 HC Gases 4C-7/4P39 4C-4/7P65
131 4-BA-19 4P131-4"-B1 4E6/4E9 bypass line 4P24 4P70
132 4-BA-20 4P132-1"-C13 HC Gases 4-BA21/4P39 4P43/4BA-20
133 4-BA-19 4P133-4"-C1 LGO 4E-6B 4E-6C
134 4-BA-23 4P134-8"-E16 4E-3A/3 4E-4 4BA22
135 4-BA-16/21 4P135-3"-B12 H2+HC 4P127 4P78
137 4-BA-27 4P137-4"-B1 LGO 4C-11
138 4-BA-27 4P138-4"-B1 Treated LGO 4P70 4C-13
139 4-BA-27 4P139-4"-B1 Treated LGO 4C-13 4C-10
140 4-BA-18 4P140-4"-C13 HC Gases 4C-14A Top 4-BA-21/4P39
141 4-BA-18 4P141-4"-C13 Off Gases 4C-14B Top 4P140
142 4-BA-18 4P142-0.5"-C13 Vent Gases 4C-15 Top 4P140
143 4-BA-18 4P143-1"-C36 Auto drain 4C-14A Mid
144 4-BA-18 4P144-1"-C36 Auto drain 4C-14B Mid
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
145 4-BA-18 4P145-1"-C36 4C-14A Mid 4P149
146 4-BA-18 4P146-1"-C36 4C-14B Mid 4P149
147 4-BA-18 4P147-1"-C36 Bypass line of auto drain 4P145 4P145
148 4-BA-18 4P148-1"-C36 Bypass line of auto drain 4P146 4P146
149 4-BA-18 4P149-1.5"-C36 4P145/46/54/55 4C-15
150 4-BA-18/21 4P150-4"-C13 HC Gases 4-BA-21/4P39 4C-14A
151 4-BA-18 4P151-4"-C13 4P150 4C-14B
152 4-BA-18 4P152-1"-C36 Auto drain 4C-14A
153 4-BA-18 4P153-1"-C36 Auto drain 4C-14B
154 4-BA-18 4P154-1"-C36 4C-14A Bottom 4P149
155 4-BA-18 4P155-1"-C36 4C-14B Bottom 4P149
156 4-BA-18 4P156-1"-C36 Bypass line of auto drain 4P154 4P154
157 4-BA-18 4P157-1"-C36 Bypass line of auto drain 4P155 4P155
158 4-BA-18 4P158-1.5"-C36 Amine sump pump 4C-15 Bottom 4G-7
159 4-BA-18 4P159-1.5"-C36 Rich Amine 4G-7 4-BA-21/4P38
162 4-BA-16 4P162-3"-B13 H2+HC 4K-3A/B 4P110
163 4-BA-16 4P163-3"-B13 H2+HC 4P32 4K-3A/B
164 4-BA-17 4P164-3"-B13 H2+HC 4P73/74 Suction of 7K-7
165 4-BA-17 4P165-3"-B13 H2+HC Discharge 7K-7 4P74
166 4-BA-26 4P166-4"-B1 LGO 21P2302 4P167/168
167 4-BA-26 4P167-4"-B1 LGO 4P166 4C-24
168 4-BA-26 4P168-4"-B1 LGO 4P166 4C-25
169 4-BA-26 4P169-4"-B1 LGO 4P171 4P167
170 4-BA-26 4P170-4"-B1 LGO 4P171 4P168
171 4-BA-26 4P171-4"-B1 LGO 4-C24/25 4C-26
172 4-BA-26 4P172-4"-B1 LGO 4P171 4P173
173 4-BA-26 4P173-4"-B1 LGO 4C-26 4C-27
174 4-BA-27 1P174-4"-B1 LGO 4P82 MHB-7402
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 4: DISTILLATE HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/09/2009
Rev: 00 NA: not available
Date: 05/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
4-BA-26 4P174-4"-B1 LGO 4C-27 21P2302
175 4-BA-27 1P175-4"-B1 LGO 4P82/1P174 1-RA-3
4-BA-26 4P175-2"-B1 LGO 4P167 PSV32
176 4-BA-26 4P176-2"-B1 LGO 4P168 PSV33
177 4-BA-26 4P177-2"-B1 LGO 4P171 PSV34
178 4-BA-26 4P178-4"-B1 LGO 4C-27 vent
179 4-BA-26 4P179-4"-B1 LGO 4P172 4P174
180 4-BA-26 4P180-4"-B1 LGO 4P174 4P82
4P60 Bottom of
181 4-BA-17 4P181-1"-B1 Condensate HC 4P261
4C-8
182 4-BA-17 4P182-2"-B13 H2+HC 4P164 4P165
203 4-BA-23 21P2031-4"-B1 7-BA-13 4P128
223 4-BA-19 4P223-6"-B1 Treated LGO 4P70 Plant 1/4p138
226 4-BA-20 4P226-6"-E13 H2+HC 4P45 4P45/4E-2
227 4-BA-20 4P227-6"-C13 H2+HC 4C-9 Top 4P117
254 4-BA-16 4P254-3"-B13 H2+HC 4P127 Free End
261 4-BA-17 4P261-2"-B1 Condensate HC 4-BA19 7BA-13
319 4-BA-21 5P319-2"-C13 Purge Gas 7-BA-13 4P36
410 4-BA-19 4P410-3"-C1 LGO 4P28 4P21
421 4-BA-19 4P421-4"-C1 LGO 4E-6C LCV6X
424 4-BA-19 4P424-4"-B1 LGO PSV23 4P23
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 6: NAPHTHA HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/05/2009
Rev: 00 NA: not available
Date: 17/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
1 6-RA-2 Sheet 3 6PG1-2'-B12 Sweet fuel gas blanket 10PG101 6PG2-1*1/2"-B12 90 60/25 100
6-RA-2 Sheet 3 6BD1-6"-B1 Relief PSV1/6C-3 To Relief header 350 144 80 350
6-RA-2 Sheet 3 6PW1-2"-B19 Process water 6C-3A (Bottom) 8PW1 50 308 38 308 63 10 100
6-RA-2 Sheet 3 6UA1-3"-A1 Utility air for cat regen. 35UA30 6P8-10" 150 90 120 90 180 120 90
6-RA-4 Sheet 2 of
6IA1-1"-A1 Instrument Air 35IA10-2"-A1 Near 6C-3/6K-1 160 70 100
3
6-RA-2 Sheet 3 6FG1-3"-B12 Fuel Gas 6FG106 6F-1 Burners 80 100 60 100 90 35/25 100

6-RA-2 Sheet 2 6N1-1*1/2"-B1 Nitrogen 15N1 6N2/6N3/6K-1A 250 -320 188 -320 376 at100°F 75 Amb

6-RA-2 Sheet 2 6H1-2"-C13 Hydrogen H2 plant 6H2 610 233 545 320 840 545 120
6-RA-2 Sheet 2 6CW1-2"-A2 Cooling wate supply 6CW5 6E-3 c 85 105 65 105 100 40 74
6-RA-2 Sheet 3 6HS1-6"-D24 600 # Steamn 31HS25 6GT-1AY 690 700 600 700 1250 600 700
6-RA-2 Sheet 3 6MS1-2"-C23 200# snuffing steam 31MS24 6F-1 275 470 207 470 373 200 388
6-RA-4 Sheet 1 of
6LS1-1*1/2"-B23 50# steam 31LS27-14"-B23 Service point 66 312 50 298 83 50 298
3
6-RA-4 Sheet 1 of
6LC1-2"-B23 Low Temp Condensate 9LC4 50 298 100 50 150
3
2 6-RA-2 Sheet 2 6LC2-2"-C23 Condensate 31BFW106 6BFW303/304 212 1095 730 150
6-RA-2 Sheet 3 6PG2-1/1/2"-B12 Sweet fuel gas blanket 6PG1-2"-B12 6C-3 90 60/25 100
6-RA-2 Sheet 3 6UA2-2"-C23 Utility Air 6-RA-4 2MS4/5/6/7 150 90 120 90 180 120 90
6-RA-2 Sheet 2 6PW2-2"-B19 Sour Water 6C-2 (Bottom) 8PW1/15PW1 50 308 38 308 63 12 100
6-RA-2 Sheet 2 6CW2-2"-A2 Cooling water return 6E-3 out 6CW6 85 105 65 105 100 35 100

6-RA-2 Sheet 2 6N2-1"-E13 Nitrogen 6N1 6K-1A Suc/6P56 250 -320 188 -320 376 at100°F 75 Amb

6-RA-2 Sheet 2 6BD2-6"-B1 Relief PSV4 To Relief header 310 1197 665 310/145

6-RA-2 Sheet 2 6LS2-1"-B23 50# steam 31LS27 6P330 (16" jacket ) 66 312 50 298 83 50 298
6-RA-2 Sheet 2 6H2-1*1/2"-C13 Hydrogen 6H1 Near 6K-1 610 233 545 320 840 545 120
6NG100-1*1/2"-
6-RA-2 Sheet 3 6FG2-1*1/2"-B12 Natural Gas 6F-1 Pilots 80 100 60 100 90 35/25 100
B12
3 6-RA-2 Sheet 3 6MS3-6"-C23 20# Steam 31MS15 Header 275 470 207 470 373 200 388

LINE LIST Page 137


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 6: NAPHTHA HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/05/2009
Rev: 00 NA: not available
Date: 17/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
6-RA-2 Sheet 2 6N3-1"-E13 Nitrogen 6N1 6K-1B Suc/6P57 250 -320 188 -320 376 at100°F 75 Amb
6-RA-4 Sheet 2 of
6LS3-1*1/2"-B23 50# steam 31LS29 Service point 66 312 50 298 83 50 298
3
6-RA-2 Sheet 2 6BD3-6"-B1 Vent PSV5/6C-4X 6BD100 435 504 280 100/435

4 6-RA-2 Sheet 2 6LS4-8"-B23 50# Steam 6GT-1AY 31LS29 66 312 50 298 83 50 298
6-RA-2 Sheet 3 6MS4-6"-C23 200# Steam 6MS3-6"-C23 Near Furnace Coil 275 470 207 470 373 200 388
6-RA-2 Sheet 2 6BD4-4"-B1 relief PSV7 To Relief header 268 536 268 880

6-RA-2 Sheet 2 6N4-1"-E13 Nitrogen 6N1 6K-1B Dis 250 -320 188 -320 376 at100°F 75 Amb
6-RA-4 Sheet 1 of
6UA4-1*1/2"-A1 Utility air 6UA1-3"-A1 Service point 140 100 125 90 190 125 90
3
6-RA-4 Sheet 1 of
6UW4-1*1/2"-A1 Utility Water 32UW18 Service point 100 70 75 70 113 55 60
3
5 6-RA-2 Sheet 3 6CW5-2"-A2 Cooling Water supply 32CW34 6G-1/6G-1A/6GT-1A 85 105 65 105 100 40 89
6-RA-2 Sheet 3 6P5-6"-E2 Naphtha feed 6G-1/1A Dis 6P5/6P61 1015 100 839 100 1260 839 100
6-RA-2 Sheet 1 6LS5-1*1/2"-B23 50 # steam 31LS29 6K-1B 66 312 50 298 83 50 298
6-RA-4 Sheet 2 of
6UW5-1*1/2"-A1 Utility Water 32UW18 Service point 100 70 75 70 113 55 60
3
6C-4X Knockout
6-RA-2 Sheet 2 6H5-4"-C13 Hydrogen 6C-5 (Top) 330 100 280 100 420 280 100
drum/6P41
6-RA-2 Sheet 3 6MS5-6"-C23 200# Steam 6MS3-6"-C23 Near Furnace Coil 275 470 207 470 373 200 388
6-RA-4 Sheet 2 of
6BD5-1*1/2"-A1 Blow down 6FG107 6BD100 Intermittent
3
6-RA-2 Sheet 3 6P5-4"-E13 Naphtha Feed 6P5-6"-E2 6E-1(F) 1015 100 839 100 1260 839 100
6G-1/6G-1A/6GT-
6 6-RA-2 Sheet 3 6CW6-2"-A2 Cooling water return 32CW33 85 105 65 105 100 34 100
1A
6-RA-2 Sheet 2 7H6-6"-C13 H2 rich gas Platforming unit 7H11-6"-C13 335 240 300 100 450 300 100
6-RA-2 Sheet 2 6H6-6"-C13 H2 rich gas 6E-3 out 6P41 330 100 280 100 420 280 100
6-RA-2 Sheet 1 6LS6-1*1/2"-B23 50# steam 31LS27 6K-1A 66 312 50 298 83 50 298
6-RA-4 Sheet 2 of
6UA6-1*1/2"-A1 Utility Air 6UA1-3"-A1 Service point 140 100 125 90 190 125 90
3
6-RA-2 Sheet 2 6BD6-4"-B1 Relief PSV6 To Relief header 268 536 268 880

LINE LIST Page 138


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 6: NAPHTHA HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/05/2009
Rev: 00 NA: not available
Date: 17/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
6-RA-2 Sheet 3 6MS6-6"-C23 200# Steam 6MS3-6"-C23 Near Furnace Coil 275 470 207 470 373 200 388
7 6-RA-2 Sheet 3 6P7-10"-E8 Naphtha+Gas 6E-1 (E) 6F-1 Heat coil inlet 1015 623 764 623 1500 744 623
6-RA-2 Sheet 1 6CW7-2"-A2 Cooling Water supply 6CW5 6K-1B 85 105 65 105 100 40 74
6-RA-4 Sheet 2 of Service point/Near 6C-
6UW7-1*1/2"-A1 Utility Water 32UW18 100 70 75 70 113 55 60
3 2
6-RA-4 Sheet 2 of Service point/Near 6C-
6UA7-1*1/2"-A1 utility Air 6UA1-3"-A1 140 100 125 90 190 125 90
3 2
6-RA-2 Sheet 2 6H7-4"-E13 Hydrogen Isom unit 6P17 880 162 789 230 1260 789 232
6-RA-2 Sheet 3 6MS7-6"-C23 200# Steam 6MS3-6"-C23 Near Furnace Coil 275 470 207 470 373 200 388
Reactor charge from
8 6-RA-2 Sheet 3 6P8-10"-E18 6F-1 6C-1 765 150 709 745 1352 709 745
heater 6F-1
6-RA-2 Sheet 1 6CW8-2"-A2 Cooling water return 6K-1B 6CW6 85 105 65 105 100 33 83
6-RA-4 Sheet 2 of Service point/Near 6G-
6UW8-1*1/2"-A1 Utility Water 32UW18 100 70 75 70 113 55 60
3 30
6-RA-4 Sheet 2 of Service point/Near 6G-
6UA8-1*1/2"-A1 Utility Air 6UA1-3"-A1 140 100 125 90 190 125 90
3 30
6-RA-4 Sheet 2 of Service point/Near 6C-
6LS8-1*1/2"-B23 50# steam 31LS29 66 312 50 298 83 50 298
3 2
6-RA-2 Sheet 2 6MS8-1*1/2"-C23 200# Steam 31MS19 6H-1 275 470 207 470 373 200 388
9 6-RA-2 Sheet 3 6P9-10"-E18 Reactor outlet 6C-1 6P309-10"-E18/6E-30 731 150 675 750 1290 675 750
6-RA-4 Sheet 2 of Service point/Near 6G-
6LS9-1*1/2"-B23 50# steam 31LS29 66 312 50 298 83 50 298
3 30
6-RA-2 Sheet 1 6CW9-2"-A2 Cooling Water supply 6CW5 6K-1A 85 105 65 105 100 40 74
10 6-RA-2 Sheet 3 6MS10-1*1/2"-C23 200# Steam 31MS15 Near Pump 6G-1/1A 275 470 207 470 373 200 388
6-RA-2 Sheet 1 6CW10-2"-A2 Cooling water return 6K-1A 6CW6 85 105 65 105 100 33 83
11 6-RA-2 Sheet 2 6P11-10"-E19 Hydrotreated Naphtha 6E-1 (F) 6P80-10"-E19 691 150 637 275 1038 637 275
6-RA-2 Sheet 2 7H11-6"-C13 H2 rich gas 7H6-6"-C13 6E-3 inlet 335 240 300 100 450 300 100
13 6-RA-2 Sheet 2 6P13-4"-C13 H2 rich gas PIC5 6P40/6P42 Deleted
14 6-RA-2 Sheet 2 6P14-6"-C13 (A) Hydrotreated Naphtha 6C-2 (Bottom) 6C-5 674 150 615 100 923 615 100
6-RA-2 Sheet 2 6P14-6"-C13 (B) Hydrotreated Naphtha 6C-5 (Bottom) Gas Plant 8 674 150 615 100 923 615 100
17 6-RA-2 Sheet 2 6P17-6"-E13 H2/H2rich gas 6K-1A/1B 6P34/6P18 880 162 789 230 1260 789 232
25 6-RA-2 Sheet 2 6P25-8"-C13 H2/H2rich gas 6C-4X (Top) 6P326-8"-C13 330 100 280 100 420 280 100
27 6-RA-2 Sheet3 6P27-1*1/2"-B1 Knock out liquid 6C-4X (Bottom) 1P53/6P32-3"-B1 330 100 280 100 420 Intermittent

LINE LIST Page 139


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 6: NAPHTHA HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/05/2009
Rev: 00 NA: not available
Date: 17/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
Orsat Analysis conn
29 6-RA-2 Sheet 3 6P29-10"-B6 Open end 6F-1 duct Atm 398 Atm 212 24 Atm 212
during regeneration
31LS29-14"-B23
Orsat Analysis conn
30 6-RA-2 Sheet 3 6P30-10"-B6 6P29-10"-B6 Near 6C-1 top Atm 398 Atm 212 24 Atm 212
during regeneration
31 6-RA-2 Sheet 3 6P31-1"-E13 Presulphiding 6G-30 Reactor inlet/6P64 Intermittent

32 6-RA-2 Sheet 3 6P32-3"-B1 Start up recycle to 6C-3 6G-1/1A 1P53-6"-B1 80 150 62 350 106 29 100

34 6-RA-2 Sheet 2 6P34-4"-E13 H2/H2rich gas 6P17 5P22-4"-E13 880 162 780 230 1242 780 232
35 6-RA-2 Sheet 2 6P35-2"-C13 H2/H2rich gas 6P45 6C-4X 330 100 280 110 422 280 110
37 6-RA-2 Sheet 2 6P37-6"-B12 Fuel Gas 6P49 To Fuel Gas 80 210 60 210 100 50 100
38 6-RA-2 Sheet 3 6P38-6"-E8 Naphtha + Gas 6P7-10"-E8 6F-1 inlet 1015 623 763 623 1500 740 623
39 6-RA-2 Sheet 3 6P39-6"-E8 Naphtha + Gas 6P7-10"-E8 6F-1 inlet 1015 623 763 623 1500 740 623
40 6-RA-2 Sheet 2 6P40-4"-C13 Evacuation purpose 6P13 6H-1 Full Vacuum
41 6-RA-2 Sheet 2 6P41-8"-C13 H2/H2rich gas 6H6 6C-4X Knockout drum 330 100 280 100 420 280 100
42 6-RA-2 Sheet 2 6P42-4"-C13 H2 rich gas 6P13 To LGO HTU 670 150 605 100 908 605 100
44 6-RA-2 Sheet 2 6P44-2"-E13 H2/H2rich gas 6P34 6E-3 cooler 880 162 780 232 1245 780 232
45 6-RA-2 Sheet 2 6P45-2"-E13 H2/H2rich gas 6E-3 cooler 6P35 880 162 778 110 1170 778 110
47 6-RA-2 Sheet 3 6P47-6"-E8 Naphtha + Gas 6P7-10"-E8 6F-1 inlet 1015 623 763 623 1500 740 623
48 6-RA-2 Sheet 3 6P48-6"-E8 Naphtha + Gas 6P7-10"-E8 6F-1 inlet 1015 623 763 623 1500 740 623
49 6-RA-2 Sheet 2 6P49-4"-C13 H2 rich gas 6C-2 6P59/6P42/6P37 670 310 615 100 923 615 100
50 6-RA-2 Sheet 2 6P50-10"-E18 Hydrotreated Naphtha 6E-1 (E) 6E-1 (D) 1290 666 635
51 6-RA-2 Sheet 2 6P51-10"-E18 Hydrotreated Naphtha 6E-1 © 6E-1 (B) 1290 455
52 6-RA-2 Sheet 2 6P52-10"-E13 Naphtha + Gas 6E-1 (B) 6E-1© 1178 350
53 6-RA-2 Sheet 2 6P53-10"-E8 Naphtha + Gas 6E-1 (D) 6E-1(E) 1178 748 500
Crude col overhead or
6-RA-2 Sheet 3 1P53-6"-B1 stab. Naphtha from Storage or plant 1 6C-3 200 110 150 110 225 108 110
storage
54 6-RA-2 Sheet 3 6P54-1*1/2"-B1 Drain/Proces water 6C-3 6C-3A(Top) 85.2 100 64 100 96 25 100
55 6-RA-2 Sheet 3 6P55-2"-B1 Drain/Proces water 6C-3 6C-3A 85.2 100 64 100 96 25 100
56 6-RA-2 Sheet 2 6P56-6"-C13 H2/H2rich gas 6P330 6K-1A Suc 330 100 280 100 420 280 100
57 6-RA-2 Sheet 2 6P57-6"-C13 H2/H2rich gas 6P330 6K-1B Suc 330 100 280 100 420 280 100
58 6-RA-2 Sheet 2 6P58-1*1/2"-B1 Relief 6P27 To Relief header 330 100 280 100 420 280 100
59 6-RA-2 Sheet 2 6P59-3"-C13 H2 rich gas 6P49 6P312-3"-C13 670 310 615 100 923 615 100

LINE LIST Page 140


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 6: NAPHTHA HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/05/2009
Rev: 00 NA: not available
Date: 17/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
61 6-RA-2 Sheet 2 6P61-4"-E2 NNF (Naphtha) 6P5-6"-E2 6P80-10"-E19 1015 100 839 100 1260 839 100
62 6-RA-2 Sheet 2 6P62-10"-E13 Naphtha+Gas 6E-1 (G) 6E-1 (A)
63 6-RA-2 Sheet 2 6P63-10"-E13 Hydrotreated Naphtha 6E-1 (A) 6E-1 (G)
64 6-RA-2 Sheet 3 6P64-1"-E13 Presulphiding 6P31-1"-E13 6P90/6P86 Intermittent
80 6-RA-2 Sheet 2 6P80-10"-E19 Hydrotreated Naphtha 6E-1 (F) 6E-2 A/D/E/F
81 6-RA-2 Sheet 2 6P81-10"-C19 Hydrotreated Naphtha 6E-2 A/D/E/F 6C-2
82 6-RA-2 Sheet 2 6P82-3"-E19 6E-2 Bypass 6P36-2"-C13 6P80-10"-E19
83 6-BA-302 6P83-6"-B12 Overhead vapor 6P410 6C-41
84 6-BA-302 6P84-6"-B13 Overhead vapor 6P410 6PSV101
85 6-RA-2 Sheet 3 6P85-10"-B1 Naphtha Feed 6C-3 (Bottom) 6G-1/1A/31
86 6-RA-2 Sheet 3 6P86-8"-B1 Naphtha Feed 6P85-10"-B1 6G-1A Suction
89 6-RA-2 Sheet 3 6P89-8"-B1 Naphtha 6G-31 6G-1 Suction
Naphtha Feed Booster
90 6-RA-2 Sheet 3 6P90-10"-B1 6P85-10"-B1 6G-31
pump
91 6-RA-2 Sheet 2 6P91-3"-C13 H2 rich gas 6FIC32 6H6-6"-C13
92 6-BA-301 6P92-8"-B1 Naphtha 6P402 6P403
100 6-RA-2 Sheet 3 6NG100-1*1/2"-B12 Natural Gas 15-RA-3 6FG2-1*1/2"-B12 80 100 60 100 90 35 100
6-RA-4 Sheet 1 of
6BD100-16"-B1 Plant 6 blow down header 19BD100 Intermittent
3
101 6-RA-2 Sheet 2 6BD101-3"-C13 vent Gas 6P37 6BD100 80 210 60 210 100 50 100
102 6-RA-2 Sheet 2 6BD102-6"-B1 vent Gas PSV12 To Relief header
103 6-BA-302 6BD103-4"-B12 Vapors 6PSV101 6BD402
106 6-RA-2 Sheet 2 31BFW106-2"-D24
6-RA-4 Sheet 2 of
6FG106-3"-B12 Fuel Gas 15FG110 6FG107 80 100 60 100 90 35/25 100
3
6-RA-4 Sheet 2 of
107 6FG107-12"-B12 Fuel Gas 6FG106 6BD5/ 80 100 60 100 90 35/25 100
3
200 6-RA-2 Sheet 3 8P200-2"-B1 Ex C3/C4 Splitter 8C-11 Vent 6PG1-2"-B12
203 6-RA-2 Sheet 3 11P203-4"-B1 Naphtha heartcut Plant 11 6P307-4"-B1
301 6-BA-303 6BFW301-2"-C23 Boiler Feed Water 9BFW1 LIC51
6-BA-303 6MS301-6"-C27 200# Steam 6E-30 steam gen 6FI53 275 470 207 470 373 200 388
6-BA-303 6UW301-1*1/2"-a1 Utility Water 32UW18 6C-30 100 70 75 70 113 55 60
6-BA-303 6K301-1*1/2"-C1 Phosphate supply 9K3 6E-30 centre 250 450 373 200 100
302 6-BA-303 6BFW302-2"-C27 Boiler Feed Water LIC51 6E-30 Bottom

LINE LIST Page 141


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 6: NAPHTHA HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/05/2009
Rev: 00 NA: not available
Date: 17/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
6-BA-303 6MS302-6"-C23 200# Steam 6FI53 31MS16 275 470 207 470 373 200 388
303 6-RA-2 Sheet 3 6P303-6"-B1 Naphtha 6P406-6"-B1 1P53-6"-B1
6-RA-2 Sheet 2 6N303-1"-B1 Nitrogen 6-RA-4/15N1 6BD314 250 -320 188 -320 376 at100°F 75 Amb
6-RA-2 Sheet 2 6BFW303-2"-E13 6LC2 6P63

304 6-RA-2 Sheet 2 6BFW304-1*1/2"-E19 6LC2 6P80/6E-2

6-RA-2 Sheet 2 6N304-1"-B1 Nitrogen 15N1 6P328-8"-C13 250 -320 188 -320 376 at100°F 75 Amb
305 6-BA-303 6BD305-1"-B23 Blow down 6E-30 steam gen 6C-30
306 6-BA-303 6BD306-1*1/2"-B23 Blow down 6C-30 Side Storm drain
307 6-RA-2 Sheet 3 6P307-4"-B1 Naphtha 11P308-4"-B1 6P320-6"-B1
6-BA-303 6BD307-1*1/2"-B23 Blow down 6C-30 6BD306
308 6-BA-303 6BD308-4"-B23 Relief from relief valve 6PSV55/56 Atmosphere

309 6-RA-2 Sheet 3 6P309-10"-E18 Reactor outlet 6P9-10"-E18 6E-30 Steam Generator

6-BA-303 6BD309-1"-B23 Blow down 6E-30 steam gen 6BD305


310 6-RA-2 Sheet 2 6P310-10"-E18 Hdrotreater naphtha 6E-30 steam gen 6E-1 (E)
6-BA-303 6BD310-1"-B23 Sample line 6BD309 Sample point
311 6-BA-303 6P311-10"-E18 Bypass 6P309 6P310
6-BA-303 6BD311-1"-B23 Sample line 6BD305 Sample point
312 6-RA-2 Sheet 2 6P312-3"-C13 H2 rich gas 6P59 6FIC32
6-BA-303 6BD312-2"-C27 To Relief Valve 6E-30 steam gen 6PSV56
Presulphiding feed
313 6-RA-2 Sheet 2 6P313-1"-B1 Presulphiding Pump suc 6G-30 Suc
stock drum
6G-30
314 6-RA-2 Sheet 2 6BD314-1"-B12 Relief Presulphiding 6BD100
pump
316 6-RA-2 Sheet 3 6P316-1"-E18 For Presulphiding 6P31-1"-E13 6P8-10"-E18
End close by spool
318 6-BA-303 6BD318-4"-E18 6P309
piece
End close by spool
319 6-BA-303 6BD319-8"-E18 6P310
piece
320 6-RA-2 Sheet 3 6P320-6"-B1 Full Range Naphtha Tankage 1P53-6"-B1
6-RA-2 Sheet 2 6BD320-1"-C13 Vent gas 6P326 6BD6-4"-B1

LINE LIST Page 142


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 6: NAPHTHA HYDROTREATER Approved by: Rana Zaheer Ahmed
Document No: BOPL/05/2009
Rev: 00 NA: not available
Date: 17/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
325 6-RA-2 Sheet 2 6P325-4"-C13 H2 rich gas 6P49 PIC 5
326 6-RA-2 Sheet 2 6P326-8"-C13 H2/H2rich gas 6P25 6Y-1 (Strainer)
327 6-RA-2 Sheet 2 6P327-8"-C13 H2/H2rich gas 6P326 6P328
328 6-RA-2 Sheet 2 6P328-8"-C13 H2/H2rich gas 6Y-1 (Strainer) 6P330-12"-C13
330 6-RA-2 Sheet 2 6P330-12"-C13 H2/H2rich gas 6P328 6P56/6P57 suction
401 6-BA-301 6P401-6"-B1 Naphtha from crude unt 1P234-6"-B1 6E-41A
6-BA-301 6MS401-4"-C23 200# Steam 6E-40' 275 470 207 470 373 200 388
6-BA-302 6PW401-2"-B19 Sour Water 6PW402/403 15PW2003-3"-B19 150 100 150 100 100
6-BA-301 6MC401-2"-C23 200# condensate 6E-40' 6C-42 275 412 210 412 315 75 320
402 6-BA-301 6P402-6"-B1 Naphtha 6E-41A 6C-40
6-BA-302 6BD402-4"-B12 Vapors 6BD103 Vent to relief header
6-BA-302 6PW402-1"-B19 Sour Water 6C-41 6PW401 150 100 150 100 100
6-BA-301 6MC402-2"-C23 200# condensate 6C-42 8MC9/6-RA-4 275 412 210 412 315 75 320
403 6-BA-301 6P403-6"-B1 Naphtha Tankage 21P2030 6C-40 top
6-BA-302 6PW403-2"-B19 Sour Water 6C-41 6PW401 150 100 150 100 100
6-BA-301 6BD403-1"-B1 Relief from relief valve TSV101 6P402
404 6-BA-301 6P404-2"-C13 Stripping Gas Plant 4 6FIC103
6-BA-301 6BD404-1*1/2"-B23 Relief from relief valve 6PSV103 To Atmosphere
405 6-BA-301 6BD405-1"-C23 Relief from relief valve 6C-42 6PSV103
6-BA-301 6P405-6"-B1 Stabilized naphtha 6C-40 6E-41A
Stripped naphtha from Naphtha from
406 6-RA-2 Sheet 3 6P406-6"-B1 6P303-6"-B1
FRN Oxygen Stripper oxygen stripper
6-BA-301 6P406-6"-B1 Stabilized naphtha 6E-41A 1P53-6"-B1
407 6-BA-301 6P407-6"-B1 Stabilized naphtha 6P406-6"-B1 To 8E-17
Col bottom/ stabilized
408 6-BA-301 6P408-8"-B1 6C-40 Bottom 6E-40'
naphtha
409 6-BA-301 6P409-8"-B1 Reboiled naphtha 6E-40' 6C-40
410 6-BA-301 6P410-6"-B12 Overhead vapor 6C-40 Top 6E-42/6BA-302
412 6-BA-302 6P412-3"-B1 Condense overhead 6C-41 6G-40/A
413 6-BA-301 6P413-2"-B1 Reflux Return 6G-40/A 6C-40 Top
414 6-BA-302 6P414-2"-B1 Stabilizer overhead 6P413 8P307-4"-B13
415 6-BA-302 6P415-3"-B12 Fuel Gas 6C-41 15FG101
416 6-BA-301 6P416-3"-B13 Gas 6FIC103 6C-40 tray1

LINE LIST Page 143


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 7: PLATFORMER UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/04/2009
Rev: 00 NA: not available
Date: 25/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1 7-RA-2 Sheet 4 7PG1-1*1/2"-B12 Sweet Gas 10PG102 PCV7 Blanket Gas Only 50
7-RA-2 Sheet 4 7UA1-6"-A1 Regen/Plant air 35UA29 7P40-20"-C13 150 90 115 90 225 120
7-RA-2 Sheet 4 7BD1-6"-B12 vent to silencer 7P40-20"-C13 To Silencer 100 120
7-RA-2 Sheet 4 7H1-20"-C13 Hydrogen 7C-4 (Top) 7H2-20"-C13 335 240 300 100 450 300
7-RA-2 Sheet 3 7CW1-1"-A2 Cooling wate supply 32CW29 7G-2A 85 105 64 74 100 45
7-DA-5 7MS1-10"-C23 200# Sat Steam 7C-10 7MS328 275 412 207 388 360 225
7-DA-5 7K1-1*1/2"-C1 5% phosphate injection 4-BA-4 7C-10 500 250
7-DA-5 7BFW1-10"-C27 Boiler feed water 7C-10 Bottom 7G-7 303 409 228 409 390 225
7-DA-5 7UW1-2"-A1 Utility Water 32UW17 Blow down pit 83 70 83 70 125 83
7-EA-7 7SO1-1*1/2"-B1 Seal Oil 7K-1 outlet 7D-1 (Seal Oil Tank)
Compressor
7-EA-6 7LO1-3"-B1 Lube Oil 7E-8/8A/7T-3
bearing/coupling
7-RA-2 Sheet 4 4H1-2"-C13 Hydrogen 7H8-2"-C13 Plant 4 595 320 545 320 820 200
7-RA-2 Sheet 4 7N1-2"-B1 Nitrogen 7N5 7H8-2"-C13 350 60 264 60 325 70
7-RA-2 Sheet 3 7HS1-3"-D24 600# steam 31HS24 7GT-2A 690 700 625 700 1305 600
4-RA-4 7LC1-3/4"-B23 50# Condensate Header 7D-2 70 100 53 100 80 50
7-RA-2 Sheet 3 7LS1-4"-B24 50# steam 7GT-2A 7LS100 66 312 50 298 110 65
2 7-RA-2 Sheet 4 7P2-8"-B1 Platformer feed 7C-9 (bottom) 7P43-8"-B1(7G-1) 80 257 62 257 93 50
7K-1 (Recycle Gas
7-RA-2 Sheet 4 7H2-20"-C13 Hydrogen 7H1-20"-C13 335 240 300 100 450 300
Compressor)
7-RA-2 Sheet 4 7PG2-1*1/2"-B12 Sweet Gas PCV7 7C-9 (Top) Blanket Gas Only 50
7-RA-2 Sheet 3 7CW2-1"-A2 Cooling Water Return 7G-2A 32CW38 85 105 64 74 100 35
7-RA-2 Sheet 4 7BD2-6"-B1 pressure relief PSV7 To relief system/7BD6 100 80
4-RA-4 7UA2-1"-A1 Utility Air 35UA29 Service point/7C-5 150 90 115 90 225 120
7-DA-5 7BFW2-10"-C27 Boiler feed water 7BFW1 7G-7A 303 409 228 409 390 225
7-EA-7 7N2-1"-B1 Nitrogen 15N3 7D-1 (Seal Oil Tank) 350 60 264 60 325 70
7-EA-7 7SO2-1*1/2"-B1 Seal Oil 7K-1 outlet 7D-1 (Seal Oil Tank)
7-DA-5 7MS2-14"-C27 200# steam 7F-5 7C-10 275 412 207 388 360 225

LINE LIST Page 144


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 7: PLATFORMER UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/04/2009
Rev: 00 NA: not available
Date: 25/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
Servo motor hp Lp
7-EA-6 7LO2-2"-B1 Lube Oil 7G-8/8A section/emergency stop valve/
Governer

7-RA-2 Sheet 4 7HS2-4"-D24 600# steam 31HS24 7GT-1 690 700 625 700 1305 600
7-RA-2 Sheet 4 7LS2-6"-B23 50# steam 7GT-1 7LS100 66 312 50 298 110 65
3 7-RA-2 Sheet 4 7P3-6"-C1 Feed 7G-1/7P44-6"-C1 635 257 568 257 850 568
7-RA-2 Sheet 7 7FG3-4"-B12 Fuel Gas supply 7FG4 7F-2 70 35
4-RA-4 7UA3-1*1/2"-A1 Utility Air 35UA29 Service point/7C-4 150 90 115 90 225 120
4-RA-4 7UW3-1*1/2"-A1 Utility Water 7UW1 Service point/ 7F-1 83 70 83 70 125 83
7-RA-2 Sheet 5 7P3-16"-C13 Platformate 7E-1 (M) 7P39-20"-C13
7-DA-5 7BFW3-8"-C27 Boiler feed water 7G-7 7F-5 341 409 315 362 538 315
7D-1 (Seal Oil
7-EA-7 7N3-3"-B1 Nitrogen Separator 350 60 264 60 325 70
Tank)
7K-1 (Recycle Gas
7-EA-7 7SO3-2"-C1 Seal oil 7P107
Compressor in)
Bearing/Servo motor hp
7-EA-6 7LO3-6"-B1 Lube Oil Lp section/emergency Tank 7D-4
stop valve/ Governer

7-DA-5 7HS3-3"-D24 600 # steam 4HS100 7GT-7A 690 700 625 700 1305 600
7-DA-5 7LS3-4"-B23 50# steam 7GT-7A 7LS100 66 312 50 298 110 65
7-RA-2 Sheet 4 7H3-20"-C13 Hydrogen 7K-1 outlet 7H30-20"-C13 515 305 475 165 710 475
7-RA-2 Sheet 3 7MS3-1*1/2"-C23 200# steam 7MS1 7P50-10"-C1 275 412 207 388 360 225
7-RA-2 Sheet 5 7LC3-1/4"-C23 Condensate 7G-6BX 7H5-14"-C13 500 100 470 100 700 470
7-RA-2 Sheet 4 7BD3-1*1/2"-B1 Purge Gas 7PG2-1*1/2"-B12 7BD6 100 Blanket Gas
4 7-RA-2 Sheet 4 7CW4-1"-A2 Cooling water supply 32CW29 7G-1/A 85 105 64 74 100 45
7-RA-2 Sheet 5 7P4-4"-C1 Reformer feed 7P335-6"-C1 FIC3 635 257 568 257 850 568
4-RA-4 7UA4-1*1/2"-A1 Utility Air Header Service point/7C-6 150 90 115 90 225 120
7-DA-5 7BFW4-8"-C27 Boiler feed water 7G-7A 7BFW3 341 409 315 362 538 315
7-EA-4 7HS4-8"-D24 600# steam 31HS24 7KT-1 690 700 625 700 1305 600
7-EA-4 7LC4-3"-B23 Condensate 7HE-1X/1AX 21LC1/31LC6 70 100 53 100 80 60

LINE LIST Page 145


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 7: PLATFORMER UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/04/2009
Rev: 00 NA: not available
Date: 25/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
7-EA-4 7LS4-3"-B23 50 # Steam 7GT-5A 7LS100 66 312 50 298 110 65
7-EA-7 7SO4-3"-B1 Seal Oil 7K-1 outlet 7SO6
7-RA-2 Sheet 6 7FG4-6"-B12 Fuel Gas supply 15FG30 7F-1 70 35
7-RA-2 Sheet 5 7H4-14"-C13 Hydrogen 7H3-20"-C13 7P41-14"-C13 515 305 475 165 710 475
Compressor balance
7-RA-2 Sheet 4 7N4-1"-B1 Nitrogen 7N1-2"-B1 350 60 264 60 325 70
line
7-RA-2 Sheet 4 7BD4-8"-C1 Blow Down PSV6 To Relief system 100 335
5 7-RA-2 Sheet 4 7CW5-1"-A2 Cooling Water Return 7G-1/A 32CW38 85 105 64 74 100 35
7-RA-2 Sheet 7 7N5-2"-B1 Nitrogen 7N2 7P19-20"-E15 350 60 264 60 325 70
4-RA-4 7UA5-1*1/2"-A1 Utility Air Header Service point/7F-1 top 150 90 115 90 225 120
7-EA-4 7HS5-1"-D24 600# steam 7HS4 Gland box 690 700 625 700 1305 600
7-EA-4 7LC5-3"-B23 Condensate 7G-5/5A 7HE-1X/1AX 70 100 53 100 80 60
7-EA-7 7SO5-3"-B1 Seal Oil 7K-1 outlet 7SO6
7-RA-2 Sheet 2 7FG5-3"-B12 Fuel Gas supply 7FG4 7F-4 70 35
7-RA-2 Sheet 3 7LS5-1"-B23 Quench to 7G-2 7LS100 7G-2 66 312 50 298 110 65
7-RA-2 Sheet 1 7BD5-8"-B1 Relief from relief valve PSV8 To relief system 100 155
7-RA-2 Sheet 5 7H5-14"-C13 Hydrogen 7H3-20"-C13 7P42-14"-C13 515 305 475 165 710 475
6 7-RA-2 Sheet 4 7N6-2"-B12 Nitrogen 7N301-2"-B1 7FG13-8"-B12 350 60 264 60 325 70
7-RA-2 Sheet 4 7H6-6"-C13 Hydrogen 7H1-20"-C13 7P301-8"-C13/PIC5 335 240 300 100 450 300

7-RA-2 Sheet 4 7MS6-2"-C23 200# steam 7MS1 7H-3 (Vacuum ejector) 275 412 207 388 360 225

4-RA-4 7UA6-1*1/2"-A1 Utility Air Header Service point/7F-1 150 90 115 90 225 120
7-RA-2 Sheet 5 7P6-14"-C13 Reformer feed 7E-1 (L) 7E-1 (K) 490 410 460 410 690 460
7-DA-5 7CW6-1"-A2 Cooling water supply 7CW102 7G-7/7A 85 105 64 74 100 45
4-RA-4 7BD6-12"-B1 Main Header 100 -
7-EA-7 7SO6-4"-B1 Seal Oil 7SO4/7SO5 7D-1 (Seal Oil Tank)

LINE LIST Page 146


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 7: PLATFORMER UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/04/2009
Rev: 00 NA: not available
Date: 25/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig

Condensate to 7E-5 Surface


7-EA-4 7LC6-4"-B23 7G-5/5A 5 4psia
condensate return pump condenser

7-EA-6 7LS6-4"-B23 50 # Steam 7GT-8A 7LS100 66 312 50 298 110 65


7-RA-2 Sheet 6 7FG6-1*1/2"-B12 Pilot Gas 7FG10 7F-1 70 35
7 7-RA-2 Sheet 6 7MS7-3"-C23 200# steam 4MS100 7F-1 275 412 207 388 360 225
4-RA-4 7UA7-1*1/2"-A1 Utility Air Header Service point/7C-1 150 90 115 90 225 120
7-DA-5 7BD7-2"-C28 Blow down 7C-10 bottom Blow down pit 390 Intermittent
7-EA-7 7LS7-3"-B23 50 # Steam 7GT-9A 7LS10 66 312 50 298 110 65
7-DA-5 7CW7-1"-A2 Cooling Water Return 7G-7/7A 4CW100 85 105 64 74 100 35
8 7-RA-2 Sheet 5 7P8-14"-C14 Reformer feed 7E-1 (J) 7E-1 (H) 482 660 450 650 675 450
7-EA-4 7LS8-14"-B24 50 # Steam 7KT-1 7LS100 66 312 50 298 110 65
7-EA-4 7LC8-1"-B23 condensate 7LC5 PSV12 70 100 53 100 80 60
7-EA-4 7CW8-16"-a2 Cooling Water Return 7E-5 Sur cond. 32CW30 85 105 64 74 100 35
4-RA-4 7BD8-1.5"-B1 Blow Down 7C-6 Main Header/7BD6 100 Manual Relief
7-RA-2 Sheet 7 7MS8-2"-C23 200# snuffing steam 4MS100 7F-2 275 412 207 388 360 225
7-RA-2 Sheet 4 7H8-2"-C13 H2 from storage 7-BA-13 7K-1 suc & dis 595 320 545 320 820 200
9 7-RA-2 Sheet 4 7H9-6"-C13 Hydrogen 7K-1 outlet 7H6-6"-C13 515 305 475 165 710 475
Surface condenser level
7-EA-4 7LC9-1*1/2"-B23 condensate 7LC4 70 100 53 100 80 60
gauge
7-EA-4 7CW9-16"-A2 Cooling water supply 32CW29 7E-5 Sur cond. 85 105 64 74 100 45
4-RA-4 7BD9-1.5"-B1 Blow down FG KO Pot Blow down header 100 Drain only
7-RA-2 Sheet 3 7LS9-1"-B23 Quench to 7G-2A 7LS100 7G-2A 66 312 50 298 110 65
7-RA-2 Sheet 2 7FG9-1"-B12 Pilot Gas 7FG10/4FG8 7F-4 70 35
10 7-RA-2 Sheet 5 7P10-14"-E15 Reformer feed 7E-1 (G) 7P18-20"-E15 492 880 440 870 755 440
7-RA-2 Sheet 4 7H10-12"-C13 Hydrogen 7K-1 outlet 515 305 475 165 710 475
7-RA-2 Sheet 2 7MS10-2"-C23 Snuffing steam 4MS100 7F-4 275 412 207 388 360 225
4-RA-4 7FG10-1.5"-B12 Fuel Gas 4FG8 7FG6/7/8 70 35
7-EA-7 7LS10-1*1/2"-B23 50# steam 7LS4/7LS7 7D-1 (Seal Oil Tank) 66 312 50 298 110 65
50# steam tracing
4-RA-4 7LC10-3"-B23 Header 31LC21 70 100 53 100 80 60
condensate return
7-EA-7 7BD10-1*1/2"-1 Blow down 7K-1 body To Relief Header 100 Negligible
11 7-RA-2 Sheet 5 7P11-4"-C1 Reformer feed 7P335-6"-C1 FIC2 635 257 568 257 850 568

LINE LIST Page 147


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 7: PLATFORMER UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/04/2009
Rev: 00 NA: not available
Date: 25/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
7-RA-2 Sheet 4 7BD11-2"-C13 Vent 7C-30A PSV27 685 62 1027.5 380

7-EA-4 7LC11-1"-B23 Pressure balance line 7G-5/5A Surface condenser/7E-5 70 100 53 100 80 60

7-EA-6 7LS11-1*1/2"-B23 50 # Steam 7LS6 7D-4 66 312 50 298 110 65


7-EA-4 7MS11-2"-C23 200# Steam 7MS23 7GT-5A 275 412 207 388 360 225
12 7-RA-2 Sheet 4 7BD12-2"-B12 Vent 7C-30B PSV28 685 62 1027.5 50
7-EA-6 7MS12-3"-C23 200 # steam 7MS1 7GT-8A 275 412 207 388 360 225
4-RA-4 7LS12-1.5"-B23 50 # Steam 7LS3-4"-B23 Service point/7F-1 66 312 50 298 110 65
7-EA-7 7CW12-1*1/2"-A2 Cooling Water Return 7E-7/7A 32CW38 85 105 64 74 100 35
7-RA-2 Sheet 4 7FG12-8"-B12 Fuel Gas 7H13-8"-B12 7C-30B 70 35
13 7-RA-2 Sheet 5 7P13-14"-C13 Reformer feed 7E-1 (E) 7E-1 (D) 490 410 460 410 690 460
7-RA-2 Sheet 4 7FG13-8"-B12 Dechlorinated gas 7C-30B 15FG118-8"-B12 70 35
7-EA-7 7MS13-2"-C23 200 # Steam 7MS23 7GT-9A 275 412 207 388 360 225
4-RA-4 7LS13-3"-B23 50 # Steam 7LS100 Tracers 66 312 50 298 110 65
7-EA-7 7CW13-1*1/2"-A2 Cooling water supply 4CW100 7E-7/7A 85 105 64 74 100 45
7-RA-2 Sheet 4 7BD13-3"-B1 Relief from relief valve PSV27 7BD15-4"-B1 685 62 1027.5 380
7-RA-2 Sheet 4 7H13-8"-B12 Hydrogen PIC5 7FG12-8"-B12

14 7-RA-2 Sheet 6 7LC14-3"-B23 50# condensate 7E-10 (Air Heater) 7LC10-3"-B23 70 100 53 100 80 60

4-RA-4 7LS14-1.5"-A1 50 # Steam 7LS3-4"-B23 Service point/7C-1 66 312 50 298 110 65


7-EA-6 7CW14-1*1/2"-A2 Cooling water supply 4CW100 7E-8/8A 85 105 64 74 100 45
7-RA-2 Sheet 4 7BD14-2"-B1 Relief from relief valve PSV28 7BD15-4"-B1 685 62 1027.5 50
15 7-RA-2 Sheet 5 7P15-14"-C14 Reformer feed 7E-1© 7E-1 (B) 482 660 450 650 675 450
4-RA-4 7LS15-1.5"-B23 50 # Steam 7LS3-4"-B23 Service point/7F-1 66 312 50 298 110 65

7-EA-4 7MS15-1*1/2"-C23 200# steam 7MS23 7H-1/1AX/2(all ejectors) 275 412 207 388 360 225

7-EA-6 7CW15-1*1/2"-A2 Cooling Water Return 7E-8/8A 32CW38 85 105 64 74 100 35


To Blow Down
7-RA-2 Sheet 6 7LC15-1*1/2"-B23 50# condensate 7E-10 (Air Heater) 70 100 53 100 80 60
Sump/7BD100
16 7-RA-2 Sheet 2 7LS16-1"-C23 Pump seal heating 7LS100 Pump seal heating 66 312 50 298 110 65
7-DA-5 7CW16-1"-A1 Cooling water 7CW7 7BD100 85 105 64 74 100 45
7-EA-4 7LC16-3"-B23 Condensate Ejectors Atmosphere 70 100 53 100 80 60
17 7-RA-2 Sheet 5 7P17-14"-E15 Reformer feed 7E-1 (A) 7P18-20"-E15 492 880 440 870 755 440
7-RA-2 Sheet 2 7LS17-1/2"-C23 Pump seal heating 7LS16-1"-C23 7G-4 Seal 66 312 50 298 110 65

LINE LIST Page 148


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 7: PLATFORMER UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/04/2009
Rev: 00 NA: not available
Date: 25/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
18 7-RA-2 Sheet 6 7P18-20"-E15 Feed+H2 to heater 7P312-20"-E15 7F-1 492 880 440 870 755 440
7-RA-2 Sheet 2 7LS18-1/2"-C23 Pump seal heating 7LS16-1"-C23 7G-4A Seal 66 312 50 298 110 65
19 7-RA-2 Sheet 6 7P19-20"-E15 Feed+H2 from heater 7F-1 7C-1 468 1010 420 1000 1280 420
7-RA-2 Sheet 2 7LS19-1/2"-C23 Pump seal heating 7LS16-1"-C23 7G-3 Seal 66 312 50 298 110 65

20 7-RA-2 Sheet 6 7P20-20"-E15 Platformate from reactor 7C-1 7P313-24"-E15 450 920 410 910 750 410

7-RA-2 Sheet 2 7LS20-1/2"-C23 Pump seal heating 7LS16-1"-C23 7G-3A Seal 66 312 50 298 110 65
21 7-RA-2 Sheet 7 7P21-20"-E15 Platformate from heater 7F-2 7C-2 440 1010 390 1000 1190 390
Line to surface
7-EA-4 7LS21-16"-B23 50 # Steam PSV12 66 312 50 298 110 1psia
condenser

22 7-RA-2 Sheet 6 7P22-20"-E15 Platformate from reactor 7C-2 7P316-20"-E15 420 991 385 981 1000 385

23 7-RA-2 Sheet 6 7P23-20"-E15 7P316/7F-3 7C-3 410 1010 360 1000 1100 360
24 7-RA-2 Sheet 5 7P24-24"-E15 Platformate 7P317-24"-E15 7P25/32-16"-E15 370 1010 340 997 1030 340
7-DA-5 7MS24-1*1/2"-C23 200# steam 7MS2/7F-5 PSV2 inlet 275 412 207 388 360 225
25 7-RA-2 Sheet 5 7P25-16"-E15 Platformate 7P24-24"-E15 7E-1 (G)S/S 370 1010 340 997 1030 340
27 7-RA-2 Sheet 5 7P27-16"-C14 Platformate 7E-1 (H) 7E-1 (J) 360 785 330 772 514 330
29 7-RA-2 Sheet 5 7P29-16"-C14 Platformate 7E-1 (K) 7E-1 (L) 350 570 320 557 480 320
30 7-RA-2 Sheet 5 7H30-20"-C13 Hydrogen 7H3-20"-C13 7E-32 (Packinox) 515 305 475 165 710 475
7-RA-2 Sheet 7 7MS30-2"-C23 200# snuffing steam 4MS100 7F-6 275 412 207 388 360 225
31 7-EA-4 7MS31-2"-C23 200 # Steam 7MS23 275 412 207 388 360 225
32 7-RA-2 Sheet 5 7P32-16"-E15 Platformate 7P24-24"-E15 7E-1 (A)S/S 370 1010 340 997 1030 340
7-EA-4 7MS32-3"-C23 200 # Steam 7HS4 275 412 207 388 360 225
34 7-RA-2 Sheet 5 7P34-16"-C14 Platformate 7E-1 (B) 7E-1 © 360 785 330 772 514 330
36 7-RA-2 Sheet 5 7P36-16"-C14 Platformate 7E-1 (D) 7E-1 (E) 350 570 320 557 480 320
7-RA-2 Sheet 3 7MS36-1*1/2"-C23 200# steam 7MS35 7C-5 Bottom 275 412 207 388 360 225

37 7-RA-2 Sheet 4 16P37-4"-C13 Hydrogen HIC58 LP Make up gas to Isom

38 7-RA-2 Sheet 5 7P38-16"-C13 Platformate 7E-1 (F) 7P39-20"-C13 340 308 310 295 465 310
39 7-RA-2 Sheet 5 7P39-20"-C13 Platformate 7P318-20"-C13 7E-2 Product cond. 340 308 310 295 465 310
40 7-RA-2 Sheet 4 7P40-20"-C13 Products 7E-2 7C-4 335 240 300 100 450 300
41 7-RA-2 Sheet 5 7P41-14"-C13 Feed FIC3 7E-1 (M) 490 180 460 180 690 460
42 7-RA-2 Sheet 5 7P42-14"-C13 Feed FIC2 7E-1 (F) 490 180 460 180 690 460
43 7-RA-2 Sheet 4 7P43-8"-B1 Platformer feed 7P2-8"-B1 7G-1 suction 80 257 62 257 93 50

LINE LIST Page 149


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 7: PLATFORMER UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/04/2009
Rev: 00 NA: not available
Date: 25/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
44 7-RA-2 Sheet 4 7P44-6"-C1 Platformer feed 7G-1 dis 7P3-6"-C1 635 257 568 257 850 568
335/17 240/24 250/14 240/10 380/22 300/14
46 7-RA-2 Sheet 4 7P46-6"-C1 Unstabilized platformate 7C-4 (Bottom) 7E-3A/B/C&D
0 0 5 0 0 5
47 7-RA-2 Sheet 3 7P47-6"-B1 Stabilizer Feed 7E-3A/B/C&D 7C-5 160 265 135 267 203 136
48 7-RA-2 Sheet 3 7P48-14"-B1 Stabilizer Bottom 7C-5 (Bottom) 7P49-12"-B1 160 414 135 414 203 135
49 7-RA-2 Sheet 3 7P49-12"-B1 Stabilizer Bottom 7P48-14"-B1 7G-2 170 414 135 414 203 135
Platformer feed from
50 7-RA-2 Sheet 4 21P50-6"-B1 7-BA-13 8P54-6"-B1
storage
Stabilizer bottom to
7-RA-2 Sheet 3 7P50-10"-C1 7G-2 7P51/52/84/85 284 414 235 414 350 235
Reboiler
Stabilizer bottom to
51 7-RA-2 Sheet 2 7P51-4"-C1 7P50-10"-C1 7F-4 284 414 235 414 350 235
Reboiler
Stabilizer bottom to
52 7-RA-2 Sheet 2 7P52-4"-C1 7P50-10"-C1 7F-4 284 414 235 414 350 235
Reboiler
53 7-RA-2 Sheet 2 7P53-16"-B1 Reboiled material 7F-4 7C-5 160 427 135 427 203 135

Platformer feed from gas


54 7-RA-2 Sheet 4 8P54-6"-B1 Gas Plant 7C-9
plant (Deisohexanizer)

7-RA-2 Sheet 3 7P54-6"-B1 Stabilizer Bottom 7C-5 (Bottom) 7E-3A/B/C&D 160 414 135 414 203 135
55 7-RA-2 Sheet 3 7P55-3"-B1 Platformate 7E-A/B 7E-6/7P70-4"-B1 160 250 130 200 195 130
56
Depent platformate to
57 7-RA-2 Sheet 3 7P57-6"-B1 7E-6 & 7E-31 Platformate R/D 220 150 165 150 250 130
storage
58 7-RA-2 Sheet 2 7P58-10"-B12 Stabilizer overhead 7C-5 (Top) 7E-4 inlet 155 210 130 183 195 130
Depent overhead
59 7-RA-2 Sheet 2 7P59-8"-B12 7E-4 outlet 7C-6 155 150 125 100 180 125
condenser outlet
60 7-RA-2 Sheet 2 7P60-8"-B1 7C-6 Bottom Liquid 7C-6 7G-3/4 160 150 125 100 180 125
61 7-RA-2 Sheet 2 7P61-6"-B1 7C-6 Bottom Liquid 7P60-8"-B1 7G-3 160 150 125 100 180 125
62 7-RA-2 Sheet 2 7P62-4"-B1 Reflux 7G-3 7C-5 210 150 175 100 260 175
63 7-RA-2 Sheet 2 7P63-4"-B1 7C-6 Bottom Liquid 7P60-8"-B1 7G-4 160 150 125 100 180 125
64 7-RA-2 Sheet 2 7P64-3"-C1 Depent O.H Liquid 7G-4 Gas recovery unit 254 150 214 100 320 214

65 7-RA-2 Sheet 1 7P65-3"-B12 Overhead receiver top 7C-6 4C-8/ Depent O.H. Gas 155 150 125 100 180 125

66 7-RA-2 Sheet 2 7P66-6"-B1 7C-6 Bottom Liquid 7P60-8"-B1 7G-3A 160 150 125 100 180 125
67 7-RA-2 Sheet 2 7P67-4"-B1 Reflux 7G-3A 7P62-4"-B1 210 150 175 100 260 175

LINE LIST Page 150


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 7: PLATFORMER UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/04/2009
Rev: 00 NA: not available
Date: 25/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
68 7-RA-2 Sheet 3 7P68-12"-B1 Stabilizer Bottom 7P49-12"-B1 7G-2A 170 414 135 414 203 135
69 7-RA-2 Sheet 3 7P69-10"-C1 Stabilizer Bottom 7G-2A 7P50-10"-C1 284 414 235 414 350 200
Plat splitting line #
70 7-RA-2 Sheet 3 7P70-4"-B1 Platformate 7P55-3"-B1 170 250 130 200 195 130
7P109-4"-B1
Platformate from run 7D-3X (chemical
72 7-RA-2 Sheet 3 7P72-3/4"-B1 7P306-6"-B1 220 150 165 150 250 130
down injection tank)

73 7-RA-2 Sheet 4 7P73-8"-B13 For vacuum 7H1-20"-C13 7H-3 (Vacuum ejector) 50 200

77 7-RA-2 Sheet 1 7P77-3"-B12 Fuel gas drum 7P65-3"-B12 To fuel gas mix drum 155 150 125 100 180 125
78 7-RA-2 Sheet 3 7P78-4"-B1 Startup Bypass 7P55-3"-B1 Bypass 220 150 165 150 250 50
80 7-RA-2 Sheet 5 7P80-1/4"-C1 Chemical Injection 7G-6AX 7P4-4"-C1 580 257 568 257 850 550
81 7-RA-2 Sheet 2 7P81-4"-B1 7C-6 Bottom Liquid 7P60-8"-B1 7G-4A 160 150 125 100 180 125
82 7-RA-2 Sheet 2 7P82-3"-C1 Product R/D 7G-4A 7P64-3"-C1 254 150 214 100 320 214
Stabilizer bottom to
84 7-RA-2 Sheet 2 7P84-4"-C1 7P50-10"-C1 7F-4 284 414 235 414 350 235
Reboiler
Stabilizer bottom to
85 7-RA-2 Sheet 2 7P85-4"-C1 7P50-10"-C1 7F-4 284 414 235 414 350 235
Reboiler
86 7-RA-2 Sheet 4 7P86-3"-B1 7G-1 8P54-6"-B1 635 257 568 257 850 568
87 7-RA-2 Sheet 4 7P87-3"-C1 Reformer feed 7G-1 8P54-6"-B1 635 257 568 257 850 568
88 7-RA-2 Sheet 2 7P88-1*1/2"-B1 7C-6 drain line 7C-6 bottom Drain 160 150 125 150 180 Intermittent
89 7-RA-2 Sheet 4 7P89-1*1/2"-C1 Unstabilized platformate 7H2-20"-C13 7P46-6"-C1 335 240 300 100 450 Intermittent

LINE LIST Page 151


OPERATING
CONDITION

Temp.
°F
60
60
120
100
74
397
60
362
60

60
60
650
100
311
257

100

60
88
388
60
362
60

397

LINE LIST Page 152


OPERATING
CONDITION

Temp.
°F

650
311
257
100
60
60

362

60

650
311
165
397
100
Blanket Gas
74
257
60
362
650
100

LINE LIST Page 153


OPERATING
CONDITION

Temp.
°F
311

100
165

60

363
88
60
60
650
100

100
311
210
165
60
100

397

60
410
74
-

LINE LIST Page 154


OPERATING
CONDITION

Temp.
°F

100

311
100
397
60
Intermittent
311
88
650
311
100
88
Manual Relief
397
60
165

100

74
Drain only
311
100
870
165
397
100
311

100

Negligible
257

LINE LIST Page 155


OPERATING
CONDITION

Temp.
°F
170

100

311
397
100
397
311
88
100
410
100
397
311
74
170

100

311
74
100
650
311

397

94

100

311
74
100
870
311

LINE LIST Page 156


OPERATING
CONDITION

Temp.
°F
870
311
1000
311

910

311
1000

311

981

1000
997
397
997
772
557
165
397
397
997
397
772
557
397

295
295
100
180
180
257

LINE LIST Page 157


OPERATING
CONDITION

Temp.
°F
257

100/100

265
414
414

414

414

414

427

414
200

100

183

100

100
100
100
100
100

100

100
100

LINE LIST Page 158


OPERATING
CONDITION

Temp.
°F
414
414

200

100

100

100
100
100
100
100

414

414

257
257
Intermittent
Intermittent

LINE LIST Page 159


Sr. # Exon Missing BOPL Missing 19
1 7BFW101-2"-C23 7BD110-3"-B1

2 7FG332-6"-B12 7BD15-4"-B1
3 7FG4-6"-B12 7H11-6"-C13
4 7FG5-3"-B12 7H7-8"-B12
5 7FG6-1*1/2"-B12 7MS16-1.5"-C3
6 7FG9-1"-B12 7MS17-1.5"-C23
7 7H8-2"-C13 7MS23-3"-C23
8 7K1-1*1/2"-C1 7NG100-2"-B12

9 7LC15-1*1/2"-B23 7P109-4"-B1

10 7LC16-3"-B23 7P56-6"-B1
11 7LC3-1/4"-C23 7P71-6"-B1
12 7LO1-3"-B1 7P76-3"-C1
13 7LO2-2"-B1
14 7LS20-1/2"-C23
15 7MS1-10"-C23
16 7N1-2"-B1
17 7N3-3"-B1
18 7N4-1"-B1
19 7P106-2"-C1
20 7P107-2"-C1
21 7P108-3/4"-C23
22 7P20-20"-E15
23 7P307-6"-B1
24 7P334-3/4"-C1
25 7P67-4"-B1
26 7P86-3"-B1
27 7P87-3"-C1
28 7P95-2"-B1
29 7PG2-1*1/2"-B12
30 7SO3-2"-C1
31 7SO4-3"-B1
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 3
1 8 8P-1 C-13 Flashing Naphtha Line 6P-14 Line 8P-72 170 400 173 100 260 173 100
of 3
2 8-RA-2 12 8P-2 B-13 H.C.Liquiid 8C-1 A2S Bottoms Line 8P-4 178 128 153 117 230 153 117
8-RA-2 Sheet 3
3 10 8P-3 B-13 H.C.Vapour 8P-74 8C-1 178 128 158 102 240 158 102
of 3
4 8-RA-2 10 8P-4 B-13 H.C.Vapour Line 8P-74 8E-2 178 128 153 105 230 153 105
5 8-RA-2 8P-5
6 8-RA-2 8P-6
8-RA-2 Sheet 3
7 14 8P-7 B-13 H.C. 8P-228 8C-3 178 128 153 100 230 153 100
of 3
8-RA-2 Sheet 3
8 12 8P-8 B-13 H.C. 8C-3 8G-2&2A 178 128 154 100 230 154 100
of 3
8-RA-2 Sheet 3
9 8 8P-9 B-13 H.C. 8G-2&2A 8C-1 255 128 192 100 290 142 100
of 3
8-RA-2 Sheet 3
10 8 8P-10 B-13 H.C. 8C-1 Line 8P-33 178 128 160 273 275 160 273
of 3
8-RA-2 Sheet 3
11 16 8P-11 B-13 H.C. 8C-1 8E-3 178 128 160 273 275 160 273
of 3
8-RA-2 Sheet 3
12 20 8P-12 B-13 H.C. 8E-3 8C-1 178 128 160 273 275 160 273
of 3
8-RA-2 Sheet 3
13 4 8P-13 B-19 Water 8C-1 (Water drain) 8C-4
of 3
8-RA-2 Sheet 3
14 8 8P-14 B-13 H.C.Vapour 8C-1 (OVHD) 8T-1 170 400 150 109 225 150 109
of 3
8-RA-2 Sheet 3
15 8 8P-15 B-13 H.C. 8T-1 8C-2 170 400 145 100 220 145 100
of 3
8-RA-2 Sheet 3
16 6 8P-16 B-13 H.C.Vapour 8C-2 (Off Gas) Fuel Gas Header 170 400 145 100 220 145 100
of 3
8-RA-2 Sheet 3
17 4 8P-17 B-13 H.C.Liquiid 8C-2 8G-1 & 1A 170 400 145 100 220 145 100
of 3
8-RA-2 Sheet 3
18 3 8P-18 B-13 H.C.Liquiid 8G-1 & 1A 8C-1 253 400 195 400 340 197 100
of 3
8-RA-2 Sheet 2
19 10 8P-19 B-1 H.C. 8C-5 Line 8P-38 140 328 118 348 210 118 348
of 3
8-RA-2 Sheet 2
20 10 8P-20 B-1 H.C. Line 8P-19 Line 8P-52 140 328 105 328 245 55 348
of 3
8-RA-2 Sheet 2
21 20 8P-21 B-1 H.C. 8C-5 8E-5 A/B 140 328 118 348 210 118 348
of 3
8-RA-2 Sheet 3
22 3/4 8P-22 B-13 H.C. Line 8P-18 Line 8K-1 253 400 195 400 340 197 100
of 3

LINE LIST Page 161


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 2
23 4 8P-23 B-1 H.C. Line 8P-21 Line 8P-19 140 328 118 348 210 118 348
of 3
8-RA-2 Sheet 2
24 24 8P-24 B-1 H.C. 8E-5 A/B 8C-5 140 145 118 348 204 118 348
of 3
8-RA-2 Sheet 2 C 3 - C4
25 16 8P-25 B-13 8C-5 8E-4 140 328 115 126 180 115 126
of 3
8-RA-2 Sheet 3
26 1 1/2 8P-26 B-13 H.C.Vapour 8G-1 & 1A 8C-2
of 3
8-RA-2 Sheet 2 C 3 - C4 Hot Gas Bypass to
27 8 8P-27 B-13 Line 8P-25 140 328 115 126 180 115 126
of 3 8C-6
8-RA-2 Sheet 2 C 3 - C4
28 10 8P-28 B-13 8E-4 8C-6 140 328 110 100 175 110 100
of 3
8-RA-2 Sheet 2 C 3 - C4
29 10 8P-29 B-13 8C-6 8G-3 &3A 135 131 110 100 175 110 100
of 3
8-RA-2 Sheet 2 C 3 - C4
30 6 8P-30 B-13 Line 8P-34 8C-5 180 131 150 100 225 150 100
of 3
8-RA-2 Sheet 2
31 8 8P-31 B-13 H.C.Vapour 8C-6 Fuel Gas System 135 131 101 131 152 45 110
of 3
32 8-RA-2 10 8P-32 B-13 H.C.Vapour 8C-3 Vent 8C-1 170 400 127 400 220 153 100
8-RA-2 Sheet 3
33 10 8P-33 B-13 H.C.Flash Line 8P-10 8C-5 178 128 116 260 188 116 260
of 3
8-RA-2 Sheet 2 C 3 - C4
34 6 8P-34 C-12 8G-3 &3A Line 8P-30 180 131 150 110 225 150 110
of 3
8-RA-2 Sheet 2 C 3 - C4
35 6 8P-35 C-12 Line 8P-34 8G-4 & 8G-5A 180 131 150 100 225 150 100
of 3
8-RA-2 Sheet 2
36 4 8P-36 B-1 Naphtha Line 8P-50 Line 8P-48 50 180 38 180 59 13 257
of 3
8-RA-2 Sheet 2 C 3 - C4
37 4 8P-37 C-12 8G-4 & 8G-5A 8C-7 285 131 252 100 380 252 100
of 3
8-RA-2 Sheet 2
38 16 8P-38 B-1 H.C.Flash Line 8P-19 8C-13 50 180 38 180 59 18 236
of 3
8-RA-2 Sheet 2 Vapour C5's
39 30 8P-39 B-12 8C-13 8E-12 50 180 38 180 59 6 127
of 3
8-RA-2 Sheet 3
40 1 1/2 8P-40 B-13 H.C.Vapour 8G-2 & 2A 8C-3
of 3
8-RA-2 Sheet 1
41 1 1/2 8P-41 B-12 H.C.Vapour 8G-10/10A & 11/11A 8C-15
of 3
8-RA-2 Sheet 2 C5's Hot Gas Bypass to
42 10 8P-42 B-12 Line 8P-39 50 180 38 180 59 6 127
of 3 8C-14
8-RA-2 Sheet 2 C5's
43 10 8P-43 B-1 8E-12 8C-14 50 180 38 180 59 1 100
of 3

LINE LIST Page 162


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 2 C5's
44 10 8P-44 B-1 8C-14 8G-7 & 7A 50 100 38 100 57 1 100
of 3
8-RA-2 Sheet 3
45 6 8P-45 B-13 H.C.Vapour Line 8P-16 Fuel Gas System 170 400 145 100 220 145 100
of 3
8-RA-2 Sheet 1 C5's
46 8 8P-46 B-1 8G-7 & 7A Line 8P-47 134 100 100 100 150 68 100
of 3
8-RA-2 Sheet 2 C5's
47 8 8P-47 B-1 Line 8P-46 8C-13 134 100 100 100 150 68 100
of 3
8-RA-2 Sheet 2
48 16 8P-48 B-1 Naphtha 8C-13 8E-13 50 180 38 180 59 13 257
of 3
8-RA-2 Sheet 2
49 24 8P-49 B-1 H.C. 8E-13 8C-13 50 180 38 180 59 13 257
of 3
8-RA-2 Sheet 2 Lines 8P-51 &
50 10 8P-50 B-1 Naphtha 8C-13 50 180 38 180 59 13 257
of 3 8P-52
8-RA-2 Sheet 2
51 4 8P-51 B-1 Naphtha Line 8P-50 8G- 5 & 5A 50 180 38 180 59 13 257
of 3
8-RA-2 Sheet 2
52 10 8P-52 B-1 Naphtha Line 8P-50 8G- 6 & 7A 50 180 38 180 59 13 257
of 3
8-RA-2 Sheet 2
53 3 8P-53 B-1 Naphtha 8G- 5 & 5A 8E-31 A, 8P-246 215 180 175 257 285 175 257
of 3
8-RA-2 Sheet 1
54 6 8P-54 B-1 Naphtha Line 8P-55 Cat. Reformer 122 180 92 180 144 73 257
of 3
8-RA-2 Sheet 1
55 6 8P-55 B-1 Naphtha 8E-17 Cat. Ref. Tankage 122 180 92 180 144 58 100
of 3
8-RA-2 Sheet 1 C5's
56 6-4 8P-56 B-1 Line 8P-46 8C-15 134 100 101 100 151 68 100
of 3
8-RA-2 Sheet 1 i-C5
57 20 8P-57 B-12 8C-15 8E-14 50 100 38 100 57 14 117
of 3
8-RA-2 Sheet 1 i-C5
58 8 8P-58 B-12 Line 8P-57 8C-16 50 100 38 100 57 14 117
of 3
8-RA-2 Sheet 1 i-C5
59 8 8P-59 B-1 8E-14 8C-16 50 100 38 100 57 9 100
of 3
8-RA-2 Sheet 1 i-C5
60 8 8P-60 B-1 8C-16 8G- 10 & 10A 50 100 38 100 57 9 100
of 3
8-RA-2 Sheet 1 i-C5
61 6 8P-61 B-1 8G- 10 & 10A Line 8P-63 99 100 75 100 112 55 100
of 3
8-RA-2 Sheet 1 i-C5 i-C5 Storage
62 3 8P-62 B-1 Line 8P-61 99 100 75 100 112 55 100
of 3
8-RA-2 Sheet 1 i-C5
63 6 8P-63 B-1 Line 8P-61 8C-15 99 100 75 100 112 55 100
of 3

LINE LIST Page 163


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 1 n-C5
64 4 8P-64 B-1 Line 8P-65 Line 8P-68 50 100 38 100 57 18 156
of 3
8-RA-2 Sheet 1 n-C5
65 6 8P-65 B-1 8C-15 8G- 11 & 11A 50 100 38 100 57 18 156
of 3
8-RA-2 Sheet 1 n-C5
66 4 8P-66 B-1 8G- 11 & 11A 8E-15 80 100 60 100 90 44 156
of 3
8-RA-2 Sheet 1 n-C5
67 4 8P-67 B-1 8E-15 Product Blending 80 100 60 100 90 34 100
of 3
8-RA-2 Sheet 1 n-C5
68 16 8P-68 B-1 8C-15 8E-16 50 100 38 100 57 18 156
of 3
8-RA-2 Sheet 1 n-C5
69 24 8P-69 B-1 8E-16 8C-15 50 100 38 100 57 18 156
of 3
8-RA-2 Sheet 1 i-C5
70 1 1/2 8P-70 B-1 8C-16 Drain 50 100 38 100 57
of 3
8-RA-2 Sheet 3
71 8 8P-71 B-13 Naphtha Line 8P-110 Line 8P-33 140 328 105 328 173 50 90
of 3
8-RA-2 Sheet 3
72 8 8P-72 B-13 Naphtha Line 8P-1 8C-1 170 400 151 100 226 151 100
of 3
8-RA-2 Sheet 2
73 10 8P-73 B-1 Naphtha Line 8P-33 Line 8P-20 178 128 134 128 204
of 3
8-RA-2 Sheet 3
74 4 8P-74 B-13 Wet Gas Line 4P-74 Line 8P-3 170 400 153 170 235 153 170
of 3
8-RA-2 Sheet 3
75 4 8P-75 B-13 Wet Gas Line 8P-74 8E-4 140 328 153 170 235 153 170
of 3
76 8P-76
8-RA-3 Sheet 3 C 3 - C4
77 4 8P-77 C-12 8C-7 8C-8 A/B 240 183 215 100 322 215 100
of 3
8-RA-3 Sheet 3 C 3 - C4
78 4 8P-78 B-12 8C-8 A/B 8E-6 B 215 123 208 100 312 208 100
of 3
8-RA-3 Sheet 2 C 3 - C4
79 4 8P-79 B-12 8E-6 A 8C-11 215 123 195 125 292 195 125
of 3
8-RA-3 Sheet 2 C 3 - C4
80 10 8P-80 B-12 8C-11 8E-7 215 123 190 107 285 190 107
of 3
8-RA-3 Sheet 2 C 3 - C4
81 4 8P-81 B-12 Line 8P-80 8C-12 215 123 190 107 285 190 107
of 3
8-RA-3 Sheet 2 C 3 - C4
82 6 8P-82 B-12 8E-7 8C-12 215 123 185 100 278 185 100
of 3
8-RA-3 Sheet 2 C 3 - C4
83 8 8P-83 B-12 8C-12 8G- 9 & 9A 210 125 185 100 278 185 100
of 3
8-RA-3 Sheet 2 C 3 - C4 Lines 8P-85 &
84 6 8P-84 C-12 8G- 9 & 9A 251 125 221 100 331 221 100
of 3 8P-86

LINE LIST Page 164


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-3 Sheet 2 C 3 - C4
85 4 8P-85 C-12 Line 8P-84 8C-11 251 125 221 100 331 221 100
of 3
8-RA-3 Sheet 1 C 3 - C4 C3 to Storage
86 3 8P-86 C-12 Line 8P-84 251 125 221 100 331 221 100
of 3
8-RA-3 Sheet 2 C 3 - C4
87 8 8P-87 B-12 8C-11 8E-8 215 123 195 203 305 195 203
of 3
8-RA-3 Sheet 2 C 3 - C4
88 12 8P-88 B-12 8E-8 8C-11 215 123 195 203 305 195 203
of 3
89 8-RA-3 3 8P-89 B-12 C4 8E-8 8E-9 215 123 195 203 305 195 203
8-RA-3 Sheet 2 C4 to product
90 2 8P-90 B-12 C4 8P-244 (8E-10) 215 123 185 100 278 185 100
of 3 Blending
91 8-RA-3 4 8P-91 B-12 C4 8C-11 8E-6 215 123 205 192 322 205 192
8-RA-3 Sheet 2 C4
92 4 8P-92 B-12 8E-6B 8E-10 215 123 200 140 308 200 140
of 3
8-RA-3 Sheet 2 C4 C4 to Storage
93 3 8P-93 B-12 8P-244 (8E-10) 215 123 190 100 285 190 100
of 3
8-RA-2 Sheet 2 Line 8P-95 &
94 6 8P-94 B-1 Naphtha 8E-17 122 180 92 180 144 68 257
of 3 6P-407-6"
8-RA-2 Sheet 2 Lines 8P-94 &
95 6 8P-95 B-1 Naphtha 8G- 6 & 7A 122 180 92 180 144 73 257
of 3 8P-55
8-RA-2 Sheet 2 C 3 - C4
96 2 8P-96 B-12 Line 8P-101 Line 8P-100 280 215 210 215 330 110 100
of 3
8-RA-3 Sheet 3
97 2 8P-97 B-38 MEA 8C-7 9C-1 240 182 235 100 350 235 100
of 3
8-RA-3 Sheet 3 C 3 - C4
98 4 8P-98 B-12 8C-8 A/B 8E-11 280 215 135 450 238 135 450
of 3
8-RA-3 Sheet 3 C 3 - C4
99 2 8P-99 B-12 8E-11 8C-10 280 215 210 215 330 125 100
of 3
8-RA-3 Sheet 2 C 3 - C4
100 3 8P-100 B-12 8C-10 8G-13 280 215 210 215 330 110 100
of 3
8-RA-3 Sheet 3 C 3 - C4
101 2 8P-101 C-12 8G-13 Line 8P-245 430 215 324 215 510 257 100
of 3
102 8P-102
8-RA-2 Sheet 2 C 3 - C4
103 6 8P-103 B-13 Line 8P-25 Fuel Gas system 140 148 115 126 173 115 126
of 3
8-RA-3 Sheet 2 C3
104 6 8P-104 B-12 Line 8P-80 Fuel Gas system 215 123 190 107 285 190 107
of 3
105 8P-105

LINE LIST Page 165


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F

8-RA-3 Sheet 2 C3 Plant-15 ( C3 to fuel


106 2 8P-106 C-12 Line 8P-83 210 125 185 100 278 185 100
of 3 gas vaporizer)

107 8P-107
8-RA-2 Sheet 1
108 4 8P-108 B-1 Naphtha Line 8P-56 Line 8P-67 134 100 101 100 151 80 100
of 3
8-RA-3 Sheet 2 C 3 - C4
109 1 1/2 8P-109 B-12 8C-12 Drain 210 125 185 100 278
of 3
8-RA-2 Sheet 3
110 6 8P-110 B-13 Naphtha Line 1P-53 Line 8P-71 140 328 105 328 174 50 110
of 3
8-RA-2 Sheet 1
111 6 8P-111 B-1 Line 8P-55 Slops Header 122 180 91 180 141 58 100
of 3
8-RA-3 Sheet 3 C 3 - C4
112 2 8P-112 B-12 Line 8P-98 Line 8P-99 280 215 210 215 330 213 100
of 3
113 8-RA-2 3 8P-113 C-12 C3 Plant-15 8G-5A 100 40
8-RA-3 Sheet 2 C 3 - C4
114 4 8P-114 B-12 Line 8P-99 Fuel Gas System 280 215 135 450 238 135 450
of 3
8-RA-2 Sheet 2 C 3 - C4
115 8 8P-115 B-1 Line 8P-31 Line 8BD-4 135 131 101 131 151 45 110
of 3
8-RA-2 Sheet 3
116 1 1/2 8P-116 B-12 H.C. 8C-3A 8C-3 178 128 153 100 230 153 100
of 3
8-RA-2 Sheet 3 H.C. +H2O
117 2 8P-117 B-19 8C-3 8C-3A 178 128 153 100 230 153 100
of 3
8-RA-2 Sheet 3
118 1 1/2 8P-118 B-13 H.C. 8C-4 8C-1 178 128 160 130 244 160 130
of 3
8-RA-2 Sheet 3
119 1 1/2 8P-119 B-13 H.C. 8C-2A 8C-2 170 400 145 100 220 145 100
of 3
8-RA-2 Sheet 3 H.C. +H2O
120 2 8P-120 B-19 8C-2 8C-2A 170 400 145 100 220 145 100
of 3
8-RA-2 Sheet 2
121 1 1/2 8P-121 B-13 H.C. 8C-6A 8C-6 135 131 110 100 175 110 100
of 3
8-RA-2 Sheet 2 H.C. +H2O
122 2 8P-122 B-19 8C-6 8C-6A 135 131 110 100 175 110 100
of 3
8-RA-2 Sheet 2
123 1 1/2 8P-123 B-12 H.C. 8C-14A 8C-14 50 100 38 100 57 1 100
of 3
8-RA-2 Sheet 2 H.C. +H2O
124 2 8P-124 B-19 8C-14 8C-14A 50 100 38 100 57 1 100
of 3
8-RA-3 Sheet 2
125 1 1/2 8P-125 B-12 H.C. 8C-10A 8C-10 280 215 210 215 330 110 100
of 3

LINE LIST Page 166


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-3 Sheet 3 H.C. +H2O
126 2 8P-126 B-19 8C-10 8C-10A 280 215 210 215 330 110 100
of 3
127
128
8-RA-3 Sheet 2 C 3 - C4
129 2 8P-200 B-12 8C-11 6-RA-2 215 123 190 107 285 190 107
of 3
130 8P-201
131 8P-202
132 8P-203
133 8P-204
8-RA-2 Sheet 1 n-C5
134 4 8P-205 B-1 8P-66, (8G-11) 8P-65, (8G-11A) 80 100 60 100 90 44 156
of 3
8-RA-3 Sheet 2 C 3 - C4
135 1 8P-206 B-12 Line 8P-200 Line 8P-99 215 123 190 107 285 190 107
of 3
8-RA-3 Sheet 2 C3
136 2 8P-207 C-12 Line 8P-106 Line 8P-244 210 125 185 100 278 185 100
of 3
8-RA-3 Sheet 3 C 3 - C4
137 4 8P-208 C-12 Line 8P-77 8C-22 240 183 215 100 322 215 100
of 3
138 8P-209
139 8P-210
8-RA-2 Sheet 2
140 6 8P-211 B-1 Naphtha Line 8P-55 Line 8P-95 122 180 92 180 144 58 100
of 3
8-RA-2 Sheet 2
141 6 8P-212 B-1 Naphtha Line 8P-95 Line 8P-54 122 180 92 180 144 73 257
of 3
8-RA-2 Sheet 1
142 6 8P-213 B-1 Naphtha Line 8P-55 FIC-10V Bypass 122 180 92 180 144 58 100
of 3
8-RA-2 Sheet 2
143 6 8P-214 B-1 Naphtha Line 8P-33 Line 8P-95 178 128 116 260 188 116 260
of 3
144 8P-215
145 8P-216
146 8P-217
147 8P-218
8-RA-3 Sheet 2 C 3 - C4
148 3 8P-219 C-12 line 8P-78 Line 8P-86 215 123 208 100 312 208 100
of 3
8-RA-3 Sheet 2 C 3 - C4
149 3 8P-220 C-12 Line 8P-86 line 8P-77 251 125 221 100 331 221 100
of 3
8-RA-3 Sheet 3 C 3 - C4
150 4 8P-221 C-12 line 8P-77 line 8P-78 240 183 215 100 322 215 100
of3

LINE LIST Page 167


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-3 Sheet 2 C3 Lines 8P-78,
151 1 8P-222 C-12 Line 8P-207 210 125 185 100 278 185 100
of 3 8P-101
8-RA-3 Sheet 3 C 3 - C4
152 2 8P-223 C-12 Line 8P-101 8C-6 430 215 324 215 510 257 100
of 3
8-RA-3 Sheet 3 C 3 - C4
153 4 8P-224 C-12 8C-23 Line 8P-77 240 183 215 100 322 215 100
of 3
8-RA-3 Sheet 3 C 3 - C4
154 3 8P-225 C-12 8C-22 8C-23 240 183 215 100 322 215 100
of 3
8-RA-2 Sheet 3
155 10 8P-226 B-13 8C-1 8C-1
of 3
8-RA-2 Sheet 3
156 4 8P-227 B-13 Naphtha 8P-9 8P-72 170 400 151 100 226 151 100
of 3
8-RA-2 Sheet 3
157 4 8P-228 B-13 H.C. 8P-307 8C-3 178 128 154 100 230 154 100
of 3
158 8P-229
8-RA-2 Sheet 2
159 4 8P-230 B-1 H.C. 8P-19 8P-94 (8E-17) 140 328 118 348 210 118 348
of 3
8-RA-2 Sheet 2
160 2 8P-231 C-12 Naphtha 8G-5A 8C-3 215 180 175 257 285 175 257
of 3
8-RA-2 Sheet 2
161 2 8P-232 B-13 Naphtha 8G-5A 8C-5 215 180 175 257 285 175 257
of 3
8-RA-2 Sheet 3
162 2 8P-236 C-12 Line 8P-1
of 3
8-RA-2 Sheet 1 i-C5
163 4 8P-237 B-1 8G-10A 8P-66 99 100 75 100 112 55 100
of 3
8-RA-2 Sheet 1 n-C5
164 6 8P-238 B-1 8P-65 8G-10A 50 100 38 100 57 18 156
of 3
8-RA-2 Sheet 1 n-C5
165 3 8P-240 B-1 Line 8P-67 Line 8P-95 80 100 60 100 90 34 100
of 3
8-RA-3 Sheet 2 C 3 - C4
166 4 8P-241 B-12 8E-8 8E-6A 215 123 195 203 305 195 203
of 3
8-RA-3 Sheet 2 C 3 - C4
167 2 8P-242 B-12 Line 8P-78 Line 8P-79 215 123 208 100 312 208 100
of 3
8-RA-3 Sheet 2 C4
168 4 8P-244 B-12 8E-10 Line 8P-93 215 123 190 100 285 190 100
of 3
8-RA-3 Sheet 3 C 3 - C4
169 2 8P-245 C-12 Line 8P-101 Line 8P-220 430 215 324 215 510 257 100
of 3
8-RA-2 Sheet 3
170 3 8P-246 B-1 Naphtha Line 8P-53 Line 8P-247 215 180 175 257 285 175 257
of 3
8-RA-2 Sheet 3 Line 8P-246 ,
171 3 8P-247 B-1 Naphtha Line 8P-14 215 180 175 257 285 175 257
of 3 8E-31B

LINE LIST Page 168


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 1 C5's
172 8 8P-248 B-1 Line 8P-59 Line 8P-43 50 180 38 180 59 1 100
of 3
8-RA-2 Sheet 1 Vapour C5's
173 20 8P-249 B-12 Line 8P-39 Line 8P-57 50 180 38 180 59 6 127
of 3
8-RA-2 Sheet 1 C5's
174 8 8P-250 B-1 Line 8P-56 50RA 134 100 101 100 151 68 100
of 3
8-RA-3 Sheet 2 C 3 - C4
175 12 8P-251 B-12 8E-8A 8C-11 215 123 195 203 305 195 203
of 3
8-RA-3 Sheet 2 C 3 - C4
176 6 8P-252 B-12 Line 8P-87 8E-8A 215 123 195 203 305 195 203
of 3
8-RA-3 Sheet 2
177 8 8P-253 B-1 Naphtha Line 8P-95 8E-8A 122 180 92 180 144 73 257
of 3
8-RA-3 Sheet 2
178 8 8P-254 B-1 Naphtha 8E-8A Line 8P-95 122 180 92 180 144 73 257
of 3
8-RA-2 Sheet 1
179 6 8P-302 B-1 Naphtha Line 8P-55 50-RA-11 122 180 92 180 144 58 100
of 3
8-RA-2 Sheet 3
180 4 8P-307 B-13 Platformer Line 7P-64 Line 8P-228
of 3
8-RA-3 Sheet 3
181 2 9P-28 C-36 Lean MEA 9-RA-2 8C-7
of 3
182
183 6-RA-4 8 8BD-1 B-1 HC Vapour Line 8BD-14 Line 8BD-16 - - 25 400 100 11.3 201
184 8-RA-2 6 8BD-2 B-1 HC Vapour 8C-3 Line 8BD-16 - - 178 128 268 178 128
8-RA-2 Sheet 3
185 3 8BD-3 B-1 HC Vapour 8C-2 Line 8BD-16
of 3 - - 170 400 296 170 400
8-RA-2 Sheet 2 C3 - C4 Vapour
186 10 8BD-4 B-1 8C-5 Line 8BD-16
of 3 - - 140 328 232 140 148
8-RA-2 Sheet 2 C3 - C4 Liquid
187 6 8BD-5 B-1 8C-6 Line 8BD-16
of 3 - - 135 131 203 135 100
8-RA-2 Sheet 2 C3 - C4 Liquid
188 8 8BD-6 B-1 8C-14 Line 8BD-16
of 3 - - 50 100 75 50 100
8-RA-2 Sheet 1 C3 - C4 Liquid
189 6 8BD-7 B-1 8C-16 Line 8BD-14
of 3 - - 40 100 75 50 100
8-RA-3 Sheet 3 C 3 - C4
190 4 8BD-8 B-1 8C-7 Line 8BD-16
of 3 - - 240 183 360 240 100
8-RA-3 Sheet 3 C3 - C4 Vapour 8C-8A/B
191 4 8BD-9 B-1 Line 8BD-1
of 3 (LPG Drier) - - 240 200 376 240 200
8-RA-2 Sheet 1
192 10 8BD-10 B-1 8C-15 Atmos
of 3 - - - - - 50 165

LINE LIST Page 169


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 2
193 10 8BD-11 B-1 8C-13 Atmos
of 3 - - - - - 50 180
8-RA-2 Sheet 2
194 10 8BD-12 B-1 8C-13 Atmos
of 3 - - - - - 50 180
8-RA-3 Sheet 2 C3 - C 4
195 4 8BD-13 B-1 8C-10 Line 8BD-1
of 3 - - 280 215 440 280 215
8-RA-3 Sheet 2 C3 - C 4
196 6 8BD-14 B-1 8C-12 Line 8BD-1
of 3 - - 210 125 315 210 70
8-RA-3 Sheet 2
197 6 8BD-15 B-1 8C-11 Atmos
of 3 - - - - - 215 123
198 6-RA-4 10 8BD-16 B-1 HC Vapour Line 8BD-1 Line 19 BD-108 - - 25 400 100 95 204
8-RA-2 Sheet 2
199 2 8BD-21 B-1 Naphtha Line-8P-48 6-RA-4 50 180 38 180 59 13 257
of 3
200
8-RA-2 Sheet 2
201 3 8PW-1 B-19 Sour Water Sour Water Header
of 3 280 215 210 215 315 100 100
8-RA-2 Sheet 3
202 2 - 1 /21
8PW-2 B-19 Sour Water 8C-3 Plant-15
of 3 178 128 153 100 230 153 100
8-RA-2 Sheet 3
203 1 /2
1
8PW-3 B-19 Sour Water 8C-4 Line 8PW-2
of 3 178 128 160 130 240 160 130
8-RA-2 Sheet 3
204 2 - 1 1/2 8PW-4 B-19 Sour Water 8C-2 Line 8PW-1
of 3 170 400 145 100 218 145 100
8-RA-2 Sheet 2
205 2 - 1 1/2 8PW-5 B-19 Sour Water 8C-6 Line 8PW-1
of 3 135 131 110 100 165 110 100
8-RA-2 Sheet 2
206 2 - 1 1/2 8PW-6 B-19 Sour Water 8C-14 Drain
of 3 50 100 38 100 57 1 100
8-RA-3 Sheet 3
207 2 - 1 1/2 8PW-7 B-19 Sour Water 8C-10 Line 8PW-1
of 3 280 215 210 215 315 110 100
8-RA-3 Sheet 3
208 1 1/2 8PW-8 C-12 Sour Water 8C-22 Line 8PW-1
of 3 280 215 210 215 315 110 100
209
210
8-RA-2 Sheet 3of
211 3/4 8K-1 B-13 Kontol 8G-14 Line 8P-14
3 - - 218 60 328 218 60
212
8-RA-2 Sheet 2
213 1 8CW-1 A-2 Cooling water 8CW-3 8G-5A
of 3 85 105 65 105 100 48 74
8-RA-2 Sheet 2
214 1 8CW-2 A-2 Cooling water 8G-5A 8CW-4
of 3 85 105 65 105 100 45 104

LINE LIST Page 170


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 2
215 1 8CW-3 A-2 Cooling water 8CW-5 8G-5
of 3 85 105 65 105 100 48 74
8-RA-2 Sheet 2
216 1 8CW-4 A-2 Cooling water 8G-5 8CW-11
of 3 85 105 65 105 100 45 104
8-RA-2 Sheet 2
217 1 8CW-5 A-2 Cooling water 8CW-10 8G-6
of 3 85 105 65 105 100 48 74
8-RA-2 Sheet 2
218 1 8CW-6 A-2 Cooling water 8G-6 8CW-11
of 3 85 105 65 105 100 45 104

LINE LIST Page 171


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 1
219 1 8CW-7 A-2 Cooling water 8CW-10 8G-7A
of 3 85 105 65 105 100 48 74
8-RA-2 Sheet 1
220 1 8CW-8 A-2 Cooling water 8G-7 8CW-11
of 3 85 105 65 105 100 45 104
8-RA-2 Sheet 1
221 1 8CW-9 A-2 Cooling water 8CW-7 8G-7A
of 3 85 105 65 105 100 48 75
222 6-RA-4 1 /21
8CW-10 A-2 Cooling water 6CW-5 8CW-5 85 105 65 105 100 48 75
223 6-RA-4 1 1/2 8CW-11 A-2 Cooling water 8CW-6 6CW-6 85 105 65 105 100 45 104
8-RA-2 Sheet 1
224 1 8CW-12 A-2 Cooling water 8G-7A 8CW-8
of 3 85 105 65 105 100 45 104
8-RA-2 Sheet 3
225 6 8CW-22 A-2 Cooling water 6-RA-4 8E-31 A/B
of 3
8-RA-2 Sheet 3
226 6 8CW-23 A-2 Cooling water 8E-31 A/B 6-RA-4
of 3
227
8-RA-2 Sheet 3
228 10 8MS-2 C-23 200 # Steam Line 31MS-19 8E-3
of 3 - - 225 398 390 200 388
8-RA-2 Sheet 2 Lines 8MS-4 &
229 10 8MS-3 C-23 200 # Steam Line 31MS-19
of 3 8MS-5 - - 225 398 390 200 388
8-RA-2 Sheet 2
230 8 8MS-4 C-23 200 # Steam Line 8MS-3 8E-5A
of 3 - - 225 398 390 200 388
8-RA-2 Sheet 2
231 8 8MS-5 C-23 200 # Steam Line 8MS-3 8E-5B
of 3 - - 225 398 390 200 388
8-RA-3 Sheet 2
232 6 8MS-6 C-23 200 # Steam Line 31MS-16 8E-8
of 3 - - 225 398 390 200 388
233 8-RA-2 1 /21
8MS-12 C-23 200 # Steam - - 225 398 390 200 388
234 8-RA-2 1 1/2 8MS-15 C-23 200 # Steam - - 225 398 390 200 388
8-RA-2 Sheet 2
235 10 8MS-17 C-23 200 # Steam 6-RA-4 8E-13
of 3 225 398 390 200 388
8-RA-2 Sheet 3
236 2 6MS-106 C-13 6MS1 8C-1
of 3
8-RA-2 Sheet 2
237 2 6MS-107 C-13 6MS1 8C-13
of 3
8-RA-3 Sheet 3
238 2 6MS-108 C-13 6MS1 8C-7
of 3
8-RA-3 Sheet 2
239 2 6MS-109 C-13 6MS1 8C-11
of 3
8-RA-2 Sheet 1
240 2 6MS-110 C-13 6MS1 8C-15
of 3
241

LINE LIST Page 172


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 3
242 4 8MC-2 C-23 200 # Condensate 8E-3 Line 8MC-9
of 3 - - 225 398 390 80 388

LINE LIST Page 173


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-2 Sheet 2 Lines 8MS-4 &
243 4 8MC-3 C-23 200 # Condensate Line 8MC-9
of 3 8MS-5 - - 225 398 390 80 388
8-RA-2 Sheet 2
244 3 8MC-4 C-23 200 # Condensate 8E-5A Line 8MC-3
of 3 - - 225 398 390 80 388
8-RA-2 Sheet 2
245 3 8MC-5 C-23 200 # Condensate 8E-5B Line 8MC-3
of 3 - - 225 398 390 80 388
8-RA-3 Sheet 2
246 3 8MC-6 C-23 200 # Condensate 8E-8 Line 8MC-8
of 3 - - 225 398 390 80 388
247 6-RA-4 3 8MC-8 C-23 200# & 600#Condensate Line 9MC-1 Line 8MC-9 - - 225 398 390 80 388
248 6-RA-4 8 8MC-9 C-23 200# & 600#Condensate Line 8MC-8 8C-21 - - 225 398 390 80 388
8-RA-2 Sheet 2 8C-24 Condensate
249 3-4 8MC-14 C-23 200 # Condensate 6-RA-4
of 3 pot(8E-13) 225 398 390 80 388
250
8-RA-3 Sheet 3
251 1 1/2 8HS-1 D-24 600# Steam 600# Header 8E-19 & 8E-18
of 3 - - 625 700 1300 600 700
8-RA-3 Sheet 3
252 1 8HC-1 C-23 400# Condensate 8E-19 & 8E-18 Line 8HC-2
of 3 - - 450 460 800 400 447
253 6-RA-4 6 8HS-2 D-24 600# Steam 50-RA-12 Line 8HS-1 - - 625 700 1300 600 700
254 6-RA-4 1 1/2 8HC-2 C-23 400# Condensate Line 8HC-1 50-RA-12 - - 450 460 800 400 447
255
256 1 1/2 8H-15
257
258 1 1/2 8UA-1 A-1 Utility Air Utility Station 8C-1 140 100 125 90 190 125 90
259 1 1/2 8UA-2 A-1 Utility Air Utility Station 8C-5 140 100 125 90 190 125 90
260 1 1/2 8UA-3 A-1 Utility Air Utility Station 8C-13 140 100 125 90 190 125 90
261 1 1/2 8UA-4 A-1 Utility Air Utility Station 8C-7 140 100 125 90 190 125 90
262 1 1/2 8UA-5 A-1 Utility Air Utility Station 8C-15 140 100 125 90 190 125 90
263 1 1/2 8UA-6 A-1 Utility Air Utility Station 8C-11 140 100 125 90 190 125 90
264 8UA-7
265 6-RA-4 1 1/2 8UA-8 A-1 Utility Air 35UA-30 Utility Station 140 100 125 90 190 125 90
266 6-RA-4 1 1/2 8UA-9 A-1 Utility Air 35UA-30 Utility Station 140 100 125 90 190 125 90
267 6-RA-4 1 1/2 8UA-10 A-1 Utility Air 35UA-30 Utility Station 140 100 125 90 190 125 90
268 6-RA-4 1 1/2 8UA-11 A-1 Utility Air Line 6UA-1 Utility Station 140 100 125 90 190 125 90
269 6-RA-4 1 1/2 8UA-12 A-1 Utility Air Line 6UA-1 Utility Station 140 100 125 90 190 125 90
270 6-RA-4 1 1/2 8UA-13 A-1 Utility Air Line 6UA-1 Utility Station 140 100 125 90 190 125 90
271
8-RA-3 Sheet 1
272 1 1/2 8LS-1 B-23 50# Steam 9LS-8 8G-9
of 3 - - 60 308 100 50 298

LINE LIST Page 174


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mushtaq Khokhar

LINE LIST Checked by:


PLANT 8: GAS UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/08/2009
Rev: 00
Date: 17/02/2009
DESIGN CONDITION OPERATING
Line Size UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Class Service From To
Inches
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
8-RA-3 Sheet 1
273 3/4 8LS-2 B-23 50# Steam 8LS-1 8G-9A
of 3 - - 60 308 100 50 298
8-RA-2 Sheet 2
274 10 8LS-7 B-23 50# Steam Line 31LS-27 8E-13
of 3 - - 60 308 100 50 298
8-RA-2 Sheet 1
275 10 8LS-9 B-23 50# Steam Line 31LS-29 8E-16
of 3 - - 60 308 100 50 298
8-RA-3 Sheet 3
276 2 8LS-11 B-23 50# Steam Line 31LS-29 8E-11
of 3 - - 60 308 100 50 298
8-RA-2 Sheet 1
277 1 1/2 8LS-12 B-23 50# Steam Line 31LS-29 8C-15 (PSV)
of 3 - - 60 308 100 50 298
8-RA-2 Sheet 2
278 1 1/2 8LS-13 B-23 50# Steam Line 31LS-29 8C-13 (PSV)
of 3 - - 60 308 100 50 298
8-RA-3 Sheet 2
279 1 1/2 8LS-15 B-23 50# Steam Line 31LS-29 8C-11 (PSV)
of 3 - - 60 308 100 50 298
8-RA-2 Sheet 3
280 1 1/2 8LS-16 B-23 50# Steam Line 31LS-27 Kontol Heating Coil
of 3 - - 60 308 100 50 298
281 6-RA-4 6 8LS-17 B-23 50# Steam 8C-17 Line 31LS-27 - - 60 308 100 50 298
282 6-RA-4 1 1/2 8LS-18 B-23 50# Steam Line 31LS-27 Utility Station - - 60 308 100 50 298
283 6-RA-4 1 1/2 8LS-19 B-23 50# Steam Line 31LS-27 Utility Station - - 60 308 100 50 298
284 6-RA-4 1 1/2 8LS-20 B-23 50# Steam Line 31LS-27 Utility Station - - 60 308 100 50 298
285 6-RA-4 1 1/2 8LS-21 B-23 50# Steam Line 31LS-29 Utility Station - - 60 308 100 50 298
286 6-RA-4 1 1/2 8LS-22 B-23 50# Steam Line 31LS-29 Utility Station - - 60 308 100 50 298
287 6-RA-4 1 1/2 8LS-23 B-23 50# Steam Line 31LS-29 Utility Station - - 60 308 100 50 298
288
289 8-RA-2 3-4 8LC-7 50# Condensate 8E-13 Line 31LC-22 60 308 100 50 298
8-RA-2 Sheet 1 8E-16 (8C-25
290 3-4 8LC-9 50# Condensate Line 31LC-22
of 3 Condensate pot) 60 308 100 50 298
8-RA-3 Sheet 3
291 1 1/2 8LC-11 50# Condensate 8E-11 Line 31LC-22
of 3 60 308 100 50 298
292
293 - 1 1/2 8UW-1 A1 Utility Water Dry Riser 8C-1 100 70 75 70 113 55 60
294 - 1 1/2 8UW-2 A1 Utility Water Dry Riser 8C-3 100 70 75 70 113 55 60
295 6-RA-4 1 1/2 8UW-3 A1 Utility Water 32UW-18 Utility Station 100 70 75 70 113 55 60
296 6-RA-4 1 1/2 8UW-4 A1 Utility Water 32UW-18 Utility Station 100 70 75 70 113 55 60
297 6-RA-4 1 1/2 8UW-5 A1 Utility Water 32UW-18 Utility Station 100 70 75 70 113 55 60
298 6-RA-4 1 1/2 8UW-6 A1 Utility Water 32UW-18 Utility Station 100 70 75 70 113 55 60
299 6-RA-4 1 1/2 8UW-7 A1 Utility Water 32UW-18 Utility Station 100 70 75 70 113 55 60
300 6-RA-4 1 1/2 8UW-8 A1 Utility Water 32UW-18 Utility Station 100 70 75 70 113 55 60

LINE LIST Page 175


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 9: AMINE TREATING UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/06/2009
Rev: 00 NA: not available
Date: 30/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
1 9-BA-21 9P1-4"-B38 Rich Amine 8P97/5P2004/4P38 9C-3 90 343 65 150 97.5 65 150
9-BA-21 9BD1-3"-B12 Blow Down 9C-3 9BD15 135 90 140
6-RA-4 9UW1-1*1/2"-A1 Utility Water 32UW18 Blow Down Pit 100 70 75 70 113 55 60
6-RA-4 9N1-1*1/2"-B1 Nitrogen 15N1 9V006 350 60 263 60 395 75 60
9-BA-21 9LS1-1"-B23 50# Steam 9LS6 9D-1 66 312 50 298 75 50 298
6-RA-4 9BFW1-1*1/2"-c23 Boiler Feed Water 31BFW34 Plant 9 300 298
6-RA-4 9UA1-1*1/2"-a1 Utility Air Header 6UA1 Plant 9/9UA2 140 90 125 90 180 125 90
6-RA-4 9FG1-1*1/2"-B12 Fuel Gas 15FG110 9BD12 80 100 60 100 90 35 100
9-BA-21 9LC1-1"-B23 50# condensate 9D-1 9LC3 60 307 60 307 90 50 298
2 9-BA-22 9FG2-1"-B12 Fuel Gas 9FG1 9P7 80 100 60 100 90 35 100
9-BA-23 9K2-3/4"-B19 Anti Foamant 9G-7X 9G-1/1A/9P11 20 100 20 100 30 15 100
6-RA-4 9UW2-1*1/2"-A1 Utility Water 32UW18 Service point 100 70 75 70 113 55 60
6-RA-4 9UA2-1*1/2"-A1 Utility Air 9UA1 Service point 140 90 125 90 180 125 90
9-BA-22 9LS2-4"-B23 50# Steam 9LS10 9E-2X 66 312 50 298 75 50 298
9-BA-22 9LC2-4"-B23 50# condensate 9E-2X 9LC3/9LC5 60 307 60 307 90 50 298
3 9-BA-21 9P3-3"-B38 Rich Amine 9C-3 (Bottom) 9E-1A/B/C/D 90 343 65 140 97.5 65 140
6-RA-4 9UW3-1*1/2"-A1 Utility Water 32UW18 Service point 100 70 75 70 113 55 60
6-RA-4 9K3-1*1/2"-C1 Chemical Injection 6-RA-4/header Plant 9
6-RA-4 9UA3-1*1/2"-a1 Utility Air 9UA1 Service point 140 90 125 90 180 125 90
6-RA-4 9BD3-4"-B1 Blow Down Header Plant 9 9BD16 etc 135 90 308
4 9-BA-22 9P4-3"-B38 Rich Amine 9E-1A/B/C/D 9P92-6"-B38 90 343 55 212 82.5 55 212
To Pump seal
6-RA-4 9UW4-1*1/2"-A1 Utility Water 32UW18 quench9G3X/9G3AX/9G1A 100 70 75 70 113 55 60
/9G-5/9G-5AX

6-RA-4 9UA4-1*1/2"-A1 Utility Air 9UA1 9C-1 140 90 125 90 180 125 90
9-BA-23 9K4-1?"-B19 Anti Foamant 9D-4X 9G-7X 20 100 20 100 30 5 100
9-BA-23 9LC4-1*1/2"-B23 Condensate 6LC1 9D-2 60 307 60 307 90 40 100
5 9-BA-21 9BD5-3"-B1 Blow Down 9D-1 (Top) vent Atmos 0 0 110

LINE LIST Page 176


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 9: AMINE TREATING UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/06/2009
Rev: 00 NA: not available
Date: 30/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
9-BA-23 9LS5-1"-B23 50# Steam 9LS10/9LS6 9D-4X 66 312 50 298 75 50 298

6-RA-4 9LC5-2"-B23 50# condensate Header 9LC3 31LC22 60 307 60 307 90 50 298

9-BA-22 9P5-4"-B38 Lean Amine 9C-1 Bottom 9E-2X 50 302 12 244 18 12 244
6 6-RA-4 9LS6-3"-B23 50# Steam header 9LS10 Plant 9 66 312 50 298 75 50 298
7 9-BA-22 9P7-8"-B38 Reboiled Amine 9E-2X 9C-1 50 302 12 244 18 12 244
6-RA-4 9LS7-1*1/2"-B23 50 # Steam 9LS10 Service point 66 312 50 298 75 50 298
9-BA-23 9LC7-1"-B23 50# condensate 9D-4X Drain 60 307 60 307 90 50 298
8 9-BA-22 9P8-6"-B38 9C-1 Overhead 9C-1 9E-4/9BA24 50 302 9 225 15 9 225
6-RA-4 9LC8-2"-B23 Condensate Plant 9 Blow Down Pit 60 307 60 307 90 50 298
6-RA-4 9LS8-1*1/2"-B23 50 # Steam 9LS6 9V-1 66 312 50 298 75 50 298
9 9-BA-23 9BD9-3"-B1 Blow Down 9D-2 Safe Location Atmos 0 0 110

6-RA-4 9LS9-2"-B23 50 # Steam tracer header 31LS36 Plant 9 66 312 50 298 75 50 298

9-BA-24 9P9-4"-B38 Sour Gas 9E-4/9E-4A 9C-2 50 302 6 100 9 6 100


6-RA-4 9LC9-1*1/2"-B23 Condensate 6-RA-4 OWS 60 307 60 307 90 50 298
10 9-BA-22 9BD10-4"-B1 Relief from Relief valve PSV3/3A Relief Header 50 400 75 9 225
6-RA-4 9LS10-4"-B23 50 # Steam Header 31LS29 9LS6 66 312 50 298 75 50 298
9-BA-23 9LC10-1?"-B23 50 # Condensate 9D-5 6-RA-4 60 307 60 307 90 50 298
11 9-BA-23 9LC11-1"-B23 Condensate 9LC3 9D-4X 60 307 60 307 90 50 298
6-RA-4 9LS11-1*1/2"-B23 50 # Steam 9LS6 Service point 66 312 50 298 75 50 298
9-BA-24 9P11-1*1/2"-B19 9C-2 bottom for reflux 9C-2 9G-1/1A 50 302 6 100 9 6 100
12 9-BA-22 9P12-1*1/2"-B19 Reflux 9G-1 9C-1 97 302 52 100 78 52 100
6-RA-4 9BD12-1*1/2"-B1 Blow Down 9FG1 9BD16 80 100 60 100 90 35 100
13 9-BA-22 9P13-3"-B38 Lean amine 9E-2X 9E-1A/B/C/D 50 302 12 244 18 12 244
14 9-BA-23 9BD14-2"-B1 Blow Down 9D-5 vent Atmos 0 0 100
9-BA-23 9LS14-1?"-B23 50# Steam 6-RA-4 9D-5 66 312 50 298 75 50 298
15 9-BA-21 9BD15-4"-B1 Blow Down 9BD1 9BD3 135 90 140
Steam Tracing to amine
6-RA-4 9LS153/4"-B23 9LS10 Amine sump 66 312 50 298 75 50 298
sump
9-BA-21 9P15-3"-B38 Lean Amine 9G-3X/3AX 9E-5 110 302 60 170 90 60 170
16 9-BA-21 9P16-3"-B36 Lean Amine 9E-5 outlet 9P17/9P83/9P68 110 110 83 110 125 45 110
9-BA-24 9BD16-4"-B20 Blow Down 9P98 6-RA-4/9BD3 135 90 308

LINE LIST Page 177


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 9: AMINE TREATING UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/06/2009
Rev: 00 NA: not available
Date: 30/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
17 9-BA-21 9P17-3"-B36 Lean Amine 9P16 9D-1 45 110 67.5 45 110
21 9-BA-21 9P21-3"-B36 Lean Amine 9D-1 9P93 0 0 110
22 9-BA-21 9P22-3"-C36 Lean Amine 9P95 9P55/9P51/9P30 285 110 275 110 415 275 110
25 9-BA-21 9P25-3"-C36 Lean Amine 9G-4 Lean AmineTo 4C-7 689 110 684 110 1025 684 110
28 9-BA-21 9P28-2"-C36 Lean Amine 9P95 Lean Amine To 8C-7 285 110 275 110 412 275 110
29 9-BA-21 9P29-2"-B12 Fuel Gas 9C-3 Fuel Gas System 50 140 75 50 140
30 9-BA-21 9P30-1"-B38 Lean Amine 9P22 9C-3 90 343 70 110 105 65 110
Kick Back From Pump
34 9-BA-21 9P34-1*1/2"-C36 9P96/9P52/9P54 9D-1 689 110 520 110 780 20 110
Discharge
37 9-BA-21 9P37-2"-B38 Amine sump pump 9G-2 9D-1 20 170 15 170 22.5 15 170
9C-1 (Bottom) /
38 9-BA-22 9P38-1*1/2"-B36 Lean Amine TP 72/Drain 12 244 18 12 244
9P5
9-BA-21 4P38-3"-C36 Rich Amine From 4C-7 8-BA-2 9P1
39 9-BA-22 9P39-1*1/2"-B38 Amine 9C-1 1st tray TP 72 12 244 18 12 244
46 9-BA-24 9P46-1*1/2"-B19 Drain 9C-2 Drain Point
47 9-BA-24 9P47-1?"-B19 Level gauge drain 9C-2 LG Amine sump 50 302 6 100 9 6 100
50 9-BA-24 9P50-6"-B20 Acid Gas 9P98 Acid gas to 1F-1
51 9-BA-21 9P51-3"-C36 Lean Amine 9P22 9G-4 Suc 285 110 275 110 412 275 110
52 9-BA-21 9P52-1*1/2"-C36 Kick Back From 9G-4 9G-4 Dis 9P34 689 110 684 110 1034 684 110
54 9-BA-21 9P54-1?"-C36 Kick Back From 9G-4A 9G-4A Dis 9P34 689 110 684 110 1034 684 110
55 9-BA-21 9P55-3"-C36 Lean Amine 9P22 9G-4A Suc 285 110 275 110 412 275 110
57 9-BA-21 9P57-3"-C36 Lean Amine 9G-4A Dis 9P25 689 110 684 110 1030 684 110
58 9-BA-22 9P58-3"-B38 Lean Amine 9E-1A/B/C/D 9G-3X/3AX 50 302 6 170 9 5.6 170
59 9-BA-22 9P59-3"-B38 Lean Amine 9G-3AX 9P15 110 302 60 170 90 60 170
Underground
60 9-BA-23 9P60-4"-B38 Drain Amine 9D-2 1 244 2 1 244
amine drain
65 9-BA-21 9P65-1"-B36 Drain 9C-3 (Side) To Amine Sump 65 140 97.5 65 140
66 9-BA-24 9P66-1"-B19 Reflux 9P12 9C-2 Bottom 6 100 9 6 100
68 9-BA-21 9P68-3"-B36 Bypass 9P17 TP4 110 110 83 110 124 45 110
69 9-BA-23 9P69-1?"-B19 Amine 9G-2 9G-1/9P11
71 9-BA-22 9P71-1?"-B36 Rich Amine 9P4 TP72/Amine sump 90 343 55 212 82.5 55 212
72 9-BA-21 9P72-1?"-B36 Gas oil Blanket 9D-1
75 9-BA-23 9P75-1?"-B36 Blanket Oil Source 9D-5

LINE LIST Page 178


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 9: AMINE TREATING UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/06/2009
Rev: 00 NA: not available
Date: 30/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
76 9-BA-23 9P76-3"-B36 Amine Loading line Amine Truck 9D-5
77 9-BA-23 9P77-2"-B36 Amine loading bypass 9P76 9P78
78 9-BA-23 9P78-2"-B36 Fresh Amine 9D-5 9D-2
79 9-BA-22 9P79-1?"-B19 Amine/Sour water 9P12 Sour water system 97 302 52 100 78 52 100
81 9-BA-24 9P81-1?"-B19 Reflux 9G-1A 9P12 97 302 52 100 78 52 100
82 9-BA-24 9P82-1?"-B19 Reflux 9P11 9G-1A 50 302 6 100 9 6 100
83 9-BA-21 9P83-3"-B36 Lean Amine 9P16 9T-1X 110 110 83 110 125 45 110
84 9-BA-21 9P84-3"-B38 Lean Amine 9T-1X 9P17 45 110 67.5 45 110
85 9-BA-21 9P85-?-B36 Lean Amine 9T-1X Amine sump 45 110 67.5 45 110
86 9-BA-24 9P86-6"-B38 Sour Gas 9P8 9E-4A 50 302 9 225 15 9 225
87 9-BA-24 9P87-4"-B38 Sour Gas 9E-4A 9P9 50 302 6 100 9 6 100
88 9-BA-21 9P88-3"-B38 Lean Amine 9P15 9E-5A 110 302 60 170 90 60 170
89 9-BA-21 9P89-3"-B36 Lean Amine 9E-5A 9P16 110 110 83 110 125 45 110
90 9-BA-21 9P90-?-B36 Drain from 9E-5a/9E4A 9E-5A/9E4A Amine sump
91 9-BA-21 9P91-?-B36 Drain from 9E-5/9E4 9E-5 drain/9E4 Amine sump
92 9-BA-22 9P92-6"-B38 Rich Amine 9P4 9C-1 90 343 55 212 82.5 55 212
93 9-BA-21 9P93-3"-B36 Lean Amine 9P21 9G-5AX/5X 0 0 110
94 9-BA-21 9P94-3"-C36 Lean Amine to Plant 8 9G-5AX/5X 9P95
95 9-BA-21 9P95-2"-C36 Lean Amine 9P94 9P28/5P2002/9P22
Kick Back From Pump
96 9-BA-21 9P96-1?"-C36 9G-5AX/5X 9P34 689 110 520 110 780 20 110
Discharge
97 9-BA-21 8P97-2"-B36 Rich Amine From 8C-7 8-RA-3 9P1
9-BA-24 9P97-6"-B20 9C-2 Overhead 9C-2 9C-9
98 9-BA-24 9P98-6"-B20 Acid Gas 9C-9 9P50
99 9-BA-24 9P99-1"-B19 Amine 9C-9 (Bottom) OWS
100 9-BA-24 9P100-1"-B19 Amine LG8 Amine sump
101 9-BA-24 9P101-4"-B20 Acid Gas 9P50 Plant 14
102 9-BA-22 9P102-1?"-B38 Level gauge drain 9E-2X level gauge Amine sump
Sample return from rich
103 9-BA-22 9P103-1"-B38 amine monirex
9-BA-21 9P4
104 9-BA-21 9P104-1"-B38 Rich Amine 9P3 90 343 65 140 97.5 65 140
105 9-BA-21 9P105-1"-B38 K.O Liquid 9C-10 9P79/9-BA-22
106 9-BA-21 9P106-1"-B38 Vent Gas 9C-10 (Top) 9P29
2000 9-BA-21 9P2000-2"-C36 Lean Amine 5P2002 9P1 647 152 600 152 900/1125 275 152

LINE LIST Page 179


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 9: AMINE TREATING UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/06/2009
Rev: 00 NA: not available
Date: 30/04/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
2002 9-BA-21 5P2002-2"-C36 Lean Amine 9P95 Lean Amine To 5C-20
2004 9-BA-21 5P2004-2"-B38 Rich Amine From 5C-20 8-BA-2 9P1

LINE LIST Page 180


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul hamid


PLANT 11: PLATFORMATE SPLITTER Approved by: Rana Zaheer Ahmed
Document No: BOPL/03/2009
Rev: 00 NA: not available
Date: 16/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
1 MHA 6990 11BD1-8"-B1 Relief header 11BD2-10"-B1 Header 20 400 20 400 30 10
Service point near 11G-
MHA 6990 11UW1-1*1/2"-A1 Utility Water 32UW19-3"-A1 100 70 75 70 113 60
50A
Relief from 11C-1
2 MHA 6990 11BD2-10"-B1 PSV1 11BD2-8"-B1 20 400 20 400 30 10
overhead line
MHA 6990 11UA2-1*1/2"-A1 Utility Air 35UA31-3"-A1 Near 11C-1 140 120 120 120 180 120
3 MHA 6990 11UA3-1*1/2"-A1 Utility Air 35UA31-3"-A1 Service point 140 120 120 120 180 120
4 11-RA-8 11PG4-1*1/2"-B12 Purge Gas 11PG100-2"-B12 11-RA-7 80 100 60 100 100 60
5 11-RA-8 11LS5-1*1/2"-B23 50# steam 11LS10-4"-B23 11-RA-7 75 50
6 11-RA-8 11UW6-1"-A1 utility water 32UW19-3"-A1 11-RA-7 100 70 75 70 113 60
11-RA-8 11HS6-1*1/2"-C23 400# sat steam 31HS30-8"-C23 11-RA-7 495 470 400 470 600 400
11-RA-8 11HC6-1"-C23 400# condensate 11-RA-7 11HC100-6"-C23 495 470 400 470 600 75
7 11-RA-8 11MS7-1"-C23 200# sat steam 31MS27-6"-C23 11-RA-7 275 412 210 412 315 200
Platformate splitter
10 11-BA-302 11P10-18"-B1 11C-1 (top) 11E-3 60 295 45 290 75 5
overhead
11-RA-8 11LS10-4"-B23 50# steam 31LS25-8"-B23 Header end cap 66 312 50 312 75 50
11 11-BA-302 11P11-8"-B1 Light Platformate 11E-3 11C-2 60 290 45 290 75 1
11-RA-8 11LS11-1*1/2"-B23 50# steam 11LS10-4"-B23 11-RA-7 66 312 50 312 75 50
13 11-RA-8 11LS13-1*1/2"-B23 50# steam 11LS10-4"-B23 11-RA-7 66 312 50 312 75 50
15 MHA 6990 11MS15-6"-C23 200# sat steam 11MS17-6"-C23 275 412 210 412 315 200
Service point near 11G-
16 MHA 6990 11LS16-1*1/2"-B23 50# sat Steam 31LS25-8"-B23 66 312 50 312 75 50
50A
MHA 6990/11-BA-
17 11MS17-6"-C23 200# sat steam 31MS27-6"-C23 11E-30 275 412 210 412 315 200
302
vent tank 11C-12(16-BA-
11-BA-302 11BD17-1*1/2"-B12 vent vapors 11C-2 (top) 60 290 45 290 75 1
04)
18 11-BA-302 11MS18-2"-C23 200# steam 11MS17-6"-C23 11C-31 275 412 210 412 315 200
11-RA-8 11LS18-1*1/2"-B23 50# steam 11LS10-4"-B23 11-RA-7 66 312 50 312 75 50

20 11-BA-302 11BD20-3"-B12 Platformate vapors 11P322-8"-B12 11C-11/11BD303-3"-B12 60 290 45 290 75 1

21 11-RA-8 11CW21-3"-A2 Cooling water supply 11CW100-6"-A2 11-RA-7 85 105 65 105 100 45
88 11-RA-8 11CW88-3"-A2 Cooling water return 11-RA-7 11CW101-6"-A2 85 105 65 105 100 30
Condensate
100 MHA 6990 11MC100-3"-C23 200# condensate 275 412 210 412 315 75
header

LINE LIST Page 181


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul hamid


PLANT 11: PLATFORMATE SPLITTER Approved by: Rana Zaheer Ahmed
Document No: BOPL/03/2009
Rev: 00 NA: not available
Date: 16/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
Cooling water
MHA 6990 11CW100-6"-A2 Cooling water supply 85 105 65 105 100 45
supply header

MHA 6990 11PG100-2"-B12 Purge Gas Blanketing Sweet gas header 80 100 60 100 100 60

Cooling water
101 MHA 6990 11CW101-6"-A2 Cooling water return 85 105 65 105 100 30
return header
MHA 6990/11-BA- 11C-31
102 11MC102-4"-C23 200# condensate 11MC103-6"-C23 275 412 210 412 315 75
302 condensate pot
200# condensate
103 MHA 6990 11MC103-6"-C23 200# condensate 275 412 210 412 315 75
header
109 11-BA-301 7P109-4"-B1 Platformate 7C-5/7-BA-13 11FIC52
Platformate vapors free
124 11-BA-302 11P124-1*1/2"-B1 11E-3 11C-2 60 290 45 290 75 1
draining
138 MHA-7226 11P138-3"-B56 Flare Liquid 11C-12 11G-27 15 200 25 200 40 2

171 MHA-7226 11P171-2"-B1 Flare Liquid 11G-27 50-RA-11 58 32

176 MHA-7226 11P176-4"-B1 Platformate 11E-1A/B 11C-1 75 250 60 250 100 25


177 11-BA-303 11P177-4"-B1 Heavy Platformate 11FIC58 Heavy Platf RD
16-BA-34/11P177-4"-B1
178 11-BA-302 11P178-4"-B1 Light Platformate RD 11FIC57
Hvy Plat line
179 11-BA-302 11P179-4"-B1 Light Platformate 11G-51/A 11G-50/A 70 35
180 11-BA-302 11P180-4"-B1 11E-32 bypass line 11P320-4"-B1 11P321-4"-B1 148 74
181 11-BA-302 11P181-4"-B1 Light Platformate 11G-50/A 11P320-4"-B1 190 95
182 11-BA-302 11P182-4"-B1 Isom Feed 11FIC57 16-BA-11 180 90
Hvy Platformate to light Light Platformate RD
185 11-BA-303 11P185-4"-B1 11P177-4"-B1
platf RD line line

301 11-BA-303 11N301-1*1/2"-B1 Nitrogen 15N2-2"-B1 11BD20-3"-B12/11C-11 600 100 600 100 900 70

MHA 6990 11CW301-4"-A2 Cooling water supply 11CW303-6'-A2 11E-33 85 105 65 105 100 45
11LS16-1*1/2"-
MHA 6990 11LS301-1"-B23 50# sat Steam 11G-55/A 66 312 50 312 75 50
B23
11BFW301-1*1/2"-
MHA 6990 BFW 50-RA-12 11T-30
D24
MHA 6990 11HS301-6"-D24 600# steam 50-RA-12 MHA- 6992 690 700 600 700 950 600
302 11-BA-301 11P302-6"-B1 Platformate 11E-1A/B 11C-1 75 250 60 250 100 25
MHA 6990 11CW302-4"-A2 Cooling Water Return 11CW304-6"-A2 11E-33 85 105 65 105 100 30

LINE LIST Page 182


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul hamid


PLANT 11: PLATFORMATE SPLITTER Approved by: Rana Zaheer Ahmed
Document No: BOPL/03/2009
Rev: 00 NA: not available
Date: 16/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
MHA 6990/11-BA-
11BD302-6"-B12 Off Gas to flare 11PSV52 11BD2-8"-B1/11-RA-8 50 300 75
303
303 11-BA-301 11P303-4"-B1 Platformate 11FIC52 11E-1A/B 85 250 65 250 105 35
MHA 6990/11-BA-
11CW303-4"-A2 Cooling water supply 11CW100-6"-A2 11E-32 (MHA 6992) 85 105 65 105 100 45
302
11-BA-303 11BD303-3"-B12 Off Gas to flare 11C-11 11BD302-6"-B12 100 50
MHA 6990 11LS303-1"-B23 50# sat Steam 31LS25-8"-B23 11C-11A/11C-32 66 312 50 312 75 50
MHA 6990/ 11-
304 11CW304-4"-A2 Cooling water return 11E-32 11CW101-6"-A2 85 105 65 105 100 30
BA-302
11-BA-303 11BD304-3"-B12 Relief 11C-11 11PSV52 100 50
306 11-BA-302 11BD306-2"-B23 Relief to atmosphere 11PSV51 to atmosphere 450 225
MHA 6990/11-BA-
308 11BD308-6"-B12 11C-2 (11-BA-302) 11PSV53 11BD2-8"-B1 90 45
302
309 11-BA-302 11BD309-1*1/2"-B1 Water 11C-2(bottom) drain 20 10
310 11-BA-302 11P310-6"-B1 Heavy Platformate 11C-1(bottom) 11G-55/A 40 20
311 11-BA-302 11P311-3"-B1 Heavy Platformate 11G-55/A 11E-1A/B 122 61
312 11-BA-301 11P312-3"-B1 Heavy Platformate 11E-1A/B 11E-31 110 55
MHA-7226/11-BA- Heavy platformate to
314 11P314-12"-B1 11P310-6"-B1 11E-30 40 20
302 reboiler
MHA-7226/11-BA- Heavy platformate vapor
315 11P315-24"-B1 11E-30 11C-1 36 18
302 from reboiler
316 11-BA-302 11P316-10"-B12 11E-3 by pass line 11P10-18"-B1 11P11-8"-B1 60 295 45 290 75 5
318 11-BA-302 11P318-6"-B1 Light Platformate 11C-2 (bottom) 11G-51/A 26 13

319 11-BA-302 11P319-4"-B1 Reflux Light Platformate 11G-51/A 11C-1 134 67

320 11-BA-302 11P320-4"-B1 Light Platformate 11P181-4"-B1 11E-32 190 95


321 11-BA-302 11P321-4"-B1 Light Platformate 11E-32 11FIC57 180 90
322 11-BA-302 11P322-8"-B12 Platformate vapors 11C-2 (top) 11BD20-3"-B12 20 10
323 11-BA-303 11P323-6"-B1 Hvy Platformate 11E-31 11C-11 32 16
324 11-BA-303 11P324-4"-B1 Heavy Platformate 11C-11 (bottom) 11G-4/A 32 16
325 11-BA-303 11P325-3"-B1 Heavy Platformate 11G-4/A 11FIC58 120 60
326 11-BA-302 11P326-1"-B1 Platformate from relief 11TSV51 11P302-6"-B1 318 159
331 11-BA-303 11P331-1*1/2"-B1 Free draining 11P323-6"-B1 11P332-1*1/2"-B1 40 20
332 11-BA-303 11P332-1*1/2"-B1 Free draining 11E-31(top) 11P323-6"-B1 40 20

LINE LIST Page 183


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul hamid


PLANT 11: PLATFORMATE SPLITTER Approved by: Rana Zaheer Ahmed
Document No: BOPL/03/2009
Rev: 00 NA: not available
Date: 16/03/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press.
Psig °F Psig °F Psig Psig
11C-11A(water surge
334 11-BA-302 11P334-2"-B1 Water 11C-2 20 10
pot)

LINE LIST Page 184


OPERATING
CONDITION

Temp.
°F
250

60

330

60
60
100
298
60
448
320
388

220

298
150
298
298
388

298

388

150

388
298

150

75
95

320

LINE LIST Page 185


OPERATING
CONDITION

Temp.
°F

75

100

95

320

320

150

150

100-250

245

271
271
136
100

60

75

298

700
245
95

LINE LIST Page 186


OPERATING
CONDITION

Temp.
°F

200

75

100
298

95

100
338

300

136
447
447
148

447

451

220
139

139

136
100
136
100
100
100
245
180
180

LINE LIST Page 187


OPERATING
CONDITION

Temp.
°F

136

LINE LIST Page 188


Sr. # Exon Missing BOPL Missing 18
1 11BD20-3"-B12 11BD21-1.5"-B1
2 11BD303-3"-B12 11CW304-1"-A2
3 11CW21-3"-A2 11P184-3"-B1
4 11CW88-3"-A2 11P411-8"-B1
5 11CW301-4"-A2 11P412-8"-B1
6 11HS6-1*1/2"-C23 11P413-3"-B1
7 11HC6-1"-C23 11P414-3"-B1
8 11MC100-3"-C23
9 11MS7-1"-C23
10 11MS15-6"-C23
11 11MC103-6"-C23
12 11P124-1*1/2"-B1
13 11P138-3"-B56
14 11P171-2"-B1
15 11P176-4"-B1
16 11P326-1"-B1
17 11P332-1*1/2"-B1
18 11LS5-1*1/2"-B23
19 11LS10-4"-B23

11LS11-1*1/2"-B23
20

11LS13-1*1/2"-B23
21

11LS16-1*1/2"-B23
22

11LS18-1*1/2"-B23
23
24 11LS301-1"-B23
25 11LS303-1"-B23
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 14: SULPHUR RECOVERY PLANT Approved by: Rana Zaheer Ahmed
Document No: BOPL/07/2009
Rev: 00 NA: not available
Date: 04/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
1 14-BA-11 14-P001-4"-11L Acid Gas 9P101-4"-B20 14C-2/14-BA-12
X14-BA-17 X14PW1-1"-B20 Sour Liquid X14C-101 14PW104 50 300 38 300 57/425 1 50
X14-BA-17 X14P1-8"-B20 Sour Gas X14C-101 14C-5 50 300 38 300 57/425 1 50
14-BA-12 14PA001-4"-11A Air 14K-2A 14F-2 inlet

14-BA-12 14BD001-1*1/2"-11L Blow Down 14P107 14BD112

Sulphur seal
14-BA-13 14LS001-3"-11C LP Steam 2LS88-4"-B23
Pots/14LS013
14-BA-14 14N001-1*1/2"-11A Nitrogen 2N3 14N002/004
Service
14-BA-14 14IA001-1*1/2"-11B Instrument Air 14IA102 14IA003 Nom. Flow
Test
14-GD-A-62006 14K001-1*1/2"-13A Chemical Injection 14K100 14K003 740 60 740 60 1125 Nom. Flow
Sulphur seal
14-BA-13 14LC001-2"-11C Condensate 14-BA-14/2LC9
Pots/14LC012
14-BA-13 14BFW001-2"-13A Boiler Feed Water 2BFW36 14BFW002/14BFW003

Service
14-BA-13 14UW001-1*1/2"-11A Utility Water 2UW5-1*1/2"-A1 14UW006/004/002 Nom. Flow
Test

14-BA-12 14FG001-1*1/2"-11D Warm Up Fuel Gas 14FG102 14F-2

Intermittent Boiler
14-BA-12 14CWS001-2"-11C 14E-1 (Bottm) 14-BA-14/14CWS003
Blowdown

14-BA-12 14PW001-1*1/2"-11E Sour Water 14C-2 14G-2A

2 14-BA-12 14PW002-1*1/2"-11E Sour Water 14C-3 14PW001

14-BA-12 14P002-3"-11L Sour Gas 14C-2 (Top) 14F-2 inlet


14LS001/14-BA-
14-BA-12 14LS002-1"-11C LP Steam 14F-2
14
14-BA-12 14CWS002-1"-11G Water to sewer Sample Cooler Sewerage
14-BA-12 14LC002-1"-11C Condensate 14F-2 14-BA-14/14LC001
14BFW002-1*1/2"- 14-BA-
14-BA-12 Boiler Feed Water 14E-1 (Bottom)
13A 14/14BFW001

LINE LIST Page 190


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 14: SULPHUR RECOVERY PLANT Approved by: Rana Zaheer Ahmed
Document No: BOPL/07/2009
Rev: 00 NA: not available
Date: 04/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
Primary Sulphur
14-GD-A-62006 14K002-1*1/2"-13A Chemical Injection 14K001 740 60 740 60 1125 Nom. Flow
condenser
Utility water to sample 14-BA- Blow down sample Service
14-BA-12 14UW002-1"-11A Nom. Flow
cooler 14/14UW001 cooler Test

14-BA-12 14PA002-1*1/2"-11A Process Air 14P001 14F-2

14-BA-12 14FG002-1"-11D Fuel Gas 14FG001 14PA002

14-BA-12 14BD002-1*1/2"-11L Blow Down 14P108 14BD113

14-BA-12 14N002-1"-11A Nitrogen 14-BA-14/14N001 14P002

3 14-BA-11 14LS003-2"-11C LP Steam 2LS88-4"-B23 14C-2,14C-3


14-BA-11 14N3-1*1/2"-B1 Nitrogen 2N3 14N001/14-BA-14
14-BA-12 14PA003-4"-11A Air 14PA001-4"-11A Vent to Atmos
14-BA-12 14P003-2"-11L Sour Gas 14P002-3"-11L 14F-2
14BFW003-1*1/2"- 14-BA-
14-BA-13 Boiler Feed Water 14E-2 (Bottom)
13A 14/14BFW001
Final Sulphur
14-GD-A-62006 14K003-1*1/2"-13A Chemical Injection 14K001 740 60 740 60 1125 Nom. Flow
condenser

14-BA-14 14BD003-3"-11E Blow down 14BD001/002/005 14BD104-3"-B1

Sewerage water
14-BA-14 14CWS003-3"-11G Sewerage Water from 14E-3/14E- CWS/Sewerage drain
2/14E-1
Service
14-BA-13 14IA003-1*1/2"-11B Instrument Air 14-BA-14/14IA001 14IA004/Sparger Nom. Flow
Test
Service
14-BA-13 14UW003-1*1/2"-11A Utility Water 14UW001 Sample Cooler Nom. Flow
Test

14-BA-11 14PW003-1*1/2"-11E Sour Water 14G-2A/14-BA-12 14PW101

14-BA-11 14LC003-1"-11C Condensate 14C-2/14C-3 2LC9


14FG004-1"-B1/14-BA-
4 14-BA-11 14-FG004-1"-11D Fuel Gas Incinerator/14F-1
11

14-BA-12 14LS004-1*1/2"-11C LP Steam 14LS003-2"-11C 14C-3

LINE LIST Page 191


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 14: SULPHUR RECOVERY PLANT Approved by: Rana Zaheer Ahmed
Document No: BOPL/07/2009
Rev: 00 NA: not available
Date: 04/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
14-BA-12 14LC004-1"-11C Condensate 14C-3 14LC003-1"-11C

14-BA-12 14N004-1"-11A Nitrogen 14-BA-14/14N001 14F-2

14-BA-13 14CWS004-1"-11G Water to sewer Sample Cooler 14-BA-14


14-BA- 14E-3 LPSteam Service
14-BA-13 14UW004-1"-11A Utility Water Nom. Flow
14/14UW001 condenser Test

14-BA-11 14FG004-1"-B1 Fuel Gas 14-FG004-1"-11D 14BD109-4"-B1

14-BA-11 14P004-2"-11L Sour Gas 2P188-3"-B20 14C-3/14-BA12


5 14-BA-12 14P005-2"-11L Sour Gas 14C-3 (Top) 14P002

14-BA-12 14N005-1"-11A Nitrogen Inst Purge 14-BA-14/14N001 14PA002

14CSW005-1*1/2"- 14E-2 final S


14-BA-13 Intermittent Blowdown 14-BA-14
11C condenser
14-GD-A-62006 14BD005-2"-11E Blow Down 14F-2 14BD003
14E-3 LPSteam Water to sewer/14-BA- Service
14-BA-13 14UW005-1"-11A Utility Water Nom. Flow
condenser 14 Test
14E-1 top relief
14-BA-12 14LS005-3"-11C LP Steam 14-BA-14/14LS001
valve
14-BA-12 14LC005-1/2"-11C LP Condensate Steam Trap 14-BA-14/14LC001
14-BA- Service
6 14-BA-12 14UW006-1"-11C Utility water Pyrometer Nom. Flow
14/14UW001 Test

14-BA-12 14LS006-1*1/2"-11C Warm up steam 14LS001 14E-1'

14-BA-13 14LC006-1/2"-11C Condensate 14LS007 14-BA-14/14LC001


14-BA-12 14P006-8"-11E Hot Gases Bypass Pass 2/1B 14P009

14-BA-12 14BD006-3"-11C Blow Down 14E-1 (PSV147A) Atmosphere

7 14-BA-12 14BD007-3"-11C Blow Down 14E-1 (PSV147B) Atmosphere

14-BA-13 14LC007-1"-11C Condensate Header Seal Pot 14LC012


14E-3 LPSteam
14-BA-13 14LS007-1"-11C Warm up steam 14LS001
condenser

LINE LIST Page 192


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 14: SULPHUR RECOVERY PLANT Approved by: Rana Zaheer Ahmed
Document No: BOPL/07/2009
Rev: 00 NA: not available
Date: 04/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F

14-BA-12 14P007-6"-11E Pass 3 Effluent to 14C-8 14E-1 Pass 3 14C-8

8 14-BA-12 14BD008-2"-11C Blow Down 14N002 Atmosphere


14-BA-13 14LC008-1"-11C Condensate Header Cond Return 14LC012
Ametek Tail Gas
14-BA-13 14LS008-1"-11C LP Steam 14LS001
Analyzer

14-BA-12 14P008-6"-11E Pass 4 Effluent to 14C-4B 14E-1 Pass 4 14C-4A/B

9 14-BA-13 14P009-3"-33A Hot Gases TIC 200 14P008


14-GD-A-62006 14LS009-2"-11C LP Steam 14LS001 14D-1/Seal pot
14-BA-13 14LC009-1/2"-11C Condensate 14LC008 14P017
Atmosphere safe
14-BA-13 14BD009-2"-11C Blow down PSV196A
location
10 14-BA-13 14P010-3"-33A Hot Gases 14P006 14P028-6"-11E
14-GD-A-62006 14LS010-2"-11C LP Steam 14LS001 Sulphur r/down pit
Trap on line
14-BA-13 14LC010-1/2"-11C Condensate 14LC001
14LS001
Atmosphere safe
14-BA-13 14BD010-2"-11C Blow Down PSV196B
location
Reactor Effluent from
11 14-BA-12 14P011-6"-11E 14C-4A/B Pass 4 of 14E-1
14C-4A
14D-1 Sulphur storage
14-BA-13 14LS011-1"-11C LP Steam 14LS010/14LS001
pit/ R/Down

14-BA-13 14LC011-1*1/2"-11C Condensate 14E-3' 14E-2'

Water to sewer, cont.


12 14-BA-12 14BD012-1*1/2"-11C 14E-1' Sewerage
boiler blow down
Reactor Effluent from
14-BA-13 14P012-6"-11E 14C-4B 14E-2 inlet
14C-4B
14-BA-13 14LC012-1"-11C Condensate 14LC007/008 14LC001
14-BA-13 14LS012-2"-11C LP Steam 14E-2' 14E-3'
13 14-BA-12 14P013-3"x4"-11F Sulphur Product Pass 1A 14-BA-13/14C-6B
14-BA-13 14LS013-2"-11C LP Steam 14LS001 14LS009/14LS010
14-BA-13 14LC013-1/2"-11C Condensate 14C-8 14-BA-14/14LC001
Continuous Boiler 14E-2 final S
14-BA-13 14BD013-1"-11C 14BD0014
B/Down condenser

LINE LIST Page 193


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 14: SULPHUR RECOVERY PLANT Approved by: Rana Zaheer Ahmed
Document No: BOPL/07/2009
Rev: 00 NA: not available
Date: 04/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
14 14-BA-12 14P014-3"x4"-11F Sulphur Product Pass 3 14-BA-13/14C-6A
Continuous Boiler 14BD012/14BD01
14-BA-14 14BD014-2"-11C 2BD179
B/Down 3
15 14-BA-12 14P015-3"x4"-11F Sulphur Product Pass 4 14-BA-13/14C-6C
14D-1 Sulphur storage
14-BA-13 14LS015-2"-11C Snuffing Steam 14LS001/002
pit/ R/Down
16 14-BA-13 14LS016-1"-11C LP Steam 14LS001 14C-8/14C-5
14E-2 final S 14C-6D Sulphur Seal
14-BA-13 14P016-3"x4"-11F Sulphur Product
condenser Pot
17 14-BA-13 14P017-2"x3"-11F Sulphur Product 14G-3 Loading Arm(14L-1)
14E-2 final S
18 14-BA-13 14P018-6"x8"-11H Tail gas from 14E-2 14P104-6"/8"-A15
condenser
19 14-BA-13 14P019-3"x4"-11H Vent to safe location 14D-1 Safe location
20 14-BA-13 14LS020-1"-11C LP Steam 14LS101 X-14H-1 (Ejector)
14C-6A Sulphur 14D-1 Sulphur storage
21 14-BA-13 14P021-3"x4"-11F Sulphur Product
seal pot pit/ R/Down
14C-6C Sulphur 14D-1 Sulphur storage
22 14-BA-13 14P022-3"x4"-11F Sulphur Product
seal pot pit/ R/Down
Tail Gas Sample to
24 14-BA-13 14P024-1"x2"-11H 14P018 Ametek Analyzer
Ametek Analyzer
Tail Gas Sample to
25 14-BA-13 14P025-2"x3"-11H 14P018 Ametek Analyzer
Ametek Analyzer
26 14-BA-12 14P026-2"-11L Sour Gas 14P002-3"-11L 14P107-1*1/2"-B20
27 14-BA-12 14P027-1*1/2"-11L Sour Gas 14P005-2"-11L 14P108-1*1/2"-B20
28 14-BA-13 14P028-6"-11E Effluent from 14C-8 14C-8 14C-4A/B
50 14-BA-13 14P050-1"x2"-11F Sulphur Product 14017 Loading Arm
51 14-BA-13 14P051-2"x3"-11F Sweap Gas 14D-1 14H-1
14F-1/14-BA-15/Flame
52 14-BA-13 14P052-2"x3"-11F Sweap Gas 14H-1
arrestor
53 14-BA-13 14P053-2"-11E vent 14P017 vent
54 14-BA-13 14P054-2"-11E vent 14P017 vent
14C-6B Sulphur 14D-1 Sulphur storage
60 14-BA-13 14P060-3"x4"-11F Sulphur Product
seal pot pit/ R/Down
14C-6D Sulphur 14D-1 Sulphur storage
61 14-BA-13 14P061-3"x4"-11F Sulphur Product
seal pot pit/ R/Down

LINE LIST Page 194


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 14: SULPHUR RECOVERY PLANT Approved by: Rana Zaheer Ahmed
Document No: BOPL/07/2009
Rev: 00 NA: not available
Date: 04/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F

70 14-BA-12 14PW070-1*1/2"-11E Sour Water 14PW001 14G-2B

71 14-BA-12 14PW071-1*1/2"-11E Sour Water 14G-2B 14PW003

80 14-BA-12 14PA080-4"-11A Combustion Air 14K-2B 14PA001


Steam Jacket on
88 14-BA-11 14LS88-2"-B23 50# Steam 2LS88-4"-B23
14P104-6x8"-A15
101 14-BA-11 14FG101-2"-B12 Fuel Gas 14C-1 14FG102/103 80 210 60 210 95/450 35 100
X14-BA-17 14P101-2"-B20 S.W,S Off Gas 14-BA-11 2P206 50 308 38 308 57/450 8 180
Service
14-BA-11 14IA101-1*1/2"-A1 Instrument Air 21IA1-1*1/2"-A1 Incinerator/14F-1 Nom. Flow
Test
14-BA-11 14LS101-1"-B23 50# Steam 2LS88-4"-B23 Service point
Service
14-BA-11 14UW101-1"-A1 Utility Water 2UW5-1*1/2"-A1 Service point Nom. Flow
Test
Process Water/Sour
14-BA-11 14PW101-1*1/2"-B19 1PW42/14PW003 2-BA-38
water 296 250 223 250 335/450 50 100
Service
14-BA-11 14UA101-1"-A1 Utility Air 2UA6-2"-A1 Service point Nom. Flow
Test
14-BA-11 14BD101-3"-B1 Blow Down from Relief PSV307/A 14FG004/14BD109 50 17 140
102 14-BA-11 14FG102-1*1/2"-B12 Fuel Gas 14FG101 14-BA-14/14FG001 80 210 60 210 95/450
Service
14-BA-11 14UA102-1*1/2"-A1 Utility Air 2UA6-2"-A1 End Closed Nom. Flow
Test
14-BA-11 14BD102-1*1/2"-B1 14C-1 (Bottoms) 14C-1 14BD101 50 NNF
X14-BA-17 14PW102-1*1/2"-B19 Sour Liquid 14G-1 14-BA-11 296 250 223 250 335/450 50 100
Service
14-BA-11 14IA102-1*1/2"-A1 Instrument Air 21IA1-1*1/2"-A1 14IA001 Nom. Flow
Test
103 14-BA-11 14FG103-2"-B12 Fuel Gas 14FG101 To Incinerator/14-BA-15 80 210 60 210 95/450 35 100
X14-BA-17 14P103-2"-B20 Amine Plant Acid Gas 14-BA-11 2P206 50 300 38 300 57/450 8 100
14-BA-11 14BD103-2"-B12 14C-1 (Top) 14C-1 PSV307/A 80 140 60 140 90/450 35 100
104 14-BA-11 14BD104-3"-B1 Blow down 14BD111 14BD105/14FG004 400 50 17
Service
14-BA-13 14P104-6"/8"-A15 Tail Gas 14P018 14F-1/14-BA-15 1 262
Test
X14-BA-17 14PW104-1"-B20 Sour Liquid 14C-5 14G-1
Gas Line to incinerator burner to
105 X14-BA-17 14P105-6"-B20 free dran from flame arrestor to 14C-5 Burner
14C-5

LINE LIST Page 195


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 14: SULPHUR RECOVERY PLANT Approved by: Rana Zaheer Ahmed
Document No: BOPL/07/2009
Rev: 00 NA: not available
Date: 04/05/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
106 14-BA-11 14FG106-1*1/2"-B12 Fuel Gas 6-RA-2 14C-7 (Top) 50 NNF
X14-BA-17 14BD106-3"-B20 Blow Down Gas 14C-5 PV83/83A 50 400 38 400 57/450 8 100
107 14-BA-11 14BD107-1*1/2"-B1 14C-7 Blow Down 14C-7 (Bottom) 14BD108 50 NNF
14-BA-12 14P107-1*1/2"-B20 Sour Gas 14P026 14BD001 50 400 38 400 57/450 8 100
14-BA-12 14FG107-1"-B12 Fuel Gas 14FG001 PSV142 95/450 NNF
108 14-BA-11 14BD108-4"-B1 Blow Down 14BD110 6-RA-4 400 400 50 17
14FG004/14BD10
109 14-BA-11 14BD109-4"-B1 Blow Down 14BD110/14BD108
1/14BD104 400 400 50 17

LINE LIST Page 196


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 15: COMMON FACILITIES (FUEL DISTRIBUTION SYSTEM) Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 17/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
150#
15BD2001-4"-
1 15-RA-2 15BD1-4"-B1 Blowdown 6-RA-4 Rating 50 305
B1/15C-3
6
PID-1510(1/2) 15P1-2"-B19 FUEL Gas 8P106-2"-C12 21P559-3"-C12
15-RA-2 8PW1-3"-B19 Process water 8-RA-2 15PW2003-2"-B19
15-RA-2 15PW1-4"-B19 Process water 50-RA-11 8PW1-3"-B19 50 308 38 308 6 10 110

PID-1510(2/2) 1FG1-6"-B12 Fuel Gas 15FG116-10"-B12 1F-1

NHT CHARGE
PID-1510(2/2) 6FG1-3"-B12 Fuel Gas 6FG106-3"-B12
HEATER
PID-1510(2/2) 9FG1-1.5"-B12 FUEL Gas 15FG203-3"-B12 9E-2
PID-1510(2/2) 2FG1-6"-B12 FUEL Gas 31FG10-8"-B12 2F-1

1197-22-PID-1509 1FO1-4"-B1 Fuel Oil 15FO128-6"-B1 1F-1/2FO1-3"-B1

1197-22-PID-1509 2FO1-3"-B1 Fuel Oil 1FO1-4"-B1 2F-1

1197-22-PID-1509 15K1-0.5"-B1 Additive Additive Drum 15G-5

2 MNB-4384 15P2-3"-B1 Process 1P98-6"-B1 15C-9


MNB-4385 15MS2-2"-C1 Steam -- 15C-9
MHA-9561 1FG2-6"-B12 Fuel Gas 1C-15x 1NG100-2"-B12/1F-1
15-RA-4 15P2-3"-B1 Process 50-BA-11/4 15P3-1.5"-B-1/15C-9
15-RA-4 15MS2-2"-C23 Steam 50-BA-12/5 15C-9

1197-22-PID-1509 15P2-3"-B1 Process LGO Flush 15C-9/15p3-1.5"-B1

1197-22-PID-1509 15MS2-2"-C23 Steam 200# Steam 15C-9


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 15: COMMON FACILITIES (FUEL DISTRIBUTION SYSTEM) Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 17/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F

1197-22-PID-1509 1FG2-3"-B1 Fuel Gas 1F-1/2FG2-2"-B1 15FO104-4"-B1

1197-22-PID-1509 2FG2-2"-B1 Fuel Gas 2F-1 1FG2-3"-B1

15FO114-8"-
B1/15FO112-8"-
3 15-RA-4 15P3-1.5"-B1 Process 15P2-3"-B1
B1/15P6-1"-B1/15P7-
1"-B1

15-RA-4 15MS3-4"-C23 Steam 15MS101-4"-C23 15GT-4A

1197-22-PID-1509 15P3-1.5"-B1 Process 15P2-3"-B1 15FO2010-6"-B1

1197-22-PID-1509 15K3-0.5"-B1 Additive 15G-5 15FO132-4"-B1

4 15-BA-800 15P4-2"-B1 Process 15C-8 15G-6


5 MNB-4384 2BD5-6"-B1 Blowdown 2C-1 2C-17
15-BA-800 15P5-1.5"-B1 Process 15G-6 50-BA-12
15-RA-2 15BD5-2"-B19 Blowdown 15P1-2"-B19 6-RA-4 50 308 38 308 63 2 219
PID-1510(2/2) 2FG5-2"-B12 FUEL Gas 15FG203-3"-B12 14F-1/14F-2
PID-1510(2/2) 6BD5-1.5"-A1 Blowdown 6FG107-12"-B12 Blowdown Header
6 15-RA-2 15BD6-2"-B19 Blowdown 15BD5-2"-B19 15BD1-4"-B1
15-RA-4 15P6-1"-B1 Process 15P3-1.5"-B1 15FO139-1.5"-B1
5FG100-1.5"-B12/5F-
7 MHA-9561 5FG7-4"-B12 Fuel Gas 5C-9
1/2
15-RA-4 15P7-1"-B1 Process 15P3-1.5"-B1 15FO139-1.5"-B1
PID-1510(2/2) 21PG7-3"-B12 FUEL Gas 21PG7-4"-B12 19C-4X
PID-1510(2/2) 21PG7-4"-B12 FUEL Gas 31FG10-8"-B12 21PG7-3"-B12
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 15: COMMON FACILITIES (FUEL DISTRIBUTION SYSTEM) Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 17/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
Pilot Gas 4F-1/2/7F-
8 MHA-9561 4FG8-2"-B12 Fuel Gas 7NG100-8"-B12
1/2/3/4/5/6

9 MHA-9561 2FG9-8"-B12 Fuel Gas 2C-10 2NG100-1.5"-B12/2F-1

10 PID-1510(2/2) 31FG10-8"-B12 FUEL Gas 15FG10-8"-B12 21PG7-4"-B12

1197-22-PID-1509 31FO10-4"-B1 Fuel Oil 15FO128-6"-B1 To Boiler BMS

11 1197-22-PID-1509 31FO11-3"-B1 Fuel Oil Steam Boiler 15FO104-4"-B1

16 PID-1510(1/2) 8P16-6"-B13 Fuel Gas 8-RA-2 15FG122-10"-B12


23 PID-1510(2/2) 15FG23-6"-B12 FUEL Gas 31FG10-8"-B12 KO POT
29 PID-1510(1/2) 9P29-2"-B12 Fuel Gas 9C-3 15FG200-3"-B12
30 15-RA-2 15PW30-2"-B19 Process water 8-RA-2 15PW2003-2"-B19
7NG100-2"-B12/4F-
MHA-9561 15FG30-1"-B12 Fuel Gas 4C-12x
1/2/7F-1/2/3/4/5/6
EX1PSV38/1BD69
50 MHA-9561 1BD50-8"-B1 Blowdown Blowdown
-1.5"-B12
62 MHA-9561 1BD62-1.5"-B1 Blowdown 1C-15x
69 MHA-9561 1BD69-1.5"-B12 Blowdown 1C-15x 1BD50-8"-B1
100 MHA-9561 7NG100-2"-B12 Natural Gas 15NG103-3"-B12 4FG8-2"-B12
MHA-9561 1NG100-2"-B12 Natural Gas 15NG103-3"-B12 Pilot Gas 1F-1
MHA-9561 5NG100-1.5"-B12 Natural Gas 15NG103-3"-B12 Pilot Gas 5F-1/2
MHA-9561 6NG100-1.5"-B12 Natural Gas 15NG102-3"-C12 6F-1
MHA-9561 2NG100-1.5"-B12 Natural Gas 15NG103-3"-B12 Pilot Gas 2F1
15FG102-6"-
15-RA-3 15FG101-12"-B12 Fuel Gas B12/15FG122-10"- 15C-5 80 210 60 210 95 50 100
B12

15-RA-3 15LS101-1.5"-B23 Steam 6-RA-4(PID-1501) 15C-5


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 15: COMMON FACILITIES (FUEL DISTRIBUTION SYSTEM) Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 17/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
15-RA-4 15LC101-1"-B23 Condensate 15C-5 6-RA-4(PID-1501)
15-RA-3 15BD101-8"-B1 Blowdown 15C-5 6-RA-4 210 80 100
15FO131-4"-
101 15-RA-4 15FO101-6"-B1 Furnace oil 31-RA-6 B1/15FO102-6"- 190 175 143 175 214 100 175
B1/15FO103-6"-B1
15HS2002-4"-
15-RA-4 15HS101-3"-D24 Steam 31-RA-6
D24/15HS102-4"-D24
15-RA-4 15HC101-2"-D24 Condensate 15E-3 15HC2003-4"-D24 690 700 600 700 1305 600 700
15-RA-4 15MS101-4"-C23 Steam 31-RA-6 15MS3-4"-C23 275 470 207 470 373 200 383
102 15-RA-3 15FG102-6"-B12 Fuel Gas 8P104-6"-B13 15FG122-10"-B12 80 210 60 210 95 50 126

15-RA-3 15LS102-4"-B13 Steam 6-RA-4(PID-1501) 15E-4 60 307 50 298 53 50 298

15-RA-3 15LC102-1.5"-B23 Condensate 15E-4 6-RA-4(PID-1501) 60 307 50 298 83 50 298


British Gas 6NG100-1.5"-
MHA-9561 15NG102-3"-C12 Natural Gas
Compound B12/15NG103-3"-B12
15-RA-4 15FO102-6"-B1 Furnace oil 15FO101-6"-B1 TK-855 190 175 143 175 214 100 175
15-RA-4 15HS102-4"-D24 Steam 15HS101-3"-D24 15E-3 690 700 600 700 1305 600 700
PID-1510(1/2) 15BD102-3"-B1 Blowdown 15E-4 6-RA-4

15C-5/15FG135- 15FG107-6"-
103 15-RA-3 15FG103-12"-B12 Fuel Gas 80 210 60 210 95 50 100
12"-B12 B12/15FG104-14"-B12

7NG100-2"-
B12/1NG1002"B12/5N
MHA-9561 15NG103-3"-B12 Natural Gas 15NG102-3"-C12
G100-1.5"-
B12/2NG100-1.5"-B12

15-RA-4 15LS103-3"-B23 Steam 15LS105-3"-B23 TK-854 66 312 50 298 83 50 298


15-RA-4 15FO103-6"-B1 Furnace oil 15FO101-6"-B1 TK-854 190 175 143 175 214 100 175
15-RA-3 8P104-6"-B13 Process 8-RA-3 15FG102-6"-B12

15-RA-3 15FG104-14"-B12 Fuel Gas 15FG103-12"-B12 Heaters


80 210 60 210 95 35 100
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 15: COMMON FACILITIES (FUEL DISTRIBUTION SYSTEM) Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 17/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
15-RA-3 15BD104-1.5"-B1 Blowdown 15FG112-1.5"-B23 6-RA-4 80 210 60 210 95 65 100
PID-1510(1/2) 8P103-6"-B13 Fuel Gas 8C-5 8P104-6"-B13
PID-1510(1/2) 15BD103-1.5"-B1 Blowdown 15-TSV-2 6-RA-4
15FO105-4"-
31-RA-
B115FO106-4"-
104 15-RA-4 15FO104-4"-B1 Furnace oil 6/15FO132-4"- 270 250 203 250 310 200 250
B1/31FO107-3"-
B1/15FO130-4"-B1
B1/15FO133-4"-B1
15-RA-4 15LS104-6"-B23 Steam 15LS111-6"-B23 31-RA-6 66 312 50 298 83 50 298
15-RA-3 15BD105-6"-B12 Blowdown 15FG107-6"-B12 6-RA-4
8P106-2"-
15-RA-3 15FG105-4"-B12 Fuel Gas C12/21P575-3"- 15E-4
C12 220 125 165 125 262 50 40
15LS103-3"-B23/TK-
15-RA-4 15LS105-3"-B23 Steam 31-RA-6 66 312 50 298 83 50 298
855
15-RA-4 15LC105-1.5"-B23 Condensate TK-855 15LC107-2"-B23 60 307 50 298 83 50 298
105 15-RA-4 15FO105-4"-B1 Furnace oil 15FO104-4"-B1 TK-855 270 250 203 250 310 200 250
15-RA-4 15MS105-1"-D24 Steam 50-BA-12/5 15C-9

1197-22-PID-1509 15HS105-1"-D24 Steam 600# Steam 15C-9

106 15-RA-3 15FG106-8"-B12 Fuel Gas 15FG108-8"-B12 15FG101-12"-B12 220 125 165 125 262 50 40
15-RA-3 8P106-2"-C12 Process 8-BA-3 15FG105-4"-B12
15-RA-4 15FO106-4"-B1 Furnace oil 15FO104-4"-B1 TK-854 270 250 203 250 310 200 250
PID-1510(1/2) 15BD106-3"-B1 Blowdown 15-PSV-4 15BD105-6"-B1
PID-1510(2/2) 6FG106-3"-B12 FUEL Gas 15FG110-4"-B12 6FG1-3"-B12

107 15-RA-3 15FG107-6"-B12 Fuel Gas 15FG103-12"-B12 15BD105-6"-B12


80 210 60 210 95 50 100
TK-855/15LC105-
1.5"-
15-RA-4 15LC107-2"-B23 Condensate 31-RA-6
B23/15LC108-
1.5"-B23 60 307 50 298 83 50 298
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 15: COMMON FACILITIES (FUEL DISTRIBUTION SYSTEM) Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 17/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
15-RA-4 31FO107-4"-B1 Furnace oil 15FO104-4"-B1 50-BA-11/4 15 175 11 175 30 0/15 175
15-RA-4 15FO107-4"-B1 Furnace oil TK-855 OWS 15 175 11 175 30 0/15 175
PID-1510(2/2) 6FG107-12"-B12 Fuel Gas 6FG106-3"-B12 6BD5-1.5"-A1
108 15-RA-3 15FG108-8"-B12 Fuel Gas 15E-4 15FG106-8"-B12 220 125 165 125 262 65 40
15-RA-4 15LC108-1.5"-B23 Condensate TK-854 15LC107-2"-B23 60 307 50 298 83 50 298
15-RA-4 15FO108-4"-B1 Furnace oil TK854 OWS 15 175 11 175 30 2/15 175
109 15-RA-4 15FO109-8"-B1 Furnace oil TK-855 15FO111-8"-B1 15 175 11 175 30 2/15 175

PID-1510(1/2) 15FG109-12"-B12 Fuel Gas 15FG101-12"-B12 15PSV-3

110 MNB-4384 15BD110-4"-B1 Blowdown 15C-9 2C-1


15-RA-4 15FO110-8"-B1 Furnace oil TK-854 15FO111-8"-B1 15 175 11 175 30 2/15 175
MNB--4385 15FO111-5"-B23 Steam 15GT4A --

PID-1510(2/2) 15FG110-4"-B12 Fuel Gas 15FG121-14"-B12 6FG106-3"-B12

1197-22-PID-1509 15BD110-4"-B1 Blowdown Balance Line 15C-9

15FO109-8"- 15FO114-8"-
111 15-RA-4 15FO111-8"-B1 Furnace oil 15 175 11 175 30
B1/15FO110-8"-1 B1/15FO112-8"-B1 2/15 175
15-RA-4 15LS111-6"-B23 Steam 15GT4A 15LS104-6"-B23

PID-1510(2/2) 15FG111-8"-B12 Fuel Gas 15FG121-14"-B12 4-BA-4/1

112 15-RA-3 15FG112-1.5"-B23 Fuel Gas 15C-5 15BD104-0.5"-B1/OWS


60 307 50 298 83 50 298
15-RA-4 15FO112-8"-B1 Furnace oil 15FO111-8"-B1/15FO134-8"-B1
15FO2001-8"-B1 15 175 11 175 30 2/15 175
114 15-RA-4 15FO114-8"-B1 Furnace oil 15FO111-8"-B1 15FO2005-8"-B1 15 175 11 175 30 2/15 175
PID-1510(2/2) 15FG114-6"-B12 Fuel Gas 15FG121-14"-B12 BLIND

15FO2004-6"-
116 15-RA-4 15FO116-6"-B1 Furnace oil 15FO132-4"-B1 270 175 220 175 330 220 175
B1/15FO121-6"-B1
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 15: COMMON FACILITIES (FUEL DISTRIBUTION SYSTEM) Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 17/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F

PID-1510(2/2) 15FG116-10"-B12 Fuel Gas 15FG121-14"-B12 31FG10-8"-B12

15FO131-4"-
118 15-RA-4 15FO118-6"-B1 Furnace oil B1/15FO2014-6"- 15FO121-6"-B1
B1
15-RA-4 15FO118-1"-B1 Furnace oil TK854 OWS 270 175 220 175 330 - 175
120 15-RA-3 15FG120-12"-B12 Fuel Gas 50-RA-12 15FG101-12"-B12
15-RA-4 15FO120-1"-B1 Furnace oil TK855 OWS 270 175 220 175 330 - 175
15E-3/15FO116-6"-
121 15-RA-4 15FO121-6"-B1 Furnace oil 15FO118-6"-B1 B1/15FO122-4"- 270 175 220 175 330 220 175
B1/15FO2009-6"-B1

PID-1510(2/2) 15FG121-14"-B12 Fuel Gas 15FG104-14"-B12 15FG116-10"-B12

122 15-RA-3 15FG122-10"-B12 Fuel Gas 6-RA-4 15FG101-12"-B12


15FO128-5"-
15-RA-4 15FO122-4"-B1 Furnace oil 15FO121-4"-B1 220 175
B1/15FO2010-6"-B1 270 175 220 175 330
125 15-RA-4 15FO125-6"-B1 Furnace oil 15E-3 15FO128-6"-B1 270 250 203 250 310 200 230

PID-1510(2/2) 15FG125-2"-B1 Fuel Gas 15FG121-14"-B12 GAS HEADER

127 15-RA-4 15FO127-1"-B1 Furnace oil 15FO2010-6"-B1 OWS 250 250 atm 230

15FO122-4"-
128 15-RA-4 15FO128-6"-B1 Furnace oil 31-RA-6 270 250 203 250 310 200 230
B1/15FO125-4"-B1

130 15-RA-4 15FO130-4"-B1 Furnace oil 15FO122-4"-B1 15FO104-4"-B1 270 250 203 250 310 200 230
131 15-RA-4 15FO131-4"-B1 Furnace oil 15FO101-6"-B1 15FO118-6"-B1
132 15-RA-4 15FO132-4"-B1 Furnace oil 15FO116-6"-B1 15FO104-4"-B1
133 15-RA-4 15FO133-4"-B1 Furnace oil 15FO104-4"-B1 15C-9
134 MNB-4384 15FO134-8"-B1 Furnace oil 15C9 15FO137-8"-B1/15FO111-8"-B1

1197-22-PID-1509 15FO134-8"-B1 Fuel Oil 15C-9 15FO109-8"-B1

135 15-RA-3 15FG135-12"-B12 Fuel Gas 15C-5 15FG103-12"-B12


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by:


PLANT 15: COMMON FACILITIES (FUEL DISTRIBUTION SYSTEM) Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 17/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
50-BA-11/4/2-BA-
15-RA-4 15FO135-3"-C6 Furnace oil 15C-9
34

136 1197-22-PID-1509 15FO136-3"-B1 Fuel Oil Fuel Oil 15FO135-3"-B6

137 15-RA-4 15FO137-8"-B1 Furnace oil 15FO134-8"-B1 15FO132-4"-B1


15P6-1"-B1/15P7-
139 15-RA-4 15FO139-1.5"-B1 Furnace oil TK-854/TK855
1"-B1
109 PID-1510(1/2) 15BD109-2"-B1 Blowdown 6-RA-4 15C-5
200 PID-1510(1/2) 15FG200-3"-B12 Fuel Gas 9P29-2"-B12 15FG120-12"-B12
PID-1510(2/2) 15BD200-3"-B1 Blowdown 15C-100 RELIEF HEADER
1197-22-PID-1509 15FO200-1.5"-B1 Fuel Oil PSV 15-01 15FO202-4"-B1
201 PID-1510(1/2) 15FG201-6"-B12 Fuel Gas FUEL GAS BPL 15FG101-12"-B12
PID-1510(2/2) 15BD201-3"-B1 Blowdown 15C-100 RELIEF HEADER

1197-22-PID-1509 15FO201-1.5"-B1 Fuel Oil PSV 15-02 15FO202-4"-B1

202 PID-1510(2/2) 15FG202-8"-B12 Fuel Gas 15FG104-14"-B12 15C-100

15FO200/201-
1197-22-PID-1509 15FO202-4"-B1 Fuel Oil 15FO104-4"-B1
1.5"-B1
9FG1-1.5"-B12/2FG5-
203 PID-1510(2/2) 15FG203-3"-B12 Fuel Gas 15FG202-8"-B12
2"-B12
204 PID-1510(2/2) 15FG204-8"-B12 Fuel Gas 15C-100 STEAM BOILER

210 1197-22-PID-1509 15FO210-96"-B1 Fuel Oil Gantry Pump FO Storage Tank

236 PID-1510(1/2) 8P236-2"-C12 Fuel Gas 8P106-2"-C12 8-RA-2


401 15-RA-2 6PW401-2"-B19 Process water 6C-41/6-BA-802 15PW2003-2"-B19
559 PID-1510(1/2) 21P559-3"-C12 Process 50-BA-11 8-RA-2
575 15-RA-4 21P575-3"-C12 Process 21-BA-3 15FG105-4"-B12
1848 PID-1510(1/2) 21P1848-1"-C12 Fuel Gas 15-TSV-2 21P559-3"-C12
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 16: ISOMERIZATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 03/09/2009
OPERATING
Sr.No P&ID No Line No Service From To DESIGN CONDITION
CONDITION
16-BA-16/16-BA-
16HS1-6"-D24 Steam 11HS301-6"-D24 Header 690 700 690 700 1800 580 700
64
16-BA-61/16-BA-
16LS1-12"-B23 Steam 16LS36-8"-B23 Header 66 312 66 312 425 48 213
64
16-BA-64 16MS1-8"-C24 Steam 16MS17-6"-C24 Header 275 412 275 412 1100 180 379
16-BA-64/16-BA-
16HS2-4"-D24 Steam 16HS1-6"-D24 FV-6 690 700 690 700 1800 580 700
16
16-BA-64/16-BA-
16LS2-4"-B23 Steam 16LS1-12"-B23 16LS20-4"-C24 66 312 66 312 425 48 213
12
16-BA-16/16-BA-
16MS2-2"-C24 Steam 16MS1-8"-C24 16H-1 275 412 275 412 1100 180 379
64
16-BA-16 16HS3-4"-D24 Steam FV-6 16E-7 690 700 690 700 1800 435 700
16-BA-64/16-BA-
16LS3-1.5"-B23 Steam 16LS1-12"-B23 16LS11-1.5"-C1 66 312 66 312 425 48 213
12
16-BA-12 16LS4-1.5"-C1 Steam 16LS3-1.5"-B23 16P405-6"-C1 330 300 330 300 1100 48 213
16-BA-64/16-BA-
16MS4-6"-C24 Steam 16MS1-8"-C24 FV-11 275 412 275 412 1100 100 180
18
16-BA-16 16HS5-1"-D24 Steam 16HS3-4"-D24 16HS6-1.5"-D24 690 700 690 700 1800 435 700
16-BA-64/16-BA-
16LS5-3"-B23 Steam 16LS1-12"-B23 16E-13 66 312 66 312 425 48 213
20
16-BA-18 16MS5-6"-C24 Steam FV-11 16E-9 275 412 275 412 1100 159 370
16-BA-16 16HS6-1.5"-D24 Steam 16C-20 PSV-374 690 700 690 700 1800 435 700
16-BA-64/16-BA-
16LS6-1.5"-B23 Steam 16LS1-12"-B23 16P212-6"-C1 66 312 66 312 425 48 213
41
16-BA-18 16MS6-1"-C24 Steam 16MS5-6"-C24 16MS7-1.5"-C24 275 412 275 412 1100 159 370
16-BA-64 16HS7-6"-D24 Steam 16HS1-6"-D24 PV-342 690 700 690 700 1800 580 700
16-BA-64/16-BA-
16LS7-10"-B23 Steam 16LS1-12"-B23 FV-510 66 312 66 312 425 48 213
47
16-BA-18 16MS7-1.5"-C24 Steam 16C-21 PSV-375 275 412 275 412 1100 159 370
16-BA-16 16HS8-4"-D24 Steam 16HS2-4"-D24 16HS2-4"-D24 690 700 690 700 1800 580 700
16-BA-47 16LS8-10"-B23 Steam FV-510 16E-20 66 312 66 312 425 29 272
16-BA-64/16-BA-
16MS8-4"-C24 Steam 16MS1-8"-C24 PV-65 275 412 275 412 1100 180 379
32
16-BA-47 16LS9-1"-B23 Steam 16LS8-10"-B23 16LS10-1.5"-B23 66 312 66 312 425 48 293
16-BA-32 16MS9-4"-C24 Steam PV-65 16E-14 275 412 275 412 1100 78 320

LINE LIST Page 205


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 16: ISOMERIZATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 03/09/2009
OPERATING
Sr.No P&ID No Line No Service From To DESIGN CONDITION
CONDITION
16-BA-47 16LS10-1.5"-B23 Steam 16C-31 PSV-838 66 312 66 312 425 48 293
16-BA-46/16-BA-
16MS10-1.5"-C24 Steam 16MS1-8"-C24 16H-2 275 412 275 412 1100 180 379
64
16-BA-64/16-BA-
16LS11-3"-B23 Steam 16LS1-12"-B23 16LS12-3"-C23 66 312 66 312 425 48 293
49
16-BA-18 16LS11-2"-C24 Steam 16C-8 Steamout 275 412 275 412 1100 50 312
16-BA-49 16LS12-3"-C23 Steam 16LS11-3"-B22 16E-22 505 250 340 345 1100 48 293
16-BA-19 16LS12-2"-C24 Steam 16C-9 Steamout 240 250 240 250 1100 50 312
16-BA-64/16-BA-
16LS13-8"-B23 Steam 16LS1-12"-B23 FV515 66 312 66 312 425 48 293
51
16-BA-46 16LS13-2"C24 Steam 16C-27 Steamout 365 250 365 250 1100 50 312
16-BA-37 16LS14-8"-B23 Steam FV515 16E-18 66 312 66 312 425 30 273
16-BA-62 16LS14-2"-C24 Steam 16C-29 Steamout 80 250 80 250 1100 50 312
16-BA-37 16-LS15-1"-B23 Steam 16LS14-8"-B23 16LS16-1.5"-B23 66 312 66 312 425 48 293
16-BA-53 16LS15-2"-C24 Steam 16C-26 Steamout 105 250 105 250 1100 50 312
16-BA-37 16LS16-1.5"-B23 Steam 16C-30 PSV-837 66 312 66 312 25 48 293
16-BA-54 16LS16-2"-C24 Steam 16C-25 Steamout 105 250 105 250 1100 180 379
16-BA-64 16MS17-6"-C24 Steam PV-342 16MS1-8"-C24 275 412 275 412 1100 180 379
16-BA-4 16LS18-6"-B23 Steam 11C-25 11PV-16 110 320 110 320 425 75 320
16-BA-64 16MS18-6"-C24 Steam 16MS17-6"-C24 PSV-1115 275 423 275 423 1100 275 423

16-BA-4/16-BA-64 16LS19-6"-B23 Steam 11PV-16 16LS1-12"-B23 66 312 66 312 425 48 320

16-BA-50 16LS19-2"-C24 Steam 16C-23 Steamout 365 250 365 250 1100 50 312
16-BA-12 16LS20-4"-C24 Steam 16LS2-4"-B23 16E-2 66 312 66 312 1100 48 293
16-BA-61/16-BA-
16MS20-6"-C24 Steam 31MS27-6"-C23 16MS1-8"-C24 275 412 375 412 1100
64
16-BA-64 16LS21-1"-B23 Steam 16LS1-12"-B23 US#1 66 312 66 312 425 48 293
16-BA-64 16LS22-1"-B23 Steam 16LS1-12"-B23 US#2 66 312 66 312 425 48 293
16-BA-64 16LS23-1"-B23 Steam 16LS1-12"-B23 US#3 66 312 66 312 425 48 293
16-BA-64 16LS24-1"-B23 Steam 16LS1-12"-B23 US#10 66 312 66 312 425 48 293
16-BA-64 16LS25-4"-B23 Steam 16LS1-12"-B23 Header 66 312 66 312 425 48 293
16-BA-64 16LS26-1"-B23 Steam 16LS1-12"-B23 US#5 66 312 66 312 425 48 213

LINE LIST Page 206


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza

LINE LIST Checked by: Abdul Hamid


PLANT 16: ISOMERIZATION UNIT Approved by: Rana Zaheer Ahmed
Document No: BOPL/10/2009
Rev: 00 NA: not available
Date: 03/09/2009
OPERATING
Sr.No P&ID No Line No Service From To DESIGN CONDITION
CONDITION
16-BA-64 16LS27-1"-B23 Steam 16LS1-12"-B23 US#6 66 312 66 312 425 48 213
16-BA-64 16LS28-1"-B23 Steam 16LS1-12"-B23 US#7 66 312 66 312 425 48 213
16-BA-64 16LS29-1"-B23 Steam 16LS1-12"-B23 US#8 66 312 66 312 425 48 213
16-BA-64 16LS30-1"-B23 Steam 16LS1-12"-B23 US#9 66 312 66 312 425 48 213
16-BA-20 16LS31-2"-B23 Steam 16C-10 Steamout 66 312 66 312 425
16-BA-21 16LS32-2"-B23 Steam 16C-19 Steamout 66 312 66 312 425
16-BA-47 16LS33-2"-B23 Steam 16C-28 Steamout 66 312 66 312 425
16-BA-51 16LS34-2"-B23 Steam 16C-24 Steamout 66 312 66 312 425

16-BA-4/16-BA-61 16LS36-8"-B23 Steam 31LS23-14"--B23 16LS1-12"-B23 66 312 66 312 425 48 293

16-BA-61 16LS31-8"-B23 Steam 31LS25-8"-B23 16LS1-12"-B23 66 312 66 312 425 48 293


16-BA-64 16LS38-1"-B23 Steam 16LS25-2"-B23 US#4 66 312 66 312 425
16-BA-64 16LS39-1"-B23 Steam 16LS25-2"-B23 US#37

LINE LIST Page 207


BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza
LINE LIST Checked by:
PLANT 19: FLARE GAS RECOVERY SYSTEM Approved by: Rana Zaheer Ahmed
Document No: BOPL/11/2009
Rev: 00 NA: not available
Date: 19/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
1 MHC-4177 5LC1-1.5"-B23 Condensate 19LC1-1"-B23 5-BA-4
MHC-4177 19CW1-1.5"-A2 Cooling Water 5CW1-3"-A2 19K-1
19-RA-2 19IGN1-1"-B1 Flame front Gen Flame front ignitor 425
19-RA-2 19P1-4"-B1 Process 19C-2 19G-2 250 425 7.5 250
19-RA-2 19MS1-2"-C23 Steam 31MS21-4"-C23 19G2/19GT2 225 400 1100 388
19-RA-2 19MC1-1"-C23 Condensate 19MS1-2"-C23 OWS 225 400 1100 388
19-RA-2 19LC1-1"-C23 Condensate 19MS1-2"-C23 OWS 60 300 425 60 298
19-BA-2 19UW1-1"-A1 Utility water 21UW3-4"-A1 19D-1 100 100 200 15 60
2 MHC-4177 19CW2-1.5"-A2 Cooling Water 19K-1 5CW2-3"-A2
MHC-4177 19LS2-1"B23 Steam 5-EA-4 19LS12-1"-B23 60 300 425 298
19-RA-2 19IGN2-1"-B1 Flame front Gen Flame front ignitor 425
19-RA-2 19PG2-1.5"-B12 Fuel gas 19BD110-20"-B1 21PG7-3"-B12 77 100 425 100
19-RA-2 19UA2-1"-A1 Utility air 21-UA12-3"-A1 Flame front ignitor 100 100 200 20 80
19-RA-2 19UW2-1"-A1 Utility water 21-UW3-4"-A1 19D-1
19-RA-2 19P2-2"-B1 Process 19C-2 OWS 10 250 425
19-RA-2 19LC2-1"-B23 Condensate 19LS4-1"-B23 OWS 60 300 425 60 298
19-RA-2 19MC2-1"-C23 Condensate 19MS10-2"-C23 OWS 225 400 1100 388
3 MHC-4177 19CW3-2"-A2 Cooling Water 50-BA-12 19E-1
19-RA-2 19PG3-1"-B12 Fuel gas 19PG7-1"-B12 19BD103-36"-B1 77 100 425 100
19-RA-2 19IGN3-1"-B1 Flame front Gen Flame front ignitor 425
19-RA-2 19MS3-6"-C23 Steam 19MS8-6"-C23 19F-1 225 400 1100 388
19-RA-2 19UA3-1"-A1 Utility air 21-UA12-3"-A1 19V-1 100 100 200 20 80
19UW4-2"-
19-RA-2 21UW3-4"-A1 Utility water 21-BA-15 A1/19UW2-1"- 100 100 200 15 60
A1/19UW9-4"-A1
19-RA-2 19UW3-4"-A1 Utility water 19UW4-2"-A1 19C-3 100 100 200 15 60
19-RA-2 19LS3-3"-B23 Steam 19BD110-20"-B1 19LS5-2"-B23 60 300 425 298
19-RA-2 19P3-2"-B1 Process 19C-3 OWS 10 250 425
4 MHC-4177 19CW4-2"-A2 Cooling Water 19E-1 50-BA-12
19-RA-2 19IGN4-1"-B1 Flame front Gen Flame front ignitor 425
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza
LINE LIST Checked by:
PLANT 19: FLARE GAS RECOVERY SYSTEM Approved by: Rana Zaheer Ahmed
Document No: BOPL/11/2009
Rev: 00 NA: not available
Date: 19/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
19-RA-2 19UW4-2"-A1 Utility water 21UW3-4"-A1 19D-1 100 100 200 60

19-RA-2 19P4-4"-B1 Process 19G2/19P11-3"-B1 21-RA-8 80 250 425 50 250

19-RA-2 19MS4-2"-C23 Steam 31MS21-6"-C23 19LS5-2"-B23 225 400 1100 388


19-RA-2 19LS4-1"-B23 Steam 19G-3/19GT-3 19LC2-1"-B23 60 300 425 298
19-BA-2 19UA4-1"-A1 Utility air 21UA12-3"-A1 19D-1 100 100 200 20 80
5 19-RA-2 19UA5-1"-A1 Utility air 21-UA12-3"-A1 19D-1 100 100 200 20 80
19LS10-1"-
19-RA-2 19LS5-2"-B23 Steam 19MS4-1"-C23 60 300 425 298
B23/19LS7-1"-A1
6 19-RA-2 19PG6-1"-B12 Fuel gas 19PG3-1"-B12 Flame front Gen. 77 100 425 100
19-RA-2 19LS6-2"-B23 Steam 19LS5-2"-B23 19D-1 60 300 425 298
7 19-RA-2 19PG7-1"-B12 Fuel gas 21PG7-3"-B12 19F-1 77 100 425 100
19PG2-1.5"- 19PG7-1"-
19-RA-2 21PG7-3"-B12 Fuel gas 77 100 425 100
B12/21-BA-7 B1219PG4-2"-B12
19-RA-2 19LS7-1"-A1 Steam 19LS5-2"-B23 19D-1 60 300 425 298
19-BA-2 19IGN7-1"-B12 Flame front Gen Flame front ignitor
19MS3-6"-
8 19-RA-2 19MS8-6"-C23 Steam 31MS21-6"-C23 225 400 1100 388
C23/19MS7-4"-C23
19-RA-2 19P8-3"-B1 Process 19C-3 OWS 10 250 425
19-BA-2 19LS8-1.5"-B23 Steam 19LS3-2"-B23 19LS5-2"-B23 60 300 425 298
19-BA-2 19IGN8-1"-B12 Flame front Gen Flame front ignitor
9 19-RA-2 19UW9-4"-A1 Utility water 21UW3-4"-A1 19F-2 100 100 200 60 60
19-RA-2 21PG9-3"-B12 Fuel gas 21PG7-3"-B12 19C-4
19-BA-2 19IGN9-1"-B12 Flame front Gen Flame front ignitor
10 19-RA-2 19MS10-2"-C23 Steam 31MS21-6"-C23 19G-3/19GT-3 225 400 1100 388
19-RA-2 21PG10-3"-B12 Fuel gas 19C-4 21PG7-3"-B12
19-BA-2 19LS10-1"-B23 Steam 19LS5-2"-B23 19P1-4"-B1 60 300 425 298
19-BA-2 19P10-4"-B1 Process 19P2-2"-B1 OWS
19-BA-2 19UW10-1.5"-A1 Utility water 19UW4-2"-A1 19C-3
11 19-RA-2 19MS11-3"-C23 Steam 31MS21-6"-C23 19D-1 225 400 1100 388
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza
LINE LIST Checked by:
PLANT 19: FLARE GAS RECOVERY SYSTEM Approved by: Rana Zaheer Ahmed
Document No: BOPL/11/2009
Rev: 00 NA: not available
Date: 19/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
19-RA-2 19P11-3"-C23 Process 19G-3/19GT-3 19P4-4"-B1 80 250 425 90 60/100
19PG12-1.5"-
19-BA-2 19PG11-1.5"-B12 Fuel gas 31MS21-6"-C23 B12/19PG13-1.5"-
B12
19-BA-2 19LS11-4"-B23 Steam 32-EA-1 19MS12-2"-C23
12 MHC-4177 19LS12-1"B23 Steam 5LS2-8"-B23 Lube oil Sump
19-RA-2 21UA12-3"-A1 Utility air 21-BA-15 19D-1 100 100 200 20 80

19-BA-2 19PG12-1.5"-B12 Fuel gas 19PG11-1.5"-B12 19PG14-1.5"-B12

19-BA-2 19MS12-2"-C23 Steam 19MS3-6"-C23 19F-1 225 400 1100 388

13 19-BA-2 19PG13-1.5"-B12 Fuel gas 19PG11-1.5"-B12 19PG15-1.5"-B12

14 19-BA-2 19P14-2"-B1 Process 19P11-3"-B1 OWS


15 MHC-4177 19P15-2"-B1 Process 19C-5 5P51-4"-B1

19-BA-2 19PG15-1.5"-B12 Fuel gas 19PG13-1.5"-B12 19C-7

16 19-BA-2 19P16-3"-B1 Process OWS 19G-3


19-BA-2 19PG16-1.5" Fuel gas 19C-7 19BD109-36"-B1
17 19-BA-2 19P17-2"-B1 Process 19C-3 Atomos
19-BA-2 19PG17-1.5"-B12 Fuel gas 19C-7 TE-5/6/7
18 19-BA-2 19P18-4"-B1 Process 19C-2 19G-2A
19 19-BA-2 19P19-4"-B1 Process 19G-2A 19P4-4"-B1

19MS8-6"-
21 19-RA-2 31MS21-6"-C23 Steam 21-BA-15 C23/19MS10-2"-
C23/19MS11-3"-C23

100 MHC-4177 19FG100-5"-B1 Fuel gas 19K-1 50-BA-12-4


101 MHC-4177 19FG101-3"-B1 Fuel gas 19FG100-5"-B1 19E-1
102 MHC-4177 19FG102-3"-B1 Fuel gas 19E-1 19C-5
103 19-RA-2 19BD103-30"-B1 Blowdown 19C-2 19C-3
105 19-RA-2 19BD105-30"-B1 Blowdown 50-RA-12 19C-2
BOSICOR OIL PAKISTAN LIMITED Prepared by: Mohsin Raza
LINE LIST Checked by:
PLANT 19: FLARE GAS RECOVERY SYSTEM Approved by: Rana Zaheer Ahmed
Document No: BOPL/11/2009
Rev: 00 NA: not available
Date: 19/06/2009
DESIGN CONDITION OPERATING
UPSET CODE TEST INSUL CONDITION
Sr.No P&ID No Line No Service From To
Press. Temp. Press. Temp. Press. Press. Temp.
Psig °F Psig °F Psig Psig °F
109 19-RA-2 19BD109-36"-B1 Blowdown 19C-3 19F-1
19BD119-8"-
B1/19BD120-10"-
110 19-RA-2 19BD110-20"-B1 Blowdown 19C-3
B1/19BD-121-12"-
B1/19BD122-14"-B1
111 19-BA-2 19BD111-10"-B1 Blowdown 19BD103-30"-B1 19C-3
112 19-RA-2 19BD112-10"-B1 Blowdown 19BD111-10"-B1 19C-3
113 19-RA-2 19BD113-20"-B1 Blowdown 19C-3 19C3
119 19-RA-2 19BD119-8"-B1 Blowdown 19BD110-20"-B1 19F-2
120 19-RA-2 19BD120-10"-B1 Blowdown 19BD110-20"-B1 19F-2
121 19-RA-2 19BD121-12"-B1 Blowdown 19BD110-20"-B1 19F-2
122 19-RA-2 19BD122-14"-B1 Blowdown 19BD110-20"-B1 19F-2
124 MHC-4177 19BD124-10"-B1 Blowdown 50-BA-12 19C-5
125 MHC-4177 19BD125-10"-B1 Blowdown 19C-5 19K-1
126 MHC-4177 19BD126-1.5"-B1 Blowdown 19FG100-5"-B1
128 19-BA-2 19BD128-1.5"-B1 Blowdown 19C-3 19BD109-36"-B1
538 19-BA-2 21P538-4"-B12 Process 21-RA-3 19C-2
578 19-RA-2 21P578-1.5"-B1 Process 19C-4 19C-2