3 Technical Specifications 5 of 80 2.2.1 (u) Scheme for Bio- methanation The statement says “may”. Is it part of BEDP? Bidder to follow the tender specification
4 Technical Specifications - - - Would there be workshop facility at site during plant operation? Requirment to be given in equipment list
2.2.1 Bidder will provide Storage philosophy and presizing data for all type of
5 Technical Specifications 4 / 80 c) / d) / e) / Definition of Battery Limit storages. For chemicals used for CIP, it will be defined with CIP Bidder to follow the tender specification
f) specification.
Bidder will provide Storage philosophy and presizing data for storage
of Lignin/stillage. Bidder will provide pre-sizing data for process boilers,
6 Technical Specifications 2.2.1 h) Definition of Battery Limit and will specify equipment required on steam/condensate network. Bidder to follow the tender specification
Bidder will provide scheme and sufficient information to define the
Effluent Treatment plant.
Neutralization / Passivation Facilities are part of the Detailed It is part of ISBL. Bidder to follow the tender
7 Technical Specifications 2.2.1 k) Definition of Battery Limit
Engineering Contractor Scope of work. specification
As per tender Special Firefighting and safety
Please be advised that Firefighting and safety systems are not part of
8 Technical Specifications 2.2.1 L) Definition of Battery Limit systems as necessary is under the Battery
Licensor Scope of Work.
Limits of Bidder
Facilities for Corrosion monitoring are part of Detailed engineering
9 Technical Specifications 5/80 2.2.1 p) Definition of Battery Limit Bidder to follow the tender specification
contractor scope of work
Closed Blowdown system (CBD) is part of Detailed engineering
10 Technical Specifications 2.2.1 q) Definition of Battery Limit Bidder to follow the tender specification
contractor scope of work
11 Technical Specifications 2.2.1 s) Definition of Battery Limit Flare system: not applicable for this process -
Laboraty equipment for installation in Owner laboratory is part of DEC
Bidder to provide details of Lab equipments
12 Technical Specifications 2.2.1 t) Definition of Battery Limit scope of work. Bidder will provide analytical methods and analysis
and follow the tender specification
frequency in the Operating manual.
Please clarify if utilities generated ISBL can be exported and in such case
13 Technical Specifications 2.2.2 Definition of Battery Limit confirm the Prices for such utilities. Unit could have excess of energy, no Query not clear. Bidder to clarify.
export could lead to waste.
For Check Case, please provide feed quality for the Corn (Maize) Stalk
14 Technical Specifications 2.3.5 Design Feed & Unit Capacity Feed Characteristics will be provided
which shall be processed.
15 Technical Specifications 6/80 2.6.1.A Feed Characteristics The Ash content in Rice straw is very high. Please confirm. Bidder to follow the tender specification
Feed Characteristics: Please clarify the composition of the row "Others" It consists of mainly Acetates, formates, urionic
16 Technical Specifications 2.6.1 B) Feed Characteristics
for all the feedstocks acids.
Total composition does not represent 100% of the Feed. Please clarify
17 Technical Specifications 2.6.1 d) Feed Characteristics Balance is Mineral matter
the balance
2.6.1 d) It is specified that Biomass will have Dirt, dust, Mud/sand in a range of
NPV evaluation will be based on the feed
18 Technical Specifications General Feed Characteristics 2%wt. Please clarify if this 2%wt are considered at the Feedstock Price
composition mentioned in tender.
Note in the NPV evaluation.
Bidder to optimise by products production as
Please clarify requirement solid sulfur production. Solid Sulfur
19 Technical Specifications 2.8.1 Unit optimisation Criteria per Unit optimisation criteria and follow the
production is not economical for such low quantity
tender specifications
Table
Quality of DM Water, treated Wherever it is maximum or minimum, the
20 Technical Specifications 2.11.b) and Please clarify if value specified are maximum or minimum.
Raw Water & Raw water same is specified.
2.11.c)
2.12.1 & Enzymes, Yeast/basteria, Storage philosophy and presizing data will be provided for
21 Technical Specifications
2.12.2 catalyst… enzymes/additives, as well as yeast/bacteria to the process system.
Bidder to follow the tender specification
Enzymes, Yeast/basteria, Bidder technology is based on on-site Enzyme production. Facilities for
22 Technical Specifications 2.12.3
catalyst… enzyme production will be foreseen in the BEDP.
Enzymes, Yeast/basteria, Details of treatment / neutralization will be provided at later stage of Data to be provided and Bidder to follow the
23 Technical Specifications 2.12.5
catalyst… the project. tender specification
Enzymes, Yeast/basteria, Storage philosophy and presizing data will be provided for chemicals to
25 Technical Specifications 2.12.7 Bidder to follow the tender specification
catalyst… the process system (pretreatment section).
Enzymes, Yeast/basteria, Guidelines will be provided in the operating instructions for Facilities to be provided as per Tender
26 Technical Specifications 2.12.8
catalyst… adsorbent/Catalyst loading and unloading facilites. specification
Reactor details for 60 KLPD will be provided in the technical proposal.
Specific Process Design
27 Technical Specifications 2.13.3 However scale up procedure and calculations are part of the Licensor As per Tender, Reactor configuration and its
Guidelines
Know How. sizing finalized for the plant will be submitted
Specific Process Design Sizing Criteria and Yeast activity are part of Licensor Proprietary know in the bid with justification.
28 Technical Specifications 2.13.4
Guidelines how and cannot be disclosed at this stage.
Specific Process Design Flare load mitigation is out of Licensor Scope of work. Licensor will
36 Technical Specifications 2.13.22 Bidder to follow the tender specifications.
Guidelines describe at PDP stage a philosophy to limit relief flowrate to the flare.
Specific Process Design Bidder cannot foresee space for debottlenecking without knowing the
37 Technical Specifications 2.13.23
Guidelines final production target.
2.13.24 / Specific Process Design
38 Technical Specifications Closed blowdown facilities are part of DEC scope of work
2.13.25 Guidelines
2.13.27 & Specific Process Design Lignin / Ash / residue disposals depend on local market. Bidder can only Ok and Bidder to follow the tender
39 Technical Specifications
6.1.2.8 Guidelines suggest potential disposal route or end users. specifications.
2.13.29 / Specific Process Design Detailed features for environnement protection and occupational safety
40 Technical Specifications Bidder to follow the tender specifications.
2.14 Guidelines will be discussed at PDP stage.
Please clarify if the addionnal equipment or design margins foreseen to Additional equipments, if any for design case 2
42 Technical Specifications 5.2.1 Techno-economic evaluation handle the Design Case 2 will be considered in the CAPEX of the UNIT to be specified separately. Kindly refer clause
for the NPV evaluation. 5.2.2 point no xiv for NPV estimation.
Annexure IV main control loop and main operating conditions to be controlled will
53 35/80 control & set point summary
A 1.1.a be detailled on the PFD.
standards followed in
54 1.2 please clarify the standards you make reference
HC/distillery industry
64 2p) Basis of design Drawing standards are given as separate chapter of the process book.
Annexure IV
77 45/82 Compressors Anti-surge facilities will be defined by vendor.
A 6.2.5 j)
Annexure IV At basic stage, Bidder will not provide data on release rates,
79 Safety requirements
A 7.2 conditions. Only PSV discharge cases of PSV will be provided.
Annexure IV
80 47/80 Flare load summary It is not foressen to implement a flare for this process.
7.4
Bidder will follow Owner's equipment numbering and naming
Annexure IV philosophy. For this unit, very specific symbols shall be used (for
81 P&Ids
A 8.1 fermentors, specific filters etc…). For this reason, Bidder will not use
Owner symbols but Bidder standard symbols.
Annexure IV Only Utility P&Ids relative to steam and condensate equipment will be
82 48/80 Utility P&Ids
A 8.1.1b) developped by Bidder.
The Process cause and effect diagram shows already all the interlocks.
Annexure IV
83 49/80 Interlock description Consequently, there is no need of other document for interlock
A 8.3
descriptions. Logic diagram will not be provided by Bidder
Note that for solid transfer (biomass, pretreated biomass etc…), Bidder
will provide solid characteristics, and other requirements in a specific
Annexure IV
84 50/80 piping specifications datasheet. Enough information will be given to allow the EPC to consult
A 9.2
vendors. Type of conveying system will not be selected at design stage,
except if specifc requirement.
Annexure IV
85 line schedule flow regime will not be provided in the line schedule
A 9.3
Annexure IV
Analyzers,Temp., Pressure, Alarm set point are provided in a separate datasheet, and will not be
86 52/80 A 10.2.4 to
Flow and Level instruments included in Analyzer, Temp., Pressure, Flow, Level instruments.
10.2.8
Instruments lists for Temperature, Pressure, Flow and Level
instruments shall provide the specification of service indicating normal
Annexure IV
Temp., Pressure, Flow and steady state, the applicable operating conditions and physical
87 A 10.2.5 to
Level instruments properties of process streams, mechanical design pressure and
10.2.8
temperature. No other information will be provided, unless specif
requirement.
Bidder recommendations about the use of Field Bus technology will be
88 10.3 General Instrument
developped during KOM
Advanced Process Control study is not part of the scope. So there will
89 10.3 General Instrument
not have any description for advanced process control.