CONSTRUCTION ENVIRONMENTAL
PAGE 1 OF 19
MANAGEMENT PLAN
10040-00-091-PD-0007 REV.: 00
CONSTRUCTION ENVIRONMENTAL
MANAGEMENT PLAN
ATTACHMENTS
DOCUMENT CODE DESCRIPTION REV.
TEMPLATES
DOCUMENT CODE DESCRIPTION REV.
10040-00-091-PD-0007-tmp01 Environmental Weekly Checklist 00
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL
PAGE 2 OF 19
MANAGEMENT PLAN
10040-00-091-PD-0007 REV.: 00
INDEX
1. PURPOSE 3
2. SCOPE 3
3. DEFINITIONS 4
3.1 GENERAL DEFINITIONS 4
3.2 SPECIFIC DEFINITIONS AND ABBREVIATIONS 4
4. HSE POLICY 6
5. ROLES AND RESPONSIBILITIES 6
6. ENVIRONMENTAL MEETINGS 8
7. INDUCTION AND TRAINING 8
8. ENVIRONMENTAL PERMITS 8
9. ENVIRONMENTAL ASPECTS AND IMPACTS 9
9.1 SOIL AND GROUNDWATER 9
9.1.1 Commissioning Spill Prevention 11
9.2 AIR QUALITY 12
9.3 NOISE 13
9.4 WASTE 14
10. INPECTIONS, MONITORING AND REPORTS 14
10.1 MONITORING AND MESUREMENT 15
11. EMERGENCY AND CONTINGENCY 15
12. AUDITS 16
13. MOTIVATION 16
14. NON COMPLIANCE 16
15. REFERENCES 16
15.1 COMPANY SPECIFICATIONS AND PROCEDURES 16
15.2 PROJECT MANAGEMENT SYSTEM PROCEDURES 17
15.3 LAWS AND REGULATIONS 17
15.4 CONTRACTOR CORPORATE ENVIRONMENTAL PROCEDURES 18
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL
PAGE 3 OF 19
MANAGEMENT PLAN
10040-00-091-PD-0007 REV.: 00
1. PURPOSE
2. SCOPE
The implementation of the Construction Environmental Management Plan shall apply to all
areas under CONTRACTOR responsibility: construction areas, warehouse, lay down areas,
yards and temporary facilities (offices and camp) and during the execution of the
Construction, Pre-Commissioning and Commissioning phases of the Fadhili Gas Program
Project under CONTRACTOR scope of work.
Monitoring and measurement as EIA requirements are not under CONTRACTOR scope of
work.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL
PAGE 4 OF 19
MANAGEMENT PLAN
10040-00-091-PD-0007 REV.: 00
3. DEFINITIONS
SAUDI ARAMCO: Saudi Aramco as used in this procedure shall mean Saudi
Arabian Oil Company and its affiliated companies, including,
but not limited to Aramco Overseas Company.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL
PAGE 5 OF 19
MANAGEMENT PLAN
10040-00-091-PD-0007 REV.: 00
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL
PAGE 6 OF 19
MANAGEMENT PLAN
10040-00-091-PD-0007 REV.: 00
4. HSE POLICY
Responsibilities directly related to achieve compliance with the CEMP are the following:
CONTRACTOR shall be responsible for issuing and implementing on site the CEMP.
SUBCONTRACTOR shall prepare their own CEMP ensuring to comply with the
requirements of this CEMP.
CONTRACTOR shall appoint a qualified HSE Manager and several HSE Supervisors
on site, who are competent on environmental matters and that shall be in charge of
SUBCONTRACTOR environmental performance supervision.
CONTRACTOR shall appoint a qualified CONTRACTOR Environmental Coordinator,
who is competent on environmental matters, to coordinate the CEMP. He will report
to the CONTRACTOR HSE Manager.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL
PAGE 7 OF 19
MANAGEMENT PLAN
10040-00-091-PD-0007 REV.: 00
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL
PAGE 8 OF 19
MANAGEMENT PLAN
10040-00-091-PD-0007 REV.: 00
6. ENVIRONMENTAL MEETINGS
8. ENVIRONMENTAL PERMITS
The COMPANY shall handle the CONTRACTOR a copy of all the environmental permits,
such as the Environmental Permit to Construct (EPC) or Land Use Permit (LUP) before
starting the site construction works.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL
PAGE 9 OF 19
MANAGEMENT PLAN
10040-00-091-PD-0007 REV.: 00
Spills or contamination incidents may occur anywhere but there are some areas which are
more likely to suffer a spill or leakage. Some of these areas during construction phases are
the following:
- Equipment locations (due to failures such as ruptured hoses).
- Wastewater treatment system.
- Hazardous material storage areas.
- Fuel delivery and handling areas.
- Equipment maintenance areas.
- SUBCONTRACTORS’ workshops.
Between all these, the main activities that could result in spillage are: the refuelling of
vehicles, the maintenance of vehicles and equipment as well as leaking from storage tanks.
These areas, that have great potential for the occurrence of an undesired, shall be analysed
and adequately protected from the very beginning of the construction phase.
In order to reduce the risk of spills happening, the following must be done:
To prevent soil contamination at laydown areas, hazardous material storage areas
and in case of small refuelling areas, machinery fuelling/maintenance areas shall be
prepared and used by each SUBCONTRACTOR. The access to all hazardous
material storage area shall be controlled to prevent entry of unauthorized persons or
vehicles.
This area will be properly signalled and provided with a fire extinguisher. To prevent
spills these machinery areas shall be provided with a waterproof surface and shall
have systems to contain any occasional spill, drainage control such as berms and
ditches or collection systems designed to retain leachate and precipitation. The
containment system shall be of sufficient size to retain the accumulation from a
100mm storm wastes, oils or wastewater generated within the machinery
maintenance area will be contained and properly disposed of. SUBCONTRACTOR
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 10 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
shall ensure that maintenance activities such as washing down of equipment do not
cause soil contamination.
Drip pan/trays will be provided where equipment is used in a stationary position to
contain possible leakage/spillage when refuelling and during working hours under
cranes, compressors and generators.
Vehicles and mobile equipment shall be regularly inspected and maintained to
confirm that they are not leaking or dripping.
Lubricants, waste oil and chemical storage areas shall be constructed on a
waterproof surface and shall have systems to contain any occasional spill. Fuel lines
and pumps will be emptied into containers, which will be used to catch drips and spills
as needed, prior to disassembly.
For bulk storage of fuels, double-walled tanks meeting international standards shall
be used. An impervious surface coating shall be applied to the base and walls.
Refuelling shall only be carried out in designated areas following specified
procedures to reduce potential spillages. Refuelling areas shall be communicated to
all site personnel by signs and notice boards. Refuelling areas shall be constructed in
such a way as to prevent spillages. Vehicle fuel pumps will be equipped with
automatic dispensing shut off valves (or equivalent) to prevent overfilling tanks.
Spills or leaks resulting in soil contamination shall be cleared, removed and disposed
of using approved waste disposal providers.
In each area of activity, and in special near storage area and fuel containers,
SUBCONTRACTORS shall have an appropriate quantity of the following equipment
and materials to deal with small-scale incidents (<20 litters), the spillage of polluting
material shall be as minimum:
a) Absorbents pats
b) Absorbent material
c) Sand Bags
d )Large heavy duty plastic bags
e) Several empty (210litters) drums
d) Appropriate Personal Protective Equipment and Tools.
Each fuel service car carriers must have: absorbent pads, absorbent materials and
fire extinguishers
Hazardous material storage areas shall be labelled as per requirements.
Hazardous materials shall only be handled by operators who have been trained in
spill response procedures. Access to a hazardous material storage area shall be
controlled to prevent entry of unauthorized persons or vehicles.
Hazardous materials stored in drums or other moveable storage containers shall be
stored with sufficient aisle spacing to allow inspection and movement of the drums or
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 11 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
containers. Drums may be stacked on pallets or skids, no more than two (2) drums
high. Containers holding hazardous materials shall be individually labelled to reflect
the actual contents of the container. The labelling shall include either:
a) contents and associated hazards using the United Nations chemicals
hazard classification; or
b) a unique identification which is cross-referenced to a document which lists
the contents and the hazards
Waste water from the wash basins, kitchens and shower units shall be directed to a
holding tank or septic tank. CONTRACTOR and SUBCONTRACTOR are responsible
for clearing and cleaning regularly of these tanks and disposal in Sewage Treatment
Plant according to local and national laws in order to prevent overflowing of the tanks.
A disposal site for washing out residual concrete from trucks shall be fit out with
waterproof surface and deep enough to evaporate water and contain the concrete
waste.
Incompatible materials shall not be placed in common containment areas, the same
containers or on the same vehicles.
Dewatering groundwater during excavations and trenching will be reused for dust
suppression, and other construction activities such as concrete curing, where
possible.
Groundwater must not be extracted for any construction activity use, except for
dewatering during excavations).
Dewatering groundwater quality will be determinate prior to disposal.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 12 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
Main construction activities foreseen to affect the environment and, more specifically, the air
quality will be those involving dust and exhaust combustion gases generation from civil
works, earth moving and engine vehicles.
Environmental practices focused on air quality preservation include minimizing the potential
fugitive dust and gaseous emissions and therefore, the following measures shall be taken
into account:
Compacting and watering unpaved site ways in case it is necessary, according to the
criterion of the CONTRACTOR HSE Manager. Sea water will not be used as a dust
control spray on the road.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 13 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
Excavations and grading operations will be suspended during dust storms or very
high wind speeds.
Provision of dust suppression through wetting during loading and unloading of trucks
of substances of potential high dust impacts as deemed necessary by
CONTRACTOR HSE Manager.
Covering vehicles carrying earth dry materials or other powdered materials.
Stockpiles regular inspections and wet suppression according to the criterion of
CONTRACTOR HSE Manager.
Ensuring equipment, machinery and vehicles are properly maintained and inspected
so as to reduce gaseous missions to ALARP level.
Ensure all vehicles leaving the site are clean so that roadways remain dust-free and
usable for all other neighbours, as well as in safe driving condition.
Reuse of non-potable water whenever possible shall be necessary to reduce the
water consumption for dust suppression. All water used for irrigation purposes shall
meet the irrigation water quality standards described in local regulations at both
discharge and use points. The treated effluent irrigation water distribution system
shall be clearly marked and utilize unique fittings and materials to avoid cross-
connection with drinking water or other water distribution systems.
All trucks and other vehicles where possible, will have their engines turned-off when
not required.
CONTRACTOR will use data from the air quality monitoring station which PMT will install on
the site for compliance verification
9.3 NOISE
During the Construction, Pre-Commissioning and Commissioning phases of the project some
activities will be susceptible to generate high noise levels that shall be controlled by means of
protective and preventive measures to avoid impact to the environment. The main activities
which are susceptible to produce noise are the use of power tools, earth moving and heavy
equipment as well as general vehicular traffic.
Despite the fact, noise control shall be performed following these instructions:
- All vehicles and mobile equipment entering the site area shall be regularly inspected
and maintained according to manufacturers’ specifications and recommendations and
always in compliance with applicable legislation so as to ensure noise levels are upon
admissible limits. In addition to that, the Equipment Inspection Procedure described in
the Contractor Site Safety Program (10040-00-091-PD-0005) shall be implemented.
- All machine engines that generate excessive noise level shall be fitted with acoustic
hoods, whenever practical.
- Noise generating equipment shall be throttled down or switched off when not in use.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 14 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
- Activities which are potentially noisy will be performed during daylight hours only,
avoiding prayer timings and public holidays.
- Any tool, vehicle or equipment found to be noisier than expected shall be removed
from the site until repaired and re-inspected.
- Silent steam blowing will be used where reasonably practicable to ensure noise level
criteria is not exceeded, additionally silencers and/or screening will be used at the
pipe outlet to mitigate noise level.
9.4 WASTE
Waste management during construction has been developed in the Waste Management Plan
(10040-00-091-PD-0008) following the guidelines about meeting, training, inspection, audits,
motivation and non-compliance of the present document.
CONTRACTOR and its SUBCONTRACTORS will perform periodic inspections to verify that
the CEMP is being implemented. Environmental inspections will be carried out jointly with
scheduled health and safety inspections.
Daily HSE inspection consists in a visual checking activity performed by CONTRACTOR
HSE Manager and/or Supervisor jointly with SUBCONTRACTOR HSE Manager and/or
officers to be sure that works are executed in compliance with environmental requirements.
Violations will be identified and SUBCONTRACTOR shall be notified of the recommended
actions to be taken and shall be recorded using TR Observation application or equivalent.
Weekly HSE Assessment Inspections shall be carried out by CONTRACTOR HSE Manager
and the CONTRACTOR and/or SUBCONTRACTOR supervisory personnel. CONTRACTOR
HSE Manager will fill out the Weekly HSE Assessment Check List attached to this CEMP
(10040-00-091-PD-0007-tmp01).
An Environmental section will be included at the HSE Monthly Report. All monitoring,
violations, environmental incidents/ accidents etc. shall be reported in the HSE Monthly
Report.
SUBCONTRACTOR shall provide all necessary information to elaborate the Monthly HSE
Report. At the end of the PROJECT a Final HSE Report shall be issued that shall include all
environmental aspect taken place during Construction, Pre-Commissioning and
Commissioning and included in Construction Final Report.
In case of any environmental Incident, a specific report has to be issued and submitted to
CONTRACTOR HSE Manager for information and/or action in accordance with Emergency
Response Plan (10040-00-091-PD-0009).
HSE Alert Shall be prepared and distributed to HO HSE Department and communicated to
all employees so as to lessons learned are used and advantage taken to avoid reoccurs.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 15 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
.Air Quality
Visual air quality monitoring shall be done during weekly and daily site visits by the
CONTRACTOR Environmental Coordinator. The decision for compacting, watering unpaved
site ways, wetting during loading and unloading of trucks according to the criterion of
CONTRACTOR HSE Manager.
Waste Management
Daily site visit by the CONTRACTOR Environmental Coordinator to monitor activities related
to segregation, storage, treatment and disposal of wastes generated during construction and
commissioning.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 16 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
Traffic accidents
Security threat
Regular drills shall be conducted to verify the effectiveness of the Emergency Response Plan
(10040-00-091-PD-0009), the alertness of emergency response team and workers and to
train personnel to execute emergency procedures.
12. AUDITS
Environmental audits will be carried out jointly with health and safety corporate audits carried
out by CONTRACTOR HO personnel. For additional information see section 13.2 of the
Contractor Site Safety Program (10040-00-091-PD-0005).
13. MOTIVATION
Any SUBCONTRACTOR who fails to handle, store, or dispose of waste in a correct and safe
manner in line with this Plan shall be liable for the costs incurred in the subsequent remedial
actions. This will include payment of any legal costs, fines and compensation claims incurred
by CONTRACTOR through the SUBCONTRACTORS incorrect, unsafe or illegal activity.
15. REFERENCES
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 17 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 18 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
FADHILI GAS PROGRAM (FGP) PROJECT 10040
CONSTRUCTION ENVIRONMENTAL PAGE 19 OF
MANAGEMENT PLAN 19
10040-00-091-PD-0007 REV.: 00
PG-09 Communication.
This document is property of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.