SIL STUDY REPORT
MUK
DATE: 08/13/18
PROJECT
ENGINEER
MUK
DATE:
08/13/18
CERTIFIED
RDD
04104/13
08/13/18
DATE: 10/25/
2016
CONSTRUCTION
AGENCY
TBD
08/13/18
DATE: Prepared by
OPERATIONS
TBD
08/13/18
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
AUG 2018
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
TBD
SAUDI ARABIAN OIL COMPANY
TABLE OF CONTENTS
ENGG CERT
RDD
1 INTRODUCTION ................................................................................................................. 3
MUK
2 SCOPE ................................................................................................................................ 3
3 OBJECTIVES ...................................................................................................................... 3
4 SIL STUDY TEAM ............................................................................................................... 4
5 DEFINITIONS & ABBREVIATIONS .................................................................................... 5
ISSUED FOR REVIEW
08/13/18 10-01936
DATE:
08/13/18
CERTIFIED
RDD
04104/13
08/13/18
DATE: 10/25/
2016
CONSTRUCTION
AGENCY
TBD
08/13/18
DATE:
OPERATIONS
TBD
08/13/18
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
1 INTRODUCTION
TBD
RDD
The SIL was facilitated by SNC Lavalin Fayez Engineering and attended by engineers
from Saudi Aramco and SLFE.
The SIL assessment session was conducted at SLFE office in Al-Khobar on 9th August
2018.
ISSUED FOR REVIEW
DESCRIPTION
The purpose of the SIL review within this study is to assign safety integrity levels to each
Safety Instrumented Function (SIF) in accordance with Saudi Aramco standards (SAEP-
250 Published 21 January 2018) to demonstrate that the Safety Instrumented Functions
(SIFs) proposed provide adequate levels of risk reduction and meets the Risk Target
Frequencies identified by Layer of Protection Analysis (LOPA).
Findings from the study session were recorded in LOPA worksheets (provided by Saudi
JO/EWO
08/13/18 10-01936
2 SCOPE
The scope of SIL assessment consists of facilitating and chairing SIL workshop,
NO.
REV
DISCIPLINE
performing SIL assessment using Layer of Protection Analysis (LOPA) methodology in
ENGINEER
MUK accordance with the guidelines provided in the Saudi Aramco Engineering Procedure,
DATE: 08/13/18
PROJECT
SAEP-250 (21 January 2018) & IEC-61511.
ENGINEER
MUK
The purpose of this study is to access the Safety Instrumented Functions (SIFs) so that
DATE:
08/13/18
CERTIFIED the Design of Safety Integrated Systems is adequate to protect personnel, environment
RDD
04104/13
08/13/18
and assets against potentially hazardous situation. The SIL assignment study included all
DATE: 10/25/
2016
CONSTRUCTION
AGENCY
high-risk areas, which were developed during the HAZOP study undertaken on original
TBD
design basis.
08/13/18
DATE:
OPERATIONS
The team identified 22 SIF loops within the scope of the project. SIL Study was conducted
TBD
08/13/18 for risk scenarios (identified during HAZOP) and recommended SIFs (identified in HAZOP
DATE:
CONTROL NUMBER
3 OBJECTIVES
DATE:
BY:
The objective of this SIL study is to systematically identify SIF required to prevent or
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
mitigate a hazardous event and to determine its Safety Integrity Level (SIL) required for
OF THIS DRAWING IS COVERED, FOR ALL
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
The SIL determination study covers all the Safety Instrumented Functions (SIFs) as
TBD
RDD
Safety Integrity Level determination study is the part of overall safety studies, which
MUK
SIL assessment/determination is the phase 2 activity of the overall Safety Lifecycle (SLC)
of the SIS (Figure 7 of IEC 61511-1:2016). This Phase 2 activity in IEC 61511- 1:2016 is
referred as “Allocation of the Safety Functions to Protection Layers”.
Safety Life Cycle Phase 1, i.e.” Hazard & Risk Assessment”, is required to be undertaken
before the commencement of Phase 2. Results of Phase 1 are required to be available
before the start of Phase 2.
JO/EWO
08/13/18 10-01936
• SIL Facilitator
NO.
REV
DISCIPLINE
• SLFE Instrumentation Engineer
ENGINEER
MUK • SLFE Process Engineer
DATE: 08/13/18
PROJECT
• SLFE Project Management
ENGINEER
MUK • Saudi Aramco Loss Prevention Department
08/13/18
DATE:
CERTIFIED
• Saudi Aramco Proponent/ operations representative(s)
RDD
• Saudi Aramco Project Management team
04104/13
08/13/18
DATE: 10/25/
2016
CONSTRUCTION
AGENCY
Refer to Appendix A of this report for list of attendees.
TBD
08/13/18
DATE:
OPERATIONS
TBD
08/13/18
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
5 DEFINITIONS & ABBREVIATIONS
TBD
ABBREVIATION
ENGG CERT
RDD
08/13/18 10-01936
DISCIPLINE
ENGINEER
SIS Safety Instrumented System
MUK TAHH Temperature Alarm High High
DATE: 08/13/18 ZV Remote Shut-Off Valve (or Emergency Isolation Valve)
PROJECT
ENGINEER
MUK
DATE:
08/13/18 DEFINITIONS
CERTIFIED
RDD
MTTR Mean Time to Restoration
04104/13
08/13/18
DATE: 10/25/ Mean Time to Restoration consists of mean time to repair logistical delay
2016
CONSTRUCTION
AGENCY time and administrative delay time. Mean Time to Restoration is the total
TBD downtime used in availability calculations
08/13/18
DATE: Availability The probability that a device is operating successfully at a given moment
OPERATIONS
in time. This is a measure of the uptime and is defined in units of percent.
TBD
β Factor Beta Factor, Indicating Common cause susceptibility. The fraction of total
08/13/18
DATE: failure rate that is attributed to a single cause in common with other units
CONTROL NUMBER
in the group. A common cause failure will result in all units with the group
VERIFICATION
failing simultaneously.
EDSD
BPCS Basic Process Control System. IEC-61508 term used to describe the
DATE:
Diagnostic A measure of system’s ability to detect failures. This is a ratio between the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Coverage failure rates for detected failures to the failure rate for the all the failures in
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
the system.
(DCC) NO. _____________________
system.
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
RDD
FE Final Element, This term included all the devices required for the purposes
of acting to remove of hazards.
The frequency of the hazard outcome after IPL’s have been considered
MUK
Intermediate
Event but before any further protective function has been added. It is the
Frequency demand rate made on any additional safety functions required as a result
of analysis. Sometimes referred to unmitigated frequency.
IPF Instrumented Protective Function, A function comprising one or more
initiators, logic solver and one or more final element whose purposes is to
ISSUED FOR REVIEW
IPL Independent Protection Layer. This refers to various other methods of risk
reduction possible for a process. Examples include items such as rupture
disks and relief valves, which will independently reduce the likelihood of
the hazard escalating into a full accident with harmful outcome.
LOPA Layer of Protection Analysis. A modified event tree where only the single
hazard outcome and resulting occurrence of the consequence are of
interest. An initiating event cause is analyzed together with all effective
IPL’s. The resulting frequency is called the intermediate Event Frequency,
(for the single event cause).
JO/EWO
08/13/18 10-01936
DISCIPLINE prevent the occurrence of the consequence. The term is related to the
ENGINEER
MUK Fault Tolerant Time of the Process.
DATE: 08/13/18
Proof Test The periodic testing of the equipment, (usually SIF components and sub
PROJECT systems) to detect and correct any otherwise undetectable hardware
ENGINEER
MUK failures that would prevent the equipment form successfully operating on
08/13/18 demand.
DATE:
CERTIFIED PTC Proof Test Coverage: The percentage failures that are detected during the
RDD
servicing of the equipment. IEC-61508 allows people to assume that when
04104/13
DATE:
08/13/18
10/25/ a proof test is performed any errors in the systems are detected and
2016
CONSTRUCTION
AGENCY
corrected (100% proof test coverage); in practice, this is usually not the
TBD case.
DATE:
08/13/18 PTI Proof Test Interval: The time interval between servicing of the equipment.
OPERATIONS
TBD Redundancy Use of multiple elements or systems to perform the same function.
DATE:
08/13/18 Redundancy can be implemented by identical elements or diverse
CONTROL NUMBER
availability.
EDSD
SFF Safe Failure Fraction: The fraction of the overall failure rate of a device
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
that results in either a safe fault or diagnosed (detected) unsafe fault. The
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
safe failure fraction includes the detectable dangerous failures when those
B
place.
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
RDD
SIL Safety Integrity Level: A quantitative target for measuring the level of
safety in a process. Defining a target SIL level for the process should be
based on the assessment of the likelihood that an incident will occur and
MUK
Spurious These unnecessary trips result from safe failures of sensors, logic solvers,
Trips and final shutdown elements. The STR value is used to quantify the
expected frequency of these trips.
STR Spurious Trip rate: This is the average frequency of safe process trips
JO/EWO
08/13/18 10-01936
DISCIPLINE
ENGINEER
MUK
DATE: 08/13/18
PROJECT
ENGINEER
MUK
DATE:
08/13/18
CERTIFIED
RDD
04104/13
08/13/18
DATE: 10/25/
2016
CONSTRUCTION
AGENCY
TBD
08/13/18
DATE:
OPERATIONS
TBD
08/13/18
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
6 APPLICABLE DOCUMENTS
TBD
RDD
MUK
5 RA-495031.001 P&IDs
6 RA-495049.001 P&IDs
7 RA-495050.001 P&IDs
8 RA-380425.001 P&IDs
9 RA-495035.001 P&IDs
JO/EWO
08/13/18 10-01936
10 RA-495037.001 P&IDs
11 RA-495031.001 P&IDs
DATE
12 RA-495040.002 P&IDs
NO.
REV
13 RA-495039.001 P&IDs
DISCIPLINE
ENGINEER 14 RA-495044.001 P&IDs
MUK
23 RA-495048.001 P&IDs
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
6.2 GENERAL REFERENCE DOCUMENTS
TBD
ENGG CERT
RDD
1 SAEP-250 (21 January 2018) Safety Integrity Level Assignment and Verification
Functional Safety of
2 IEC-61508;2010 Electrical/Electronic/Programmable Electronic
Safety Related Systems
Functional Safety- Safety Instrumented Systems for
3 IEC-61511:2016
ISSUED FOR REVIEW
08/13/18 10-01936
NO. DATE
REV
DISCIPLINE
ENGINEER
MUK
DATE: 08/13/18
PROJECT
ENGINEER
MUK
DATE:
08/13/18
CERTIFIED
RDD
04104/13
08/13/18
DATE: 10/25/
2016
CONSTRUCTION
AGENCY
TBD
08/13/18
DATE:
OPERATIONS
TBD
08/13/18
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
7 PROJECT DESCRIPTION
TBD
Qatif field is unique for producing three different grades of crude oil, Arab Extra Light
ENGG CERT
RDD
(AXL) crude from Light Lower Fadhili formation, Arab Light (AL) crude from Arab D
MUK
formation and Arab Medium (AM) crude from Arab C formation. Both AXL and AM crude
are blended at Qatif GOSP-1 and 2 to produce AL Crude at a rate of 500 MBCD. Abu
Safah field is located offshore. The field produces 300 MBCD of AM oil crude.
• Qatif GOSP-1
• Qatif GOSP-2
08/13/18 10-01936
• Utilities Plant
DATE
GOSP-1 and GOSP-2 facilities process crude from the Qatif reservoirs to produce an AL
NO.
REV
DISCIPLINE blend while the Abu Safah facilities process AM crude fed from offshore wells via a
ENGINEER
MUK
pipeline.
DATE: 08/13/18
PROJECT
ENGINEER Associated gas from all the GOSPs is compressed and treated in the Gas Gathering Plant
MUK
DATE:
08/13/18 before being routed to Berri Gas Plant. Produced water from all the facilities is treated in
CERTIFIED
RDD the Water Oil Separation Plant (WOSEP) before injection into disposal wells drilled in the
04104/13
DATE: 10/25/ 08/13/18 Sulay Aquifer. Wasia Water is currently used to maintain pressure in the reservoir and it is
CONSTRUCTION
AGENCY
2016 injected via Water Injection Pumps (WIP).
TBD
08/13/18
DATE: The production forecast indicates that the total produced water will exceed the current
OPERATIONS
TBD installed water handling capacity by 2021. Both Qatif and Abu Safah reservoirs are
08/13/18
DATE: progressively increasing in water cut, which results in a continuous increase in the amount
CONTROL NUMBER
VERIFICATION
of produced water received in the facility. In order to meet the Qatif and Abu Safah
EDSD
facilities MSC, it is essential to ensure that the water handling facility has sufficient
DATE:
BY:
capacity to process the forecasted amount of produced water. The production forecast
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
also indicates that the required water injection rate at Qatif north field which is being fed
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
from the WIP at GOSP-1 is increasing and will exceed the installed capacity of the WIP.
(DCC) NO. _____________________
10-01936-0001-001
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
Hence, the WIP capacity has to be upgraded to meet the water injection requirements.
TBD
In addition, in order to increase the quality of the crude oil from Ju’aymah Terminal, the
ENGG CERT
RDD
crude storage tanks are dewatered to meet the required specifications of the exported oil.
MUK
The resulting effluent water needs to be treated and safely disposed. This effluent water is
The project will upgrade the water handling and WIP at Qatif GOSP-1 to handle the
ISSUED FOR REVIEW
forecasted produced water, wash water and expected amount of water rates from
DESCRIPTION
Juaymah Terminal.
a) Install one (1) additional Water Oil Separation (WOSEP) vessel in parallel to two
(2) existing WOSEPS of the same size with capacity equal or higher than existing
WOSEP vessel handing capacity shall be used. Latest technology internals shall
be used to maximize the water-oil separation.
JO/EWO
08/13/18 10-01936
b) Install two (2) LPDT Water Draw Off Pumps in parallel to three (3) existing pumps
DATE
c) Install one (1) Water Injection Pump in parallel to five (5) existing pumps.
A
DISCIPLINE
ENGINEER
MUK d) Install four (4) Salt Water Disposal Pumps in parallel to the five (5) pumps; four (4)
DATE: 08/13/18
existing pumps and one (1) pump will be installed under BI-10-01936 scope. After
PROJECT
ENGINEER
MUK the addition of the four pumps, there would be nine (9) pumps in total (one pump
08/13/18
DATE: will remain as spare).
CERTIFIED
RDD
04104/13
08/13/18
e) Install an underground pipeline (10”) to pump oily water from JTF to Qatif GOSP-1
DATE: 10/25/
2016
CONSTRUCTION
AGENCY
WOSEPs.
TBD
DATE:
08/13/18 f) Install one (1) Diesel driven fire water pump of 454.2 m3/h (2,000 GPM) capacity,
OPERATIONS
and having the same pressure characteristics with the existing fire pumps.
TBD
08/13/18
DATE: g) Provide Chlorination skid to chlorinate the Fire water.
CONTROL NUMBER
VERIFICATION
h) Provide / Upgrade all Instrumentation & Control systems required for the new
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
A 08/13/18 10-01936 ISSUED FOR REVIEW MUK RDD TBD TBD
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
RDD
TBD
TBD
MUK
APPROVAL/CERTIFICATION REQUIREMENTS,
MUK
AGENCY
BY:
PROJECT
2016
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
CERTIFIED
08/13/18
04104/13
08/13/18
08/13/18
10/25/
08/13/18
DATE: 08/13/18
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________
10-01936-0001-001 DATE:
-001
QATIF
Saudi Aramco 2616-ENG (03/99)
FACILITY
EAST WEST PIPELINE
UPGRADATION OF WATER DISPOSAL SYSTEM
GOSP-2 & PIPELINE QT-2B
DOC
SAUDI ARABIA
2/Q06
Q01/Q0
JO / EWO:
SAUDI ARABIAN OIL COMPANY
A
DWG.TYPE PLANT NO. INDEX
10-05237-001
SIL-XXX1
DRAWING NO.
OF
20
12
SHT.NO.
A
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
RDD
Safety life cycle approach as per IEC-61511 and Saudi Aramco Engineering Procedure
identified in SAEP-250 is used for the SIL assignment of the Safety instrumented function
MUK
9 SIL ASSIGNMENT:
The SIL assessment comprises an assessment of the plant process equipment and
ISSUED FOR REVIEW
to assess the risk that is present for persons and the environment and assets.
This assessment is made on the basis that no protective systems are in place so that a
basic level of risk can be established for the equipment under control (EUC) or Process as
per IEC-61508 & IEC-61511 terminology.
Essentially the SIL derived rating is a measure of the performance availability that is
JO/EWO
08/13/18 10-01936
required to be achieved by the safety–related control system, in order that the residual risk
level is within acceptable limits, or, is as low as reasonably practical (ALARP) as defined in
DATE
DISCIPLINE
ENGINEER
MUK The SIL rating shall be considered for the entire Safety integrated function i.e. from
DATE: 08/13/18
PROJECT
initiating devices through the logic solvers / controllers to the final actuating elements in
ENGINEER
MUK order that the system will adequately meet the design intent.
DATE:
08/13/18
CERTIFIED SAEP-250 is used as the main data source (for initiating cause frequency/PFD of
RDD
04104/13
08/13/18 protection layers etc.)
DATE: 10/25/
2016
CONSTRUCTION
AGENCY As per requirements of SAEP-250, LOPA methodology shall be used for SIL assessment.
TBD
DATE:
08/13/18 SIL Assignment will be carried out based on LOPA based on following steps
OPERATIONS
TBD
08/13/18
DATE:
9.1.1 Identification of Hazardous Scenario
CONTROL NUMBER
VERIFICATION
EDSD
HAZOP report, Cause and Effect shall be used for the identification/development of
DATE:
hazardous scenario, additional scenarios can be listed through brain storming during SIL
BY:
REVISIONCERTIFICATION
session. Each scenario must have a unique initiating event/consequence pair. LOPA is
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
9.1.2 Quantitative Risk Target Frequency
TBD
Quantitative risk target frequency shall be assigned for the hazardous event identified that
ENGG CERT
RDD
used as guideline for “Quantitative Risk Target Frequency” against each hazardous event/
risk.
The consequences against each of the following category will be identified for each
hazard/risk and a target frequency will be assigned against each consequence as
ISSUED FOR REVIEW
identified below.
DESCRIPTION
a- Personnel Safety
b- Environment safety
c- Asset Safety
d- Reputation
Note: SIL assignment is carried out against lowest “risk target frequency” as this will lead
JO/EWO
08/13/18 10-01936
DISCIPLINE For LOPA, each scenario has a single initiating event. The frequency of the initiating
ENGINEER
MUK
event, causing the hazard, will be identified. Appendix-I (PART A) of Saudi Aramco
DATE: 08/13/18
PROJECT
ENGINEER
Standard SAEP-250 shall be used as guideline for calculating initiating event frequencies.
MUK
Expert judgment/operation experience and OREDA database will also be referred to
DATE:
08/13/18
CERTIFIED identify the failure rate of some of the equipment that will be part of initiating cause of that
RDD
04104/13
08/13/18 hazard.
DATE: 10/25/
2016
CONSTRUCTION
AGENCY
Refer to Appendix-C of this report for referring Saudi Aramco standard SAEP-250
TBD
08/13/18
DATE:
OPERATIONS
TBD 9.1.4 IPLs
DATE:
08/13/18 One by one, all the IPLs (excluding SIF under evaluation) available were identified which
CONTROL NUMBER
are present to mitigate the consequences or reduce the frequency of the hazard event
VERIFICATION
EDSD
from proceeding to its undesired consequence independent of the initiating event or the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
action of any other layer of protection associated with the scenario. Independent
OF THIS DRAWING IS COVERED, FOR ALL
Protection Layers (IPL) , when applied to mitigate the hazard shall reduce the
10-01936-0001-001
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
Identified risk by a factor of 10 or more, shall be specific, independent, dependable and
TBD
auditable.
ENGG CERT
RDD
IPL risk reduction values shall be taken based on conservative approach from Appendix I
MUK
multiplying the initiating event frequency by probabilities of all the IPLs failing to do their
intended function. Conditional modifiers/Enabling conditions are also multiplied along with
other IPLs to calculate the final MEF values.
JO/EWO
08/13/18 10-01936
NO. DATE
REV
DISCIPLINE
ENGINEER
MUK
DATE: 08/13/18
PROJECT
ENGINEER
MUK
DATE:
08/13/18
CERTIFIED
RDD
9.1.6 RRF CALCULATION
04104/13
08/13/18
DATE: 10/25/
CONSTRUCTION
AGENCY
2016 Risk Target Frequency for the SIF will be calculated by dividing the mitigated risk with the
TBD
DATE:
08/13/18 target Risk (identified in step c) to identify the Risk Reduction Factor (RRF) required by the
OPERATIONS
SIF loop.
TBD
08/13/18
DATE:
9.1.7 SIL/PFD CALCULATION
CONTROL NUMBER
VERIFICATION
Inverse of RRF (i.e. 1/RRF) will lead to PFD of the SIF, against which SIL will be assigned
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
RDD
a- the HAZOP findings and risk ranking ranked high in the HAZOP recommendations
&
The facility has been designed and engineered properly based on the Saudi Aramco
ISSUED FOR REVIEW
DESCRIPTION
SIL study has been conducted for the SIFs which are covered under the scope of this
project BI-10-05237-001.
Permissive & Maintenance Bypasses are not covered in the SIL assessment.
08/13/18 10-01936
The SIFs with hand switches and push button (PB) as initiators are considered SIL 1
by default and are not studied during the SIL workshop (in accordance with SAEP-
DATE
250). Such manual initiators in a SIF require operator action that is used for both
prevention and mitigation of hazardous events, like total plant shutdown, unit
NO.
REV
DATE: 08/13/18
Alarms are considered as an IPL with a PFD of 0.1 provided the operator has clearly
PROJECT
ENGINEER understood the alarm, Operator has more than specified time (15 minutes for control
MUK
08/13/18 room alarm ; 30 minutes for field alarms) to respond in order to prevent the demand
DATE:
CERTIFIED
RDD occurring on the SIF. Also, this credit shall only be given if the operator is trained and
04104/13
DATE: 10/25/ 08/13/18 regularly completes action as drilled exercise, has access to clear written procedures
CONSTRUCTION
AGENCY
2016 and performs actions according to the appropriate procedures and operating.
TBD
08/13/18
DATE: CCPS “Approach A’ is followed, i.e., where BPCS is an Initiating Event (IE) for a
OPERATIONS
TBD scenario, no credit for protection layer in the BPCS is taken.
08/13/18
DATE:
Independence between BPCS protection and initiating cause is taken in accordance
CONTROL NUMBER
VERIFICATION
DATE:
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
Team identified low low WOSEP may create dual hazard scenario (fire and toxic) due
TBD
to gas blow by to the pumps . Hence SIF-005 were analyzed separately for toxic
ENGG CERT
RDD
release and fire hazard scenarios. LOPA identified SIF-005 to be SIL-a for fire case
MUK
where as SIL-2 for toxic scenario. Hence based on this SIF-005 was assigned SIL-2
(higher rating among both scenarios).
Team identified dissolved H2S concentration is 500PPM at Draw off pumps and Salt
Water Disposal pumps
ISSUED FOR REVIEW
DESCRIPTION
SAEP-250 Appendix-M was utilized to identify the Probability of ignition in case of fire.
08/13/18 10-01936
The results of the SIL determination /assessment workshop are summarized below:
The following is the list of target SILs for the SIF tags;
NO.
REV
DISCIPLINE
ENGINEER SIF No. Description Target P&ID No. C&E No.
MUK
SIL
DATE: 08/13/18
PROJECT
ENGINEER
SIF_001 Suction Low Low Pressure PALL- SIL-a RA-495031.001/RA-495049.001/RA-
MUK 0103 Shutdown Pump Q01-G- RA-71419.001
495050.001/RA-380425.001
08/13/18
XXX1A
DATE: SIF_002 Discharge High High Pressure SIL-a
CERTIFIED RA-495031.001/RA-495049.001/RA-
PAHH-0105 Shutdown Pump Q01- RA-71419.001
RDD 495050.001/RA-380425.001
04104/13
G-XXX1A
08/13/18
DATE: 10/25/ SIF_003 Suction Low Low Pressure PALL- SIL-a RA-495031.001/RA-495049.001/RA-
2016
CONSTRUCTION 0108 Shutdown Pump Q01-G- RA-71419.001
AGENCY 495050.001/RA-380425.001
TBD XXX1B
SIF_004 Discharge High High Pressure SIL-a RA-495031.001/RA-495049.001/RA-
08/13/18
DATE: PAHH-0110 Shutdown Pump Q01- RA-71419.001
OPERATIONS 495050.001/RA-380425.001
G-XXX1B
TBD SIF_005 Low Low Level LALL-0205 In D- SIL-2 RA-495035.001/RA-495037.001/RA- RA-372976.001
08/13/18 XXX1 Shutdown Salt Water 495031.001/RA-495040.002/RA-
DATE:
Disposal Pumps 495039.001
CONTROL NUMBER
VERIFICATION
495031.001/495040.002/ 495039.001
SIF_007 PALL-0212 Shutdown Pump Q02- SIL-1 RA-495044.001/RA-495037.001/RA- RA-372976.008
DATE:
BY:
G-XXX1A 495039.001
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
XXX1A 495039.001
B
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
SIF_009 Low Low Flow FALL-0205 SIL-1 RA-495044.001/RA-495037.001/RA- RA-372976.008
TBD
RDD
G-XXX1C 495039.001
DESCRIPTION
08/13/18 10-01936
G-XXX1D 495039.001
XXX1
DISCIPLINE
ENGINEER
SIF_020 Hi Hi Discharge Pressure PAHH- SIL-a RA-495042.002/RA-495042.001/RA- RA-380525.009
MUK 0604 Shutdown Pump Q06-G-XXX1 495048.001
DATE: 08/13/18
PROJECT
SIF_021 FALL-0601 Shutoffs Pump Q06-G- SIL-a RA-495042.002/RA-495042.001/RA- RA-380525.009
ENGINEER XXX1 495048.001
MUK
DATE:
08/13/18 SIF_022 TAHH-0601 Shutoffs Pump Q06-G- SIL-1 RA-495042.002/RA-495042.001/RA- RA-380525.009
CERTIFIED XXX1 495048.001
RDD
04104/13
08/13/18
DATE: 10/25/
Table 1: SIF tags SIL assignment
2016
CONSTRUCTION
AGENCY
TBD Note: As the team developed LOPA scenarios, for some SIF tags there was no protection layer except the SIF
DATE:
08/13/18 being studied, hence a PFD value ‘1’ was entered in the IPL column for the LOPA calculation.
OPERATIONS
TBD
DATE:
08/13/18 12 RECOMMENDATIONS & ACTIONS
CONTROL NUMBER
VERIFICATION
GENERAL
EDSD
1. During SIL Verification ; Beta factor shall be considered for VMS shutdown and ESD
DATE:
BY:
SIF to cater for common cause of failures between the two systems.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
2. As per IEC-61511 section 11.2.10; A device used to perform part of a safety
TBD
instrumented function shall not be used for basic process control purposes.
ENGG CERT
RDD
ESD logic solver. Generally, the safety function case with the highest SIL requirement
will be the case that determines whether the logic solver meets performance
requirements.
4. System architecture for each SIF shall be designed in accordance with the
ISSUED FOR REVIEW
DESCRIPTION
1. When the required risk reduction factor on LOPA is above 1 but below or equal to
10 for Environment or Economic loss then the interlock may be implemented in
the BPCS. This would necessitate the use of independent sensor, output relay
and separate I/O module from the original BPCS indication and alarm channel
JO/EWO
08/13/18 10-01936
should be noted that when interlock is implemented in BPCS system for risk
reduction required b/w 1 to 10 then IEC61511 Part 2, Clause 9.4 mentions that
NO.
REV
DISCIPLINE
ENGINEER
MUK
DATE: 08/13/18
PROJECT
“Any claim for risk reduction should be justified by the consideration of the integrity
ENGINEER
MUK of the BPCS (determined by reliability analysis or performance data) and the
08/13/18
DATE: procedures used for configuration, modification and operation and maintenance.
CERTIFIED
RDD
When allocating risk reduction to functions in the BPCS, it is important to ensure
04104/13
08/13/18
DATE: 10/25/
that access security and change management are provided”
2016
CONSTRUCTION
AGENCY
TBD
08/13/18
DATE:
OPERATIONS
2. When the required risk reduction factor on LOPA is above 1 but below or equal to 10
TBD
DATE:
08/13/18 and for the safety consequence then SIL-1 in accordance with SAES-J-601/SAEP-48
CONTROL NUMBER
requirements.
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
TBD
SAUDI ARABIAN OIL COMPANY
13 .CONCLUSIONS
TBD
ENGG CERT
RDD
Safety instrumented functions designed for the safety of personal; assets /equipment
& environment are sufficient with the assigned SIL level to meet the required risk
MUK
14 APPENDICES
ISSUED FOR REVIEW
DESCRIPTION
08/13/18 10-01936
NO. DATE
REV
DISCIPLINE
ENGINEER
MUK
DATE: 08/13/18
PROJECT
ENGINEER
MUK
DATE:
08/13/18
CERTIFIED
RDD
04104/13
08/13/18
DATE: 10/25/
2016
CONSTRUCTION
AGENCY
TBD
08/13/18
DATE:
OPERATIONS
TBD
08/13/18
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SIL STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
-001