EARTHWORK TAKE-OFF EarthworksSA

PROJECT NAME: Michael Church


DATE OF TAKE-OFF : 10/08/18
EARTHWORK TAKE-OFF BY: EarthworksSA

DISCLARIMER EarthworksSA uses grading plans to generate earthwork take-offs. Geo-technical data provided will be
used to designate any over excavation and or stripping thicknesses. Since we based our take-offs on grading plans
provided by client, We try to do our best to pick up any errors and/or omissions the plans may have; if any assumption is
taken by EarthworksSA it will be noted. All EarthworksSA earthwork takeoffs daylight to existing terrain at boundary. Any
areas beyond the boundary line will not be calculated unless specifically dictated by client. EarthworksSA Takeoffs are
provided for informational purposes only, the user of this information is to assume the ultimate responsibility of checking
any quantities and graphic representations stated and shown in this takeoff document and hereby agrees to indemnify
and hold EarthworksSA harmless from and against all claims of any type or nature asserted by customer or any party for
the use of this information document. Due to the nature of digital files the client is responsible for any trojan/virus
detection and removal. It is the client responsibility to detect/intercept and/or remove any computer viruses before loading
any EarthworksSA file. EarthworksSA should be hold harmless from and against all claims of any type or nature asserted
by customer or any party as a result of any computer viruses/trojans and or attacks inadvertently caused, transmitted
with, and/or along any digital and electronic files.
QUANTITY SUMMARY EarthworksSA

PROJECT NAME: Michael Church


NOTES
EARTHWORK (0% Expansion – 0% Compression )

Cut Area: 38816.8 FT2


Fill Area: 28693.3 FT2
Work Area: 68053.8 FT2

Bank Cut: 967.1 YD3 << Over Ex 3ft


Expanded Cut: 967.1 YD3
Bank Fill: 405.5 YD3
Topsoil Stripped: 0.0 YD3
Topsoil Replaced: 0.0 YD3

Export: 561.6 YD3

Pavement AC
Area SF 22,096.00 SF
Area SY 2,455.11 SY
HMAC Thickness 3.00 IN
BASE Thickness 6.00 IN
HMAC MATERIAL 445.60 TONS +/-
BASE MATERIAL 931.71 TONS +/-

SUBGRADE SUMMARY EarthworksSA

PROJECT NAME: Michael Church


SUBGRADES, AREAS & LENGHTS NOTES

Subgrade Name Area, FT2 Perimeter, FT Volume, YD3


PAVEMENT 3"AC/6"B" 22096.0 1420.0 613.8
CONCRETE 5400.1 504.2 200.0
SIDEWALK 1191.7 510.3 14.7
SIDEWALK 131.5 66.4 1.6
SIDEWALK 146.2 73.6 1.8
BUILDING 8956.4 481.1 248.8

PLANS EarthworksSA

GRADING PLAN

A
B

CUT AND FILL COLOR


1.6
FILL >> 1.6

CUT >> 1.6

CROSS SECTIONS EarthworksSA


SECTION “A” (RED = PROPOSED // GREEN = EXISTING // DARK GREEN = STRIP) ** Peaks and valleys are marginal

SECTION “B” (RED = PROPOSED // GREEN = EXISTING // DARK GREEN = STRIP) ** Peaks and valleys are marginal
Sheet2
Bio Basing 1.5'/3'
Building

Conc. Pav. 6"/B6"


Conc. Pav. 6"/B6"
Conc. Pav. 6"/B6"

Pavement 3"/10"
Pavement 3"/10"
Pavement 3"/10"
Pavement 3"/10"
Pavement 3"/10"

Sidewalk 4"/B4"
Sidewalk 4"/B4"

Page 6
Sheet2
946.8 170.7 157.8
9924.9 415.8 20.5

449.1 86.4 16.6


252.1 267.6 9.3
285.8 68.1 10.6
987 36.19

15880.2 1773.2 637.2


379.5 107.5 15.2
86.9 111.1 3.5
207.4 263.6 8.3
78.5 97.4 3.1

3670.5 1191.6 90.6


708.3 239.1 17.5
4378.8 107.0373333
143.2273333

Subgrade Name Area, FT2 Perimeter, FT Volume, YD3


Bioret Basin 644.3 162.3 35.8
Con Pav 6" 8342.0 590.0 154.5
Con Pav 6" 2973.3 396.1 55.1
Permeable Parking 3" 4006.9 388.7 74.2
HMA Pavement 2718.1 336.4 67.1
HMA Pavement 815.7 168.4 20.1