Dear Sir.
CONTRACT PAC K AGE NO. RDA/SEEP/CO NT-S4
CONSTRUCTION OF E XTE NSION OF SOUTHERN EXPRESSWAY,
SECTION - 4 MATTALA TO HAMBANTOTA VIA ANDARAWEWA
SUB: Cost Evaluation RV0#034- Additional Post Tension Work to BRI-04 piS, p16 Beams
This refers to the Engineer's letter Ref.: FSDIS4-CHEC-2323 dated 12t h December 2017 and
approved IFC drawing Rev.06 & 07 regarding the captioned subject.
According to the instruction given through approved IFC drawing Rev.07. the post tensioning
work which is carried out subsequently casting of beam BRT-04 P 15 & P 16 is set up as
additional work to the contract, due to not in original scope of work. Hence, this add itional work
has been constituted as a Variation pursuant to Sub-Clause 13.1 [Right to Vary] of the General
Conditions of Contract.
And the cost evaluation is prepared in accordance with the Sub-Clause 12.3 (Evaluation] (b) of
General Conditions of Contract.
Page 1 of 2
Our Ref: CHEC/ RDA/SEEP/CONT/S4/0 1.52/0 /004297
Hence, we hereby submit the cost proposal for the same for your review and approval please.
Thank You.
Yours faithfully,
Yang Sertyan
Contractor's Representative
~I:JIIAP2p
Encl: 0 I File
Page 2 of 2
EXTENSION OF SOUTHERN EXPRESSWAY FROM MATARA TO HAMBANTHOTA
INDEX
1. SECTION-1 : NARRATIVE
2. SECTION-2 : INSTRUCTION
6. SECTION-6 : CORRESPONDENCE
EXTENSION OF SOUTHERN EXPRESSWAY FROM MATARA TO HAMBANTHOTA
1. SECTION-1 :NARRATIVE
EXTENSION OF SOUTHERN EXPRESS WAY FROM MA TARA T O HAMBANTHOTA
SECTION 4 FROM MATIALA TO HAMBANTOTA CH 0+000 TO CH 25+000
COST EVALUATION
NARRATIVE
1). This cost evaluation is for the post tensioning work of BRI-4, P15, P16 girder beam which
was occurred as additional work to the Contract due to design change.
2). According to the Engineer's letter ref. FSDIS4-CHEC-2323 dated 12th December 2017 and
approved drawing Rev.06&07, the post tensioning work which is carried out subsequently
casting of beam BRI-04 P15 & P16 at site is set up as additional work to the contract, due to
not in original scope of work. Hence, this additional work has been constituted as a Variation
pursuant to Sub-Clause 13.1 [Rig ht to Vary] of the General Condit ions of Contract
3). The cost evaluation is prepared in accordance with the Sub-Clause 12.3 (Evaluation ] (b) of
General Conditions of Contract.
(ii) no rate or price is specified in the Contract for this item,
"Each new rate or price s/1all be derived from any relevant rates or prices in the Contract, with
reasonable adjustments to take account of the matters described in sub-paragraph (a) and/or (b),
as applicable. If no rates or prices are relevant for the derivation of a new rate or price, it shall be
derived from the reasonable Cost of executing the work, together with reasonable profit, taking
account of any other relevant matters"
4). This assessment consist of item described in below;
a). Supply and Installation of Gl. Steel Corrugated Round Ducts,
b). Post tensioning work to P15, P16 beams,
c). Class 45 Cement grouting work,
d). Heavy duty steel structure for false work
5). The unit cost is evaluated as a cost per one duct of set considering all related items required
and invoice based data.
2. SECTION-2 : INSTRUCTION
CH I :-.JA HA I LWAY FI I~ST Sl.R\'EY & DESIGN INSTITUTE GROCP CO .• LTD.
Engineer·s Site Office
In front of Botanic garden
Sooriyawewa Road
Katuwewa, Hambanlota
121h December 2017
Contractor's Representative
Extension of Southern Expressway Project (Scction-4)
China Harbour Engineering Company Ltd [CHEC]
Dear Sir,
Thanking you,
Yours faithfully,
o;~g~f,. . . . . . . .
Team Leader [ESEP- Section 04]
China Railway First Survey & Design Jnstitute Group Co., LTD.
Cc: Mr.A.P.K. Abeydeera, PD (ESEP-S4)-f.i. pl
JWa: 'l'v
CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE GROUP CO.,LTD.
Contractor's Representative
Extension of Southern Expressway Project (Section-4)
China Harbour Engineering Company Ltd [CHEC]
Dear Sir,
The Engineer reviewed the Submission of the Calibration Certificates of the Pre-stressing
Jack for post Tensioning Work and the tabled uncertainty calculation report provided by
Industrial Calibration and Service Center shall be accepted as per company details and its
client details.
However, in the future the Contractor shall inform the Engineer for calibration of
Hydraulic Jacks and Pressure gauges for the Structure Engineer's necessary information
also.
Thanking you,
Yours faithfully
D~~~t. . . . . . . . ..
Team Leader [ESEP- Section 04]
China Railway First Survey & Design Institute Group Co., LTD.
FW(MS): ~
Jl!hl::• l'i.;J • vli'!i: • vli~r}lf62 \; 1'1111:1'~:710013 ll\i,r. : o29-H23651'i3 {/i!'i:02!J sz:l6fil74 llt tp://w!Ow. r~di. ('o·~.rn
Page 1 of 1
1\d.l:\o. 2 Xiying !load, Xi · un,l.hina l'ost Code:710013 Tel :86 0:!9 li2J65023 Fax:86-0~ 82365171
EXTENSION OF SOUTHERN EXPRESSWAY FROM MATARA TO HAMBANTHOTA
A DDITIONS
GROUTI NG
FALSWORK
. Use of heavy duty steel structure false work for girder beam post (7,920,013)
1 04 nos 2.00 Rate-04 0.00 7,920,013.00
tcntioning work as per latest design and instruction. •o.5o
Consisting of250mm Steel I beam, 450mm Steel I beam, 600mm steel
I beam, 800mm di. 6mm thick Column, C Channel 100 x 50mm, H
Iron 75 x 50mm, 225 X 50mm steel plate, 225 x 225mm steel plate
+ Cost for the post tension work is considered in here as 50% of total
cost of false work.
ADDITIONS
120mm dia. Gl. Corrugated sheet round ducts with making cost,
12mm supporting reinforcements, Bearing plate and Spiral
rcinforccmentsl and necessary accessories lor post tension beam
as per dctui15 & 6 ofSEEP/S4/409/14/2,3/3 Rcv.02 and method
statamcnt.
Oty in meter
Cl 18.82 m m 2 5 18.82 188.20
C2 18.74 m m 2 5 18.74 187.40
375.60
POST TENSIONING
Post tensioning work to PIS, P16 beams after concreting work
1.02 nos 2 10 20.00
is finished at site, including;
a). Supply & installation of 15.24mm uncoated cold drawn, low
relaxation 7 nos wire strands 21 nos per one duct,
b). Anchor head
c). Wedges
d). Cutting of excess length
e). I Jydraulic Jack (400T) & Pressure pump for stressing
(Ultimate Tensile Strength (N/mm2) Normal section
(2940/mm2), Normal mass 23.142 (Kg/m), Normal braking load
5475 (KN) for post tension beam)
Oty inmetcr
CJ m 5 21 20.22 2123.42
C2 m 5 21 20.14 2114.70
GROUTING
FALS WORK
Use of heavy duty steel structure false work for girder beam post
1.04
tentioning work as per latest design and instruction.
TEST
Cost of calibration certificate of Pre-stressi ng Jack and Gauge
1.05
combinations for BRJ-04 as per Engineer instruction.
PIS, P16 nos 1 1 1.00 1.00
La
FSDJ
Project Names:Constructlon of Extension of
Southern Expressway, Section 4 - Mattala to
Hambantota via Andarawewa
Contracor's Design Submission (CDS)
Herewith we make some corrections and resubmit the working drawings for substructure of bridge bri-04 at A0+859.000
PART 2 (for P14 -P16) (Rev 7) for your review and approval. These drawings will supersede the previous approved
drawing
Appendix 1: Working Drawings for Substructure of Bridge BRI-04 AT A0+859.000 part 2 (for P14 -P1 ( ~jJ.( ~~
. ,... ~
<\..
__..;...,.,.,.,"'"'" .. .. SEJ:'O <:'Ill (5l
REQUIRED INFORMATION
J-....:;;..0:
' ~ •·
Ol:TAT~'PROVII)E D
o I· !L-~
"'.~..,.....
..........._/
,.
..._ . . Submission of worl<mg drawmgs for substructure of bridge bri-Q4 at A0+859.00lTPARI2
W 0 '"S 0 ISCip1me (for P14 -P16) (Rev 7)
Sub-contractor N/A
Design ManageriShi Fulu
Nature of Worl<s (Permanent I Temporary) Permanent
Applicable Standard As spectfied in Specifications
Design Drawings Provided (Yes I No) Yes
Design Calculations Provided (Yes I No) No
Purpose of Submission. For Approval
From : Contractor's Representative
Name · Yang Seny
J:l.
D~te · 31st0ctoper2017"
Stgnatur//~/W N/A I Shlf:ulu I Shena Hona Zhuan
Sub-contractor l Orialnator I Checked Bv
Dlstribulib!'il Rem+rl(s ·N
7L ,
0 \}
(
.;
ROAD DEVELOPMENT AUTHORITY
MINISTRY OF PORTS AND IDGHWAYS
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
,.;
Clifc
CIDNA HARBOUR ENGINEERING COMPANY LTD.
01 NOV2017
NOTES:
.. Herewith we make some corrections for the working drawings for substructure
of bridge BRI-04 at A0+859.000 part 2 (for P14- P16) (REV.6). This drawing will
supersede the previous approved drawings NO.SEEP/54/04/09/(5', 7', 10',
Revision explanation:
Considering the actual construction site conditions and construction safety,
modifications have been done to the construction process of the Pier (PlS and
P16) on pier cap content, mainly include the following two aspects:
It 1. For the SEEP/$4/04/09/7' drawings, in the note section, about the maximum
diaphragm and slab erection, and sectional grouting and sealing anchor head
'It
; !'"~....1 ;... - .. • • J~T ...; '
-
;:;_ •
()).~-·~ 4~L~ .· · ;:;
I..., .t,..-.._:. .;......;.:...~..;. ... L.
(:;z,.;;;.>.s.;)
....... _ ,
Oate .• :)-:llL.).LL.P.f
•
Contract No.RDA!SEEP/CONT-S4
EXTENSION OF SOUTHERN EXPRESSWAY FROM MATARA TO HAMBANTOTA SECTION-4
FROMMATTALA TOHAMBANTOTA VIA ANDARAWEWA
Drawing List
...
Orawing~o. Drawing Title Sheet Nos. Drawing No. Ora~;ng Title Sheet ~os.
...
I
-- - - '
--
-· - .. ··-'.......
I lfl oA l · \ ' !
... ····-··Y......'-1.......~ .....:.:;;.............
.':">./)": Si'R!..-(~1 )"ftl 1G.S•,•. . ' ·~r;:,. 0 :;
- f){)j\}_"[J' ~1)9
~ .. ....................
----- I
...
101
e1Jlta&9.000
1
e~919.000
o; .1.
10\
w\o
~
'
tOoOJ
.
z'"'v l~ o~
lot (.i),LOt859.QGil
y
~~--·-·-------·_jl__ __
---- I
-- 50 0 1
,Q\03__ __ SOl07
IOS
l
l-
----z0\04 iO oa
oO
1 PLAN
- SCALE 1:500
.. I
PILES LOCATION TABLE
COORAINATE
ILOCATIONS IP1lE NO.
EAST NORTH
1 530978.973 420469.513
2 530979.031 420465.763
P14
3 530982.722 420469.571
4 530982.781 420465.821
I 531009.449 420481.337
2 531009.329 420477.589
3 531013.197 420481.217
4 53 1013.077 420477.469
·. . . _'·::
LJa~
PIS
5 531008.919 420464.846 Li)'htv-4
6 531008.798 420461.097 ft:: ;- _;.~l-.;....,; ,?~~.\LC~ ·.Cj;oC:::;:,
7 531012.667 420464.725 \.?..;,:,::? ... s.~J
If) I I l 8 531012.5·47 420460.977 Oare .... ~.D.. /L.Qf
I 531039.666 420474.676
2 53-1039.367 420470.938
3 531043.404 420474.377
4 53104.3.105 420470.639
P16
5 531038.351 420458.228
NOTE:
6 531038.053 420454.490
! .All piers ond cbu!ments ore arranged rodlolly.
7 531042.089 420457.930
2.Ail dimensions ore given in mm except for the stotions ond tho elevations in m.
8 sslo4 t.7s1 I
42o<s4.t91
3.This drowing wifJ supersede lht previous approved drawing NO.SW'/S4/04/09/05' («£V.6).
,..._.,.,,.
~--~ C'~lX:SOCIJ,$11t!tiJ&JC.OJ.saJLA.~CA
~t~o& ~- tot.<:.\110~ &~l~'tS
ICONSUUAHT t II
P!lilti
CON'~~ @c ~ ~
t:ti
!I
EXrEXS10H Of SOU'TMDN ur•fUWAYRCnON:· 4 (ESEP.s.q
FROW W.n....U. fO HA.U.IANTOTAW~\\"CWWl
;:s·Ol
Dr.IM'illfTdt SRlOOE BRI~(AD+859.000)
f'-., • ...
Jr'
. . . . _.... _ _,._,_ _ _ _ .._....,. ...... . . . ... .......$
~c-
If)
JtOAIJlH~'I:!l..&;W,,f.J~oTAtmtOJun·
l"·'lo.ICC!Oiilt~lO'I·IAlt~Qf~(!C'ICUo'M,.
'*'' ~..............
,.,.,,,Jt,l
.. ..__...._
11-• a••·~n_.u t- . ~.-...
•o: 'l!.
•
~~ t;: • "SA •,.. q
•
Otf(A WWAY DtS1 SUR'/& 5I: 061Ci!ll ~~(()Jill
~m•~•l.tttllilau~w ........ ~
Cli l.''iAHAA.IO\.m fNG!NUKIN<i (OMIJ;.Nv LTO. , 0_., 2011.1t.Ol
1
•
IU:iV
:0~~ ~tO'!
20 ~1'.~t~ ;
?
ct~..,..-..w.~a.•,.....t •n•..ut•llillol.,. - Ora'N1n9IO&
;;c;;;
PILE LAYOVT
StE?....~W
-nl.-..
' 11t
---,.,
7
•
P~.UN(
J~~o,~~s@l
~t ,..j.. • .,..~.., ~£2)
~l 1
!! I
I •
'-
i I
I
"
2~0
1125 £3
2125 Fzm
I .; r
f ~
r
I ~
I
I ~
,
~1:!!
PARAMETER LIST
OC!\TIO~ PRiol I VALUE
It~~ I I I I
.I t
3-..50 12s:J n t78.493
I
I
I ~
I I
L..__.~- i
.
[2 j78.229
I I I • I I • I
1
l_ =~I i
~i l -f-
L. -~ L-~
I I I I
~-t=~ i !:3 ,61.400
'71
...,;j
f: -) (:)1'-1 l
-J- P14 I £4 l39.soo
~i
l '
f: -~ f:· -~ I H1 j149.38
L
I I I I
~4
L_I_ _F
IT\ 1-1
tjS:=f-
(p14)
I'
·
'-c_c
~
I I
·~~-r
I
t·rp-
__
I 1 H2
L
' 14818
120000
I 102s
9500
6250 . ,,·•,·· z.•Ch l ~··· ~ L'C
• ..
~
1~1 ... ..~..!h.!kfl.. ....
!: ,·· ·- ' .. .:~: ~ . =.... :·~· t.. ~.·,_: ~
. u... .
- .. ~- , ·~ ..- ·~- I
\ ~!;P ~ S··;
r>a·•a.J:<u)t./Jdi(
I . 1 7 I • I 7
,.
ll~l~
NOTE:
!.All dimensions or~ in millimeter except for el!Votion in meter.
~ 2.lhe tip of lhe bored pile must gel to the design elevation •
.3.The bored pi!e must bt socketed mere lhon 2.0m into the hord rock.
I 1250 , Juo j 1250 , 4.This drawing will supersade lh• prewous oppro>'l!d drowing
1 6 J ~O.SftP/S4/04/09/07' (REV.6).
14
~~ ~,...PLAN
,.1r •. ,1'1.1'\ (Pl.)
1
0(~l'1t SOC!AIJST aov:su:: 0#-SN wn;A ~~rANT ~ iCJt.:'AACHlR @c 101 ! l~r* 1Xt£N$1D..-"f CM' $0VT'H:!A!t l»''teiSWA.Y SfCllON .. I.(~
Ij
'Mil MATTA-t.ATO'iAN:M!ITOllo.VlAAKCARAMWA
~t'tOf. HIGHEA (DlJCAJ):ff * HGKW.A.''!S
"'-'"" BRIDGE BRJ.Gc(AG+859.000}
..,..
fSOI 1Q!l.'<tC1 ,......,__ _ _ _ _ _ _ _...,_,._,....
•
-
OlllENSION DETAILS FOR PIER
,."__..
·~-~,....
.......,._.
.R.<lA» 11&\'tWPM('\1'--At.n-IORrrr
f'I!O.IIl;'tii'IS"•ot·t;l1l'IIM!rr;CI#..,...,..,.,..,..,...._,.
~~ ·~
•••-a.-ll!lt• • •'~•e •
CMr\A t~D'AJ ntSt SlJJM'f a Dt,SI:;.'t ~ rt111 Q. •
•••~x~•••o~•
~~tHCIIHUAI'fOCtJNI'N('fU'O. 'Dot
-'017 ,101
6 t ~7.ta..CS I a.a,. ....,..._.,,._ . ..,,,....,..,...,... J~uo
S£t-.r
. I ~·
~TI~ ~~~~~
rso
rr1£fu-:-
. ~ ~- !00~• r , , , ?!U§'
f - 11 n
I I ol
~i
--
~.
i
11092 ~
"" !I I _ I., iI
:c
,.
2025
{t I I' ,m
~~ I I '
I =
i
I
~
~50 I ~so
2 \ 1-1
! SCALE 1:ISO
(PIS) S7'$) •
- I
F ·
3150
1 • .,.:..
• ! L-.N
,~<$>/.,
I ..~ J
/-~\
l "~ I 1P16
I
I
/~;!\
I "" I
~ PARAMETER LIST
v/ v / v/ , OCATJO:-.j PRM VALUE
~~ r - ., - ~
I I II II
I El 78.782
£2 78.782
ClosS1!S of concrete:
~~
·-1 "'~
~-:i! _ i pier cop: class 45:
11_ PIS
In 61.500 pier column: class :ro:
/ - -,/ ,A 11092 W!. ~..J~
. H 14982
pile cop: class 30.
@:r,.
C:C."VH:~cre~t ~D EXUH$10HOf~EXP'Il.£$$\"'AVatCTIOI4•4(t$9o$()
~
""""'t.\HT w "ro)tKtTM
btMOC:.fiAnc SOC"~t:.Uk!K*UC or ~~J lA'..cA """~~-' '1':_ ~ _
_ f Pl'OM M4TTALA TO KA.WSAJ.:TOlA VIA ANDAAAY.'!WA
I-I:M~Tit'f O' *lil•
fouc:AlkW tk NloOtiWAVS
FSDI .. •·- llT t O<..:.,M• BRIOGE BRI-04(110•859.000)
kU~\U Ut:\'t:-WI".\IiJ\T~lJI'ii)iUTV
,,.#(._. ~;.. 1 2011.11.01 ~........ .............,_....,_ _•" ...,.,.~..."', .."'-~ll OI MENSIO.~ OETAJ.LS FOR PIER
..-..-u-ro.uc~·Ul«~~tD>IIliiW..'t
'Pllii-11101\Til!llt!iiOAI~:I! t;rt~A:Je:t'l•••f.ii!<i ~ .sat+ s to11, tD,OII e.:,o ..........._......,.. ._,,...lll'll4,..•t...-... Dtw~nttt.o. _ _ J""""'- JJ>&
illllt·~ . . . .. _ -
w M.OlW*' ,.,:,,1:NtliU ..... :~·
OC\4 a.t.:l.'l!QT JaSr IJl\.tr l OISif._~ tiSr.Ml GRO..P ~TC, ~,.-..AitiiOUat-~tu:NGCCl'*';.~YLTD. 0. Mt7 :112'- CW oac...-JD« &(tp~~ 2G 1
PH.UNE
gsJo
p4} ~500 w~ 43&\ iso1
I~
.. ~"17
r <;t.-~nn .
"' I Jl"'t'i
I
1
M4 ~
1! 1
~
g}O{ot
~ 1~1
'~SIJ75(lj
. I
2~
I II l
Ii 300 T
60-10 8400 1000 1000 I
I --- ' I
i I ! ..--.L
~
pier column I
' I "'
212$ 2<1o 2125 2125 I Jx, 2125 I
~
..
2025 2200 1025
I ~--·: sf= I II I :
r T w
~r
{~.-~ ru~ ~
T
m 1- 1 (P16)
~
l --!-- ---- C) SCALE l:l50 1 <
j _
T
· - t · - ---..;:::..=
.....--~
0~?!1. 1- ~
1 ' '
t
3150 ..... I : 12!i<l r--r--4 12*> I ... 3750 I i 1I J
c:1
-
8
~
I
-L
1: •• '
_::t-_
--k-
·
)
I 62:10
'
"-f->
; ..:: :~ rt\·~
L~~-.}~~f.~.........;;;:·
.~~.JC"nc
~ J-L-1.
..!.. ~~T=;
I 6250
l= f~'
1 I
~-t-) ' -- mo
'-1-
'
-'*'-'u
'--;
- t-, r= -~
L'r6
::r ):..!
r ~1$00 ~ f e t$(10 u. •-1~",..
"j( ::....
( fl$00 ·~
<
-..$00 - ·r.4 ;f-; 1!oo31
r-
~~;~.,
;;"-.:..i:E.!. ,_... .
L-•-:9 L_LJl l· .~=? . s;) "--L-'- ~ L _,_ :9
oate.. ~l./. . . ll.!Of 2-2
if - SCALE 1:150
-,
PH.UNE
f{
- ,..-'). ,..- -/ ,.. --- A ,.. - '). l PARAMETER LIST
~
"'
I
\ '>'
#
v __ /,..r
I
l
1
\,..#I
y'> J IPI7
I ~~· \
l y "" J
r
I .A:> I
i ~~ J
''F.ii / I
~ I OCATION: PRMfVALUE
- El 179.12 1
l
... t1!:2l
~
~ 3
Classes of concrete:
I I - -a- - --t:::r - -m- - 'SS I I ; £2 79.121
300~~~
~ier cop: cfoss 45;
gl~ I -1-- 1 ~~~ 8 :ill Jj P E3 61.500
ll.. ..,,.., - ---m-- --a--=---a- --_ "' --~- ~~I
I
N ~
--, - I "'!"' 16 p!er column: doss 3~;
E6 39.600
I - I g! i
. .
_,,
/'
--- ......
.r /'
11040 { 4 0 Sl
I /'
1
2000 300
--- ~~--L
r~-'.1'- I~' 1 L
H 15321
20000
pile cop: eloss 30.
.. 2.1ne tip o! the bared pile must get to the design elevaiiot~.
3.Tne bored pile must be socketed more then 2.0m into the hard rock.
contrcclor. The strength , stiffness and stability of the fromeworlc must
be ~hec!ced to meet the requi~menl of construction iechnical
construclion.
5.This drawing will sUpi!rsede the previous cpprnved drawing
~O.S£EP/S4/0,/09/07' (il[\1.6).
Dtllwit~unn.-
E'ICTEHM)H Of'l SCUfHI!JU( UP"I\eUYAY s:cc'1l:)H • 4
MOM MAnAL.A fOfU.MBAN'TOTA 'M.AHOAMW£'o'IA
BRIDGE BRI-Q4(A.0+859,Q00)
[hU'-$q
Jr ... RCi~\0-i)i\rJ.TOPiiP,:-:\.7
loltt'\al-·'···~~ · ~·
~ UJI'- mtrtR l~ ttaensMCCI
Oetl. ~# fl~ SJaVI't • CUXii'C: fiSim..-:1 fiKD (0,&!1:1
.;.31~.41I:I21flll•t!::il
~kAAIOUilltNG!N£E-=NGCOMi'AA'fllO.
._....
D•
a.:-l~M...,.,.,._,~••"•J.,....,.
~
IOI~w""f,..
DIMENSION OETAllS FOR'-Pif<Ei::R=- -o.
$1(P~CT - ,.._ ... ~>
I'"
7
r,'
I 3
14 9~
~~ ~
~
(CI) ~ ¢30 @ 0 0 016
n@'~
1fl32 T£>32J(l32 @l2-Dl>•""'
-·@ {9016
-
91os -:,""
~·
~ ~:C;
' r \-
t..-._.
@ ~~~sa~ ~~~~
..a ~. sm ~
L~ ~ @ 16-032xll488
~"'
9l50
L!.@ 7
21~ 4000 27~ ~[]\> @ 10- 03b11550 #1~
. <52>-sm
.-,
~rr~ e9 ~~-032x9ll2(o·s·> Jl!!
. w:...t 'ro~:...•~ o;.lf:..
• I
.-1
~~I
-.
0
@) S4-DI6x5455
~
'\:i "' (;lli
"i'
~
-~
€} 72-1>16x4J51(cvg.)
~~
-,
-
1> .
@ 27- 016x8162
'S3<
.""'
@~I~
~[rt :w
~ 210
~ T ~td·~tt~
J bd
® 5L- 016x570Z
UM...J
@ 72- 01ox4597{avg.)
z;.L
1!$4
@ :S5-D1ox7057(ovg.)
PARAMETER LIST
. - -· .-- .. ...... UNIT IOIAL
fiAR Sl2.f OTY. LENGTH' ~~~T~
,_ ~
~~~~"'~
!In 72 4351 I 313.3
I 1.578 ~94.97
EB 3-31:50
Noie: 36 17057 I 254.1 1.578 401.40
76s'l:84
~SCALE {P11.)
EB 4-41:50 (P14l
~ SCAlE
l.AI! dimensions ore In mlllimclcrs •
2.Lopping of r<tinforcemenf shall be stos~rd.
3.This drawing will supersede fht prtvious
appro~ed dro-.ring IIO.SEEP/S4/0M)9/I O' (R£V.6).
TOTAL OUAifUTIES:
-
Rtl.\tJ t>t:'flHAWM~TAl~
Jr ,~ce-r•co~.u • •....a"'ott0li1W:Ift< tu•en~v
. k ......,.... ......... ...... ...
t~t·$HU.nW) I.. J tJ'*~ ' ...............~
'1'\t!ll-11>.,Q~tliilii!I UIII~"
OUI<AW'MYftlllSURvtr •~INm.J!lGIOI.OC41Jl).
'l>:li:IA.Il!IIIRIU~II
OCNAlWt&OURtNGINEtnNC COMJIANV LTD. """"......
.... 114\4
2011.1101
•
""'
:0(7.U>.«l ~,c:.J"'Il!t!IHltlfiltJIINt" .. f"-(,J-P'Ml....,.-.1 On..........
...~p~,.. ..,, 1"''
.,
It
l ' §!
-
-, fit
OL~
-'C/
~
:51;;: b;s~
en I~
-... -
~
~
'CI
'
-
(II
"'
!)~?@
'
~~
I I l I I I I I I I I
l I I I I I I I I I I I
1(3 I I I I I I I I I I
~I~ I~
I I
l l lI l l l l l
~ 1I 1
T I I I I 1
;~
I
I
I
I I
I
I
I
I
I
I
I
I
I
I
1
I
, s
.=.i- """
:"':~ '""'~'R.-:1;"
= M? I~·-
• c'l: :'. .
61J!I64
r!j-- 4MI25 !\. ......
L__..j ...._,----
1
04\ t61 ~ ~~""@'-'L L_~ '
(II
1:50 (P 14)
1CROSS SECTION(f't 4)
......... ~10:t! ..:·-~~h;fl ... ·;·.~:::··
SCALE 1:SO Note:
~·)I •JI••\ _'"\.,.;~,I..,;. :'--,-.~"J..::.~
I .All dimensions ore in millimeters .
(. ;::;:::> -~"1) 2.loppir.q ol reinforcement shoU be slogge((j.
Oate.~i).\ f.J.,..tf8. 3.!his drawing will supersede the previous
approved drawing NO.SEIP/$4/04/09/10' {R::"'¥.6).
OE&.!OCU11C SOOA.WTQ.ItVM.KC~UIV.N<A
co~fANf
~
c,mv..:rOR @t: 10 I I l~}e<.! Tiil4l
• 1-zct:.~.Zit.
MY
, ~,..
CK.J•
_ _ _ _ _ _, _
~~-~.tH!n("lJ-'~1~
_._.,.___ or-..,;n9Ti~
~·..
fi
.,25 _ __ 6250 6250
Ii •60125 ~2~
d ,..-,
. -~ai't2S 1251
I
.•,03~
.
~~~·
@PH
!l!i:i ;1~·~...
..
4 3- 3
--~
(P14)
:G
I=
E9 4-41:50 (P14)
~SCAli.
~
,. r" AI-'i ':: .. ._, .... --r.:·~lV."
~:;?
'CI
(§ftl6 I :
I
[ r
I
I
~32
i
:@ •32
.......l¥f\~ u~~
t ' :{~ , '-''-' '
{s;:.-p. &· ;i
·-
. . . :-:·;:.:;:
~ - "--•"\.
..
I I I
.... oare...~.!).,.n.. l)f
~ 16
I I I I
~~
[J ~
@>_lL~ I
l
I
:
I
~
I
l tt
ftt"
~
1
Note:
I .All dimensions ore in millim•ters .
(s1p32 ' 2.!.opping of reinforcemtnf shall be sloggerd.
_\ \\ ~· v2J032
).., l'eo
032~ l !
250150
~000
ulllso
_J.
3.This drawing will supersede 'he ortvious
approv•d drowing NO.SEtP/54/04/02/10' (REV. G).
3\ 2- 2 {P14)
(i Cif§c ,. ..
Ll
CON'\Ur..m t ~+C1T.,_ bfVtSION 0 ,. SOUTMCJt!t CXPttiMWA.VSftTIOH · 4 (~·
CO>lRAC!Vq
._..,,...
OVJlQC.M11C. SOQAUST~Of' $'-1 WW(A
f'RO.M lf.\TIAL.A.1'0M.\MM)IT'QfA"Noi.~AAWEWA
~Of~CDU:.A::I>NAtfGttWA'fS
I'SDl 8R10Ge 8-(.c;o.8S9.000)
ZDt7l~tr--... - - - - -·· ..._...._.._~_.... - - . --~
Jr
RQ.\D K\'I.U)niL'T .U.."'Tl'IIORlTY
1'-..ct~·~,---~-
_ ,.. '!o-... ..... . . _ _
•• •-••otltalle•• <>"-
._ ! ~ll.aAXItll•a•u: • .;.;;;..
o;:M......c>UOL'G'U!OIN<i~l'IO. -
.,
,
<><>~ _ , _ , _ ,.,, .. ~,-
...._
jo-..,.... =-•a REINFORCEMENT OF Plffi
,-.. .... !,I
hi .. ~,. . . . ....,~~ ....,....,. , _ ........... ""' - - ' - :cs=.t coo
1057~ 960
'1'""'"1'
667J
-- "'i
~t~ @) 14-032x19633
6120
.. {0 t9-D32x5950
55
56
Fl
016
0 16
032
120
52
49
11976 1437.1
i 2000 104.0 1.58
7880 386.1
1.58
6.31
2272.,:~1
164.32
2'36.42
(11)6.4 rt' 032 49 5950 291.6 6.31 11839.68
1 _ F2 032 49 7944 389.3 6.31 2456.21
;[!'\ ® 49-032x7944 ~~ F3
F4
032
032
49
49
7880 386.1
7944 389.3
6.31
6.31
2436.42
2456.21
rsa 032 13 12000 156.0 6.31 984.36
........ &000 ·r FSb 032 13
· ·--13--·
12000 156.0 6.31 984.36
0~ ~
f5c 032 I 3264 42.4 6.31 267.75
J;j~ & 49-032x7880 ~ ~
, ,
F6 j 015 300 2240 672.0 I 1.58
TOTAL OUANTITIES:
1061.76
28167.211
:"V:.u f ...... r ...... .s ~ . ~cno.
0064
1 Nole:
,(;.!~2;;}. ...)!!.::~.............
T~~--
~
llt<OCJAUS1 ~ror U ,,. ,....... ~ ~- ! a> MO.t& w.n~TOiWABAATOf.A\'\o\AHOAMAWCWA.
~Of' HIGI'Il'lttn:IGA110N $.HI)tM'A¥$ •
n, 1111 - R1 0"•"-!i n~~< BRIDGE BRt.o-4(Al>te59.000)
.-. . . . . .,. '
1 . •
fSOI ~ .4~ f :on.u.Ot _...,.,._ -•·~--- .. _.......___,.,. REINFORCEMENTOFPIE.R
RO.\U JlliVY.r P\tl;:o..i .\UTHOR11'V . If i1 • - • • lit ,. 1i! • If .ff • t:- C1
'PIIWI~~d'f!r . . . (f ~ - ~~. M1~1Q_Qt ~"""'~.., .., .. ,._.,..,_,.,~ r-..- I''"
Jr 1'110*1DPMI~•C)I'Ill~Of·Oimii!•O~b•-V
.r.. ~--...--....
l~ UU.f'* ' .-.. J• ~---t .......~~
~ ~, nast S*m A CGI:iN 111SM.'<tQ/OiCQJJ"C. or.NA~UC"QN!Our..'GCOMi'ANVUO. o..- 20t'1.11.C1 1-.<v I .UCWTIOI'
Onowlf'l9 tie>.
sn~~'*
'
L "1': 7
til
f2
7Wo 350
"'
Jl~ ffl~~' 1l ltl
~r
~
I 1130
~
~ "''or-----,
~~ l-J
242 ~
® 9-016:z486 @ 4-016x4616
I
BAR UARK,SllE(mm) (pes)
OTY. LENGTH
TOTAl
LrNGTH
UNIT
WEIGHT
TOTAl
WEIGHT
(mm)
i -- 2000
802»-184() sd Cl I 016 9 2436
(m}
22.37
(KG/m)
1.578
(KG)
35.3
Note:
l.AII dimensions ore in milllmclers .
2.lopping of reinforcement $holl be stoggerd.
3.This drawing wilt supersede the previous f-
opprovod drawing NO.StEP/S4/0.4/09/10' (REV.6).
l-
Jr
Q61XJJ.;.£SOG\USlJt:~(J$$aSLA.JrA:.4
S&l!ei!P.YQ H:Q1!'~ Un~.A."l:)f<( & ICHWAVS
@c
ll>Stl":::I!IStl .. fiS:II
--- ...
jooi. - - -
t -.
"f l
.JJ:.
..r.-..
"'•
I
1
...•
- ~
I
~7 ~1.;r~_,.. _
.....
_......_ .... _~__....-~...-~ ~
j
--
~tcJe
IXT'DfSIO)IOI ~ IXPMSS'WAY~ - 4(UV'..$4)
f*OM au.rtA&..A to ~tA VSAAHQ;IJ'fAWEWA.
BRIOGE 8RI-04{A0+859.000}
REINFORCEMEr.IT Of PlS
J7
"*'At;J~--c:~Ot' . . . . . . . ~-'
..r.t~~~
U:HOIP'Wt ,_.M".:MJ.XI , .... ~-------
OINA IA'l'JIJAt r'II'Sl U:o"EV.! \JI'..D:i."( ~11 G'IIC J. Ot."""'~~!O;HGCOY~AH'tL.lU
.... ~0!!,~---
~ m• .~..oa
i
~"""""~'"'.._.,.,.,~
Dbe.'llf'TIOIII ~- ... S~ttr r~- w
~
I3 C2''D32
19100/2
Pw"
~~
I I I
J2j~ 2~
f4 ! 41,
"l
I
~~ ~~
I
c "' ~
~a~{~
/
l
)I IJ
~01 5
~t:::lii iiJI I I I I I I I I ! I II II I I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I ! I ,.,
·- ~CJ 1 @020 ~ 7 ~025 ~ ~032 ;
cs 012
C6 0 12
1
-
l- 1
SCAl f 1:50
(P\5?16)
'
CD -
DETAIL AT END OF THE PIER CAP
SCALE 1:50
19100/2
fi~ 300150 175 240200 l
I II I
~I l
....
::: -j-@012
•1~::. ~
1 II~"'"
g J:i!
11
/7
.,
I"~ J
~016
~
@020 :c7)012
(P15,P16) @ 032
-~, :>I"'
, :c-n~N
2•00
.......k~.~~- ...&~.~................
.· i;.")r:s'!·,\ 1 ... ·;~.·t.tc_ · ~;i, .r3.l!'.:Er;r~
CD 4-4
~SCALE 1:50
{Z~v' ·SI)
C'· to .}~[):./f.cQ/?
g
~I ~
,.
Note:
l.AII dimensions ore in millimeters .
032 2.The splices of reinforcement should be staggered.
3.This drawing wili supersede lhe previous
approved drawing NO.SfEP/S4/04/09/10' (RE¥.5).
3-3 (P15,P1 6)
- SCAL£ 1:50
w c~ @c
~ M
.....
I• I I
~T·
~--
~CWIOUTKEJl.~UI'USSWAYSE«;~-4~
lltOV t&AnALA TO~AV\AAI<:OAAA"'ff:'N4
BRIOOE~J.O«(fo0.859.00ll)
....
14.U.\DOlt\'EI..OrMll1\'f4.\.JTl i().Jt1'rY
_,.~"'""""~ .......
tiOitC'f CIIfe'l'OII· ~OCottW,_tll!ol rvltfj.IWII'I
~
OTY.
BAR MARKI SIZE(mm}I (pes}
lENGTH
(mm)
I TOTAL
LENGTH
UNIT
WEIGHT
TOTAL
WEIGHT
I (m) (KG/m) (KG)
aooo 6000 C1
I 016 333 I 7612 ! 2534.80 1.578 3999.9
I I ~20 I
~[
1
~
I
lli!tl
r
~ j ~
C2-1
C2-2
C2-3 I
032
032
032
a5 1 91.5~
100 1 216.00
85 I 68.13
6.313
6.313
6.313 l
577.8
1363.6
430.1
~16-D32x10000 ~16-03~6320 ~16-032~8000 I
f---·r------4I
C2'-1
C2'-2
032
032
l 100
20 I
160.00 1 6.313
101.12 I 6.313
6.313 I~
10 10.1
638.4
C2'-3 I 032 I
I
128.00 6.313
C.H I 025 159.18 3.853
I
~o
C3-2 336.oo
100 1 336.00 I1 3.853
3.8531 1294.6
"' r·· ·
56S!I
rl 12000 ···-·····-:::-±;;
3185
f
C3-3 BS 89.18 I1 3.853 343.S
C4 016 111 10~4.73 1.578 1648.6
rng] ill§]
cs 012 34 70.55 0.888 62.6
0 ,'} I 34 I 2222 I 75.55 I 0.888 67.1
@)28- 02Sx5685 @ 28- D25xl2000 ~28-D25x3185 @ 111 -016x9412 C7 ' 012 ' 28 I 20'"' I 57.04
o n• 0.888
I n ooD I ~n..,
1
cal ozo.J so ! 2soo 115o.oo
150.00 2.466 1
12.466 ~
TOTAL FOR ONE PIER CAP: 13278.4
1
2075
1
2222
~---
2037
l ~Il=::
Nofe:
"' @ 34-£ll2x2.075 @ 34- DI2x2222 @ 28-0IM037 @ 60-020x2500 I .All dimensions oro in millime!ers .
2. Til~ splices of reinforcemeni should be staggered .
• ·.J- ...• • --~·-·r--
.... 10.~.
r•
\'
v ..),
3.Thfs drawing will supersede the previous
m
!..:.;,;h·,·:~j T I_Jt"' ~~:::t
(~;...::".::;c.)
oa:e.•.~l.).,./l.d!f
• @c
u.,oo,..
ronRAcr~
~0 ~T~
~
(omut,JAHT t:r1"DlSllftOf' 50UTKUN ~YUC'nDH· 4 {($9.$4J
DtYOCU.TJC SOClA!Sl ~Of W LAKt.A
~.t:tS'fP.Yor ~~110H lr~.VIoYS
•• , 6:;; 0r»w .... r...
F«0M MATTAI.A TOHAM&Uf'TOTAW.~
BRIDGE 8RJ.O.I(A0•559.000)
RO.\f) llFVI.t.()r\lr.:<.T \l,,lk)fltT\'
FSO!
~!lllll;ll.l.lf<!II ..IJ'"" !-'>...:1 " \4 t \1'.3'!; !tot~--·----- . . . .-."'"- 1IDrf...Mt* REINFO~CEMENT OF' PIER
"'
.._.,
.. r7
;
w- ,.-..... . r···~r····-··1.
f i' •I
:
; .J., ;. .t ;.
!
! .
li
I ; '\;)'. ,~-·
:
.
. · .~· I . :
-.,-• -€;- i
~ ;~ ~
;:- -.
!...:.:.:...:-.....:. . . . . ._ _ ... .
;;]
12_3 "'
r--, - - -
. 020
EB 1-11:50 (PIS,PlS)
~ SCALE
- SCALE 1:50 '
.,...,.
I ~t1 ~
290 290
l~
3~· ~
~ I ~ ~)
,rp.;
llllllnml=1 1 !+==
@ 020
2Jl8
@) 41- D20X2898
:1 lf
~~II
2060
[1 11 .
~r ~ ~ @ 20-020)(3965
@ 60-020Xl612
;:...:..-2~\.:.·-.. : ...... ~·~1·.::·....:o·
J .• I
I 2JOO
/1 k.....- Um/IM ....•....
:.:~;·:..~i~ ... "·-.:.1:. ·;= :;..,.;~L.R
·s·,..:~. . . .f:') ..!·~· =..,..
BAR QUANTITIES oate.J'!Y.t)dl,of
~--;~~~·~
I I Il -~
i
~AR MARK' SIZE ( mm) (pes,)
{ OTY LENGTH
' I I TOTAL UNIT
TOTAL
LENGTH WEIGHT WEICHT
(mm) (m} (KC/m) {KG)
! 020 .t:y I I I ~ ~, 2 01 I 020 42 2s9s I 121.1 I 2.47 300.64
I ~ I , ~,
02 I 020 20 3986 ! 79.7 I 2.47 196.91
03 I 020 1612 I 96.7 I 2.47 238.90
~~.
' 60
TOTAL FOR ONE PIER CAP: 736.45
• ,I 2000
1 ~ IOx iOO
2 020
Note:
l.AII dimensions ore in millimeters •
EB 3-31:50 (PIS,Pili)
~SCALE
2.The splice.s of reinforcement should
3.This c!rowlng wiii su~rtede the previous
approved drawing NO.SEC:P/S4/04/09/10' (Rrf.6).
ne staggered.
'i
!::CNlRACIIllt ~ '-'...sr• OlEJo,'$(0)10J' $011ll4l1Uf UPlEliSVIAYSEt:'nOM · C(~
~
QoNSII.AtAUf
bE.MOQtAnc toa.wcr~a.JC Of m tNUA
W.C5T-Y 01 .cl«k mut:.lfl)J4 & H:Qf<NAVS
~01
@c ••I
7
I
2017.1!-.0, _,,.,. ..... _ _ . . . _ .... _ _._""""'" "''._~
_,,..
NtO*t MotiltA.LA TO HAI.le.umrTA ~ Ak~"tWA
BRIDGE BRI-04(A0•859.000)
REINFORCEMENT OF PIER I
iW~-UJiiSH::Lo1"\Ut.' r Al!'il-Kmm
....... ,...
Jr _,,..._.......,....._.....
~CIUC'IOI'•O...O'tl~·li'Clltii(II.,...Y
D«CMffiON
OlfW~t~t NO.
S£E~
1 ttl!' 7
fl 2t00
·~j I I '.
"' :1 =
~I II ~-
II
ll 032 1
I
'I
f-ir-, 1-H-H+!+,J....I....I..I ~
I
I I
I
....--
\ 3
Olw$3
3 l '
016 4
"' 0
01 w55~
!;;.'":-~\<('/~ l:..!J i .Jt ~ .J l·.f}'.'~T;'C}-f
:~
~
...........~.~--·
:clii 016 5
-e ""
·~
-- ·-·
-~57"
('
' ~
"p .
~t ~- ~-i~n '
~ 21 Da!c.)~j.),,j,
!032. 1 s
0.32~ hs.,S1IS
i I .,... I II J "' T I
(ffi\ (F3) ~16 ''
~32
'76t6 :1; 11m ~32 I ~
~
{~(~
'U' r ,,_ '<,7
J4 ~ ~r;:r
: lI : II : : : 4
l~t~~l
I
~ ~.
I
I I 1 I I I I I I 1 I I I I 1 I I I
1I I I I I I I
I I I I
I ' l .:
I 1
~ ~ @j?R I I I I I I I I D
'i'])
"' .
I
1 I I
+ I I
1
I- I
1
I
tI
:
I 1 I l
~ !::!"" I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
~
rl
'·"~'
I
I
I
I
I
I
\~"\'n."\..., ., ...¥\~1'\'
I
I
I
I
I
I
~"'
I
I
I
I
I
ln"'X¥\'"(~"':¥\"c
I
I
I
I
J5
"'
~c:
0(FlJD
~'-- ' .!/~
o32 .t { : .l
I I
I
I
.l
I
I
I
.I
5 ~
~ LL t1)o3{&m ~.J
21 2 A032
' o32
_j _..l....... _ _II ([Y .- IL_____l\, _ _ j
CROSS SECTION(?15,P16)
~ SCALE 1:50
l
Nole: EB 1- 11:50 (Pt5.P16)
~ SCAlf
l.Ail dimensions ore in miflimeftrs .
2.The splices of reinforcement should be staggered.
3. ii reb or 51 /s 1' conflicts with corrugate sheoting, length of rebcr
S1/s1' shall be adjusted at sUe, oddilicnol rebar S1o shall be
ir.troduced at both sides of the corrugate sheeting.
4.Thls drawing will supersede tilt previous
"' approved dro• ing NO.S££?/$4/04/09/10' (R£V.6) •
@c ..... T...
~
COI:i:UlTAJ.:l ~NO' IOUTKfftlltDn.U.SWA"W ltcnDN • 4 1f:S9.SC)
ot.'iQCAATIC SOCIAUSi II.EPVBUC Of,.; V.IIU. CONTRACTO< Flll.QM ti.A.TTAU. TOHAM.DA.hi'OT.-.\Y.ANOARAW0~
)o'fl'f1$ntYOt HIGH~k tOI..'tAOON $ M.Of'NA't'$ Ot~onstAA> BRIDGE BRI-04CA()-t8Sn.QOO)
.
-
M,\U 0~\'l'.l.t>PM.L~T At:'rllmtiTY
REINFORCEMENT OF PIER
~{;$A'-*'.,.~~!~. Z"11" ~ . t:'tillltr:tti 'fiJJa!l~~
o•_...N:a.
,.~
Qot llUUM I
........._..._...!Moill• ....,......
fiiJOHCTOIIUC'IUI••I:. . . . O#'~(MUorll·l·-·
fM . tn.Jaol
oeu. J.l:l\\Al fiJtST 51$.-YPI' a; Ctsi:H 11$i1t"...-:t QOI CD,J.a ~ HAASOU• rMi:Ntl"--NG (OMPJI.NVlTO. s~g
t'25~ 5250
)'~ hF.i___
lt~l
:8~12~ 125)
((S, ~125
i
lo32 11 @ -- ll
032
l't03
...
~i~
~I«>
f"OI
,....
;:;,~
...
II -···-·-·.,n;
(I')~-~.:~·- (P1S,P16l - ®--5=-s
~ SCAU: 1:50 (Pl5,P16)
"'
~
:T~~.-.
., oati3"'Jf?j),./.J.,r~i
Note:
l.AII dimensions ere in millimelen .
2Jhe splices of reinforcemenl should be staggered.
3.if rebor Sl/:1' or Slb/Slb' conflicts 'lfilh corrugate si)ecting.
!engfh of rebor Sl/sl'or 51 b/51 b' shall be adjusted ol siie,
[ additional rebor Slo shall be introduced ol both sld~s cf the
032~
corrugate sheeting.
"l ····- 130125-1QZ2]J! l~
' 2000 I 4. This drawing will supersede the previous
8j ~
2-2
SCAU: 1:50 (P1S,P16) (Pl5.PI5}
approved drowing NO.SEEl'/54/04/09/10' (R£¥.6).
WH~ACTC!l Cif§c s- I
~
COUWt.l.t.Ht ~~ Of SOUTlltllli lll?1tUIWAVse:TIOJt.41(UO'~
i!RlOOE BR~859.000)
REINFORCE_!AEtiT OF PIER
RUM> l) ~\'lil.OP)It.ST AVl'UQIUl'V .,. 11 10- ~ 11 tllt lll•l:r l l ' " ' . qJ$:e1~1(lfitlaiHHJ ;,v!
tSIIt.<I~Ta•,~·Clll'llloCHf.,MVMit(U,.IIU'w:l." • --· -- ~ ~· l • 2:1)"11.~ C:J,CJqiii'-~III IIM .. ,~fl'\.'_. ~l~4iJ~•d•ul Qt........
•n ~fi.~. . .IIM.-.,.
J.. I .I~:Ut•U t't>J II\IIHI_,. I ~HoAU~
0t1M Lll>IM M!1' $lJit\'IY 6 lX$0111NsmuT! GOOOI CO~t'Q, C)r,NA HAAto\.IA ENGI.h(UCNG COM,ANYLiD. WI DU.C:totmOH ' ~£P~ct
•
-r-----.. !.!l.'?.!.?... ""t~~-- li--825i
)l;lt·~ 6128
"". · ~ @ 'H-032x(flt4G93) (sl ond s l' slogge~ on·ongen1enil .,._,_ .,....-------------~
""1
H-8732 960 IIIJ.IO ~13-D32xl2000
~ :;;
• ;:;
~~ @ 23-D32x(HH693) ~ ~.,
I
(s1 ond s1' sloggereC: arrangement)
1 ·~~ "', ~=
......."'..... I-
ll!
~
j taw I;:;
• ~t", @ 7-D32x(H+8423) , ~ ~
"'
"'
Q
"''
@ 300-0i6x2240
I ,_,., ,"', "" ''" '"' '" ~"'"' '"' "''•'"" ~r-1 1@ N
g:
~~ 1 1-
()
@ 8 - 032x(H+8423)
3026
(sl bend s1 b' staggered arrange men!)
~....,_
1
@13-D32x12000
s1?a t
J ff,. ~...:C"'."!Or,
I
"'""'""'~ U'm'~................. ..
Cvrv ............
~t_~ 0 10-03M026 t -~ ;\j;~· !?.1'fil:c·:v..~r·L L,--=~· . .;;-t ~-:;-k,:J-~:::L~r-i
Pt5l P16 {S:~CP .. ~-~)
~000 O:~l~..-:?:?.0!.!/:.P.g
~t~
~~ "<;> ® 62-032x9465 210
-r~
• 0'-1
;:;,.. _
<S'.t
"":'(•...., g
. .... N
~<i'J_,.:r2
-·
N II N
~l
-
~
\ tm PARAMETER UST <tor one
TOTAl
pier)
UNIT TOTAL
I 2.0Sll I 1
&90 ~ g""o-1
·!-,--=20""· BAR SIZE QTY. lENGTH
LENGTH WEIGHT WEIGHT
MARK (mm} (pes) (mm)
@ [0.5x(n+2))-D16x2510 @ 0.75x(n+2)-016x2310 @ (n+2} - 016x8380 (m) (kg/m) (kg)
64lOO
·s,,s,· 032 47 HH693 0.047x(H+4693) 6.313 0.29x(H+4693)
S1o 032 10 6026 60.26 6.313 380.-42
[ l
I
~[f\ ~,~
1b/Slti 032 15 H+8423 0.015x(Ht8423) 6.313 0.09x(Ht8423)
@ 49-032x7880 $2 032 62 9465 586.83 6.313 3704.66
$3 016 0.5x(nT2) I 2510 1.3x(n+2) 1.578 2.05x(n+2)
595-l 54 015 0.75x(nt2) 23i0 1.73x(nT2 ) 1.578 I 2.72x(nt2)
55 016 n+2 8380 8.38x(n+2) 1.578 I 13.22x(n+2)
@ 49-032x5950 F1 032 49 7880 386. 12 6.313 2437.58
606" F1' 032 49 5950 291.55 6.3 13 1840.56
1 I _, F2 032 49 7944 389.26 6.3 13 2457.40
~rr; ~1~
. J
@ 49- 032x7944
5000
i
F3
F4
fSc 032
032
032
49
49
13
I
J
7880
7944
12000
386.12
389.26
156.00
6.313
6.313
6.313
2437.58
2457.40
984.83
!
~J1~
t5b 032 13 i2000 156.00 6.313
*[f'% @ 49-032x78BO f5c 032
F6 016
13
300
I
I
3264
22.CO
42.43
672.00
6.313 i
I
984.83
267.86
1060.42
r--- . . . . . . . . 6()61, _,....... ...... ...... ..l
Note:
1.578
-Jrt . u ~iftA.tloi ~
........
approved drawing NO.SEEP/$4/04/09/10' (R~V.S} .
-··
---
COWAt- ~ txm"'Si::f Of sovntf.&t~IXMDS'i"I.AY S!rnOJI' ...c {ESU&q
OfMOC.Mnt SOCAUST ltPfJaJ: Of~ tA.f«A
J..'JI:!STXV OF fi)Gf11~ [OOCA.OOft & tQG.01'.V~YS
•SOl
@c a ..w
"'
:Kl
•
'7 '~~~--------
T
.,_Tl11oo
'WOK ~ltAU. TO AAJdAtiTOTA. VIA ~Ti'IA
EIRlOGE BRI-04(A0•859.000J
.RO.~U 1Jt\'t!J...()I•\1i..'
..
)Y\7
... ! . .tltl'l"F•t l OIO'U".''~ ~ ··l~ MtTt1.01 ccsc••ll'nOfC
~
12
350 aol
2400
902~8-8Q2240 sa
I 0!6..@ 7w.O I ~ 1!
1'"2-+-..--~=1 "' .:£.._ ' 16
~ f1 I 00§ l l ~1~01 l I I I I I I I I
~
0 ~~)
.c 1L ,...
"' ~" ~. c
ut6
m! a\
t~ ~ . .. i ~ I
~
0 ~ ro ~" ~ ~.
~ ~ v ~~
~ SCAt.£1- 11:50 (P15,P16)
'0 ffi SCAt.£
'0 3-3
1:5() (?15,?16
l W SCALE
'0 2-2 (P 5P l
1:50 I ' 16
•<f~~
~.;.- ,•
1 1ft
2~
.,,;
!::: '?
@ 9-0l5K2486 @ i0- 016x5448 @ 9-016><2965
PARA~AETER LISTS
350
!6 eof
2~
902~8.8c21o!G a!!_ BAR ~lARK SIZE<mm (
OTY.
)
LENGTH
( )
TOTAL
L(NGTH
UNIT
WEICHT
TOTAL
WEICHT
.p r-l.--r-+-t
~
~
1~
il
i
!01~
C'
J4
1 FH>l6
7ml70
Tn f.-.
1-
~
~~
-
4 ~ I i
~ ~~
:::
::1
fl tC2)
'r616
1
II
l
Cl
C2
C3
015
016
016
9
10
9
pes
2486
5448
2966
22.4
54.5
25.7
TOTAL NUIIaER roR ONE PIER:
mm (m) (KG/m)
1.578
1.578
(KG)
35.35
86.08
1.578 . 42.18
163.61
::: i - I o1~
~' ~
12_"' i ~ ~ { ~16
!
lL -
,,
;: .•..v.Y ••. ~ .......~..................
Jrt S""!-s.d~:rv:t'.L ;;... ;. ...
O~!~...'~tHl.,/l&f.
("~~~F' . ;,A)
c·~·= -.:,:::;;·
.
- I& v ~
L:.,.. l.All dimensions ore in miliimelors .
(7\ 4.- 4. (!'IS,PIS) {f\ 5-5 (P l S,P l o) {f\ 6-6. (Pl S,P l S) 2.The splices of reinforcement !hould be staggered.
~ V SCALf 1.50 Q SCALE 1:5() V SCALE l.SO 3.Thi! drawing will $Upersede lhe previous
opproved drawing NO.SITP/54/04/09/10' (REV.6 ).
li ~11C.SJOC4US1P.l:P".JSLI:~Sli~U.
"""""""" IGGH[OIJ)<l(An:>t..................
eot.= r.un t- A
>SOl
allll1!.-t'I:R @:
H 'C ~
~
I>'-
""''
IQ_
10
•
•
~ flllt
....,.,, "'"
~orSOt.mCJt.Nor•usvu.YSZCllON·~taU'"
F'~Vo\TlAl.ATOMA.U....... fOTAYIA.~WC."l/.
BRIDGE BRI.04(.'10·859.0ll0)
Jr
t«M.OO~\"J!LOJ'i\1 a;1-...-r umroRm'
!OflojU1 ~1-·"''-~""~.~·
:.~!~~;=-~-"_..,_,~
rp 11' . - • • ~ tt t\ "I} "II '-l' "'
Oilf',A «.AllW.Y :'ltSrSt.lr\'l'Y t 01$0: IN5'!!Mt ~ CO.UO.
~~~.~ -~xa •• • tt.i."'•
~--
~
CH1.''1lAtiARISOU~a«it.'\U.l:NGC0M"!Jfrt.to.- IN»
--~'"h " 1 I
.,~\4-- -&tit~·.,~ !>a
2017. 11 01 Mlv'i
~11.1~.~ ........._-----•·•-
I
..... ___._""'_...
ct;lN......__.IIN,...._,,., ...,.,.,......,
OUtiW'liQ~
DrllwlnlfNO.
RElNFORCEMENTOfPIER
Sff_~IO'
r-"' UtO
I"
1
UST P14 P15 PI&
l(mm 20000 20000 20000
b~ 0 63 63 63 ~
b 8 8 8
I
jlllllll
c(mm), 1900
BAR QUANTITIES
I 1900 1900
~Wif111
!IIIHfW
i~!05 1290
J
~cs!
--'--="...-!.
...::t. ......,W~.H
r:::~cr;:,
. . Umt:!)..............
BAR
MARK
SIZE
(mm)
QTY. LENGTH
(pes) (mm}
TOTAL
LENGTH
(mm)
L+2650 37x (l+2650l
l 1500 -.n
·,.;:,;:n. . C.' ;.;,:c..~ £7..;~:'-!~.::t ~ 016
025 37
33+a)x4783
(:.:;;:p. ~., 82 33+a 476i
83 020 b+3 ~631 (b+3)x460S
o......~O.dl:il
Note:
1.AII dimensions ere in millimefors.
2.Sel Aond Sel B ba~ ore loid alternately.
_
3.This drawing "ill supened~ !ho prtvio.. s
approved drawing NO.SEEP/54/0.t/09/11' (P£V.6).
COUSULTAH1'
y iCOIT(OIC:fCR @c 111 I t~r• U'TUtiON Of' IOUnttftN UPII!:USWAY SE'C'IJOH • .t COl"+Q
tJtOM tM""-1A 1'0 MA"'BA~""JOTAVIANinA.RA\\'t.WA
OMIWI"''' ri'lk QRIOOE 6R~(A0+8S9.000)
FSOI t 201T. f1.tn -....... ...... , _ ..,.,.,_111.. - - .. _....-... ,..,s.....,._ BORED PU.E REBAR DETAILS
"'n~t-•«il!ltiUI:CII .. '-' ~ '\'%!VI :tit IIAIIII!:"' lil
~... 2017.100!
00U. '-"lWAY AII:Sl SUIM1 t cm;.'f N:IJ\.m QO~ "C. I OGM fi.ARICUR [NwelU:NQ CON.,ANY uo. tUJ,..' u:.=••,_•h4li!ttllf
.'\!OO.. Orawhp-.,.
6!&~-:ttn
19j00
"'
, 119? wooo I !OOQ 1 1000 I 10Ql! Ffooo r r I@ 1000 ftooo i5Q?l 1000 f 1\iOO I lQQQ r.QQQ..l_lqQ~...l!m_l 1000 1 lQ!)Q r4
( } ) CABLE ARRANGEMENT o; )
SCALE 1:80 (PL,,0 lG
Distances of Y1
"'
OI~~S£ 200 11001 1000 1000 10001 1000 1000! 1000 1000 1000 SOC 1000 1000 10001 100~ 1000 1000 1000 1000\100 200
C2 o
o ""~I
o N • ,.... 1t
.;) ~
,...... (7)
o o0) oen ; o
m oen o<"' o
at
en
o .... I
~ ..,., .... N o l ~
,..... \0 ;- '""' N - - -- - ,.,. - ~ U'l 1
NOTE: W lj '
\.All dimensions are in millimeters. •............~ .......''::.!.~~ .................
2.Profile dimensions 11 ore gjyen from the tenfretine t;·:MC :t ST!:\0~·~·i 1 ~-t.\l. or:~1C~~ ~,J;;r!t: :..;':?
ol duels perpendicular to bollom of girder.
4.Stressing shall be lwo ands jacking.
S.This drawing wUl supersede the pre~ious
(:;;:,~;;.:> • ::··li
teo ':']<JJQ. f/,
0 a ......... " ..... •
o? "'
approved drawing NO.st"'tl'/S4/04/09/14' (REV.&}.
-~ eotf\\ATNR y IClNiVACUR ~
r,. lwM 10 I ~Tck ~CWtoulttP.-'f~Y~·-C(~J
~*&.. 2G'1.''-";-----~--·---~--
OE.UOCUTICsoa.u.tSl!D\&XOJWtN3.A U ~ ~~ t : ~M MAn""-"TOttA.»INf'lOTo\.'Wt.A.~
II ~ 8RIOOEBR~+8SS.OOO}
1.-
""'lS'>YOf>!>l>!,UOoc•-••t«.HWA'IS fSOI Di lo- I i --
-.-
1 tm
;:~!t-=~=&.H~·~
m
~~"4101o:,~.,.,..,..,... ~11: a - £•2ttaamfi•Ufll"
OHW.WArf'!m~tf·«:sa:!!~(K 'D.
l ~3••=tt-=:a~e~lll
Oof:NAMAUOI.A~~"oOGCOM'AN'fLTD.
1<>-<',.
~
D•
41.
.,.1 ~
'201f, 1101
,
1
1m'
w.r.~a.oe·
l
Q .o· .,...,.....,.,,._c,.u_. ...... ,........
~
~f.b
ARAANGEMENTOFPRESTRE.SS'i'ENDON
lft~11f
fu-- \0
1'
1"
7
-.
+++~-$
+++++
l I
l 1
t+~ll ill
@Jc,·Jcl' jc1'l c1 I
j380
1 ~:;
[c· lcl' lcl' Jc,Jc' 1
13evl *****Iii!!
~ .!80 j
, c1
4••to
?<_Q!t
IC2 IC2 IC2 IC2 @] ~ C2 IC2 IC2 IC2 IC2 I IC2 IC2 IC2 IC2 IC2 I
EB 1-1
~ SCALE 1:50
EB ~ SCAU: 1:50
2- 2 EB ~ SCALE 1:50
3- 3
(So
~I Ill
I
I
I
I
dE
J m l
s ) DETAIL-A 7) DETAIL- 8
L SCALE 1:10 SCAU: 1:10 el
u !cmrH"'1'0R @c ... , rl>j(K: fi!JI: IX'flN1JOtf 0 , SOUl tcf."N mtPKU :IWAV $£C'm)H · • (1t$U.J&4)
I'M'-' M.A~ 10tf.lllfDAHTOfA. ~ AIICAAAWf!WA
I -~~-%~~···~·
hf!h;1\1nef J«iK.. IQUCAT10H a t«if'!W-''tS ....ingu-.
~ SRIDGE 8FU41(Ao.a~.OOO)
-
FSD!
,._.__
ao.,"\f) 01;\-"'tJ...O""--J;.,"T ~U.,fOIUn
....
UIN{Cf~~- . . . ...,~-.,
.....,IIP\..
•"•-•••""••:=~~•e•
~ . . , 11m ~a CUGrC MI:IVtt « oc:tAKMICMI.t.~COMI'A'"n'LJtl. ~~·-
AARANGEMENT OF PRESTRESS TENDON
s..~.-
r:..~tc-t ........ f
-.
It
I
Cl 18823 ! 700 I 20223 I s 101.1 23.142 2339.7 120 IS823 5 94.1 1 15-21 10 65 I 65
C2 18740 I 700 I 20140 ' 5 100.7 I 23.142 I 2330.4 120 18740 5 I 93.7 1 15-21 10 65.2 I 65.2
• QUANTITIES
TENDON
Totallenght (m)
- 24
2151 :,' I
!
3 63
«1 .
~~~~~~m)
ANCHORING
D\-=120mm
,
375.63 !' .... b:J.~~ ~~;:·:;·;;.::::· }
(.:. • • • -~l-~ ~ -·· w ·•~-"
DEVICE (SET) 15-21 !! 40 D:lto.. ~J),..//. 1 .0,?
BAR DIAMETER QTY. LEHGTil PER TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
MARK (mm) (pes) BAR (mm) (m) (kg) (kg)
• I 012 6«1 426 272.64 0.888 242.1
preslrossinq notes :
4. Concrete strength shall not be less !han 85% of feu btfore stressing tendon.
!.Tendons shell ecth consist of the iollaw:Og nos. of 15.2~mm uncoated cold drawn lo• relaxation seven wire slrond. !
STRCSSu;c WUWUII AGE i
~"*NO !1 Ct c2 ' sroun1ct or or co~,i!Ol mESS JACIONG
i fOR
1
'
Ct,C2 7 DAYS
•
TENDO~................. STR£SSNG
I
PRESTRESSING
....... .
t 39~1CPc
,----1 FORCE
1 4101 '<II
t.ORII.\l. Sl:CnON (mm i ) 2'J.W 2S40
KORIIJJ.IUSS (kg/,) !23.1<2 23.1•2
~~
·A - .
OlldOCM1lt~ll~,u""*X.OIWtANICA
dCOt:sui.!ANt y ct::NlRACl~ Cf!§.
H ,,. iW""
~ ""¥
' tO
e
i ~lith: EXTV0'.$10N0,$0Ul)l£1UioPRUS\'IIAYstcn0H·CCUEI"-$.1l
fftOM MA.'I'fAU.fOHAt.tBANTOTAYIAMOARAwtwA
II' Mlt.tmYOI'~IG"t<.. lDIJCATIOr< .. _,AYS FSOI ,. - '-'I ; a o... ,"lr.,, ""BRibGe BRI·O~{A0>85D.OOO) ·-·- -
R.( _ nt.\' tto:\*1' UTH Ji rn ~"W ..61... 1 -:ou.u.o1 ~,. .... _ ,...._ ,_.. _ _ _._.,,.......,. .....~, ARRANGEMENT OFPRESTRESSTENOON
... ~£
-. ...•~Yl~
.... ~'o..l~~"ll"......
.. ............
• t.pttl'-··. .q. ,;. t;JSeJfi81!"1)..
:"::';;=~==~·~ _ _ _ _ ~VOLWMr.ur~-~~~UCS~_a"JJlfif1CVCOJ.nl_
-t!Gil41l.X:l'I'IJIJ!I{f~'J:
at:NAHAAIOU~t\G!NUR!NGCOW.A•iYLlD.
,,......
o.w
liS~\-
!tnUt~~
•
_,
20U10CO C:l,O_..,....,......,.,,..,.,pt_,.. ... ,...,.
~
I:HK. . rio.
SE£P~..t
I"'""- :l.'l
lq'
:
'Iii
--. .l. . . . . . . . . _. r. . . . . . .r. . . . . . ·r-
jliljij'-" IQij()
19100/2
1(1(1() i()ljij 1000
'• 1000
. . . . -1
J!ir - J
1 ----
111
e
(1\ PROFILE
4 e.;
~ ·-- """
. .. ~qZJ.._..ll~~:::;:·:·,:·~;.: .·:;
-·<ucT'
~
rr ~
I
:.'!
111 I .
~it ! .:1:1:1:1~J:~::
~I ~ - ~
~
012
-ffi- 1-B-
j I
'-m- -lEBI- "*=*"'
..,;!!? I 012
~i
IC • • • J • • •I • • I. •• 1•• ~ , ,
.~
fSD!
""''Tlt~-:JI @.c
L""' .I 4!! I ~ 1-.... - l ~--~-
-··
._........_.,. 1._..., ...
~OE-~IVRQSW-4Y~··~
IJtOM MATTAU. t.O Kf...Ya,UifOtA.\"""AA.~t'lA
..,............................
RQ;\D DI\'EU)I'\fEI\.T.~(!'rll(jiU"ff
HOM:Cf-CfCC •·I•"-....Oio of *OQ'IMOI"'-(UIIil......T
toa.u •Mtt.,.r ,.., •namau 1-. : .-.~1.1•
'l>tt lf-lt lf~ rlii• tll'!lf~ "
a... IWIWAV nm S.f.\'IY • _,.1<11:11r! GJO# =
~ l!ht.• .t. li ,,.Jlf:f ~ ii
01!M HNt.eOUR L"''GINffii!NCS COMPA..''Y LTC.
Cl.Cl,_..__• .,..... ,.._.P"tl.-"')lltlillt.....
tt•c;l(tM'IOI(
IDt_i..., t:O..
StCPJSA.I040W1V
....
7
,,
~I~,
~~ ~
; -~ ~
~! '
~l
I
i
;
.,._I ..
~
lL
$!· 012
~r::~ t .-*I=GI-*1-*It::t.
012
6.)012
012
5
2400
SECTION 4
1) 012
6 SECTION 5 7 SECTION 6
())012
SCAU: 1:30 SCALE 1:30 SCALE 1:30
..... _..., '-' "' ....... - ..... J " ,_
.. . ..LV~....~~~-~~'j·:··
.
:::.".·.::;~·
~- ~ ~ ~~::.(£~; ~-~}-- ~· ~ -''·~ ~~--~
ITI I I
Oate .. E!.?:P:.?:~f~=====2=271=======J~
"+-
(j)68-012x2417
.. ~
I ~1 ¢11:1¢
A
~~ ~i l (V340-012x338
BAR QUANTITIES
..
SCALE 1:30 SCALE 1:3D
2.This drowing will sup€rsede lht previous
approved drcwlng NO.SW'/54/04/09/19' (REV.6) .
:JDIOCUJJC SOCWJS1
~t$~lDUCAD'lNa~w
-.&:.........:Of SIS WJ.A
cot:ur.un
y.SI)j
C!)N'""'- @c
IOJ;; I '!'!
11> I
I~ IJD17.n.o~
I
-
R0.'\.0 1)~\'l:t.Of'\.IL'"T .\ IJI)K)M.n"-. REINFORCEMall' OF Pi£R CAP FIXING DUCT
Jr ~tlllltC--·t.......... Of~ . . . . . . . .
''*"
Wlot ................ . _ _
Y••M•:oa,.! eu...,., , _ _......,.
•a• - ••&~rll a ce 11•~
o--.~~~•~:~art~~NSm".m(;ICJtlco..ll).
• •II.&A:tt:rn•&ee£l
Cli:NA HAUOUil CHGJoiwurr.G ~NlY \ l1>. ·c. 2e":f,t.C1
• I t 10~7 1C.MI CJ.b......__,..,.,..._,I"U.,..,...l...,.W ,~No
:~
u
. FSDI
CHINA RAILWAY FIRST SURVEY & D~IGN INSTITUTE
GROU P CO.,lTO.
Documents of Quality Management Syste m
.C onstruction of Extension of Southern Expressway,
Section 4 - Matta Ia to Hamba ntota vi a Andarawewa
I) Qua.lity Notification:- .·
.··: : · · .
N~i~ofNo-Objeetion ·. • ..
2) Conuitents: I w d.--<-t.L:'t.c<J . - ~\ --
~----~· · .
.· _J •
.t_Ni -~
. • 1.
3) Confim1ed By:-
PAitTD : Toi.Jcco m
4) R!!ccivcd By:-
..
~
CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE
Construction ofEx1ension ofSouU1em Expressway,
GROUP CO.,LTD.
Section 4 ·- Mattala to Hambantota via Andnrawewa
. FSDI Documents of Quality Management System
REQUESTFORINSPECTIONCHECKFORM(RICF)
Outgoing Log No. : CHEC/NCDCCSTB2751~1 .2_6/0/ j :J_O Cf .£"
Partll:Aclion ; . '
Received by the Ensioeer's representative:
Name· /C.M,1;e,·uv.~~"' Position:_~J(,__,~=-. . :. . ___ Date : ·rnbu~t;l- ·: lime ;
Inspection Required YES
f."":}'
~
0
NO _:_ ~ ...:.
1 . t( , T
· · • ; .·
. . . . .- t ' < I . . .' .. .. .
Pcrsonresponsibleforinspect.ion: . : · :·: '':- · · , · •· .. · ,.
. . . '0r. ._i_(J1· t/_>._~. G:·fl.t1/!!.V~ i7; ,ft;;c . , Pje.Jcinsp~ctth.eaio~~·wor;.. o; ·
., ' BartC;~~~Hs ·~~~·-~~~~ ·~~~;i~\~~!~·. 1 ;:~~~·:·~~~~~~~~~~ ·~
Th~a~ov~workSv.oerei~~~'ctedon , f:~·;: ! .. Date: ~ ~ b '/J.~-f~.ci{f1- TiJ!!c: ._ _ _ __ ....;-.,..
1
1) Quality Notification:·
.
I .
.
..•1.' .,
•.., ... ~: I
3) Contirpe<!By:-
4) Received By:-
rn .
Name:
~
\ __:.,...:....-'...
t-~ _ ~)J~nr.uu-c _ .,..C>_,L.. . : .tQ Position:---~....:;:;:__;,
_ _ Date~ •J:t ~ (JTimc:
~-
CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE
Construction of Extension of Southern Expressway,
GROUP CO.,t.TD.
Section 4 • Mattala to Hambantota via Andarawewa
FSDI Documents of Quality Management System
2)
. ..
. Relevarliorawings I Specification I Referenc:e:
.
. '
i· Enclosure: YES D. ·No 0
. \.·
.
·Category of.Controlpoint:
.. .
,' Quali,ty Hold Point : ~·
~cJ
~
QQality\V,itJJ~ Point 0
/rom: ContraetOt'> representative · · ·
..:.;-:·
.
Name: f\A...ftJ~ Position: , _g £·--,_. Signature: ~ n:~·~1t~;_zJ41
PARTn·&-c: Tobccoruplctcd.byEngincer rcpresentAtiv~· ·.'
Part B:Ac:tion .' ·,,
Rcce1v6d QY tite E;tgineer's r~pi~~~-~~~i~c : ( , I :. . :1;.,
~:unc::· "/C. M ;/:{, Ul')~...., .• Position: _ _._&~
·""·.,€,_. .__ ' Date: '1Jfl?i/~ rtf= :·.
.• ~:- ·Notiooof:No.Objcc!ion subj~J?i ~Q comments- o/Orks mey proceed., R~subn1itR£f'F (!'k~~e see comments.be!oW)· • ::.
• : .. 1 : • • • • - :. :_~:- • ": • • • ; • ··:· ·.; • •• '!. . .·.. 0 • • '. : - : • •: " {' ' • ! ...__ :~..: .:_.:. ;! .
3) Confirmed By:-
4) Received By:·
Description:
t
5/! ~~
/
The lollowing ''wks will he rcody for inspection on
~ P ;t.
?: r
Pt Q!Jru 6 .
cLu? d-nP-re_q_,j;-r?J-1 L: ~ eL~
Date ;,2-.8- /.9. l.../3 }6 Time :
0
P r n r;h Por p ~ A;u;UJ('~ c(U).g f'o-n
1) Work Proposed after Inspection Check:
~~
~~.~'~
·d~
~~,· -'~·~
· ·~
t ·~· ~~
·· ~-
-~
~- -~~.~~----~~
Relevant Drawings I Specification I Reference: Enclosure: YES o. :NO o· '· ·j
I
l
.
CntcgoryofControl ~oin;: .'Q uality Hold Point
'·'
Fmm: Cont'ractrii's
Ntu~leM..... ~ -q:,.
representative
.
S: ~=---
Position:;..,--.... !J
. 0 ·
·" Signature: . ~·
pthers 0
II
Personrcsf>on.Siblclbrinspection: · . ~t ·•
..
~;. ·P~ #f$. • S i.t1.e'f i YJtl{k
--==-===~~-======~======~==~==--=a:=====-~~";='=""'"'--=o:-==-=:='=
Pleascinspect thcabovework ' ,.,,
~· ,: :...:·:~
•••. L • ' ; ' ' ....t ;;.! .:: ·, :!/.,.., ·
.: ; · , •• • • •1
~mme~~
_.·. , • ~ IA-.)r . ~ ..
,-J_~~ .~~ ~._. : z~'~ : ~b
l}
·\ . . ··· .. ·
. ·;. .. :. '< •
' ....
3) Continiiecl.Eiy :-.
1
(:'ARTD : Tobccomplclcd by Contracto•·
..
..
U.
FSDI
CHINA RAilWAY FIRST SURVEY & DESIGN INSTITUTE
GROUP CO.,LTD. '
Documents of Quality Management System
Construction of Extension of Southern Expressway,
Section 4 - Mnuala to Hambantota via Andarawewa
,
REQUESTFORIN.S PECTIONCHECKFORM(RICF)
WorkProposcdallc~InspectionC~eck:. _j
,· ·
.· rprer
2) ,.,. A .:
·, ,;
~
Relevant Drawings I S~ification I Ref~rcnce: Enclosure: NO o·
- .l
,.
-...)
Category ofControl Point:..Quality Hold Point . Q Others Q,
;~ - . : P-1/;~/~
• t . •. ···'·
~ru~: _k~/v7,1(.,.,.;[);.:j,
lnspeetio?. ~i:quircd
.:·
:· ·m 0
Positlon: _ ..,A.,_._.._·b"'
'·_. _ _ _ Date:
~o:~·- o.! r .. , . J .
.. ..
.
l .·'
I~)
I
Convnents: •. c.: ' <k ~· t) .'
. ·; >
~-f
.~
.,
3) ConfimledBy:·
/~)
I
Received By:-
~
Nami':\ ~CL,.o> ~IAL_gsi!!Jmturc:
0,
Position : _ _(Q
__ U
____ Date :30'~ '- •.)...('<~me : (7. ~ . .,. '
-~
~-
CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE
Construction of Extension of Southern Expressway,
GRO UP CO.,LTD.
Section 4 - Mattala to Hambant'ota via Andarawewa
FSDI Documents of Quality Management System
'P''it~CWiAwd .
2)
WMkPropM<d
Relevatli' .
. Drawings I Specification I Reference: Enclosure: ·NO 0
• t ~ -.
. :-
I) QunlityNotifica~ion :-,
··.;_-
NolieeofNo-Objectioo .·
NotieeofNo-Objcctloo subjeci to comments- Wotks may p•ocoed. Resubmit RTCF (Pici!Sesee comments tel ow)
-~:- ·.:· · :4:... . . • . .. ' . . ...... _;t"7:' 7 ~-. .. ....
- ,.NoticeofRejeetion-Piease
"· ·. . . resubrnit
'
RJCF
,
·
., ~) Comments :
3) ConfirmedBy:-
I
· "ARTO ·Tobccom lctcd byContractor
~~ l ,_;.., By -
Name: [ • j2..,..,_ ~J"''.o,zzt Sir.nmurc: Position: <Sf. <....• .f' Date : o, Io,)z,.@ Time: I I. So
...
SOUTHERN EXPRESSWAY EXTENSION PROJ ECT
i
I
r (ti§c !
SECTION4
MATTALA TO HAMBANTOTA VIA ANDARAW EWA
J----
I
-·····- - ----- - - - - · · · .,,_i _ . ---··-········---·---·--·-- -·····-----·- - - - - -- · · - - --·-·- - - · - - · ---·"
Inspection Sheet for Grouting
!
1--=-- ---·-
1 Element Type
--- ----.--I : Element 10
r·- ---···-·----···-··--····--··-- -- ,_!:.~_
IRD§_~------.. ---..·- -: _ __,fBRl_ / l J..b__~_£lQ.or h.e.tYi ..
dl:
i I I .
____[ _ c . C-1'-l C-1 -M1
I C-1'R I c
Mixmg
! Sample
'I
1
I Accepted by
l
j
I
- - - - - -- - -·--- - -- -- - - -- - - -- - -- - - --·---
I
...,
EMPLOYER : ENGINEER: CONTRACTOR:
I -
ROAD DEVElOPMENT AUTHORnv.
D~MOCRATIC
lANKA·
SOCIALIST REI'URUC OF SRI
MINISTRY Of HIGHWAYS
La ~:~:~::~::!:,:::~~:~~~,:j @c
FS D I DESIGN INSTil UTE GROUP CO., LTD
•1•~~~~~-If:\!:tfu.ltJtf'": i~\=j
,
Date ofTested 01.01.2018 / Test No CHEC/SEEP/54/G r out-301 /
.......
Cement Ultratcch (OPC) ~ Admixture fG rout agent PGA / ' .
TEST: Determination of Expantion & Bleeding
METHOD: BS EN 445:2007
,.
Sample Collected Batch No. 2
After 30 mintes fluidity value ( sec. ) 23.34. ~ Ambient Temperature ( "C ) I 3 1 ....
Expansion (A Iter 24 hours) % 0.5 ... 0.4 /'' 0.4 .... (·1105)
Bleeding \Aiier 3hours) % 0.4 ~
OA ,. 0.4 ... { less I han 2 >
Temperature of Groul (''C) 25 ( less than 35 "C)
·'
Remarks
Contractor Engineer
Tested ,By Checked by Witnessed by Approved by
Name cloV\o\~o. Cv.o.. . .CJ"/v. 'i;o."'S M.. .• ~ d L.f.?! "lt 1n6. .,
-
Designation -').,t'T ntE A ~ ~
d l-::_vTI ~ 4 ~~~
-----
Signature
n .. t ....
--
o1.· 01" '£:0 1$} 0.3 . \ ') . ?Mf} I ·.·
03~1!1. - .;>t>J&-
'
/
,.- CONSTRUCTION OF EXTENSION OF SOUTHERN EXPRESSWAY I
'
Contract No: RDA/SEEP/CONT-S4
...,
Mattala to Hambantota VIA Andarawewa
EMPL OYER: ENGINEER: C ONTR{\CTOR:
I -
ROAD DEVELOPMf;Nl' AUTHOR ITY-
DEMOCRATIC SOCIALIST REPUBLIC
OF SRI LANKA-
MINISTRY OF HIGHWAYS
Le
FSDI
r.J:l~Ht'<;-WJ'i~i!!iJ·fiftffimfil:t:H}t:rJ
Specification
Fluidity( BS EN 447 1996 ) :;: 25 sec. ::: IOsee. 0 min. 30 min (Project Specification 553.7.5 - ::: IIsee. )
Proportio~~of Material~
~
Fluidity
13atch Inlet Outlet Temp Inlet Qensity Outlet Density Density varilllion '
Girder No
No sec. •c (g/cnr') (gfcm' > %
I sec.
l LC- 1 / 2 ;
20.1 2 20.0 1
/
25 2.025 .-- 2.028 _, 0.2
I Remarl<s
I I
Contractor Engineer
Name r k o."' o'JLa C1 <-.0"".9'f (.A ')(~ 0.-'\_9 {VL, p('~ ~"\1"'-1.0."\
Designation 4-f l \ , I£ /\. l rYr
Signature .A \ ~-N ~-6 ~~.~
I ..., /
:_________. . . - _ . _ ........... ··- -----~1~P ER__• --··- _.....__ .. ..~----......__ !B _BS_ Jd..f:_LE..:__Rj.tk.Y... h~
I i i I
·- -----··-----
. :_ J_ __c_ _ l ·C-1'-l ~=1·~-c C-1'~----~--
I
I
1
Mixing
I
I
t---
i
1 Pouring
I
1 Sample
I
I CONSTRUCTION OF EXTENSION Of SOUTII ERN EXPRESSWAY
Contract No: RDA/SEEP/CONT-S4
Mattala to Harnbantota VIA Andarawcwa
fi:NGlNF.E R : CONTR ACTOR:
ali ROAD DEVROPMCNl' AUliiORIIY • ~ l f.f.?.:!l · ·/!l;i{!!tiH;c!lli i'II~T~!hl.Jj
1 1 •I•~H~it.'J:Ct.'UiN-1 tlt!H~ r.iJ
II~ DEMOCK/\TIC SOCI/\I.IS'f REI'UOI.IC 01' SRI IY'~
~c
~
I lANKA.
w
M1Nisr 1 or. tHGuw11vs F s
IIIII" OliN/\ R/\II.W/\Y (.IRST SURVEY/\Nil
D 1 o~:s1GN •NsrrrurE GROUP co.,tro ~
CIIINI\ HI\RGOUR f.NGIN r:f.IIING
COMPANY ll'O
4liliiiill Of Sit I LANKA- CHIN/\ Ri\ILWt\Y FIRST Stilt VEY AND CJIINI\ 111\RilOUR
\ II MINISTitY OF HIGHWt\YS FSDI Dl!SION INSl'frtJTE GROUt' CO.• I.Tl> ENWNI!ERIN(i COM I'ANY LTD
l
j
j
Location
Cement
BRI-04
Admixture
BRI-04 PI S Pier !l end
Specification
fluidit) ( BS EN <147 1996 I ~ /.5 s.:c. ~ lOsee. 0 mitt JO min (Project Spt..'cilicutiun 553.7.5 - ~ lls.:o:. 1
t>roportions of Ma te r ials
Wmcr Cement i\clmixuu-.:.s W/C'
Pmportinn
Kg Kg Kg Ratio
-
0.3<18
Per bnt<.:h 174 500
/
56.7
-
Fluidity Liquid J)cnsity
13mch Inlet Outld Temp lnkt Dcn~ity Outkt O~nsity Density vuriutiun
Girder No o;.,
No ~I: C. sec. •c (Efcnr'l (!_1cnl}
IRomacks
I
Contractor Engineer
Name
Designation
Signature
Dale 0) . 0 I • '2018
/
1 CONSTRUCTION OF EX Tl~NS I ON
Date of Tested
-
03.01.201 8 / Test No C HEC/S EEP/S:.I/Grout-303
/
Location BRI-04 Name of Structure BRI-04 P 15 Pier· Head
/
....,_
Cement Ultt·a tceh (OPC) Adm ixturc G rout agent PG A /
/ /
I 2 hour
3 hour
17.311
l ll.Jil
912
913
2
.3 ..
0.2
0.3
0.2
0.3
I 2~~ hour 914 0 0.4 0.0
15.30
Remarks
Con tractor Engineer
Tested 13y Checked by W itnessed by Approved by
-· ·-·
Nmne c"'o."" t'~t_a_ c. .9
u- 0. .... "j v. xt()-.g 1'1\i 5'.J-Jl U )" U ('. c> N1Y() n
P{'\ L\?> Y\-t hOI ".
Designation Mt'f r....,.
'~ ,._, '-. Mlr t-11_
{}--..
..
's·
Ewture ---· -I( ~ ~. .~ /. f @.u-¥-,~M--f..._ · - ~
... O(.;. ·() I • z.c. \~ OS' 0 1 . Z.•l <f \ b&- 0 1 ~2 ~·· () \K' O~\QI J ~, 2-
= - - --:=-;:;·- - - -··- -. ~
.,
--,
I~ NGI NEE R : CONTRACTOR :
I
EMPLOYER:
~
RtMO l)foVEI.OI'MENT ,\UTIIORITY - '1'\~ifi·-!llf:iii~ i i·~!n:-11 111Hi.': uJ •l•l!li~ilf I~ "Hmeti·J: 1:~ ...,
- OEMOCRA'J'I(' SOCIAl.ISf RI:PUOLJC
OF SRII.ANK,\ -
MINISTRY OF IIIGIIWAYS
~ -~
FSDI
CIIINA I!AILWAY I'IRST SURVEY 1\ND
DESIGN INSTITUTE GltOlll' C:O .. LTD
@r: CHINA HARBOUR
ENGINEEIUNG CO.\oii'ANY LTD
/
Cement Ultratcch (OPC) Admixture Crout ;1gcnt PCA
./
S pecifica tion
Fhlidily ( RS EN ·H 7 199(\} ~ ?.~ ~cc. ~ lOsee. ()m in. 30 min ( l'n \i~t:l Spc..:ilicmit>n 5:'3.7.5 - ?:: Iisee. )
Proportions of Materials
\Valc.:r Cc.:m.:nl l\dmi:'\lun:s \ViC
l'rupnrliun
Kg Kg Ko::: Ratio
---
IR<m•rks
I I
Contractor Engineer
Name
cL.o.""~\ a. C.u.c...""\ <>t""J '- .K··c. ... C\ t-;1._ , f>y ;~..,.::, V'\~0."
16'- MUYu OPnrlYO. n
Designation ,.,.,,'T /'>? fLC
.,,,,/, ...J
M· C::.
Signature
~ ,/w iJ i I
~~' ~~
Date 0'-f.·O\ · '[.6'18 0_$ 01 · 'tO \[} 6 ~- 0 t - .). C> \.8' o \' ol \ 1.-o \~
- -·
CON STRUCTION OF EXTENSION OF SOUTHERN EXPRESS WAY
Contract No : RDA/SEEP/CONT-S4
Ma tta la ro 1-Jambantota VIA Andarawcwa
EMPLOYER: ENGINEER: CONTRACTOR:
ROAD O~VF.lOPMENT AU'rHORITY • ~ •I• U,~-I!JH'(i'! itPit!!~l-fl-f,jT8~~i"!] <l>l!l~~J:f.-lli~lftfT:0iiJ
I
- -i
- - DEMOCRATIC SOCIALIST REPUBLIC Of SRI
lANKA . ~ CHINA RAILWAY FIRST SURVEY AN D rufr CHINA IIAR OOUR r:NGINr:ERING
' MINISTRYOI' HIGI IWAYS FSDI DESICiNINSTIIUHGR()IJPCO., ITO ~ COMPANY LTD
/
Location BRI-04 Name of Structure BRI-04 PI S Pier Head
/
Remarks
Contractor Eng ineer
Tested By Checked by Witnessed by Approved by
Name
Designati on
Signature
0 S: · 0 I · z_oI f I
CONSTRUCTION OF EXTENS ION OF SOUTHERN EXPRESSWAY
Contract No : RDA/SEEP/CONT-S4
Mattala to Hambantota VIA Andarawewa
EMPLOYER: ENGINEEn : CONTRACTOR:
~ 1 1> fJi~-I!JJ:f.t1!tii·f.it!n1-f1-f,JJ1ii~EJ <1>~!-'-J~It.n~~ :ff lr:~ i;"J
I
--~
-
ROAD DEVELOPMENT lllfTHORilY •
DEMOCRATIC SOCIALIST REPUBLIC OF SRI
LANKA .
~
~ CHINA RAILWAY FlllST SlJRVt:Y ANI)
(@'Et Cl liN/\ IIARBOU R t:NGINEf:RING
MINISTRY or- HIGHWAYS F s 0 1 oF.SIGN INSTITUTE GROUP co .• LTO COMPANY LTD
Cube No. G H
Age Days 7 7 7
Remarks
BRI-04 PIS Pier Head (MC- 1)
Contractor Engineer
Tested By Checked by Witnessed by Approved by
Name S.Mumgendran
Designation ~ M.E
Signature ..cL
v
v
Date I O · Of · ZCI e tJ.O ·01 · 20 I g I ,.~ •• 0 J - .!2-blk'
Form No: SEEP/S4/IAB-Grout:02(Rev. 00)
CONSTRUCTION OF EXTENSION OF SOUTHERN EXPRESSWAY
Contract No : RDA/SEEP/CONT-S4
Mattala to J·iambantota VIA Andarawewa
EMPLOYER: ENGINEER : CONTRACTOR :
ROAD DEVEI.OPMENT AUlHOHilY • ~ rl> 'i'.1;~-I!JJ~~ i!l; il·r>Jt!f11·fl·l;:ff.f.! ~·~ i¥J 'I' 1!1 ;{¥;~ .I f.'/. {.flit-!'df f r:L: F.;J
I
--~
- - DEMOCRATIC SOCIAll$1 REPUilliC OF SRI
lANKA . ~ CHINA RAilWAY FIRST SURVEY ANI) l:ifc CHINA HARBOUR ENG INEEf{IN G
MINISTRY 01' HIGHWAYS Fs D I DESIGN INSTITUTE GROUP co.. LTD ~ COMPANY LTD
Remarks
Contractor Engineer
Tested By Checked by Witnessed by Approved by
Name
Designation
Signature
I
o1.· Ol' 2o1S 0.3 . t>'l ' 70/ 9
CONSTRUCTION OF EXTENS ION OF SOUTHERN EXPRESSWAY
Contract No : RO/\/SEEP/CONT-S4
..,
Mattala to llambantota VIA Andarawewa
EMPLOYER: ENGINEER : CONTRACTOR :
I ROAD DEVELOPMENT AU'I HORil' Y -
. . . DEMOCRATIC SOCIALIST REI'UOI.IC
OF SRI LANKA -
MINISTRY OF HIGHWAYS
La
FSDI
rt> ~~'!';·· ·U~<Mil!l f·f.~ !I!!'!'IHI~H."~.:rf
/
Date of Tested 01.01.2018 Test No C HEC/SEE P/S4/Grout-3 0 I ·'
Location RRI-04
, Name of Structure / RR I-04 Pl6 Pier ll ead
Specification
Fluidity ( BS EN 447 1996) :": 25 sec. ~ IOsee . 0 min, 30 min (Project Spccilkution 553.7.5 - ?: I Isee. l
Proportions of Materials
Water Cement Adrni;.;turcs W/C
Proportion
Kg Kg Kg Ratio
I Remacks
I I
Contractor Engineer
Name (' k (). "" 0 \ \l.o. C, CAC'..\_91 V. ')( ~ 0."\_9 (Vt.., ()("r~"'; "'~" 15· Murun P.~rh··f',n
- .J
--, I
Date ofTcsted
ROAn ot:vt:LOPM~Nr AU1 ttOIII1Y ·
- - DEMOCRATIC SOCIAliST R(I'UBLIC OF SRI
lANKA ·
MINISl RY 0 1' HIGHWAYS
~ •1 ' 7-J;~ -WJ:t--!:ll:il·f.ltmttWW1'~r;J
FS D 1
02.01.2018
~
"
CIIINA RAILWAY HHST SURVEY AND
o t:SIGN INSTI run GIIOUP co., 1
Test No
.-ro @ """'""'0"' ,••'"'""'"'
'l 't'l-1~ ;"!';:ctrui!H 'It I:: r~
COMPANYll'l>
...
Re marks
Contracto r Engineer
Tested By Checked by Witnessed by Appro ved by
Name c lov-c'.~c. ~u..o.~C3"1lA xi o-.... g wL f r r h{c, +1'\0-1'\ '
f'\ B·Muruo~ nrl..rnr'1
Designation II'\ t'l I?) IE A '-. M
/4
, tM~£
S ig nature -A--. ~ ,.-- rA'-1 2J 2-t A2 ~~
,.. .,., ." Oj . 0 1' ~O t &' 6 5 ·01 . 2,018
v
o 5 ~o l -.~ o \ ~· 'llg' ~,' 2-tl l .¥'
CONSTRUCTION OF EXTENSION OF SOUTHERN EXPRESSW 1\ Y
Contract No: RDA/SEEP/CONT-Sil
Mallala to Hambantota VIA Andarawcwa
EMPLOYER :
I -
ENGINlmR :
IWAD DEVEI.OI'MENT AUTHORITY·
DEMOCRATIC SOCIAI.IST IH:I' lJIJl.IC
~
CONTRACTOR :
' I'<'H)-I!IJ~;( il!;:Hn:!HI·li HFlE::;J @'EC rfll.lllil~i~T.rt\·ffr.JHH.!H:~wl
--~ lll' SR I LANKA - Cl IIN1\ RAILWAY FIR!;T SURVE Y AND CIIINA II AIUlOUR
MINISTRY OF llf(iiiWA YS FSDI Dt:SIGN IN!;liTIJTE GROUP CO .. LTD ENGINEERING COMPANY I.TD
Location
Cement
llRI -04
Ultratech (OPC) ./
Name of Structure
Admixture
BRI-04 PI S Pier ll ead
S pecificatio n
Fluidit) ( BS L:N rH7 1996) S: 7.5 s~c. ?: I Osee.:. 0 min. 30 min ( Project Sp..:cilicatil>ll 5:\3.7 5 - ?: I I ~..:c. )
Proportio ns of Materials
Wntcr Cem..:nt Admixtures W/C
Pmportion
Kg Kg Kg Ratio
-
0.348
Per batch 174 500
/
56.7
-
Fluidity Liquid Density
Batch Inlet Outlcl Temp Inlet Density Outlet Density Density vnriHtiun
Girdcr Nu
No sec. s~c. oc (f'/Cill~ ) (!l/cnr') t~.
/ RC- 1 I 23.04
"'
20.44, 26./ 2.012 .,... 2.006 - 0.3 ,-
, LC - 1 2 19.70, 2 1.59
- 25 / 2.0 16 ./ 2.026 ,/ 0.5 /
IRcn.a,ks
I
Contractor Engineer
Name
Designation
Signature
u~ I ~~ \ '1--c 1v
I
Date 0~ . 0 I • 'ZOI 8 o.S. t11'.t .'Cotcf
)
CONSTRU CTI ON OF EXTENS ION Of SOUTH ERN EX PRESSW1\ Y
Contract No : RDA/SEEP/CONT-S4
Mattala to Hambantota VIA Andarawewa
EMPLOYER: ENGINEER: CONTRACTOR:
~ 1 P ff;!'.f;-WJ~ i!tii-f.it!f~H1fl!af~aj •1>00itMirt£:Rm-rJtl r:0 '1!!J
I ROAD DEVELOPMFNT AU'rllORITY -
- - DEMOCRATIC SOCIALIST REPUBLIC OF SRI
--~
Ill"'"~
*' ruft CHINA ltARBOUR ENGINEERING
~
LANKA . CHINA RAilWAY FIRST SURVEY AND
MINISTRY OF HIGHWAYS FS D I DESIGN INSTITUTE GROUP co., LTD COMPANY LTD
Cube No. G H
Age Days 7 7 7
Sectional area em-' 49 49 49
Weight g 703 71 3 708
Volume cm 3 343 343 343
Unit weight g/cm3 2.050 2.0 79 2.064
Remarks
BRI-04 P 15 Pier Head (RC- 1, LC- 1)
Contractor Engineer
Tested By Checked by Witnessed by Approved by
Name S.Murugendra11
Designation ME
"
Signature
I v
Date 0 c,. 01 · Zt:t~ !10'0 1• 20 19 J- :J_ - b j .-- .)..O \ ~
Unit - nos
Qty· 1.00 (20.18m 1 duct)
No. of No. of Local Currency (Rs)
Ref. No. labour Cost Total Rate Ref. Unit
Persons hours
Unit Rate Amount
1.01 Foreign ganeer 1 1.00 1.00 hr 1,406.25
-1.02
- - - 1,406.25
Foreman 1 2.00 2.00 801.01 hr 348.15 696.30
--- - --
-1.03
-- Mechanic
- 1 2.00 2.00 801.04
~ 516.30
_ _276.30
1,032.59
-1.04
-- local Skill Labour 2
- 2.00 4J~Q- 801.02 hr 1,105.19
1.05 local Un·skill Labour 4 2.00 8.00 801.03 hr 185.19 1,481.48
Sub-total (1) s 721.81
No. of Sub Total Total local Currency (Rs)
Ref.No. Material Cost Rate Ref. Unit
Units Q'ty Q'ty Unit Rate Amount
Supply and Installation of 15.24mm uncoated cold drawn, low
2.0 1 21.00 20.18 423.81 invoice m 156.38 66,275.64
relaxatio n 7 nos wire strands 21nos.
---
As per Invoice attached;
- - - -- -
1kg • 0.859USO = Rs 133.46 (Invoice #4)
Currency rate-Rs 155.3638/USD
Custom duty - Rs 0.05/kg (Rs 2550.00/46946kg)
Freight charges - Rs 6.62/kg (Rs 2000.00/46946kg)
Insurance - Rs.0.12/kg (Rs 35.50/46946kg)
1Kg = Rs. 140.25
1115g =1m
Cost per 1 M etter = Rs 156.38 )
---
Cost of strands Handling and transportation form Colmobo port
- - -- - --
2.02
to Hambantota.
---
As per Invoice attached;
---
For 15 packges = Rs 263,668.55,
1 1.00 1.00 invoice Item 2,660.00 2,660.00
1 packges (2800 m) = Rs 17,577.90
One duct 423.81m cable= Rs 2660.00
2.03 Anch or head (OVM M15A-21) RMB 525.00 (Invoice #6)
- - - -- - -
2 1.00 2.00 invoice nos
- - -- -
12,500.25 25,000.50
2.04
---
Wedges (GI5V.O) RMB 35.00 (Invoice 116) 2 21.00
- -- - -
42.00 Invoice nos 833.35 35,000.70
- - --
Cost of Anchor head &Wedges Handling and transportati on
2.05 form Colmobo port to Hambantota. 1 Sum 2,500.00 2,500.00
Assuemd for all Rs. 50,000.00 = for 1 duct = Rs 2,500.00
(Renminbi (China) 1= Rs 23.81 2017-11-28)
Sub-total (2) 131,436.84
No. of Sub Total Total Local Currency (Rs)
Ref. No. Equipm ent Cost Rate Ref. Unit
Units Q'ty Q'ty
Unit Rate Amount
2nos Hyd raulic Jack (400T) used for both side, (Invoice 117)
1 jack • USD 3026.29 = Rs. 468,378.90 (1USD - 154.77)
3.01 1 2.00 2.00 Invoice nos 23,418.95 46,837.90
induding CIF value as per invoice
then for, 1 anchor head (20nos) = Rs. 23,418.95
---
2nos Pressure pump (Oil pump) used for both side, (Invoice #7)
-
1 pump- USD 1069.94 = Rs. 165,594.64 (1 USD -154.77)
3.02 1 2.00 2.00 invoice n os 8,279.73 16,559.46
including CIF valu e as per invoice.
then for, 1 anchor head (20nos) = Rs. 8,279.73
---
Cost of Handling and transportation form Colmobo port to
--- 1- --
3.03 Hambantota. 1 Sum 3,000.00 3,000.00
Assuemd for all Rs. 60,000.00 = for 1 duct = Rs 3,000.00
- - - --
3.04 Re bar cutting machine (fuel) 1 2.00 2.00 Invoice hrs 312.50 625.00
---
3.05 Mobile crane 25 ton for handling jacks and strands 1 1.00 1.00 invoice hrs 4,900.00
--
4,900.00
3.06 Long Vehicle for trans port to Site from store
- - -
3.07 Allow 5% on labour for small tools
-1 1.00 1.00
- hrs 4,900.00 4,900.00
286.09
Sub-total (3) 77108.45
Local Currency (Rs)
Ref. No. Other Di rect Cost Q'ty Unit Rate Ref.
Unit Rate I Amount
4.01 Additional cost for safety and environment issues etc. 1 Sum 15,000.00 15 000.00
Sub-total (4) 15,000.00
5) Total Direct Job Costs(DJC) (1)+(2)+(3)+(4) 229,267.10
6) Indirect Cost and Profit 1(1)+(2)+(3)+(4}) X 35% 80,243.49
7)Total (5)+(6) 309,510.59
8) Unit Rate (7)/Q 309,510.59
9) Combined Rupee Rate (F+L) nos 309,511.00
(All taxes are included except VAT)
Note:- Unit cost Is evaluated by using of purchase invoices and reasonable industrial standard
Use of heavy structure steel false work for girder beam post tentioning work as per Engineer instruction.
Unit- nos
Qty- 1 (for one beam)
No. of No. of Local Currency (Rs)
Ref. No. Labour Cost Total Rate Ref. Unit
Persons hours
Unit Rate Amount
1.01 Foreign ganger 1 9.00 9.00 hr 1,406.25 12,656.25
1.02 Foreman 1 18.00 18.00 801.01 hr 348.15 6,266.67
We lder (4days)_ _ 4
1.03
- - -- - 27.00
-- 108.00 801.04 hr 242.22 26,160.00
4
1.04 Local Skill Labour (4days)
-- --27.00 108.00
-801.02
-- hr 276.30 ~.840.00
1.05 Local Un-skill Labour (4days) 4 27.00 108.00 801.03 hr 185.19 20,000.00
--
Sub-total (1) 94,922.92
Sub Total Total Local Currency (Rs)
Ref. No. Material Cost Times Rate Ref. Unit
Q'ty Q'ty Unit Rate Amount
2.01 250mm Steel I beam (250mm x 125mm x 12m) 1.00 275.55 275.55 Quot.n m 4,958.33 1,366,268. 75
-- - --
450mm Steel I beam (450mm x 200mm x 12m) 1.00 86.40 86.40 Quot.n
--
2.02
2.03 GOOmm steel I beam (600mm x 200mm x 12m) 1.00
-
32.50 32.50 Quot.n
- mm 13,562.50
18,333.33
1,171,800.00
595,833.33
800mm di. 6mm thick Column (2400mm x 1200mm x
- -
2.04 1.00 303.75 303.75 Quot.n m2 6,577.18 1,997,818.43
6mm sheet), (2.98m2=LKR 19600)
2.05 c Channel 100 x 50mm {lOOmm x 50mm x 12m) 1.00 12.00 12.00 Quot.n m 697.92 8,375.00
- ----- -
2.06 H Iron 75 x 50mm (75mm x 50mm x 12m) 1.00 11.70 11.70 Quot.n m 1,172.92 13,723.13
--
225 X 50mm steel plate (2400mm x 1200mm x 6mm
2.07 1.00 39.69 39.69 Quot.n m2 6,577.18 261,048.27
sheet), (2.98m2=LKR 19600)
-
225 x 225mm steel plate (2400mm x 1200mm x 6mm
2.08 1.00 2.00 11.03 Quot.n m2 6,577.18 72,513.41
sheet), (2.98m2=LKR 19600}
- -- - - - - --
Allow sum for transportation (Materials delivery from
2.09 Sum 85,000.00
Colombo to site)
--- -- -
Sub -total (2) 5,572,380.32
No. of No. of Local Currency (Rs)
Ref. No. Equipment Cost Tota l Rate Ref. Unit
Units hours
Unit Rate Amount
3.01 Allow sum for welding rods and etc. Sum 12,000.00
3.02 Allow sum for Anticorrosive paint Sum 30,000.00
-- -
3.03 Add 2.5% for small tools from manpower Sum 2,373.07
--- Sum
-
3.04 Allow sum for bending of steel plate for round columns 125,000.00
---
3.05 Allow sum for electricity power Sum 20,000.00
--
Sub-total {3) 189,373.07
Local Currency {Rs)
Ref. No. Other Direct Cost Q'ty Unit Rate Ref.
Unit Rate Amount
4.01 M iscellaneous
-
Additional cost for safety and environmP.nt issues etc. 1 Sum 10,000.00 10,000.00
Cost of calibration certificate of Pre-stressing Jack and Gauge combinations for BRI-04 as per Engineer instruction.
Unit- nos
O!Y- 1.00
No. of No. of l ocal Currency (Rs)
Ref. No. Labour Cost Total Rate Ref. Unit
Person s hours
Unit Rate Amount
- -- --
,_- -
,_ ~
- -- 1-
-
- -
Sub-total (1) .
Sub Total Total Local Currency (Rs)
Ref. No. Material Cost Times Rate Ref. Unit
Q'ty Q'ty Unit Rate Amount
2.01
2.02
-- - -
---
Sub-total (2) .
No. of No. of local Currency (Rs)
Ref. No. Equipment Cost Total Rate Ref. Unit
Units hours
Unit Rate Amount
2.01
2.02
--
-- -
2.03 .
---
Sub-total (3) .
Local Currency (Rs)
Ref. No. Other Direct Cost Q'ty Unit Rate Ref.
Unit Rate Amount
4.01 ICSC Calibration of two batch in~ olant with transportation
-
ICSC Invoice value • 90,000LKR 1 Sum 90,000.00 90,000.00
--- -
Sub-total (4) 90,000.00
5) Tota l Direct Job Costs(DJC) (1)+(2)+(3)+(4) 90,000.00
6) Indirect Cost and Profit [(1)+(2)+(3)+(4)] X 35% 31,500.00
7) Tota l (5)+(6) 121,500.00
8) Unit Rate (7)/Q 121,500.00
9) Combined Rupee Rate (F+l) nos 121,SOO.OO
Ao~ncy Funetrons Curroncy Buyin9 Rate (Rs.) Selling Rate (Rs.) :o t:·>rt.•:IU~
The rates given here are furnished only as indicative rates for respective currencies.
G~ Central Bank of Sn Lanka . Altrigllls rOSONOrl 2010. Sit~ by St.T Wob Services
file:/f/E:/SEEP%20-%20S4/26%20-%20Cost%20Proposai/Cost%20proposai/Cost%20Proposai%20%23%20034%20Post%20Tension/supporting... 2/2
9=t 3t = f!;t fiU jfE =I
CHINA COMMUNICATIONS 2nd NAVIGATIONAL BUREAU 2nd
~ ff ~~ ~ QJ
~!$
INVOICE
ti!:~~/fnvoice No. 2017091801
CONSINEF.:
China Barbour Engineering Company Ltd.
BM/Date:2017. 9. 18
ADD: Level 32,East Tower,World Trade
Cent t>r, Echc I on Square, Colombo 01, Sri Lanka.
~~~/Dispatch Port: TJANJ JN
0/A: Ministry of llighways,Ports and Shippi ng
Project: Extension of Southern Expressway from
Jl~mm/Dest ination Port: COLOMBO. SRI LANKA
Matara to Hambantota Section 4- From Mattala to
llambantota via Andarawewa.
~151-i} /contract no. 02-SEEP-S4- 2017091801
MR XU SEN LIN 0094 766059448
71::$: 6. 6
,) ill~FREIGHT (USD)
1677.27
~JtiNSURANCE(USD)
35.62
CIF TOTAL ( USD)
21624.58
~ ~ 1ft
PACKING LIST
1it~~/Invoice No. 2017091801
CONSTNEE:China llarbour Engineering CoiDpany Ltd.
ADD: Leve l 32, East Tower, World Trade Cente•·. Echelou
Squarc.Colombo OI,Sri Lanka. B Wl/ Date:20 17.9. 18
0/A: ~linistry of Highways, Ports and Shipping
Project: Extension of Sout hern Expressway from ~~t{£/Di spatch Port:TIANJIN
Mat.ara to llambantota Sec ti on 4- From Mattala to
Hawbantota via Anda1·awewa. l!£~~/Dest ina t ion Port: COLOMBO, SRI LANKA
~IR XU SEN LIN 0094 766059448
-frii· Tot~:~)
16 18588 18620 3.42
I
-~
~
BILL OF lADING FOR OCEAN TRANSPORT
MAERSK
D
MAEU
I
SCAC
OR MULTIMODAL TRANSPORT
LINE - - ---
; 11/l.Ho. 597318610
Sii- -~ .....
CHINA COMMUNICATIONS 2ND 597318610
NAVIGATIONAL BUREAU 2ND ENGINEERING I . --.- - - - -
CO. , LTO.(CSNEC) ' &portn:fcmus S>tCoot.._,
I
I
- ----
THREE/3
_ _I _ _
-
- - - - ---
This transport document has one or more numbered pages
---- -
. ...,.. .
... ,.,'~.;: ....
"-.. ' ... ' :
·--~~~--
. I ,
H~MtOf'
t nfotn~tJon
TIN· 1740996932525
3 WAY LOGIS lit:~ IN l t:RNATIONAL P l
50/99,BROOKE ESTATE,RAMAHERA RD. 16 ~unity ()f origir f 7 Country nf dc:s-t!~ation
HEWAGAMA,KADUWELA China ( Sri lanka
1---------------------------------~--r-----~~-------~·---------------------
~~~·~~:·~~EPNICA
21 Voyaoo No,/Oato
1 t::"·;~:~~~,r~r?1'
,..2 C...l'l'ency & Tot111l Amount Invoice-d 3 E.~ech•noo Ra"- Jt• ~tllf'4 of
1.
1712 OF 18.10.2017 I USD I 21 ,624.58 155.44951 I ~ranst.
2S Mo~ 1'twnl~ j26 fnlilnd Mode 27 Pt:;ce- of to~di~J'Ots.eha.rging ~~ Ffr'l•n~!•' 1md b.anltine d11t::. 9999
1 J.lt 9otdet ( I Ytana;pofl e«ns of paymant 90 No foreign Exchange involved
I-28-0I-lice,.~..;.o_f_E_n-'lry-IE....Jd'---'--'--+3-D_L_o-ca_uo_n_o_lG-ood--.-------j~•nk No~"' : NFE \
CBHQ1 Colombo Head ~ICT ~.anch : 000 Rtf. No:
33 Commod~y ~~Code
I I
31 Pecka,QH
and
Description
of Goods
IM rks and numbtt"' • Cof'IQincrs No($1 · Numbe( end kind
M•rb~Nos
of Pacuoeo:
01 X 20'FCL CONTAINER
MRKU6628636
72103000;1
34 Cty. ~COde
00
3$ Gross Mus (Kg)
I J
Number& 16.00 PK a!C N ......lbl 18,620.00
Kind Package J7 Prooedvrt ~ N<!t M05S (KQ) J9 Qoot~
Con.. lners No(s)
O..Criptlon: . -- --- · . ...--· ·· • ..... ...._,.,.,._.....,...,_,... _ __,_ ---~
. ·- • ',
4000 1223 18,588.00
. .'
GALVANIZED STEEL STRIP ~ p~·-:c.~sc~f1 ~- -~:..t ;....
~ ~~- ..., ' ·· ..,
"-'..•. t
· lvn.t"' ~
~ P,.vious Powment /IlL No. lAWS t<o.
597316610
Sl\.
~~::~:
and Aolho-
Llce.,ceNo
A.O. 0+0~·0~
_ ,
41UOMC.Qty. 2
41 UO"' lL Oly. 3
A.l.
145Adj-mem
46 stoti<tiul Value
tiutfon
3,361,400
4 T Calcul- Typo To• Bose Rat~ Amount MP 48 A. c . Nvmb<!r 49 ldontfli.-llon of war• - &
otton of ~--+---------~---------+----------~
TaKe• CID 3,361.400 0.00 0 1
PAL 3,361,400 7.50 0 1 B ACCOUN'TlNG OETAILS
NBT 3,949,645 2.00 0 1
"'ode of Payment
VAT 3,949,645 15.00 0 1 '
As.wument Number :
R«elpt Nvmb<lr :
Guuant" :
0 1
c. a0101.~
lnvol<e Value:
.,.,.....,..._
uso
-·· -~
.L,
;I
21,624••58
Frelgtrt: US0 0
52.
...........
-----K ~.
53. I ~o hereby eonflnnlhltall pertlcula"' entertd by me or on my b<ltt>lf In
tho CvcO.C end electronically trans.f•rYed to the Sri L1nk.a Customs are
as~~~·-·. J ....
ttue & co~nd tkat tho ,,..,... p.tt11culars appe-ar in prtnt form on thi~-
dooum~nt. l E• tf't'tr:o-rH 1r- !":"\ ~ <0
D.
~H\NMl ~RSOUr\ ·~.~~tllilr:r.:: ...< iA• ..... u.
SIGNATUR.E OF TER I EXPORTER I AGt:.NT: ............................
DATE: ...~ ........ \ .....
# a> 2. ~ Q. U 'f \\ t\ '{"~ Q... .- 0 1_ ~'Dvu...t-):
~fJJ. 1. ~. ~~U~jM)l)(J~IJ1.f~.
2. M~n~: ltfll.:&:m.
3. Hitkjjta tt$f'~~~1ttrorntdti8JJHWJ&t35-flljttl~2-5-4
*~11. 150-23()()--4813
..4. -tRfftfl'3\tWh 2017~12Jl30EfliV=If~.
INVOICE
Shipper: company: Luzhou City, Sichuan Province, Qi Shun construction services Co., Ltd
For grouting
2 precast or cast - 1 - 218kg 748.81 748.81
in- place component
Jfj .Y ffifl;lJ~#~~~
Mortar pump t!J{tf(I<HLJ!!mi~ 8413810090
Used for mixing of
ash, sand and
3 other material s .~ 1 456kg 1172.69 1172.69
.y~ ,l(Y.&J!;~~*ll-
Mortar blender l'flm1* 8474390000
INVOICE
Jnvoice No.r 20171024
Consignee:
Date : 20 I Z· I Q-24
Port of Dispatch
TO:China Harbour Engineering Company Ltd. SH8NGHAI.China
ADD:Levei32,East Tower, World Trade Port of Destination
Center,Echelon Squnre,Colombo 0 I,Sri Lanka
0 /A:Ministry ofHighways.Ports and Shipping ~QLQMBO.Sri Lanka
Project:Extension ofSouthem Expressway Tenns of Dclivery:CIP Colombo
from Matara to Hambantota Section 4-from
Mattala to Hambantota via Andarawewa. B/L no:COAU7055235650
Payment:NO FOREIGN EXCHANGE TRADE
Unit Price
Serial NO. Description UNIT Quantity (1) Total Amoun (USD)
(USD)
W!i$(~
1 KGS 46946.00 0.859 40337.40
Steel Strand
FRElGHT(USD) 2000.00
INSURANCE FEE ( USD) 35.50
Total CIF amount ( USD) 42372.90
fQ[ );;~tension
Qf Southern Ex12r~:t~~ from Matara to HambautQta
Section 4-From Mattall! !2 Hambantota via Andaraw~wg
- ~
PACKING LIST
Packing List No.20 171024
Consignee:
Invoice No. 20 17- 10-24
Date : 2017-! Q-~4
TO:China Harb<lur Engineering Company Ltd. Port of Dispatch
ADD:Level32,East Tower, World Trade
Center,Echelon Square,Colombo 0 I ,Sri Lanka Sl:IAt:IQI:IAI,Cbina
0/A:Minlstry ofHighways,Ports and Shipping
Project:Extension ofSouthem Expressway from Port ofDestination
Matara to Hambantota Section 4-From Mattala to COLOMBO,Sri Lanka
l·lambantota via Andarawewa.
Name of Ship TAIPEI TRIUMPH
' Stamp/Signature
,_ )
PAGE: 1 OF 2
SEA WAYBILL
ON CY-CY TERM
SHIPPER ' S LOAD,
8ppat811t
eonlaln_., t.e d~n 0( 1M goodl 1nd U>6 ...,.Ghl• .,._, in this Sea W1)t>l ... ~~~~by v.. me«:h&nta, and v.fllch ""'e~Wfier h'" Oato '--don on Board 2 6 OCT 2 0 17
no roMOnGI:Iil: m01ns <t tiWI~ng tnd Is noc • pc~n of tiVc Sea Waybill conu.ct The cenler has ki&U<!d __3._ Sea W~l. The ma~har«
9QrM IO bt bound by 1M II""' .,d condillons of 111s S.. Waytlllt M I Md1 h.tld ~f)' ligiiDd ttC Su Wo)'bil,
"Ajljllc:al)leOt\I)'Ymt!l O.C.Uonenl UHd et e CoMblnctd Transj>mt Sa;s Wll)lbiU.
0,.,.11t~ge and ~MUCI\ lNil be chdrvod 1e>:ordhg II> lllc tillilf ~od on lne Komt P8te of LINES.COSCOSHPPING.COt.t If any
& Dolc)n!lon r a.tf
Signed for the carrier, NEW GOLDEN SEA SHIPPING PTE. l TO.
OF' rtr,t:r.rv ~o~y
CUSOEC I SRILANKAC "'TO,;;~~~~~~~~FCI ARAliOt< I DECLARATION !-) 1a..Z.l .,
~~~~~~?~g~ WUHAN C ~C .[.... : ~-~~I;J(/:~:1'~-,-.m'-1 1 1 " Pa.,·c-.,-~ 0.~: .;: .~l'l·'3;0'='~ '.-l,;•- ,.-.,-.~·-.-=-s-.:-~-~-c-e-:-N-u,-,-t><-,------1
1-'-:'-f-fs:-r::-o-:-t,-=-t
5
.....
1
8 Cont.igno-e nN : 4092550517000 , Purson Rvspont(lble for Fin~nciAI Settlement TIN:
1
~2 Value OetaU:s
Con•IFi••• D•l. I
feN ' I N jCty.
nN: / 1740996932525 15 Country of €-.port 15 Cty. Ex. Cod•
1
3 WAY LOGISTICS INTERNATIONAL P L fchina afCN Jbf
. 50199,BROOKE ESTA TE,RAMAHERA RO : · 16 Country of orlyin 17 Count'Y of Mst.in.ation
HEWAGAMA,KAOUWELA _.- . . . ··: ;, ' · , China Sri Lanka
18 vuscllfligt.U 119 Ctr. :~o 0c11vo7 Terms
TAIPEI TRIUMPH
21 Voyoge No./Oatc
I I~ ~ I
~2 Curroncy & T01.al Amount Invoiced 3 Exch3n~ Ra't JZ4 Nature of
1
0954 -002W OF 05.11.2017 I '\ ~so -I 42,372.90 155.36381 I ~~•"-'t.
15 MOde Tra~. 12'.,. J~ln~~?... . ;r f'h•ce of LoadingiOI•..d\·;,gi·;g-·"-'""'""'' 0 rtna!'ciel and banking ctatfl Oenk CoM 9999
1 ~ll;lctde< ·-:-j·,•••porl TO<mS of poy~n~ 90 No rotE<iyu .El<Ch<III(Jto iuvulv~d
l-2_9_0_ffi_••J:•::..o.::f.::Ec::nt::..ryc../-E~-'it'---.L.:..==.;_+30-t..-oca--tio-n-o-f-G-o-<><ls------•..- -lBank Name :Other banks (not n3gistereq)
CBHQ1 Colombo Head CICT e rort<:h : 000 Ref. No: ·
32ttem No.
I J
31 Pockogo• M;~rk' and number$ ~ Containers No(s) .. NumOOr and kind 33 Commodity (HS) Code
and 02 X 20'FCL CONTAINERS
Oesctiptlon
Marhs & Nos 11 1 73121000 00 1
of Goods of P:ac:kag•s.: BMOU2688511, CCLU294141 9 :1-4 Cty. Orlg. Codo SS Gross Mass (Kg) 3& Preference
N,m,ber& 15.00 PK
Kind
•ICN lbl 47,021 .00
37 PrOc.du,., MN•I,..••(Kg) 39Quotot
6,583,215
•r Calcul· Tyt? • '- ' \ " ' " ' - 'ra'; D. Amovnl MP 48 A.<:. Numbi!r
adoo of
Toxoo CIO 6,583.215 0.00 0 1
. .
PAL 6,583,215 7.50 0 1 B ACCOUNT1NG DETAilS
NBT 7,735,279 2.00 0 1 Modo of Paynwnt
VAT 7,735,279 15.00 0 1
Ass.c~GIT'Miflt Humber Date: 17/11/2017
ReC<Ipt Number Dote : 17[1112017
Total F - 2.550LKR
~--~--------~--------~----------~
~ 01 Total Oecl•rauon :R$. 2,550LKR
50. c. uiT~ommf~ln~mue~d~MM~.w•tmnOLC~•m·w~n~<~r--------~
!,.-
Fr•lghl: uso 0.00
Offlco
u•• 51. losunmco: uso 0.00
'l
Othe.r: uso 0.00
52.
· ·:.~~
.· 0
~ LV
· '='v
·~· %
'. ·K
_ :l. \:,·,. ·\
0 J\
53. 1do h~y ~II ~rtleulars
c::onfinn Itt at entered by me or on my heh•lf in
the CusO end ek!ctronh::o.Uy tronsferred to the Sri lAnl<.a CU$tOm$ are
trua ~~ ;-..·• . , 1.7~ w~~ th~ ~o.~e .P~rtis:urars .,ppe~r in print rotm on thl$
.
t-:----+--------!---+---,----1 dow..."" : ui1no0uii t.NGINffRtrJG CQ. tTD.
a. .~
.. ··o···a·~.
• -· . .,. ·.U··,..a··c···· .. _ . SIGNATURE.OF ORTER I EXPORTER/ AGENT: ................_,....... ..
PATf: ...~-------~:;1
54. PECI..ARATI:~jt78't'•~ ....... ..: ... ...... t l
""' ~in~
IA•
M15A- (20-22) LiZT. 0
Gl5-21T.O
~
~
20
2
290.00
2520. 00
5800
5040
IJHtli Gl5-7T.O {tf 4 700. 00 2800
• \.~~'3a..~ ~ vJt.~~ I~ft ~
G.15V.O
-
ftj 100 ( 35.0U \ - 3500
flit~~~ Ml5A-7 ~ 2 soW. oo 10000
fft~~!J& !dl5A-9 ~ 1 6700.00 6700
f.-1t~~~ M15A-21 !f{ 1 15000.00 15000
Jj\lt 377,030.0Q
1 lilP37-t!~!Jl,~~:m m?X l 25,.892. 76 25892. 76
;J,it 25, 892.76 I
... I
'
-~-fit- 402,922.76
- ---------------
., - ~· "" I '
{ili_~~~l!l~:~~i!J
;&'. . '&~A· ~1'Vl~ ilM1re:Jm~
. ?t~~~:
"'- '·,Go'
• . -1-k...
. If!#'
~,..).......
h0·tr··
...
,. ..
,~
-.-.
o.l(.· .
'
.. .;;:_""'~.::~"~~r...."t,<< ~-:.
• ~§~~'(~0:::<)Pu~..;_~
.·-:7r' ,_...
~am~,~
.,_~~ 7 r
Iliw,~>fi tm~~:~]l-"'t fk$:_ ~11J,
·...,.; .• ...............__... ,.. ,
..,,-...,.~ ·.. .~ .. ~
''·.._; • . C':::J
.: . ;--~:-:"':;.~~.·~..... .. .
.. <:
.~1ft (ClF)
1¥-fJ- ofl, ~l;:j~j(i['. Description &Marks lie:til: Qty. l'(i{l'[_ -*ffi' Total Amount
(Unit) U/Price (USD)
(USD)
:iEWlFREIG~IT (USD) 21 1. 58
~~INSURANCE(USD) 75.36
?.~·,~:r
~ Wuhan Hangke Logistics Co., Ltd.
ADD: No.19, Xianggang Road,Jiangan Region, Wuhan City,Hubei Province. PRC
Tel :0086 27 85730475 Fax_: 0086 27 85730475
~ ~ INVOICE
£~-f;}fi~Invoice No.: 20170824007
tiSr:fRA:
Cons ignee: BWJDate: 2017-08-24
MliiH.f!Port of Dispatch
TO:China Harbour Engineering Company Qlogdao.China
Ltd.
ADD: Level 32,Eost Towe~:,World Trade ~1.\mmPort of Destination
Center,Echelon Square,Colombo 01 ,Sri COLOM:eO.Sri Lanka
Lanka.
0/A:Ministry ofHighways,Ports and 3C:Vi'/.n3~Tenns ofDeJivery:FOB Qingdao
Shipping t!.tli~BIL No. HSKV0602 J
Projectt Extension of Southern Expressway
from Matara to Hambantota Section 4-From
Mattala to Hambantota via Andarawewa.
N~1JitPayment: NO FOREIGN EXCHANGE TRADE
fAi~
J:l
llll ~ *4rr f(Jit !f!ift ~ill"
Unit Price
HS r..t> Description KGS Quantity Total A moun (USD)
3824409000
MIJ(\\>. 0...£:~
$1l±*1JIJ~J/GROUNT
AGF..NT PGA
KGS 24000
(USD)
0.-W J 9537.3 1
--
:jgf/l/Freight 1997.02
~~Jt/Insurence 15.23
Stamp/Signature
(if[.) ~*
$ Wuhan 1-Iangke Logistics Co., Ltd.
ADD: No.l9, Xianggang Road,Jiangan Region, W uhan City,Hubci Province. PRC
Stamp/Signature
(~iit)~*
BILL OF LADING FOR OCEAN TRANSPORT JsCAC SAFM
OR MULllMODAL TRANSPORT ··--·- - - - - ·---·-
OA.No. HSKV06021
Sf4ij.o;·-..- - - · -- - ·- -- - - -- - - -- - - - - - - - - - - - · - - · -- ~No. ---·-··--- ---- - - - - - - - ·-
WUHAN HANGKE LOGISTICS COMPANY LIMITED HSKV06021
ADD:N0.19, XIANGGANG ROAD,JIANGAN REGION, .,_,;;;;-----·- -----··-···--- --- ----
c¥.~-·-·
WUHAN CITY,HUBEI PROVINCE. PRC
2642479
TEL:0006 27 85730475 FAX: 0086 27 85730475
o;;;;;;;w;;;--*'o~c~..;;;di,'"d;;.. '·""'-"'_,old<._._,· - - -··
~~~ ...,,_..,'10.....,..,-io-~-Potaon-.;-:;o.;;i.o~-.., -IIOory....,
~(.Hc;;;;;Mv,------
CHINA HARBOUR ENGINEERING COMPANY LTD. CHINA HARBOUR ENGINEERING COMPANY LTD.
ADD:LEVEL 32,EAST TOWER,WORLD TRADE ADD:LEVEL 32,EAST TOWER,WORLD TRADE
CENTER,ECHELON SQUARE,COLOMBO 01, CENTER,ECHELONSQUARE,COLDMBO 01,
SRI LANKA. TEL:0094766287394
0/A:MINISTRY OF HIGHWAYS.PORTS AND SHIPPING
I
SRI LANKA. TEL:0094766287394
0/A:MINISTRY OF HIGHWAYS,PORTS AND
!,~:'JE_~;!XTENSION
. _ :_ _ _ __ _ :1__:_________
\t\ls~(te.U~~~WQ1•1tl
_?F SOUTH~E~'!,EXPRES5>\'AV"-------··j.~N"'•o4Rtot"lpf
te r-40 .
~IPP~G. ~~IM'tfi~WH<JitM~fTt~tUA.,,.-ot.MuMI)
PROJEC~EXTENS~'?!'~~-:.----~------·--·-- -·
MAERSK SAVANNAH 1712
-,.;;;;;t-;;;g- - - - - ,_ .. __. - · · - - - · · -··- ~;;;.y.~.._ _ _ _ ....._T_tu..(<.. - t l - -- --
QJNGOAQ,CHJNA COU>t.CBO
=-~~~~------_ !:'.AI3J!qM.~,A.B~..BiRN~tl~Jiavs~lf.r.!ffi_...-------=-~==:=~~=~=--::===~
t<lol<foi~;~••'OUOd•: -_,N...,befl: ~N<IJSHINo. w.IQI• -
GROUNTAGENTPGA
N/M
TCf<U1119S35 ML-CN6235687 20DRY 8'6 960 BAGS 24096.000 KGS 22.464 CBM
SHIPPER'S LOAD, STOW, WEIGHT AND COUNT
FREIGHT PREPAID
AGENT AT OESTlNATION:
SAFMARINE SRI LANKA (PVT) LTD
36, D.R WIJEWARDANAMAWATHA
COLOMBO 10 SRI LANKA
Tel: (4 11 4794866
~~·--by~IOI!houc~~~-C.OW(- .....H14)
• ~· Chlrto< -
- ·-------·-----'-·--- -- - -
- - ----·---- - -- - -·----
This tf'llnsport document has one or more numbered pages
~t.Ml! OULE II
,.,, ., ~ ":;,l"' ·;·"'!.·-
''
~
t:UM)fC I ~ ,,., t Ar¥" ,\ :...e,<;T('It1 S • GOOOS t.'£C!..'\ri,.\TlC.)f-.t I O€CUHtAnON Cu!i!·)IY,,. . s~
)romr
r
N0.19, XIANGGANG ROAD, J Lo:sd li=:.! I 172713 13/1012017
JIANGAN REGION, WUHAN CITY 1 1 l.\.a ~Jfe~t
HUBEI PROVINCE
"httn11~ • ,..,~, ~. ...o.. c..c•• •• nr• S.Quenco Nun•bor
CHINA
1 960.001 2017 #42
5 Consignee TIN: 4092550517000 jg Per, on Respon sibf«:! rot• f1otmehtl St!IUGI'I'IOnl TIN:
leN N 1•
14 [)Qebral"lttR9Pft'u nl•twe TIN 1740996932525 t5 COufltry of E !Cpott 15 Cty. c.{od• t7A Cty. O.o. Cod~
~~ZlemNi' I
l1 Pockogeo
and
OootrfptiO<I
or Goods
Marks ~nd numbers .. Contalnt:ra NO(et .. Number and kfod
Mali<s&NO$
ofPacbges:
01 X 20' FCL CONTAINER
TCKU1119335 ..
33 C<>mmod~y (HSI Co<lo
38244000
34 Cty. Ofig. Code
00
J5 Grou u ..s(Kg)
I I JOPt.fe-,.,nc.
Number&
Kind
960.00 BG aiCN ~bl 24,096.00
Containers No{I)
Bag
37 ProO<!dr· ll Nat Mus (Kg I 39Quobl
HSKV06021
•1 UOM &Oty, 1 21tem Pt'lce(FOOICIFI I rJ V.M.
'4 Add. 1nfo Li~nceNo ovar O.Oty ~GM 24,000.00 11,550 .,Ocl
~umoms
Produud
0+()-+()i{)-() 41 UOM & Cly. 2 A.l. 145 Adjust..-.t
C4ftllicatet A .O.
ond Aultlo· 41 uou .. Qly. l "Statistical Value
riutton
1,791,243
47 Colcu1· Type Tax Base Rate Amount loiP 48 A.C. Number 49 klentfflcallon of w•u•house &
ollonof
TaKef CID 1,791,243 0.00 0 1
PAL 1,791,24~ 7.50 0 1 B ACCOUNTING DETAILS
om..
Fr.lghl: uso 0.00
u.. 51.
.. IJisurance: uso ..o:oo----·
Other: uso 0.00
F« m.NJ.If £ubmfuioN 1.o ~fiNed tw th4t decfat• nt
52. 53. I do hereby confirm that att p411ftfo4.1fan entored by mo or on my behalf in
iho Cu•Oee and et.etronluUy t-ran•f•~ to th• Sri LanSca Custo~ art:
~·· -· ·~~"''""1!1"~·1"G'etr"tt"
CHIN · f ~ \1::.;'!.:~ t.N\3\'~t'l: {\1
document.
1
':J , \.1 . ·
0.
SIGNATURE OF IMPORTER I 'I£R I AGENT: .......... - .................
CAlC:.................... .- :.
5C OECt.ARAllON SUSM1~ ·••• • •
· ... , ori~.ect Sh:;vlattJre .
........ _ .,,,,_,.,........
~-· ··-····· ·· ..·-··-................,_ ···-····· . ·······························
SIGNATURE OF CUSTOMS HOUSE AGENT tO NUMBER
..
T. N. Constructions
NoA1, San)eeva Building, Colombo Road, Uyanagemulla, Seeduwa.
Tel. 011 4962324 Fax: 011 2259012 E-mail: tn_cons@yahoo.com
22-01-2018
Dear Sir,
We are pleased to submit our best quotation for the Supply of Undermentioned Machinery and
Equipment for you Kind consideration and approval.
Dozer
Roller
• .
·NoA1, sanjeev<~ Bulldihg, Colombo Road, Uyanag~muHa, Saeduwa.
Tel 011 4962324 Fax: 011 2259012 E-mail: m_cons@yahoo.CQm
D4E
1 Ton
4,250.00
600.00
3,600.00
500.00
425,000.00
60,000.00
360,000.00
50,000.00
Roller 5 Ton 1,800.00 1,400.00 180,000.00 140,000.00
Roller 10Ton 3,800.00 3,200.00 380,000.00 320,000.00
Roller 12Ton 4,200.00 3,500.00 420,000.00 350,000.00
Sheet Foot Roller 10Ton 4,000.00 3,400.00 400,000.00 340,000.00
Air Compressor 125 CFM 1,500.00 1,000.00 150,000.00 100,000.00
Air Compressor 175 CFM 2,000.00 1,400.00 200,000.00 140,000.00
Concrete Mixture 7/10 850.00 800.00 85,000.00 80,000.00
Concrete Mixture 14/10 1,500.00 1,400.00 150,000.00 140,000.00
Wacker 65kg - 80kg 750.00 650.00 75,000.00 65,000.00
\_ ) Plate Compactor 6Skg - 80kg 750.00 650.00 75,000.00 65,000.00
Vibrator Poker with Engll')e 2" -4" 650.00 600.00 65,000.00 60,000.00
Mobile Crane 25To n 4,900.00 4,300.00 490,000.00 430,000.00
Mobile Crane SOTon 9,000.00 8,000.00 900,000.00 800,000.00
Concrete Truck Mixer 5M3 4,500.00 3,500.00 450,000.00 350,000.00
Water Pump tf>c..~o I) 2" 550.00 500.00 55,000.00 50,000.00
· Water Pump (.J)o,ct~t.U ~
. ~· 650.00 600.00 65,000.00 60,000.00
Water Pump \ .,~ ) 4" 1,300.00 1,100.00 130,000.00 110,000.00
__Water Pump t ,, ) 6" 2,800.<]0 2,500.00 280,000.00 250,000.00
Generator 5-10KVA 750.00 700.00 75,000.00 70,000.00
Generator 20-30KVA 1,100.00 950.00 110,000.00 95,000.00
Generator 40-SOKVA 1,750.00 1,500.00 175,000.00 150,000.00
Generator 60-100KVA 2,850.00 2,500.00 285,000.00 250,000.00
Generator 120-200KVA 4,750.00 4,000.00 4 75,000.00 400,000.00
Name of Vehicle
Crew Cab 140,000.00 100,000.00
~\ Double Cab 180,000.00 130,000.00
Van 135,000.00 95,000.00
Car 130,000.00 90,000.00
Jeep 200,000.00 160,000.00
As[!halt MachinerY
Asphalt Paver 6m 850,000.00 700,000.00
PTR 12Ton 400,000.00 300,000.00
Macadam Roller 12Ton 400,000.00 300,000.00
Bitumen Bowser 4000 Ltr 400,000.00 300,000.00
Tracto r Boome r 6Ft 375,000.00 350,000.00
Aircompessor _ 125/175CFM 185,000.00 100,000.00
Egui[!ment
Re-bar Cutting Machine 75,000.00
Re-bar Bending Machine 75;000.00
3 Phase Packer Engine with Cable 75,000.00
J
I
(d) Three days notice will have to be given to us by the client prior to the su pply.
(e) Wet Basis- Fu el for machinery should be supplied by the client and the cost of same
may be deducted from the payment against our invoices.
(f) In case of breakdown similar type of machine will be replaced immediat ely.
(g)
The above Monthly rate is base on 100 hours per month and exceeding that will ·be charged at pro-rata basis
(h) The above rates and conditions could be negotiated.
(i) When invoices are submitted, payment will have to be made within 15.days. of submission.
Yours Faithfully
\. __) T. N . Constructions
S. A. Nuwan
M anaging Partner
0777-424302
Cfi.~c EXTENSTION OF SOUTHERN EXPRESSWAY FROM MATARA TO HAMBANTHOTA
SECTION 4 FROM MATTALA TO HAMBANTOTA CH 0+000 TO CH 25+000
Contract No:RDNSEEP/CONT-S4
W~, ChinqJiabour Engineering Company, Please provide your Quotation for below listed items
..,
.) 801.03 Unskilled Labour .. ...... hr .... 4,550:02 . ·--~-_250.00 1,137,500.00
.. .. -
4 801 .04 Rebar worker 127,530.00
5
·-
801.05
~"- ---··--·-······-··
Concrete Worker
hr
hr
.....2.92:Q
.O.
260.00
327 :£?.1...
307.00 79,820.00
......... -·-· !························· .... .......•...•..•••. .. .. -
6 801.06 Bridge Worker hr 260.00 446.00 115,960.00
~-·- . . -·~ ............ ..........................._,, ___ _ i·- .. .... .. .. ---- . . . ............ - - ·····-· ...... ·-·
--· -~
17 801.17 Operator for other plant and equipment hr 780.00 396.00 308,880.00
·- ................ . ... .. ·····--· ·········· -··· - - - ···-·····-- -- -· ......... ........... ..... ·--··
18 801.18 Assistant Operator for other plant and 780.00 347.00 270,660.00
equipment hr
) Bill No. 800 Daywork Labour total Carried to Bi11800 Day
5,274,.360.00
work Summary
31
EXTENSTION O F SOUTHERN EXPRESSW AY FROM M ATA RA TO HAMBANTHOTA
Section 4 Fr om Mntta la to Hambanthota via Anda rnwewa.
18
Industrial Calibration & Servics Center (pvt) Ltd
~ICSC
318, Siddamulla, Plliyandala, Sri Lanka
Tel: +94 777949654, fax +94112052233, email :sales@jcsclk.com, icsclk@yahoo.com
Authorized Sianature .
RV: 00,2017/04/05, ADM-03, ISSUE-02
Accountant
Industrial Calibl'ntion fj Survir.as ·
Cente,• (Pv!) ltd.
rm-:"
~
._,.,., ~~_. .. }:, ,,,, 'J!Jl'~l"
•·.' •"'"i :~ ... ~ . a/.:-~·- b ... d
lndusfrial Calib(ation & S~rv(ces Center ( Pvt} Ltd.
~!CSC
.36/1 Siddamulla ,Piliyandala, Sri Lanka
Telephone -+94( 0)77~7~49654/ +94 (0)11-2052233 I +94( 0)11-4277084
Email: icsclk@yahoo:c·om I sales@icsclk.com Fax: -t·94 ( 0 )11-2052233
GaHbration Report
Report No. C-2U17-101 17 Page 01 ·of .02·
Date of Ce~libration 11/27/2017 Next Calibration 11/26/2018
Ambient Temperature
China Harbour Engineering Company Ltd.
Cliont J<ur:upana, Pahala Andarawewa,
Hambantota.
Particular· ofJnstrurriertt
Pr'e stressing, Jacl<
Mariu.fa<;ttirer
· 1-------------~~--~------------------~~~~~~----~~--------------------~
Moaol YCW$Qb8-2Q.O
ldentlficatlon'·N o
.j.iack MOO :kN, j I.
Capacity 11-G-
.'i:\-
.u~ge-.·-----lr-6-oM""""'i:>""""'
···a··:-'-----11 Divis io'n· ,..---·-· --o,,_
S_.M_p_a-·:-··
Q142;:tf5(AF(Q,b,Of:·.a.,~1
·C.13..8PN26.11AFI0001
U rlcettair1tv::
' Th~; r!;!pOrt~q expande.d unce$l~:"~iY ~,f hiea.sur~i!i~!l.t }s:'stated as·,tne .standard uricertaint~ of.m·ea,l3U(ernen(.
mif.ltipliad b}lth<:!' coverage ·fact6r'K=4.:·wilich for a ·oor:rrliil cii.slrib.ution cpiJ'e~pg,nds to ?l.·coverag~ pro~~bifitY·¢f.
~pprc;>xirn~tely 9f5 % · . ·
lJ n c~rtalnty Contributions •Co nsidered :
~L Relative.sfandard un~rtainty du~' to repeatati{HfY ·of1h~ ,maQh/.ne;in9icaUon •. Urcip
2. Relative $1al1d~rd uru:;ertainty due io·the r.e.~QiuJY6n oJ the Jndic13lor, · v.re$
·:3. R~lalive sfandar9·~,Jncer.tainly 9f C<3Jibratfon .9fili~ S~and~rd, u61r1 •
'Not~ 1: Thfs report should not be reproduqeo except in full ,;~lthd'Ut 1he:writlen appr:pvarfroni
th~ ·r ecllni.car rVIana9er of rnd!J.~triai Cati~raiio:i &:se,vices Cchter•. PiliyanClala.
Nole 2 : This.:ner~lflcR.le refem on !}' 1.o p~if'ticutar iiem suqmitle<;! ~~ T<~{>LlflS ob:;jer~~d .at.lil<~·f~min')'f ca libra!ioh
l No te 3 : 1\'m:t.s;alrf)ralf.on dulc ;;~;pel' U~e cu ::~ lon"iel' reques: ~ ~, ..., :.: .. ·;: . ·'·· "'··::· '<'
. . . .,. _.,. __ _.... . . ,. . _- ------··-.;··- - - - . -·---·-- ·~-. -·-------- --------·--~-~~ ~~:.c~:~1~,tQ~~-t . :_L:2~:~i· ~:>~;< ·,.ti~£___
Dal€! ( J: l ~t·!C<:~ip! ,Of l!isi(Uthenl : I 1/2.lf201T RV: O't, ;?Oi71Q~(:1;1. ()1\:,-0~i{f:!!'~~ - iSSi)F-07
• ~
Contractor's Representative
Extension of Southern Expressway Project (Section-4)
China I I arbour Engineering Company Ltd [CHEC]
Dear Sir.
Contractor should inform Engineer to inspect the new machine when the first time
carried out on site..
Thanking you!
Yours faithfully,
~~
·················~···················
Dong Wei
Team Leader [ESEP- Section 04]
China Railway First Survey & Design Institute Group Co., LTD.
Cc: Mr.A.P.K. Abeydeera, PD (ESEP-S4)-f.i. Pl.
G.T.P:7'~
}{U·il .ri·1 i'B • p~·!.t: • !''Ji;;!~ex t ~~· ~~n~~7J~:H·J:\ r.t!.i~: ot!9 ~~:~b;>iY:~ 'i!ft: o~~, . .·x:!;;r)o1l i .Htp· ::'~~w. ··~rrl.t:tJ'!J.l'il
\•l~f \,.:t Xiyirar Ho·•1i,Xi~ 'tri !~:! H~il Pfl:~ i Co:Ji: .'r' iih}-1:{ 'ic l ><t: tt;~; H::.U):i0l' l'u~:Hri 0~~~ ~?'!h:J J'l·l
111
Uak: :l7 December, 20 17 13y Hand & E-IVIni l
Our Ref: CI-I EC/RDA/SEEP/CONT/S4/0 I .0110/0039 13
I:O:nginecr's RepresentHtive,
No: 70 2/ 1, 2nd Floor, Lucky Plnzn Building,
St.Anthony's Mawathn, Colombo - 03
We arc herewith submitting the calibrution ccrtilicatc o f Pre-stressing Jack for your review and
approval.
Yours faithfull y,
f t'.?/tiC.~
-JJ1 y
>ntractor's Representative
0<
S -t:tJ WXH
Encl: 12 pages
Pi.!BC 1 of 1
lndusfrial Calibration &Setvices Center ( Pvt) Ltd.
~tcsr
36/1 Siddamulla • Pi!iyandala, Sri Lanka
~ Telephone ·+94( 0)77·79tl9G54 I +94 (O)ll -20S2233 I ·•·94( 0)11·4277084
Email : icsdk@yahoo.com I salcs@icsclk.corn Fax : +94 ( 0 )11·2052233
Calibration Report
Report No. C-20 17-1 0117 Page 01 of 02
Date of Calibration 11/27/2017 Nexl Calibration 11/26/2018
-
28 ± 1•c
- =:
Ambient Temperature
China Harbour Engineering Company Ltd.
Client Kurudana, Pahala Andarawewa,
Hambantota.
Particular of Instrument
Instrument Pre stressing Jacl<
Manufacturer -
Model YCW600B-200
Identification No --
.. .....
Capacity
IJack 6000 kN I Di vis ion I ··- ·-----
!Gauge 60Mpa J J 0.5 Mpa
Pump 170602
Serial No. Jack 170701
Gauge 2010.11.6123
Indicator type Dial
Location Of Examined Harnbantota.
Measureme11t Traceabillt:i
The Jack was calibrated against the following standard The forces applied are traceable to National Metrology
Center , Science Park Drive Singapore& lstituto Nazionale Di Ricerca Metrologica, Italy( I.N.R.I.M) via
Method of Calibration
Tile Jack was calibrated in accordance with ISO 7500-1 :2015. The forces
were applied in compression mode. The calibration was carried out with incremental forces.
The calibration data is given in the report.
Uncertain!:i :
The reported expanded uncertainly of measurement is stated as the standard uncertainty of measurement
multiplied by the coverage factor K=2, which for a riormal distribution corresponds to a coverage probability of
approximately 95 %
Note 1 : Thi;, report should nol l>c reproduced excep: 10 full without tile written <:~pprovAI fro111
!he Tt>cl1nicar Mana;)et of Industria! Calibration & Services Center, Piliyand<Jin.
Note/· I hh r:<!rfifica!e r8fPr:; o. l!)' to ;l;.~dicu lar item s>~ ' Jmi Hcd r results observ~:d F:i I!In t uw~ of calibration
Nc.tc 3. h11.:": i V'''~; : ation dc;lt; ;~ · . : t:: fl :::! ,;t ' ~lomet n::que: .:, . .
t~, . . .. "''
.. . .. ..
--·---- ..... -
:
. '·.·t
-~- ----- -----·-·- - .. -- - ··-··-.........:.-· ···- :.
·.: - :... _; -~..:'..!...::..!~~- .J
! ):It, ( ( f 1:1:-;:runa:l :! .
r • ••
: .. .· ::1
·_., :
~
-#. •
Report No I C-2017-10117 I I ::~ppendix. 1 01 or 1
appendix.
A= -1.21673E-01
F :.. A+ B.X + C.X 2 + D.X3 X =Machine Reading 13 ~ 1.23587Ei·02
F =True Load C= -4.123132E-01
D= 7.00970E-03
Machine readmg = Mpa
. )
C-2017-101 17 I' age 02 of 02
Report No
Calibration Resu lt
Indicated True Force , kN at28:!; 1°C
Force, Run#1 Runt/2 Runt/-3
Mean
Mpa 00 120° 240°
0.0 0.0 0.0 0.0 0.0
5.0 6 11.0 614.0 618.0 61-1.3
10.0 1188.0 1191.0 1191.0 1190.0
15.0 1785.0 1790.0 1792.0 1789.0
20.0 2359.0 2369.0 2370.0 2366.0
25.0 /936.0 2951.0 2951 .0 29116.0
30.0 3518.0 3521.0 3522.0 3520.3
35.0 4105.0 4 106.0 4108.0 4106.3
36.0 -1 246.0 4245.0 4248.0 4246.3
Mpa b ± o, a
5.0 0.54 0.00 2.00
10.0 0.08 0.00 1.00
15.0 0.17 0.00 0.67
20.0 0.17 0.00 0.50
25.0 0.17 0.00 0.40
30.0 0.05 0.00 0.33
35.0 0.03 0.00 0.29
36.0 0.03 0.00 0.28
Relative uncertainty
...... ~,
\_ /;:~.~
.... ,..._...,.- __,.. ..... ... ·- .... -.. . .. ... ... ..... . . .
~ECSC
36/1 Siddamulla , Prliyandala, Sri Lanka
Telephone -+94{ 0)77-7949654 I +94 {O)ll-7052233 I ~·94( 0)11-4277084
Email : icsclk@yahoo.com I sales@icsclk.com rnx: +94 ( o )ll-2052233
Calib ration Report
Report No. C-2017-10115 Page 01 of02
Date of Calibration 11/27/2017 Next Calibration 11/26/201 8
Ambient Temperature 28 ± 1"C
China Harbour Engineering Company Lid.
Client Kurudana, Pahala Andarawewa,
Hambantota.
Particular of Instrument
Instrument Pre stressing Jack
Manufacturer -
Model YCW6008-200
Identification No -----
Capacity
!Jack 6000 kN I Division I
!Gauge 60Mpo I I 1 Mpa
Pump 170602
Serial No. Jack 170702
.-
Gau ge 042713171
Indicator type Dial
Location Of Examined Hambantota.
Measurement Tracca b ilit~
The Jack was calibrated against the following standard The forces applied arc traceable to National Metrology
Center , Science Park Drive Singapore& lstituto Nazionale Di Ricerca Metrologica , Italy( I.N.R.I.M) via
•'
Stan dard Certifi cate number Calib ration Due Date Calibration A uthority
c·f42-051AF!0002 and
16-0304-0 1 20 19-04-07 I.N.R.I.M, Italy
C1.'38PN261/AF/0001
Method of Calibration
The Jack was calibrated in accordance with ISO 7500-1:2015. The forces
were applied in compression mode. The calibration was carried out with incremental forces.
The calibration data is given in the report.
Un certalnt~ :
The reported expanded uncertainty of measurement is stated as the standard uncertainty of measurement
multiplied by the coverage factor 1<=2, which for a normal distribution corresponds to a coverage probability of
approximately 95 %
Note 1 : ·rhis report should no: bn reproduced excc~pl in full without the writlcn up!)IOval from
tile Toclmicnl rvlc-~n::>~Jcr of Industrial Calibr<>l1on & ~3er viccs Centur, Piliy<:J!id<·JI:J.
{\J('J~ (\ ;' • T il is C(~rli!ict~te rd(:t:'; t11 ,;y io parliculm Hem Silbmtt.od & results oiJswvcd ::l !he time of calibraHoP
.. h'• pxl r:nhb1a lion d.. ', • .. :. : ··~• fhe Cll::>fOiilln 1c ,,,,,:,/
....__
1\inlr
-· -... 1>·
- -...
(l: .:, •-.ip: Ollm,!nw .. ••• ·
R .. · - - · -
_...... ____ - ·-
111/.?i/OJ,
.. ··- -·-·- - -·- ·- . .......
" ~
·---1"'.- . - -.
.... ,:-
~--:-~ - ........
. . ·. ! ~ .;
; ~-... i .
:·~ •; ~· !) i-··} ,-f: ~ :.:'!
Heporl No I C-2017-10115 I I appendix. I 01 Of 1
fillpcndix.
A= 2.73488E+02
F::.:: A+ B.X ·I·
2
C.X + D.X 3
=
X Machine l ~eading B= 1.22 ·J38E+02
F = True Load C= -1.93341 E-03
0 :.: -2.3~32'18E -03
Machine reading = Mpa
Machine 0 1 2 3 4 5 6 7 8 9
reading True Load, kN
0 883.8 1,005.7 1,127.6 1,249.3 1,370.9
10 1,492.3 1,613.7 1,734.8 1,855.8 1,976.6 2,097.3 2,217.6 2,337.8 2,457.7 2,577.4
20 2,696.8 2,815.9 2,934.8 3,053.3 3,1 71.4 3,289.3 3,406.8 3,523.9 3,640.6 3,757.0
30 3,872.9 3,988.4 4,103.5 4,218.1 4 ,332.3 4,446.0
....... ---
Heport No C-20 ·17-·10115 Page 02 of 02
Relative uncertainty
..,
:rr:::.,..' - ..- /
'~ 1\ f~ Mc nak<.1 I ! l -(i<D'U:1uratn<'l H H KarunDra\11r.!
i ~'V'!il-':.·:. :! O ffir.cr T e dlllic:' l l·.t;;-:• •:·Jr.;m Ted ll tical fVi<)l'rt.:<~•-:t'
L_ . .. , .. . ": ' ,
"--~ .!_;,:__ ~
... ~... '· ......
.- - · .-J
Industrial Calibration & Servi ces Center ( Pvt) ltd.
(~ lCSC
36/1 Siddamulla • Piliyandala. Sri Lanka
Telephone -+94( 0}77-7949654 I +911 (0)11-7052733 I ~ 9-1( O}ll-42T/08'1
Email : icsclk@yahoo.com I sales@icsclk.com l-ax : +94 ( 0 )11-2052233
Calibration Report
Report No. C-2017-10116 Page 01 of 02
Date of Calibration 11/27/2017 Next Calibration 11/26/2018
-
A mbient Temperature 29 ± 1°C
China Harbour Engineering Company Ltd.
Client l<urudana, Pahala Andarawewa,
Hambantola.
Method of Calibration
The Jack was c~libra ted in accordance with ISO 7500-1:2015. The forces
were applied in compression mode. The calibration was carried out with incremental forces.
The calibration data is given in the report.
Uncertainty :
The reported expanded uncertainty of measurement is stated as the standard uncertainty of measurement
multiplied by the coverage factor K=2, which for a normal distribution corresponds to a coverage probability of
approximately 95 %
No:<' 1 : 'this rc.potl ·-hould not be reproduct·~d 0>:::ep: in full without tlw wtiUcn approval from
I he '(~!d) t ll r:'l i1kmnoer of lndust:·ial c n;!t). :->tion & Services Co ni<~•, r::iliynndala.
tvl): ~., 2: Thin c, • ~ i! i.:<li:; 1 :~io n~ only to iJ~H (b;ia; i:!'),,! ~: u brni!lcd & re:m ! \~' l)b:~c ~v<:<i at the tinw >>f c: J lill ;o~ ;cn
!
I' i\' ;:r '>.
·'. Nnxl r~; .I·I)J :w. ~~ ;: ... ..-~r, p e 1 tho c t ;~-;h -. ;h ~ ii l~, :est
... ..
··r:·: .. __
-- --
~
. . -- ·-·--
r. •
: . -·- --· .
: , ; ., Of I~!)(.C)il, ( ) ... ' : ' :· .I .
_,. . -·~
l"l />; I
.. ..~---· - ·- . .. ---·-- - ~ ._...._._
Machine 0 1 2 3 4 5 6 7 8 9
reading True Load, I<N
0 61'0.9 729.3 047.8 966.3 1,084.9
10 1,203.4 1,322.0 1,440.6 1,559.2 1,677.7 1,796.2 1,914.6 2,033.0 2,151.3 2,269.5
20 2,387.6 /.,505.5 2,623.3 2,741 .0 2,858.5 2,975.8 3,092.9 3,209.9 3,326.6 3,443.1
30 3,559.3 3,675.3 3,791.1 3,906.5 4,021.7 '1,136.5
)
f~eport No
I C-2017-10116
I I Page
I 02 of 02
_--····---
..." .. Calibration Result
Indicated True Force . kN at29 ± 1°C
Force, Run#1 Run#2 Run#3
Mean
Mpa oo 120° 240°
0.0 0.0 0.0 0.0 0.0
5.0 609.0 6 11.0 613.0 6 11.0
10.0 1196.0 1208.0 1206.0 1203.3
15.0 1793. 0 1801 .0 1804.0 1799.3
20.0 2387.0 2386. 0 2391.0 2388.0
25.0 2961.0 2965.0 2972.0 2966.0
30.0 3559.0 3569.0 3581.0 3569.7
35.0 4132.0 4136.0 4 138.0 4135.3
Relative uncertainty
/ ''1 -~~---
H A R lv1enak<; rt;~; ka;:;maralna
Tu<;hnir.cl OlltCfJ~· ·; ( -~: ; ) ;li ,; :' ;l!ldi13SJ01
... _ .. ___
.
.
.
~
Industrial Calibration & Services Center ( Pvt) Ltd.
~fCSC
36/1 Siddamulla , Piliyandala, Sri Lanka
Telephone -+94( 0)77-79496511 I +911 (0 )11·2052233 I +911( 0)11-11 277084
r:rnail : icsclk@yohoo.com I salcs@icsclk.com
-=--
Fax : -1911 ( 0 )11-2052133
='='f"M'"i'ern= = - ·- ..
Calibration Report
Report No.
-
C-20'17-10114 Page - 01 of 02
Date of Calibration 11/27/2017 Next Calibration 11/26/2018
Ambient Temperature 28 ± 1·c
China Harbour Engineering Company Ltd.
Client Kurudana, Pahala Andarawewa,
Harnbantola.
Particular of Instrument
Instrument Pre stressing Jack
Manufacturer ~
Model YCW600B-200
Identification No ..----
Capacity
jJack 6000 kN I Division I
j Gauge 60Mpa I I 1 Mpa
Pump 170602
Serial No. Jacl< 170702
Gauge 0515901 71
Indicator type Dial
Location Of Examined Harnban\ola.
Meas urem ent Traceabilit~
The Jack was calibrated against the following standard The forces applied are traceable to National Metrology
Center , Science Park Drive Singapore& lstiluto Nazionale Di Ricerca Metrologica, Italy( I.N.R.I.M ) via
Method of Calibration
The Jack was calibrated in accordance with ISO 7500 -1:2015. The forces
were applied in compression mode. The calibration was carried out with incremental forces.
The calibration data is given in the report.
Uncortaint~ :
The reported expanded uncertainty of measurement is stated as the standard uncertainty of measurement
multiplied by the coverage factor 1<=2, which for a normal distribution corresponds to a coverage probability of
approximately 95 %
Note 1: 'f hi~~ :r•;)ott should nol bo rGp l or:t ,G0d except in lull will :('!lf ih0 written approv:1 f II O' l·
tnr:: -1 c,JH1ical Manager ol ' 'Hi; •:;: rial CCJiibration & f>erv!r.c:; Center, l'iliyandnl;...
Nolo ?:
i'l!otc 3 :
. ~-- --- --
fJaiC' C)~!:~ f ~
. ----·-- --. -
r .:;:· UCI\l ·
•. : ·,;, r •
....... ..--/01i'IO~?_~
:
----- \':
• •
... -
• •• ~-
• ·:1:
0
• .J.··· ~...:.
, • i:-;suE::-0/
••• ·; • ._:·~ _ ;- - -
.,
Mach i ne 0 1 2 3 4 5 6 7 8 9
reading True Load, kN
0 660.6 '780.8 900.7 1,020.4 1,139.8
10 1,258.9 1,377.7 1,496.3 1,614.6 1,732.7 1,850.5 1,968.1 2,085.4 2,202.5 2,319.4
20 2.436.0 2,552.4 2,668.6 2,784.6 2,900.4 3,016.0 3,131.3 3,246.5 3,361.5 3,476.2
30 3,590.8 3,705.3 3,819.5 3,933.6 -1 ,0117.5 -1, 161.2
C-2017-10114 Page 02 of 02
Report No
Calibration Result
Indicated True Force . kN al28 ± 1°C
Force, Run#1 Runtf.2 Run#3
Mean
Mpa 00 120° 240°
0.0 0.0 0.0 0.0 0.0
5.0 654.0 675.0 673.0 667.3
10.0 1250.0 1263.0 1265.0 1259.3
15.0 1855.0 1853. 0 1846.0 1851 .3
20.0 2431 .0 2433.0 2-1 45.0 2436.3
25.0 3001.0 3026.0 3006.0 3011.0
30.0 3586.0 3598.0 3607.0 3597.0
35.0 4146.0 41 65.0 4166.0 4159.0
Mpa b ± o, a
•....c"'l_ :.--""
.?.'...:::.·::>-... \
H A 1\ M.-•n: ·!(;:1 H H I<::JnJh:·J I':l:n:· H ! ! 1·:: :r nn;Jratna
' 1 !t: 11 •.r· 1: ~!ianager
·r cch••irp! or :. . ,.''l;llnicol M::m;•r;: ''
=· : !!.·i~G
EXTENSION OF SOUTHERN EXPRESSWAY FROM MATARA TO HAMBANTHOTA
6. SECTION-6 : CORRESPONDENCE
/ORIGI NAL/
~
FSDI
Contract Nos. RDA/SEEP/CONT-84
Project t.lames: Construction of Extension of
Southem Expressway, Section 4 - Mattala to
Contractor's General
Submission (CGS)
Hambantota
Part A: To be prepared by Contractor
To: EMineer's Representative Mr.Dong Wei
Subject : Method Statement Supplement for BRI-04 Bridge Girder Installation I
Submission Rof. No. : CHEC/CGS/0131/RO
Outgoing Log No. : CHEC/RDNSEEP/CONT/S4/01.21 /0/003836
Specification Reference :
Drawing Reference :
Location o( Works : BRl-04 Bridge
SUBMISSION DETAIL
[ } ] . 1 -For Information J Rtloord; 3 -for Construction;
Purpose of Submission : 2 - For Approval:
~~~.:.. L ]"-...
~t;~
~
Desctiplion of Content :
A
We hereby submit the Method Statement Supplement for BRI-04 Bridge Girder Installation. EEP ..S4
"'' n...,,..oived On
., 1-
.-.4 0 5 DEC 201
~
Your earliest approval on this regards will be highly appreciated.
..-. Engineer's
~ Sffe~r
Thank you
'~rllt
Date; 5-Deo-
Sisnatur~
Distribution/Remarks:
') v, {l~IN JI.~RBOilR r~r.l~l, .\
RDA/SEF.P/CON I~S.J
NfA
IH,;(; m l t'fi Subcontractro~
lwang Xiao Hual Shen
Originator I
Hong Zhuan
Checked By
~
Comm~11s (~ntor bolow for each ll c-m scparo!oly Ot lrisert. NJA)
~;;~~?~e ~ //~?>/~....
~
_....,? -,
~~:0ad~~ fHhm~:kd.
~~
-
-. 4<71-P~#
Title: Name: Signature: Date:
Contractor's Represenlative
Extension of Southern Expressway Project (Section-4)
China Ilarbour Engineering Company Ltd [CHEC]
Dear Sir.
Contractor should inform Engineer to inspect the new machine when the first time
carried out on site.
CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE GROUP CO. ,LTD.
Thanking you!
Yours faithfully,
--~+. . . ..
Dong Wei
Team Leader [ESEP- Section 04]
China Railway First Survey & Design Institute Group Co., LTD .
Cc: Mr.A.P.K. Abeydeera, PD (ESEP-S4)-f.i. Pl.
G.T.P:7~
;~~ :rj"!U • ¥'G'!,t,. • ~ftH~~~ ~} tr:tHC!•'ii•M'·r~ t{:!:L~:u:=~> N!,!:\lil ·:~ ''· (l·flllf·~~:;tint;i .:ltr~ · ·,-,"." ··~trl l'•J• ,,
\• .1 \-, 'J. \ 'yi•;;: Hu.,.j, Xa' , .... ,Ch ", t'u-.a C·JI.i•: 7 1)-t~t Jcl.'iO U~~ :-~.{h:iil ~ 'u~,;x~; U:l~t ,.,~~11.1J'i t
;15,:.: ill J!, :. '),
--~
. • I
~ I
La
FSDI
Contract Nos. RDAISEEP/CONT-S4
Project Names: Construction of Extension of
Southern Expressway, Section 4 - Mattala to
Hambantota
Contractor's General
Submission (CGS)
Description of Content :
With reference to your comments on general submtssion CHEC/CGS/0101/RO dated on 04th September 2017 regardtng
the above subject, our comments are as follows.
We are here with re-submitting the Theoretical calculations of the BRI 4-P15 and P16 referring to the designer who has
con ceded matenal p roperties.
\..!u,,,, !1.\l\.liul.>•'
==
\D.I:lD
Pre-stressing force Ps at each section can be calculated from below equation
ROA/Sl::EP/CO "" \ 1)11
Ps== Po e-(kx +IJ e) :(Designer's has used same Equation for the calculation: Tx=Tj'e-(I.Ja+Ax)) :-3ft:J 1 :>t:- '7
Where, lMI'IIBAN'fOT..
• P- Pre-stress force (without loss). I~ .• _ j _ , 1(1'"'1E
,T
-, )
• Ps ; (Tj)::Force at the jacking end ___;_.. ~.....;;..,_
' ~
~
reel of strand should be used to resolve discrepancies.
Using Galvanized Metal Sheath matenaJ properties
• curvature Coef. (Friction Coeffictent). v=
0.3 ~ A
• Material Coef. (wobble coefficient)A(m-1)= K=0.004 ......._ SEEP-S4
• Dia. of Strand, 15.24 mm
· Area Per Strand, Ap= 140 mm2
.,
p .7\ . . -: .... .... '"" ~
2 1 f)t:~
--
-j --1 201
• Mod. of Elasticity, Es:::200 GPa
~
r
· Tensile Strength, fpu = 1860Mpa Engineer's
Theoretical elongation values, U where calculated by using numerical formula, Site Office
/lli= (Pp X) I ApEs) .t/ .
=
Where; Average pre stress force, Pp (Ps + P)/2 or Pp = P(1- e-(kx +IJ e)) I {kx +IJ e) 'ot r(' o)
/
Designer's considered tendon length and our calculation length is defferent, because in the actual site situation, we
consider the permanent anchorage length for the calculations. (Please refer the attached manufacture details for '1
a nchorage length =80mmn)
Your earliest reply on this regards will be highly appreciated.
Thank you
.)
Fromf.!!..ontractor's Representative/Project Manager
1
Nam : Yoog Senyan ,
~
Date:
Signature : b
21-De~
I N/A
lsubconlractro~
Iwang Xiao Hua!Shen Hong Zhuan
Orrginator I Checked By
Dlstributton/Remarks:
Part B: To be Completed by Engineer
A : Reviewed & in line with S"- Reviewed with comments: C - Fails to comply R - Returned &
Contract incor orate comments and proceed and resubmit Not reviewed
... .
- - La l
Contract Nos. RDA/SEEP/CONT-S4
roRJCtlu A~
cl
DistributionfRem~ rks:
I
Jl
n ~~- . \
'
ro 11 ,-:Jon
l..l.
Part 8: To be Completed by Engineer
A - Rev1ewed & in line w1th B - Rcv.ewed with comments. C - Fails to comply R- Returned &
Contract mcorporate comments and proceed and resubmit Not revievved
~
Comments (enter below for each item separalely or insert N/A)
~---~~--7~ 7£2~
~c:?C
~
.~ PJ
t
7L 1/lMA j)~ I
~]-11-lu
v
\ I
FSDI CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE GROUP CO .• LTD.
Engineer Review Comments
No. FSDI~ CHEC /CGS/003729/A
According to the CDS#003715 about Working Drawings for Substructure of bridge BRl-04
"Note: Pier cap framework erection,the foundation of the framework must be calculated and
treated before construction by the construction Contractor.The strength stiffness and stability
specification. the framework shall be surcharge preloaded shall be more than 1.1 times of the
Maximum vertical load impacted on false work during construction and eliminate the
influence of the inelastic and elastic deformation to make sure the deflection ofthe
The sequence of stressing indicated that after 1OO%C' 1 tensioned and grouted, the precast
girder will be erected and after 1OO%C2 grouted and sealed anchor head, the frame will be
) removed.
The letter of Clarification of Calculation for Falsework ofBRl-04 (P15 and P16 Pier
internal force of combination 1+2+4a meet the specification and the structure is safe, but
according to the calculation bending moment, the 4a is including self-weight of I beam and
Title
But according to the calculate the preloading pressure on false work,the preloading pressure
on concreting location is 72.93kN/m(l.l times of safety factor).It is just consider about the
equipment) load and concrete vibration load,didn't consider about five girder erection
self-weight,that's means the preload weight is not the Maximum vertical load impacted on
false work during construction,and the calculation sheet also not mention about it. If
Contractor insist to constmct the pier head according this method totally,lead to any cracks
According to the calculation for bearing pressure,the bearing capacity of the soil ground
should not less than 150kPa,Contractor should submit the bearing capacity of soil ground
Also the same as unloading.every stages observation should be recorded and calculated
and elastic deformation settlement value.The preload and unload observation report should
Contractor's Representative
Extension of Southem Expressway Project (Section-4)
China I !arbour Engineering Company Ltd (CHEC]
Dear Sir.
Please be noted that the submitted Method Statement of I Girder Installation tor Bridge BRJ-04
has been reviewed by Engineer, and the said statement meets the requirement of Technical
Specitication needs and approve.
Thanking you!
Yours faithfuJly,
TTh~~~;iiJ!;:k . ....
For Dong Wei
Team Leader [ESEP- Section 041
..
CH f NA lM fUM\' FIRST SHRVEY & DES IGN INSTITUTE GI~OliP CO • .LlD.
China Railway First Survey & Design Institute Group Co., LTD.
Cc: Mr.A.P.K. Abeydeera, PD (ESEP-84)-f.i. Pl.
G.T.P:~~
& DESifr\ I ,S1'!1t1'E (,RO P CO .. I.TD.
Dear Sir.
This r~f~..·rs to th!! letter No:CHECJRDNSEEP/CO~ ·1 S..J/0 1.0 I/0 /0035-49 dated 26th
Scptl:rnbl!t, 20 17 rl!garding the above subject.
W.: "i))h to make our comments on the above relercnccd letter us folio,., s:
I.Load evaluation
The c~lculation sheet which Contractor submitted rdi!r to load is not cnough.the
LOADS(dead and li\'c)should include as follows:
a.Prt:strcssing reinforceml!nt concrete self-,\.eight load.
b.Outer and bonom form work self·\\ eight load.
c.Con~truction (personnel.matcrial and equipment) load.
d.Concrctl! vibrating and pouring impact load.
c.rabe "ork (ba i lc~ beam) =>clf-\\eightload.
2.1 he load ~::va l uation menth.med:"As per lhc technical sp~.:cificat i on 556.5 dctlcction
should not exceed l /500(for ll.65m length tld1cction 21mm)".
The \\orking drawing didn't ill ustrate this length,so Contractor should explain of this.
CHINA HAlLWAY FIRST SURVEY & DESIGN INSTITUTE GROUP CO. ,LTD .
5.Load combination
CDPrestressing reinforcement concrete self-weight load.
~Outer and bottom form work self-weight load.
®Construction (personnel,material and equipment) load.
@Concrete vibrating and pouring impact load.
@False work (bailey beam) self-weight load.
The strength load combination is 1.2"'(CD+®+@]+l.4"'Q)
Rigidity/Stiffness load combination is CD+~+@
Stability load combination is 1.2"' [CD+®+@]+O. 9"' 1.4 "'®
So Contractor should submit enough detailed load combination factors to Engineer for
approval.
J:Li.Jl! ·~t•\11, • !1l}'li • tHi~~- ~~~ :; ·< lji~r!;E· i10!:·!:t it}~{:U~t; HJ.:;t~;·r;;1 f~fr. : t>~~~~ }):~;H~~jl ! i 1~t t o; !.""w~·. f..::L ''')·l . .:··t
!\d( ~ \f\. :l \.) i:w. U\.i•::L :\ f' :;;t 1 n 1 i ;;a Pn:\.i :~oJ: . . ! Pfil i : ~ i'(.' ~ kf-i ~: ~~~ · >L:.\fl:;uf.!;' l'tt': ftH 0;!~ 1 ·xt::t,,:, l f·l
'1'
CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE GROUP CO . ,L'ID .
6.The calculation sheet should include ULS and SLS calculation conclusion.
The ULS calculation including:
a.Column maximum combination stress.
b.Transverse I-beam maximum combination stress.
Based on the above comments, Engineer require Contractor to resubmit the Calculation for
Falsework ofBRI-04(P15 and P16 Pier Head) for approval.
Thanking you!
Yours faithfully,
Dong Wei
Team Leader [ESEP- Section 04]
China Railway First Survey & Design Institute Group Co., LTD.
Cc: Mr.A.P.K. Abeydeera, PD (ESEP-S4)-f.i. Pl.
G.T.P: P7~
{!1~·&_· • ~G ~:;rx :! \ ;. I Ht'•· 7 1(!0 I;~ ~ rt: 02, li2:;c~;-,l l't ft L\ . n~'· H:;:~{;:'i t "l·· lit to: ... / tiW•. f ~th. t •' L I'U
!'!;t.:l : !i.! i ~ .
\\.!, :\r,.:.! \hi·•..: 1-lunl. \:i' UJ,Cht llll P•1:-,l t:Jah~~'."tf)()tt 1••1;~~ 02'• Sil::eiln:.!:i F<t~·~ii. Oi~ k~:lt,,li1
...
'
Contract Nos.: RDA/SEEP/CON~
[ORIGI/' 1 ' I!
~
FSDI
Project Names:Constructlon of Extension of
Southern Expressway, Section 4- Mattala to
Hambantota via Andarawewa
Contracor's Design Submission (CDS)
Appendix 1: Working drawings ror substructure of bridge BRI-04 at A0+859.000 Part 2 (for P14-P16} (rev.4)
-
\\),L!1~
A ?>
CHr.~t 11.-\RBOL Rf!\Gl Y££Rl\G COlm
.RDA/SEJ.:PJCO:\'T-S-1
\t:-
0)
~~~P-S4
"''C:
04 S[p 2017
I '
~ f<Jt., ..,n
R S•teo~ 1-
i , ~
H i\ ll.\, 'TOTA
E.n9ineer's
~RJECEJ! \-'ED
~·bl•<t;'i/,; 'Ol-~":1,.-
~~
'i<'rl>l 'l.u: CO<:) :~=' t, ~
.9
l{i l~J ~
Name ; Yang Senyan
"'.. . 04~$··~
S•gnatJre · ~ fl/1./ N/A I Shi Fulu 1 Shena Hono Zhuan
Sub-contractor I Orioinator I Checked Bv
D'stnbutlon/ Remarks \
j'-J.- ~~
C-t/PP ~e)._ '
~ F5PI-Offcjcp5jtJo}~/A ~
f..-
~~ce ~/.:77~
·i\J LIV\ o7/o9~
Tille Name· Siqnature ,, Dale
7'
T\e{~, 1 t...- '7 '1/v, :a i..l..~~--- /JrL..,. I _.,.. t)~ 1OC( I( '""
u I --- I I
J~ ~~~~~~~rr~~m~~*~
FSDI CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE GROUP CO., LTD.
Engineer Review Comments
No. FSDI- CHEC /CDS/003450/A
piER CAP
r ---- - ~-,
:~ ~ I
I I
I I
I I
I
~ 31, J3' ~
l·t~JI .Jql.!·tll ~ lr~;~,~~~ 2 ~; !fl~t~~ 710f;.tJ tl:, ~,r.· 0::!'>-&~365~~8 fr,:. t\ c)29-82)t'51'7·t hup· . . twww t!,~.h com ~n
Page I of I
!\Jtl N•J ~ Xi\ih\1 R(l:td Xt'an. Chinn Po$! Co<it' /1 11\HJ T"'l -~6-29-~23<>5~28 Fo'( •8f>-~Q.~~.H)5 1 7~
J~ ~~~~~~~rr~~mt~*~
FSDI CHINA RAILWAY FIRST SURVEY & DESIGN INSTITUTE GROUP CO., LTD.
Engineer Review Comments
No. FSDI- CHEC /CDS/003450/A p~e o2~:3
"1-h A.e
a./c../.:;#P-7 ~
ca • .
@)15-PpZ
S2 -15-/?:?2
Yc4/"'4 2-2 CR?/~d~ ~c;,fo~4)
l/7 .P~7 /) S~P~¢3-3
rt?_ L ,,, >.l ·-..: IDl':U:<t? •.; tl.:l'f4 71 J(l4.1 t(L,i; 02'J-S:!\(.5~:!S II( \ c':G.R~3:i'l7o1 l•up 1'-'\\W f~J•..:om.~r Page J of I
•\JJ 1\-J! '< \lr~ lbu:1 Xl'un. Chi. I r-·~· Co.k· 7101)•1 r,•l 8!.-~'··>~31l5~~M "~' ·~(i-~<>.l!1<tdl71
U ~~~~-~~*~•m~~*~
·· FSDI CHINA RAILWAY FIRST SURVEY & DESIGN INSTITIJTE GROUP CO. , LTD .
Engineer Review Comments
No. FSDI- CHEC /CDS/003450/A
@-"/5-:/?.}'2
b~~ ~ ~/#'"' <::A~*I/7 ~/~
;Pl!er CM/ ,-:;; J/y/-v ~~/?~. /
~~N;/--~m~
//?~~ Co~~ ~.te5/l6~/-?.
Title Name
~·A .;,, •-' 1-r·~- ••iWh~~ 2 '; • ·!rl':. 7f~<~~.t3 il.V o:<~-l\~3Mll~~ fl: :t 02~·S2J65i7-+ nHr' ~~'"'" r.o wm ,-n
Page I of I
;\.j, ·~o :; X•} ,r;g Ro•d. XI ~n. Cl• 1W f>•>\1 •:'vd;: 1! :J•l~3 'lei 'RC•·:!' -~1365M~S F1~ Xt'·2~-P 1lt>~ I'll
'
lJrdGINAL;
~
•
~
Contract Nos.: RDA/SEEP/CONT-54
Project Names: Construction of Extension of Contractor's Material
Southern Expressway, Section 4 • Mattala to Submission (CMS)
Hambantota via Andarawewa
FSDI
Part A: To be prepared by Contractor
To. Engineer's Representative Mr.DongWei
Title of Submission : Test reports for Admixture for Post tension grouting, Castech grout agent PGA,
Submission Ref. No. :
Outog1ng Log No. :
CHEC/CMS/00132/A
CHEC/RDAISEEP/CONT/S4/01 .2210/003369
Description Of Contents: f~'""'""'""•re-• olworl<ilocolien)
We hereby submit the test report tor the Castech grout agent PGA from IT o'/1
r-'
CHIN.HIAR8otR£~GI .r.Rl\!J(O.LTD
-
"f!: co
L"r..
o ~1 ~
r rev!Ar a
I-.....
!11 vat.
~r=co -~A
v
\ _
RDA/SU P/C<•t..H-S4 - . \~
~ lc~l 2-Pc i - ':' " • "r- ?017 L:
IIJANTOTA , r; . . ~-
RECEl VRD E~gine~r's ~
~hicct hlr. D 1, :z. -i- Stte Offtce y
~ri.ll ''" {") ~ :S. 7- .~:t.;. - \_
REQUIRED INFORMATION DETAILS PROVIDED ./
Material Name/Type Castech grout agent PGA,
~ '
Part B: To be completed by Engineer
A · Review & in line with B • Reviewed with commenls C. Fails to comply R ·Returned &
with the Contract incorporate comments & and resubmit Not !reviewed
proceed
~
Comments (Enter below for each item separately or insert NIA)
/Y\~~~
} tJ I I . g . >-4-
Title Name: Signature Date
~~
Description Of Contents: (men/Joncd the arooltype ofworMocation)
ee!.s4 [\
Manufacture's company profile
Manufacture Product details
Manufacture's relevant certlflcales --- _,M..,
~
HAMBANTOTA
I RECEIVED SlleO~
Subjctl File: Q t \ .J-l.
I Seri•l Nu: J!L~It:> lof.;!, p <? '' .,.}oC ):Y
REQUIRED INFORMATION DETAILS PROVIDED
Malerlal Name/Type Post tensioning system
La
FSDI
- - - --· .. Contract Nos.: RDA/SEEP/CONT~S4
Project Names: Construction of Extonslon of Southern
Expressway, Soctlon 4 -MattaIa to Hambantota via
Andarawewa
Contractor's Material Submission
(CMS)
A
£. [\
,c ~
Manufacture's relevant certlncates -·- EEP S4
Manufacture's test reports CHINA MRBOUR ENGi;~EERING CO.LTD - ,_:; Received On ~~
Pervlously completed projects Rl>A/Sf:EP/CONT-S 4 ~· 2 1 APR 2016 1}'.:
D'l'foSf..lott. .,.; E ~~
HAMBANTOTA 1
ngineer's ~~
RECEIVED ~ SJteo~~...
~:;~~='" ~;~~..,., ,.. 11 fo1'~ ~
REQUIRED INFORMATION DETAILS PROVIDED
Material Name/Type Post tensioning system
Material Usage anchorage of prestressing steel used for presterss concrete construction
We have reviewed the submitted manufacturer's company profile and system certifications,
and product details are acceptable in general. There is no objection to get supply of Post
1ensioning System from the proposed manufacturer, Liuzhou OVM Machinet-y Co. Ltd.
However, while supplying the above items, you are requested to submit the following
documents as follows:
01. Selected dimensions and its specified properties as per design requirement.
02. Authorized purchase documents.
03. The manufacturer's material made chemical composition and mechanical properties
analysis test reports of each component of the system.
04. The manufacturer's quality confirmation certificate or Certificate of guarantee for
purchasing lots of post tensioning system.
05. If available, the latest third parties test reports from recognized laboratory.
In addition, you are required to prove that the anchorage system should be withstand the
maximwn allowable Tension force as per design incorporated Technical Requirement, prior
to real application for former approval.
~~ oflo§ {'U)\kl,
Material Engineer Mr.S.Murugendran
v . ·-------·
ovm
LIUZHOU OVM MACHINERY CO., LTD.
January 2016
LIUZHOU OVM MACHINERY CO., LTD.
cvm Submittal Document for Extension of Southern Expressway, Sri Lanka
Contents
..
LIUZHOU OVM MACHINERY CO., LTD.
ovm Submittal Document for Extension of Southern EKpressway, Sri Lanka
OVM Po~t - tcnslonlng System consists of anchor •N o need to accurat<!ly dct crmtne strand
age (strrsslnu·cnrl, rlca<l-end), coupler, strand length In advance.
01nd duct. OVM po~t · t ensioning systems mating
strands with various diameters: OVMB for • High a.nchorlng coefficient, rell.lbte and
strand dla. 12.5/12.7/12.9mm, OVMlS for strand stable.
dl.>. 1!>.2•1/1 5.3 /15.7mm, OVM221or strand dia. • for OVM po~t-tcnslonlng Svstern:
21.8mm, OVM28 lor strand dla. 28.6mm, which
feature:
+Anchor cocrtlclont: '1 c1 ~ 0.95;
+Total strain at ultimate tensile forc.e:
• Ad,lpt.tble for strand wl!h various strength £ ap11 2! 2.0'36.
such a$ 15 70/16 70/1770/1860/2000MPa and
varlou~ diameters.
• si mple and reliable equipmen t ror
lnst allil tinn, tensioning and grou ting.
• full range of t endon sizes are avai lable (t~ 55
strands and largllf sites Me avall<1 ble on request).
2 6 7
1. Tool andwr4ge
>. PlHOII
3. Cylinder
4. Sp3cer
S. Wedge
6. And1or h'!ad
1. Splralrclnforu•nl'!lll
8. Strand
9. lltarhltlPI-'Ie
9 8
LIUZHOU OVM MACHINERY CO., LTD.
cvm Submittal Document for £)(tension of Southern £)(pressway, Sri Lanka
OVM.M&SA S•riiJ
OVM.MUAStrllt
HQOM.SOlUftOH
su-
, ., 1\N
SU84l
f "IMf:•t
/(Xf"AfrtOIO
:U (AHO)
OMif <~ , . lfJtf
f'Mirf• · JI4A7t
S'MW• UJ .•I
........
C)Vtrol,._..., .......... ..
,
~
LIUZHOU OVM MACHINERY CO., LTD.
cvm Submittal Document for Ext ension of Southern Expressway, Sri Lanka
Contents
A. Stressing-end anchorage
Gfoullt'lfpon
~... -~
.,,:r•~
"<WM"""! \.t.!!"\!IJ~•J•
Unit: mm
4
A I
Unit: mm
Round Duct
Flat Duct
(b s:
::::L_
:r:
.
1-·~--
I
I
• G
j•
M a in Dat a
'"""Me.
Ouct Ouct
'>pees S~cs
g G h H G G h II
28508(ln) so S6 l9 2~ 3 2870B(Zn) 70 76 19 2S 3
.11!601l(ln) 60 66 )!) 25 l 289011(Zn) 90 !l6 L9 2~ 3
I.Tho adjbccnt bisger duct can be used n~ the coupler. II. Spcclol duct can~ suppllod on requ~l
Contents
u.·
Gl
lfi
ovm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern EKpressway, Sri Lanka
Contents
2 0 1 2 0 0 0 3 3 3Z (20 12)1liH.\~tVi'-(077)~}
TEST REPORT
BETC-CL 1-2012-454
M15A~12
deli
(Name of )
Anchorage efficiency,
J"9i § ~1ft 6(3 Sets)
Total elongation under ultimate
<Item) (Quantity)
load of the tendon
:ttl!. RX Laboratory ofOVM BAA 2012/04/10
(Place) (Date)
~~~
('rest) 1« tt.l}
(Reference
documents)
(
Load cell, caliper, tapeline etc.
*
~~~;,~ (Conclusion)
Remarks:
1. Inspection data refer to page 2.
2. Client provided the strand for test, which is bear strand of grade 1860[270] with actual
average ultimate strength of269.2kN, manufactured by JiallgXi XinHua Metal Products Co.
Ltd.
3. AASHTO LRFD Bridge Construction Specifications 3rd Edition 2010 is not included in the
standards that our test center has registered in CNAS.
ltt~lti(Approval) r4i~(Verificnt ion)
@] ~ ~ ~a I :t¥ f!i :m Mt fl *~ ~~ r:p 'l) 1ft ~~ =m ~
TEST REPORT OF NATlONAL CENTER FOR QUALITY
SUPERVISION AND TEST OF BU1LD1NG ENGJNEERING
Test Data
Actual Value
Items Requirement
454-1 454-2 454-3
Total elongation under ultimate load of
~ 2.0 3.8 4.0 4.2
the tendon (%)
Actual Ultimate Tension Force (kN) --- 3106 3135 3131
.
TEST I~EPORT
BETC-CL1-2012-457
Prestressing anchorage
Il~ I ;tc ,~~~' (Tendon- anchorage assembly)
Name of Engineering/ Produc .......__ _ _ _ _ _ _ _ _ _ _ _ __
~1&l1L1tl
Clion..,_·_ __ Liuzhou OVM Machinery Co., Ltd
I~
documents) ·~}fU[
Systems)) ,ETAO 013 Edition June 2002 «Post-Tensioning Kits for ,.,;;..-.---
«
Prestressing of Structures )) ,FIP-1993 Recommendations for the
~~~~--;-A~c_c~op~t_an~c~c~o~f~P~os~t~-'f,~e~ns~i~ot=li~ng~Sy~s~te_m=s=»~,~U~ls~
p~ec~tl~·o~n~P~ro~x~y--------4 ~l=~J
~ 4- Load cell, caliper, tapeline etc.
(Equipment)
1-------A~~~~~L-----------------------------------------------~~~~~
*
...._,__
~~t'jlf~ (Conclusion)
~-----------------------------------------------------------------1
The static anchoring performance of specimens meets the requirements.
Remarks:
1. Inspection data refer to page 2.
2. Client provided the strand for test, which is bear strand of grade 1860(270] with actual
average ultimate strength of269.2kN, manufactured by JiangXi XinHua Metal Products Co.
Ltd.
3. The strands shall be stressed and locked with consequence of one by one and by steps with
loads corresponding to 20%, 40%,60% and 80% of strand characteristic tensile strength.
4. AASHTO LRFD Bridge Construction Specifications 3rd Edition 2010 is not included in the
standards that our test center has registered in CNAS. ~f~')--.
L%. \1\l~l m:d1"-
@I ~ ~ mI u~ Mi. :1: llir tl *!?I ~& Jt~ ,~, *!?I ~& ~& ~
TEsT REPORT OF NATIONAL CENTER FOR QUALITY
SUPERVISION AND TEST OF BU.ll,DING ENGINEERING
1E!~,
after · after
remained remained
force value force value
Wedge Normal · Nonnal Normal
CERTIFICATE OF QUALITY
Address: No. I Yi:mghui Road, Liuzhou City, Guangxi, P. R. Chinn Postcode: 545005 1/3
Tel: +86-772-3 116402 Fax: +86-772-311 8665 Email: ~i!l.M@.Qymchinp.com, Http//:www.twmchina.com
t&:~~OHG 1 cvm QA Document, OVM
QUALITY CERTIFICATE
Customer name:
Project name:
Inspection Result:
Certified by:
Director of QC Dept.
Date:
Address: No. 1 Yanghui Road, Liu:rhou City, Guongxi, P.R. China Poslcode: 545005 2/3
Tel: +86-772-3116402 Fax: +86-772-3 118665 Email: ~lowchin!I&Qnh Http//:www.ovmchina.com
QA Document,OVM
TESTING REPORT
Name and
Product Name Model Qty.
Testing Results:
20- 32HRC
Anchor head
1
Ml5-7-12BT:40Cr·GBrf3077-l999
Material
MI5-15BT: 45-GBff699-l999
BMlS-3-5: 40Cr-GBm077-1999
--
Geometric Dimension Drawings with the design requirements
Address: No. 1 Yunghui Road, Liuzhou City, Gmmgxi, P. R. Chinn Postcode: 545005 3/3
Tel: +86-772-3116402 Fax: +86-772.-3118665 Email: snlc,q@ovmchinQ ..£ll.!J1. 1!Hp//:wv,rw.ovmchina.com
ovm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Docum ent for Extension of Southern Expressway, Sri Lanka
ovm
LIUZHOU OVM MACHINERY CO., LTD.
January 2016
,.; cvm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern Expressway, Sri Lanka
*Duration
No. *Name of Project *System *Location * Structure's Type *Description of Work
From To
Trincomalee Integrated
Infrastructure Project( Keyankermi
supply of anchorage, bearings,
1 bridge, Verugal bridge, Ralkull PTSystems 2010 2012 Sri Lanka Other
and equipment
bridge, Gungei bridge and Upparu
bridge), Sri Lanka
,.;
Neelum-Jhelum Hydraulic Power Ground Anchor Supply of Ground anchorages,
2 2010 2014 Pakistan Other
Station, Pakistan Systems strands and equipment
ACCRA-KUMASI DUAUSATION
supply of anchorage, bearings,
3 PROJECT LOT6: APEDWA-NSAWAM, PTSystems 2010 2011 Ghana other
and equipment
Ghana
Constructlon of Flyover at Gujaratgai Bearlngs & Expanslon Supply Steel Strip Expansion
7 2012 2012 India Other
Circle at Surat, India Joints joints
I
...
ovm UUZHOU OVM MACHINERY CO., LTD.
.... . ., :
Submittal Document for Extension of Southern Expressway, Sri lanka
..
'_, J EM 4 '9 £"
Cable-stayed
9 KD Bridge PTSystems 2012 2013 Korea Supply of PT anchorage
Bridge
10 Gansun No.4 Bridge Cable Systems 2012 2013 Korea Arch Bridge Supply of 18 hangers
Under
15 Part of the Taipei dome PTSystems 2014 Taiwan Other Supply the equipment
Under
16 2014 Taiwan Highway Supply PE sheathed strand
project Systems Construction
•
ovm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern Expressway, Sri Lanka
I
-
OVM supplied PT system,
Under
19 Ghana Elmina bridge PTSystems 2014
,. Construction
Ghana Other equipment, bridge bearings
and expansion Joints.
OVM supplied PT
The New Caldwel Bridge and Under Monrovia,
28 PTSystems 2014 Other system,Bridge bearings
Approach Road Construction Liberia
&expansion joints.
...
Ill
Chole-Magna Design and Build Road Bearings & Expansion OVM supplied Bridge bearings
34 2014 2014 Ethiopia Other
Project Joints &expansion joints.
Under Cable-stayed
38 Butterfly Bridge Cable Systems 2014 Taiwan Supply GJlS-1 Cable
Construction Bridge
Ill
Cable-stayed
Liannan Bridge Cable Systems 2014 2015 Taiwan Supply GJ15-12 Cable
1 39 Bridge
L______
Ill
•
ovm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern Expressway, Sri Lanka
The cement
40 The cement plant, Guatemala PTSystems 2014 2015 Guatemala plant, Supply of PT anchorage
Guatemala
,. Under
Consultant Dar AI-Handasah,
42 Greenline Metro PTSystems 2015 QATAR Railway Main contractor
Construction
SBG-PORR-HBK
I PTSystems
Harbor, consultant HALCROW •
Under
46 Residential Buidling at AI Mahboula PTSystems 2015 KUWAIT Building SUBCONTRACTOR CANAR
Construction
Under
47 Sabah AI Salem University City PTSystems 2016 KUWAIT Building SUBCONTRACTOR CANAR
Construction
-
•
ovm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern Expressway, Sri Lanka
ovm
LIUZHOU OVM MACHINERY CO., LTD.
January 2016
cvm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern Expressway, Sri Lanka
TABLE OF CONTENTS
+ Products complying with AASHTO, ASTM, BS, ETA, FIP, GB, JIS, etc.
+ Elast omeric Bearing, Pot Bearing and Spherical Bear ing satisfy CE Certificates
Thanks to SO years of experience, OVM is now a leading product supplier and specialist
contractor in China In the field of prestressing and other special construction techniques.
Enjoying with a high reputation on its reliability, professionalism and innovation, OVM's
series technology and products have successfully applied on numerous projects, including of
bridges, highways, high-speed railways, buildings, dams, nuclear power plants, LNG, and
Sufficient R&D
invested on technical R&D. OVM owns a nationa l technology center and a postdoctoral
research workstation and mainta ins close cooperative relationships with lot of renowned
universities and institutions in China. OVM has achieved 480+ technical patents by 2014.
ovm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern Expressway, Sri Lanka
brand in civil engineering field. As the biggest supplier in China, OVM provides a big
inventory of prestressing systems including 5 categories, 30 series and more than 420 types
of products, i.e.:
Ill. OVM Construction Solutions (Incremental Launching, Turning and Heavy Lifting)
The endurable and reliable OVM products are guaranteed by outstanding managements.
OVM is certified with 1509001-2008 Quality Management System by BSI and CQC. The
overall production process is strictly executed quality control programs. OVM products
satisfy requirements in major Standards: e.g. AASHITO, ASTM, BS, EN, ETA, FIP, GB, JIS, PTI
etc. Meanwhile, OVM has delivered extensive tests in the international independent test
With worldwide network, OVM strives continually to provide high quality services to clients,
Contents
·~
ovm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern Expressway, Sri Lanka
by reason of its
Quality Management System
has been awarded this certificate for cornp!1ance with the standard
IS09001: 2008
GBJT 19001~2008
The Quality Management System {\pplies in the following area:
Dasljjn & Development, Manufacturo <>f OVM Prostro$sing Sy$t<>ml0 & Related Products, Cable Syswms
Elastomerlc aear!r~g s & Expa.,:sion Joint& Etc.
Cwtifl11d since:,Jul.11, 1995 Valid frnm: . lul. 09, 2013 Valid urllil:.lul. 08,2016
Ah)tc ~el!bt:\08 4}'do, the cetliti.c.ute U \'a:Zd cnl'fw1!1!i!'r! used t~e{!\ur\,ilh csn Accepl4'.n;;e NOI~ orSul'\·e:.oonce Au<l~ 1s.su00 ti/COC.
flle..Js.e aocest 'M'IW.cqc.co.'l'\.cn tor ~l'leQ.\rtg va•icfrtt of the OOrtil\(aCft.
~
..
Signed by; Wang Kejiao
tONet ·
--~·~~~
bsi.
Certificate of Registration
QUALITY MANAGEMENT SYSTEM~ ISO 9001:2008
Tills Is to certl(y that: l.luzhou OVt'-1 Machinery Co., Ltd. ·fM1lKAUt9!Hll~~JJi!'{)J.fif!l z~ iiJ
No.1 Yanghul Road J9859ti8 7-3
Uuzhou •l•lfl
Guangxi J''jlj
545006 !9'.llllili
China I1HAtWIII ~
mtlf.!;l, 511iOOt~
The design, manufattttre and selvldng of OVM pre· stressing anchorage systems and the
derivative products ,cable products , elastome11c bearings, and expansion joints.
tW.Il'fit!;\tht~IOI I4•~.?1d~'l:r"'.t/., lU~~~.ll" ~~~ .nl!, WfJi~J?Je lttlt·, Wrt.fUJR# .
®•• "VokA<ffV""''•'I'l"'"-'S
((ilT 11..11.1"011.0••
Ptlnrcd cQJ>I!'i un h~ v.lli<fatcd •t """N.IJ>I~.~Il),~m)· orl!'lt'l>I'<Y'e +S6 10.110013000, &5"'"' .s ~~ m-w.ooc...gpyM~,Iti< <>ffl<"'l "~~" cfrl~~
~ C~Jiifl<.J!'on and At(wJlttt~on Mmlr.I.'U~«M of lh< f't<Ople's "'"">bk1'1 Cl1t11e.
I ur\hu ••annro(>O'" t"')'a(dit\) tll<l scopr or llos c.mflr.i.ll<> ~'><! t1•e ;owi'Ul!ltlily 01 ~ 9001 :li.Vll ~~nlll~rott rN'I b~ 01>1Ain:N liY <cosuluouiiXI r.fY'"IIIAUon.
'11>'> celt!ltc>lte ~~ va!!d only Wprovldc'<l or1o'n•l '~ n;~ h ("'~•r>M• &t·l
Ul~lll\~tton a.ld O>!liod' as~ ~~C!l~rl< C~wl, l)~~y 1\""""<'<l(no,'lflill, 1>11~011 Y.•:ltl<$ Hl<S 8Pl\ T.,<.; ~ ·l ~ 1!45 OUtl 9llOO
IJSlA!o$Utllt><.ll lh<lln:tltll, r-.gi!l.e<-ed lol f.r<;l •<>! .-l<b< """.t>er 180S3l l •lliiH~tw.tc'<H~h Mod, lo».loo Wt w. U~.
IJM MWIQCI'I('I11 S~s (.<(J!l(;)re< (/It,, 11) C<>., l\<J.
~·' lOOa l•.>t Ottan Cinl<>', No. 2« It· .uom6'l'""' !:ll'o•~ p_.,,)ng 100004.1; A. c~; tb1t~ +&; tl' 85<J7 lOOIJ
I< folenbtc olltlt' BSI G•-4i~l•'l:f.
LIUZHOU OVM MACHINERY CO., LTD.
cvm Submittal Document for EKtension of Southern EKpressway, Sri Lanka
Uuzhou OVM Mnchi11ery Co., Ltd. 11te design, manufacture and servidng of OVM pre· stressing
No.1 Yanghui Road anchorage systems and the derivative products ,cable
Uuzhou products , elastomerlc bearlrlgs, and expansion joints.
GuangXi Ol'lllll(r-:lfJI/JI'fl,ll(;€iJH~~~"M" ~:M"J.I/J, ltltt:A::!i\. f'tl!ti!
~NAtJill. i i· . ~Jia (dN({ff.
545006
China
.JW/11 i<J;ffUJJ lllbl!/12 m'f i 1U 1-~iiJ
19859687-3
.PW
,~i!!i
JSJf!fi1T
llfl,ltU'IHft
llll!~: 545001)
Uuzhou OVM Machinery co., ltd. The design, manufacture and servicing of OV!I1prHtreSsing
No. 5 Jlfa Road anchorage systems and the derivative products ,cable
Liuzhou products , elastomcric bearings, and CKponslon joints.
Guangxi (l\'llfiJ~;/J\t.\1/oil-f:j!i.Jl.t\i!'i'f'o\1,_ ~:A/ili'Jtl/, , l~ll((;,l;l!l\, (IJill/1
545006 ~,11'(1(.)\'.Hi·. ;J,~ii~illHI·.
Olina
~flll!):fff.t~./ILJ\!IIf~fHWU ~111
61!134720-0
tfrlll
j"jllj
~ffltli
~~1'1!11151}
~fa: 515006
Page; 2 or 2
11\15 ooltiRCilte w.s lswed el(rtroolceliy Pnd remains the property or BSI •nd Is bou•1d bY Ult 1'01\dltfon~ ot <~ract.
An drotoolc ce<t'illcal( con be outh~nUr.a\00 jl(IUo.t.
Pti<l«>d copieS con be voildaiA!d at WIWI.bsl·ylobdi.Qlfll/OI<!n!Oiredoly C< telq)I!Qne +86 10 4501 3000, as Y.<U _.at 'f/Wtt mea goyCQ, 11\e olficllll wel><lrr• of CNC.A-
Certiltc:atlon i!lrld Actr<NIIt!lllM Admlnlllr"'Jon of the I'.'Ojl!e's RepubliC. Clf Clllna.
f1Jrtlw da~liatioJls <<l!ardli111 the~ ot tnts r.cmtleall! ·""' tl'~ ~al6ty of ISO 9001:2008 requ&- m.av bo oC>taned by C'OIIsuling the org~nu•lioo.
Thl< certilialte Is YaJ.d only Wprovided otlfiiMI COp!eS are h Qll'llpfE!e ,.a
lnlonnoltion and Cant•ct: RSI, Klttmol\ CO<Jtt, Do"\' A - . K1JO<..a.1 , Mibl J(ernet ~11<5 8PP. Td: + <14 MS OliO 9'.100
8St 1\.swnrnc. UK~ f'<91stet«<1'1 E~nd unde< OOil'll>er 181lSlll et lll9 Crtb~ liiQI\ Road, l<inllorl\V4 ~ UK.
8St ~o<nt 5r>(ems Cft\rOUios (OtJ.->9) 01., Ltd.
Rln. 2008 fast <><r•n Ccnta; No, 24A )1.1~"'"' Street. 8clP"9 IGO<JO.I, P.ll Chna Td· ~ S6 10 8507 3000
A MembEr or UlC 8St Group d r~•perllos.
liUZHOU OVM MACHINERY CO., LTD.
cvm. Submittal Document for Extension of Southern Expressway, Sri Lanka
******* u\
l * **
****
THE INTERNATIONAL CERTIFICATION NETWORK
Registered address. No.3 longquan Road, Yufong District, LluZhou, GuangXI, P.R. China
Operation addrosa, No.I Yanghul Road, Yang he new industrial district,Yufong District, LluZhou,
GuangXI, P.R.Chlna
Michael Drechsel
President of JQNet
IQNcc Pt\th1tr,•:
~- President ofCQC
At;;NOR SfXIIII Al'NOH c;.,rtifl<:otlon ~ro11cc AIH-Vii>11<JilC lntcmnlionolli<,lgiwn ANCI>·SIOB M••-tit'O 1\PC~R l'or11i{J<II CCC ClJPiliS
CI!>Q IWiy CQC Chi11o CQM Clti11a CQS C?.ecit 1/qJ!ciJiil.' Ct'O Ccr! Cmmia DQ8 I folding Omhll Gormauy
FCI\V lJru~il I•'ONOONORM/\ VHilt!J'..mtht ICON'l'J•: C Cul~lntbfa tMNC Ale!Xit.'O IOIJ:JX:Citt Ccrtif.ic<\lion f>1ttlantl IRAM A~JPnlitltJ
JQA Japtln KIIQ l<oma MlliTl~C IJre«t't? MSZ'r Jlungary Ntmi<O liS NoJu~t// NSAI Ireland PCUC l'olmul
Quoll!y AU31rla ,juslrl<t Rll/lltssfrt f:lll /sm~l SIQ lli<>v~>tia Slf~IM Q,\S lntcl'llnlionnt Malay<i<t
llQS 5)u/<v.crlcmtl SRAC R"maufa TI':S'l' S! 1'<:\crslmrt\llm:sl(l TSI,; l\11~"ll YUQS S~ rl>iu
IQNct is t'Cprcaen(ed in the USA by; Ar•'NOR C•~fUfl.c:n~iOll, Cl!.iQ,OQ811ulclius Gmhll mtd N~'MI tnt".
• The lint of IQNel pcu·tncl":\ i:t vnli<.l ot the tin\c ()( h;."Sl10 of 1h~ ~,·tirt~cd<•. Upcttue<l iufm1notion is m•olln.bfe uudc,· ,..ww.iqncN~<:J'tUieuti'ln.amt
LIU2HOU OVM MACHINERY CO., LTD.
ovm Submittal Document for Extension of Southern Expressway, Sri Lanka
I }4, "'·~ -· :·.,~ ... · '"t .... "":,~~ .·· ..•• ··li''
®
~-
- J:i:~~t ~ c:?'~~L--
Michael Drechsel
President of IQNet President of CQC
tQNt>t r•At'hi<'li!!:
AgNOil Spain AI'NOR C:c,·lltlcn!lon J?rwttx' 11113· Vln\">UC luttrnoUon11l flcl{finm 1\NCI~-!:liO!,: Mw:ico tH'C~;R J'<Jrlt!gul CCC ( .'yplliS
C:ISQ ltaly GQC C'J1iun CQM Cl>in<t CQS O:cc/i NtJ,mhlic Cro c,•rt Ctoolt\t DQS Holding Ombfl GtJtt!WII!J
f.'CAV 1./mzil IIONIX1NOHM•\ Vcnv:.:uc/a IC()NTJ::t; Co!omiJia IMNC Max/co II>~J)c<'\1\ Cortlflcutionl'inlnnd !RAM Atyalllil!(t
JQI\ Japan KIIQ Ko•oo MIJngc Orecce MSZT Hu•l!}<lf!J Ncmko AS Nonv"y NSI\1 /fe/t>ncl l'CUC 11nlmul
QuQiily Austria tlusfri<t llll Ut<s$ilr S!l/~rael S IQ Slovcmic< S!l~IM QMJ lntcrlli\liounl Malnysir<
SQS Swifu:rlond Sf~AC Rouwtticr T~S'f $t 1~\(,'l'~ IJua·g /<u$sia 'fS£ 'ntt*•!Y YUQS !Wtbia
IQNoll• r<prtscnled In \he 11~1\ by; AFNOR C<rtill<'lllun, CJSQ, DQS Holding Oml>H ~ttd NSAI Inc.
* "fhe li~t. ofYQNct tlfU1n~t_, iS' vnlkJ ell the lime of t&.nlC tJf thi:\ C\ti'Jifi~\\a.
lJI~'IH\<.•d h'I[C.u'I)H\lfon ito ''Wdlubk: \.lttdcr \\'\VWJqt~(~l·~::~nifk;dian.~,.JU~
cvm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern Expressway, Sri Lanka
Contents
POST-TENSIONING SYSTEM-OVM.M15A
OVM Bonded Post-Te11sioning System for 1 to 37 strands
(7·wlre preslressing steel strand.s 015,7 mm; Y1770S7, Y1860S7)
plac~d on the market by:
is submllted by the manufacturer to a factory production control and to the further testing of samples
taken at the factory in accordance with a prescribed test plan and that the notified body No.
1020 · Technical and Tost Institute for Colletructlon Prague
has performed the Initial type-testing for tho relevant charac!eflstlcs of tha product, the initial
inspection of the factory and of Ute factory prodvcUon control and pc!fom1s tho continuous
surveillance, assessment and approval of tho rector{ production conlrol and an audit-testing of
samples taken at the factory, on thtl market or on lha construcilon site. '\
ThiS certiftcate attests that all provisions concerning lhe attestation of conformity and tho
p~rformances described in
--==~==================================~
cvm LIUZHOU OVM MACHINERY CO., LTD.
Submittal Document for Extension of Southern Expressway, Sri Lanka
Typ a poutitr vyrobku OVM Piadplnaci system pro prectpfnanf se soodrznosti pro
GeMrlc type end usa 1 ez 371an
of construction product OVM Bonded Post-Tensioning System for 1 to 37 strands
Platnost od /..3.08.2012
Validity from
do 31 .12.2015
to
prodloutena od 01.06.2013
extended from
do 31 .05.2018
to