HEAD OF DEPARTMENT
Mohammad Afif Bin Ahmad Nazri
Week
Process PIC
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Drawing
Finalise drawing Najib & Nazmi
Endorsed Imran
Fabrication
Handle
Column Bar
End Rod Column
Lock Shaft
Outsource
Assembly
Electrical
Testing
Engineering Solution
In order to save budget and reduce the time of fabrication, Handling department implement bottom up approach. Bottom
up approach is where it fully utilise whatever given by the faculty to fabricate the parts. Outsourcing or purchasing parts is
the last option. Table below shows the difference after implementing bottom up approach.
Note that by using bottom up approach, previous design need to be change according to material that available in the
workshop.
No. Item Quantity Previous Costing Bottom up approach
1. Handle 1 RM 50.00 RM0.00
2. Column Bar 1 RM100.00 RM0.00
3. End Rod Column 1 RM10.00 RM0.00
4. Locked Shaft 1 RM20.00 RM0.00
5. Handle Lock 1 RM20.00 RM0.00
6. Bearing 1 RM20.00 RM20.00
7. End Rod 4 RM60.00 RM2.00
8. Connector Chassis 1 RM15.00 RM10.00
9. Connector Shaft 1 RM20.00 RM10.00
10. Electrical Equipment 1 RM30.00 RM30.00
Total RM345.00 RM72.00