IPC-CO-00-ITP-005

INSPECTION & TEST PLAN Rev. : 0


FOR ELECTRICAL EARTHING WORKS Page : 1 of 9
Date : 22 Nov 2011
EVA Plant & Utilities Project

INSPECTION & TEST PLAN


FOR ELECTRICAL EARTHING WORKS

JOB NO. : 100670

PROJECT NAME : IPC EVA PLANT & UTILITIES PROJECT

COMPANY : International Polymers Company

SITE : Jubail, Saudi Arabia

Najeeb
0 22 Nov 2011 Issued For Construction Ali Imam B.R.Park K.I.Lee
Kban
Najeeb
C1 20 Nov 2011 Issued For Approval Ali Imam B.R.Park K.I.Lee
Kban
REVD DATE
REV. DATE DESCRIPTION PREP’D CHK’D REV’D APP’D
COMPANY
IPC-CO-00-ITP-005
INSPECTION & TEST PLAN Rev. : 0
FOR ELECTRICAL EARTHING WORKS Page : 2 of 9
Date : 22 Nov 2011
EVA Plant & Utilities Project

TABLE OF CONTENTS

SECTION DESCRIPTION

1. INSPECTION & TEST PLAN

2. ATTACHMENTS

#1) QGI-001
#2) QEI-100
#2) QEI-001
#3) QEI-002
#4) QEI-003
#5) QEI-004

GS Engineering & Construction IPC EVA Plant & Utilities Project


339
IPC-CO-00-ITP-005
INSPECTION & TEST PLAN Rev. : 0
FOR ELECTRICAL EARTHING WORKS Page : 3 of 9
Date : 22 Nov 2011
EVA Plant & Utilities Project

1. INSPECTION & TEST PLAN

Activity and Characteristics Reference Documents Sub- Lab


No. Acceptance Criteria Verifying Documents Contractor Company
to be checked (Code/Std/Spec./Proc.) Contractor (3rd Party)

1 Material Receiving

1) Earthing system materials,bare copper Inspect for damage dimension check Material Inspection Report
00-EL-00-SS-021
wire, GV wire and grounding installation manufacturer recommendation & cerificate of (QEI-100) I W R
Para 3.8.1, 4.1 and 4.2
assoceries,thermo weld mold etc. material test Material Certificate

2 EARTHING SYSTEM

1) Equipment for construction Calibration Certification I R R

2) Electrode installation-Drilling of pits / 00-EL-00-SS-011


IFC Drawing, Earthing Layout QEI-001 & QEI-003 I W R
installation of earth rods. Para 8.0

3) Earth resistance test of individual electrodes 00-EL-00-SS-011 IFC Drawing QEI-002 I W W

4) Inspection of cable trench, where applicable IFC Drawing, Earthing Layout I W S

5) Earthing cable layout wiring 00-EL-00-SS-011 IFC Drawing, Earthing Layout QEI-001 I W R

6) Inspection release before backfill 00-EL-00-SS-011 IFC Drawing, Earthing Layout QEI-001 I W R

7) Bonding of metal equipment and


00-EL-00-SS-011 IFC Drawing, Earthing Layout QEI-001 I W W
accessories
8) Inspection for lightning system, where
00-EL-00-SS-011 IFC Drawing, Lightning Layout QEI-004 I W R
applicable

LEGEND :
I : Execution of Inspection and Test R : Review S : Surveillance W : Witness H : Hold Point

GS Engineering & Construction IPC EVA Plant & Utilities Project


IPC-CO-00-ITP-005
INSPECTION & TEST PLAN Rev. : 0
FOR ELECTRICAL EARTHING WORKS Page : 4 of 9
Date : 22 Nov 2011
EVA Plant & Utilities Project

2. ATTACHMENTS

GS Engineering & Construction IPC EVA Plant & Utilities Project


IPC-CO-00-ITP-005
INSPECTION & TEST PLAN Rev. : 0
FOR ELECTRICAL EARTHING WORKS Page : 5 of 9
Date : 22 Nov 2011
EVA Plant & Utilities Project

GS Engineering & Construction IPC EVA Plant & Utilities Project


IPC-CO-00-ITP-005
INSPECTION & TEST PLAN Rev. : 0
FOR ELECTRICAL EARTHING WORKS Page : 6 of 9
Date : 22 Nov 2011
EVA Plant & Utilities Project

GS Engineering & Construction IPC EVA Plant & Utilities Project


IPC-CO-00-ITP-005
INSPECTION & TEST PLAN Rev. : 0
FOR ELECTRICAL EARTHING WORKS Page : 7 of 9
Date : 22 Nov 2011
EVA Plant & Utilities Project

GS Engineering & Construction IPC EVA Plant & Utilities Project


IPC-CO-00-ITP-005
INSPECTION & TEST PLAN Rev. : 0
FOR ELECTRICAL EARTHING WORKS Page : 8 of 9
Date : 22 Nov 2011
EVA Plant & Utilities Project

GS Engineering & Construction IPC EVA Plant & Utilities Project


IPC-CO-00-ITP-005
INSPECTION & TEST PLAN Rev. : 0
FOR ELECTRICAL EARTHING WORKS Page : 9 of 9
Date : 22 Nov 2011
EVA Plant & Utilities Project

GS Engineering & Construction IPC EVA Plant & Utilities Project