8. a) Cement Concrete 1:5:10 in foundation with brick ballast 40 mm


thick gauge for 150 cu.m 6
b) Reinforced brickwork 1:3 cement sand mortar for 25 cu.m 6
UNIT-V
9. a) Write consideration to fix the rent of government buildings 4
b) Calculate the standard rent of a Government residential building
newly constructed at Hyderabad from the following data
i) Cost of land Rs.25,00,000.00
ii) Cost of construction of the building Rs.55,00,000.00
iii) Cost of roads within the compound and fencing Rs.10,00,000.00
iv) Cost of electricity installations 10% of the cost of the building
v) Municipal House tax Rs.2250.00 per annum
vi) Water and property tax Rs.2500.00 per annum 8
OR
10. Prepare a detailed estimate for earthwork for a portion of road from
the following data given in Table.2. Formation width of road is
12 meter, side slope 2:1 in baking and ½:1 in cutting 12
Table-2 Details of Road Formation
Chainage in (m) R.L. of ground R.L. of Formation
0 115.50 116
150 115.75 ↑
300 116.25 Upward. gradient 1 in 300
up to 900 m
450 116.20 ↓
600 117.10
750 117.85 ↑
900 119.00 Down ward gradient of 1 in 450.
up to 1500 m
1050 119.25 ↓
1200 119.10
1350 118.80
1500 118.75

[02/VI S/112]
[April-12]
[EURCE 606]
B.Tech. Degree Examination
Civil Engineering
VI SEMESTER
PROJECT ESTIMATION & CONTRACTS
(Effective from the admitted batch 2008–09)
Time: 3 Hours Max.Marks: 60
-------------------------------------------------------------------------------------
Instructions: Each Unit carries 12 marks.
Answer all units choosing one question from each unit.
All parts of the unit must be answered in one place only.
Figures in the right hand margin indicate marks allotted.
Data Book has to be provided for rate analysis quantities calculations
---------------------------------------------------------------------------------------------
UNIT-I
1. a) What are the general specifications of the I and II class buildings? 6
b) Write about detailed estimate 6
OR
2. a) Write short notes on errors in estimation, contingencies, and
types of approvals 6
b) Write the detailed specifications of Kankar stone ballast,
Bituminous painting and brick work I class 6
UNIT-II
3. a) Who is responsible for the quality and quantity of work executed
by a Sub-Contractor? What are the different types of Sub-
contractors? Explain them 6
b) Write short notes on Interim Payments and Arbitration 6
OR
4. a) Write the general and detailed specifications of road work 6
b) Write short notes on Scope of Contract Sufficiency of tender 6
UNIT-III
5. Calculate the quantities of the following items for the building shown
in Fig.1
a) Brick work in Cement mortar (1:6) in foundation 6
b) 15 mm thick plastering inside the building 6
OR
6. a) First class brickwork in superstructure 6
b) White washing inside of building 6
UNIT-IV
7. Analyse the rates for: (Adopt the quantities and rates of materials
given in Table.1)
a) 12mm plastering in 1:6 cement mortar for 100 sq.m 6
b) R.C.C. work in Beams, Slabs etc 1:2:4 for completion of
work-for 10 cu.m 6
Table-1 Rates for cost estimation
Details Rate in Rs.
For Plastering
Sand 3.6 cu.m. 70/cu.m.
Cement 2650/cu.m.
1N of mistri 208/head
12N of mason 182/head
14N of mazdoor 121/head
Scaffolding, Sundries, T&P L.S. 75
For RCC work and Brick work
Cement 3.2 cu.m. 2500/cu.m.
Sand 250/cu.m.
Stone ballast 550/cu.m.
Steel 8.00 q 1020/q
Binding Wire 3.00 kg Rs.12/kg 0.5N of mistri 60/head
4N of mason 182/head
12N of beldar 150/head
20N of coolie 121/head
8N of blacksmith 121/head
12N of carpenter 121/head
Nails, Timber, Plank L.S. 100
T&P L.S. 75