EARLY MANAGEMENT (EM)

PILLAR REFERENCE GUIDE

Early Management
PILLAR REFERENCE GUIDE

Version 3
November 2016
Page 1 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY
EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

© 2016, NESTEC LTD.

Property of NESTLÉ. For internal use only.


STRICTLY CONFIDENTIAL: no reproduction without NESTLÉ prior authorisation.

Page 2 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

TABLE OF CONTENTS
Table of contents ......................................................................................................................................... 3
Document control ........................................................................................................................................ 4
Introduction .................................................................................................................................................. 5
Target audience.......................................................................................................................................................... 5
Objective .................................................................................................................................................................... 5
The document is... ...................................................................................................................................................... 5
The document is not... ................................................................................................................................................ 5
Document map ............................................................................................................................................. 6
Pillar definition ............................................................................................................................................. 7
What is a Pillar?.......................................................................................................................................................... 7
Pillar mission .............................................................................................................................................................. 7
Pillar objectives........................................................................................................................................................... 8
Pillar role .................................................................................................................................................................... 8
Pillar Implementation Strategy ................................................................................................................... 9
Starting EM Pillar ........................................................................................................................................................ 9
EM Implementation CYCLE ...................................................................................................................................... 10
Expected Contribution to TPM Maturity Phases ....................................................................................................... 13
Interactions with the other Pillars .............................................................................................................................. 14
Pillar methodology .................................................................................................................................... 16
Description................................................................................................................................................................ 16
EM Systems ............................................................................................................................................................. 16
Synchronization of Activities ..................................................................................................................................... 17
Interactions between EM Cycle and Projects ........................................................................................................... 17
Expected Results – Measures .................................................................................................................................. 19
Waste Prevention....................................................................................................................................... 21
Description................................................................................................................................................................ 21
Activities ................................................................................................................................................................... 21
Deliverables .............................................................................................................................................................. 25
Standards & Feedback .............................................................................................................................. 26
Description................................................................................................................................................................ 26
Activities ................................................................................................................................................................... 26
Deliverables .............................................................................................................................................................. 31
Project Management Foundations ........................................................................................................... 32
Description................................................................................................................................................................ 32
Activities ................................................................................................................................................................... 32
Deliverables .............................................................................................................................................................. 35
Operations & Start-up Management ........................................................................................................ 36
Description................................................................................................................................................................ 36
Activities ................................................................................................................................................................... 36
Deliverables .............................................................................................................................................................. 39

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 3 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

DOCUMENT CONTROL
Changes made
Date of update Updated by Status of
(Section numbers and Version #
(dd/mm/yyyy) (Author name) document
description)
02.09.2013 Jose Ferrato EM Pillar Reference Guide 1.0 Superseded
01.09.2015 Jose Ferrato EM Pillar Reference Guide 2.0 Superseded
Complete revision of the
24.11.2016 Robert Le Dortz 3.0 Released
document

Page 4 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

INTRODUCTION

TARGET AUDIENCE THE DOCUMENT IS...


The target audience for this document is any  Aligned with the St-00.907 - Corporate
person involved in an industrialisation project. Engineering Standards that describes
the principles of Project Management
For instance Market TPM Managers, EM Foundations and provides an
Pillar leaders and members, Chief Engineers, introduction to EM methodology.
Factory NCE Coordinators, Other NCE Pillars  An integral part of the EM Pillar
Leaders and members, Project Managers, Framework (refer to the Support
Application Groups and TCUs. Materials in the EM Pillar Knowledge
Centre).
It can be used as a reference at different
levels of the organisation (Factory, Market,
Function, R&D and NPTCs). THE DOCUMENT IS NOT...
 A training document or a set of
OBJECTIVE examples.
This document explains Early Management  A description of the EM Pillar structure,
roles and responsibilities and
methodology which is the way to manage
management routines. This information
industrialisation projects in Nestlé. It covers
is available in the EM Pillar Framework
any project with direct impact in
(Support Material for EM Pillar Reference
manufacturing, including recipe introduction
Guide), which you can find in the TPM
or changes, lines installation/modification,
Knowledge Center.
packaging change and other.
Early Management enables multifunctional
collaboration for continuous improvement of
the delivery of new product, equipment and
processes, achieving sustainable Vertical
Start-up.
It also reinforce the importance of establishing
and using standards during industrialisation
projects.

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 5 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

DOCUMENT MAP

This document is part of the TPM Knowledge Center. The link below gives you access to this
Knowledge Center and other TPM related documents (Implementation Strategy, Governance,
Pillar Reference Guides and Support Material).

Page 6 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

PILLAR DEFINITION

WHAT IS A PILLAR?
Early Management aims to build and sustain
What it is capability for industrialisation excellence,
The EM Pillar is a team of people who have enhancing cooperation between R&D,
expertise in, and disseminate, Early Operations and Project Teams in a
Management methodologies. consumer-driven war to eliminate waste from
initial new design to full-scale production.
A “Pillar leader or member” is usually a role,
not a position. Refer to the NCE Operating
Framework for details.
What it does…
It builds people competency on the EM
methodology through training, coaching and
assessments.

PILLAR MISSION
Our mission is to enable our people to deliver
Manufacturing Excellence through
industrialisation projects. This means launch
new equipment, processes and products with
a sustainable Vertical Start-Up, so that
business objectives are reached at the right
time and at the right cost.

In every industrialisation projects, with or


We provide a set of practices that engage our
without investment, Early Management also
people to deliver loss-free manufacturing
delivers Manufacturing Excellence by setting
systems by working cross-functionally,
Standard routines from the beginning of
implementing established Standards and
operations.
Best Practices with discipline and re-applying
what they’ve learnt from experience.

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 7 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

PILLAR OBJECTIVES PILLAR ROLE

How to fulfil the mission What the Pillar does


A Pillar’s role comprises the following four
The primarily objective of EM Pillar is to enable activities:
our multifunctional Project Teams, which
includes NPTCs when required, to deliver loss-
free manufacturing systems impacting in all  Methodology:
dimensions of Manufacturing Excellence: the Pillar should master the methodology
Safety, Sustainability, Quality, Cost, and tools in order to support the
Availability and ultimately Asset Intensity. organisation (methodology and tools are
designed by Master Pillars)
To do so, we will:
 Promote a waste prevention mindset,  Training:
enhancing collaboration on losses analysis the Pillar provides training on Pillar
(with FI Pillar) that enable Project Teams methodology and tools.
to understand manufacturing losses in
existing solutions and plan for its  Coaching:
elimination in every industrialisation. the Pillar coaches on the application of
Pillar methodology and tools.
 Promote and foster a “Vertical Start-Up”
mind-set amongst all project stakeholders.
 Assessment:
 Provide systems to assure projects will be
the Pillar ensures the right application of
designed and resourced for Manufacturing
the methodology and tools.
Excellence from the start.
 Leverage existing company and category
standards, promote learnings and
improvements from existing manufacturing
systems, as inputs to new projects.
 Develop collaboration between
Operations, R&D and Categories for better
understanding of manufacturing
requirements based on the TPM initiative.
 Develop Project Teams and improve their
competencies to use EM methodology and
tools as part of the end to end project
management process.

Page 8 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

PILLAR IMPLEMENTATION STRATEGY

STARTING EM PILLAR
At Market Level At Factory Level
The launch of EM Pillar at Market level is For launching the Pillar in factories, it is
aligned with the TPM implementation Plan of necessary to have a Market EM Pillar
the market. As soon as the first factory of launched. Factory EM Pillar will be launched
market gets ready for progressing to Phase as part of the TPM Phase 1 implementation,
1, the pillar should be launched and its as illustrated in the image below. For
members trained to better support the factories where important Industrialisation
achievement of Manufacturing Excellence projects are forecasted, it is also
through industrialisation. recommended to launch the EM pillar as
early as possible in order to start building
capability in the teams.

Picture 1 NCE Advanced Practices Implementation Steps

At Greenfield Level 2. The Project team need to be trained


in EM Methodology and apply EM
Greenfield projects are to be implemented
Methodology and tools.
according to EM methodology. As a general
requirement, it is expected that new factories
open their Gate and reach TPM Phase 1 Note that Leadership Development (LDv)
within the first year of operations. requirements may not be fully satisfied at the
For this reason, the following aspects need to time of Gate Assessment and should be
be taken into consideration: reviewed later on as per Market NCE
strategy.
1. EM Pillar has to be launched at
Market level and trained to support
the Greenfield project.

Page 9 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

EM IMPLEMENTATION CYCLE
Description needed for the market and factories to deliver
Early Management Pillar works in a cycle of Operational Excellence.
continuous improvement that helps to Once the Market and selected Factories have
consistently develop internal capability for met the conditions to launch the pillar they
preventing waste in each industrialisation need to set the cycle and perform it at least
project selected in the OMP. By leveraging once a year and every time there is a
this cycle we keep ensuring that every effort significant change in the OMP or in the
we put on Industrialisation delivers the short projects portfolio, such as changes in
term business results and also sets the long priorities, new business requirements, major
term industrial capabilities and competencies organisational changes, etc

Picture 2: EM Cycle and relationship with OMP

Roles and Responsibilities

In order to guarantee consistency and functional approach. The table below


alignment the execution of the EM cycle provides guidance on the different people
should be performed with a cross- involved in the process.

Page 10 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

At their respective level, EM Pillar leaders


play an active role of facilitator for the
different steps of the EM Cycle.

Lead Participate
Market NCE Champion
Chief Engineer Market TPM Manager
Market Level
I&R Manager FI Market Pillar Leader
EM Pillar Leader
Factory EM Pillar Leader
Factory TPM Coordinator
Factory Level Factory manager
FI Pillar representative
Factory Executive Committee

1. Understand previous projects results  Collect through the other pillars


(I&R, Capex, improvements projects): what are the typical operational
Even prior to the pillar being set-up issues delivered from projects.
(either at market or at factory level), there
is a legacy from previous projects. It is 2. Understand current losses:
very important to understand the lessons It is important to understand the current
learnt from previous successes and losses that exists on the manufacturing
failures. This understanding will help the area to ensure industrialization projects
pillar to drive more efficient will effectively contribute to their
industrialisation efforts to reach business elimination and to prevent future ones.
objectives. For that is critical to include at least:
The investigation should include at least  Loss tree analysis from the
the following elements: market factories (LTA)
 Analyse the effect that recent  Loss tree analysis from similar
projects have had on business factories in the category(LTA)
results and what has been their  Detailed analysis on unplanned
contribution and impact. and planned stoppages
 Identify -in previous and existing  Category benchmarks on the
projects- the different problems, in losses for specific line design.
particular the ones that are most FI Pillar can help to get detailed
common across projects. understanding of current situation, and
 Identify also the best practices prioritize losses.
that may have helped prevent
problems before the project start-
up phase/product launch.
 Find what are the typical 3. Understand market and factory
resources, the timelines to deliver competencies:
the projects and how they have Map EM competencies currently
been influenced by the best available at the market and at factory
practices and problems levels and their contribution to
previously identified. continuously improve the results of the
projects. This mapping has to be done for

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 11 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

project teams, project sponsors and any  Establish competence matrix


other relevant stakeholders. Understand for project teams to understand
which competencies should be prioritized their strengths and opportunity
for short and long term success. areas and built development plan
accordingly.
Overall competency level of the  Ensure awareness for
concerned operational staff should be Market/Factory Leaders on the
evaluated as well. basic concepts behind EM to
inspire the organization.
4. Understand projects portfolio  Establish training calendar for
contribution to business priorities: the market, factories and project
Industrialization projects are expected to teams based on competencies
contribute to Business short and long required.
term objectives. Therefore a clear  Ensure collaboration with E&T
understanding of the integrated project Pillar to support this activity.
portfolio has to be developed, at
categories, market and factories level.
Then the priority projects EM Pillar will 6. Execute pillar implementation plan
focus on can be identified and selected. and projects and monitor progress:
The EM pillar drive results via the
For the first iteration, the Pillar should be development of the project teams. To
launched after this 4th step at the latest. achieve such purpose the EM Pillar team
should establish:
5. Develop pillar implementation plan to  The specific coaching sessions
support projects execution: for the project teams, particularly
Based on the results of the previous cycle during critical periods of the
steps, the EM Pillar Implementation Plan project development (i.e. losses
provides the guidance for the pillar understanding, definition of CQV
members on what are the required plan, etc.)
competencies to be developed during the  The proper project routines that
year. Support from other NCE Pillars may support the project teams to
be required. autonomously check the health
of project progress. (DOR;
In that sense the EM Pillar WOR).
implementation plan contains the specific  The project governance routines,
activities required to train, coach and enable steering committees and
assess project teams and their project teams cascading /
connection with each project specific escalation process as well as
milestone. change management when
The EM development plan should be required. For more information
aligned to the business needs. on how to establish a proper
At Market/Factory Level: routine, refer to the GA
 Develop EM coaches at the Reference Guide.
market/factory to provide
capability to the coming project
teams.

Page 12 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

EXPECTED CONTRIBUTION TO TPM MATURITY PHASES


The image below, illustrates the minimum expected contribution of the EM Pillar to the TPM
Maturity Phases for factories.
At Market level, setting-up the EM Pillar is required before launching pillars in factories to support
capability building and proper deployment.

Picture 3: Contribution of EM to TPM Phases

Page 13 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

INTERACTIONS WITH THE OTHER PILLARS


As Early Management intends to deliver Factory level the interactions will be triggered
Manufacturing Excellence through projects, it while running through the EM Pillar
is of paramount importance that all the Implementation Cycle with the proper level of
requirements coming from the other NCE collaboration between all required
Pillars are well understood so that project Stakeholders. That way the priorities can be
results can reach expectations. In order for set regarding capability building and
the results to be obtained, the other Pillars consistency can be ensured between TPM
also have developed specific methodology Roll-Out and Projects Portfolios.
and tools. What is really important to consider here is
Therefore, other Pillars need to support and not only the current status of TPM
build competencies of the EM Pillar leader implementation within the organization but
and members at the different levels of the also the forecasted one at the time projects
organization (Market and Factory Pillars, will deliver operations.
Projects Teams). As a result, the outcomes
of the project will be consistent with the NCE
As a consequence of these considerations,
Advanced Practices Maturity Phases
the impact on the resources allocation plan of
expectations and standards.
the organization need to be evaluated and
The chart below illustrates some key relevant decisions taken.
interactions (gives and gets) between each of
the NCE Pillars and EM Pillar. At Market and

Picture 4: Examples of some interactions between EM and some other Pillars

Page 14 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

At project level, from a practical point of view, part of their scope, as well as they plan and
these interactions are triggered as part of the receive the necessary support during the
project team’s activities during the project project execution.
preparation and execution. This will ensure
project teams consider other Pillar’s inputs as

Page 15 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

PILLAR METHODOLOGY

DESCRIPTION
In our journey toward Manufacturing Start-Up will be delivered if and only if the
Excellence it is critical that for every activities of each of these systems are
industrialisation project and each time we performed in a synchronized way. This
introduce a new technology or product to a requires good cooperation between all key
factory a clear focus is made on designing stakeholders, specifically Operations,
“waste out”. For that purpose, all project Categories and R&D. Deep involvement and
related activity have been classified into 4 strong collaboration of key equipment
main systems that are described below. It suppliers may also be required.
must be highlighted that sustainable Vertical

EM SYSTEMS
The 4 different systems and their purpose are Project Management Foundations
described below:
Provide the disciplined way for the teams to
Waste Prevention steer and deliver projects, including the
Ensure clear identification and understanding sequencing of activities
of losses and provide ways to prevent them.
Operations & Start-up Management
Standards and Feedback Ensuring the Operational preparation and
Ensure adherence to Standards and enable Start-Up execution required to enable
continuous learning from projects and current Vertical Start-up.
manufacturing operations

Picture 5: the 4 EM Systems

Page 16 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

SYNCHRONIZATION OF ACTIVITIES
Project’s activities required are sequenced planning, scheduling and controlling, and
through a Multi-Functional Project Workflow, thereby avoiding the waste of time, money,
a stage gate process defined to conduct any and resources. All the required activities are
industrialization projects within Nestlé. It grouped in the Task Completion Checklist.
covers all the key tasks in a project’s At each step and for each activity, the
execution, as well as the milestones and expected Deliverables are clearly defined
gates required to monitor and control the and available for the Project Teams.
project. For more information about Project Workflow
It reflects internal and external best practices please refer to the EM Knowledge Center.
in project management and provide structure
to project management, standardization in

Picture 6: Project Workflow

INTERACTIONS BETWEEN EM CYCLE AND PROJECTS


While the EM cycle should be triggered and These activities are organized and
executed at least on a yearly basis, projects sequenced throughout the steps of the
follow their own lifecycle. Project Teams will Project workflow.
apply EM methodology in their projects by Interaction between projects and EM Cycle
executing activities from all 4 systems in a can be represented on the following picture.
synchronized way.

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 17 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

EM Pillar follows a continuous improvement cycle…

…while each project team follows the project workflow

Picture 7 – Interactions between EM cycle and projects

Page 18 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

EXPECTED RESULTS – MEASURES


Project Measures established, to clarify how each function
The EM methodology must be applied to contributes to its achievement.
manage industrialisation projects, with or These elements are presented in the
without investment. In order to drive the good following table.
quality of implementation and the The frequency of monitoring is a
achievement of the results, Vertical Start-up recommendation and may vary depending of
has been defined as the key final measure for the project size and complexity. It can also be
project success. adapted as required during the project
It has been broken down into PPIs and APIs, execution, according to point of focus at a
and a Vertical Start-up dashboard was given time.

Expected
Type Measure Frequency Why do we need this measure?
result
At the end of This is the final measure of project success
PPI Vertical Start-up Yes
the Project (see details in the next section)

To ensure we learn from previous


API % Adh. to standards Quarterly 100%
experience and sustain knowledge
% Adh. to improvements To ensure we learn from operational
API Quarterly 100%
replication continuous improvement activities

To track how the project is working on the


% Adh. to loss prevention
API Monthly 100% loss prevention opportunities identified at
plan
early stages

To ensure operators, technicians and staff


have the right competencies to operate and
% Adh. to development
API Monthly 100% maintain the new manufacturing solution,
plan
including competency on TPM reliability
pillars.

To ensure projects are on track and


API % Adh. to Project workflow Quarterly 100% capturing their learnings in the milestone
PDAs
Recordable Injury Rate To ensure we care about our people during
KPI Monthly 0
(RIR) project implementation

To constant monitor project expenditure


PPI % Adh. to expenditure plan Monthly 100%
against the plan

To measure the quality of the initial plan of


API # of Scope Changes Monthly 0
the project

Additionally to the measures above, for


The three last measures are already as per projects with investments, it is expected that
St-00.907 - Corporate Engineering the equipment and operators pass through
Standards. an AM assessment according to TPM/AM
Pillar requirements.
The detail of the calculation can be found into
the EM Measures Manual which is available
on the Knowledge Centre.

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 19 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

Vertical Start-Up
Definition
EM aims for flawless introduction of new  …has been delivered and validated
products and equipment, impacting all 5 for Manufacturing Excellence
dimensions of Manufacturing Excellence.  …is free of problems and with
This means launch new equipment, minimum waste
processes and products with a sustainable  …has been delivered On time, Right
Vertical Start-Up, which is defined as follows. First time
 …had capabilities built from a defect
It is a measure of Project Success that shows free design to deliver a defect free
that the new production system: operation

Picture 8: Vertical Start-up Chart

Measure
A line achieves sustained AI ≥ 80% in less  Technically Acceptance Time Line
than 100 days after commissioning Agreed for selected SKU’s
completion. It applies for both new and
modified lines. In Full Ramp-Up Elements:
The key contributors for achieving this are:  Ramp up Plan Agreed based on
Success Criteria validated by Steering
On Time Elements: Committee on MS2 / Go to Industrialize
 Commissioning completion on time: No Gate.
gaps on installation, on functionality,  Volume for Product Launch Gate by
Safety or food safety. Confirmed with SKU
Steering committee at Gate Go to  Asset Intensity Target Sustained for 3+
Qualification Meeting (MS6). weeks

Page 20 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

WASTE PREVENTION

DESCRIPTION
Why / purpose
As described the primarily objective of EM preventive actions taken as part of new
Pillar is to enable our Project Teams to projects, to avoid same issues to reoccur.
deliver a loss-free manufacturing solution. The continuously application of this process,
It is understood that the Product Cost may be project after project, will contribute to build a
affected by different kind of losses, as ‘loss-free by design’ mindset, and to achieve
illustrated in the image below: Manufacturing Excellence with every project.
Waste Prevention System groups the
different activities that will enable the Project
Teams to remove waste by design.

ACTIVITIES
 Understand Losses
 Set Target
 Prevent losses

Picture 9: Product Cost contributors Understand Losses

Manufacturing Losses covers any kind of Why / purpose:


losses during the manufacturing process, like To have a detailed understanding of losses in
quality or productivity losses, for example, existing similar operations, as well as losses
which will directly impact the Cost of that occurred in previous projects.
Production (CoP) and, consequently, the
Product Cost.
Description:
The Business Losses are impacted by
At the beginning of a project, the Project
Time-to-Market, missed opportunity and
Team must build a clear understanding of
others.
losses from existing similar operations,
Finally, Project Losses groups all kind including incidents, consumer complaints,
losses generated due to mistakes or waste, quality defects and stoppages. Once
omissions during project planning and the targets are set, this information will
execution. It can generate delays, enable the team to evaluate the gaps,
overspending, extra start-up costs and prioritize them and plan the actions that need
ultimately, manufacturing losses into future to take place, in order to ensure the new
operations. projects won’t bring the same losses and
In order to continuously improve the results therefore deliver below expectations.
delivered by our projects, it is essential to The Project Team should also understand
learn not only from previous projects, but also the losses generated during previous project
from existing and/or similar operations. execution, which are captured through the
Existing losses identified need to be analysis of Project Learnings. More
analysed, its root cause understood and

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 21 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

information is available in the Standards and Current Operations Assessment (COA): in


Feedback System. order to understand the current issues in
similar operations, the readiness of the
The following processes and tools will technology, the best practices and the
support this activity: organization culture in the project, including
operational competencies gaps.
Loss Tree Analysis (LTA): in order to have Benchmarking and tagging (for equipment)
a pragmatic and detailed understanding of activities are recommended to be performed
existing losses, organized by categories and in order to enrich the understanding of
based on a cost perspective. current operations.
The following table shows the different Even similar equipment not under TPM
manufacturing loss categories, which will be implementation can be the object for tagging
identified in the analysis. for a project purpose.
For more details about LTA, refer to the FI
Pillar Reference Guide. Quality Matrices (QX/QM): QX Matrix
correlates defect modes, machine
components, process parameters and
machine settings, while QM Matrix identifies
the process conditions that have significant
impact on defects (Q Factors) and the way to
control them.
The understanding of these matrices will
enable the Project Team to improve the
machine settings control, in order to prevent
quality defects.
For more details about the Quality Matrices,
refer to the Q Pillar Reference Guide.

Learning from previous projects: beyond


learning from current operations, it is also
important to analyse previous projects
execution to learn from their experience and
also capitalize on their positive deliveries.
For more information, refer to the “Standards
& Feedback” system, later in this document.

Picture 10: Loss categories


Losses across the Value Chain: the impact
of the project on the whole Value Chain
Identify, Prioritize, Assign (IPA) and data
should be considered and eventual losses
collection: will be used to collect and stratify
identified properly. Specific activities such as
any other losses not captured in the LTA
IBO (Identifying Business Opportunities),
(incidents, consumer complaints, water and
CCVP (Consumer and Customer Value
energy consumption, etc…).
Proposition), VSM (Value Stream Mapping)
Refer to FI, Quality and SHE Reference can provide useful information. Refer to
Guides for more details. LEAN Initiatives reference documentation for
details.

Page 22 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

Set Targets Prevent Losses

Why / purpose: Why / purpose:


To define targets for the main losses Ensure projects delivers loss-free solutions,
categories (PPIs), in a way the project can enabling them to achieve sustainable Vertical
deliver on the 5 dimensions of Manufacturing Start-up. As a result new manufacturing
Excellence. system are expected to satisfy the 6 following
EM performance concepts:
Description:  Safety: designed safe to operate.
In order to deliver on the expected KPIs, the Covers the “free from” dangerous
Project Team should set clear targets on the operations and maintenance tasks.
contributors (PPIs).  Quality: designed for quality.
As example, in order to deliver 80% of Asset Covers the “First Time Right”
Intensity in a manufacturing line, the Project requirements for a quality defect
Team need to define what will be the target free operation.
for Unplanned and Planned Stoppages, as  Reliability: designed for “high
well as for Speed Loss and Waste & Rework, performance”. Covers the
in order to enable the targeted AI. More requirements to ensure stable
details on Asset Intensity can be found in the production at the desired level of
Standard GI-21.010 - Performance Asset Intensity.
Measures for Manufacturing.  Operability: “easy to operate”, with
minimal ongoing operator
The following processes and tools need to be intervention.
used to perform this activity:  Maintainability: “easy to maintain”
by understanding critical
Target Setting Allocation (TSA): used to components life cycle to prevent
evaluate and define performance targets for breakdowns.
the manufacturing systems, assessing how  Affordability: designed for optimal
improvements at Asset Intensity PPIs levels “Total Cost of Ownership” of the
(change over, unplanned stoppages, etc…) manufacturing system and its
will affect the AI. components.

Identify, Prioritize, Assign (IPA): Provides


Description:
robust data analysis to identify improvement
opportunities and a structured way to To eliminate the identified losses according
prioritize activities. The IPA methodology to the targets defined.
establishes how many improvement activities Different methods and tools may be used for
are needed to achieve a given target based losses prevention, as presented below. They
on the quantitative contribution of each should be applied based on existing
improvement activity. operations and their outputs should integrate
For more information about IPA, refer to the the design of new manufacturing solutions.
FI Pillar Reference Guide. Tools have to be selected according to the
losses identified that have to be prevented.

Problem solving tools (GSTD/DMAIC):


provide problem-solving methodologies to
effectively address and eliminate different

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 23 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

types of problems/losses with varying levels eliminate the root cause of losses, in the
of complexity. design. Verification that activities results will
meet forecasted targets can be ensured
Single Minute Exchange of Die (SMED): during Design Reviews as described in the
enables optimization of planned stoppages, Project Management Foundations system.
with direct impact on Asset Intensity. Additionally to this, it is also important to
confirm that the actions taken are delivering
Failure Mode and Effect Analysis (FMEA): the expected results in later stages. This will
is a technique used to identify, prioritize and be done during:
eliminate potential failures within a system, in
order to implement countermeasures to Factory Acceptance Test (FAT): is the
prevent failures. opportunity to perform safety tests, static
tests, dry tests without product, and
Value Stream Engineering Design (VSED): performance tests with product in a new
provides a systematic approach to optimize piece of equipment under near production
basic plant designs, ensuring the most long conditions at the manufacturer’s facility prior
term value, optimizing process flows, line it is delivered to the factory.
layout. The FAT is a contractual requirement that
prevents shipping a machine that does not
Breakdown Analysis (BDA): is a process to meet the requirements specified in the
understand root cause of machine contract with the supplier.
breakdowns and identify countermeasures to
prevent them to happen again in the future.
For more details, refer to PM Reference Induced Failure Test: to confirm the
Guide. capability of the equipment and the operators
in identifying failures and recovering from
Implement operational standards: through them.
NCE implementation, factories will create The test can be performed mainly during the
important standards and routines to eliminate FAT, while running or dry cycling the
losses and sustain results. It includes CIL, equipment, inducing or simulating a failure.
Centerlining, Planned Maintenance, etc. Then confirm that the failure has been
properly identified and that the operator can
Those standards, when incorporated as
restart the equipment.
inputs to new projects, will also help the
prevention of losses as from the start-up.

The methods and tools above will be not only,


but predominantly, used at early stages of a
project, to provide the Project Team with the
detailed information on what to do to

The image below illustrate how the Waste


Prevention system can be applied to the
different equipment considered into a project.

Page 24 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

Understand Losses Prevent Losses Set Targets

ES 2 days EF

Eqpt. A
SMED Eqpt. A

Eqpt. B
Changeover Changeover

Eqpt. Z
Planned

LS LF

losses
Planned
Start/Shutdown Start/Shutdown

20%
Plan. Maint. Plan. Maint.
losses

ES 3 days EF
35%

CIL BDA Eqpt. B CIL


LS LF
Eqpt. B

3 days

80% Asset Intensity


ES EF
Eqpt. Z

FMEA Eqpt. B
65% Asset Intensity

Eqpt. A Breakdowns

Unplanned
Unplanned

Breakdowns LS LF
Waste/Rework Waste/Rework

Minor stops ES 2 days EF Minor stops

Speed Loss FMEA Eqpt. Z Speed Loss

LS LF
Eqpt. Z

Eqpt. A

ES 2 days EF
Eqpt.
B

Qx Matrix Eqpt. Z
LS LF

Line level Equipment / Machine level Line level

Picture 11: Illustration of the whole “Waste Prevention” flow

DELIVERABLES
Activities Deliverables
 Pareto of losses from previous projects,
 Pareto of losses from existing similar
operations,
Understand losses  List of taggings put in existing similar
equipment,
 List of operational standards (CIL, Centerlining,
etc.)
 Clear targets at KPIs and PPIs level
 Appropriated contribution analysis,
Set Target
demonstrating that the deliverables of the PPIs
will ensure the KPI results.
 Operational standards implemented (CIL,
Centerlining, etc.)
 Achievement of targets defined, through the
Prevent losses
loss elimination activities identified (SMED,
GSTD, FMEA, etc.) and performed from the
design.

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 25 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

STANDARDS & FEEDBACK


 Implement required Standards
DESCRIPTION  Collect Project Feedback
Why / purpose
Standards refer to written definitions of Perform Pre-Project Review
proven current best practices related to
equipment, building, operations, products
Why / purpose:
and materials. As described in the “Nestlé
Way for Standards in Manufacturing” The pre-project review ensures that
(NWSM), they can be either Generic, Standards, best practices and key data
Category Specific or Local. applicable to the project are identified and
reviewed since the early beginning. The
Standards are usually owned by CO / CT
ultimate aims are that:
functions (Generic), NPTC / TCU (for
Category Specific) or directly by factories - The project’s outcomes comply with
(Local). the existing applicable Standards.
- The project’s outcomes satisfy the
The “Standards & Feedback” system is a
standards requirements for AM
key component of Continuous Improvement
Step3, as a minimum.
and as such aims to ensure that:
- Existing applicable Standards are - Clear alignment is built on which key
implemented properly learnings can be reapplied to prevent
- Valuable learnings from previous the repetition of issues detected in
projects as well as improvements existing operations and/or previous
from ongoing operations are projects.
reapplied
- Standards, specifications or any
Description:
project key data can be updated (or
created) Several sub-activities can be performed
which will help to build a 360° vision.
Key data relates to performance of existing
lines, downtimes, breakdowns, quality - “Understanding Losses” activities as
records, consumer complaints, etc. described in the system “Waste
Prevention”.
The process that describes how to create - Review required minimum technical
Standards is covered in the NWSM expectations to enable AM Step 3.
documents and is not described in this
- Review and align all other
Reference Guide. Nevertheless it is key to
consider that in case of first industrialisation, expectations for the TPM maturity
good application of Early Management and level the project has to satisfy.
proper usage of “Standards & Feedbacks” - Review of the “Project Learnings
system can contribute to Standards creation. Analysis” from previous projects in
the same factory, in the same market,
ACTIVITIES on similar lines or equipment, in the
same category, etc.
The “Standards & Feedback” system can be
- Review of the Technical and
structured around 4 main activities.
Business Post-Project Evaluations
- Review of the existing validated
 Perform Pre-Project Review improvements in MP Data Base.
 Collect Factory Feedback

Page 26 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

- Extensive collaboration with NPTC, establish by PM and consistent with NWSM


TCU/PCU, Subject Matter Experts requirements for the category must be used.
and review of the existing Defects
Prevention Checklist for their relative
Establish List of Improvements
Standards
Most of all, it must be highlighted that this
review does not consist only in reviewing The improvements that can be reapplied or
become a Standard in the future must be
documentation but also Go and See in other
documented in an Improvement Register
locations and take the opportunity to share (see below) and included into a List of
directly with Standards Owners, previous Improvements, where all the Improvements
projects teams and Operations staff. are gathered. If EM Pillar is not already
Any intention to reapply a learning has to be launched at factory level, this document has
properly documented with facts and figures to be maintained by PM Pillar.
and clear references have to be described in The criteria to define “Improvements” can be
the project documentation. as followed:

- Change has delivered the


Collect Factory Feedback improvement with direct impact on
Manufacturing Excellence.
- The improvement is replicable within
Why / purpose: the factory or to other factories.
The aim of this activity is to take - The improvement can be applied to
acknowledgement of AND/OR to provide the other projects
potential improvements that have been made
As a basic rule, this is the responsibility of the
at factory level during normal operations and
Standard Owner to decide whether the
that can be reapplied.
improvement can be reapplied or not.
This feedback process can impact each type
of Standards (Generic, Category Specific or
Register improvements
Local)

In order to describe the technical changes


Description: more in details, a template called
To generate, analyse and communicate Improvement Register (Maintenance
feedbacks from Operations, several sub- Prevention Data Sheet) has to be used. This
activities have to be performed, as following: template will collect all the technical details
and information needed to ensure the
Standard owners can evaluate and validate
Manage Changes (MoC) the change, allowing correct replication to
new machines and equipment as well as to
existing ones (includes description of the
All the improvements and modifications change, reason, benefits, and results
triggered or executed by the AWG/MWG achieved).
throughout TPM journey, as well as problem When applicable, a Standard Operational
solving activities carried out throughout FI Procedure (SOP) should be updated to
projects (DMAIC, SMED…), have to follow reflect the changes.
rigorously the Management of Change
Process as described in the St-21.114. These documents should be uploaded in
For proper identification of the equipment GLOBE as part of the MoC process and will
concerned, the standard FLOC structure serve as a basis for sharing.

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 27 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

Share Improvements fully part of the project scope and that the
persons in charge of the implementation
have the required level of competence.
Once the decision is made to select an
improvement for reapplication beyond the Adherence to the Standards should be
“Local” level then it has to be communicated controlled during Design, Implementation
in a structured way to all the areas and Start-Up phases by the relevant authority
concerned, depending of the type of depending of the level of Standards
Standards impacted. (Category Specific, Generic, Local). This can
be done through specific “Design Reviews”,
The Responsible for proper communication
as described in the “Project Management
remains the Standard Owner.
Foundations” system. Final validation is
required prior to Start-Up.
For the technical Improvements, a specific
tool - called Maintenance Prevention Data
Base (MPDB) - has been designed in order Collect Project Feedback
to support effectively the sharing process.
This is a central and global searchable Why / purpose:
database which is accessible by all Nestle
users. The MP DataBase is structured by The purpose of this activity is to capture
Product category (as defined per NWSM) learnings from a project (positive learnings or
and based on the standard functional location negative ones) in order to prevent similar
(FLOC) structure established for each of defects to happen in future projects (or even
these category through the Modularization in the following steps of the same project) as
process. well as to reapply positive learnings.
The learnings and feedbacks provided may
impact all level of Standards.
Once validated by the Standard Owner, the
documents created during the MoC process
(MP Datasheet, SOP) can be uploaded on Description:
the MPDB then shared within the community To generate, analyse and communicate
concerned by this change depending of its feedbacks on a Project, several sub-activities
type (Generic, Category Specific). can be performed at different time of the
project lifecycle and with different impacts or
benefits, as following:
Implement required Standards
Analyse Project Learnings
Why / purpose:
Once the Pre-Project Review has been
This activity consist in capturing the learnings
performed and clear alignment has been built
at each step during project’s lifecycle. The
on which Standards must be applied and
learnings can be either positives ones that
which learnings has to be taken into account
can be reapplied (Best Practices) or negative
and replicated, it is key to implement in a
ones (Defects).
flawless and consistent way.
Positive learnings have to be recorded and
share among the community in the more
Description: appropriate manner in order to ensure
The responsibility of project team is to ensure replication or Standards Improvement.
the identified Standards and learnings are

Page 28 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

For the Defects, a detailed Analysis has to be Perform Project Final Evaluation
performed. It consists in identifying in which
project step each defect were found and in
The final evaluation of the Project and its
which project step the defect would have
results is performed at different level and
been avoided.
with different timeline depending of the
An evaluation of the impacts of each defect purpose. The following elements can be
on the 5 dimensions of Manufacturing mentioned.
Excellence has to be carried on as well as a
Root Cause Analysis.
 Perform Technical Post Project
During Project preparation or execution,
Evaluation
learnings and changes are captured at each
project milestone and analysis is performed The scope of this activity is primarily technical
by the project team. Here the main purpose (technology and project management) and
aims to summarize the project achievements
is to prevent similar defects to happen during
compared with the agreed success criteria.
the next project steps. This may require
changes in the Project Management Plan.
During Project Closure, a final exercise also  Perform Post-Launch Analysis
has to be performed. This exercise should be The review visit covers all the issues and items
performed by a cross-functional teams with which relate to effective and efficient technical
representatives from technical, commercial transfer of the product and process into
operations, from the R&D brief stage through the
and management so that leanings can be
development phase, the factory trials, the
shared quickly throughout the organization. industrialization, the launch period and the post-
To support the Project Learning Analysis, a launch period.
specific tool (called Project Defect Analysis -
PDA) has been developed. Further details on
how to perform this analysis and how to use  Perform Business Post Project
the PDA tool can be found in the ED-221.30. Evaluation
The scope of this evaluation is primarily
financial and commercial and aims to
Update Defects Prevention Checklist
summarize the project achievements
compared with the expected targets.
All the defects identified during the Project
Learnings Analysis and related to existing
Standards must be discussed with the
concerned Standard Owners and trigger Use of Learnings from Projects
some changes for improvements if required.
Moreover, for each technical Standards, a Learnings from projects can be used in
Defect Prevention Checklist can be built. different ways at different levels and for
This Checklist which comprises technical different purposes, as explained below.
YES / NO questions and ensures that the  Learnings from the project used for the
previous identified Defects are not repeated. next steps of this project
It will be used by the respective Standard  Learnings from the project used as inputs
Owner in order to guide, coach and challenge for other running or future projects (in the
the project teams during project preparation same factory, in the same category, in the
and execution. market or even at global level).
 Learnings from all the projects at factory
or market level used as inputs for the
understanding of project results (1st step

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 29 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

of the EM implementation cycle) and inputs to feedback and strengthen the


maturity level assessment. methodology.
 Learnings from the project used as inputs
to feedback design or existing standards The process for sharing learning has to be
defined for the category. defined at Market level and at Category level
 Learnings from all projects (on a factory, in order to ensure a proper diffusion across
in a category, in the market, at zone level
project teams and factories.
or even at the Centre level) used as

Page 30 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

DELIVERABLES
Activities Deliverables

 Requested Standards for the project


identified. Standards Owner contacted.
Perform Pre-Project Review  Learnings from previous projects formally
reviewed
 Lessons learnt fully included into Project
Scope
 MoC in place (according to St-21.114)
 List of improvements available
 Improvements documented on
Collect Factory Feedback
“Improvement Register” template
 Sharing of improvements performed
through the MP DataBase
 Defined Standards implemented with
proper validation (ZCTM, TCU, PCU,
CTAG, Zone Chief Engineer…)
Implement required Standards
 Required Operational Standards
implemented, as stated in “Waste
Prevention”
At Project level
 Milestone PDA executed
 Final PDA executed
 If required Defect Prevention Checklist
completed with Standard Owners
 Technical Post-Project Evaluation
performed
Collect Project Feedback
 Business Post-Project Evaluation
performed

At Market/Category level
 Process in place to share learnings from
projects across factories and Project
teams.

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 31 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

PROJECT MANAGEMENT FOUNDATIONS


Description:
DESCRIPTION The high level requirements of the business
Why / purpose and of key stakeholders (high level “Why”
and “What”) are captured in the “Project
The Project Management Foundations Charter”. This document is formally approved
objective is to bring the right structure, by the Steering Committee.
discipline and alignment within project teams
in order to deliver projects that meet the The structure of the document is described
agreed success criteria, including the overall below:
business and technical objectives.
Project Management Foundations also  The project purpose and justification
enables proper integration of all the required  The project high level description
 The project strategy, high level
activities defined in the 4 systems.
requirements and scope
 The project high level risks
Project Management Foundations system is  The project key objectives with
based and relies on the Corporate success criteria
Engineering Standards St-00.907 and its  The project organization
associated documents. As described above,
the mandatory application of these
requirements are part of the Factory
Preparation phase.
Plan Project - Develop the Project
Management Plan

ACTIVITIES Why / purpose:


 Initiate Project - Develop the Project The purpose of this activity is to define how
Charter the project team will execute, monitor, and
 Plan Project - Develop the Project control the project. Through this activity, the
Management Plan project baselines in terms of scope, cost and
 Execute, Monitor and Control Project schedule are also established and used for
project approval.

Initiate Project - Develop the Description:


Project Charter To capture the basic design content of the
project and the plans to manage its various
Why / purpose: aspects, a Project Management Plan (PMP)
has to be established. Based upon the
The purpose of this activity is to define clearly knowledge areas defined by the Project
the business proposal that will be supported Management Institute (PMI), this document
by the project with its associated Success is structured around different subsidiary
Criteria and the main requirements to provide plans as follows:
the expected results. At that stage the
organization also formally recognizes the
 Safety and Health management
existence of the project and allow resources
allocation.  Human resource management
 Communication management
 Stakeholder management

Page 32 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

 Time management and baseline


 Quality management
 Cost management and baseline
 Risk management
 Procurement management
 Scope management and baseline
 Operations and Start-Up
Management Plan

Signed off by the Steering Committee, it will


drive the project team for the Project
Execution.

Execute, Monitor and Control


Project
 Project Workflow: the defined
Nestlé’s Project Workflow is
Why / purpose: rigorously followed and the required
During project execution, Monitoring and activities, milestones and gates are
control is the process of tracking, reviewing properly scheduled.
and regulating the overall project status  Clear Deliverables: the project
relative to the objectives defined in the deliverables are clearly defined,
Project Charter and in the Project understood and are owned by the
project team.
Management Plan. It aims to ensure that the
 Clear Governance: the project
required level of Quality will be delivered for
sponsorship, the interactions
all Project’s activities and for the Project’s between the steering committee and
outcome. the project team, as well as the
management of any significant
Description: change requests generated during
the course of the project are defined
While Monitoring and Control is a continuous and agreed.
Project Process, it is achieved through the  Holistic Organization: all roles and
use of assessments or checklists during functions required for the project
Design Reviews, Milestone, Gate, and design, implementation, operation
Steering Committee review meetings. These preparation, and start-up activities
specific activities are described as follows. are described.
 Competent Team: job success
Ensure adherence to Project profiles, competencies and potential
Foundations training required for the project team
members are described. The
competencies evaluation is part of the
Prior to Project Execution an exhaustive EM cycle as described in the relevant
assessment should be conducted and section.
demonstrate the adherence to the 7 elements  Adequate Resources: the required
of Projects Foundations. These elements are resources for all stages of the project
covered in details in the ED-221.29 and the and for future operations are
expectation are as follows.

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 33 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

adequately defined and planned at


Market and Factory levels. Perform Milestone Review
 Standards and Feedback Loop: the The milestone review allow the Project Team
project team demonstrates how the to measure the progress against the planned
learnings from previous projects and activities and requested deliverables.
existing operations will be reapplied
and used as described in the
Perform Gate Review
“Standards & Feedback” system.
Gates are structured decision points (Go/No
Go) where the Steering Committee takes the
Perform Design Reviews decisions to continue, temporary stop,
These exercises allow the Project Team readjust the scope or cancel the project.
members to verify in deep detail that what is
intended to be built will deliver the expected
results and contribute to reach the Success
Criteria defined in the Project Charter.

Page 34 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

DELIVERABLES
Activities Deliverables

 Project charter with project high level scope


Initiate Project - Develop Project Charter and targets
 Success criteria (“WHY” part)
Baselines and auxiliary project management plans
developed:
 Scope management and baseline incl.
WBS list and success criteria “HOW” part
 Time management and baseline
 Cost management and baseline incl.
Project Estimating & Cost Tracking Tool
“ProjECT”
 Safety and Health management
 Human resource management
Plan Project - Develop the Project Management
 Communication management incl. Capex
Plan
Dashboard tool (CADA), progress and final
report
 Stakeholder management incl. stakeholder
matrix
 Quality management Incl. the Task
completion check list
 Risk management incl. risk matrix
 Change management incl. change request
form
 Procurement management
 Adherence to Project Foundations
demonstrated
 Design, Milestones and Gate Reviews
performed
 Schedule, scope and cost controlled
Execute, Monitor & control Project  Changes to the project baseline managed
 Checklists monitored (Task completion,
Expert and Defect Prevention)
 Dynamic Risks Management performed
 Defects and lessons learnt documented
through Project Learning Analysis

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 35 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

OPERATIONS & START-UP MANAGEMENT

DESCRIPTION
Why / purpose Description:
The Operations & Start-Up Management The multifunctional project teams should
system defines the way for early understand the current risks and synergies
manufacturing engagement in projects. between the factory and the project by
Besides the focus on equipment and analysing the Current Operation Assessment
construction, aiming for vertical start-up also (COA). At same time they should lead the
requires a thorough preparation of all capture of inputs from the factory
operational aspects such as people hiring stakeholders that can enable the project to
and training, recipes, materials as well as prevent existing losses from Loss Tree
processes, compliance requirements, Analysis (LTA), as described in the Waste
methods and organization structure. Prevention System.
This system contains the procedures and By doing this activity the project teams will
activities required to plan, prepare and ensure that existing experience and learning
execute the start-up of new or modified are available to make the project successful
operations (equipment and/or product) and at the same time prepares the landscape
regarding people, methods and materials. in the factory to embrace the changes that
the project will provide.
ACTIVITIES For projects taking place in TPM factories, it
is important to consider TPM competencies
 Collect manufacturing input to design
required to deliver the AM Step 3 level as
 Understand Compliance requirements
required.
 Prepare Quality & Food Safety
 Set GLOBE/IT preparation
 Set Maintenance and Spares Understand Compliance
 Define Supply, Demand & Materials
requirements
readiness
 Set Line Labour Mapping and staffing
needs Why / purpose:
 Provide Manufacturing, Product and To ensure that the project team understands
Process Competencies the potential compliance risks that the
 Define Start-up sequence and protocols existing factory site has, and ensure that the
project is prepared to address any
compliance requirements. This will enable
not only the project to be successful but to
Collect Manufacturing Input to ensure the factory compliance is enabled and
design sustained by the projects.

Why / purpose: Description:


The aim of this activity is to provide voice to There are three steps to develop this activity.
the factory regarding the available First the project team based on the input from
experience, improvements that can be the regulatory/legal experts and the
leveraged by the project, as well as enable information from previous projects should
factory engagement. map the permits, licences and required

Page 36 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

compliance assessments that the project


should be prepared to submit trough the Description:
project life. Secondly the project team should,
For small impact projects, the plan should
make available the Compliance Tracking
ensure that the existing GLOBE templates
Tool (CTT) plans, as well as previous audit
are updated and that the Key users provide
plans to the project team in order to
the refreshment on the capability to users
understand common risks and opportunities.
based on the changes. However for high
The third part is to write the Compliance plan
impact projects like a new production
for the project including the mapping of
department or a new Greenfield site. The
permits and audits, as well as the different
GLOBE preparation plan should include the
preparation activities and factory and market
factory mapping, the key user development,
level to enable this plan.
as well as the validation of the data.

Prepare Quality & Food Safety Set Maintenance and Spare Parts

Why / purpose: Why / purpose:


To ensure a successful project we should Every new line or change to existing line,
ensure that the product that is going to be must come with the right preparation to
produced/launched delights the consumers. ensure sustainable performance long term,
In that sense is critical that the food safety
thus maintainability is required.
and quality assurance methods are prepared
and executed.
Description:
This plan should include the basic
Description:
maintenance requirements AMM, including
The Project team must ensure that the FLOCs and Maintenance Procedures. For
Hazard Analysis Critical Control Points new equipment it is particularly critical to
(HACCP) and the Quality Monitoring Scheme have this as well as the revised spare part
(QMS) have been developed for the new stock. For equipment modifications is critical
product / new line that the project will bring. to ensure the maintenance plan is adequate
This should be included in the Quality & Food for the new situation.
Safety plan, as well as the different These activities require the support of the PM
components to make it happen like the Pillar and are described in the relative
Laboratory Set up, Sampling plan, Quality Reference Guide.
competencies and Product Technical
Acceptance.
Define Supply, Demand and
Materials Readiness
Set GLOBE/IT Preparation
Why / purpose:
Why / purpose: The final outcome of the project is the actual
Every new product/line requires to monitor product volume flowing to the market. In that
report specific performance information into sense it is critical to ensure that the supply
the company systems. Depending on the chain is set in as part of the operational
impact of the project on the current set up, it preparation.
may be needed to set up the GLOBE
preparation plan.

STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY | Page 37 of 39


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

develop to ensure the capability of the staff


Description: before the qualification stage starts.
This plan comprises the supply base For Greenfield projects, the capability
requirements to support the project as well as building plan should also be aligned with the
the proper production planning and the implementation plan of NCE Advanced
proper contingency planning regarding to Manufacturing Practices defined by the
demand variation. The plan should be based market.
on SAP data available in GLOBE, and
properly reflected in the operational Define Start-up Sequence and
preparation and project ramp up curve.
protocols (CQV)
Set Line Labour Mapping and
staffing needs Why / purpose:
This is the execution plan that provides the
final integration of all the workflow streams to
Why / purpose: get the “go live” of the project. In that sense
Production operators will drive the success of the CQV plan requires a detail planning of
every new line or every change to existing each module and each step to ensure a
line to industrialize. perfect execution according to standards.

Description: Description:
It is critical to ensure that there is a clear The Commissioning Plan provides the details
mapping of resources required by the line, for the installation qualification (IQ) e.g. the
and that this is properly recruited during the safety checks, the I/O test, the functional
line construction to be able to prepare them. tests, and the operational qualification (OQ)
of the installed equipment. The optimal
Provide manufacturing, product settings of the equipment are documented,
and the maintenance plans are prepared in
and process competences SAP. Finally, the training of the factory staff
is completed. The Qualification Plan covers
Why / purpose: the release of the line by SHE and QA and
covers the initiation of the industrial trials for
The product and process Mastership
the capability of the process and the
competencies required for every position in
operators, as well covering the final validation
the new/modified line as well as for the
of SOPs (Standard Operating Procedures)
supporting staff (QA, Maintenance, etc.)
for operation and maintenance. It also
should be planned and executed. Depending
includes the test that the line can operate at
on the project complexity, the competences
nominal speed and committed asset intensity
can include business and functional
level for a period a time a defined in the
competences.
project success criteria. Finally, the first
saleable production lot is technically
Description: approved. The Verification plan comprises
The standard package coming from the the monitoring of the project success criteria,
category, should include the technology and the assessment of the level of training
deployment materials to develop the and skills of the factory staff, as well as the
competency of the factory staff. A Training final documentation of the Manufacturing
plan and competency measure should be Dossier.

Page 38 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY


EARLY MANAGEMENT (EM)
PILLAR REFERENCE GUIDE

DELIVERABLES
Activities Deliverables
Collect Manufacturing Input to design Manufacturing design review

Understand Compliance requirements Compliance Plan including Permit, License


requirements
HACCP, QMS, NGMP, Product Technical
Prepare Quality & Food Safety
Acceptance plan
Set GLOBE/IT preparation GLOBE Mapping, Key User development
Spare Parts list, FLOC, AMM update,
Set Maintenance and Spares
Maintenance Procedures
Define Supply, Demand & Materials Supply & Demand Plan, Materials Plan, Ramp
readiness up Curve
Set Line Labour Mapping and staffing Labour Map, Standardize work for line, Staffing
needs and recruitment plan.
Provide Manufacturing, Product and Technology Transfer and Training plan, SOP’s,
Process Competencies Training Materials, Competency matrixes
Define Start-up sequence and protocols CQV Plan, Start-up measures, final
(CQV) manufacturing dossier. Ramp up Curve

Page 39 of 39 | STRICTLY CONFIDENTIAL – FOR INTERNAL USE ONLY