Вы находитесь на странице: 1из 2

SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff -June 2014) Rev 8 30-Jun-14

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
Plumbing Fixtures and Fittings SATIP-S-060-04 31-Dec-14 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

1.1 Not applicable

2.0 MATERIAL RECEIVING

Plumbing Fixture is defied as Receptacle, Device, or


appliance which is supplied with water or which
receives liquids or liquid-borne waste and discharges
such wastes into drainage system. Plumbing Fixtures
Plumbing Fixture SAIC SAIC include but not necessarily limited to:
2.1
Receiving Inspection S-4036 S-4036 H W Water Closet, Floor Drain, Shower Stall, Urinals, and
Sinks

Saudi Aramco to be notified on initial delivery of each


item by type or manufacturer

Plumbing Fixture Handling, Storage SAIC SAIC


2.2
and Preservation S-4036 S-4036 W S Contractor QA/QC to perform Weekly Inspection

3.0 INSTALLATION

SAIC SAIC Saudi Aramco to be notified on start of this activity for


3.1 Plumbing Fixture
S-4037 S-4037 H W each item (by type) located in each building or area

See SATIP-S-070-03 Thermoplastic and RTR Piping


SATIP-L-350-07 Carbon Steel Cement Lined and
See
3.2 Piping See Remarks SATIP-L-350-08 Fabrication of Piping & Miscellaneous
Remarks
Structure
as applicable

See See SATIP-N-001-01 Cold Service


3.3 Insulation See Remarks
Remarks See SATIP-N-001-02 Hot Service

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff -June 2014) Rev 8 30-Jun-14
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Plumbing Fixtures and Fittings SATIP-S-060-04 31-Dec-14 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Plumbing Fixture Supply Piping and Saudi Aramco to be notified on start of this activity for
SAIC SAIC
3.4 Drainage Piping Connection
S-4037 S-4037 H W each item in each building or area by type or
Inspection manufacturer

4.0 PRE-COMMISSIONING

SATR SATR
4.1 Fixture Watertightness Test
S-4006 S-4006 H W

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use