Contract No.: Site Technical Query Form Query No.: ALSADD3-037


GTC/735/2015 Date: 06-OCT-2018
Qatar Power Transmission System Expansion Phase-13 Substations, Packages S1, S2, S3, S4, S5, S6,
Project :
S11, S19 & S20 - 132/11KV AL SADD 3 SUBSTATION

Client/Consultant : Kahramaa / EPE


Drawing No.: PH13-5C-95-72-7006 Rev.: 2
Area / Location: Tie beam area
Drawing No.:PH13-5C-95-71-6009 Rev.: 3

Originated By: Vinoth Kannan N Position: Jr.QA/QC Engineer

Action Required From: SIEMENS Response Required by: 5-Oct-2018

Category
Drawings Material

Specifications Others Specify:

Query:

Query:-a With reference to the drawing PH13-5C-95-71-6009 REV-3 @ elevation 3 & 4 we have RCC upstand at above tie beams in
the Outer periphery. But there is no upstand details in the drawing PH13-5C-95-72-7006 Rev-3. Kindly provide the RCC upstand details

Area affected & Consequences:

Tie beam concreting

Signature : Issue Date:

Attachments Yes ( ) No ( ) cc :

Received by: On:

RESPONSE :

Responded By: Position: Date:

Attachments Yes ( ) No ( ) cc :

Unrestricted Format No-4G79371-Q0010-Y147A