26 8.05 16.15 Preperation of the BOQ for the tender Document MKRP/KALU/RB/B/148
29 8.08 16.20 Preperation of the BOQ for the tender Document MKRP/KALU/RB/B/148
30 8.03 16.23 Preperation of the BOQ for the tender Document MKRP/KALU/RB/B/148
31 8.03 16.16 Preperation of the BOQ for the tender Document MKRP/KALU/RB/B/148
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
1 7.44 16.00 Design of underground water sump for Mahaoya base hospital
2 7.40 16.00 Design of underground water sump for Mahaoya base hospital
3 7.35 16.00 Design of underground water sump for Mahaoya base hospital
4 7.48 16.00 Design of underground water sump for Mahaoya base hospital
5 7.55 16.00 Design of underground water sump for Mahaoya base hospital
8 7.39 16.00 Design of underground water sump for Mahaoya base hospital
9 8.01 16.00 Design of underground water sump for Mahaoya base hospital
10 On Leave
11 On Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
6 On Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
4 On Leave
10 Duty Leave
11 - - On Leave
14 8.10 16.35 Study the Design of Small Canal Structures from USBR
15 8.10 16.15 Study the Design of Small Canal Structures from USBR
17 - - On Leave
21 8.31 16.27 Study the Technical Guidelines for Irrigation works by Ponrajah
22 8.03 16.20 Study the Technical Guidelines for Irrigation works by Ponrajah
23 8.26 16.19 Study the Technical Guidelines for Irrigation works by Ponrajah
24 8.17 17.05 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
25 8.12 16.15 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
28 8.35 16.40 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
29 8.27 16.17 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
30 8.21 16.24 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
31 8.18 16.18 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
1 8.12 17.00 Study the Design of Small Canal Structures from USBR
4 On Leave
5 8.03 16.30 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
6 8.21 16.17 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
19 8.24 16.15 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
25 8.09 16.38 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
26 8.06 16.35 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
29 8.01 16.15 Design of a Bridge across Atamba Oya (3+860km) in Medirigiriya Agbopura Road
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
1 7.32 16.00 Checking & corrections for steel roof truss at Medirigiriya Base Hospital
2 On Leave
3 7.27 14.45 Checking & corrections for steel roof truss at Medirigiriya Base Hospital
6 7.39 16.00 Checking & corrections for steel roof truss at Medirigiriya Base Hospital
7 7.33 16.00 Estimate checking for Medirigiriya Mahaweli stadium at Medirigiriya Dev. Project
8 On Leave
9 7.38 16.00 Estimate checking for Medirigiriya Mahaweli stadium at Medirigiriya Dev. Project
13 On Leave
14 7.53 16.00 Estimate checking for Medirigiriya Mahaweli stadium at Medirigiriya Dev. Project
14 7.29 16.00 Estimate checking for Medirigiriya Mahaweli stadium at Medirigiriya Dev. Project
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
1 7.17 16.00 Design of Measuring strurcture - 01 for Aqua culture dept. Welikanda
2 On leave
5 8.10 16.00 Design of Measuring strurcture - 01 for Aqua culture dept. Welikanda
6 7.34 16.00 Design of Measuring strurcture - 01 for Aqua culture dept. Welikanda
7 7.26 16.00 Design of Measuring strurcture - 01 for Aqua culture dept. Welikanda
8 7.46 16.00 Design of Measuring strurcture - 01 for Aqua culture dept. Welikanda
9 8.07 14.45 Design of Measuring strurcture - 02 for Aqua culture dept. Welikanda
14 7.28 16.00 Design of Measuring strurcture - 02 for Aqua culture dept. Welikanda
15 7.28 16.00 Design of Measuring strurcture - 02 for Aqua culture dept. Welikanda
16 On leave
19 7.26 16.00 Design of Measuring strurcture - 02 for Aqua culture dept. Welikanda
21 On leave
26 On leave
27 On leave
28 On leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
2 7.37 16.00 Design steel roof truss for Medirigiriya Base Hospital at Medirigiriya Development Project
3 7.43 16.00 Design steel roof truss for Medirigiriya Base Hospital at Medirigiriya Development Project
4 7.30 16.00 Design steel roof truss for Medirigiriya Base Hospital at Medirigiriya Development Project
5 7.37 16.00 Design steel roof truss for Medirigiriya Base Hospital at Medirigiriya Development Project
6 7.40 16.00 Design steel roof truss for Medirigiriya Base Hospital at Medirigiriya Development Project
6 7.43 16.00 Design steel roof truss for Medirigiriya Base Hospital at Medirigiriya Development Project
9 7.27 16.00 Design steel roof truss for Medirigiriya Base Hospital at Medirigiriya Development Project
10 7.48 14.45 Design steel roof truss for Medirigiriya Base Hospital at Medirigiriya Development Project
11 On leave
13 7.40 16.00 Design steel roof truss for Medirigiriya Base Hospital at Medirigiriya Development Project
16 8.09 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
17 7.28 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
18 7.41 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
19 7.30 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
20 7.40 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
23 8.02 14.45 Design of Weir cum Measuring structure for Welikanda aqua culture farm
24 On leave
25 7.37 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
26 8.15 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
27 7.51 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
30 7.44 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
31 7.35 16.00 Design of Weir cum Measuring structure for Welikanda aqua culture farm
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
6 Duty Leave
8 On Leave
9 On Leave
16 Duty Leave
22 Duty Leave
23 Duty Leave
27 On Leave
29 8.39 16.40 Structural Design of Vehicle Park NO 01 for Bakamuna RPM office
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
6 On Leave
16 On Leave
23 Duty Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
8 Duty Leave
9 Duty Leave
14 On Leave
17 On Leave
21 7.53 16.00 Preparation of detail drawing for turnout of D6 RBMC2 at Moragahakanda Dev.Project
22 8.06 16.00 Preparation of detail drawing for turnout of D6 RBMC2 at Moragahakanda Dev.Project
23 9.25 16.15 Preparation of detail drawing for turnout of D6 RBMC2 at Moragahakanda Dev.Project
24 Duty Leave
25 Duty Leave
28 8.23 16.15 Preparation of detail drawing for turnout of D7 RBMC2 at Moragahakanda Dev.Project
30 8.25 16.15 Preparation of detail drawing for turnout of D7 RBMC2 at Moragahakanda Dev.Project
31 8.20 16.15 Preparation of detail drawing for turnout of D7 RBMC2 at Moragahakanda Dev.Project
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
8 - - On Leave
29 - - On Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
18 On Leave
24 7.37 16.00 Studying & Discussion Medirigiriya Blocking Out Plan with Project Engineers
25 7.30 16.00 Initial Design of D.U.C at 2+000 km for Medirigiriya Development Project
26 8.11 16.00 Initial Design of D.U.C at 2+000 km for Medirigiriya Development Project
28 7.27 16.00 Initial Design of D.U.C at 0+650 km for Moragahakanda Development Project
31 7.27 14.45 Initial Design of D.U.C at 0+650 km for Moragahakanda Development Project
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
2 On Leave
17 On Leave
28 Duty Leave
31 Duty Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
5 On Leave
10 On Leave
25 On Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
5 On Leave
17 On Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
1 On Leave
2 8.35 16.20 Structural design of DUC at 0+815 under Medirigiriya Development Project
6 7.34 16.15 Structural design of DUC at 0+815 under Medirigiriya Development Project
7 7.43 16.20 Structural design of DUC at 0+815 under Medirigiriya Development Project
8 8.28 16.15 Structural design of DUC at 0+815 under Medirigiriya Development Project
9 7.47 12.00 Structural design of DUC at 0+815 under Medirigiriya Development Project
10 8.33 16.20 Structural design of DUC at 0+815 under Medirigiriya Development Project
14 On Leave
16 Duty leave
17 Duty leave
24 Duty leave
30 On Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
4 7.39 12.01 Design of R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
5 8.27 16.16 Design of R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
6 8.29 16.15 Design of R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
7 8.31 15.08 Design of R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
8 On Leave
11 8.16 14.52 Design of R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
12 8.38 16.18 Design of R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
13 8.08 16.01 Design of R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
14 On Leave
15 7.36 16.00 Design of R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
18 7.31 16.00 Preparation of drawings for R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
19 7.59 16.00 Preparation of drawings for R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
20 7.39 16.00 Preparation of drawings for R.C.C Bridge at 0+000 for Medirigiriya - Agbopura Road
28 Duty Leave
29 Duty Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
2 7.38 14.45 Design of D.U.C at 0+653 for RBMC Moragahakanda Development Project
3 7.37 16.00 Design of D.U.C at 0+653 for RBMC Moragahakanda Development Project
4 8.40 16.25 Design of D.U.C at 0+653 for RBMC Moragahakanda Development Project
5 - - On Leave
8 7.50 16.00 Design of D.U.C at 0+653 for RBMC Moragahakanda Development Project
9 7.44 16.00 Preparation of drawings of DUC at 0+653 for RBMC Moragahakanda Dev Project
10 8.07 16.00 Preparation of drawings of DUC at 0+653 for RBMC Moragahakanda Dev Project
11 8.48 16.45 Preparation of drawings of DUC at 0+653 for RBMC Moragahakanda Dev Project
12 - - On Leave
15 7.41 16.00 Structural analysis of Child & Maternity ward at Moragahakanda Dev Project
16 7.51 16.00 Structural analysis of Child & Maternity ward at Moragahakanda Dev Project
17 8.28 16.15 Structural analysis of Child & Maternity ward at Moragahakanda Dev Project
18 7.30 16.00 Structural Design of Child & Maternity ward at Moragahakanda Dev Project
19 8.27 16.15 Structural Design of Child & Maternity ward at Moragahakanda Dev Project
22 8.20 16.15 Structural Design of Child & Maternity ward at Moragahakanda Dev Project
23 8.27 16.15 Structural Design of Child & Maternity ward at Moragahakanda Dev Project
24 7.35 16.00 Structural Design of Child & Maternity ward at Moragahakanda Dev Project
25 8.13 16.00 Structural Design of Child & Maternity ward at Moragahakanda Dev Project
26 7.34 16.00 Structural Design of Child & Maternity ward at Moragahakanda Dev Project
29 7.48 14.45 Structural Design of Child & Maternity ward at Moragahakanda Dev Project
30 8.25 16.00 Structural Design of Child & Maternity ward at Moragahakanda Dev Project
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
1 8.30 16.15 Strctural Design of Child & Merternity Ward at Ambana in MKDP
2 7.36 16.00 Strctural Design of Child & Merternity Ward at Ambana in MKDP
5 8.15 16.15 Strctural Design of Child & Merternity Ward at Ambana in MKDP
6 7.37 16.00 Strctural Design of Child & Merternity Ward at Ambana in MKDP
7 On Leave
8 8.26 16.15 Strctural Design of Child & Merternity Ward at Ambana in MKDP
9 8.17 14.45 Strctural Design of Child & Merternity Ward at Ambana in MKDP
12 7.34 16.00 Strctural Design of Child & Merternity Ward at Ambana in MKDP
14 8.01 16.00 Strctural Design of Child & Merternity Ward at Ambana in MKDP
15 On Leave
27 On Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
4 On Leave
12 On Leave
18 On Leave
20 On Leave
22 On Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
2 On Leave
13 On Leave
23 On Leave
25 On Leave
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….
MONTHLY PERFORMANCE REPORT
3 On Leave
6 On Leave
15 On Leave
21 On Leave
29
…………………….. ……………………………….
Signature of the Officer Approved by:
Date: ……………………………….