TERM OF REFERENCE
Location: Plot No. NS-24, NS-29 & NS-28(P), Aurangabad Industrial Growth
Centre (BIADA), Aurangabad
Land Area – 67.64 Acres (27.37 ha)
Production Capacity
Existing Proposed After Proposed amendment
Clinker 3.6 Million TPA 0.9 Million TPA 4.5 Million TPA
Grinding Unit (OPC, PPC & PSC) (OPC, PPC, PSC &
SSC)
CPP Nil 20 MW 20 MW
Project Cost
Project Cost Existing (Rs.) Proposed (Rs.) Total (Rs.)
APPLICANT
Mr. Rakesh Bhargava (Authorized Signatory)
M/s Shree Cement Ltd.Post Box No. 33, Bangur Nagar,
Andheri Deori, Beawar,Distt. Ajmer (Raj.)
E-mail- bhargavr@shreecementltd.com, Phone No. 01462-228101-6
Prepared by
ENKAY ENVIRO SERVICES PVT. LTD.
(NABET Accredited at Serial No. 44)
Corporate office: L-6, ARG Corporate Tower, Ajmer Road,
Gopal Bari, Jaipur – 302 001
Email- info@enkayenviro.com
Phone- 0141-2363996
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5
Million TPA Cement (OPC, PPC, and PSC& SSP) along with installation of 20
MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P),
Aurangabad Industrial Growth Centre (BIADA), District: Aurangabad (Bihar)
i
4.6 Soil Classification 40
4.7 Climate data from Secondary Source 40
4.8 Social Infrastructure Available 41
SECTION – V PLANNING BRIEF 42-43
5.1 Planning Concept 43
5.2 Population Projection 43
5.3 Land Use Planning 43
5.4 Assessment of Infrastructure Demand 43
SECTION – VI PROPOSED INFRASTRUCTURE 44-48
6.1 Industrial Area 45
6.2 Residential Area 45
6.3 Green Belt 45
6.4 Social Infrastructure 45
6.5 Connectivity 45
6.6 Drinking Water Management 46
6.7 Sewerage System 46
6.8 Industrial Waste Management 48
6.9 Solid Waste Management 48
6.10 Power Requirement & Supply/ Source 48
SECTION – VII REHABILITATION & RESETTLEMENT (R&R) PLAN 49-50
7.1 Rehabilitation & Resettlement (R&R) Plan 50
**********
ii
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
PRE-FEASIBILITY REPORT
SECTION – I
EXECUTIVE SUMMARY
1
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
2
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
3
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
4
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
5
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Petcoke : Indian /
Imported Coal 30:70 100% Indian /
Description Unit (heat basis) Imported Coal
Bed ash quantity TPD 84 66
Fly ash quantity TPD 103 99
Total ash
quantity TPD 187 165
6
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
7
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
SECTION – II
INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION
INDEX
S. No. Contents Page No.
i IDENTIFICATION OF PROJECT AND PROJECT 9
PROPONENT
ii BRIEF DESCRIPTION OF NATURE OF THE 12
PROJECT
iii NEED FOR THE PROJECT AND ITS IMPORTANCE 12
TO THE COUNTRY AND OR REGION
iv DEMAND-SUPPLY GAP 14
v IMPORTS VS INDIGENOUS PRODUCTION 15
vi EXPORT POSSIBILITY 15
vii DOMESTIC/EXPORT MARKETS 15
viii EMPLOYMENT GENERATION (DIRECT AND 16
INDIRECT) DUE TO THE PROJECT
8
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Products
The Company's pursues multi-brand portfolio strategy which consists of three brands viz
Shree Jang rodhak cement, Bangur Cement and Rockstrong Cement. The Company
currently has the highest market share in Rajasthan, Delhi and Haryana and
distinguished positions at the top in Punjab, West Uttar Pradesh and Uttarakhand.
Corporate Sustainability
At SCL Sustainability is an integral part of our business and forms the core of our future
growth strategy. We have always envisioned a growth which is inclusive and aims
towards Total Prosperity of all the stakeholders. We have inculcated sustainability as
business culture and all our efforts attempt to focus upon fostering innovation, ensuring
prosperity, creating happiness and building trust in people.
Sustainability leads us to the enhancement of corporate values through innovation and
sound business practices. This approach has helped us to proactively address
challenges to our growth. Integration of sustainability in our day to day business
9
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Recognitions
First Indian Cement Company to join Cement Sustainability Initiative of WBCSD.
First Indian Cement Company to be Member of World Economic Forum.
First company in the World to use innovative techniques to utilize 100% petcoke in
its operations.
First Cement Company of the World to fetch Certified Emission Reductions (CER’s)
on its Clean Development Mechanism project “Optimal Utilization of Clinker”.
First Indian cement company to issue Corporate Sustainability Report following the
highest level “A+” for reporting triple bottom line performance
New World Sustainability Champions by the World Economic Forum (WEF)
CDP Climate Disclosure Leader for the year 2014
Government of India recognized in-house R&D centre.
Awards
2014-15 H.M. Bangur, MD, Winner of Best CEO (Mid-sized Companies -Cement) by
Business Today.
2014-15 Skoch Group Platinum Award for creating value for stakeholders.
10
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
11
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
(iii) Need for the project and its importance to the country and or region.
Cement demand has grown at ~6% CAGR in the last four years (FY10‐14), the slowest
pace in past two decades for four consecutive years. It is believed that the growth has
bottomed out in FY14 with the demand growth being the lowest since FY02, even below
the GDP growth. This is attributed to sluggish housing activity; steep cut in government’s
spending on infrastructure and weak investment cycle.
It is expected the trend to reverse on the back of stable and decisive government at the
centre, though, the weakness in growth is likely to continue for the next six months till
the time the transition is set in. However, we believe that the growth momentum would
pick up strongly in H2FY15/Q1FY16 on the back of revival in sentiment. Hence, we
expect All‐India cement consumption to grow 6.0% and 9.0% in FY15 and FY16,
respectively resulting into an improved capacity utilisation.
12
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Eastern region was the best performing region, with demand growth of 11.2% during
FY08‐13 against all‐India growth of 8.2%. Upsurge of public sentiments and government
spending in Bihar, demand from industrial and government sector in Orissa and
Chhattisgarh drove the demand in the region.
Growth slowed down post FY11 on account of softening of demand from industrial
sector and cut in government spending. Notwithstanding these, it is expected that
demand to revive strongly in FY16, led by a pick‐up in industrial demand (supported by
speedy clearances in recent months), continued robustness in private demand and a
stable government at the centre.
Industry is expected to add 16m tonnes of capacity in the next two years (FY14‐ FY16E)
against a 17m tonnes addition in the last five years. Despite sizeable addition, the region
would continue to operate above 84% level on the back of strong demand and reduced
inflow from other regions.
13
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
TARGET MARKET
Demand in Target Market
Cement market for the proposed unit would be Eastern India viz. Eastern Uttar Pradesh,
Bihar and West Bengal.This market has been identified keeping in mind the economic
transportation system distance and location of other supplying clusters and existing supply
from others plants of SCL.
The Target market for SCL has been depicted in the chart below.
AURANGABAD
GRINDING
UNIT
14
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Figures in MIOTPA
Year Demand Supply Surplus/ (Deficit)
15
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Company may sell the cement under SCL’s highly popular existing Brands
(Shree Jung Rodhak Cement, Bangur Cement and Rockstrong Cement.
Company may use its existing marketing offices and depots or may open new
depots at strategic locations to ease movement of cement into the market.
(viii) Employment Generation (Direct and Indirect) due to the project Sourcing
SCL follows the “son of the soil” policy, wherein the maximum possible staffing is from
local area. Only where skills are not available locally, staff will be hired from outside.After
expansion total nos. of employees will be 298 (existing: 178 & proposed: 120).
16
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
SECTION – III
PROJECT DESCRIPTION
INDEX
S. No. Contents Page No.
i Type of Project including interlinked and independent projects if any 18
ii Location (map showing general location, specific location, and 19
project boundary& project site layout) with coordinates
iii Details of alternative site consideration and basis of selecting the 23
proposed site particularly the environmental considerations gone into
should be highlighted.
iv Size or magnitude of operation 23
v Project description with process details 23
vi Raw materials required along with estimated quantity, likely source, 32
marketing area of final products, mode of transportation of raw
materials and finished product.
vii Resources optimization/ recycling and reuse envisaged in the 35
project, if any, should be briefly outlined.
viii Availability of water its source, energy /power requirement and 35
source should be given.
ix Quantity of waste to be generated (liquid and solid) and scheme for 37
their management/disposal
**************
17
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
18
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC & SSC) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
ii. Location (map showing general location, specific location, and project boundary&
project site layout) with coordinates
19
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSC) along with installation
of Captive Power Plant, 20 MW at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
20
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSC) along with installation
of Captive Power Plant, 20 MW at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Figure 3: Topographical Map showing study area of 10 km radius and project site
21
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSC) along with installation
of Captive Power Plant, 20 MW at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
22
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
(iii) Details of alternative site consideration and basis of selecting the proposed site
particularly the environmental considerations gone into should be highlighted.
No alternate site has been considered for the project. The project site falls adjacent to
NH-98 connecting Patna to Aurangabad close to its intersection with the Delhi – Kolkata
expressway (NH-2).
The location of the project site is shown in the Figure No. - 2.
The co-ordinates of the proposed plant location are as follows:
A Latitude 24046’38.8” N
Longitude 84021’00.8” E
B Latitude 24046’32.1” N
Longitude 84021’27.3” E
C Latitude 24046’18.8” N
Longitude 84021’24.3” E
D Latitude 24046’25.1” N
Longitude 84021’03.5” E
Elevation: 190 m above MSL
The proposed location provides the following facilities to the plant:
Better connectivity to blending material sources
Good access to major target markets having proximity to the National Highway
Reasonably good infrastructure in the region.
23
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
At present only PPC, PSC and PPC are manufactured. Now it is proposed to
manufacture SSC.
1. Clinker: 15%
2. Gypsum ( Calcined) : 15
3. Slag: 70%
24
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
PROCESS DESCRIPTION
Major Process Steps of Clinker Grinding Unit:
Clinker storage & handling
Fly Ash & Pond Ash storage & handling
Gypsum storage & handling
Slag Storage & handling
Cement production and storage
Coal & pet coke storage, handling, grinding and hot air generator
Cement packing and dispatch.
Receive and dispatch of raw material and product by road and railway
Ready mix concrete plant during construction activity only
25
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
26
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
1. Coal & Pet Coke Storage, Handling, Grinding and Hot Air Generator
Hot air is required for removal of moisture. This is generated from hot air generator.
Petcoke / coal is used as fuel which is ground in Coal &PetcokeMill.Indian and imported
coal and petcokebeing is utilised. Additional Hot air generator is proposed for anhydrite
gypsum production.
2. Cement Packing and Dispatch
Rotary electronic packing machines are being used for packing of cement. Loading of
packed bags onto the trucks is done by truck loading machines. Bags are of 50 kgs
each. Loose cement would also be dispatched through closed bulkers to bulk
consumers. Cement is dispatched by road. However, in future, rail network will be used
for dispatch to long distance.
27
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
3. D.G. Set ( 1250 kVA (1000 kVA / 2x500 kVA + 250 kVA)
DG sets are operated only for power back up in case of emergency.
28
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Petcoke : Indian /
100% Indian /
Description Unit Imported Coal 30:70
Imported Coal
(heat basis)
Main Steam
kg/cm2. A 89 89
Pressure
Petcoke : Indian /
Ultimate analysis (% 100% Indian /
Imported Coal 30:70
by weight) Imported Coal
(heat basis)
Petcoke : Indian /
100% Indian /
Description - Imported Coal 30:70
Imported Coal
(heat basis)
29
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Petcoke TPD 59 0
Indian / Imported
TPD 308 431
coal
Limestone TPD 92 22
30
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
EQUIPMENT DETAILS
Equipment Selection
A list of equipment and storage capacities are given below. To select a particular type of
equipment or storage for the project, among others, the following issues have been
considered:
Equipment costs
Energy consumption
Raw material characteristics
Sizes in which the equipment is available
Lead times for particular types of equipment
Operating experience with various types of equipment
Ease of operation of equipment
Product to be manufactured
Site conditions
Local skills available
Environmental issues.
31
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
2 Steam Turbine 20 MW
(vi) Raw materials required along with estimated quantity, likely source, marketing
area of final products, mode of transportation of raw materials and finished
product.
The sources for fly ash, gypsum, and their approximate distances from the proposed
plant site are given below:
Raw Material Requirements for OPC, Source & Transportation
32
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
33
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
/synthetic/imported Rail
gypsum & other
sources etc.
3. Slag 55 2.47 NTPC- Nabinagar, By Road
DVC- Koderma and
other TPPs&other
sources
4. Coal/ pet - 0.63/ 0.32 Local Market/ Indian By Road &
coke and imported& other Rail
sources
34
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Petcoke : Indian /
Imported Coal 30:70 100% Indian /
Description - (heat basis) Imported Coal
Petcoke TPD 59 0
Indian / Imported
coal TPD 308 431
Limestone TPD 92 22
(vii) Resources optimization/ recycling and reuse envisaged in the project, if any,
should be briefly outlined.
Fly ash generated as a waste from proposed CPP, NTPC-Nabinagar, DVC-
Koderma and other TPPs, will be used for PPC manufacturing.
Slag generated as waste in steel plant at Bokaro will be used for PSC manufacturing
No solid waste generation from the grinding unit. However, material collected by the
dust collectors (Bag Filters) being and will automatically be recycled into the process.
There will be no waste water generation from grinding unit.
There will be no discharge outside the project premises.
(viii) Availability of water its source, energy /power requirement and source should be
given.
The total water requirement is 350 KLD and no additional water will be required.
35
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Domestic(utility) 15 55 70
Drinking 10 5 15
Total 175 175 350
15KL 70 KL 65 KL 200 KL
RO Unit Utility Softener Mill Spray
15 KL
(220 KL)
3 KL 12 KL 50 KL
50 KL
RO Reject Drinking Cooling Tower
STP
(Mill Spray) (Cap. 65 KLD
5 KL
55
Plantation
36
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Total power requirement after proposed expansion shall be around 18.5 MW which will
be sourced from proposed CPP, Grid. D.G sets of 1250 KVA (1000 KVA/ 2 x 500 KVA &
250 KVA) will be used for power backup.
(ix) Quantity of waste to be generated (liquid and solid) and scheme for their
management/disposal
No waste water is being discharged outside the plant.
No industrial waste generation in operation phase. Domestic waste water generated
from office toilets and guest house is disposed off in soak pit and septic tanks.
Feasibility of STP would be studied and treated water will be used for greenbelt
development / plantation. RO and softener reject water will beused for mill spray.
No liquid and solid waste generation from cement grinding unit.
Used oil & grease generated from plant machinery/Gear boxes and DG set will
besold to the CPCB authorized recycler.
37
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
SECTION – IV
SITE ANALYSIS
INDEX
S. No. Contents Page No.
i Connectivity 39
ii Landform, Land Use And Land Ownership 39
iii Topography (Along With Map) 39
iv Existing Land Use Pattern 39
v Existing Infrastructure 40
vi Soil Classification 40
vii Climatic Data From Secondary Sources 40
viii Social Infrastructure available 41
38
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
The site is well connected with communication facilities like telephone, fax, wireless and
telex and as such, no constraints are envisaged in this aspect as the Tehsil and District
headquarters are near to the site.
(iii) Topography
The general terrain in the area proposed for the Cement Grinding Unit is more or less
flat with minor undulations. A lump sum provision for site preparation, grading and
levelling has been kept in the cost estimate.
(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies
(including area under CRZ)), shortest distances from the periphery of the project
to periphery of the forests, national park, wild life sanctuary, eco sensitive areas,
39
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
water bodies (distance from the HFL of the river), CRZ. In case of notified
industrial area, a copy of the Gazette notification should be given.
Details
S. No. Particulars
(Approx. Aerial Distance from project site)
40
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
The area has generally moderate climate. The temperature variation is from 5oC to
48oC.The average annual rainfall in the area is about 50 cm. The relative humidity varies
between -- Maximum 96% & Minimum 15%.
The Social infrastructure available will be elaborated in the EIA/EMP report , final
submission.
41
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
SECTION – V
PLANNING BRIEF
INDEX
V Amenities/Facilities 43
42
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
(v) Amenities/Facilities
SCL will develop the Amenities/Facilities in nearby area of the proposed project site as
per requirements under Corporate Social Responsibilities programs.
43
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
SECTION – VI
PROPOSED INFRASTRUCTURE
INDEX
44
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
(v) Connectivity
45
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Road: The site falls on NH 98 connecting Patna to Aurangabad close to its intersection
with the Delhi – Kolkata expressway (NH-2).
Rail: The nearest railway station is the AnugrahNarain Road, approximately 9.5km
(Aerial distance) from the site.
Air: The nearest airport is at Gaya (approx. 60km aerial distance).
Sea: The nearest sea port is at Kolkata, West Bengal, approximately 500 km away.
The site is well connected with communication facilities like telephone, fax, wireless and
telex and as such, no constraints are envisaged in this aspect as the Tehsil and District
headquarters are near to the site.
46
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
Bar screen chamber followed by collection cum equalization tank followed by Fluidized
Aerobic Bed Reactors (2 Nos.) will be provided with coarse air bubble diffusion system
followed by Tube Settler Tank in the STP. The clear supernatant after disinfecting by
chlorination will be passed through dual filter and activated Carbon filter before will be
collected in the treated water tank. The sludge generated from the FAB will be passed
through sludge digester and dried and the filtrate will be collected and sent back to the
equalization tank and the dried cakes will be used as manure. The treated water will be
used for plantation activities.
47
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
48
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
SECTION – VII
REHABILITATION AND RESETTLEMENT (R&R) PLAN
INDEX
49
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
50
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
SECTION – VIII
PROJECT SCHEDULE & COST ESTIMATES
INDEX
51
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
(ii) Estimated project cost along with analysis in terms of economic viability of the
project
Existing project cost at 3.6 MTPA cement production along with housing facility is Rs.
50589 lacs. The cost of proposed of expansion of clinker grinding unit will be Rs. 122
lacs and for proposed CPP will be Rs. 10000 lacs. The total capital cost after proposed
expansion along with installation of proposed CPP will be Rs.60711 lacs.
52
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
SECTION – IX
ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
INDEX
53
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
The state of Bihar will get revenues in terms of taxes, local people will get opportunity in
terms of direct/ indirect employment, business opportunity like transport of Cement to the
market, and fly ash transport from nearby Power Plant, in short nearby people will get
opportunity to improve their livelihood.
The underlying benefits through the proposed project are:
It aims to provide additional employment to the local population of the proposed project
and will provide conveyance facilities to all employees, for daily commuting will be
provided.
Refresher training will be imparted as per the requirement to generate potential
manpower. Workers will be imparted training in use of personal protective equipments.
In addition to this P.P. proposes to construct a Water tank of 500 lit capacities, for
villagers.
The PP also proposes minor physical structures in government schools or health centers
in the villages around the Tehsil, thus contributing to the social benefit. The lessee will
be committed for social upliftment by way of providing drinking water facilities, in school
renovation and further as per requirement.
As per the preliminary site visit, the above activities were identified on the need based
requirement of the study area. Further activities will be analyzed, after the analysis of
the baseline data generation and socio- economic survey; the appropriate sustainable
development will be contributed and projected by the proposed project. The appropriate
amount of CSR is proposed to be Rs. 2% of the last three year’s average annual profits
as capital cost and and 1% of it as recurring cost.
54
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
SECTION – X
CONCLUSION
INDEX
55
Proposed expansion of Clinker Grinding Unit from 3.6 Million TPA to 4.5 Million TPA Cement (OPC, PPC, PSC& SSP) along with installation
of 20 MW Captive Power Plant, at Plot No. NS - 24, NS - 29 & NS - 28 (P), Aurangabad Industrial Growth Centre (BIADA), District:
Aurangabad (Bihar)
Pre-feasibility Report
10.0 CONCLUSION
Proposed project will result in growth of the surrounding areas by increased direct and
indirect employment opportunities in the region including ancillary development and
supporting infrastructure. Special emphasis on Financial and Social benefits will be
given to the local people including tribal population, if any, in the area. Development of
social amenities will be in the form of medical facilities, education to underprivileged and
creation of self-help groups. No adverse effect on environment is envisaged as proper
mitigation measure will be taken up for the same.
**********
56