NO R AT E INC R E A SE 2 0 20 T H RO U G H 20 23:
Drivers for Utility: Drivers for Utility:
• Invest in Source Water • Construct New Cell
Water Improvements Sanitary (2021 and 2023)
Purification • Water Infrastructure Landfill • Improve Facilities to
Maintenance to Coincide with Enhance Customer Service
Major Street Reconstruction and Employee Functionality
2020 2021 2022 2023 2020 2021 2022 2023 2020 2021 2022 2023
Drivers
Waterfor Rate Increase:
Reclamation (Sewer Rates) Drivers for Rate
Storm Increase:
Drainage Fees Drivers for Electric
Rate Increase:
Light
• Expand capacity from • Operation and maintenance of the • Build Second Substation at
21.0 MGD to 30.1 MGD system Intersection of Madison Street
• Invest in existing infrastructure • Improve neighborhood drainage and Harlem Avenue (2019)
• Construct New Office and Shop
Facility for Light and Power and
Traffic (2023)