Академический Документы
Профессиональный Документы
Культура Документы
• PRMS Overview
What is PRMS?
reservoir
Net Project
Reservoir recoverable
resource (production & cash
(in-place volumes)
flow schedules)
Property
(ownership/contract terms)
Mega-project
project project
Source : SERSEN, M. (2008) “EVOLUCIÓN EN LA TÉCNICA DE PRUEBA Y EVALUACIÓN DE POZOS EXPLORATORIOS EN YACIMIENTOS DE CRUDO PESADO”
Development pending:
requires more data or study to confirm commerciality (Raya)
Development on hold:
awaiting removal of constraints- technical, environmental, political, marketing
Development not viable:
no plans to develop or acquire additional data
Recursos
Contingentes
Recursos
Prospectivos
SEC
Securities & Exchange Commission (SEC)
SPE/WPC/AAPG
Society of Petroleum Engineers (SPE)
World Petroleum Congress (WPC)
American Association of Petroleum Geologist (AAPG)
DETERMINISTIC APPROACH
PROBABILISTIC APPROACH
Descubierto Prospectivo
Producción Acumulada
Reservas
Probadas
No desarrolladas
Desarrolladas
CATEGORÍA CERTIDUMBRE
En Producción
1P Alta (90%)
No Producidas
2P Media (50%)
No Probadas
Posibles
SAGARI FIELD
MASHIRA PROSPECT Reservas Probadas No Desarrolladas
Recursos Prospectivos Recursos Contingentes
KINTERONI
PROBADAS DESARROLLADAS
3 development wells (2007-2011)
PROBADAS DESARROLLADAS
1 discovery well (1987)
MAPI PROSPECT 3 development wells (2011-2013)
Recursos Prospectivos
PROBADAS DESARROLLADAS
Cum. Gas production: 1 101 BCF (since 2004)
Cum. condensate production: 32 MBbl
PROBADAS DESARROLLADAS
Cum. Gas production: 544 BCF (since 2008)
Cum. condensate production: 18 MBbl
KINTERONI 1
PROBADAS DESARROLLADAS
Cum. Gas production: 347 BCF (since 2009)
Cum. condensate production: 9 MBbl
18
Ingeniería de Reservorios II MIPAYA Mayo 2017
Normativa SEC: Reservas Probadas
RESERVAS PROBADAS:
• Proved reserves for other undrilled units can be claimed only where
it can be demonstrated with certainty, that there is continuity of
production from the existing productive formation.
Typical Examples
Alternative DCA
The proved reserves were estimated
using exponential decline (gray
projection).
This well has been hydraulically
fractured and produces from a tight
formation.
Require a high degree of
interpretation from the reserves
evaluator.
Typical
Examples
Static Model
Dynamic Model
• Seismic processing
• Drive mechanism & recovery factor
• Rock types and heterogeneities
• Changes in fluid composition
• Spatial distribution & facies Modeling
• Relative permeability behaviour
• Fluid contacts placing & size reservoir
• Faults transmissibility
Portafolio de Proyectos de
Inversión
Main groups of Uncertainties in Estimation of Reserves
Uncertainty in
Calculation of Technical
Recoverable Volumes
1
Gas Re serves ( Bulkvolume ntg )S g ( )(1 shrinkage)(1 plantlosses )( RF )
g
Production
Performance MBE