S camupa ‘Section A: Key Performance Index (KPI)
Nome SYERFAZAL aN MUSTAPHA Sto no:09385,
roster: GAGE WANAGER Grade 55
Corny GAM ENGINEERINGSON BHO one: 4/088
Dept: GSHEDEFE
‘Appraiser, ANDY LEE CHOON FOR. ‘Types of Review: Year-End
sultAreas
Oana openers re
e Tenet Welemace 4) Aebevement ‘oct | weed West
score 0) Score 8)
Score)
[Maintain sytem [Waiaannteratod [ Aasting SRI Raat RKO on
and continuous Management System 25th August 2017 to obtain 0 9001: 2015
improvement fuctty) document and [erations
Jeriestion of 50 2 condutitas Brifng eal GBU project.
fsoor2015, teams
[Maintaining & updating project MS to
20% comply wih 1s0 9001:2038(prepare and | | 70m | sem rom | 14x
(sedating QSHE/NsP/017-Aisk
[Management & improvement procedure)
land alto to meets wth
lienteensutantrequerents (ie. Sia
[ety all project which requvesto
comply with ckert speciatons SMI)
[scppon tener eevee Bubmison of quality Fr asasting tender toamin propane
landsecurngnew ——_|aocumentfor tender to [document tender fr
Jorejeet Jcacdeparmant within Jatin Bonk Project
[he sepulted tie, biPmvinta Projects
fe sea cy mal 2 Projects (secured)
fj puaaya Homes Projects
fel purajaya Plot amo Preaner sPrajects | | go | ag,
[shocistes) weal
[attending tender briefing and
coordinate with CRC Dept in comping
lender dacumente
2 Being one presenter during tender
resentation fr SCM 2 and ain Bank
protect
pit tandare mage [Wantor snd mata fe Pans and conduct qaliy wanna NS
land reputation of |auslay compliance at all [Trsining/Clsse Awareness einng) ‘0
[somudo's csHe Buicing Un and if prieetsopertins sta toincrease thet
[rewship projects [awareness n quality complance
> asssting HO Team during monthy OSH
nepoction to ensure both HQ and Projet
Jeom achive & maintaining the monthiy
Ix iarget (0%) nspecton conducted by
Jsing lasses reference
3 Arsting ana gue ausdance to all ANC
[engineer and Document Contain in
[order to maintain the quality of works ond
Jmainaring the documentation 2
lorcecs ses. 4
[cncovrage projec team to use Qassic
tsle or dy napecton to ensure the
quatty of the fish product ae complying
lth Gass standara (08).
5. aways reviewing project 80 ana
specications to ensure ll submited
Inateral/Method statement has been
compte before submissien to reduce
resubmission cused by noncompliance,
Is. ontoring Concrete design mix
comply with contain req ie GBifeaely
|tengh ete}, Tralmixas wall as Concrete
soy fede test Trend Analy Assisting CRC eas Paral eoe
Dept. cost reduction derived fram
reson of Conerete design mix (eduction
lor Retarder/usage of Sag cement GGBS or
[ra instead of OPC whichis sighty
[creapar etc). A good design ma wilheps
lon the resucing the defece worksS& camupa Section A: Key Performance Index (KP!)
Nome: SYERFAZAL BN WUSTAOWA stn 8386
roster: GAGE MANAGER Gace 3
senOMPANY GANUDR ENGINEERING SONBHD ome: 4/9/2018
Dept SBHE DE
sgpraser,ANGYLEE GHGOR TOW eset even: Yard
ccnmazen eae
lespecay curing pastconcteane,
Inspections.
17. To ensure any NCR gwen has been
eitended in ety manners (closure rte
jwithin 7 ye) anc Root cause Analyse
[conducted and arayse to reducer
foccurence. (Concrete Penetration Tes
to check hveried concrete setting ine
[vga Transformation [Matenalue FlaView Fi To ensure proecticam snare and
system fer Quay lnderstand we appletion tool
secon reisven,
10% [2 Toasestprolect team in preparing mom | om wos | 7
laste Monthy raportby refering Fieldview
reports prepared by Feléview operator.
lasne awareness [imalerentaton of fi. Take martin term of sonporine SWE
preeram and suppor JasHe awareness lanarenessnrogram/ CA prosramne
Jothorashetasks——|prearamie leonducted by HO Teams
program laste@conference, 2. reparation of Br monthly MR See
laste @schoo! andere} land Yeary GBU MR slises/Report,
jn ateaize cou I conductes Monthy Q8aC Meeting
Imanagement Review tow —_|ameng QAc Engineer at MP project eee eee
Inepors iscussing& shaving session of quality
si) plementation of |ssues nse at every GBU projet)
other ask to support
lasHe mplementaton
are performance for
lcamuda
Dasse ensure thatthe] soy ol aa ane
[lease ick the Yolowing aftr your eicaiion
the xPinave been mutually agreed upon
1 Theamendment of Kt have been mutually agreed upon (i ny)
nave had a discussion with ny superior on
blalie
‘nave had a gscussion wth my subordinate
conhisneracneverents
‘Employee Signature] ake “Tapia [Reviewer Sigastare Oatsa ose
ove nessy] semanas
auuos saseaey
hi
wn me ore es) so ten) woutoma | sounaduoy